KR20040053018A - Device for setting up a scaffolding on the block of a hull - Google Patents
Device for setting up a scaffolding on the block of a hull Download PDFInfo
- Publication number
- KR20040053018A KR20040053018A KR1020040038429A KR20040038429A KR20040053018A KR 20040053018 A KR20040053018 A KR 20040053018A KR 1020040038429 A KR1020040038429 A KR 1020040038429A KR 20040038429 A KR20040038429 A KR 20040038429A KR 20040053018 A KR20040053018 A KR 20040053018A
- Authority
- KR
- South Korea
- Prior art keywords
- scaffold
- pin
- hull block
- plate
- support
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/20—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
본 발명은 선체블록작업용 가설발판 설치대에 관한 것으로, 보다 상세하게는 본 출원인에 의해 선출원된 바 있는 가설발판 설치대를 개선하여 가설발판 설치대를 구성하는 발판지지구의 일단부에 고무패드가 부착된 클램핑면이 구비된 쐐기식 클램프를 일체로 형성하므로써, 선체블록내에 설치된 T자형 보강판이나 격판의 수직단부에 신속하고 간편하게 설치 및 해체할 수 있게 되어 가설발판의 설치 및 해체작업에 소요되는 시간과 노력을 대폭 단축시킬 수 있도록 할 뿐 아니라, 도장완료된 선체블록내에서도 도장된 표면을 전혀 손상시키지 않고 용이하게 설치 및 해체할 수 있도록 하는 것이다.The present invention relates to a temporary scaffold mounting stand for hull block work, and more particularly, a clamping surface having a rubber pad attached to one end of the scaffold support constituting the temporary scaffold mounting stand by improving the temporary scaffold mounting stand previously filed by the present applicant. By integrally forming the wedge-type clamp provided, it is possible to quickly and easily install and dismantle the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block, thereby reducing the time and effort required for installation and disassembly of the temporary scaffold. Not only can be significantly shortened, but also to be easily installed and dismantled in the painted hull block without damaging the painted surface at all.
일반적으로 선체블록의 제작시나 대형건물의 시공시 각종 고소작업을 할 경우에는 선체블록이나 건물의 벽면에 작업자가 올라서서 좌우로 통행하며 안전하고 용이하게 작업할 수 있도록 가설발판을 임시로 설치하게 된다.In general, when various kinds of heights work are made in the manufacture of hull blocks or construction of large buildings, temporary scaffolds are temporarily installed to allow workers to climb up and down on the hull block or wall of the building and work safely and easily. .
이를 위하여 본 출원인은 이러한 가설발판을 설치하기 위한 가설발판 설치대를 이미 선출원(실용신안 등록번호 제0314570호)한 바 있다.To this end, the present applicant has already filed an application (utility model registration No. 0314570) for installing a temporary scaffold mounting platform for installing such a temporary scaffold.
본 출원인에 의해 선출원된 가설발판 설치대는 도 1에 도시되어 있는 바와같이 일단부에 걸림부(3a)가 구비된 끼움관(3)이 설치되며 타단부에 체결공(4a)이 관통된 결합편(4)이 설치되어 있는 발판지지구(2)와, 상단과 중앙에 잠금핀(7)이 구비된 가드레일걸이부(6)가 설치되며 하단에 상기 발판지지구(2)의 끼움관(3)에 삽입되는 끼움부(8)가 설치되고, 상기 끼움부(8)의 상단에는 발판지지구(2)의 끼움관(3)에 구비된 걸림부(3a)의 외측에 삽입되어 상하부를 관통하는 잠금핀(10)에 의해 결합되는 ㄷ자형상으로 된 안전걸이부(9)가 설치되어 있는 가드레일지지구(5)로 구성되어 있다.As shown in FIG. 1, the temporary scaffold mounting stand pre- filed by the present applicant is provided with a fitting pipe 3 provided with a locking portion 3a at one end thereof, and a coupling piece having a fastening hole 4a penetrated at the other end thereof. (4) is provided with a scaffold support (2), and the guard rail hook portion (6) is provided with a locking pin (7) at the top and the center and the fitting pipe of the scaffold support (2) at the bottom ( 3) is inserted into the fitting portion 8, the upper end of the fitting portion 8 is inserted into the outer side of the locking portion (3a) provided in the fitting pipe (3) of the footrest support (2) It consists of a guardrail support (5) which is provided with a U-shaped safety hook portion (9) coupled by a locking pin (10) penetrating.
그러나, 상기와 같은 본 출원인에 의해 선출원된 가설발판 설치대는 선체블록에 설치시 도 2에 도시되어 있는 바와 같이 선체블록내의 벽면에 가설발판 설치대(1)의 발판지지구(2)를 고정시키기 위한 설치구(20)를 일정간격으로 용접하거나 체결공을 형성하여 볼트로써 고정설치한 후 일정간격으로 고정설치된 설치구(20)에 발판지지구(2)의 일단부에 형성된 결합편(4)을 밀착시켜 볼트와 너트로써 체결고정시켜야 하므로, 설치 및 해체작업이 대단히 번거로울 뿐 아니라 설치 및 해체작업에도 많은 시간과 노력이 소요되는 문제점이 있었다.However, the temporary scaffolding mounting platform previously filed by the present applicant as described above is used to fix the scaffold support 2 of the temporary scaffolding mounting table 1 to the wall surface in the hull block as shown in FIG. 2 when installed in the hull block. After welding the installation tool 20 at a predetermined interval or forming a fastening hole to fix it with bolts, the coupling piece 4 formed at one end of the scaffold support 2 is installed in the installation tool 20 fixed at a predetermined interval. In order to close and fasten with bolts and nuts, the installation and dismantling work is very cumbersome, as well as the installation and dismantling work takes a lot of time and effort.
또한, 본 출원인에 의해 선출원된 가설발판 설치대는 도장작업이 완료된 선체블록에 설치될 경우 가설발판 설치대(1)의 발판지지구(2)를 고정시키기 위하여 선체블록의 벽면에 일정간격으로 형성되어야 하는 설치구(20)의 설치로 인하여 선체블록의 도장된 표면에 흠집이나 손상을 발생시키게 되므로, 가설발판 설치대 및 설치구를 해체한 후 손상된 선체블록의 표면에 대한 재도장작업을 실시해야 하는 문제점이 있었다.In addition, the temporary scaffold mounting bracket pre- filed by the applicant should be formed at a predetermined interval on the wall surface of the hull block to fix the scaffold support (2) of the temporary scaffold mounting bracket (1) when installed on the hull block is completed painting work Due to the installation of the mounting fixture 20, scratches or damages are caused to the painted surface of the hull block, so that the problem of having to repaint the surface of the damaged hull block after dismantling the temporary scaffolding mount and the mounting fixture is there was.
본 발명은 상기의 문제점을 해결하기 위하여 안출된 것으로서, 본 출원인에 의해 선출원된 바 있는 가설발판 설치대를 개선하여 가설발판 설치대를 구성하는 발판지지구의 일단부에 고무패드가 부착된 클램핑면이 구비된 쐐기식 클램프를 일체로 형성하므로써, 선체블록내에 설치된 T자형 보강판이나 격판의 수직단부에 신속하고 간편하게 설치 및 해체할 수 있게 되어 가설발판의 설치 및 해체작업에 소요되는 시간과 노력을 대폭 단축시킬 수 있도록 할 뿐 아니라, 도장완료된 선체블록내에서도 도장된 표면을 전혀 손상시키지 않고 용이하게 설치 및 해체할 수 있도록 하는 것을 기술적 과제로 한다.The present invention has been made to solve the above problems, it is provided with a clamping surface with a rubber pad attached to one end of the scaffolding support constituting the temporary scaffolding mounting platform to improve the temporary scaffold mounting bar that was previously filed by the applicant By integrally forming the wedge clamp, it can be quickly and easily installed and dismantled on the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block, greatly reducing the time and effort required for installation and dismantling of the temporary scaffold. In addition, the technical task is to allow easy installation and dismantling of the painted surface without damaging the painted surface even in the painted hull block.
상기의 기술적 과제를 해결하기 위하여 본 발명은 일단부에 걸림부가 구비된 끼움관이 설치되어 있는 발판지지구와, 상단과 중앙에 잠금핀이 구비된 가드레일걸이부가 설치되며 하단에 상기 발판지지구의 끼움관에 삽입되는 끼움부가 설치되고, 상기 끼움부의 상단에는 발판지지구의 끼움관에 구비된 걸림부의 외측에 삽입되어 상하부를 관통하는 잠금핀에 의해 결합되는 ㄷ자형상으로 된 안전걸이부가 설치되어 있는 가드레일지지구로 이루어진 것에 있어서, 상기 발판지지구의 타단부에는 후크형상으로 만곡형성된 클램프본체가 일체로 형성되고, 상기 클램프본체의 내측전후면에는 핀삽입공이 관통형성된 경사판과 고무패드가 부착된 수직판이 각각 고정설치되고, 상기 경사판과 수직판사이에는 외측면에 경사판의 핀삽입공에 삽입되는 가이드핀이 고정설치되며 내측면에 고무패드가 부착된 클램핑판이 전후방으로 이동가능하게 삽입설치되고, 상기 경사판과 클램핑판사이에는 한쌍으로 된 쐐기핀의 상하단부가 연결되어 일체로 형성된 이중쐐기핀이 삽입설치되도록 구성되는 것을 특징으로 한다.In order to solve the above technical problem, the present invention is provided with a scaffolding support provided with a fitting pipe having a locking portion at one end, and a guardrail hook portion having a locking pin at the top and a center thereof, and fitting of the scaffolding support at the bottom thereof. A guard rail inserted into the pipe is installed, and a guard rail provided with a U-shaped safety hook inserted into the outer side of the locking part provided in the fitting pipe of the scaffold support and coupled by a locking pin penetrating the upper and lower parts is installed. In the support member, the other end of the scaffold support is integrally formed with a clamp body curved in the shape of a hook, and the inclined plate and the vertical plate with a rubber pad are fixed to the inner front and rear surfaces of the clamp body, respectively. It is installed, the guide inserted into the pin insertion hole of the inclined plate between the inclined plate and the vertical plate on the outer surface A pin is fixedly installed and a clamping plate with a rubber pad attached to the inner side is inserted to be moved forward and backward. A double wedge pin is integrally formed between the inclined plate and the clamping plate by connecting the upper and lower ends of a pair of wedge pins. Characterized in that configured to.
도 1은 본 출원인에 의해 선출원된 가설발판 설치대를 나타내는 분해사시도.Figure 1 is an exploded perspective view showing a temporary scaffolding mounting table pre- filed by the applicant.
도 2는 본 출원인에 의해 선출원된 가설발판 설치대의 사용상태를 나타내는 사시도.Figure 2 is a perspective view showing a state of use of the provisional scaffolding mounting stage pre- filed by the applicant.
도 3은 본 발명에 의한 선체블록작업용 가설발판 설치대를 나타내는 분해사시도.Figure 3 is an exploded perspective view showing a temporary scaffold mounting stand for hull block work according to the present invention.
도 4의 (가)(나)는 본 발명에 의한 선체블록작업용 가설발판 설치대의 클램핑과정을 나타내는 측단면도.Figure 4 (a) (b) is a side cross-sectional view showing the clamping process of the temporary scaffold mounting for hull block work according to the present invention.
도 5는 본 발명에 의한 선체블록작업용 가설발판 설치대의 사용상태를 나타내는 측단면도.Figure 5 is a side cross-sectional view showing a state of use of the temporary scaffold mounting base for hull block work according to the present invention.
〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
1 : 가설발판 설치대 2 : 발판지지구 3 : 끼움관DESCRIPTION OF SYMBOLS 1 Temporary scaffold mounting base 2 Scaffold support 3 Fitting pipe
3a : 걸림부 4 : 결합편 4a : 체결공3a: engaging portion 4: coupling piece 4a: fastening hole
5 : 가드레일지지구 6 : 가드레일걸이부 7 : 잠금핀5: Guard rail support 6: Guard rail hanger 7: Locking pin
8 : 끼움부 9 : 안전걸이부 9a : 핀결합공8: fitting part 9: safety hook part 9a: pin coupling hole
10 : 잠금핀 11 : 클램프본체 12 : 경사판10 locking pin 11 clamp body 12 inclined plate
12a : 핀삽입공 13 : 수직판 13a : 고무패드12a: pin insertion hole 13: vertical plate 13a: rubber pad
14 : 클램핑판 14a : 가이드핀 14b : 고무패드14: clamping plate 14a: guide pin 14b: rubber pad
15 : 이중쐐기핀15: double wedge pin
이하, 상기의 목적을 달성하기 위하여 본 발명은 도 3 내지 도 5를 참고하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to FIGS. 3 to 5 to achieve the above object.
도 3은 본 발명에 의한 선체블록작업용 가설발판 설치대를 나타내는 분해사시도이며, 도 4의 (가)(나)는 본 발명에 의한 선체블록작업용 가설발판 설치대의 클램핑과정을 나타내는 측단면도이고, 도 5는 본 발명에 의한 선체블록작업용 가설발판 설치대의 사용상태를 나타내는 측단면도이다.Figure 3 is an exploded perspective view showing a temporary scaffold mounting platform for hull block work according to the present invention, Figure 4 (a) (b) is a side cross-sectional view showing a clamping process of the temporary scaffold mounting platform for hull block work according to the present invention, Figure 5 Is a side cross-sectional view showing a state of use of the temporary scaffolding mounting for hull block work according to the present invention.
도 3에 도시되어 있는 바와 같이 본 발명에 의한 선체블록작업용 가설발판 설치대의 구성에 있어서, 일단부에 걸림부(3a)가 구비된 끼움관(3)이 설치되어 있는 발판지지구(2)와, 상단과 중앙에 잠금핀(7)이 구비된 가드레일걸이부(6)가 설치되며 하단에 상기 발판지지구(2)의 끼움관(3)에 삽입되는 끼움부(8)가 설치되고, 상기 끼움부(8)의 상단에는 발판지지구(2)의 끼움관(3)에 구비된 걸림부(3a)의 외측에 삽입되어 상하부를 관통하는 잠금핀(10)에 의해 결합되는 ㄷ자형상으로 된 안전걸이부(9)가 설치되어 있는 가드레일지지구(5)로 이루어지는 구성은 본 출원인에 의해 선출원된 가설발판 설치대의 구성과 동일한 것이다.As shown in Fig. 3, in the construction of the temporary scaffolding mounting table for hull block work according to the present invention, the scaffolding support 2 having the fitting pipe 3 provided with the locking portion 3a at one end thereof is provided. A guard rail hook 6 having a locking pin 7 is installed at the top and the center thereof, and a fitting 8 inserted into the fitting tube 3 of the scaffold support 2 is installed at the bottom thereof. At the upper end of the fitting portion 8 is inserted into the outer side of the locking portion (3a) provided in the fitting pipe (3) of the scaffold support (2) in the c-shape is coupled by the locking pin 10 penetrating the upper and lower portions The structure consisting of the guard rail support 5 with which the safety hook part 9 was provided is the same as the structure of the provisional scaffold installation stand previously filed by this applicant.
따라서, 본 발명에 의한 선체블록작업용 가설발판 설치대는 상기 발판지지구(2)의 타단부에 후크형상으로 만곡형성된 클램프본체(11)가 일체로 형성되고, 상기 클램프본체(11)의 내측전후면에는 핀삽입공(12a)이 관통형성된 경사판(12)과 고무패드(13a)가 부착된 수직판(13)이 각각 고정설치되고, 상기 경사판(12)과 수직판(13)사이에는 외측면에 경사판(12)의 핀삽입공(12a)에 삽입되는 가이드핀(14a)이 고정설치되며 내측면에 고무패드(14b)가 부착된 클램핑판(14)이 전후방으로 이동가능하게 삽입설치되고, 상기 경사판(12)과 클램핑판(14)사이에는 한쌍으로 된 쐐기핀의 상하단부가 연결되어 일체로 형성된 이중쐐기핀(15)이 삽입설치되도록 구성되는 것을 특징으로 한다.Therefore, the temporary scaffold mounting stand for hull block work according to the present invention is integrally formed with the clamp main body 11 which is formed in a hook shape at the other end of the scaffold support 2, and the inner and rear surfaces of the clamp main body 11 are integrated. The inclined plate 12 through which the pin insertion hole 12a is formed and the vertical plate 13 to which the rubber pad 13a is attached are fixed, respectively, and between the inclined plate 12 and the vertical plate 13 on the outer surface. The guide pin 14a inserted into the pin insertion hole 12a of the inclined plate 12 is fixedly installed, and the clamping plate 14 having the rubber pad 14b attached to the inner side thereof is inserted and installed to be moved forward and backward. The upper and lower ends of the pair of wedge pins are connected between the inclined plate 12 and the clamping plate 14 so that the double wedge pins 15 integrally formed are inserted and installed.
상기와 같이 구성되는 본 발명에 의한 선체블록작업용 가설발판 설치대의 설치 및 작용관계를 특징부의 구성을 중심으로 설명하면 다음과 같다.Referring to the installation and working relationship of the temporary scaffold installation stand for the hull block work according to the present invention configured as described above with reference to the configuration of the features.
본 발명에 의한 가설발판 설치대를 선체블록에 설치하기 위해서는 도 4의 (가)에 도시되어 있는 바와 같이, 가설발판 설치대(1)를 구성하는 발판지지구(2)의 일단부에 일체로 형성된 후크형상의 클램프본체(11)의 내측에 구비된 이중쐐기핀(15)을 상승시킨 후 클램핑판(14)의 전면에 설치된 가이드핀(14a)이 경사판(12)의 핀삽입공(12a)을 따라 안내되도록 하여 클램핑판(14)을 전방으로 이동시키므로써, 클램핑판(14)과 수직판(13)사이에 선체블록(23)에 설치된 T자형 보강판이나 격판의 수직단부가 용이하게 삽입될 공간을 형성하게 된다.In order to install the temporary scaffold mounting stand according to the present invention to the hull block, as shown in Fig. 4 (a), the hook integrally formed at one end of the scaffold support (2) constituting the temporary scaffold mounting stand (1) After raising the double wedge pin 15 provided inside the clamp body 11 of the shape, the guide pin 14a installed on the front surface of the clamping plate 14 is along the pin insertion hole 12a of the inclined plate 12. By moving the clamping plate 14 forward to guide the space, the vertical end of the T-shaped reinforcement plate or diaphragm provided on the hull block 23 between the clamping plate 14 and the vertical plate 13 is easily inserted. Will form.
이와 같이 상기 발판지지구(2)의 일단부에 일체로 형성된 후크형상의 클램프본체(11)의 내측에 구비된 이중쐐기핀(15)을 들어올린 후 클램핑판(14)을 전방으로 이동시킴에 따라 클램핑판(14)과 수직판(13)사이에 형성된 공간에 선체블록(23)에 설치된 T자형 보강판이나 격판의 수직단부를 삽입시키게 된다.As such, after lifting up the double wedge pin 15 provided inside the hook-shaped clamp body 11 integrally formed at one end of the scaffold support 2, the clamping plate 14 is moved forward. Accordingly, the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block 23 is inserted into the space formed between the clamping plate 14 and the vertical plate 13.
그리고, 클램핑판(14)과 수직판(13)사이에 선체블록(23)에 설치된 T자형 보강판이나 격판의 수직단부가 삽입된 상태에서 도 4의 (나)에 도시되어 있는 바와 같이 이중쐐기핀(15)을 상단을 하향타격하여 이중쐐기핀(15)이 클램프본체(11)의 내측전면에 고정설치된 경사판(12)과 클램핑판(14)사이에 이중쐐기핀(15)을 견고하게 삽입시키게 되면, 이중쐐기핀(15)이 삽입됨에 따라 클램핑판(14)이 후방으로 이동하게 되면서 선체블록(23)에 설치된 T자형 보강판이나 격판의 수직단부의 양측면에 클램핑판(14)과 수직판(13)이 밀착되므로써 견고한 클램핑상태를 유지할 수 있게 된다.Then, the double wedge as shown in (b) of Figure 4 with the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block 23 between the clamping plate 14 and the vertical plate 13 is inserted. The double wedge pin 15 is firmly inserted between the inclined plate 12 and the clamping plate 14 in which the double wedge pin 15 is fixed to the inner front surface of the clamp body 11 by hitting the pin 15 downwardly. In this case, as the double wedge pin 15 is inserted, the clamping plate 14 is moved backwards, and the clamping plate 14 and the male on both sides of the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block 23. Since the direct plate 13 is in close contact, it is possible to maintain a firm clamping state.
이 때, 선체블록(23)의 T자형 보강판이나 격판의 수직단부측면에 밀착되는 상기 클램핑판(14)의 후면과 수직판(13)의 전면에는 각각 고무패드(14b)(13a)가 부착되어 있으므로, 도장완료된 선체블록(23)의 T자형 보강판이나 격판의 수직단부에 클램핑시 선체블록(23)의 T자형 보강판이나 격판의 도장표면에 흠집이 생기지 않도록 보호하게 된다.At this time, rubber pads 14b and 13a are attached to the rear surface of the clamping plate 14 and the front surface of the vertical plate 13 which are in close contact with the T-shaped reinforcement plate or the vertical end side surface of the diaphragm 23 of the hull block 23. Therefore, when clamping the vertical end of the T-shaped reinforcement plate or the diaphragm of the hull block 23 is completed to protect the paint surface of the T-shaped reinforcement plate or diaphragm of the hull block 23 from being scratched.
상기와 같은 방식으로 선체블록(23)에 설치된 T자형 보강판이나 격판의 수직단부에 가설발판 설치대(1)의 발판지지구(2)를 일정간격으로 클램핑시켜 설치한 상태에서 발판지지구(2)의 상단에 가설발판(21)을 걸쳐 결속용 철사 등으로 고정시킨 후, 발판지지구(2)의 끝단부에 형성된 끼움관(3)에 가드레일지지구(5)를 결합한 다음 가드레일지지구(5)에 구비된 가드레일걸이부(6)에 가드레일(22)을 삽입하여 잠금핀(7)으로 견고하게 고정시키게 되면 도 5에 도시되어 있는 바와 같이 선체블록작업용 가설발판의 설치작업이 완료되는 것이다.Scaffolding support (2) in the state that is installed by clamping the scaffolding support (2) of the temporary scaffolding mounting stand (1) at a predetermined interval in the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block (23) in the same manner as described above After fixing the temporary scaffold (21) over the top of the) with a binding wire, etc., the guardrail support (5) is coupled to the fitting pipe (3) formed at the end of the scaffold support (2) and then the guardrail paper When the guard rail 22 is inserted into the guard rail hanger 6 provided in the earth 5 to be firmly fixed with the locking pin 7, the installation work of the temporary scaffold for hull block work is shown in FIG. This is done.
이와 같이 선체블록작업이 완료된 후 가설발판을 해체할 경우에는 상기 설치순서의 역순으로 해체하게 되는데, 선체블록(23)에 설치된 가설발판 설치대(2)를 해체할 경우 발판지지구(2)를 클램핑하고 있는 클램프본체(11)에 삽입된 이중쐐기핀(15)의 하단부를 상향타격하여 탈거시킴으로써 용이하게 해체할 수 있게 된다.When the temporary scaffold is dismantled after completion of the hull block work as described above, the disassembly is performed in the reverse order of the installation procedure. When disassembling the temporary scaffold mounting table 2 installed on the hull block 23, the clamping of the scaffold support 2 is performed. The lower end of the double wedge pin 15 inserted into the clamp body 11 is hit up and detached so that it can be easily dismantled.
이 때, 상기 이중쐐기핀(15)은 한쌍으로 된 쐐기핀의 상하단부가 연결되어 일체로 형성되도록 구성되어 탈거 후에도 후크형상으로 만곡형성된 클램프본체(11)에 항상 걸려 있게 되므로, 설치 및 해체작업과정에서 분실될 우려가 전혀 없을 뿐 아니라 작업시마다 이중쐐기핀의 유무를 별도로 점검할 필요없이 항상 발판지지구(2)와 함께 운반할 수 있게 되므로 취급이 용이하게 된다.At this time, the double wedge pin 15 is configured so that the upper and lower ends of a pair of wedge pins are integrally formed so that the double wedge pin 15 always hangs on the clamp body 11 that is curved in a hook shape even after removal, and thus the installation and dismantling process In addition, there is no fear of loss at all, and since it is possible to always carry with the scaffold support (2) without having to check the presence or absence of the double wedge every time it is easy to handle.
상기한 바와 같이 본 발명에 의한 선체블록작업용 가설발판 설치대는 선체블록의 표면을 손상시키게 되는 설치구를 선체블록내에 설치할 필요없이 선체블록내에 기존에 설치되어 있는 T자형 보강판이나 격판의 수직단부에 신속하고 간편하게 클램핑되므로 설치 및 해체가 대단히 용이해질 뿐 아니라 도장완료된 선체블록내에 설치된 T자형 보강판이나 격판의 수직단부에도 도장된 표면을 전혀 손상시키지 않고 용이하게 설치 및 해체할 수 있게 되는 것이다.As described above, the temporary scaffolding mounting stand for hull block work according to the present invention is provided on the vertical end of the T-shaped reinforcement plate or diaphragm that is previously installed in the hull block without the need to install an installation tool that damages the surface of the hull block. Fast and easy clamping not only makes installation and dismantling very easy, but also enables easy installation and dismantling of the painted surface on the vertical end of the T-shaped reinforcement plate or diaphragm installed in the finished hull block.
상기와 같이 본 발명에 의한 선체블록작업용 가설발판 설치대는 본 출원인에 의해 선출원된 바 있는 가설발판 설치대를 개선하여 가설발판 설치대를 구성하는 발판지지구의 일단부에 고무패드가 부착된 클램핑면이 구비된 쐐기식 클램프를 일체로 형성하므로써, 선체블록내에 설치된 T자형 보강판이나 격판의 수직단부에 신속하고 간편하게 설치 및 해체할 수 있게 되어 가설발판의 설치 및 해체작업에 소요되는 시간과 노력을 대폭 단축시킬 수 있도록 할 뿐 아니라, 도장완료된 선체블록내에서도 도장된 표면을 전혀 손상시키지 않고 용이하게 설치 및 해체할 수 있도록 하는 효과가 있는 것이다.As described above, the temporary scaffold mounting stand for the hull block work according to the present invention is provided with a clamping surface having a rubber pad attached to one end of the scaffold support constituting the temporary scaffold mounting stand by improving the temporary scaffold mounting stand that has been previously filed by the present applicant. By integrally forming the wedge clamp, it can be quickly and easily installed and dismantled on the vertical end of the T-shaped reinforcement plate or diaphragm installed in the hull block, greatly reducing the time and effort required for installation and dismantling of the temporary scaffold. In addition to making it possible, there is an effect that can be easily installed and dismantled in the painted hull block without damaging the painted surface at all.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040038429A KR100598028B1 (en) | 2004-05-28 | 2004-05-28 | Device for setting up a scaffolding on the block of a hull |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040038429A KR100598028B1 (en) | 2004-05-28 | 2004-05-28 | Device for setting up a scaffolding on the block of a hull |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040053018A true KR20040053018A (en) | 2004-06-23 |
KR100598028B1 KR100598028B1 (en) | 2006-07-06 |
Family
ID=37346570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040038429A KR100598028B1 (en) | 2004-05-28 | 2004-05-28 | Device for setting up a scaffolding on the block of a hull |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100598028B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612330A (en) * | 2018-06-25 | 2018-10-02 | 宁波建工工程集团有限公司 | The safe rope support of steel structure high-altitude operation and its construction method of installation |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101105895B1 (en) * | 2009-05-27 | 2012-01-17 | 김종헌 | scaffold wedge hook |
-
2004
- 2004-05-28 KR KR1020040038429A patent/KR100598028B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612330A (en) * | 2018-06-25 | 2018-10-02 | 宁波建工工程集团有限公司 | The safe rope support of steel structure high-altitude operation and its construction method of installation |
CN108612330B (en) * | 2018-06-25 | 2023-11-28 | 宁波建工工程集团有限公司 | Steel structure safety rope bracket for high-altitude operation and installation and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR100598028B1 (en) | 2006-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20080202064A1 (en) | Bracket and method for supoprting a platform from concrete form tabs | |
US20100025151A1 (en) | Integral safety system which can be used for construction | |
KR101608472B1 (en) | Production and on-site installation easy construction safety scaffold | |
KR100598028B1 (en) | Device for setting up a scaffolding on the block of a hull | |
KR200381397Y1 (en) | Foot plate safety guardrail device of mold | |
CN211080987U (en) | High-rise building external scaffolding fixed knot constructs | |
KR20160142928A (en) | Built-up scaffold for construction field) | |
JP5156216B2 (en) | Scaffolding board | |
KR101571542B1 (en) | Production and on-site installation easy construction safety scaffold | |
KR200205940Y1 (en) | Supporter for form construction | |
JP2000303682A (en) | Suspended scaffold and its constructing method | |
KR200410232Y1 (en) | Guide Rail Fixing Apparatus of Sliding Foam | |
JP4001285B2 (en) | Detached house scaffolding | |
KR20000024129A (en) | High rise building exterior workbench | |
JP3439196B2 (en) | Hanging scaffold | |
KR100924522B1 (en) | Hull block edge clamp | |
KR101103293B1 (en) | Falling thing prevention apparatus for gang form | |
KR200368604Y1 (en) | A tool for fixing the bedplate | |
AU2008207593B2 (en) | A clamp assembly | |
KR100828161B1 (en) | Clamp for a scaffold pipe | |
CN212507261U (en) | Scaffold for building construction | |
CN218714920U (en) | Scaffold convenient to equipment | |
CN215760610U (en) | Elevator well head protective structure convenient to dismouting | |
CN210316463U (en) | Climbing hanger and connecting system thereof with guide rail | |
KR100767633B1 (en) | Utility pole for distributing in various direction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110418 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |