KR20040043770A - a retaining panel and manufacturing process - Google Patents
a retaining panel and manufacturing process Download PDFInfo
- Publication number
- KR20040043770A KR20040043770A KR1020020072158A KR20020072158A KR20040043770A KR 20040043770 A KR20040043770 A KR 20040043770A KR 1020020072158 A KR1020020072158 A KR 1020020072158A KR 20020072158 A KR20020072158 A KR 20020072158A KR 20040043770 A KR20040043770 A KR 20040043770A
- Authority
- KR
- South Korea
- Prior art keywords
- earth plate
- iron
- plate
- earthenware
- earth
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/40—Miscellaneous comprising stabilising elements
Abstract
Description
본 발명은 지하철공사 현장이나 건축공사의 지하터파기시 굴토구간의 흙벽이 무너지는 것을 방지하기 위하여 설치되는 흙막이용 조절식 철제토류판의 설치구조에 관한 것이다.The present invention relates to an installation structure of an adjustable iron earthen board for a mudstone which is installed to prevent the soil wall of the pit pit from collapsing during the underground site digging of the subway construction site or construction work.
일반적으로 지하철공사나 건축공사의 지하터파기 공사시에 흙을 파낸 뒤 주위의 지반 및 토사가 붕괴되는 것을 방지하기 위하여 흙막이 공사를 하게 되는 바, 흙막이 공사를 설치하는 흙막이 벽의 구조는 기둥으로 사용되는 H-Beam을 일정간격으로 바닥에 세운 후, H-Beam과 H-Beam 사이에 사각 목재판을 적층하여 토류벽을 구성하고, H-Beam과 적층된 목재판을 고정하기 위하여 각재와 겨울목(쐐기)를 끼우고 상하의 토류판에 못질을 한 후, 철선으로 고정하는 등의 작업으로 인하여 작업시간 및 인력이 많이 소용되었다.In general, the earthquake construction is performed to prevent the collapse of the surrounding ground and earth and earth after digging soil during underground construction of underground construction or construction work. The structure of the wall for installing the earthquake construction is used as a pillar. After the H-Beam is placed on the floor at regular intervals, a square wood board is laminated between H-Beam and H-Beam to form the earth wall, and the wood and winter wood ( Working time and manpower were much used due to the work such as inserting a wedge) and nailing the upper and lower earth plate, and fixing it with an iron wire.
특히 H-Beam의 경우는 이를 수직으로 똑바로 박기가 어려워 설치후의 H-Beam과 H-Beam사이의 간격이 일정할 수가 없는 것이다. 따라서 상기 H-Beam과 H-Beam사이에 목재판을 끼워넣기 위하여는 H-Beam사이의 간격을 하나하나 측정하고 그 간격에 맞게끔 목재판을 톱으로 자르는등 목재판 끼움에 어려움이 많았던 것이다. 또한 공사가 끝난 후 토압의 하중으로 말미암아 목재판의 해체가 불가능하여 상기 목재판은 한번 사용으로 그 수명이 끝나므로 단가면에서 비경제적인 단점이 있었다. 더욱이 공사가 끝난후 H-Beam만 뽑아내다보니 그 뽑는 와중에 목재판은 엉켜지게 되고, 이로 말미암아 흙메움시에 빈공간부가 생겨 부실공사가 우려되는 것이며, 또한 매립된채로 오랜 세월이 지나게 되면 목재판이 부식되어지고, 이로 인하여 지반의 침하가 발생할 우려가 있어 상당한 문제점이 발생되고 있는 것이다.In particular, in the case of H-Beam, it is difficult to vertically straighten it, so the distance between H-Beam and H-Beam after installation cannot be constant. Therefore, in order to insert the wooden board between the H-Beam and H-Beam, it was difficult to fit the wood board, such as measuring the distance between the H-Beam one by one and cutting the wood board with a saw to fit the gap. In addition, it is impossible to dismantle the wooden board due to the load of earth pressure after the construction is completed, the wooden board has a disadvantage in terms of unit cost because the end of its life. Moreover, when the H-Beam is pulled out after the completion of the construction, the wooden boards are entangled in the middle of the extraction, which causes vacant spaces at the time of filling up the soil, which is a cause of concern. It is corroded, which may cause ground subsidence, which causes considerable problems.
본 발명의 철제토류판 및 그 설치공법은 이러한 단점을 해결하고자 발명된 것으로, 본 발명의 철제토류판은 두개의 토류판으로 구성하고 상기 두개의 토류판이 서로 끼워지도록 함으로서 토류판의 전체길이가 조절되도록 한 것으로, H-Beam과 H-Beam 사이의 간격이 일정하지 아니할지라도 손쉽게 토류판을 끼워 넣을 수 있도록 하여 작업이 아주 간편하고 편리하게 되어 작업시간 및 인력을 상당히 감축할 수 있게 한 것이다.The iron earth plate and the installation method of the present invention was invented to solve these shortcomings, the iron earth plate of the present invention is composed of two earth plate and the two earth plate is to be fitted to each other to adjust the overall length of the earth plate, Even if the distance between H-Beam and H-Beam is not constant, the earth plate can be inserted easily, making the work very simple and convenient, which can significantly reduce work time and manpower.
또한 공사가 끝난 후에도 토류판의 해체가 용이하여 재사용이 가능한 것이며, 또한 종래 목재판처럼 땅속에 매립시키지 아니함으로 인하여 부실공사를 방지할 수 있어 안전방호벽 시설공사를 행할 수가 있는 것이다.In addition, it is easy to dismantle the earth plate even after the construction is finished, and because it is not buried in the ground like conventional wood boards, it is possible to prevent inadequate work and to perform safety barrier facility construction.
도1은 본 발명의 철제토류판의 정면 사시도.1 is a front perspective view of the iron earth plate of the present invention.
도2는 본 발명의 철제토류판의 배면 사시도.Figure 2 is a rear perspective view of the iron earth plate of the present invention.
도3은 본 발명에 있어 내측 철제토류판의 사시도.Figure 3 is a perspective view of the inner iron earth plate in the present invention.
도4는 본 발명에 있어 외측 철제토류판의 사시도.Figure 4 is a perspective view of the outer steel earth plate in the present invention.
도5는 본 발명의 철제토류판의 분해 사시도.5 is an exploded perspective view of the iron earth plate of the present invention.
도6은 본 발명의 배면 분해 사시도.Figure 6 is a rear exploded perspective view of the present invention.
도7은 본 발명에 있어 내측 철제토류판의 개략 단면도.Figure 7 is a schematic cross-sectional view of the inner iron earth plate in the present invention.
도8은 본 발명에 있어 외측 철제토류판의 개략단면도.Figure 8 is a schematic cross-sectional view of the outer steel earth plate in the present invention.
도9는 본 발명에 있어 내.외측 철제토류판이 끼워진 상태의 개략단면도.Figure 9 is a schematic cross-sectional view of the inner and outer steel earth plate is fitted in the present invention.
도10은 본 발명의 또 다른 실시예 철제토류판의 사시도.10 is a perspective view of another embodiment of the iron earth plate of the present invention.
도11은 본 발명의 또 다른 실시예 철제토류판의 사시도.Figure 11 is a perspective view of another embodiment of the iron earth plate of the present invention.
도12는 본 발명의 또 다른 실시예 철제토류판의 사시도.12 is a perspective view of an iron earth plate according to another embodiment of the present invention.
도13은 본 발명의 사용상태도.Figure 13 is a use state of the present invention.
도14는 본 발명의 사용상태도.14 is a state diagram used in the present invention.
도15는 본 발명의 사용상태도.Figure 15 is a use state of the present invention.
도16는 본 발명의 사용상태도.Figure 16 is a use state of the present invention.
도17은 종래 고정식 철제토류판의 사시도.17 is a perspective view of a conventional fixed iron earth plate.
본 발명의 철제토류판은 일정간격으로 바닥에 H-Beam을 세우고, H-Beam과 H-Beam 사이에 철제토류판을 끼워넣어 흙막이 벽을 구성하는 철제토류판에 있어서, 철판표면을 굴곡지게 형성하고 그 양측에 지지판(4)을 부착하되, 철제토류판의 중간부분을 두개의 철제토류판(2)(3)으로 분리하고, 내측토류판(2)이 외측토류판(3)에 끼워지도록 하여 토류판의 전체적인 길이가 조절되도록 한 철제토류판(1)인 것이다.In the iron earth plate of the present invention, the H-Beam stands on the floor at regular intervals, and the iron earth plate is formed between the H-Beam and the H-Beam to form an earthen wall, and the iron plate surface is formed to be bent and both sides thereof. Attach the support plate (4) to, but separate the middle part of the iron earth plate into two iron earth plate (2) (3), the inner earth plate (2) is fitted to the outer earth plate (3) to adjust the overall length of the earth plate It would be iron earth plate (1).
상기에 있어 외측 철제토류판(3)의 상하부에는 안내턱(5)을 형성토록 하여 내측토류판(2)이 앞으로 빠져나오는 것을 방지하도록 하였다.In the above, the upper and lower portions of the outer steel earth plate 3 are formed to guide guides 5 so as to prevent the inner earth plate 2 from escaping forward.
또한 외측의 토류판 후면에는 보강띠(6)를 부착하여 설치시보다 지지력을 향상시키토록 하였고, 내측의 토류판 후면에는 손잡이(7)를 설치하여 해체나 좁히는 작업을 쉽게 하였으며, 너무 많이 빠지는 것을 방지하여 허용응력내에서 설치할 수 있도록 하였다.In addition, by attaching a reinforcing band (6) to the rear of the earth plate outside to improve the bearing capacity than when installed, the rear of the earth plate to install a handle (7) to facilitate the disassembly or narrowing work, to prevent falling too much It can be installed within the allowable stress.
이하 공법을 중심으로 본 발명을 보다 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the following method.
먼저 토류판을 H-Beam에 설치하는 일반적인 공법을 간단히 설명하면, H-Beam을 일정간격으로 항타하는 1단계, 일정 깊이로 땅을 파면서 H-Beam사이에 토류판을 설치하는 2단계, 설치된 토류판과 절토면 사이의 공간을 뒷채움하는 3단계, 구조물의 기초벽 콘크리트 타설 및 생성 과정인 4단계, 기초공사 완료후 H-Beam을 뽑아내는 5단계, 상기 뽑아낸 자리와 지하구조물 사이의 공간을 흙메우기 하는 6단계로 구성되어진다.First, the general method of installing the earth plate on the H-Beam will be described briefly.The first step is to hit the H-Beam at a certain interval, the second step is to install the earth plate between the H-Beam while digging the ground to a certain depth, and the installed earth plate and 3 steps to fill the spaces between the cut surfaces, 4 steps to build and build the foundation wall concrete of the structure, 5 steps to extract the H-Beam after completion of the foundation work, and to fill the space between the extracted spot and the underground structure. It consists of six steps.
그러나 상기 공법은 지하 터파기를 행할 때 이루어지는 통상적인 공법이며, 도로 암 파쇄시 방호용으로 사용되거나, 절개지의 흙무너짐을 방지하기 위하여는 별도의 공법이 사용되는바, 그 공사 여건 및 주위 환경에 따라 여러가지 공법이 행하여질 수 있는 것이다.However, the construction method is a conventional construction method that is performed when the underground burrowing, and is used for protection during road rock crushing, or a separate construction method is used to prevent the soil collapse of the incision site, depending on the construction conditions and the surrounding environment Various methods can be done.
또한 토류판을 설치함에 있어서도 도13과같이 체결구(21)를 이용하여 토류판을 H-Beam에 고정시키는 방법이 있으며, 체결구(21)를 이용하지 아니하고 채워지는 흙(23)의 토압에 의하여 H-Beam에 토류판을 설치하는 방법이 있을 수 있는바 어떤 방식을 취할지 여부는 공사여건 및 주변 지형 여건에 따라 결정되는 것이다.In addition, in installing the earth plate, there is a method of fixing the earth plate to the H-Beam by using the fastener 21 as shown in FIG. 13, and by using the earth pressure of the soil 23 to be filled without using the fastener 21. There may be a way to install a soil plate in Beam, and how to take it depends on the construction conditions and the surrounding terrain.
한편 종래의 토류판(20)은 도16과 같이 그 길이가 일정하게 고정되어 있어 H-Beam과 H-Beam사이의 간격이 일정하지 아니하면 끼워넣기가 여간 어려운 것이 아니었다.Meanwhile, the conventional earth plate 20 has a fixed length as shown in FIG. 16, and thus it is not difficult to insert the gap between the H-Beam and H-Beam.
그러나 본 발명의 토류판(1)처럼 그 길이를 조절할 수가 있으면 그 설치가 아주 간편하여 질뿐만 아니라 해체시에도 용이하여 반복하여 여러번 재사용할 수가 있는 것이다.However, if the length can be adjusted like the earth plate (1) of the present invention, the installation is very simple, as well as easy to dismantle it can be reused many times.
즉 본 발명의 조절식 철제토류판(1)은 토류판이 내,외측 토류판(2)(3)으로 분리되어 있고, 이를 서로 중첩되게 끼워지도록 함으로서 토류판 전체의 길이를 조절할 수 있어 H-Beam(22) 사이의 간격에 구애받지 아니하고 손쉽게 끼워 넣을 수 가 있는 것이다.That is, the adjustable iron earth plate (1) of the present invention is separated into the earth plate, the inner and outer earth plate (2) (3), by adjusting the length of the entire earth plate by sandwiching them overlapping each other H-Beam (22) Regardless of the gap between them, it can be easily inserted.
상기에 있어 내측 토류판(2)의 후면에 형성된 손잡이(7)에는 볼트(8)가 체결되어 있고, 상기 볼트(8)는 돌기역할을 하게 되는바 먼저 볼트(8)를 빼고 내측토류판(2)을 외측토류판에 끼운 후, 다시 볼트(8)를 체결하면 상기 볼트(8)가 보강띠(6)에 걸려지게 되어 내측토류판은 외측토류판에서 빠져나오는 것을 방지하게 되는 것이다.In the above, the bolt (8) is fastened to the handle (7) formed on the rear of the inner earth plate (2), the bolt (8) is to act as a projection bar first remove the bolt (8) and the inner earth plate (2) After inserting into the outer earth plate, when the bolt 8 is fastened again, the bolt 8 is caught by the reinforcing band 6 to prevent the inner earth plate from escaping from the outer earth plate.
한편 본 발명의 설치공법은 H-Beam을 일정간격으로 항타하는 1단계, 일정 깊이로 땅을 파면서 H-Beam사이에 토류판을 설치하는 2단계, 설치된 토류판과 절토면사이의 공간을 뒷채움하는 3단계, 구조물의 기초벽 콘크리트 타설 및 생성 과정인 4단계, 기초공사 완료후 H-Beam을 뽑아내는 5단계, 상기 뽑아낸 자리와 지하구조물 사이의 공간을 흙메우기 하는 6단계로 구성되어지는 흙막이용 철제토류판 설치공법에 있어서, 설치된 H-Beam사이에 길이조절식 토류판(1)을 끼워넣되 먼저 토류판의 전체적인 길이를 좁게하여 H-Beam사이에 손쉽게 끼워넣고 토류판의 길이를 H-Beam에 닿게끔 늘려 고정하는 단계; 이를 반복 작업하여 토류판을 적층되게 설치하는 단계; 공사가 끝나 해체시 토류판의 전체적인 길이를 좁게하여 H-Beam사이에서 용이하게 빼내는 단계; H-Beam을 뽑아낸후 흙메우기를 행하는 단계등으로 이루어지는 것으로 토류판의 길이조절이 용이하여 설치가 용이하고 해체가 가능하므로 종래공법에 비하여 그 효과는 훨씬 뛰어난 것이다.On the other hand, the installation method of the present invention is the first step to drive the H-Beam at a predetermined interval, the second step to install the earth plate between the H-Beam while digging the ground to a certain depth, the third step to fill the space between the installed earth plate and cut surface , 4 steps, which is the process of placing and creating the foundation wall concrete of the structure, 5 steps to extract the H-Beam after completion of the foundation work, and 6 steps to fill the space between the extracted seat and the underground structure. In the earth plate installation method, insert the length adjustable earth plate (1) between the installed H-Beam, but first narrow the overall length of the earth plate and insert it easily between the H-Beams, and increase the length of the earth plate to reach the H-Beam. Making; Repeating this step to install the earth plate laminated; When the dismantling is completed, the step of narrowing the overall length of the earth plate easily removed between the H-Beam; It consists of the step of filling the soil after extracting the H-Beam. It is easy to adjust the length of the earth plate, so it is easy to install and dismantle, so the effect is much better than the conventional method.
본 발명의 조절식 철제토류판은 내판과 외판으로 제작된 두개의 토류판으로 구성되어 있고, 상기 두개의 토류판이 서로 끼워지도록 함으로서 토류판의 전체길이가 조절되도록 한 것이므로, H-Beam과 H-Beam 사이의 간격이 일정하지 아니할 지라도 손쉽게 끼워 넣을 수 있도록 하여 작업이 아주 간편하고 편리하게 되어 작업시간 및 인력을 상당히 감축시킨 것이다. 또한 공사가 끝난 후, 토류판을 해체시 토압을 받고 있는 상태에서도 철제토류판의 간격을 손잡이 및 공구등을 이용하여 보다 손쉽게 좁혀 H-Beam 사이로부터 철거가 용이하게 되어 흙메꿈시 그 효과가 우수하게 되는 것이며, 또한 토류판의 재사용이 가능하게 되어 경제적으로 우수한 효과가 발생하는 것이다.The adjustable iron earth plate of the present invention is composed of two earth plates made of inner and outer plates, and the two lengths of earth plates are fitted to each other so that the overall length of the earth plate is adjusted, so that between H-Beam and H-Beam Even if the interval is not constant, it can be easily inserted so that the work is very simple and convenient, which significantly reduces work time and manpower. In addition, after disassembling the earth plate, even when the earth plate is under earth pressure, the gap between the steel earth plate can be narrowed more easily with a handle and a tool, making it easier to remove from the H-Beam. In addition, it is possible to reuse the earth plate is economically excellent effect occurs.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020072158A KR20040043770A (en) | 2002-11-20 | 2002-11-20 | a retaining panel and manufacturing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020072158A KR20040043770A (en) | 2002-11-20 | 2002-11-20 | a retaining panel and manufacturing process |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20040043770A true KR20040043770A (en) | 2004-05-27 |
Family
ID=37340186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020072158A KR20040043770A (en) | 2002-11-20 | 2002-11-20 | a retaining panel and manufacturing process |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20040043770A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100862902B1 (en) * | 2008-03-11 | 2008-10-13 | (주)다산컨설턴트 | Installation structure of cofferdam using pile |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5032713A (en) * | 1973-07-25 | 1975-03-29 | ||
KR960008204U (en) * | 1994-08-29 | 1996-03-15 | 주식회사경동기술공사 | Steel earth plate |
KR20000004108U (en) * | 1998-07-28 | 2000-02-25 | 정하동 | Adjustable Feet Panel |
KR200270268Y1 (en) * | 2002-01-09 | 2002-03-29 | 금광개발 주식회사 | The length adjustable lagging |
KR200302339Y1 (en) * | 2002-10-16 | 2003-01-30 | (주)한국에어로테크 | a retaining panel |
KR100389766B1 (en) * | 2001-02-20 | 2003-07-10 | 동 섭 신 | A sheathing panel for sheathing wall |
-
2002
- 2002-11-20 KR KR1020020072158A patent/KR20040043770A/en not_active Application Discontinuation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5032713A (en) * | 1973-07-25 | 1975-03-29 | ||
KR960008204U (en) * | 1994-08-29 | 1996-03-15 | 주식회사경동기술공사 | Steel earth plate |
KR20000004108U (en) * | 1998-07-28 | 2000-02-25 | 정하동 | Adjustable Feet Panel |
KR100389766B1 (en) * | 2001-02-20 | 2003-07-10 | 동 섭 신 | A sheathing panel for sheathing wall |
KR200270268Y1 (en) * | 2002-01-09 | 2002-03-29 | 금광개발 주식회사 | The length adjustable lagging |
KR200302339Y1 (en) * | 2002-10-16 | 2003-01-30 | (주)한국에어로테크 | a retaining panel |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100862902B1 (en) * | 2008-03-11 | 2008-10-13 | (주)다산컨설턴트 | Installation structure of cofferdam using pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100882831B1 (en) | Reformed sheet plate and the method of installation of the same | |
KR100713787B1 (en) | The underground structure assembly and the underground structure building method which it uses | |
KR101410471B1 (en) | Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building | |
KR101057680B1 (en) | Soil retaining wall and construction method of reuse and reinforcement steel panel | |
KR102312008B1 (en) | Two Rows type Self reliance retaining wall construction method Using the Prestressed pile | |
KR20200124949A (en) | Anchor Tension way sheathing structure and sheathing method of construction | |
KR101262357B1 (en) | Inclined Earth Retaining Structure Method | |
CN210508488U (en) | Existing wall body support system | |
KR100458821B1 (en) | The length adjustable lagging and its using method of braced wall construction | |
KR101545330B1 (en) | Prefab type land-side protection wall device | |
KR20040043770A (en) | a retaining panel and manufacturing process | |
KR200302339Y1 (en) | a retaining panel | |
JP4385127B2 (en) | Slope protection retaining wall construction method and retaining wall building unit | |
KR101127475B1 (en) | Device for connecting wales | |
KR200270268Y1 (en) | The length adjustable lagging | |
KR100568988B1 (en) | a retaining panel and manufacturing process | |
JPH10317374A (en) | Method for constructing underground column made of reinforced concrete | |
KR20060098779A (en) | Structure and assembly for protecting landslide | |
JP4423390B2 (en) | Construction method of slope protection retaining wall | |
KR102601694B1 (en) | Method for demolishing underground building | |
CN212270958U (en) | Inner supporting structure for foundation pit | |
KR102276810B1 (en) | Earth retaing structure, earth retaing plate and construction methd using the same | |
JP7398026B1 (en) | How to remove the skeleton | |
KR100708765B1 (en) | Structure and assembly for protecting landslide | |
JPH06173284A (en) | Construction method for self-standing continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |