KR20040041997A - Air supply apparatus suppling air with fixed quantity and constant pressure - Google Patents
Air supply apparatus suppling air with fixed quantity and constant pressure Download PDFInfo
- Publication number
- KR20040041997A KR20040041997A KR1020020070112A KR20020070112A KR20040041997A KR 20040041997 A KR20040041997 A KR 20040041997A KR 1020020070112 A KR1020020070112 A KR 1020020070112A KR 20020070112 A KR20020070112 A KR 20020070112A KR 20040041997 A KR20040041997 A KR 20040041997A
- Authority
- KR
- South Korea
- Prior art keywords
- air
- pressure
- supplying
- storage tank
- test object
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/26—Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
Abstract
Description
본 발명은 정량, 정압으로 에어를 공급하는 에어공급장치에 관한 것으로, 더욱 상세하게는 각종 유압계통에서의 누설 여부를 검사할 때 유로상에 에어를 정량, 정압으로 공급하는 정량, 정압으로 에어를 공급하는 에어공급장치에 관한 것이다.The present invention relates to an air supply device for supplying air at fixed pressure and static pressure, and more particularly, to quantitatively supply air at a flow path, and to supply air at constant pressure, when supplying air at a constant pressure when inspecting leakage of various hydraulic systems. It relates to an air supply device for supplying.
일반적으로 항공기, 선박, 자동차 등과 같이 화석연료를 연소시켜 동력을 발생시키는 장치들은 장치 내부에 별도의 연료탱크를 보유하고, 이 연료탱크로부터 소정량의 연료를 별도의 연료계통을 통하여 펌핑하여 엔진에서 연소시킴으로써 동력을 얻도록 되어 있다.In general, devices that generate power by burning fossil fuels such as aircraft, ships, and automobiles have a separate fuel tank inside the device, and a predetermined amount of fuel is pumped from the fuel tank through a separate fuel system. It is supposed to gain power by burning.
특히 항공기의 연료공급을 위한 연료계통에서의 이상발생은 선반이나 자동차와 달리 항공기의 운항 중 급변하는 주변상황에 따라 치명적인 사고를 유발시킬 수 있다. 실질적으로 항공 사고 중에서 연료계통의 불량으로 인하여 발생하는 비중이 다른 원인에 의한 사고보다도 월등히 많으며, 따라서 무엇보다도 항공기에서는 이러한 연료계통의 정밀한 테스트와 진단이 선행되어야 한다.In particular, abnormalities in the fuel system for fueling the aircraft may cause fatal accidents depending on the rapidly changing surrounding conditions of the aircraft, unlike shelves or automobiles. In practice, the proportion of air system accidents caused by poor fuel system is much higher than that caused by other causes, and therefore, above all, the precise test and diagnosis of such fuel system must be preceded by aircraft.
그러나 현재까지 항공기의 제작시 또는 정비시에 항공기의 연료계통에 대한 누설여부를 제대로 테스트하는 장치가 제공되지 못하고 있으며, 이러한 이유로 보다 신뢰성이 보장된 항공기의 제작 및 정비가 이루어지지 못하는 문제점이 있다.However, until now, the apparatus for properly testing the leakage of the fuel system of the aircraft at the time of manufacture or maintenance of the aircraft has not been provided, and for this reason, there is a problem in that the manufacture and maintenance of more reliable aircraft cannot be made.
본 발명은 전술한 문제점을 해결하기 위한 것으로, 본 발명의 목적은 각종 연료계통 및 기타의 유압계통에서의 누설여부를 검사할 수 있도록 에어를 사용조건에 맞는 정량, 정압으로 공급하여 유압계통에서의 누설여부를 테스트할 수 있도록 하는 정량, 정압으로 에어를 공급하는 에어공급장치를 제공하기 위한 것이다.The present invention is to solve the above-mentioned problems, the object of the present invention is to supply the air in a fixed amount, static pressure according to the conditions of use to check the leakage in various fuel systems and other hydraulic systems in the hydraulic system It is to provide an air supply device for supplying air at a quantitative and constant pressure to test for leakage.
도 1은 본 발명에 따른 에어공급장치의 블록 구성도이다.1 is a block diagram of an air supply apparatus according to the present invention.
도 2는 본 발명에 따른 에어공급장치를 도시한 유압 회로도이다.2 is a hydraulic circuit diagram showing an air supply device according to the present invention.
**도면의 주요부분에 대한 부호의 설명**** Description of the symbols for the main parts of the drawings **
100...에어공급원100 Air Supply
110...에어펌프110 ... air pump
120...저장탱크120 storage tank
160...중간연결부재160 ... intermediate connecting member
200...테스트 대상물200 ... Test Subject
전술한 목적을 달성하기 위한 본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치는 에어공급원; 상기 에어공급원으로부터 공급된 에어를 펌핑하는 펌프; 상기 펌프에서 펌핑된 에어가 저장되는 저장탱크; 상기 저장탱크에서 공급된에어를 소정압력으로 공급하는 압력조절부; 상기 압력조절부 거친 에어를 소정량으로 공급하는 유량조절부; 상기 유량조절부를 거친 에어를 테스트 대상물 측으로 배출하는 에어배출부를 구비한 것을 특징으로 한다.Air supply device for supplying air at a fixed pressure, constant pressure according to the present invention for achieving the above object is an air supply source; A pump for pumping air supplied from the air supply source; A storage tank in which the air pumped from the pump is stored; A pressure regulator supplying air supplied from the storage tank to a predetermined pressure; Flow control unit for supplying the pressure adjusting unit rough air in a predetermined amount; It characterized in that it comprises an air discharge unit for discharging the air passed through the flow rate control unit to the test object side.
그리고 바람직하게 상기 압력조절부는 상기 소정압력으로 에어압력을 조절하는 압력레귤레이터를 구비하고, 상기 유량조절부는 상기 압력레귤레이터의 하류에 상기 소정량으로 에어의 양을 조절하는 플로우미터를 구비한 것을 특징으로 한다.And preferably the pressure regulating part comprises a pressure regulator for adjusting the air pressure at the predetermined pressure, and the flow rate adjusting part has a flow meter for adjusting the amount of air at the predetermined amount downstream of the pressure regulator. do.
또한 바람직하게 상기 에어배출부와 상기 테스트 대상물 사이에는 상기 에어배출부와 상기 테스트 대상물을 서로 연결시키는 중간연결부재가 설치된 것을 특징으로 한다.In addition, preferably between the air discharge unit and the test object is characterized in that the intermediate connecting member for connecting the air discharge unit and the test object to each other is installed.
이하에서는 본 발명에 따른 하나의 바람직한 일실시예를 도면을 참조하여 보다 상세히 설명하기로 한다.Hereinafter, one preferred embodiment according to the present invention will be described in detail with reference to the drawings.
본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치는 도 1과 도 2에 도시된 바와 같이 에어공급원(100), 펌프(110) 그리고 저장탱크(120)를 구비하고, 저장탱크(120)의 하류에 압력조절부(130)(170)와 유량조절부(140)(180) 및 최종에 에어를 공급하는 에어배출부(150)(190)와 이 에어배출부(150)(180)와 테스트 대상물(200)을 서로 연결하는 중간연결부재(160)를 구비한다.Air supply device for supplying air at a constant pressure, constant pressure according to the present invention has an air supply source 100, a pump 110 and a storage tank 120, as shown in Figure 1 and 2, the storage tank 120 Downstream of the pressure control unit 130, 170 and the flow control unit 140, 180 and the air discharge unit 150, 190 and the air discharge unit 150, 180 for supplying air to the end And an intermediate connection member 160 for connecting the test object 200 with each other.
보다 구체적으로 각각의 구성요소들을 설명하면, 먼저 에어공급원(100)은 최대 7BAR 압력으로 외부에서 제공된 에어를 공급할 수 있도록 된 호스(101)와 커플러(102)를 구비하고, 커플러(102)를 거친 에어의 정화를 위한 필터(103)가 장착된다.More specifically, each of the components, first, the air supply 100 is provided with a hose 101 and a coupler 102 to supply the air provided from the outside at a maximum pressure of 7BAR, and passes through the coupler 102 A filter 103 for purifying air is mounted.
그리고 필터(103)를 거치면서 다수의 유로로 분기되는데, 펌핑이 이루어지는 에어는 직접 펌프(110)로 공급되고, 펌프(110)의 동력발생을 위한 에어는 펌프용 압력레귤레이터(104)를 거쳐 동력발생에 적당한 압력으로 제공된다.In addition, the filter 103 is branched into a plurality of flow paths. The pumped air is directly supplied to the pump 110, and the air for generating power of the pump 110 is driven through the pressure regulator 104 for the pump. It is provided at a pressure suitable for generation.
이때 공급압력이 너무 과도한 경우 이를 조절하기 위하여 별도로 유로 상에 에어 파일롯 스위치(105)와 릴리프 밸브(106)가 장착되어 있으며, 이 릴리프 밸브(106)는 85BAR로 셋팅되어 있다. 그리고 이 릴리프 밸브(106)는 저장탱크(120)와도 연결되어 저장탱크(120)의 에어 저장압력 또한 85BAR로 셋팅하게 된다.At this time, in order to adjust the supply pressure is too excessive, the air pilot switch 105 and the relief valve 106 is mounted on the flow path separately, the relief valve 106 is set to 85BAR. The relief valve 106 is also connected to the storage tank 120 to set the air storage pressure of the storage tank 120 to 85 BAR.
한편, 저장탱크(120)의 하류에는 압력조절부(130)(170)와 유량조절부(140)(180) 및 에어배출부(150)(190)가 구현되는데, 이들은 분기된 두 개의 유로 상에 각각 별도로 구현된다.On the other hand, downstream of the storage tank 120 is implemented a pressure control unit 130, 170, flow rate control unit 140, 180 and air discharge unit 150, 190, these two flow paths on the branch Each is implemented separately.
이 각각의 분기된 유로는 제공되는 에어의 압력과 양 그리고 연결되는 유압계통의 종류와 사양에 따라 다르게 적용될 필요가 있을 때 선택적으로 적용된다. 따라서 다른 실시상태로써 하나의 유로만을 형성할 수 있고, 또는 세 개 이상의 유로를 별도로 구현할 수도 있을 것이다.Each of these branched flow paths is optionally applied when it is necessary to be applied differently depending on the pressure and amount of air provided and the type and specification of the hydraulic system to be connected. Therefore, in another embodiment, only one flow path may be formed, or three or more flow paths may be separately implemented.
본 발명의 실시예에서는 두 개의 유로를 분기하여 구현하는데, 첫 번째 유로에서 공급되는 에어의 압력은 5 - 60PSI로 셋팅되어 있고, 두 번째 유로에서 공급되는 에어의 압력은 0 - 200PSI로 셋팅되어 있다.According to an embodiment of the present invention, two flow paths are implemented by branching. The pressure of air supplied from the first flow path is set to 5-60 PSI, and the pressure of air supplied from the second flow path is set to 0-200 PSI. .
본 발명의 실시예에서 첫 번째 유로의 경우 먼저 저장탱크(120)로부터 공급된 에어를 5 - 60PSI로 조절하는 제 1압력조절부(130)로써 제 1압력레귤레이터(131)와 제 1압력게이지(132)를 구비하고, 제 1유량조절부(140)로써 제 1플로우미터(141)와 제 1플로우 인디케이터(142)가 설치되며, 이들의 하류에 제 1개폐밸브(143)가 장착된다. 그리고 제 1개폐밸브(143)의 하류에는 호스(151)와 연결너트(152)로 된 제 1에어배출부(150)가 설치된다.In the first embodiment of the present invention, the first pressure regulator 131 and the first pressure gauge (1) as the first pressure control unit 130 for first adjusting the air supplied from the storage tank 120 to 5-60PSI 132, a first flow meter 141 and a first flow indicator 142 are installed as the first flow control unit 140, and a first opening / closing valve 143 is installed downstream thereof. And downstream of the first opening / closing valve 143, a first air discharge part 150 consisting of a hose 151 and a connection nut 152 is provided.
그리고 두 번째 유로의 경우 먼저 저장탱크(120)로부터 공급된 에어를 0 - 200PSI로 조절하는 제 2압력조절부(170)로써 제 2압력레귤레이터(171)와 제 2압력게이지(172)를 구비하고, 제 2유량조절부(180)로써 제 2플로우미터(181)와 제 2플로우 인디케이터(182)가 설치되며, 이들의 하류에 제 2개폐밸브(183)가 장착된다. 그리고 제 2개폐밸브(183)의 하류에는 호스(191)와 연결너트(192)로 된 제 2에어배출부(190)가 설치된다.In the case of the second flow path, first, the second pressure regulator 171 and the second pressure gauge 172 are provided as the second pressure adjusting unit 170 for adjusting the air supplied from the storage tank 120 to 0-200 PSI. As the second flow rate adjusting unit 180, the second flow meter 181 and the second flow indicator 182 are installed, and the second opening / closing valve 183 is installed downstream thereof. In addition, a second air discharge unit 190 including a hose 191 and a connection nut 192 is installed downstream of the second opening / closing valve 183.
한편, 각각의 에어배출부(150)(190)에는 압력게이지와 호스로 된 별도의 중간연결부재(160)가 장착된다. 이 중간연결부재(160)는 테스트 대상물(200)에 직접 에어배출부(150)(190)를 연결할 때 발생하는 테스트 대상물(200)의 손상 및 파손을 방지하고, 또한 다양한 종류의 테스트 대상물(200)에 대하여 중간연결부재(160)를 선택적으로 채용하여 테스트가 가능하도록 하기 위한 것이다.On the other hand, each air discharge unit 150, 190 is equipped with a separate intermediate connecting member 160 made of a pressure gauge and a hose. The intermediate connecting member 160 prevents damage and damage of the test object 200 generated when the air discharge unit 150 and 190 are directly connected to the test object 200, and also various types of test object 200. It is to enable the test by selectively employing the intermediate connecting member 160 for the).
따라서 중간연결부재(160)는 입구의 크기가 제 1에어배출부(150)와 제 2에어배출부(190)와 연결될 수 있는 사양으로 제조되고, 출구의 경우는 테스트 대상물(200)의 사양과 결합되도록 제조하여야 한다. 따라서 테스트 대상물(200)에 따라 다양한 종류의 중간연결부재(160)가 필요할 수 있다.Therefore, the intermediate connecting member 160 is manufactured to a specification that the size of the inlet can be connected to the first air discharge unit 150 and the second air discharge unit 190, in the case of the outlet and the specification of the test object 200 It must be manufactured to be combined. Therefore, various kinds of intermediate connection members 160 may be necessary according to the test object 200.
마지막으로 본 발명의 정량, 정압으로 에어를 공급하는 에어공급장치는 장치의 일측에 진공펌프(210)를 설치한다. 이 진공펌프(210)는 장치 주변의 청소 등을위하여 사용되는 것이다.Finally, the air supply device for supplying air at a constant pressure and positive pressure of the present invention is provided with a vacuum pump 210 on one side of the device. This vacuum pump 210 is to be used for cleaning the surroundings of the device.
이하에서는 전술한 바와 같이 구성된 본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치의 작용상태에 대하여 설명하기로 한다.Hereinafter will be described the operation state of the air supply device for supplying air at a fixed pressure, constant pressure according to the present invention configured as described above.
본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치는 먼저 외부로부터 제공된 에어가 에어공급원(100)으로 공급되면 1차적으로 공급된 에어는 필터(103)를 거쳐 정화된 후 펌핑을 위하여 직접 펌프(110)로 공급되고, 펌프(110)의 동력발생을 위한 에어는 펌프용 압력레귤레이터(104)를 거쳐 펌프(110)로 공급되어 펌프(110)를 구동시킨다.According to the present invention, the air supply device for supplying air at a constant pressure and positive pressure is first supplied with air from the outside to the air supply source 100, and the air supplied primarily is purified through the filter 103 and then directly for pumping. The air is supplied to the pump 110, and the air for power generation of the pump 110 is supplied to the pump 110 through the pressure regulator 104 for the pump to drive the pump 110.
이때 또 하나의 분기된 유로를 통해서는 별도로 설치된 파일롯 스위치(105)와 릴리프 밸브(106)를 통하여 공급되는 에어의 압력의 과다유무를 판단하여 압력상태의 안정적인 조절이 이루어지도록 한다.At this time, through another branched flow path, it is determined whether the pressure of the air supplied through the pilot switch 105 and the relief valve 106 separately installed is made to control the pressure state stably.
그리고 펌프(110)를 거친 에어는 먼저 저장탱크(120)에 저장되고, 저장탱크(120)에 저장된 에어는 이후 사용을 위하여 압력조절부(130)(170)로 공급된다. 이때 공급되는 에어는 제 1압력조절부(130)와 제 2압력조절부(170)에 함께 공급되는데, 공급된 에어의 사용은 각각의 개폐밸브(143)(183)의 조작상태에 따라 선택적으로 이루어진다.And the air passed through the pump 110 is first stored in the storage tank 120, the air stored in the storage tank 120 is supplied to the pressure regulator 130, 170 for later use. At this time, the air supplied is supplied to the first pressure control unit 130 and the second pressure control unit 170, the use of the supplied air is selectively depending on the operating state of each of the opening and closing valves (143, 183) Is done.
즉, 제 1개폐밸브(143)가 온되고, 제 2개폐밸브(183)가 오프된 경우에는 에어가 제 1압력조절부(130)의 제 1압력레귤레이터(131)를 거쳐 5 - 60PSI 범위에서 압력이 조절된 후 제 1유량조절부(140)인 제 1플로우미터(141)를 거쳐 설정된 정압, 정량으로 공급되고, 최종에 제 1에어배출부(150)를 거쳐 중간연결부재(160)를통하여 테스트 대상물(200)에 공급된다.That is, when the first opening / closing valve 143 is turned on and the second opening / closing valve 183 is turned off, air passes through the first pressure regulator 131 of the first pressure regulating unit 130 in a range of 5 to 60 PSI. After the pressure is adjusted, the first flow meter 140 is supplied with the positive pressure and the fixed quantity set via the first flow meter 141. Finally, the intermediate connecting member 160 is passed through the first air discharge unit 150. It is supplied to the test object 200 through.
그리고 제 2개폐밸브(183)가 온되고, 제 1개폐밸브(143)가 오프된 경우에는 에어가 제 2압력조절부(170)의 제 2압력레귤레이터(171)를 거쳐 0 - 200PSI 범위에서 압력이 조절된 후 제 2유량조절부(180)인 제 2플로우미터(181)를 거쳐 설정된 정압, 정량으로 공급되고, 최종에 제 2에어배출부(190)를 거쳐 중간연결부재(160)를 통하여 테스트 대상물(200)에 공급된다.When the second opening / closing valve 183 is turned on and the first opening / closing valve 143 is turned off, the air passes through the second pressure regulator 171 of the second pressure regulating unit 170 in the range of 0-200 PSI. After this is adjusted, it is supplied at a constant pressure and quantity set through the second flow meter 181, which is the second flow rate adjusting unit 180, and finally through the intermediate connecting member 160 via the second air discharge unit 190. The test object 200 is supplied.
한편, 동시에 서로 다른 두 개의 테스트 대상물(200)에 대하여 에어를 공급할 수가 있는데, 이때에는 제 1개폐밸브(143)와 제 2개폐밸브(183)를 모두 온 시킨 상태에서 에어를 공급하면 각각의 압력조절부(130)(170)와 유량조절부(140)(180) 그리고 각각의 에어배출부(150)(190)를 통하여 동시에 두 개의 테스트 대상물(200)에 대한 에어의 공급이 이루어진다.Meanwhile, at the same time, air may be supplied to two different test objects 200. At this time, when the air is supplied while both the first open / close valve 143 and the second open / close valve 183 are turned on, the respective pressures may be reduced. Air is supplied to the two test objects 200 simultaneously through the control unit 130, 170, the flow control unit 140, 180 and the respective air discharge unit 150, 190.
전술한 바와 같이 본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치는 테스트에 적당한 에어를 정량, 정압으로 공급하도록 한 것으로, 특히 항공기의 연료계통에서의 누설여부를 검사할 때 정밀하게 제어된 에어를 공급하도록 함으로써 보다 정확한 테스트 결과를 얻을 수 있도록 한다.As described above, the air supply device for supplying air at fixed pressure and positive pressure according to the present invention is to supply air at a constant pressure and quantitative pressure suitable for a test, and in particular, precisely control when inspecting whether there is leakage in the fuel system of an aircraft. By supplying the compressed air, more accurate test results can be obtained.
이러한 본 발명에 따른 에어공급장치는 전술한 실시예와 달리 구성의 일부를 변형하여 적용할 수 있으나 기본적으로, 동일 유로 상에 압력조절부와 유량조절부를 구비시켜 검사용 에어를 공급하도록 한 것이라면 모두 본 발명의 기술적 범주에 포함된다고 보아야 한다.Unlike the above-described embodiment, the air supply device according to the present invention may be applied by modifying a part of the configuration, but basically, all of them provided with a pressure control unit and a flow control unit on the same flow path to supply air for inspection It should be considered to be included in the technical scope of the present invention.
이상과 같은 본 발명에 따른 정량, 정압으로 에어를 공급하는 에어공급장치는 각종 연료라인 및 유압계통에 대한 제작시 또는 정비시에 연료 및 유체의 누설여부를 사전에 효율적으로 검사할 수 있도록 함으로써 연료라인 및 유압계통의 보다 향상된 작동 신뢰성을 확보할 수 있도록 하고, 또한 두 개의 서로 다른 유압계통에 대한 선택적인 테스트와 동시 테스트가 가능하게 하는 효과도 있다.The air supply device for supplying air at a constant pressure and positive pressure according to the present invention as described above enables the fuel and fluid to be leaked efficiently beforehand during manufacturing or maintenance of various fuel lines and hydraulic systems. It also allows for improved operational reliability of the line and hydraulic systems, and also enables the selective and simultaneous testing of two different hydraulic systems.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020070112A KR20040041997A (en) | 2002-11-12 | 2002-11-12 | Air supply apparatus suppling air with fixed quantity and constant pressure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020070112A KR20040041997A (en) | 2002-11-12 | 2002-11-12 | Air supply apparatus suppling air with fixed quantity and constant pressure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20040041997A true KR20040041997A (en) | 2004-05-20 |
Family
ID=37338836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020070112A KR20040041997A (en) | 2002-11-12 | 2002-11-12 | Air supply apparatus suppling air with fixed quantity and constant pressure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20040041997A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19990027459U (en) * | 1997-12-23 | 1999-07-15 | 김영환 | Air Solenoid Valve Evaluation Device |
JP2001010726A (en) * | 1999-06-30 | 2001-01-16 | Amano Corp | Powdery and granular material high-pressure transporting device |
JP3243677B2 (en) * | 1994-03-09 | 2002-01-07 | 前澤工業株式会社 | Leak detector for membrane breakage in membrane filtration device |
-
2002
- 2002-11-12 KR KR1020020070112A patent/KR20040041997A/en not_active Application Discontinuation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3243677B2 (en) * | 1994-03-09 | 2002-01-07 | 前澤工業株式会社 | Leak detector for membrane breakage in membrane filtration device |
KR19990027459U (en) * | 1997-12-23 | 1999-07-15 | 김영환 | Air Solenoid Valve Evaluation Device |
JP2001010726A (en) * | 1999-06-30 | 2001-01-16 | Amano Corp | Powdery and granular material high-pressure transporting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6848784B2 (en) | Tank mounting device | |
JP3939793B2 (en) | Control method for internal combustion engine | |
KR101314585B1 (en) | Test eqipment of fuel ejection valve for ship diesel engine | |
US20200217284A1 (en) | Pressure-regulating device for a fuel consumption measurement system and fuel consumption measurement system | |
JP2009519071A (en) | Apparatus for supplying oxygen to aircraft occupants and pressure regulator for such apparatus | |
CN111272404A (en) | Fire engine fire-fighting pipeline test system | |
US9409652B2 (en) | Dual pressure regulation system for aerial refueling operations | |
JP2019534982A (en) | How to operate tank equipment | |
KR20110021573A (en) | Fuel supplying system of lpi engine | |
US6457483B1 (en) | Process and fixture for ascertaining pressure losses | |
KR20040041997A (en) | Air supply apparatus suppling air with fixed quantity and constant pressure | |
JP6919482B2 (en) | Fuel cell system | |
JP4148005B2 (en) | Fluid supply component inspection method and inspection apparatus | |
KR102130639B1 (en) | Inspection device for pressure control cap | |
KR100478854B1 (en) | Apparatus to test pressure for a tube | |
JP3371758B2 (en) | Emergency diesel power generation equipment and its alarm generation method | |
KR20210006729A (en) | Gas leak test system with multi-test function | |
CN220540870U (en) | Pressurizing system and pressure vessel | |
RU2757342C2 (en) | Pressure retention unit | |
JP4151463B2 (en) | Fluid supply component inspection method and inspection apparatus | |
CN211652045U (en) | Fire engine fire-fighting pipeline test system | |
US11808218B1 (en) | Rapid fuel shutdown system with latching | |
CN219224149U (en) | Hydrogen injector performance test system | |
CN213658179U (en) | Sealed oil circuit structure that detects | |
KR100470264B1 (en) | Tester for sensing leak of pressure and vacuum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |