KR20040014376A - manufacturing process of a spectacles frame - Google Patents
manufacturing process of a spectacles frame Download PDFInfo
- Publication number
- KR20040014376A KR20040014376A KR1020030078557A KR20030078557A KR20040014376A KR 20040014376 A KR20040014376 A KR 20040014376A KR 1020030078557 A KR1020030078557 A KR 1020030078557A KR 20030078557 A KR20030078557 A KR 20030078557A KR 20040014376 A KR20040014376 A KR 20040014376A
- Authority
- KR
- South Korea
- Prior art keywords
- feldspar
- spectacle frame
- frame
- rim
- manufacturing
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D13/00—Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form
- B21D13/02—Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form by pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D53/00—Making other particular articles
-
- G—PHYSICS
- G02—OPTICS
- G02C—SPECTACLES; SUNGLASSES OR GOGGLES INSOFAR AS THEY HAVE THE SAME FEATURES AS SPECTACLES; CONTACT LENSES
- G02C5/00—Constructions of non-optical parts
- G02C5/02—Bridges; Browbars; Intermediate bars
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Eyeglasses (AREA)
Abstract
Description
본 발명은 안경테의 제조방법에 관한 것이다.The present invention relates to a method of manufacturing a spectacle frame.
보다 상세하게는 티타늄 등의 금속재료를 이용하여 제조되는 안경테에 있어서, 얇은 금속판재를 이용하여 제조하되, 코다리는 물론 안경테 양측부에 형성되는 장석부가 일체로 형성되게 함과 동시에 장석부의 두께가 타 부위보다 두껍게 형성되고, 더불어 코다리가 안경테 정면으로 돌출되도록 입체적으로 형성되게 하는 방법을 제공하여 외관이 매우 깔끔하고, 제조시 불량발생률이 극히 적음은 물론 제조 또한 매우 신속 간편하게 이루어지며, 내구성이 뛰어나고 제조원가 또한 저렴하게 드는 안경테를 제공하려는 것이다.More specifically, in a spectacle frame manufactured using a metal material such as titanium, the spectacle frame may be manufactured using a thin metal plate, and the feldspar formed on both sides of the eyeglass frame as well as the corridor may be integrally formed and the thickness of the feldspar may be different. Formed thicker than the site, and also provides a method of three-dimensionally formed so that the corridor protrudes to the front of the frame, very clean appearance, extremely low defect rate during manufacturing as well as very quick and easy to manufacture, excellent durability and cost The reason is to provide a cheap frame.
잘 알려진 바와 같이 안경테는 렌즈를 끼워 고정하는 두개의 림과, 상기 두개의 림을 연결 고정시키는 코다리와, 그리고 상기 림 각각의 일측단부에 형성되어 횡방향으로 절개되어 렌즈의 착탈이 가능하도록 유도하는 장석부로 구성된다.As is well known, the spectacle frame has two rims for fixing the lens, a cord bridge for connecting and fixing the two rims, and are formed at one end of each of the rims, and are laterally cut to induce detachment of the lens. Consists of feldspar.
또, 안경테는 코다리 부분이 정면으로 돌출된 형태를 취하게 되고, 장석부는 저면에서 나사체결이 이루어져야 함으로서 적어도 나사체결을 안정적으로 할 수 있는 두께를 유지하여야 한다.In addition, the spectacle frame is in the form of a protruding nose, and the feldspar portion should be screwed on the bottom to maintain a thickness that can at least secure the screw.
그러나 상기와 같은 안경테를 금속을 이용하여 제조하는 종래의 방법은, 통상 림을 먼저 형성한후, 두개의 림 사이 소정위치에 별도로 형성된 코다리를 용접고정시키고, 림의 가장자리에는 적어도 림의 두께보다 두껍게 형성된 장석부를 별도 형성하여 용접 고정시킨 뒤 장석부의 소정위치에 연결구를 용접 고정시킨다음 연마 등의 후가공처리를 하며, 외관을 깔끔하게 다듬고, 이어서 상기 장석부의 저면에서 상방향으로 드릴로 구멍을 뚫은 뒤 소정위치를 횡방향으로 컷팅하여 완성하였던 것이다.However, in the conventional method of manufacturing the above-described eyeglass frame using a metal, the rim is formed first, and then, a welded cord is separately formed at a predetermined position between the two rims, and the edge of the rim is at least thicker than the thickness of the rim. After separately forming and welding the feldspar formed by welding and fixing the connector at a predetermined position of the feldspar, and then post-processing such as polishing, trim the appearance neatly, and then drills a hole in the upward direction from the bottom of the feldspar, and then predetermined It was completed by cutting the position laterally.
따라서 종래의 안경테는 코다리 및 장석부를 별도 구성하여 용접하여야 함에 따라 고도로 숙련된 숙련공 또는 기능공이 아니면 작업이 이루어지지 못하기 때문에 인건비가 과다소요될 수밖에 없고, 용접과정에서 불량발생률이 높아 양산이 어려움은 물론 호환성이 떨어지고, 제조원가 또한 과다하게 드는 폐단이 따랐으며, 용접부위로 인하여 외관이 단정하지 못한 폐단도 따랐던 것이다.Therefore, the conventional spectacle frame has to be separately configured to weld the corridor and feldspar, so unless the highly skilled skilled or skilled workers can not work, the labor costs are inevitably excessive, and the high rate of defects in the welding process makes it difficult to mass-produce. Incompatibility was reduced, and the manufacturing cost was also accompanied by excessive waste, and the appearance was not neat due to the welding site.
따라서 본 발명은 상기한 바와 같은 종래의 제반문제점을 감안하여 발명한 것으로, 특히, 안경테를 제조함에 있어서, 티타늄 등의 얇은 금속판재를 이용하여코다리와 장석부가 일체로 형성된 안경테를 제조하되, 상기 코다리는 정면으로 돌출되어 마치 용접하여 형성된 안경테에서와 같이 돌출되게 하고, 장석부는 그 두께가 통상의 안경에서와 같이 두껍게 형성되게 하여 입체감이 뛰어나면서도 용접부위가 전혀 없는 안경테를 제조하는 방법을 제공하려는 데 그 목적이 있는 것이다.Therefore, the present invention has been invented in view of the above-mentioned conventional problems, in particular, in the manufacture of spectacle frames, using a thin metal plate, such as titanium to manufacture a spectacle frame integrally formed with a pod and feldspar, Protrudes to the front to protrude as if the frame to be welded, and the feldspar portion is to be formed thick as in ordinary glasses to provide a method of manufacturing a spectacle frame excellent in three-dimensional, but no weld at all The purpose is.
도 1은 본 발명의 제조방법을 통하여 제조된 안경테의 사시도.1 is a perspective view of a spectacle frame manufactured through the manufacturing method of the present invention.
도 2는 본 발명의 제조과정을 나타낸 공정 예시도.Figure 2 is an exemplary process showing a manufacturing process of the present invention.
도 3은 본 발명의 제조방법을 통하여 제조된 안경테의 횡단면예시도.Figure 3 is an exemplary cross-sectional view of the spectacle frame produced through the manufacturing method of the present invention.
도 4는 본 발명의 제조방법을 통하여 제조된 반테 안경의 사시도.Figure 4 is a perspective view of vante glasses produced through the manufacturing method of the present invention.
본 발명은 용접부 없이 코다리와 장석부를 일체로 형성하는 안경테의 제조방법에 관한 것이다.The present invention relates to a method of manufacturing a spectacle frame integrally formed with a cord and feldspar without welding.
특히 코다리(2)는 안경테의 림 두께와 동일하게 형성하더라도 전혀 문제가 없으나 장석부(3)는 나사를 체결할수 있어야 함으로 적어도 림 두께의 1.5 ~ 2.5배 두께가 되는 것이 가공 및 사용에 있어 바람직한 것이며, 본 발명에서는 얇은 금속판재(11)를 이용하여 안경테를 형성하면서도 적어도 장석부(3)만큼은 그 두께가 림 두께의 1.5 ~ 2.5배가 되게 할 수 있다는 데 큰 특징이 있다 할 것이며, 더불어 코다리(2)부분도 안경테의 정면으로 돌출되어 입체감을 극대화시킬 수 있게 하였다는데에도 특징이 있는 것이다.In particular, the cord 2 has no problem even if it is formed in the same thickness as the rim of the spectacle frame, but the feldspar portion 3 should be able to fasten a screw so that at least 1.5 to 2.5 times the thickness of the rim is preferable for processing and use. In the present invention, while forming a spectacle frame using a thin metal plate 11, at least the feldspar portion (3) has a great feature that the thickness can be 1.5 to 2.5 times the thickness of the rim, in addition to the bridge (2) The part also protrudes toward the front of the frame, which makes it possible to maximize the three-dimensional appearance.
본 발명의 안경테(1)를 제조하기 위해서는 적어도 두벌이상의 프레스금형이 구비되어야 하며, 안경소재로 사용할 얇은 금속판재(11)를 프레스 성형할 것인지, 또는 레이저 가공기 등과 같은 공작기계를 통하여 가공할 것인지에 따라 금형의 수량은 가감된다.In order to manufacture the spectacle frame 1 of the present invention, at least two or more press molds should be provided, and depending on whether to press-form a thin metal plate 11 to be used as a spectacle material or to process through a machine tool such as a laser processing machine, etc. The quantity of the mold is added or subtracted.
다시 말하면, 얇은 금속판재(11)를 프레스를 이용하여 평면상의 안경테(1')를 따 내고자 할 때는 금형수가 하나 더 늘어나며, 레이저 가공기 등과 같은 공작기계 등을 이용하는 경우에는 전술한 프레스 금형이 불필요하다는 것이다.In other words, when the thin metal plate 11 is used to extract the flat eyeglass frame 1 'by using a press, the number of molds is increased by one, and the above-described press mold is unnecessary when using a machine tool such as a laser processing machine. will be.
그러나 본 발명에서는 금형의 수가 중요한 것은 아니며, 이는 가공방법, 또는 제조방법에 따라 다양하게 변화될 수 있는 것이라 하겠다.However, in the present invention, the number of molds is not important, which may be variously changed depending on a processing method or a manufacturing method.
또한, 안경테의 형상을 프레스로 따내어 형성하거나 공작기계등을 이용하여 일체로 가공하는 기술 및 방법은 이미 알려진 주지사실이기에 더이상의 설명은 피한다.In addition, since the technique and method for forming the shape of the spectacle frame by pressing or integrally processing by using a machine tool or the like are already known governing facts, further description will be avoided.
이하 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail.
먼저, 안경소재로 사용되며 소정의 두께로 형성된 티타늄 등의 얇은 금속판재(11)(제조하고자 하는 안경테의 두께를 감안하여 구비함)를 구비하여 이를 프레스 또는 레이저가공기 등의 성형장치(7)을 이용하여 양측부에 길이가 다소 긴 돌출부(13')와 두개의 림(12), 그리고 코다리(14')를 가진 평판형의 안경테(1')를 형성한다.First, a thin metal plate 11 (e.g., provided in consideration of the thickness of the spectacle frame to be manufactured), which is used as a spectacle material and formed to a predetermined thickness, is used to form a molding apparatus 7 such as a press or a laser processing machine. It is used to form a flat spectacle frame 1 'having a slightly longer protrusion 13', two rims 12, and a nose leg 14 'on both sides.
이어서 안경테의 림(12)을 끼워 지지할 수 있는 림 지지돌부(41)와 상기 돌출부(13')를 타압하여 장석으로 형성할 수 있도록 된 장석 성형요부(42)를 가진 장석형성용 금형(4)을 구비하고, 상기 장석형성용 금형(4)에 평판형의 안경테(1')를 장착시킨 뒤, 장석성형요부(42) 밖으로 돌출된 돌출부(13')를 펀치 또는 해머 등의 장치(43)로서 타압시킴으로서 길이가 긴 돌출부(13')가 짧아지면서 장석성형요부(42)의 형상으로 형성되게 한다. 이때 상기한 돌출부(13')는 길이가 줄게 되는 동시에 폭과 두께가 신장되어 안경테(1)와 일체로 된 장석(13)으로 형성되게 된다.Subsequently, the feldspar forming mold 4 having a lip support protrusion 41 capable of supporting the rim 12 of the spectacle frame and a feldspar forming recess 42 which is capable of forming the feldspar by pressing the protrusion 13 '. After mounting the plate-shaped spectacle frame 1 'to the feldspar forming die 4, the projections 13' protruding out of the feldspar forming recess 42 are punched or hammered. By pressing it as), the long projection 13 ′ is shortened to form the feldspar molding recess 42. At this time, the protrusion 13 'is reduced in length and at the same time as the width and thickness are elongated to form a feldspar 13 integral with the spectacle frame 1.
이어서 상기 평판형의 안경테(1')를 안착시킬 수 있도록 두개의 림삽입돌부와 코다리 성형부를 가진 프레스 금형(5)을 구비하여 상기 프레스 금형(5)에 평판형의 안경테(1')를 취부한 뒤 프레스 등의 성형장치(7')를 통하여 성형하면 코다리(14)가 입체적으로 돌출되며, 마치 종래 별도용접하였던 코다리와 극히 동일 유사한 코다리로 형성되게 된다.Subsequently, a press mold 5 having two rim insertion protrusions and a nose leg forming portion is provided to mount the plate-shaped spectacle frame 1 'and the plate-shaped spectacle frame 1' is mounted on the press mold 5. After molding through a molding apparatus 7 'such as a press, the cord legs 14 are three-dimensionally protruded, and are formed of cord legs that are very similar to the cord legs previously welded separately.
위와 같은 일련의 공정을 통하여 제조된 본 발명의 안경테 림(12)의 내측에 통상의 방법으로 렌즈고정홈을 가공형성하고, 이어서 장석부(13)를 횡방향으로 컷팅한 뒤, 컷팅된 상 하부장석부에 각각 나사구멍과 관통구멍을 각각 형성하면 된다.After forming the lens fixing groove in a conventional manner to the inside of the eyeglass frame 12 of the present invention manufactured through a series of processes as described above, and then cut the feldspar portion 13 in the transverse direction, and then cut the upper image What is necessary is to form a screw hole and a through hole, respectively, in a stone part.
다시 말하면, 본 발명은 안경테를 제조 형성함에 있어서, 상기와 같은 소정의 공정을 통하여 제조됨에 따라 얇은 금속판재(11)로 코다리(14), 장석부(13)가 일체로 형성되면서도 코다리(14)는 입체적으로 돌출 형성되고, 장석부(13)는 소정의 두께와 폭을 가진 형상으로 형성되면서도 용접부위가 전혀 없는 입체적인 안경테를 제공하게 된다는 것이다.In other words, according to the present invention, in manufacturing and forming the spectacle frame, the cord leg 14 and the feldspar part 13 are integrally formed with the thin metal plate 11 as the cord leg 14 is manufactured through a predetermined process as described above. Is formed three-dimensionally protruding, feldspar portion 13 is to provide a three-dimensional spectacle frame with no welded portion while being formed in a shape having a predetermined thickness and width.
한편, 본 발명의 제조방법을 이용하여 별도 형성되는 연결구(15)(안경다리를 연결하기 위한 부분을 말함. 업계에서는 '미미'라 함)를 일체로 형성할 수도 있으며, 이 경우 금형에 연결구 성형요홈을 형성하고, 평판형 안경테(1')에는 연결구를 형성하기 위한 돌출부를 길게 형성하여 이 또한 펀치 또는 해머등을 이용하여 타압형성하여 연결구를 형성하고, 이어서 상기 연결구(15)를 절곡형성하면 된다.On the other hand, using the manufacturing method of the present invention may be formed integrally formed connector 15 (part for connecting the glasses legs. In the industry, referred to as 'mimi') integrally, in this case forming a connector in the mold If the groove is formed, and the plate-shaped spectacle frame 1 'is formed with a protruding portion for forming the connector, the pressure is formed using a punch or a hammer, and the connector is formed, and then the connector 15 is bent. do.
또한 상기와 같이 연결구를 일체로 형성하는 안경의 경우에는 도 4에서 보는바와 같이 온테안경뿐만 아니라 반테안경(1a)의 경우에 더 적합할 수 있으며, 그 이유는 온테 안경의 경우는 렌즈의 삽입 및 분해가 용이하도록 장석부가 형성되어야 하고 더불어 안경다리를 연결 조립하기 위한 연결구(15)가 설치 구성되어야 하지만 반테안경(1a)의 경우는 상기한 장석부가 전혀 불필요하기 때문에 연결구(15)를 일체로 형성하기 용이하다는 것이다.In addition, in the case of the eyeglasses integrally forming the connector as described above, as shown in FIG. The feldspar should be formed to facilitate disassembly, and the connector 15 for connecting and assembling the glasses legs should be installed. However, in the case of the vante glasses 1a, the connector 15 is integrally formed because the feldspar is not necessary at all. It is easy to do.
이와 같이 구성된 본 발명은 티타늄 등과 같은 안경소재로 사용되는 금속을 얇은 금속판재(11)로 구성하여 이를 프레스가공 또는 레이저절단 등등의 여러가지 가공방법들을 이용하여 두개의 림(12)과 코다리(14)가 일체로 형성된 평면상의 안경테(1')로 성형 또는 형성하되, 안경테(1')의 양측부에 길이가 제법 긴 돌출부(13')가 일체로 되게 형성하고, 이를 프레스금형을 이용하여 코다리(14)가 안경테의 정면으로 돌출되도록 성형하며 이어서 림삽입돌부(41)와 장석성형요부(42)를 가진 장석형성용 금형(4)에 상기 안경테를 끼운 상태에서 돌출부를 펀치 또는 해머 등의 장치(43)로서 측면에서 타압 성형하면 돌출부(13')가 장석성형요부(42)의 모양과 동일한 모양으로 성형되어 장석부(13)가 형성되는 것이다.The present invention configured as described above consists of a thin metal plate 11 made of metal used as a spectacle material such as titanium, and two rims 12 and a cord bridge 14 using various processing methods such as press working or laser cutting. Is formed or formed into an integrally formed flat eyeglass frame 1 ', but the protruding portion 13' having a fairly long length is integrally formed at both sides of the eyeglass frame 1 ', and the cord is formed using a press mold ( 14 is molded to protrude toward the front of the spectacle frame, and then the projection is inserted into the feldspar forming mold 4 having the rim insertion protrusion 41 and the feldspar forming recess 42 in the state where the spectacle is punched or a device such as a hammer ( 43), when the pressure is molded from the side, the protrusion 13 'is shaped into the same shape as that of the feldspar molding recess 42, so that the feldspar 13 is formed.
따라서 안경테를 티타늄 등의 얇은 금속판재를 이용하여 성형 또는 형성함에 있어 코다리(14)는 물론 장석부(13)도 용접부위가 전혀 없이 일체로 형성되는 것이며, 더불어 장석부(13)는 타 부위보다 배 정도 두껍게 형성되게 되어 장석부(13)로서의 기능 및 작용을 원활하게 수행할 수 있게 되는 것이다.Therefore, in forming or forming the spectacle frame by using a thin metal plate such as titanium, the ridge 14 as well as the feldspar 13 are formed integrally without welding at all, and the feldspar 13 is more than other portions. It is formed to be about twice as thick to be able to smoothly perform the function and action as the feldspar portion (13).
다시 말하면, 본 발명은 안경테두께와 동일한 두께를 가진 얇은금속판재(11)를 이용하여 안경테(1)를 형성함에 있어서, 장석부(14)를 안경테두께의 배 정도로 두껍게 형성할 수 있게 함에 특징이 있으며, 상기 장석부(14)가 단조공법에 의해 형성되기 때문에 이 부분이 매우 여물게 형성될 수 있는 것이고, 더불어 코다리(14)를 돌출 성형함으로서 종래 용접방식에 의해 제조되는 안경테와 비교할 때 모양상으로는 차이가 전혀 없으면서도 외관은 용접부위가 전혀 없어 깔금하고, 또, 일체형이므로 내구성과 견고함이 매우 뛰어난 안경테를 제공하게 된다는 것이다.In other words, the present invention is characterized in that in forming the spectacle frame 1 using the thin metal plate 11 having the same thickness as the spectacle frame, the feldspar portion 14 can be formed to be about twice the thickness of the spectacle frame. In addition, since the feldspar portion 14 is formed by a forging method, this part may be formed very thinly, and in addition, the shape of the feldspar 14 may be formed by protruding the corridor 14 in comparison with a spectacle frame manufactured by a conventional welding method. In spite of no difference, the exterior is completely welded and has no welding area, and because it is an integrated type, it provides an excellent frame for durability and robustness.
한편, 본 발명을 실시함에 있어서, 장석부(13)를 형성하기에 앞서 코다리(14)를 먼저 입체화 시킬 수도 있으며, 이 경우에도 제조상에 문제가 전혀 없다.On the other hand, in the practice of the present invention, prior to forming the feldspar portion 13, the corridor 14 may be three-dimensionally first, even in this case there is no problem in manufacturing.
따라서 이러한 공정 또는 가공순서 등이 뒤바뀌더라도 본 발명을 실시함에 전혀 문제가 없는 것이기에 이러한 변형 및 변화는 당연히 본 발명의 권리범위에 속하는 것이라 하겠다.Therefore, even if such a process or processing order is reversed, since there is no problem in carrying out the present invention, such modifications and changes will naturally be within the scope of the present invention.
이상 설명한 바와 같이 본 발명은 티타늄 등의 얇은 금속판재(11)를 이용하여 코다리(14)와 장석부(13)를 일체로 형성하되, 상기 코다리(14)는 정면으로 돌출되어 매우 입체적이도록 하고, 장석부(13)는 두께가 림의 두께보다 두껍게 형성하여 장석부(13)로서의 기능을 원활하게 수행할 수 있도록 함으로서, 용접부위가 전혀 없어 외관이 매우 미려단정하고, 림(12)과 코다리(14), 장석부(13)가 일체로 형성된 것이기에 내구성이 매우 뛰어남은 물론 호환성이 극대화되는 것이며, 불량발생률이 극소화됨과 동시에 양산이 용이하게 원가절감효과 및 신뢰성을 극대화시킬 수 있는 매우 유용한 발명인 것이다.As described above, the present invention uses the thin metal plate 11 such as titanium to form the cordari 14 and the feldspar 13 integrally, but the cordarial 14 protrudes to the front to be very three-dimensional, The feldspar portion 13 is formed to be thicker than the thickness of the rim to smoothly perform the function as the feldspar portion 13, there is no welding site, so the appearance is very beautiful, and the rim 12 and the cord ( 14) Since the feldspar part 13 is formed integrally, it is very excellent in durability and maximizes compatibility, and is a very useful invention that can minimize the occurrence rate of defects and at the same time maximize the cost reduction effect and reliability.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030078557A KR100576777B1 (en) | 2003-11-07 | 2003-11-07 | manufacturing process of a spectacles frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030078557A KR100576777B1 (en) | 2003-11-07 | 2003-11-07 | manufacturing process of a spectacles frame |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040014376A true KR20040014376A (en) | 2004-02-14 |
KR100576777B1 KR100576777B1 (en) | 2006-05-03 |
Family
ID=37321381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030078557A KR100576777B1 (en) | 2003-11-07 | 2003-11-07 | manufacturing process of a spectacles frame |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100576777B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20190051645A (en) | 2017-11-07 | 2019-05-15 | 이동국 | manufacturing process of a spectacles frame |
KR20190128838A (en) * | 2018-05-09 | 2019-11-19 | 공주대학교 산학협력단 | Method for making clad metals eyeglasses |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101389385B1 (en) * | 2013-05-31 | 2014-04-25 | 권귀애 | Metal glasses frames |
KR102353763B1 (en) | 2020-03-11 | 2022-01-19 | 김상길 | Method for manufacturing of eyeglass frame and itself |
-
2003
- 2003-11-07 KR KR1020030078557A patent/KR100576777B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20190051645A (en) | 2017-11-07 | 2019-05-15 | 이동국 | manufacturing process of a spectacles frame |
KR20190128838A (en) * | 2018-05-09 | 2019-11-19 | 공주대학교 산학협력단 | Method for making clad metals eyeglasses |
Also Published As
Publication number | Publication date |
---|---|
KR100576777B1 (en) | 2006-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101893769A (en) | Lens fixing method for rimless eyeglasses, and rimless eyeglasses using the same | |
KR20080042287A (en) | Manufacturing method of the housing for lcd module and housing made by the same | |
TW200803687A (en) | Manufacturing method of the housing for LCD module and housing made by the same | |
EP1120678A1 (en) | Method for securing spectacle members together | |
WO2002059682A3 (en) | Method for manufacturing an eyeglass lens | |
KR100576777B1 (en) | manufacturing process of a spectacles frame | |
KR101712975B1 (en) | Method for manufacturing metal glass frame and metal glass frame manufactured by the same, and jig device therefor | |
IT8222691A1 (en) | PROCEDURE FOR MANUFACTURING AN ELASTIC ZIPPER FOR GLASSES | |
WO2005019903A3 (en) | A new type of eyewear with non-welding nosepad support arms | |
JP2007058189A (en) | Base plate for manufacturing front frame of spectacles and method for manufacturing front frame of spectacles | |
KR20110005468U (en) | The spectacles nose holder pillar combination structure of plastic eyeglass frames | |
JP6664294B2 (en) | Stamping die manufacturing method | |
CN102233592A (en) | Cutter and shearing machine with same | |
CN204770264U (en) | Work piece positioner | |
JP2007152417A (en) | Bending die device and bending method | |
KR100916692B1 (en) | Manufacturing method of glasses frames | |
KR101187819B1 (en) | Frame of spectacles with emproved shape stability | |
CN104690188B (en) | A kind of curved manufacture craft of glasses frame surfaces | |
JPH05173095A (en) | Production of joint-integrated rim for spectacles | |
KR100360625B1 (en) | Glasses lens frame | |
US5160947A (en) | Eyeglass frame with flanged bridge of NT alloy | |
US20060098295A1 (en) | Method for forming optical elements | |
CN109128693A (en) | The manufacturing method of fastener with full figure pattern | |
CN208937836U (en) | A kind of glasses | |
JP4291707B2 (en) | Mold for molding rubber composites |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
G15R | Request for early opening | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |