KR200367313Y1 - Water-resistant structure of floor of prefabricated house - Google Patents

Water-resistant structure of floor of prefabricated house Download PDF

Info

Publication number
KR200367313Y1
KR200367313Y1 KR20-2004-0022605U KR20040022605U KR200367313Y1 KR 200367313 Y1 KR200367313 Y1 KR 200367313Y1 KR 20040022605 U KR20040022605 U KR 20040022605U KR 200367313 Y1 KR200367313 Y1 KR 200367313Y1
Authority
KR
South Korea
Prior art keywords
floor slab
sandwich panel
bracket
fixed
panel
Prior art date
Application number
KR20-2004-0022605U
Other languages
Korean (ko)
Inventor
조진석
Original Assignee
조진석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조진석 filed Critical 조진석
Priority to KR20-2004-0022605U priority Critical patent/KR200367313Y1/en
Application granted granted Critical
Publication of KR200367313Y1 publication Critical patent/KR200367313Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/644Damp-proof courses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys

Abstract

본 고안은 공장이나 주택, 창고 등의 목적으로 시공되는 조립식 건물의 하부 방수 시공구조에 대한 것으로, 특히 바닥슬래브의 타설전 거푸집의 내측 주면에 지면으로부터 이격된 가이드레일을 장착 형성한 상태에서 바닥슬래브를 타설하여, 양생된 바닥슬래브의 가장자리에 일정깊이의 단턱이 연속하여 형성되게 하여, 상기 단턱에 샌드위치패널을 입설 시공함으로서,The present invention relates to the waterproof structure of the lower part of the prefabricated building, which is constructed for the purpose of factory, house, warehouse, etc., especially the floor slab with the guide rail spaced from the ground on the inner main surface of the formwork before placing the floor slab. By pouring the step of forming a continuous step on the edge of the hardened floor slab to a constant depth, by installing a sandwich panel on the step,

바닥슬래브의 하향단턱에 샌드위치패널을 안치 고정하므로 그 샌드위치패널의 안치작업이 용이해지는 것이며, 바닥슬래브의 표면보다 그 샌드위치패널의 하향 안치되어 있으므로 빗물이나 패널 외벽을 타고 흘러내리는 물기의 유입이 되지 않으므로 보다 효과적인 방수작업 가능한 조립식 건물의 하부방수 시공구조에 관한 것이다.The sandwich panel is secured to the bottom end of the floor slab to facilitate the settlement of the sandwich panel, and since the sandwich panel is settled downward rather than the surface of the floor slab, it does not flow in rainwater or water flowing down the panel outer wall. The present invention relates to a bottom waterproof construction structure of a prefabricated building that can be more effectively waterproofed.

Description

조립식 건물의 하부방수 시공구조 {Water-resistant structure of floor of prefabricated house}Water-resistant structure of floor of prefabricated house

본 고안은 공장이나 주택, 창고 등의 목적으로 시공되는 조립식 건물의 하부 방수 시공구조에 대한 것으로, 특히 콘크리트 바닥슬래브와 측벽으로 사용되는 샌드위치패널간의 시공구조를 개선함으로서, 효과적인 방수는 물론 그 방수시공의 용이함을 제공하는 조립식 건물의 하부방수 시공구조에 관한 것이다.The present invention is for the waterproof structure of the lower part of the prefabricated building which is constructed for the purpose of factory, house, warehouse, etc. In particular, by improving the construction structure between the concrete floor slab and the sandwich panel used as the side wall, effective waterproof as well as the waterproof construction A bottom waterproof construction of a prefabricated building is provided.

일반적으로 공장이나 주택, 연립, 빌라, 아파트, 별장, 연수원, 교회, 성당, 사옥, 학교, 음악관, 휴게소, 체육관, 공공기관 등을 시공함에 있어, 설계 및 시공의 용이함을 고려하여 샌드위치패널을 조립하여 측벽을 형성하는 형태의 조립식 건물이 시공되고 있으며, 이러한 조립식 건물은 건축비의 절감은 물론 공사기간이 단축되므로 창고나 공장 등을 시공할때에 많이 적용되는 방법이다.In general, sandwich panels are assembled for ease of design and construction in the construction of factories, houses, townhouses, villas, apartments, cottages, training centers, churches, cathedrals, offices, schools, music halls, rest areas, gymnasiums, and public institutions. Prefabricated buildings are formed in the form of sidewalls, and these prefabricated buildings are a method that is widely applied when building warehouses or factories, as well as reducing construction costs and shortening construction periods.

즉, 상기한 조립식 건물의 시공구조는 도 1의 도시와 같이, 지면(100) 상에 콘크리트 혼합물에 의한 바닥슬래브(101)를 타설하고, 그 바닥슬래브(101)의 가장자리에 샌드위치패널(102)(102')을 수직 입설하는 것이며, 그 샌드위치패널(102)(102')의 선단에는 지붕(103)을 형성하여 내부공간을 갖는 건물을 완성하게 되는 것이다.That is, in the construction structure of the prefabricated building, as shown in FIG. 1, the floor slab 101 is cast on the ground 100 by the concrete mixture, and the sandwich panel 102 is disposed at the edge of the floor slab 101. 102 'is vertically placed, and the roof 103 is formed at the front end of the sandwich panels 102 and 102' to complete the building having the internal space.

여기서, 상기한 샌드위치패널은 유리섬유를 내심재로 하여 어떤 자재도 따라올 수 없는 완벽한 불연 및 방화성능으로 화재 발생시 피해를 최소한으로 줄일 수 있으며, 뛰어난 흡음효과로 별도의 흡음재를 사용하지 않아도 되며 체육시설 등 소음이 많은 건축물에 적합한 것으로서, 내장된 유리섬유 자체가 가늘고 균일한 섬유경으로 구성되어 열전도율이 낮고 단열 및 보온효과가 뛰어나 냉,난방비를 절약할 수 있을 뿐만 아니라, 자체 강도가 강한 내,외부 표면제와 복원력과 인장력이 우수한 유리섬유를 수직 성형하게 되므로, 건물의 내구성이 뛰어나며 압축강도와 구조력이 우수한 것으로 알려져 있는 것이다.Here, the sandwich panel is made of glass fiber as the inner core material, the flammability and fire resistance that can not follow any material can be reduced to a minimum in the event of a fire, the sound absorption effect does not need to use a separate sound absorbing material, It is suitable for buildings with high noise such as facilities, and the built-in glass fiber itself is composed of thin and uniform fiber diameter, which has low thermal conductivity, excellent insulation and thermal insulation effect, and saves cooling and heating costs. Since it is the vertical molding of the glass fiber with excellent external surface agent and the restoring force and tensile strength, the building is known to be excellent in durability and excellent in compressive strength and structural strength.

그러나, 상기한 바와 같은 시공구조에 의한 건축물은 바닥슬래브와 샌드위치패널의 하단 시공부의 틈새로 인한 누수가 발생하는 문제점이 있는데, 상기한 누수를 방지하고자 바닥슬래브와 샌드위치패널간의 틈새 전,후에 별도의 방수실링처리를 하고 있는 것이다.However, there is a problem in that the building by the construction structure as described above due to the gap caused by the gap of the bottom construction portion of the floor slab and the sandwich panel, before and after the gap between the floor slab and the sandwich panel to prevent the leakage. It is waterproof sealing.

따라서, 상기한 방수실링부에 의한 방수효과를 기대하고 있으나, 상기한 실링부는 작업자에 의해 인위적인 실링액의 도포에 따라 형성되는 것이므로, 실링부가 연속되지 아니하고 중간에 끊김이 발생하거나 틈새가 발생하는 경우에는 방수가 이루어지지 않는 것이며,Therefore, the waterproofing effect is expected by the waterproof sealing part, but the sealing part is formed by the application of artificial sealing liquid by the operator, so that the sealing part is not continuous and a break occurs or a gap occurs in the middle. Is not waterproof,

시간이 경과함에 따라 실링부의 접착성이 저하되거나 실링부의 물성이 변화함에 따라 방수효과가 급격히 저하되어 외부로부터 빗물이 유입되는 문제점이 있는 것인데,As time goes by, the adhesiveness of the sealing portion decreases or the waterproofing effect decreases rapidly as the physical properties of the sealing portion change.

건물 외부에 비가 내리는 경우 그 빗물은 상기한 틈새로 직접 유입되거나, 상기 샌드위치패널을 외벽을 타고 흘러내리다가 그 틈새로 유입되는 문제점이 있는 것인데, 그 바닥슬래브의 높이와 샌드위치패널의 하단이 동일한 높이에서 시공되므로 평활면을 따라 외부의 빗물이 보다 쉽게 유입되는 구조적인 불합리성을 갖고 있는 것이다.When rain falls outside the building, the rainwater flows directly into the gap, or flows down the sandwich panel through the outer wall, and then enters the gap. The height of the floor slab and the bottom of the sandwich panel are the same height. Since it is constructed at, it has structural irrationality that rainwater from outside is more easily introduced along the smooth surface.

본 고안은 전기한 바와 같은 문제점을 제거코자 안출된 것으로서, 바닥슬래브의 타설전 거푸집의 내측 주면에 지면으로부터 이격된 가이드레일을 장착 형성한 상태에서 바닥슬래브를 타설하여, 양생된 바닥슬래브의 가장자리에 일정깊이의 단턱이 연속하여 형성되게 하여, 상기 단턱에 샌드위치패널을 입설 시공함으로서,The present invention was conceived to eliminate the problems as described above, in the state of mounting the guide rail spaced from the ground on the inner main surface of the formwork before placing the bottom slab by pouring the bottom slab, the edge of the cured floor slab By making the stepped jaw of a certain depth continuously, by installing a sandwich panel on the stepped jaw,

바닥슬래브의 하향단턱에 샌드위치패널을 안치 고정하므로 그 샌드위치패널의 안치작업이 용이해지는 것이며, 바닥슬래브의 표면보다 그 샌드위치패널의 하향 안치되어 있으므로 빗물이나 패널 외벽을 타고 흘러내리는 물기의 유입이 되지 않으므로 보다 효과적인 방수작업 가능한 조립식 건물의 하부방수 시공구조를 제공함에 본 고안의 목적이 있는 것이다.The sandwich panel is secured to the bottom end of the floor slab to facilitate the settlement of the sandwich panel, and since the sandwich panel is settled downward rather than the surface of the floor slab, it does not flow in rainwater or water flowing down the panel outer wall. It is an object of the present invention to provide a waterproof structure of the lower portion of the prefabricated building capable of more effective waterproof work.

도 1은 종래 조립식 건물의 하부 시공구조를 보인 전체도1 is an overall view showing a lower construction structure of a conventional prefabricated building

도 2는 본 고안 시공구조를 가능케 하는 조립체의 분리사시도Figure 2 is an exploded perspective view of the assembly to enable the subject innovation construction structure

도 3는 본 고안 시공구조를 가능케 하는 조립체의 설치사시도Figure 3 is an installation perspective view of the assembly to enable the subject innovation construction structure

도 4a 내지 도 4d는 본 고안 시공구조의 공정별 작업과정도로서,4a to 4d is a process diagram of the process according to the present invention construction structure,

도 4a는 거푸집에 조립체를 장착한 상태의 측단면도Figure 4a is a side cross-sectional view of the assembly mounted on the formwork

도 4b는 조립체를 갖는 거푸집에 콘크리트를 타설하는 작업도4b is a working view of placing concrete in a formwork having an assembly

도 4c는 콘크리트 슬래브가 양생된 상태에서 조립체를 제거하는 작업도Figure 4c is a working view to remove the assembly in the concrete slab curing state

도 4d는 콘크리트 슬래브의 가장자리에 형성된 안치턱에 샌드위치패널을 입설한 상태의 측단면도Figure 4d is a side cross-sectional view of the sandwich panel installed on the settling formed on the edge of the concrete slab

도 5는 본 고안 시공구조에 의해 완성된 조립식 건물의 전체 단면도5 is an overall cross-sectional view of the prefabricated building completed by the present invention construction structure

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 목적지반 2 : 거푸집1: destination class 2: formwork

3,3' : 가이드레일 4,4' : 고정볼트3,3 ': Guide rail 4,4': Fixed bolt

5,5' : 나사못 6 : 바닥슬래브5,5 ': Screw 6: Floor slab

7 : 하향안치턱7: downward lower jaw

10 : 브라켓 11,11' : 수직공10: bracket 11,11 ': vertical hole

12,12' : 수평공12,12 'horizontal ball

20 : 고정편 21,21' : 나사공20: fixing piece 21, 21 ': screw hole

30,30' : 샌드위치패널30,30 ': Sandwich panel

이하, 본 고안의 바람직한 실시예를 설명한다.Hereinafter, preferred embodiments of the present invention will be described.

도 2는 본 고안 시공구조를 가능케 하는 조립체의 분리사시도이고, 도 3는 본 고안 시공구조를 가능케 하는 조립체의 설치사시도이다.Figure 2 is an exploded perspective view of the assembly to enable the construction of the subject innovation, Figure 3 is an installation perspective view of the assembly to enable the construction of the subject innovation.

목적지반(1)에 가설되는 거푸집(2)의 내측면에 지면으로부터 이격된 가이드레일(3)(3')을 상향 이격 고정하되,While fixing the guide rail (3) (3 ') spaced apart from the ground on the inner surface of the formwork (2), which is installed in the destination panel (1),

수직공(11)(11')과 수평공(12)(12')이 형성된 'ㄴ'자 상의 브라켓(10)과, 그 가이드레일(3)(3') 내측에 삽입되어 상기 브라켓(10)과 대응되는 위치의 나사공(21)(21')을 갖는 고정편(20)을,The bracket 10 on the 'b' shape having the vertical holes 11, 11 ′ and the horizontal holes 12, 12 ′ formed therein, and inserted into the guide rails 3, 3 ′ inside the bracket 10. Fixing piece 20 having screw holes 21 and 21 'at a position corresponding to

상기 수평공(12)(12')으로부터 삽입된 고정볼트(4)(4')에 의해 상호 결합 고정하여 상기 가이드레일(3)(3')에 일정간격으로 이격 고정하고,Fixed to the guide rails (3) and (3 ') to be spaced apart and fixed to each other by a fixed bolt (4) (4') inserted from the horizontal hole (12) (12 '),

상기 브라켓(10)은, 수직공(11)(11')에 나사못(5)(5')을 삽입하여 상기 거푸집(2)과 고정되게 하여,The bracket 10 is inserted into the screws (5) (5 ') in the vertical hole (11) (11') to be fixed to the formwork (2),

목적지반(1) 상에 타설되는 바닥슬래브(6)의 가장자리에 상기 가이드레일(3)(3')에 의해 샌드위치패널(30)(30') 설치용 하향안치턱(7)이 형성되게 구성한 것이다.The guide rails 3 and 3 'are formed on the edge of the bottom slab 6 to be placed on the destination panel 1 so that the downward set-up jaws 7 for installing the sandwich panels 30 and 30' are formed. .

이상과 같은 본 고안 조립식 건물의 하부방수 시공구조의 시공과정을 첨부도면에 의해 보다 상세히 설명하면 다음과 같다.If described in more detail by the accompanying drawings the construction process of the waterproof construction structure of the present invention prefabricated building as follows.

먼저, 상기한 바닥슬래브(6)의 가장자리부에 하향안치턱(7)을 형성하기 위한 조립체의 구조를 설명하면,First, when describing the structure of the assembly for forming the down-settling 7 in the edge portion of the bottom slab 6,

상기한 조립체는 가이드레일(3)(3')과 그 가이드레일(3)(3')을 고정하기 위한 브라켓(10)과 고정편(20)으로 이루어진 것으로서, 상기한 가이드레일(3)(3')의 상측에 상기한 브라켓(10)을 올려놓고, 그 브라켓(10) 하측에 위치하는 가이드레일(3)(3')의 내측에는 상기한 고정편(20)을 위치시켜, 별도의 고정볼트(4)(4')를 브라켓(10)의 수평공(12)(12')을 관통하여 고정편(20)의 나사공(21)(21')에 회전 결합하면 상기한 브라켓(10) 및 고정편(20)이 임시로 고정되는 것이다.The assembly comprises a guide rail (3) (3 ') and a bracket (10) and a fixing piece (20) for fixing the guide rail (3) (3'), the guide rail (3) ( The bracket 10 is placed on the upper side of the 3 '), and the fixing piece 20 is placed inside the guide rails 3 and 3' positioned below the bracket 10. When the fixing bolts (4) and 4 'are rotated through the horizontal holes (12) and (12') of the bracket (10) to the screw holes (21) (21 ') of the fixing piece (20), the bracket ( 10) and the fixing piece 20 is to be temporarily fixed.

따라서, 상기한 브라켓(10)과 고정편(20)은 고정볼트(4)(4')에 의해 임시 결합된 상태에서 가이드레일(3)(3')로부터 느슨한 지지상태를 갖고 있으므로 작업자에 의해 원하는 지점까지 가이드레일(3)(3')을 따라 이동 가능한 상태가 되는 것이다.Therefore, the bracket 10 and the fixing piece 20 are loosely supported from the guide rails 3 and 3 'in the state of being temporarily coupled by the fixing bolts 4 and 4'. It will be in a state capable of moving along the guide rail (3) (3 ') to the desired point.

또한, 작업자에 의해 목적하는 위치까지 상기 브라켓(10)을 이동시킨 다음, 상기한 브라켓(10)과 고정편(20)을 연결하고 있는 고정볼트(4)(4')를 회전시켜 하부 고정편(20)이 상측으로 밀착되게 하면, 그 브라켓(10)과 고정편(20)의 사이에 위치하는 가이드레일(3)(30')은 선단부가 압압 고정되며 견고한 일체의 조립체가 되는 것이다.In addition, the bracket 10 is moved to a desired position by an operator, and then the lower fixing piece is rotated by rotating the fixing bolts 4 and 4 'connecting the bracket 10 and the fixing piece 20 to each other. When the 20 is in close contact with the upper side, the guide rails 3 and 30 ′ positioned between the bracket 10 and the fixing piece 20 are pressed together and fixed together to form a solid integrated assembly.

이러한 결합상태를 갖는 조립체의 브라켓(10)을 거푸집(2)의 내측면에 밀착시키고, 그 브라켓(10)의 수직공(11)(11')에 나사못(5)(5')을 사용하여 거푸집(2)과 고정시키면, 상기한 가이드레일(3)(3')은 목적지반(1)으로부터 소정 높이 상향 고정되는 것이다.The bracket 10 of the assembly having such a bonding state is brought into close contact with the inner surface of the formwork 2, and the screws 5, 5 'are used in the vertical holes 11, 11' of the bracket 10. When fixed with the formwork 2, the guide rails 3 and 3 'are fixed upward from the destination board 1 by a predetermined height.

특히, 하나의 가이드레일(3)(3')에는 수개의 브라켓(10)이 삽입되어 거푸집(2)에 고정된 각각의 브라켓(10)에 의해 상기 가이드레일(3)(3')이 상향 고정되는 것이며, 상기 브라켓(10)은 좌,우 이동이 가능하므로 일정간격 또는 필요한 위치까지 이동시켜 안정된 고정구조를 갖게 할 수 있는 것이다.In particular, a plurality of brackets 10 are inserted into one guide rail 3, 3 ′, and the guide rails 3, 3 ′ are upwardly moved by respective brackets 10 fixed to the formwork 2. It is to be fixed, the bracket 10 is to be able to move left, right, so as to move to a predetermined interval or a necessary position to have a stable fixed structure.

이러한 상태에서 콘크리트 혼합물을 목적지반(1)에 타설하여 바닥슬래브(6)를 완성하면 되는 것인데 이러한 작업과정을 상세히 설명하면,In this state, the concrete mixture is poured into the destination board (1) to complete the floor slab (6).

도 4a의 도시와 같이 목적지반(1)의 주변에 입설된 거푸집(2)의 내측에 가이드레일(3)(3')을 지면으로부터 일정 높이 이격된 상태로 브라켓(10) 및 고정편(20)에 의해 고정 형성한 상태에서, 도 4b의 도시와 같이 목적지반(1)에 콘크리트 혼합물을 타설하게 되면, 타설 후 시간이 경과함에 따라 상기한 콘크리트 혼합물은 견고하게 양생되는데, 충분한 양생시간이 경과한 후,As shown in FIG. 4A, the bracket 10 and the fixing piece 20 are disposed in a state in which the guide rails 3 and 3 'are spaced apart from the ground by the guide rails 3 and 3' inside the formwork 2 placed around the destination panel 1. When the concrete mixture is poured into the destination board 1 as shown in FIG. 4B in the fixedly formed state, the concrete mixture is solidly cured as time passes after the pouring, and sufficient curing time has elapsed. After

도 4c의 도시와 같이 거푸집(2)을 제거하게 되면 가이드레일(3)(3')을 고정하고 있던 브라켓(10) 및 고정편(20)이 거푸집(2)과 함께 분리되면서, 상기 바닥슬래브(6)의 가장자리부분에는 하향안치턱(7)이 형성되는 것이다.When the formwork 2 is removed as shown in FIG. 4C, the bracket 10 and the fixing piece 20, which are fixing the guide rails 3 and 3 ′, are separated together with the formwork 2, and thus, the bottom slab. At the edge of (6), the downward settlement (7) is formed.

따라서, 도 4d의 도시와 같이 상기한 하향안치턱(7)에 공지의 샌드위치패널(30)(30') 하단을 위치시켜 고정하면 되는 것이며, 그 샌드위치패널(30)(30')의 하단이 바닥슬래브(6)의 상부면보다 아랫쪽에 위치하고 있으므로, 외부로부터의 빗물이나 패널의 벽면을 타고 흘러내리는 물은 건물 내부로 유입되지 아니하고 외부로 그대로 흘러 나가게 되는 것이다.Therefore, as shown in FIG. 4D, the lower end of the sandwich panel 30, 30 ′ may be fixed to the downward settling 7, and the lower end of the sandwich panel 30, 30 ′ may be fixed. Since it is located below the upper surface of the floor slab (6), the rain water from the outside or the water flowing down the wall of the panel is not flowing into the building will flow out as it is.

또한, 필요에 의해 상기한 하향안치턱(7)과 샌드위치패널(30)(30')의 틈새에는 별도의 실링처리를 하여 보다 방수효과가 극대화되게 할 수도 있는 것이다.In addition, if necessary, a separate sealing treatment may be performed in the gap between the downward settling 7 and the sandwich panels 30 and 30 'to maximize the waterproof effect.

그러므로, 도 5의 도시와 같이 완성된 조립식 건물은 그 바닥슬래브와 샌드위치패널 간의 틈새로 빗물이 유입되는 등의 누수를 방지할 수 있는 효과적인 방수시공이 이루어지는 것이며,Therefore, the completed prefabricated building as shown in FIG. 5 is an effective waterproof construction that can prevent the leakage of rainwater flows into the gap between the floor slab and the sandwich panel,

샌드위치패널을 안치시키기 위한 하향안치턱(7)이 바닥슬래브(6)에 미리 형성되어 있으므로, 그 패널의 안치 및 고정이 보다 용이하므로 시공성 또한 크게 향상되는 것이다.Since the down seating jaw 7 for seating the sandwich panel is formed in advance in the bottom slab 6, since the settlement and fixing of the panel are easier, the workability is also greatly improved.

이상과 같은 본 고안 조립식 건물의 하부방수 시공구조는, 바닥슬래브의 하향단턱에 샌드위치패널을 안치 고정하므로 그 샌드위치패널의 안치작업이 용이해지는 것이며, 바닥슬래브의 표면보다 그 샌드위치패널의 하향 안치되어 있으므로 빗물이나 패널 외벽을 타고 흘러내리는 물기의 유입이 되지 않으므로 보다 효과적인 방수작업 가능한 것이다.The waterproof structure of the lower part of the prefabricated building of the present invention is easy to settle the sandwich panel because the sandwich panel is fixed to the lower end of the floor slab, and the sandwich panel is lower than the surface of the floor slab. Since rainwater or water flowing down the outer wall of the panel does not flow, more effective waterproofing is possible.

Claims (1)

목적지반(1)에 가설되는 거푸집(2)의 내측면에 지면으로부터 이격된 가이드레일(3)(3')을 상향 이격 고정하되,While fixing the guide rail (3) (3 ') spaced apart from the ground on the inner surface of the formwork (2), which is installed in the destination panel (1), 수직공(11)(11')과 수평공(12)(12')이 형성된 'ㄴ'자 상의 브라켓(10)과, 그 가이드레일(3)(3') 내측에 삽입되어 상기 브라켓(10)과 대응되는 위치의 나사공(21)(21')을 갖는 고정편(20)을,The bracket 10 on the 'b' shape having the vertical holes 11, 11 ′ and the horizontal holes 12, 12 ′ formed therein, and inserted into the guide rails 3, 3 ′ inside the bracket 10. Fixing piece 20 having screw holes 21 and 21 'at a position corresponding to 상기 수평공(12)(12')으로부터 삽입된 고정볼트(4)(4')에 의해 상호 결합 고정하여 상기 가이드레일(3)(3')에 일정간격으로 이격 고정하고,Fixed to the guide rails (3) and (3 ') to be spaced apart and fixed to each other by a fixed bolt (4) (4') inserted from the horizontal hole (12) (12 '), 상기 브라켓(10)은, 수직공(11)(11')에 나사못(5)(5')을 삽입하여 상기 거푸집(2)과 고정되게 하여,The bracket 10 is inserted into the screws (5) (5 ') in the vertical hole (11) (11') to be fixed to the formwork (2), 목적지반(1) 상에 타설되는 바닥슬래브(6)의 가장자리에 상기 가이드레일(3)(3')에 의해 샌드위치패널(30)(30') 설치용 하향안치턱(7)이 형성되게 함을 특징으로 하는 조립식 건물의 하부방수 시공구조.The guide rails 3 and 3 'are formed on the edge of the bottom slab 6 which is to be placed on the destination panel 1 so that the downward set-up jaw 7 for installing the sandwich panels 30 and 30' is formed. Waterproof construction of the lower part of the prefabricated building.
KR20-2004-0022605U 2004-08-09 2004-08-09 Water-resistant structure of floor of prefabricated house KR200367313Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0022605U KR200367313Y1 (en) 2004-08-09 2004-08-09 Water-resistant structure of floor of prefabricated house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0022605U KR200367313Y1 (en) 2004-08-09 2004-08-09 Water-resistant structure of floor of prefabricated house

Publications (1)

Publication Number Publication Date
KR200367313Y1 true KR200367313Y1 (en) 2004-11-11

Family

ID=49440833

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0022605U KR200367313Y1 (en) 2004-08-09 2004-08-09 Water-resistant structure of floor of prefabricated house

Country Status (1)

Country Link
KR (1) KR200367313Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022246499A1 (en) * 2021-05-22 2022-12-01 Fast Build Systems Pty Ltd Formwork system & method for forming a slab with a rebate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022246499A1 (en) * 2021-05-22 2022-12-01 Fast Build Systems Pty Ltd Formwork system & method for forming a slab with a rebate

Similar Documents

Publication Publication Date Title
JP2019504945A (en) Unit bus and manufacturing method thereof
KR101218810B1 (en) Structure of prefabricated bathroom
CN203821627U (en) Wall structure system with light steel keels, and wall
KR101630744B1 (en) Steel structure construction methods of building and apartment houses
KR20100070745A (en) Structure of prefabricated bathroom
KR200367313Y1 (en) Water-resistant structure of floor of prefabricated house
FI127802B (en) Method for constructing a building
KR100592466B1 (en) Doubled-wall structure completed by prefabbing panels
ATE430228T1 (en) PRECAST COMPONENT
KR100509270B1 (en) connect panel structure of waterproof for construction
CN207004096U (en) Using the modern dry bar residential architecture of dry method assembling structure
JP2004263500A (en) House reinforcing kit and method for using the same
KR950018994A (en) Method of constructing ondol floor of multi-family house and its device
KR200361541Y1 (en) Doubled-wall structure completed by prefabbing panels
US20230013178A1 (en) Floor and column structure
JPH0136467Y2 (en)
CN213174271U (en) Building wallboard structure
CN203821926U (en) Light steel keel structure system of earthquake-proof house
JPH0626131A (en) Execution method of precast concrete block with sound absorbing material
KR102271152B1 (en) Manufacturing Method of Factory-made Integrated Toilet Module
JPH0136468Y2 (en)
CN107327162B (en) Fabricated building
KR100513890B1 (en) Remodelling structure of building using steel material and light concrete panel
JP2009215750A (en) Chamber unit reinforcing structure of wooden house
KR20180003680A (en) Metal frame insert modular concrete buildings and its construction method

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee