KR200355450Y1 - A forming device for roof tile - Google Patents

A forming device for roof tile Download PDF

Info

Publication number
KR200355450Y1
KR200355450Y1 KR20-2004-0011561U KR20040011561U KR200355450Y1 KR 200355450 Y1 KR200355450 Y1 KR 200355450Y1 KR 20040011561 U KR20040011561 U KR 20040011561U KR 200355450 Y1 KR200355450 Y1 KR 200355450Y1
Authority
KR
South Korea
Prior art keywords
molding
metal plate
tile
roller
lower rollers
Prior art date
Application number
KR20-2004-0011561U
Other languages
Korean (ko)
Inventor
안연숙
Original Assignee
안연숙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안연숙 filed Critical 안연숙
Priority to KR20-2004-0011561U priority Critical patent/KR200355450Y1/en
Application granted granted Critical
Publication of KR200355450Y1 publication Critical patent/KR200355450Y1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D13/00Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form
    • B21D13/04Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form by rolling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/04Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work
    • B21D43/08Advancing work in relation to the stroke of the die or tool by means in mechanical engagement with the work by rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/20Storage arrangements; Piling or unpiling
    • B21D43/22Devices for piling sheets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/28Associations of cutting devices therewith
    • B21D43/287Devices for handling sheet or strip material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D45/00Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
    • B21D45/02Ejecting devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/24Roof covering by making use of flat or curved slabs or stiff sheets with special cross-section, e.g. with corrugations on both sides, with ribs, flanges, or the like
    • E04D3/30Roof covering by making use of flat or curved slabs or stiff sheets with special cross-section, e.g. with corrugations on both sides, with ribs, flanges, or the like of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

본 고안은 상기 1차 성형장치 후방으로 설치되는 것으로서, 후방에는 롤 형태의 금속판재가 설치되는 브래킷에 의해 지지되는 회전체와, 상기 회전체 전방에는 금속판재를 안내하는 가이드롤러로 구성되는 재료공급장치와; 상기 재료공급장치의 전방으로 설치되는 것으로서, 중앙과 중앙 양측으로 상하부롤러를 설치하되 상하부롤러 자체의 폭과 상하부롤러와 상하부롤러 사이의 간격을 전방으로 갈수록 좁게 설치하여 금속판재에 원형절곡부와 요철부가 점차적으로 자연스럽게 성형되게 하는 1차 성형장치와; 상기 1차 성형장치 전방으로 설치되는 것으로서, 실린더의 실린더축과 연결되는 상부금형과 이와 대향 설치되는 하부금형에 의해 금속판재에 성형된 원형절곡부 및 요철부와 교차되는 단턱부를 성형하는 2차 성형장치와; 상기 절단장치의 전방으로 설치되는 것으로서, 하부에는 이동이 편리하도록 캐스터가 설치되고 상부에는 절단장치에서 배출된 완제품의 기와를 출하전 대기 상태로 있게하는 프레임으로 구성되는 적재부를; 포함하여 구성됨으로써, 금속판재의 공급과정에서부터 성형과정, 절단과정을 일체의 연결라인으로 구성하여 작업성과 생산성을 대폭 향상시시킬 수 있도록 한 기와 성형장치를 제공하고자 하는 것이다.The present invention is installed to the rear of the primary molding apparatus, a material supply device consisting of a rotating body supported by a bracket in which a roll-shaped metal plate is installed at the rear, and a guide roller for guiding the metal plate in front of the rotating body. Wow; It is installed in front of the material supply device, the upper and lower rollers are installed in both the center and the center side, but the width of the upper and lower rollers themselves and the interval between the upper and lower rollers and the upper and lower rollers are narrower toward the front to the circular bending portion and uneven A primary molding apparatus for causing the parts to be gradually formed naturally; The secondary molding which is installed in front of the primary molding apparatus, forming the round bent portion formed in the metal plate material and the stepped portion intersecting the uneven portion by the upper mold connected to the cylinder shaft of the cylinder and the lower mold installed opposite thereto. An apparatus; It is installed to the front of the cutting device, the lower portion is provided with a caster for easy movement, the upper portion of the loading unit consisting of a frame to keep the tile of the finished product discharged from the cutting device in a standby state before shipping; It is intended to provide a tile forming apparatus that is configured to include a connecting line consisting of a metal plate supply process, forming process, and cutting process as an integrated connection line to significantly improve workability and productivity.

Description

기와 성형장치{A forming device for roof tile }Tile forming device {A forming device for roof tile}

본 고안은 기와 성형장치에 관한 것으로, 더욱 상세하게는 금속판재의 공급과정에서부터 성형과정, 절단과정을 일체의 연결라인으로 구성하여 작업성과 생산성을 대폭 향상시시킬 수 있도록 한 기와 성형장치에 관한 것이다.The present invention relates to a tile forming apparatus, and more particularly, to a tile forming apparatus that can improve the workability and productivity by forming a connecting line consisting of a metal plate supply process, forming process, and cutting process as an integrated connection line. .

일반적인 기와의 제조과정을 살펴보면 롤 형태의 금속판재을 공급하는 재료 공급과정, 공급된 철판을 성형하는 성형과정, 성형된 제품을 절단하는 절단과정 등으로 나누어 지며, 기와의 제조공정은 모든 공정이 반 수작으로 이루어지므로 시간이 많이 소요되고 생산량이 떨어져 작업성이 저조하므로 문제점이 있다.In general, the manufacturing process of roof tiles is divided into the material supply process for supplying the metal sheet in roll form, the molding process for forming the supplied iron sheet, and the cutting process for cutting the molded product. Since it takes a lot of time and yield is low workability has a problem.

한편, 상기와 같은 문제를 극복하기 위해 공급장치와 성형장치 및 절단장치의 연결라인을 이루는 기와 성형장치가 출시되고 있다.Meanwhile, in order to overcome the above problems, tile forming apparatuses forming a connection line between a supply apparatus, a molding apparatus, and a cutting apparatus have been released.

도 1에 도시된 바와 같이, 이러한 종래의 기와 성형장치(1)의 구성은 금속판재 (60)를 공급하여 원형절곡부(71)와 요철부(72)를 성형하고 원형절곡부(71)에 중앙돌조를 형성시킨 용마루를 성형함에 있어서, 하부롤러(28)와 상부롤러(24)를 6~10단계로 설치하여 금속판재(60)가 공급되며 모우터(202)와 체인(203)으로 하부롤러(28)에 연결하고 일측의 하부롤러(28)를 체인(203)으로 연결하여 연속 동작되도록 하는 1차 성형장치 (20)와, 상기 1차 성형장치(20)의 일측으로 성형되며 실리더(200)의 실린더축(201)고 연결되는 상부금형(31)의 하측으로 하부금형(32)이 설치되며, 하부금형(32)의 일부분에 중앙돌조를 성형하기 위한 중앙 성형금형이 하측의 실린더축(201)에 의하여 실린더 (200)와 연결되는 2차 성형장치(30)와, 상기 2차 성형장치(30)의 일측으로 실린더(200)의 실린더축(201)과 연결된 상부칼날(41)의 하측으로 하부칼날(42)을 설치하여 용마루를 절단하는 절단장치(40)로 구성된다.As shown in FIG. 1, the conventional tile forming apparatus 1 is configured to supply a metal plate 60 to form a circular bent portion 71 and an uneven portion 72 and to form a circular bent portion 71. In forming the ridge formed with the central protrusion, the lower roller 28 and the upper roller 24 are installed in 6 to 10 steps so that the metal plate 60 is supplied and the lower portion is provided to the motor 202 and the chain 203. A primary molding apparatus 20 connected to the roller 28 and connecting the lower roller 28 on one side with a chain 203 so as to be continuously operated, and molded into one side of the primary molding apparatus 20. The lower mold 32 is installed below the upper mold 31 connected to the cylinder shaft 201 of the 200, and a central molding mold for forming a central protrusion on a portion of the lower mold 32 has a lower cylinder. Secondary molding apparatus 30 is connected to the cylinder 200 by the shaft 201, and the cylinder shaft 201 of the cylinder 200 to one side of the secondary molding apparatus 30 The lower blade 42 is installed to the lower side of the upper blade 41 connected to the cutting device 40 is configured to cut the ridge.

그러나 이는 금속판재의 공급에서 부터 완제품에 이르기까지 완벽한 연결라인으로 구성되지 못하여 여전히 작업성과 생산성이 저조한 문제점이 있었다.However, this is not a complete connection line from the supply of metal sheet to the finished product, there was still a problem of low workability and productivity.

따라서 당업계에서는 완벽한 연결라인으로 구성되는 기와 성형장치 개발이 시급한 실정이다.Therefore, there is an urgent need in the art to develop a tile forming apparatus composed of a perfect connection line.

본 고안은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 본 고안은 금속판재의 공급과정에서부터 성형과정, 절단과정을 일체의 연결라인으로 구성함으로써, 작업능률을 배가하여 생산성을 향상 시키고, 고품질의 기와제품을 제공할 수 있도록 한 기와 성형장치를 제공함에 그 목적이 있다.The present invention was devised to solve the above problems, the present invention is composed of a single connection line from the supply process of the metal sheet forming process, cutting process, double the work efficiency to improve productivity, high quality The object of the present invention is to provide a tile forming apparatus for providing tile products.

도 1은 종래의 기와 성형장치를 도시한 측면도.1 is a side view showing a conventional tile forming apparatus.

도 2는 본 고안의 일실시예에 따른 전체 측면도.Figure 2 is an overall side view according to an embodiment of the present invention.

도 3은 본 고안의 일실시예에 따른 전체 평면도.3 is an overall plan view according to an embodiment of the present invention.

도 4는 본 고안의 일실시예에 따른 재료공급장치의 확대도.Figure 4 is an enlarged view of a material supply apparatus according to an embodiment of the present invention.

도 5는 본 고안의 일실시예에 따른 제1성형장치의 확대도.5 is an enlarged view of a first molding apparatus according to an embodiment of the present invention.

도 6은 본 고안의 일실시예에 따른 제2성형장치의 확대 사시도.Figure 6 is an enlarged perspective view of the second molding apparatus according to an embodiment of the present invention.

도 7은 본 고안의 일실시예에 따른 절단장치의 확대 사시도.7 is an enlarged perspective view of a cutting device according to an embodiment of the present invention.

도 8은 본 고안의 일실시예에 따른 적재부의 확대 사시도.8 is an enlarged perspective view of a loading unit according to an embodiment of the present invention.

도 9는 본 고안의 일실시예에 따른 적재부의 확대 사시도.9 is an enlarged perspective view of a loading unit according to an embodiment of the present invention.

도 10은 본 고안의 일실시예에 따른 PE폼접합장치의 확대도.10 is an enlarged view of the PE foam bonding apparatus according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:기와 성형장치 10:재료공급장치 11:브래킷1: tile forming apparatus 10: material supply apparatus 11: bracket

12:회전체 13:가이드롤러 20:1차 성형장치12: rotating body 13: guide roller 20: 1st forming apparatus

21:제1성형부 22:제2성형부 23:제3성형부21: first molded part 22: second molded part 23: third molded part

24:상부롤러 25:요철성형홈 26:폭24: upper roller 25: uneven forming groove 26: width

27:간격 28:하부롤러 30:2차 성형장치27: interval 28: lower roller 30: secondary molding apparatus

31:상부금형 32:하부금형 40절단장치31: upper mold 32: lower mold 40 cutting device

41:상부칼날 42:하부칼날 50:적재부41: upper blade 42: lower blade 50: loading

51:캐스터 52:프레임 60:금속판재51: caster 52: frame 60: metal plate

70:기와 71:원형절곡부 72:요철부70: tile 71: circular bending portion 72: uneven portion

73:단턱부 80:롤러 컨베이어 90:PE폼접합장치73: step 80: roller conveyor 90: PE foam bonding device

91:본체 92:가열부 93:급냉부91: main body 92: heating part 93: quenching part

94:가압롤러 95:PE폼공급부 96:결합봉94: pressure roller 95: PE foam supply 96: coupling rod

97:가이드바 98:지지봉 100:PE폼97: guide bar 98: support rod 100: PE foam

200:실린더 201:실린더축 202:모우터200: cylinder 201: cylinder shaft 202: motor

203:체인203: Chain

상기와 같은 기술적 과제를 해결하기 위해 본 고안은, 상하부롤러를 단계별로 설치하여 금속판재가 공급되며 모터와 체인으로 하부 롤러에 연결하고 일측의 하부롤러를 체인으로 연결하여 연속 동작되도록 하는 1차 성형장치와, 상기 1차 성형장치 전방으로 설치되는 것으로서 실린더의 실린더축과 연결되는 상부금형의 하측으로 하부금형이 설치되는 2차 성형장치와, 상기 2차 성형장치 전방으로 설치되는 것으로서 실린더의 실린더축과 연결된 상부칼날의 하측으로 하부칼날을 설치하여 기와를 절단하는 절단장치로 구성되어 기와 성형장치에 있어서, 상기 1차 성형장치 후방으로 설치되는 것으로서, 후방에는 롤 형태의 금속판재가 설치되는 브래킷에 의해 지지되는 회전체와, 상기 회전체 전방에는 금속판재를 안내하는 가이드롤러로 구성되는 재료공급장치와; 상기 재료공급장치의 전방으로 설치되는 것으로서, 중앙과 중앙 양측으로 상하부롤러를 설치하되 상하부롤러 자체의 폭과 상하부롤러와 상하부롤러 사이의 간격을 전방으로 갈수록 좁게 설치하여 금속판재에 원형절곡부와 요철부가 점차적으로 자연스럽게 성형되게 하는 1차 성형장치와; 상기 1차 성형장치 전방으로 설치되는 것으로서, 실린더의 실린더축과 연결되는 상부금형과 이와 대향 설치되는 하부금형에 의해 금속판재에 성형된 원형절곡부 및 요철부와 교차되는 단턱부를 성형하는 2차 성형장치와; 상기 절단장치의 전방으로 설치되는 것으로서, 하부에는 이동이 편리하도록 캐스터가 설치되고 상부에는 절단장치에서 배출된 완제품의 기와를 출하전 대기 상태로 있게하는 프레임으로 구성되는 적재부를; 포함하여 구성됨을 특징으로 한다.In order to solve the technical problem as described above, the present invention, the upper and lower rollers are installed step by step, the metal sheet is supplied, and the primary forming apparatus to connect to the lower roller by the motor and chain and to connect the lower roller of one side by a chain to operate continuously And a secondary molding apparatus installed in front of the primary molding apparatus and having a lower mold installed under the upper mold connected to the cylinder shaft of the cylinder, and a cylinder shaft of the cylinder installed in front of the secondary molding apparatus. It is composed of a cutting device for cutting the tile by installing the lower blade to the lower side of the connected upper blade, in the tile forming apparatus, which is installed to the rear of the primary forming apparatus, supported by a bracket in which a roll-shaped metal plate is installed at the rear The rotating body is formed of, and the front of the rotating member consisting of a guide roller for guiding the metal And a supply; It is installed in front of the material supply device, the upper and lower rollers are installed in both the center and the center side, but the width of the upper and lower rollers themselves and the interval between the upper and lower rollers and the upper and lower rollers are narrower toward the front to the circular bending portion and uneven A primary molding apparatus for causing the parts to be gradually formed naturally; The secondary molding which is installed in front of the primary molding apparatus, forming the round bent portion formed in the metal plate material and the stepped portion intersecting the uneven portion by the upper mold connected to the cylinder shaft of the cylinder and the lower mold installed opposite thereto. An apparatus; It is installed to the front of the cutting device, the lower portion is provided with a caster for easy movement, the upper portion of the loading unit consisting of a frame to keep the tile of the finished product discharged from the cutting device in a standby state before shipping; Characterized in that configured to include.

또한, 본 고안의 적재부는, 완제품의 기와의 운반이 편리하도록 롤러 컨베이어로 구성됨을 특징으로 한다.In addition, the loading portion of the present invention is characterized in that it is configured as a roller conveyor to facilitate the transport of the tile of the finished product.

또한, 본 고안의 1차 성형장치는, 금속판재에 원형절곡부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 8행을 이루는 제1성형부와, 상기 제1성형부 전방으로 설치되는 것으로서 금속판재에 원형절곡부와 상기 양측 끝의 원형절곡부 부근의 요철부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 3행을 이루는 제2성형부와, 상기 제2성형부 전방으로 설치되는 것으로서 금속판재에 원형절곡부와 상기 원형절곡부의 사이 사이에 요철부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 3행을 이루는 제3성형부로 구성됨을 특징으로 한다.In addition, the primary molding apparatus of the present invention, the first molding portion is formed by forming three upper and lower rollers per row up and down to form eight rows so as to form a circular bent portion on the metal sheet material, and installed in front of the first molding portion A second molding part in which three upper and lower rollers are arranged up and down to form three rows so as to form a circular bent portion and an uneven portion in the vicinity of the circular bent portions at both ends of the metal sheet, and the second molding part. It is installed to the front, characterized in that it consists of a third molding portion forming three rows by three upper and lower rollers are laid up and down to form a concave-convex portion between the circular bending portion and the circular bending portion on the metal plate.

또한, 본 고안의 제2성형부는, 상부에 설치되는 상부롤러중 중앙에 설치된상부롤러를 제외하고 양측의 상부롤러에 요철성형홈을 형성하여 금속판재에 성형되는 양측 끝의 원형절곡부 부근에 요철부를 성형할 수 있도록 구성함을 특징으로 한다.In addition, the second molding portion of the present invention, except for the upper rollers installed in the center of the upper rollers installed on the upper side of the irregularities in the vicinity of the circular bent portion at both ends formed on the metal plate by forming the uneven forming grooves on the upper rollers It is characterized in that it is configured to form a part.

또한, 본 고안의 제3성형부는, 상부에 설치되는 상부롤러와 상부롤러 사이 사이에 요철성형홈을 형성하여 금속판재에 원형절곡부와 상기 원형절곡부의 사이 사이에 요철부를 성형할 수 있도록 구성함을 특징으로 한다.In addition, the third molding portion of the present invention, by forming an uneven forming groove between the upper roller and the upper roller is installed on the upper portion is configured to form the uneven portion between the circular bending portion and the circular bending portion on the metal plate material It is characterized by.

또한, 본 고안은 재료공급장치와 1차 성형장치에 사이에 설치되는 것으로서 내측 상하에 발열체를 설치하여 내부를 통과하는 금속철판에 열을 가하는 가열부와, 상기 가열부 전방에 설치되어 이송된 PE폼과 금속철판을 일정 압력으로 눌러 접합시키는 가압롤러 및 상기 가압롤러 전방에 설치되며 수개의 관을 통해 냉각수를 분사하는 냉급부를 포함하여 구성된 본체와; 상기 본체의 가열부 상측으로 설치되는 것으로서, 롤 형태의 PE폼이 결합되는 결합봉과 상기 결합봉 전방에 설치되어 PE폼의 이송을 돕는 가이드바와 상기 가이드바 전방에 설치되어 이송되는 PE폼을 안내하는 수개 지지봉으로 구성되는 PE폼공급부를; 포함하여 구성됨을 특징한다.In addition, the present invention is installed between the material supply device and the primary molding device, a heating unit for applying heat to the metal sheet passing through the inside by installing a heating element in the upper and lower, and PE installed in front of the heating unit and transported A main body including a press roller for pressing the foam and the metal plate at a predetermined pressure and a cold part installed in front of the press roller and spraying coolant through several pipes; As installed above the heating part of the main body, the coupling rod is coupled to the roll-shaped PE foam and the guide bar is installed in front of the coupling rod to guide the PE foam and the PE foam installed in front of the guide bar to guide PE foam supply unit consisting of several support rods; It is configured to include.

이하 첨부되는 도면을 참조하여 본 고안의 구성을 설명하면 다음과 같다.Referring to the configuration of the present invention with reference to the accompanying drawings as follows.

도 2,3에 도시된 바와 같이, 본 고안의 기와 성형장치(1)는, 금속판재(60)를 공급하는 재료공급장치(10)와, 상기 재료공급장치(10) 전방으로 설치되어 공급된 금속판재(60)에 1차 성형하는 1차 성형장치(20)와, 상기 1차 성형장치(20) 전방에설치되어 공급되 금속판재(60)에 2차 성형을 하는 2차 성형장치(30)와, 상기 2차 성형장치(30) 전방에 설치되어 완제품의 기와(70)를 절단하는 절단장치(40)와, 상기 절단장치(40) 전방에 설치되어 절단된 완제품의 기와(70)가 출하전 대기상태로 적재되는 적재부(50)로 구성된다.As shown in Figures 2 and 3, the tile forming apparatus 1 of the present invention, the material supply device 10 for supplying the metal plate 60, and the material supply device 10 is installed in front of the Primary molding apparatus 20 for primary molding on the metal plate 60, and secondary molding apparatus 30 installed and supplied in front of the primary molding apparatus 20 for secondary molding on the metal plate 60. ), A cutting device 40 installed in front of the secondary molding apparatus 30 to cut the tile 70 of the finished product, and a tile 70 of the finished product installed and cut in front of the cutting device 40 is It is composed of a loading unit 50 loaded in the standby state before shipping.

도 4에 도시된 바와 같이 상기 재료공급장치(10)는, 최 후방에 설치되는 것으로서 두루마리 형태의 금속판재(60)가 결합되어 자유로이 회전 가능한 회전체로(12)와 상기 회전체(12)의 전방에 형성되어 금속판재(60)의 이동시 금속판재(60)의 처짐과 이동을 돕는 가이드롤러(13)로 구성된다.As shown in FIG. 4, the material supply device 10 is installed at the rearmost side, and the roll metal plate 60 is coupled to the rotatable body 12 freely rotatable with the rotatable body 12. It is formed in the front consists of a guide roller 13 to help the deflection and movement of the metal plate 60 during the movement of the metal plate 60.

상기 회전체(12)는, 브래킷(11)에 의해 회전 가능하도록 설치되며 중앙에는 롤 형태의 금소판재(60) 중앙이 끼워지는 축봉이 모우터와 전기적으로 연결되어 자동으로 회전된다.The rotating body 12 is installed to be rotatable by the bracket 11, the shaft is inserted into the center of the roll-shaped gold plate 60 in the center is electrically connected to the motor is automatically rotated.

상기 가이드롤러(13)의 양측 끝단은 지유로이 회전될 수 있도록 베어링 등에 의해 지지된다.Both ends of the guide roller 13 are supported by a bearing or the like so that the oil passage can rotate.

도 5에 도시된 바와 같이 상기 1차 성형장치(20)는, 상기 재료공급장치(10)의 전방에 설치되는 것으로서 수개의 상하부롤러(24,28)가 상하로 축설되는 제1성형부(21)와 제2성형부(22) 및 제3성형부(23)가 후방에서 부터 전방으로 순차적으로 설치된다.As shown in FIG. 5, the primary molding apparatus 20 is installed in front of the material supply apparatus 10 and includes a first molding part 21 in which several upper and lower rollers 24 and 28 are arranged up and down. ), The second molding portion 22 and the third molding portion 23 are sequentially installed from the rear to the front.

상기 제1성형부(21)는, 1차 성형장치(20)의 최후방에 설치되는 것으로서 상부에는 상부롤러(24)가 1행당 3열로 구성되어 전체 8행으로 구성되며 하부에는 상부롤러 (24)의 폭(26)에 부합되도록 타원형태의 하부롤러(28)가 대향 형성된다.The first molding part 21 is installed at the rear of the primary molding apparatus 20, and the upper roller 24 is composed of three rows per row at the upper part, and includes eight rows, and the upper roller 24 at the lower part. The lower roller 28 of the elliptical shape is formed to correspond to the width 26 of).

한편, 제1성형부(21)에 형성되는 상부롤러(24)는, 금속판재(26)에 원형절곡부 (71)를 형성할 수 있도록 폭(26) 부위가 호형(弧形)의 형태로 구성된다.On the other hand, the upper roller 24 formed on the first molding portion 21 has a width 26 portion in the shape of an arc so as to form a circular bent portion 71 on the metal plate material 26. It is composed.

상기 제2성형부(22)는, 상기 제1성형부(21)의 전방에 설치되는 것으로서 상부에는 상부롤러(24)가 1행당 3열로 구성되어 전체 3행으로 구성되며 하부에는 상부롤러 (24)의 폭(26)에 부합되도록 타원 형태의 하부롤러(28)가 대향 형성된다.The second molding portion 22, which is installed in front of the first molding portion 21, the upper roller 24 is composed of three rows per row in the upper portion consists of a total of three rows and the upper roller 24 in the lower portion The lower roller 28 in the shape of an ellipse is formed to correspond to the width 26 of the square.

한편, 상기 제2성형부(22)에 형성되는 상부롤러(24)는, 금속판재(60)에 원형절곡부(71)를 형성할 수 있도록 폭(26) 부위는 제1성형부(21)의 상부롤러(24)의 폭(26) 보다 원형에 가까운 호형으로 형성되며, 중앙에 형성된 상부롤러(24)를 기준으로 양측으로 형성되는 상부롤러(24)의 끝단부에는 금속판재(60)의 양측 끝의 원형절곡부(71) 부근에 요철부(72)를 형성할 수 있도록 요철성형홈(25)이 형성된다.On the other hand, the upper roller 24 formed on the second molding portion 22, the width 26, so that the circular bending portion 71 can be formed on the metal plate 60, the first molding portion 21 It is formed in an arc shape closer to the circular shape than the width 26 of the upper roller 24 of the, the end of the upper roller 24 formed on both sides with respect to the upper roller 24 formed in the center of the metal plate 60 Concave-convex forming grooves 25 are formed to form the concave-convex portion 72 near the circular bent portion 71 at both ends.

상기 제3성형부(23)는, 상기 제2성형부(22)의 전방에 설치되는 것으로서 상부에는 상부롤러(24)가 1행당 3열로 구성되어 전체 3행으로 구성되며 하부에는 상부롤러 (24)의 폭(26)에 부합되도록 타원 형태의 하부롤러(28)가 대향 형성된다.The third molding portion 23, which is installed in front of the second molding portion 22, the upper roller 24 is composed of three rows per row in the upper portion consists of a total of three rows and the upper roller 24 in the lower portion The lower roller 28 in the shape of an ellipse is formed to correspond to the width 26 of the square.

이때, 하부에 설치되는 하부롤러(28)들은 금속판재(60)에 원형절곡부(71)가 점차적으로 성형될 수 있도록 후방으로 갈 수록 타원형에 가깝고 전방으로 갈 수록원형에 가까운 형태로 구성된다.At this time, the lower rollers 28 to be installed in the lower portion is formed in a shape closer to the elliptical toward the rear toward the rear, and closer to the circular toward the front so that the circular bending portion 71 can be gradually formed on the metal plate 60.

상기 제3성형부(23)에는 형성되는 상부롤러(24)는, 금속판재(60)에 원형절곡부 (71)를 형성할 수 있도록 폭(26) 부위는 제2성형부(22)의 상부롤러(24)의 폭(26) 보다 원형에 가까운 호형으로 형성되며, 각 상부롤러(24)와 상부롤러(24) 사이 사이에는 금속판재(60)에 원형절곡부(71)와 원형절곡부(71) 사이 사이에 요철부(72)를 성형할 수 있도록 요철성형홈(25)이 각각 형성된다.The upper roller 24 formed on the third molding portion 23 has a width 26 portion at the upper portion of the second molding portion 22 so that the circular bending portion 71 may be formed on the metal plate 60. It is formed in an arc shape that is closer to the circular shape than the width 26 of the roller 24, and between the upper roller 24 and the upper roller 24, the circular bending portion 71 and the circular bending portion (to the metal plate 60) The concave-convex forming grooves 25 are formed to form the concave-convex portion 72 between them.

그리고, 제1,2,3성형부(21,22,23)의 중앙과 중앙 양측으로 설치되는 상부롤러 (24)는, 상부롤러(24) 자체의 폭(26)과 상부롤러(24)와 상부롤러(24) 사이의 간격을 전방으로 갈 수록 좁게 형성함으로써, 금속판재(60)에 원형절곡부(71)와 요철부(72)의 성형이 점차적으로 자연스럽게 이루어 지도록 구성된다.In addition, the upper roller 24 provided at the center and both sides of the first, second, and third molding parts 21, 22, and 23 has a width 26 and an upper roller 24 of the upper roller 24 itself. The gap between the upper rollers 24 is formed to be narrower toward the front, so that the circular bending portion 71 and the concave-convex portion 72 are gradually formed naturally in the metal plate 60.

또한, 제1,2,3성형부(21,22,23)의 하부롤러(28)들은, 일체로 작동될 수 있도록 체인(203)에 의해 각각 연결되고 일측 하부롤러(28)는 모우터(202)와 체인(203)에 의해 연결되어 모우터(203)의 작동에 의해 하부롤러(28) 전체가 동시에 작동되도록 구성된다.In addition, the lower rollers 28 of the first, second, and third molding parts 21, 22, and 23 are connected by chains 203 so that the lower rollers 28 may be integrally operated, and one lower roller 28 may be a motor ( 202 and the chain 203 is configured to operate the entire lower roller 28 at the same time by the operation of the motor 203.

한편, 상기에서 설명한 제1,2,3성형부(21,22,23)의 1행당 설치되는 상하부롤러 (24,28)의 수는 금속판재(60)의 이루어지는 성형 형상과 폭에 따라 3개 이상이 설치될 수도 있다.On the other hand, the number of upper and lower rollers 24, 28 provided per row of the first, second, and third molding parts 21, 22, and 23 described above is three depending on the molding shape and width of the metal plate 60. The above may be installed.

도 6에 도시된 바와 같이 상기 2차 성형장치(30)는, 1차 성형장치(20)의 전방으로 설치되는 것으로 실린더(200)의 실린더축(201)과 연결된 상하부금형(31,32)에 단턱성형부를 형성함으로써, 금속판재(60)에 설형되는 원형절곡부(71) 및 요철부(72)와 교차되는 단턱부(73)가 성형되게 한다.As shown in FIG. 6, the secondary molding apparatus 30 is installed at the front of the primary molding apparatus 20 to upper and lower molds 31 and 32 connected to the cylinder shaft 201 of the cylinder 200. By forming the stepped portion, the stepped portion 71 intersecting the circular bent portion 71 and the uneven portion 72 formed on the metal plate 60 is molded.

도 7에 도시된 바와 같이 상기 절단장치(40)는, 2차 성형장치(20) 전방으로 설치되는 것으로서 실린더(200)와 실린더축(201)과 연결된 상부칼날(41)의 하측으로 하부칼날(42)을 설치하여 완제품의 기와(70)를 일정 간격으로 절단할 수 있도록 한다.As shown in FIG. 7, the cutting device 40 is installed in front of the secondary molding device 20 and has a lower blade (below) of the upper blade 41 connected to the cylinder 200 and the cylinder shaft 201. 42) to allow the tile 70 of the finished product to be cut at regular intervals.

도 8에 도시된 바와 같이 상기 적재부(50)는, 상기 절단장치(40)의 전방으로 설치되는 것으로서 하부에는 이동이 편리하도록 캐스터(51)가 설치되고 상부에는 절단장치(40)에서 배출된 완제품의 기와(70)를 출하전 대기 상태로 적재할 수 있는 적재 프레임(52)으로 구성된다.As shown in FIG. 8, the loading unit 50 is installed at the front of the cutting device 40, and a caster 51 is installed at the lower portion of the stacking unit 40 so as to be easily moved, and discharged from the cutting device 40 at the top thereof. It consists of a loading frame 52 which can load the tile 70 of the finished product in a standby state before shipment.

도 9에 도시된 바와 같이 상기 적재부(50)는, 기와(70)의 운반이 편리하도록 롤러 컨베이어로 형성할 수도 있다.As shown in FIG. 9, the stacking unit 50 may be formed as a roller conveyor to facilitate the transport of the tile 70.

도 10은 본 고안의 일실시예에 따른 PE폼접합장치를 도시한 것으로서, 도시된 바와 같이 상기 PE폼접합장치(90)는, 상기 재료공급장치(10)와 1차 성형장치(20)에 사이에 설치되는 것으로서 금속판재(60)가 통과하는 본체(91)와 상기 본체(91) 상측에 설치되는 PE폼(100)(폴리에스테르(polyester))을 공급하는 PE폼공급부(95)로 구성된다.10 shows a PE foam bonding apparatus according to an embodiment of the present invention, as shown in the PE foam bonding apparatus 90, the material supply device 10 and the primary molding apparatus 20 It is installed between the main body 91 through which the metal plate 60 passes, and consists of a PE foam supply unit 95 for supplying the PE foam 100 (polyester) is installed on the upper side of the main body 91 do.

상기 본체(91)는 내측 상하에 발열체를 설치하여 내부를 통과하는 금속철판(60)에 열을 가하는 가열부(92)와 상기 가열부(92) 전방에 설치되어 이송된 PE폼(100)과 금속철판(60)을 일정 압력으로 눌러 접합시키는 가압롤러(94) 및 상기 가압롤러(94) 전방에 설치되며 수개의 관을 통해 냉각수를 분사하는 냉급부(93)로 구성된다.The main body 91 has a heating element 92 installed in the upper and lower inner side and the heating unit 92 for applying heat to the metal iron plate 60 passing through the inside and the PE foam 100 installed in front of the heating unit 92 and It consists of a pressure roller 94 for pressing the metal iron plate 60 at a predetermined pressure and the cold roller 93 installed in front of the pressure roller 94 to inject cooling water through several pipes.

상기 급냉부(93)의 냉각수가 분사되는 관은, 수개의 관이 상하로 형성되어 상기 상하로 형성된 관 사이로 열이 절달되는 금속판재(60)가 통과하면 관에 형성된 분사공에서 냉가수가 분출되어 가열된 금속판재(60)를 식혀주게 된다.In the pipe into which the cooling water of the quenching part 93 is injected, the cold water is ejected from the injection hole formed in the tube when several pipes are formed up and down and the metal plate 60 passing heat is transferred between the pipes formed up and down. Then, the heated metal plate 60 is cooled.

상기 PE폼공급부(95)는, 본체(91)의 가열부(92) 상측으로 설치되는 것으로서 롤 형태의 PE폼(100)의 중앙부가 끼움결합되는 결합봉과 상기 결합봉 전방에 설치되어 PE폼(100)의 이송을 돕는 가이드바(97)와 상기 가이드바(97) 전방에 설치되어 이송되는 PE폼(100)을 안내하는 수개 지지봉(98)으로 구성된다.The PE foam supply unit 95, which is installed above the heating unit 92 of the main body 91, is installed in front of the coupling rod and the coupling rod is fitted in the center of the roll-shaped PE foam 100 PE foam ( The guide bar 97 to assist the transfer of the 100 and the support bar is installed in front of the guide bar 97 is composed of several support rods (98) for guiding the PE foam (100).

이상에서 상세히 살펴본 바와 같이, 본 고안의 기와 성형장치(10)는 금속판재 (60)의 공급과정에서부터 성형과정, 절단과정을 일체의 연결라인으로 구성함으로써, 작업능률을 배가하여 생산성을 향상 시키고, 고품질의 기와(70)를 제공할 수 있도록 한 것으로, 이하 첨부되는 도면을 참조하여 본 고안의 작용을 설명하면 다음과 같다.As described in detail above, the tile forming apparatus 10 of the present invention consists of a single connection line from the supply process of the metal plate material 60 to the forming process and cutting process, thereby doubling the work efficiency to improve productivity, In order to provide a high quality tile 70, the following describes the operation of the present invention with reference to the accompanying drawings.

도 2,3에 도시된 바와 같이, 본 고안의 기와 성형장치(1)의 기와(70) 성형과정을 살펴보면, 먼저 재료공급장치(10)에서 금속판재(60)를 자동으로 공급하는 재료공급과정과, 1차 성형장치(20)에 의해 상기 재료공급장치(10)에서 공급된 금속판재(60)의 표면에 원형절곡부(71)와 요철부(72)를 성형하는 1차 성형과정과, 2차 성형장치(30)에 의해 금속판재(60)에 단턱부(73)를 성형하는 2차 성형과정과, 절단장치(40)에 의해 금속판재(60)를 일정 간격으로 절단하는 절단과정과, 적재부(50)에 완제품의 기와(70)가 쌓이는 적재과정으로 이루어지는 것으로서, 기와(70) 성형과정을 각각의 장치별로 더욱 세부적으로 살펴보면 다음과 같이 이루어진다.As shown in Figures 2 and 3, look at the process of forming the tile 70 of the tile forming apparatus 1 of the present invention, first, a material supply process of automatically supplying the metal plate 60 from the material supply device 10 And, the primary molding process for molding the circular bending portion 71 and the uneven portion 72 on the surface of the metal plate 60 supplied from the material supply device 10 by the primary molding device 20, A secondary molding process of forming the stepped portion 73 on the metal plate material 60 by the secondary molding device 30, and a cutting process of cutting the metal plate material 60 at regular intervals by the cutting device 40; In addition, as the stacking process of stacking the tile 70 of the finished product in the stacking unit 50, the roof 70 forming process is described in more detail for each device as follows.

도 4에 도시된 바와 같이, 재료공급장치(10)에서는, 롤 형태의 금속판재(60)를 회전체(12)에 끼움결합하고 금속판재(60)의 선단을 1차 성형장치(20)의 최후방 상하부롤러(24,28) 사이에 끼워 금속판재(60)를 공급하기 위한 준비단계가 이루어진다.As shown in FIG. 4, in the material supply apparatus 10, the roll-shaped metal sheet 60 is fitted to the rotating body 12, and the tip of the metal sheet 60 is connected to the primary molding apparatus 20. A preparation step for supplying the metal sheet 60 is sandwiched between the rearmost upper and lower rollers 24 and 28.

도 5에 도시된 바와 같이, 1차 성형장치(20)에서는, 상기 재료공급장치(10)의 공급되는 금속판재(60)에 원형절곡부(71)와 요철부(72)를 성형하는 1차 성형과정이 이루어진다.As shown in FIG. 5, in the primary molding apparatus 20, a primary bending portion 71 and an uneven portion 72 are formed on a metal plate 60 that is supplied from the material supply device 10. The molding process takes place.

즉, 1차 성형장치(20)의 제1성형부(21)에서는, 축설된 상하부롤러(24,28)에 의해 1차 성형을 하는 것으로서 평판의 금속판재(60)에 최초의 원형절곡부(71)를성형한다.That is, in the 1st shaping | molding part 21 of the 1st shaping | molding apparatus 20, it carries out the primary shaping | molding by the built-up upper and lower rollers 24 and 28, and the first circular bent part ( 71).

1차 성형장치(20)의 제2성형부(22)에서는, 축설된 상하부롤러(24,28)에 의해 금속판재(60)에 2차 성형을 하는 것으로서 제1성형부(21)에 의해 금속판재(60)에 성형된 원형절곡부(71)를 재차 성형함과 아울러 금속판재(60) 양측 끝부위에 요철부(72)를 성형한다.In the second molding portion 22 of the primary molding apparatus 20, the first molding portion 21 is used to perform secondary molding on the metal plate 60 by the upper and lower rollers 24 and 28 built up. The circular bent portion 71 formed on the plate 60 is again molded, and the uneven portion 72 is formed on both ends of the metal plate 60.

1차 성형장치(20)의 제3성형부(23)에서는, 금속판재(60)에 3차 성형을 하는 것으로서 제2성형부(22)에 의해 금속판재(60)에 성형된 원형절곡부(71)와 요철부(72)를 한번더 성형하고 상기 금속판재(60) 양측 끝부위를 제외한 원형절곡부(71)사이에 나머지 요철부(72)을 성형한다.In the third molding portion 23 of the primary molding apparatus 20, the circular bending portion formed on the metal sheet material 60 by the second molding portion 22 by tertiary molding on the metal sheet material 60 ( 71) and the concave-convex portion 72 are formed once more, and the remaining concave-convex portion 72 is formed between the circular bent portions 71 except for both ends of the metal plate 60.

이와 같이 상기 1차 성형장치(20)의 제1,2,3성형부(21,22,23)는 수개의 상하부롤러(24,28)들에 의해 금속판재(60)에 원형절곡부(71)와 요철부(72)를 3번에 걸쳐 점차적으로 성형함으로써, 성형이 자연스럽에 이루져 성형 불량율이 적고 고품질의 성형제품을 생산할 수 있다.As described above, the first, second, and third molding parts 21, 22, and 23 of the primary molding apparatus 20 may be circularly bent to the metal plate 60 by a plurality of upper and lower rollers 24 and 28. ) And the concave-convex portion 72 are gradually molded in three times, so that molding is spontaneously formed, so that a molding defect rate is low and a high quality molded product can be produced.

또한, 1차 성형장치(20)에 형성된 상하부롤러(24,28)는, 상하부롤러(24,28) 자체의 폭(26)과 상하부롤러(24,28)와 상하부롤러(24,28) 사이의 간격(27)이 전방으로 갈 수록 좁게 형성되어 금속판재(60)에 점차적으로 완벽한 성형이 이루어진다.In addition, the upper and lower rollers 24 and 28 formed in the primary molding apparatus 20 are provided between the width 26 of the upper and lower rollers 24 and 28 itself, and the upper and lower rollers 24 and 28 and the upper and lower rollers 24 and 28. The gap 27 of the narrower toward the front is formed to gradually form the perfect metal plate (60).

도 6에 도시된 바와 같이, 2차 성형장치(30)에서는, 상기 1차 성형장치(20)에서 원형절곡부(71)와 요철부(72)가 성형된 금속판재(60) 표면에 단턱부(73)를 성형한다.As shown in FIG. 6, in the secondary molding apparatus 30, a stepped portion is formed on the surface of the metal plate 60 on which the circular bending portion 71 and the uneven portion 72 are formed in the primary molding apparatus 20. (73) is molded.

즉, 실린더(200)의 작동에 의해 실린더축(201)에 연결된 상부금형(31)이 상승되었다 하강하면서 금속판재(60)에 성형된 원형절곡부(71) 및 요철부(72)와 교차되는 단턱부(73)를 미리 입력된 수치에 따라 일정간격으로 성형한다.That is, the upper mold 31 connected to the cylinder shaft 201 is raised and lowered by the operation of the cylinder 200 and intersects with the circular bent portion 71 and the uneven portion 72 formed on the metal plate 60. The stepped portion 73 is molded at a predetermined interval according to a previously input numerical value.

도 7에 도시된 바와 같이, 절단장치(40)에서는, 성형이 완료된 금속판재(60)을 실린더(200)의 실린더축(201)과 연결된 상하부칼날(41,42)에 의해 미리 입력된 간격에 따라 일정간격으로 절단한다.As shown in FIG. 7, in the cutting device 40, the metal plate 60, which has been molded, is spaced in advance by the upper and lower blades 41 and 42 connected to the cylinder shaft 201 of the cylinder 200. Accordingly, cut at regular intervals.

즉, 실린더(200)의 승강 또는 하강 작동에 의해 실린더축(201)에 연결된 상하부칼날(41,42)이 금속판재(60)를 절단한다.That is, the upper and lower blades 41 and 42 connected to the cylinder shaft 201 cut the metal plate 60 by the lifting or lowering operation of the cylinder 200.

도 8에 도시된 바와 같이, 적재부(50)에서는, 절단이 완료된 완제품의 기와(70)가 출하전 대기 상태로 적재되는 곳으로서, 기와(70)를 안치되는 상부에 형성된 적재 프레임(52)에 완제품의 기와(70)가 적재된다.As shown in FIG. 8, in the stacking unit 50, a stacking frame 52 formed at an upper portion where the roof tile 70 is placed is placed as the roof tile 70 of the finished product, which has been cut, is loaded in a standby state before shipment. The tile 70 of the finished product is loaded.

그리고 하부에는 이동이 간편한 캐스터(51)가 설치되어 적재부(50)를 다른 라인으로 이동 설치하여 사용할 수도 있다.And the lower caster 51 is easy to move is installed can also be installed by moving the loading unit 50 to another line.

도 9에 도시된 바와 같이, 상기 재적부(50)는 기와(70)의 운반이 더욱 편리하도록 동력 또는 무동력으로 작동되는 롤러 컨베이어로도 구성할 수도 있다.As shown in FIG. 9, the loading unit 50 may also be configured as a roller conveyor operated by power or non-power to facilitate the transport of the tile 70.

도 10은 본 고안의 일실시예에 따른 PE폼접합장치를 도시한 것으로서, 도시된 바와 같이 재료공급장치(10)와 1차 성형장치(20) 사이에 PE폼접합장치(90)를 설치하여 PE폼(100)이 부착된 기와(70)를 생산하기 위한 장치이다.10 shows a PE foam bonding apparatus according to an embodiment of the present invention, by installing a PE foam bonding apparatus 90 between the material supply device 10 and the primary molding apparatus 20 as shown PE foam 100 is a device for producing a tile 70 is attached.

그 작동을 살펴보면, 먼저 금속판재(60)가 본체(91) 내측을 통과하게 되는데 이때 가열부(92)에서 금속판재(60)를 PE폼(100)과 결합하기 적합한 온도로 가열한다.Looking at the operation, first the metal plate 60 passes through the inside of the main body 91 at this time, the heating unit 92 is heated to a temperature suitable for bonding the metal plate 60 and the PE foam (100).

그리고 가열된 금속판재(60)는 가압롤러(94) 측으로 이동된다.And the heated metal plate 60 is moved to the pressure roller 94 side.

이와 동시에 본체(91)의 상측의 PE폼공급부(95)에서는 PE폼(100)이 가이드바 (97)와 지지봉(98)을 경유한 다음 가압롤러(94)에 이르러 열이 가해진 상기 금속판재 (60)와 겹쳐진 상태로 가압롤러(94)로 진입하게 된다.At the same time, in the PE foam supply part 95 on the upper side of the main body 91, the PE foam 100 passes through the guide bar 97 and the support bar 98, and then reaches the pressure roller 94, where the heat is applied to the metal sheet ( Entering the pressure roller 94 in a state overlapping with 60).

따라서, 금속판재(60)와 PE폼(100)의 결합이 완료되면 가열된 금속판재(60)의 표면을 식히기 위해 금속판재(60)는 급냉부(93)로 이동된다.Therefore, when the bonding of the metal plate 60 and the PE foam 100 is completed, the metal plate 60 is moved to the quenching part 93 to cool the surface of the heated metal plate 60.

급냉부(93)에서는 금속판재(60)에 냉각수를 분사하여 가열된 표면을 성형하기 적당한 온도로 식혀준다.In the quench section 93, cooling water is sprayed on the metal plate 60 to cool to a suitable temperature for forming the heated surface.

그리고 다음과정들은 위에서 설명한 동일한 과정을 거치며, 상기 PE폼접합장치 (90)는 PE폼(100)이 결합된 기와(70)의 생산이 필요안 경우에만 설치된다.And the following processes go through the same process described above, the PE foam bonding apparatus 90 is installed only when the production of the tile 70, the PE foam 100 is combined is necessary.

이상에서 상세히 살펴본 바와 같이 본 고안은, 반 수작업으로 이루어진던 기와 성형작업을 재료의 공급에서부터 성형과정, 절단과정 배출과정에 이르는 모든과정을 일체의 연결라인으로 형성함으로써, 작업성과 생산성을 대폭 향상시켜 기업의 경쟁력을 높일 수 있는 효과가 있다.As described in detail above, the present invention is a semi-manual tile and molding work by forming all the processes from the supply of materials to the molding process, cutting process and discharge process as an integrated connection line, greatly improving workability and productivity It can increase the competitiveness of a company.

또한, 모든 과정이 일체의 라인으로 형성되어 기와의 성형작업이 자동으로 이루어지므로 기와의 품질 향상은 물론 불량률이 현저히 감소되는 효과가 있다.In addition, since all processes are formed in one line, the molding operation of the roof tile is automatically performed, and thus, the quality of the roof tile is improved and the defect rate is significantly reduced.

비록 본 고안이 첨부되는 도면에 의해 설명되었을 지라도 본 고안은 이에 한정되는 것이 아니라 하기의 특허청구범위 내에서 많은 수정 및 변형이 있을 수 있음은 물론이다.Although the present invention has been described by the accompanying drawings, the present invention is not limited thereto, and many modifications and variations may be made within the scope of the following claims.

Claims (6)

상하부롤러를 단계별로 설치하여 금속판재가 공급되며 모터와 체인으로 하부 롤러에 연결하고 일측의 하부롤러를 체인으로 연결하여 연속 동작되도록 하는 1차 성형장치와, 상기 1차 성형장치 전방으로 설치되는 것으로서 실린더의 실린더축과 연결되는 상부금형의 하측으로 하부금형이 설치되는 2차 성형장치와, 상기 2차 성형장치 전방으로 설치되는 것으로서 실린더의 실린더축과 연결된 상부칼날의 하측으로 하부칼날을 설치하여 기와를 절단하는 절단장치로 구성되어 기와 성형장치에 있어서,The upper and lower rollers are installed in stages to supply metal plates, and the first molding apparatus is connected to the lower roller by a motor and a chain, and the lower roller on one side is connected by a chain so as to be continuously operated, and the cylinder is installed in front of the primary molding apparatus. The secondary molding apparatus is installed in the lower mold to the lower side of the upper mold connected to the cylinder shaft of the, and the lower blade is installed to the lower side of the upper blade connected to the cylinder shaft of the cylinder as installed in front of the secondary molding apparatus In the tile forming apparatus comprising a cutting device for cutting, 상기 1차 성형장치 후방으로 설치되는 것으로서, 후방에는 롤 형태의 금속판재가 설치되는 브래킷에 의해 지지되는 회전체와, 상기 회전체 전방에는 금속판재를 안내하는 가이드롤러로 구성되는 재료공급장치와;A material supply device which is installed to the rear of the primary molding apparatus, and includes a rotating body supported by a bracket on which a roll-shaped metal sheet is installed at the rear, and a guide roller which guides the metal sheet in front of the rotating body; 상기 재료공급장치의 전방으로 설치되는 것으로서, 중앙과 중앙 양측으로 상하부롤러를 설치하되 상하부롤러 자체의 폭과 상하부롤러와 상하부롤러 사이의 간격을 전방으로 갈수록 좁게 설치하여 금속판재에 원형절곡부와 요철부가 점차적으로 자연스럽게 성형되게 하는 1차 성형장치와;It is installed in front of the material supply device, the upper and lower rollers are installed in both the center and the center side, but the width of the upper and lower rollers themselves and the interval between the upper and lower rollers and the upper and lower rollers are narrower toward the front to the circular bending portion and uneven A primary molding apparatus for causing the parts to be gradually formed naturally; 상기 1차 성형장치 전방으로 설치되는 것으로서, 실린더의 실린더축과 연결되는 상부금형과 이와 대향 설치되는 하부금형에 의해 금속판재에 성형된 원형절곡부 및 요철부와 교차되는 단턱부를 성형하는 2차 성형장치와;The secondary molding which is installed in front of the primary molding apparatus, forming the round bent portion formed in the metal plate material and the stepped portion intersecting the uneven portion by the upper mold connected to the cylinder shaft of the cylinder and the lower mold installed opposite thereto. An apparatus; 상기 절단장치의 전방으로 설치되는 것으로서, 하부에는 이동이 편리하도록캐스터가 설치되고 상부에는 절단장치에서 배출된 완제품의 기와를 출하전 대기 상태로 있게하는 프레임으로 구성되는 적재부를; 포함하여 구성됨을 특징으로 하는 기와 성형장치.It is installed to the front of the cutting device, the lower portion of the caster is installed to facilitate movement and the upper portion of the loading unit consisting of a frame for keeping the tile of the finished product discharged from the cutting device in a standby state before shipping; Tile forming apparatus, characterized in that configured to include. 제 1항에 있어서,The method of claim 1, 상기 적재부는, 완제품의 기와의 운반이 편리하도록 롤러 컨베이어로 구성됨을 특징으로 하는 기와 성형장치.The loading unit is a tile forming apparatus, characterized in that consisting of a roller conveyor to facilitate the transport of the tile of the finished product. 제 1항에 있어서,The method of claim 1, 상기 1차 성형장치는, 금속판재에 원형절곡부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 8행을 이루는 제1성형부와, 상기 제1성형부 전방으로 설치되는 것으로서 금속판재에 원형절곡부와 상기 양측 끝의 원형절곡부 부근의 요철부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 3행을 이루는 제2성형부와, 상기 제2성형부 전방으로 설치되는 것으로서 금속판재에 원형절곡부와 상기 원형절곡부의 사이 사이에 요철부를 성형할 수 있도록 1행당 3개의 상하부롤러가 상하로 축설되어 3행을 이루는 제3성형부로 구성됨을 특징으로 하는 기와 성형장치.The primary molding apparatus is a metal sheet member which is installed in front of the first molding part and the first molding part comprising eight rows of three upper and lower rollers arranged up and down so as to form a circular bent part on the metal sheet. In order to form a circular bent portion and an uneven portion in the vicinity of the circular bent portion at both ends thereof, three upper and lower rollers per row are arranged up and down to form a second molding portion forming three rows, and the second molding portion is installed in front of the second molding portion. 3. The tile forming apparatus as claimed in claim 3, wherein three upper and lower rollers per row are arranged up and down to form three rows so as to form an uneven portion between the circular bent portion and the circular bent portion on a metal sheet. 제 3항에 있어서,The method of claim 3, 상기 제2성형부는, 상부에 설치되는 상부롤러중 중앙에 설치된 상부롤러를 제외하고 양측의 상부롤러에 요철성형홈을 형성하여 금속판재에 성형되는 양측 끝의 원형절곡부 부근에 요철부를 성형할 수 있도록 구성함을 특징으로 하는 기와 성형장치.The second molding part may form irregularities in the vicinity of the circular bent portion at both ends formed on the metal plate by forming the uneven forming grooves in the upper rollers on both sides except the upper rollers installed in the center of the upper rollers installed on the upper portion. Tile forming apparatus characterized in that configured to. 제 3항에 있어서,The method of claim 3, 상기 제3성형부는, 상부에 설치되는 상부롤러와 상부롤러 사이 사이에 요철성형홈을 형성하여 금속판재에 원형절곡부와 상기 원형절곡부의 사이 사이에 요철부를 성형할 수 있도록 구성함을 특징으로 하는 기와 성형장치.The third molding portion, characterized in that the concave-convex forming groove formed between the upper roller and the upper roller is installed on the upper portion to form a concave-convex portion between the circular bending portion and the circular bending portion on the metal plate material Roof tile forming equipment. 제 1항에 있어서,The method of claim 1, 상기 재료공급장치와 1차 성형장치에 사이에 설치되는 것으로서, 내측 상하에 발열체를 설치하여 내부를 통과하는 금속철판에 열을 가하는 가열부와, 상기 가열부 전방에 설치되어 이송된 PE폼과 금속철판을 일정 압력으로 눌러 접합시키는 가압롤러 및 상기 가압롤러 전방에 설치되며 수개의 관을 통해 냉각수를 분사하는 냉급부를 포함하여 구성된 본체와;It is installed between the material supply device and the primary molding device, a heating unit for heating the metal sheet passing through the inside by installing a heating element in the upper and lower, and PE foam and metal installed in front of the heating unit and transported A main body including a pressurizing roller for pressing the iron plate at a predetermined pressure and a cold part installed in front of the pressurizing roller and spraying cooling water through several pipes; 상기 본체의 가열부 상측으로 설치되는 것으로서, 롤 형태의 PE폼이 결합되는 결합봉과 상기 결합봉 전방에 설치되어 PE폼의 이송을 돕는 가이드바와 상기 가이드바 전방에 설치되어 이송되는 PE폼을 안내하는 수개 지지봉으로 구성되는 PE폼공급부를; 포함하여 구성됨을 특징으로 하는 기와 성형장치.As installed above the heating part of the main body, the coupling rod is coupled to the roll-shaped PE foam and the guide bar is installed in front of the coupling rod to guide the PE foam and the PE foam installed in front of the guide bar to guide PE foam supply unit consisting of several support rods; Tile forming apparatus, characterized in that configured to include.
KR20-2004-0011561U 2004-04-26 2004-04-26 A forming device for roof tile KR200355450Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0011561U KR200355450Y1 (en) 2004-04-26 2004-04-26 A forming device for roof tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0011561U KR200355450Y1 (en) 2004-04-26 2004-04-26 A forming device for roof tile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020040028726A Division KR20050103434A (en) 2004-04-26 2004-04-26 A forming device for roof tile

Publications (1)

Publication Number Publication Date
KR200355450Y1 true KR200355450Y1 (en) 2004-07-06

Family

ID=49347819

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0011561U KR200355450Y1 (en) 2004-04-26 2004-04-26 A forming device for roof tile

Country Status (1)

Country Link
KR (1) KR200355450Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100912211B1 (en) 2007-05-03 2009-08-18 노명준 A apparatus for mult-forming
KR20220138128A (en) * 2021-04-05 2022-10-12 노명준 Tile manufacturing equipment for ridges
KR102612491B1 (en) * 2023-05-04 2023-12-11 김영선 Steel plate roof forming device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100912211B1 (en) 2007-05-03 2009-08-18 노명준 A apparatus for mult-forming
KR20220138128A (en) * 2021-04-05 2022-10-12 노명준 Tile manufacturing equipment for ridges
KR102459846B1 (en) 2021-04-05 2022-10-27 노명준 Tile manufacturing equipment for ridges
KR102612491B1 (en) * 2023-05-04 2023-12-11 김영선 Steel plate roof forming device

Similar Documents

Publication Publication Date Title
CA2916870A1 (en) Device and method for forming thin plate-shaped substrate
KR100912211B1 (en) A apparatus for mult-forming
KR20050103434A (en) A forming device for roof tile
KR200355450Y1 (en) A forming device for roof tile
CN106216421A (en) A kind of gear ring hot-extrusion mold and assembly method thereof
CZ284917B6 (en) Apparatus for pressure bending of glass sheets
CN205576224U (en) Pressure cooling device that quenches
CN114932672A (en) Brim core shaping and cutting production line
KR101774337B1 (en) A Manufacturing Apparatus of a Metal Roofing Tile
CN210400000U (en) Steel billet conveying equipment
CN218785720U (en) Flat vulcanizing machine for rubber production
WO2014056796A1 (en) Injection device, particularly for aluminum extrusion processes, and extrusion process
CN206483866U (en) A kind of gas cylinder bottle base decompressor
CN207446955U (en) A kind of copper strips processing and forming all-in-one machine of low stain
CN210450919U (en) Novel lead-acid storage battery grid continuous casting cover half
CN211688811U (en) A equipment of bending for preparation of quartz cylinder body
CN105648168A (en) Pressure quenching cooling device
CN106671342A (en) Molding machine for EPS insulation board
KR100316837B1 (en) bellows tube forming machine
CN100447259C (en) Automatically controlled large saw blade heat treatment device
CN220346886U (en) Novel extrusion of metal layer board processing device
CN213613511U (en) Metal storage tank anti-wind circle bending device
KR900011405Y1 (en) Driving device for rotary mould and socket of synthetic resin container
KR101185779B1 (en) Manufacturing methods and manufacturing equipment tie of concrete wall form
KR101363435B1 (en) Cooling drum apparatus for calending sheet

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20060102

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee