KR200324563Y1 - Assembling segments pier - Google Patents
Assembling segments pier Download PDFInfo
- Publication number
- KR200324563Y1 KR200324563Y1 KR20-2003-0015159U KR20030015159U KR200324563Y1 KR 200324563 Y1 KR200324563 Y1 KR 200324563Y1 KR 20030015159 U KR20030015159 U KR 20030015159U KR 200324563 Y1 KR200324563 Y1 KR 200324563Y1
- Authority
- KR
- South Korea
- Prior art keywords
- segment
- standard
- foundation
- hole
- base
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 고안은 조립식 교각구조물에 관한 것으로서, 프리 캐스트 타입으로 제작된 구조물을 단일 또는 2주식, 3주식으로 수직되게 각각 조립 형성하여서 되는 교각 구조물에 있어, 프리 캐스트타입으로서 시공되는 교각 구조물에 있어, 각 위치에 맞게 이미 제작한 기초 세그먼트, 표준 세그먼트, 보정 세그먼트 및 들보 세그먼트 등을 제작, 현장으로 운송하여 현장에서 신속하게 조립하여 교각 시공에 따른 주변 현장의 교통혼잡을 최소화시켜주며, 공사기간 및 각 구성요소의 단순화로 공사비용을 현저히 절감할 수 있는 효과가 있다.The present invention relates to a prefabricated pier structure, in the pier structure is formed by assembling each of the structure formed in the precast type vertically into a single, two-column, three-column, in the pier structure constructed as a precast type, The foundation segment, standard segment, calibration segment and beam segment already manufactured according to the location are manufactured and transported to the site to be quickly assembled at the site, minimizing traffic congestion in the surrounding site due to the construction of the pier. Simplification of the elements has the effect of significantly reducing the construction cost.
Description
본 고안은 조립식 교각구조물에 관한 것으로서, 좀더 상세하게는 프리 캐스트(Pre Cast)타입으로 제작되어 시공되는 교각구조물에 있어, 각 위치에 맞게 이미 제작한 구조물(Segments)을 현장에서 신속하게 조립하여 교각 시공에 따른 주변 현장의 교통혼잡을 최소화하고, 공사기간 및 각 구성요소의 단순화로 공사비용을 현저히 절감할 수 있도록 한 것이다.The present invention relates to a prefabricated pier structure, more specifically, in the pier structure manufactured by being precast (Pre Cast) type, the pier by quickly assembling the structure (Segments) already manufactured for each position in the field It minimizes traffic congestion on the site around construction and simplifies construction cost and simplifies construction period and each component.
일반적으로 교량공사(다리 및 고가도로 건설)에서 시공되고 있는 교각은 현장타설 콘크리트 구조로, 현장에서 기초 터파기 작업이후, 기초 철근 및 거푸집을 배치한 상태에서 콘크리트를 타설한 뒤 일정 기간동안 양생시간을 갖도록 하여 기초부를 형성한다.Generally, the pier which is being constructed in the bridge construction (bridge and overpass construction) is a cast-in-place concrete structure, and after curing the foundation at the site, after curing the concrete with the foundation reinforcement and formwork, The base portion is formed to have.
기초부가 양생된 상태에서 그 상부로 철근과 거푸집을 형성해 가면서, 교각기둥을 양생하고, 교각기둥의 상부 즉, 교량의 상판을 받치는 상측부분은 동바리를 받쳐 놓고, 거푸집을 배치한 상태에서 1차 또는 2차 공정으로 콘크리트 타설하여상측부를 형성시키는 공법으로서 교각을 완성한다.While the foundation is cured, reinforcing bars and formwork are formed in the upper part, curing the pillar column, and the upper part of the pillar column, that is, the upper part supporting the upper plate of the bridge, supports the copper bar, and the primary or As a method of forming the upper part by pouring concrete in the secondary process, the piers are completed.
이 때문에 거푸집의 설치 및 시공이음 및 시공 후 거푸집의 탈형작업 등에서 많은 공사기간 및 경비가 소요된다. 또한, 교각은 시공되는 위치에 따라서 고가도로 건설의 경우는 공사가 이루어지는 주변에 교통 혼잡을 주며, 배수처리 능력을 요하는 수중공사 등과 같이 작업이 열악한 환경에서 주로 수행되므로 시공관리가 어렵고 부실시공의 우려가 상존한다.For this reason, many construction periods and expenses are required in the installation and construction of formwork and the demoulding work of formwork after construction. In addition, depending on the location where the bridge is constructed, in the case of overpass construction, traffic is congested around the construction site, and construction work is difficult because of the poor work such as underwater construction, which requires drainage treatment, Is present.
이를 위해 현장에서는 지형 바닥으로부터 기초 터파기를 포함하는 기초 콘크리트시공을 수행한 일정시간 이후에 교각을 단위 구조물(기중기를 이용하여 들어올릴 수 있는 무게)로 제작하여 조립하는 방식을 취하여 교각을 시공하도록 한바 있다.For this purpose, after the concrete concrete construction including the foundation trench is removed from the ground, the pier is constructed and assembled into a unit structure (weight that can be lifted using a crane). have.
통상적인 조립식 교각의 시공에 따른 장점으로는 단위별로 프리캐스트 타입으로 제작된 구조물 즉, 세그먼트는 일정한 장소에서 제작되므로 콘크리트의 품질관리가 유리하고, 세그먼트를 연속적으로 제작하므로 인력관리 및 거푸집 전용에 유리하며, 세그먼트 제작을 하부공사와 병행해서 실시할 수 있으므로 현장 타설방식에 비해서 공기를 단축시킬 수 있다는 점을 장점으로 들 수 있다.Advantages of the construction of the prefabricated bridge piers are that the structures manufactured in units of precast type, i.e., the segments are manufactured in a certain place, are advantageous for the quality control of concrete, and the segments are continuously manufactured, which is advantageous for manpower management and formwork. In addition, the segment production can be performed in parallel with the lower construction, it can be an advantage that it can shorten the air compared to the site-pouring method.
이와 같은 프리 캐스트타입으로 제작되어 시공되는 교각의 시공은 대한민국 특허출원 제 1993-3168호(발명의 명칭: 조립식 교각 및 기둥구조물과 그 시공방법)에 나타난 바와 같다.The construction of bridges manufactured and constructed in such a precast type is as shown in Korean Patent Application No. 1993-3168 (Name of the Invention: Prefabricated Pier and Column Structure and Construction Method).
상기 등록특허의 구성을 살피면, 구형, 원형, 타원형의 단면적을 갖고 기둥을 높이에 따라 여러 프리 캐스트 세그먼트로 제작된 상부세그먼트의 하단부에는凸형태로 하고, 이에 대응하는 하부세그먼트의 상단부는 凹형태로 하면 상부 세그먼트에 작용하는 휨 모멘트로부터의 압축 또는 인장력, 축력, 전단력을 5개의 서로 다른 위치에서 전달시키는 전단키를 凸凹부 내부에 형성되도록 한 구성으로서, 상기 전단키는 중앙부의 전단키홈에 외부로부터 그라우팅구멍을 통해 몰탈을 그라우팅시켜 연결하는 시공방법으로서 조립된다.Looking at the configuration of the patent, it has a spherical, circular, elliptical cross-sectional area and has a columnar shape at the lower end of the upper segment made of several precast segments according to the height, the upper end of the corresponding lower segment in the shape of the A shear key is formed inside the recess to transmit compression or tensile force, axial force, and shear force from bending moments acting on the upper segment at five different positions, and the shear key is a grouting hole from the outside in the shear key groove at the center. It is assembled as a construction method to connect the grout mortar through.
상기와 같은 교각의 시공의 특성으로는 상기에서 언급한 바와 같이, 교각 구조물을 단위 세그먼트로 하여 현장에서 직접 조립시공 하는데 있고, 그라우팅과 더불어 각각 방향이 다르게 설치되는 전단키에 의해 세그먼트로 발생되는 분력들을 안전하게 견뎌낼 수 있는데 특성이 있다.As mentioned above, the construction characteristics of the bridge piers are directly assembled at the site using the bridge structure as a unit segment, and the components generated in the segments by the shear keys installed in different directions along with grouting are used. It has the property of being able to endure safely.
그러나, 이와 같은 교각을 형성하기 위한 구조물은 凸凹를 일체로 콘크리트형성에 있어, 거푸집을 형성하기에 매우 어려움이 있고, 상기 凸凹가 접하는 경계지역에 형성된 전단키홈이 일치되지 못하는 경우가 있어, 전단키의 설치에 어려움이 따르는 문제점이 있었다.However, the structure for forming such a pier is very difficult to form the formwork in the concrete formation of the 凸凹 integrally, there is a case that the shear key groove formed in the boundary area where the 접 contact is not matched, There was a problem with the installation.
이 때문에 조립식으로 교각을 형성하는데 있어, 각 구조물에 받는 분력에도 다소 결함이 발생될 소지가 있는 문제점이 있다.For this reason, in forming the pier prefabricated, there is a problem that a defect may occur somewhat in the component force received in each structure.
한편, 대한민국 특허출원 제 1992-2760호(발명의 명칭: 프리 캐스트 콘크리트 기둥의 연직 연결공법)를 살피면, 교각에 있어, 하부기둥에 철망으로 된 제1도체부와, 제2도체부를 설치한 뒤 이들 도체부로부터 각각 도선을 인출하여 전원의 두단자(+)(-)에 접속하여 전류의 인가 가능하는 제1공정단계와; 전기적 설비를 갖춘 하부기둥의 철근을 상부기둥에 형성한 슬리이브에 끼워지게 하되, 각 철근에는스페이서를 끼워 넣어 슬리이브 내면과의 거리를 일정하게 유지토록 하면서 슬리이브에는 도선을 접속하고, 중심부 철근에도 도선을 접속하여 전원의 인가가 가능하게 하는 제2공정단계와; 상기 상,하부 기둥의 단부 사이에는 쐐기에 의하여 발생된 틈이 외곽으로 밀봉재를 형성하여 상기 슬리이브 내의 틈과 하나의 연통되는 공간을 형성하는 제3공정단계와; 입구에서 슬리이브 내면의 틈을 거쳐 각 기둥사이의 틈까지 하나의 공간을 따라 일정압력으로 모르타르를 채우게 하는 제4공정단계와; 상기 각 틈에 설치된 도선을 따라 전원의 일정 전류를 인가하여 틈 사이에 채워진 모르타르를 양생하는 제5공정단계로서 시공되는 방법이다.On the other hand, if you look at the Republic of Korea Patent Application No. 1992-2760 (name of the invention: the vertical connection method of the precast concrete pillar), in the piers, after installing the first conductor part and the second conductor part of the wire mesh on the lower pillar A first process step of drawing out conductors from these conductor portions and connecting the two terminals (+) (-) of the power supply to enable the application of current; Insert the rebar of the lower column with electrical equipment into the sleeve formed on the upper column, and insert a spacer into each rebar to maintain a constant distance from the inner surface of the sleeve, and connect the conductors to the sleeve. A second process step of connecting the conducting wires to enable the application of power; A third process step of forming a sealing material in a gap formed between the ends of the upper and lower pillars by a wedge to communicate with the gap in the sleeve; A fourth process step of filling the mortar with a constant pressure along a space from the inlet to the gap between the pillars through the gap on the inner surface of the sleeve; The method is constructed as a fifth process step of curing a mortar filled between the gaps by applying a constant current of the power source along the wires provided in the gaps.
상기와 같은 공정을 통해 완성되는 교각 시공방법은 연결부분의 공간 및 틈에 채워진 모르타르를 전기적 발열체를 이용하여 빠른 시간 내에 양생시킬 수 있다는 점이 특징이라 할 수 있지만, 구조물이 연결되는 부위에 각각의 쐐기를 두고 일정 틈을 확보해 주어야 한다는 점과, 내부에 도선 및 도체부를 설치해야 한다는 점, 연결부위에 있어 슬리이브를 관통하는 철근에 다수개의 스페이서를 관통 고정한다는 점을 예측해 볼 때 연결과정에서 다수의 공정 및 구성요소의 증가로 공사기간이 길어지는 단점이 있다.Pier construction method completed through the above process can be characterized in that the mortar filled in the space and the gap of the connection portion can be cured in a short time by using an electric heating element, each wedge at the site where the structure is connected In view of the fact that a certain gap must be secured, that the conductors and the conductors must be installed inside, and that the spacers are fixed through the rebars through the sleeve at the connection part, There is a disadvantage that the construction period is long due to the increase of processes and components.
본 고안은 종래의 문제점을 해결하기 위하여 안출한 것으로, 프리 캐스트(Pre Cast)타입으로서 시공되는 교각구조물에 있어, 각 위치에 맞게 이미 제작한 구조물(Segments)을 현장에서 신속하게 조립하여 교각 시공에 따른 주변 현장의 교통혼잡을 최소화하고, 공사기간 및 각 구성요소의 단순화로 공사비용을 현저히 절감할 수 있도록 하는데 그 목적이 있다.The present invention was devised to solve the conventional problems, and in the pier structure constructed as a pre-cast type, the assembly (Segments) already prepared for each position can be quickly assembled on the pier construction. The purpose is to minimize the traffic congestion of the surrounding site and to significantly reduce the construction cost by simplifying the construction period and each component.
상기 목적을 달성하기 위한 본 고안에 의하면, 프리 캐스트 타입으로 제작된 구조물을 단일 또는 2주식, 3주식으로 수직되게 각각 조립 시공되는 조립식 교각 구조물에 있어서, 기초부를 형성하기 위해 배치 설치되는 철근부에 수직으로 배열 설치되는 기초철근과, 기초철근에 안내되기 위한 안내공이 다수개 배열 형성되며, 안내공으로부터 이웃하는 위치에 다수개의 쉬즈관이 매입되어 통공이 형성되며, 통공의 외측 가장자리로부터 원주상에 소정깊이를 갖는 요홈이 형성된 기초 세그먼트와, 상기 기초 세그먼트의 쉬즈관 내에 관통되고, 구비되는 컨넥터에 의해 연장 설치되는 강봉과, 상기 기초부 바닥에 설치되어 기초 세그먼트를 소정높이에서 수평을 유지시키기 위한 위치 조정블럭과, 상기 기초 세그먼트측 쉬즈관과 일치되도록 내측에 쉬즈관이 다수개 매입되어 통공이 형성되고, 통공의 가장자리로부터 이격되는 원주상에 소정깊이를 갖는 요홈이 형성된 표준 세그먼트와, 상기 표준 세그먼트 상에 안치되도록 다수의 쉬즈관이 다수개 매입되어 통공이 형성되며, 하면에 위치하는 통공의 가장자리 외측에 요홈이 형성된 들보 세그먼트와, 상기 표준 세그먼트 및 들보 세그먼트의 쉬즈관측단으로부터 연장되는 강봉 일단에 체결되어 강봉을 긴장시키는 스트레싱 앵커리지로 구성되어 조립되도록 한 것이 특징이다.According to the present invention for achieving the above object, in a prefabricated pier structure that is constructed by assembling the structure made of precast type vertically into single, two-column, three-column, respectively, in the reinforcing bar disposed to form the base portion The base reinforcement is arranged vertically and a plurality of guide holes for guiding the foundation reinforcement is formed, a plurality of sheath pipes are embedded in the adjacent position from the guide hole to form a through hole, and the circumference from the outer edge of the through hole A foundation segment having a groove having a predetermined depth, a steel rod penetrating into the sheath pipe of the foundation segment and extending by a connector provided thereon, and installed at the bottom of the foundation to maintain the foundation segment at a predetermined height. A sheath pipe inside the position adjusting block and the base segment side sheath pipe A plurality of buried holes are formed, and a standard segment having a groove having a predetermined depth is formed on a circumference spaced apart from an edge of the through hole, and a plurality of sheath pipes are embedded so as to be placed on the standard segment, thereby forming a through hole. It is characterized in that it is composed of a beam segment having a groove formed outside the edge of the through hole located in the lower surface, and a stressing anchorage which is fastened to one end of the steel rod extending from the sheath observation end of the standard segment and the beam segment to tension the steel rod. .
도 1은 본 고안인 교각 구조물의 시공에 따른 공정상태를 개략적으로 도시한 공정도,1 is a process diagram schematically showing a process state according to the construction of the pier structure of the present invention,
도 2 및 도 3은 본 고안에 따른 교각의 각 부분 시공상태를 도시한 세그먼트의 단면도,2 and 3 are cross-sectional views of the segment showing the construction of each part of the piers according to the present invention,
도 4는 본 고안에 따른 상층부분에 해당하는 표준 세그먼트의 연결 상태를 도시한 사시도,Figure 4 is a perspective view showing a connection state of the standard segment corresponding to the upper layer portion according to the present invention,
도 5는 도 4에서의 주요부분에 대한 A-A선 단면도,5 is a cross-sectional view taken along the line A-A of the main part in FIG.
도 6은 본 고안에 따른 교각을 분리하여 도시한 단면도,6 is a cross-sectional view showing a separate piers according to the present invention,
도 7은 본 고안에 따른 2주식 교각을 도시한 정면도,7 is a front view showing a two-column piers according to the present invention,
도 8은 본 고안에 따른 2주식 교각 구조물에 있어 가로보 세그먼트가 설치된 상태를 도시한 확대 단면도,8 is an enlarged cross-sectional view showing a state in which a cross beam segment is installed in a two-stock pier structure according to the present invention;
도 9는 본 고안에 따른 일 실시예로서, 들보 세그먼트를 등분하여 적층한 상태를 도시한 단면도.9 is a cross-sectional view showing a state in which the beam segments are divided and stacked as an embodiment according to the present invention.
◎ 도면의 주요부분에 대한 부호의 설명 ◎◎ Explanation of symbols for main part of drawing
1: 기초부 2: 거푸집1: foundation 2: formwork
10: 기초철근 11: 철근부10: Basic rebar 11: Rebar
20: 기초 세그먼트 30: 위치 조정블록20: foundation segment 30: positioning block
40: 표준 세그먼트 40-1: 보정 세그먼트40: standard segment 40-1: calibration segment
50: 들보 세그먼트 60: 가로보 세그먼트50: beam segment 60: crossbeam segment
S: 쉬즈관 P: 강봉S: Sheath tube P: Steel rod
T: 스트레싱 앵커리지 C: 컨넥터T: Stretching Anchorage C: Connector
이하, 첨부된 도 1 내지 도 9를 참조하여 본 고안에 대하여 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying Figures 1 to 9 will be described in detail with respect to the subject innovation.
첨부된 도 1은 본 고안인 교각 구조물의 시공에 따른 공정상태를 개략적으로도시한 공정도이다.1 is a process diagram schematically showing a process state according to the construction of the pier structure of the present invention.
본 고안에 따른 조립식 교각 주조물은 각 구성요소를 살피면, 프리 캐스트 타입으로 제작된 구조물을 단일 또는 2주식, 3주식으로 수직되게 각각 조립 시공되는 조립식 교각 구조물에 있어서, 기초부(1)를 형성하기 위해 배치된 철근부(11)에 수직으로 기초철근(10)이 배열 설치된다.In the prefabricated pier casting according to the present invention is to examine each component, in the prefabricated pier structure that is constructed by assembling each of the structure made of precast type in a single, two-column, three stock vertically, to form the foundation (1) The base reinforcing bar 10 is installed perpendicularly to the reinforcing bar 11 arranged for the purpose.
기초철근(10)에 안내되기 위한 안내공(21)이 다수개 배열 형성되며, 안내공(21)으로부터 이웃하는 위치에 통공(22)이 다수개 배열되어 각각의 쉬즈관(S)이 매입되고, 통공(22)의 가장자리로부터 이격되는 원주상에 소정깊이를 갖는 요홈(23)이 형성된 기초 세그먼트(20)가 구비된다.A plurality of guide holes 21 for guiding the basic reinforcing bar 10 are formed, and a plurality of through holes 22 are arranged at neighboring positions from the guide hole 21 so that each sheath pipe S is embedded. The foundation segment 20 is provided with a groove 23 having a predetermined depth on a circumference spaced apart from the edge of the through hole 22.
상기 기초 세그먼트(20)에 각각 매입되는 쉬즈관(S)의 하부로는 그라우팅 주입관(S1)이 기초부(1)의 외측으로부터 연장 설치된다.The grouting injection pipe S1 extends from the outside of the base 1 to the lower portion of the sheath pipe S embedded in the base segment 20.
상기 기초 세그먼트(20)의 쉬즈관(S) 내에 관통되고, 구비되는 컨넥터(C)에 의해 연장 설치되는 강봉(P)과, 기초 세그먼트(20)를 소정높이에서 수평을 유지시키기 위한 위치 조정블럭(30)이 기초부(1) 바닥에 설치된다.A steel bar P penetrating into the sheath pipe S of the foundation segment 20 and extended by a connector C provided thereon, and a positioning block for keeping the foundation segment 20 horizontal at a predetermined height. 30 is installed at the bottom of the base 1.
상기 강봉(P)은 PT강봉(Pre stressing bar) 또는 PT강선(Pre stressing wire)이 적용된다.The steel bar (P) is applied to a PT steel bar (Pre stressing bar) or PT steel wire (Pre stressing wire).
상기 기초 세그먼트(20)측 쉬즈관(S)이 매입되어 형성되는 통공(22)과 일치되도록 표준 세그먼트(40)의 상호 접촉되는 면에는 쉬즈관(S)이 다수개 매입으로 통공(42)이 형성되고, 통공(42)의 가장자리로부터 이격되는 원주상에 소정깊이를 갖는 요홈(43)이 형성된 표준 세그먼트(40)가 설치된다.The through-hole 42 is formed by embedding a plurality of sheath pipes S on the surfaces of the base segments 20 so as to correspond to the through-holes 22 formed by embedding the sheath pipe S on the base segment 20. And a standard segment 40 having a groove 43 having a predetermined depth on a circumference spaced from the edge of the through hole 42 is provided.
여기서 표준 세그먼트(40)는 하나 이상 준비되며, 표준 세그먼트(40)와 동일 형상의 보정 세그먼트(40-1)도 구비된다.Here, one or more standard segments 40 are prepared, and correction segments 40-1 having the same shape as the standard segments 40 are also provided.
상기 보정 세그먼트(40-1)는 고가도로를 건설하기 위한 교각 구조물에 있어, 낮은 지형부터 점차적으로 등간격지게 높게 시공되는 교각 구조물에 있어, 표준 세그먼트(40)의 최 상단에 위치되어 조립되는 구조물로서, 교각의 높이 설계에 따라 길이가 각기 다르게 제작된 것이다.The correction segment 40-1 is a pier structure for constructing an overpass, and is a pier structure that is constructed at the top of the standard segment 40 in a pier structure that is gradually constructed at equal intervals from low terrain. The length is different depending on the height design of the bridge piers.
상기 기초 세그먼트(20), 표준 세그먼트(40), 보정 세그먼트(40-1)는 그 횡단면적은 설계범위에 따라 사각, 원형, 팔각 타원형 등으로 제작될 수 있다.The foundation segment 20, the standard segment 40, and the correction segment 40-1 may be manufactured in a rectangular, circular, octagonal elliptical shape, or the like according to a design range.
또한, 상기 각 세그먼트에 있어, 기초 세그먼트(20), 표준 세그먼트(40)에 대응하는 요홈(22,42)에는 그라우팅시 모르타르(M)의 누수를 방지하는 고무링(R)이 각각 안내되어 설치된다.Further, in each of the segments, the grooves 22 and 42 corresponding to the foundation segment 20 and the standard segment 40 are guided and installed with rubber rings R for preventing leakage of the mortar M during grouting, respectively. do.
또한, 본 고안에 따른 실시예로서, 상기 기초 세그먼트(20)의 상면, 표준 세그먼트(40)에 대응하는 접촉면의 가장자리에 근접하는 위치에는 상기 요홈(22,42) 및 강봉(P)을 모두 포함하는 하나의 요홈(22-1, 42-1)이 마련되고, 상기 요홈(22-1, 42-1)에는 각 세그먼트의 접촉면 외부로부터 염분의 침투를 방지하기 위한 고무링(R1)이 각각 안내되어 설치된다.In addition, as an embodiment according to the present invention, the upper surface of the foundation segment 20, the position close to the edge of the contact surface corresponding to the standard segment 40 includes both the grooves (22, 42) and the steel bar (P) One groove (22-1, 42-1) is provided, and the rubber ring (R1) for preventing the penetration of salt from the outside of the contact surface of each segment is guided to the groove (22-1, 42-1), respectively Is installed.
또한, 상기 기초 세그먼트(20), 표준 세그먼트(40), 보정 세그먼트(40-1)는 쉬즈관(S)이 설치되는 통공을 제외한 중심선상에 중공의 단면적을 갖도록 제작할 수 있다(도 5에서의 2점쇄선 참조).In addition, the foundation segment 20, the standard segment 40, and the correction segment 40-1 can be manufactured to have a hollow cross-sectional area on the centerline except for the through hole where the sheath pipe S is installed (in FIG. 5). See dashed line).
상기 최종적으로 안치되는 표준 세그먼트(40) 또는 보정 세그먼트(40-1) 상에는 들보 세그먼트(50)가 설치된다. 상기 들보 세그먼트(50)는 표준 세그먼트(40) 및 보정 세그먼트(40-1)와 같이, 다수의 쉬즈관(S)이 매입되어 통공(52)을 갖고, 하면측으로부터의 통공(52) 외측으로는 상기 고무링(R)을 수용하기 위한 요홈(53)이 형성된 구조이다.The beam segment 50 is installed on the finally placed standard segment 40 or correction segment 40-1. Like the standard segment 40 and the correction segment 40-1, the beam segment 50 has a plurality of sheath pipes S embedded therein to have a through hole 52, and the outside of the through hole 52 from the lower surface side. Is a structure in which a groove 53 for accommodating the rubber ring R is formed.
상기 기초 세그먼트(20), 표준 세그먼트(40), 보정 세그먼트(40-1)의 통공(42) 및 들보 세그먼트(50)의 통공(52)측단으로부터 강봉(P)에 체결되어 강봉(P)을 긴장시키는 스트레싱 앵커리지(T)로 구성된다. 상기 스트레싱 앵커리지(T)는 부식을 고려하여 강화 플라스틱소재, 스테인레스 스틸재질로 제작됨이 바람직하다.The steel bar P is fastened to the steel bar P from the side end of the base segment 20, the standard segment 40, the through hole 42 of the correction segment 40-1, and the through hole 52 side of the beam segment 50. Tensioning anchorage (T). The stressing anchorage (T) is preferably made of a reinforced plastic material, stainless steel in consideration of corrosion.
도면 중 미설명 부호 (2)는 거푸집을 나타낸 것이다.In the drawings, reference numeral 2 denotes a formwork.
상기와 같은 조립식 시공방법과 이에 따른 조립식 교각 구조물의 구성에 의한 본 고안의 작용 및 효과를 기술하면 다음과 같다.Referring to the operation and effects of the subject innovation by the configuration of the prefabricated construction method and the prefabricated bridge structure according to the above as follows.
먼저, 첨부된 도 1를 참조하여 볼 때, 교각이 시공되기 위한 현장에서는 종래와 동일하게 기초적인 터파기 작업이 수행되고, 터파기 작업이후에는 교각의 기초부(1)를 형성하기 위해 철근부(11) 시공 및 거푸집(2)을 형성시켜 준다.First, referring to the attached FIG. 1, the site for the construction of the piers is carried out in the same manner as the conventional excavation, and after the excavation work, the reinforcing portion to form the foundation 1 of the piers. (11) Construction and formwork (2).
상기와 같은 단계에서 프리 캐스트로 제작된 각각의 세그먼트들은 운송장비에 의해 현장으로 옮겨지며, 각 세그먼트 중 기둥부분을 형성하기 위한 기초 세그먼트(20)는 기초 콘크리트 타설 이전 세팅시켜 준다.In the above step, each of the segments produced by the precast is transferred to the site by the transport equipment, the foundation segment 20 for forming the pillar portion of each segment is set before the foundation concrete casting.
상기 철근부(11)의 시공에 있어서, 중앙으로는 위치 조정블럭(30)을 위치시키고, 기중기를 이용하여 프리 캐스트 제작으로 이루어진 기초 세그먼트(20)를 위치 조정블럭(30)상측에 안치시켜 준다.In the construction of the reinforcing bar 11, the positioning block 30 is positioned at the center, and the foundation segment 20 made of precast is placed on the upper side of the positioning block 30 by using a crane. .
상기 위치 조정블럭(30)상에 안치되는 기초 세그먼트(20)는 그 상하 관통되게 배열 형성된 다수의 안내공(21)은 철근부(11) 측으로 상기 안내공(21)의 수만큼 배열 설치한 기초철근(10)이 관통 지지되도록 한다.The base segment 20 placed on the positioning block 30 has a plurality of guide holes 21 arranged so as to be vertically penetrated therethrough and arranged as many as the number of the guide holes 21 toward the reinforcing bar portion 11 side. The rebar 10 is to be supported through.
또한, 상기 안내공(21)과 근접하는 위치에 형성된 통공(22)에 매입되어 고정된 쉬즈관(S)은 상기 철근부(11)로부터 다수개 수직으로 배열 설치된 강봉(P)이 각각 관통한다.In addition, the sheath pipe (S) is buried in the through-hole 22 formed at a position close to the guide hole 21 is fixed through the steel bar (P) arranged in a plurality of vertically arranged from the reinforcing portion (11), respectively. .
상기 기초부(1)에 설치되는 기초철근(10) 및 강봉(P)의 수는 통상적으로 교각의 높이 및 하중에 따라 그 수가 결정된다.The number of the basic reinforcing bars 10 and the steel bars P installed in the foundation 1 is usually determined according to the height and load of the piers.
상기와 같이 위치 조정블럭(30) 상에 안치된 기초 세그먼트(20)의 하단부분은 기초부(1)의 콘크리트 타설 최 상단 위치보다 낮은 위치에 위치되도록 한다.As described above, the lower end portion of the foundation segment 20 placed on the positioning block 30 is positioned at a position lower than the uppermost position of the concrete placing of the foundation 1.
이는 기초 세그먼트(20)의 하측부분이 기초부(1)에 소정 깊이 매입되는 상태에서 상호 콘크리트 타설에 의해 일체적으로 거동되도록 하기 위함이다.This is to allow the lower portion of the foundation segment 20 to be integrally behaved by mutual concrete pouring in a state where the lower portion of the foundation segment 20 is embedded in the foundation portion 1 in a predetermined depth.
또한, 상기 기초 세그먼트(20)의 쉬즈관(S)측에 연장되는 그라우팅 주입관(S1)은 기초부(1)를 형성되는 상측으로 위치시켜 소정부분은 콘크리트 타설에 의해 고정되도록 한다.In addition, the grouting injection pipe (S1) extending to the sheath pipe (S) side of the foundation segment 20 is positioned to the upper side to form the base portion 1 so that the predetermined portion is fixed by concrete pouring.
이와 같은 상태에서 기초 콘크리트 타설이 이루어지고, 일정 시간동안 양생기간을 거친 교각 구조물의 최 하단부인 기초부(1)는 기초 세그먼트(20)와 함께 일체로 거동할 수 있는 상태로 이루어진다.In this state, the foundation concrete is poured, and the base 1, which is the bottom of the pier structure after a curing period for a predetermined time, is formed in a state capable of integrally behaving together with the foundation segment 20.
상기와 같이 기초 세그먼트(20)는 일정시간의 양생 시간을 거쳐 필요로 하는강도가 이루어진 상태라면, 현장에 하역된 각 세그먼트 중 표준 세그먼트(40)를 순차적으로 조립할 수 있게 된다.As described above, if the foundation segment 20 is in a state in which the required strength is achieved through a curing time of a predetermined time, it is possible to sequentially assemble the standard segment 40 of each segment unloaded at the site.
상기 기초 세그먼트(20) 상에 안치된 표준 세그먼트(40)를 안치하기 이전 기초부(1)로부터 기초 세그먼트(20)측 쉬즈관(S)에 각각 관통된 강봉(P)의 일단에는 필요한 길이 만큼의 또 다른 강봉(P)을 수직으로 연장하기 위해 구비되는 컨넥터(C)를 체결하여서 연장시켜 준다.Before one of the standard segments 40 settled on the foundation segment 20, one end of the steel bar P penetrated from the foundation part 1 to the sheath pipe S on the foundation segment 20 side by the required length. Another steel bar (P) is to extend by tightening the connector (C) is provided to extend vertically.
상기와 같이 강봉(P)이 각각 연장된 상태에서 기중기를 이용하여 표준 세그먼트(40)를 상기 기초 세그먼트(20) 상부로부터 안치시켜 주되, 상기 강봉(P)은 표준 세그먼트(40)의 통공(42)에 삽입된 쉬즈관(S)을 통해 안내되도록 한다.(단계 S104) 여기서 상기 표준 세그먼트(40)는 강봉(P)을 포함하는 컨넥터(C)를 관통시킬 수 있는 정도의 직경으로 설정되어 있다.As described above, the standard segment 40 is settled from the top of the base segment 20 by using a crane in the state in which the rods P are respectively extended, and the rods P are formed through the holes 42 of the standard segments 40. Is guided through the sheath tube S inserted in the step S104. Here, the standard segment 40 is set to a diameter enough to penetrate the connector C including the steel bar P. .
상기와 같은 방식으로 표준 세그먼트(40)는 교각의 설정된 높이만큼 순차적으로 안치되고, 최 상단에 위치하는 표준 세그먼트(40)의 상측으로는 교량의 상판을 받치기 위한 들보 세그먼트(50)를 기중기로 들어 올려 표준 세그먼트(40)로부터 소정길이 돌출된 각 강봉(P)의 위치에 일치시켜 안치시켜 준다.In the above manner, the standard segment 40 is sequentially set by the set height of the pier, and the beam segment 50 for supporting the upper plate of the bridge to the upper side of the standard segment 40 located at the top of the Lift and settle in accordance with the position of each steel bar P which protruded a predetermined length from the standard segment 40.
상기와 같은 방식으로 조립됨에 있어, 본 고안은 각기 다른 높이로 위치하는 교각 구조물의 높이는 표준 세그먼트(40)와 들보 세그먼트(50) 사이에 높이를 보정하기 위한 보정 세그먼트(40-1)가 상기 표준 세그먼트(40)의 조립시공과 마찬가지로 적층되며, 그 상측에 들보 세그먼트(50)가 적층되는 순서로 교각의 설정된 높이를 맞추도록 한다.In the assembled manner as described above, the present invention is that the height of the pier structure located at different heights is a standard of the correction segment 40-1 for correcting the height between the standard segment 40 and the beam segment 50 is the standard As in the assembling construction of the segment 40, it is stacked, and the set height of the piers is aligned in the order in which the beam segments 50 are stacked on the upper side.
상기 보정 세그먼트(40-1) 또한, 교각의 설계 상에 따라 프리 캐스팅공법으로 이미 제작 운반하여 시공되는 것이다.The correction segment 40-1 is also manufactured and transported by a precast method according to the design of the piers.
상기와 같은 방식의 조립시공에 있어, 표준 세그먼트(40)의 적층 시공에 있어, 상층부분에 위치하는 표준 세그먼트(40)에 관통 설치되는 강봉(P) 및 쉬즈관(S)의 갯수는 하층부분에 위치하는 기초 세그먼트(20), 표준 세그먼트(40)측 쉬즈관(S)을 관통하는 강봉(P)의 수에 비해 절반 정도의 수로 설치된다.In the assembly method as described above, in the lamination construction of the standard segment 40, the number of steel rods (P) and sheath pipe (S) penetrated to the standard segment 40 located in the upper layer portion is the lower layer portion. It is provided in about half of the number of the steel bar P which penetrates the base segment 20 located in the standard segment 40, and the sheath pipe S of the standard segment 40 side.
상기 절반정도의 갯수로 설정되는 표준 세그먼트(40)측의 강봉(P) 긴장처리는 먼저, 강봉(P)의 일단에 탭핑처리를 하여 스트레싱 앵커리지(T)를 체결시켜준다.Steel bar (P) tension treatment on the side of the standard segment 40, which is set to about half the number, first tapping one end of the steel bar (P) to fasten the stressing anchorage (T).
이와 같은 상태에서 기초 세그먼트(20)의 쉬즈관(S)측에 연장 설치된 그라우팅 주입관(S1)을 통해 그 수직되는 표준 세그먼트(40)의 쉬즈관(S)의 선단부분까지 모르타르로서 그라우팅 시킨다.In this state, through the grouting injection pipe (S1) extending to the sheath pipe (S) side of the foundation segment 20 to grout as a mortar to the tip of the sheath pipe (S) of the standard segment 40 to be vertical.
상기와 같이 그라우팅 처리함에 있어, 당초 기초 세그먼트(20)로부터 적층되는 표준 세그먼트(40)는 그 적층되는 면에 상호 대응되게 형성되는 요홈(43)에 삽입된 고무링(R)에 의해 외부로 누수되지 않게되어 안정된 그라우팅을 실시할 수 있다.In the grouting process as described above, the standard segment 40 originally stacked from the base segment 20 leaks to the outside by the rubber ring R inserted into the groove 43 formed to correspond to the laminated surface thereof. It is not possible to perform stable grouting.
즉, 기초 세그먼트(20)측 쉬즈관(S)을 통해 모르타르(M)가 상층으로 그라우팅될 때, 모르타르(M)는 고무링(R)에 의해 각 이음부분의 외측으로 누수되지 않는 범위 내에서 주어진 통공의 쉬즈관(S) 내에서만 그라우팅되어 기초 세그먼트(20)와 표준 세그먼트(40) 및 각 표준 세그먼트(40)를 일체적으로 거동될 수 있도록 연결하여 강봉(P)과 함께 횡방향으로 받는 하중을 견딜 수 있도록 해준다.That is, when the mortar M is grouted to the upper layer through the sheath pipe S of the foundation segment 20 side, the mortar M is not leaked to the outside of each joint portion by the rubber ring R. Grouted only within the sheath pipe S of a given through hole to connect the foundation segment 20 and the standard segment 40 and each of the standard segments 40 to be integrally received so that they are received transversely with the steel rod P. It can withstand loads.
한편, 기초 세그먼트와 표준세그먼트, 표준 세그먼트 사이에 형성된 띠형의 요홈(42-1)에 설치된 고무링(R1)은 교각의 외부로부터 발생될 수 있는 침식조건에서 염분의 침투를 방지하여 내부 부식을 방지해 주는 역할을 한다.On the other hand, the rubber ring (R1) is installed in the band-shaped groove 42-1 formed between the base segment, the standard segment, and the standard segment to prevent the internal corrosion by preventing the penetration of salt in the erosion conditions that may occur from the outside of the piers. It plays a role.
상기와 같이, 설정된 강봉(P)의 수가 적어지는 표준 세그먼트 상에서의 그라우팅이 이루어지고 난 뒤에는 연속해서 보정 세그먼트(40-1), 들보 세그먼트(50)가 적층된다.As described above, after the grouting is performed on the standard segment in which the set number of the steel bars P is reduced, the correction segment 40-1 and the beam segment 50 are successively stacked.
최종적으로 적층된 들보 세그먼트(50)측 상부로 관통하는 강봉(P)의 일단으로부터는 스트레싱 앵커리지(T)를 이용하여 체결해 준다.From one end of the steel bar (P) that penetrates to the upper side of the beam segment segment 50 finally laminated using a tensioning anchorage (T).
상기와 같이 체결된 상태에서는 들보 세그먼트(50)의 통공(52)에 매입된 쉬즈관(S)은 하층부의 기초 세그먼트(10)측에 연장된 그라우팅 주입관(S1)을 통해 2차적으로 그라우팅이 실시되어 기초 세그먼트(20)로부터 연이어 이어지는 강봉(P), 표준 세그먼트(40), 보정 세그먼트(40-1), 들보 세그먼트(50)를 일체로 거동되게 연결할 수 있게 된다.In the fastened state as described above, the sheath pipe S embedded in the through hole 52 of the beam segment 50 is secondly grouted through the grouting injection pipe S1 extending to the base segment 10 side of the lower layer part. The steel bar P, the standard segment 40, the correction segment 40-1, and the beam segment 50, which are carried out continuously from the foundation segment 20, may be integrally connected to each other.
상기 2차 그라우팅이 완성된 상태에서 첨부된 도 3에서와 같이, 그 상측, 즉, 스트레싱 앵커리지(T) 상부측으로는 일차적으로 모르타르 등과 같은 밀봉재(M1)로 들보 세그먼트(50)의 상면과 가깝게 밀봉처리하고, 이차적으로는 방수재(M2)로서 기밀처리 된다.As shown in FIG. 3 attached in the state where the secondary grouting is completed, the upper side, that is, the upper side of the stressing anchorage T, is primarily close to the upper surface of the beam segment 50 by a sealing material M1 such as mortar. It is sealed and is hermetically treated as a waterproof material M2.
상기와 같은 공법에 의해 시공되는 본 고안의 조립식 교각 구조물에 있어서, 교량, 고가도로의 폭에 대해 교각 구조물은 2주식 또는 3주식으로 하부에 위치하는기초부(1), 기초 세그먼트(20)로부터 각각 표준 세그먼트(40)가 상기와 같은 시공법에 의해 적층 조립되는데, 각 수직으로 적층되는 표준 세그먼트(40)에 대해 횡좌굴 방지를 위해 소정높이에 위치하는 표준 세그먼트(40) 사이에는 가로보 세그먼트(60)가 설치된다(도 7, 도 8참조).In the prefabricated bridge structure of the present invention constructed by the above-described method, the bridge structure with respect to the width of the bridge, the elevated road, the two-piece or three-fold each from the base portion (1), the foundation segment 20 which is located below The standard segment 40 is laminated and assembled by the above construction method, and the cross beam segment 60 is interposed between the standard segments 40 positioned at a predetermined height to prevent lateral buckling for each vertically stacked standard segment 40. Is installed (see FIGS. 7 and 8).
상기 가로보 세그먼트(60)는 각 표준 세그먼트(40)로부터 강봉(P)이 컨넥터(C)에 의해 연장된 상태로서, 이와 같은 상태에서 기중기를 이용하여 안치되며, 각 강봉(P)은 가로보 세그먼트(60)에 마려된 쉬즈관(S)을 통해 안치되며, 가로보 세그먼트(60)의 상층으로는 상기와 같이 각각 표준 세그먼트(40), 보정 세그먼트(40-1), 들보 세그먼트(50)의 순서로 각각 시공된다.The cross beam segment 60 is a state in which the steel bar P is extended by the connector C from each of the standard segments 40 and is placed using a crane in such a state, and each steel bar P is a cross beam segment ( 60 is placed through the sheath pipe S, and the upper layer of the cross beam segment 60 is in the order of the standard segment 40, the correction segment 40-1, and the beam segment 50, respectively, as described above. Each is constructed.
한편, 상기와 같이 교각이 2주 또는 3주식에 있어, 들보 세그먼트(50)의 크기와 중량이 더해짐에 따라서 본 고안의 일 실시예로서, 첨부된 도 9에서 도시된 바와 같이, 들보 세그먼트(50)는 그 구조물을 하나 또는 그 이상으로 구획하는 프리 캐스트로 제작하여 조립시 들보 세그먼트(50)의 형상에 따라 각각 단계적으로 적층하여 조립 시공할 수 있다.On the other hand, in the two-week or three-week stock as described above, as the size and weight of the beam segment 50 is added, as an embodiment of the present invention, as shown in the accompanying Figure 9, the beam segment 50 ) Can be fabricated by pre-casting partitioning the structure into one or more, and then laminated and assembled in stages according to the shape of the beam segment 50 during assembly.
이와 같이 기초부(1) 현장 타설작업에 있어, 기둥이 시작점이 되는 기초 세그먼트(20)를 일체로 기초부(1)에 고정하여 양생시간을 거친 이후부터는 운송되어 온 각 표준 세그먼트(40), 보정 세그먼트(40-1), 들보 세그먼트(50)를 순차적으로 수직되게 적층 조립하고, 그 연결부분을 일체로 그라우팅 실시해 줌으로써, 본 고안의 조립식 교각 구조물은 기존의 현장 콘크리트 타설공법에 의해 시공되는 교각구조물의 완성에 비해, 시간이 현저히 단축되고, 현장타설 작업으로 인해 발생될수 있는 기둥부분의 수직방향 균열을 줄여 구조물의 내구성 및 품질 향상은 물론, 유지관리비용을 현저히 감소시킬 수 있는 이점이 있다.In this way, in the field-pouring operation of the foundation 1, each standard segment 40 that has been transported since the curing time has been fixed by integrally fixing the foundation segment 20 as a starting point to the foundation 1, By sequentially stacking the correcting segment 40-1 and the beam segment 50 vertically, and grouting the connecting parts integrally, the prefabricated pier structure of the present invention is constructed by the existing field concrete pouring method. Compared to the completion of the structure, the time is significantly shortened, and the vertical cracking of the pillar portion, which may be generated due to the site casting work, has the advantage of significantly improving the durability and quality of the structure as well as significantly reducing the maintenance cost.
이상에서와 같이, 본 고안은 프리 캐스트타입으로서 시공되는 교각 구조물에 있어, 각 위치에 맞게 이미 제작한 기초 세그먼트, 표준 세그먼트, 보정 세그먼트 및 들보 세그먼트 등을 제작, 현장으로 운송하여 현장에서 신속하게 조립하여 교각 시공에 따른 주변 현장의 교통혼잡을 최소화시켜주며, 공사기간 및 각 구성요소의 단순화로 공사비용을 현저히 절감할 수 있는 효과가 있다.As described above, the present invention manufactures the foundation segment, the standard segment, the calibration segment and the beam segment, which are already manufactured for each position in the pier structure constructed as a precast type, and quickly assembles them in the field by transporting them to the site. Therefore, it minimizes traffic congestion of the surrounding sites due to the construction of bridges, and can significantly reduce the construction cost by simplifying the construction period and each component.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2003-0015159U KR200324563Y1 (en) | 2003-05-16 | 2003-05-16 | Assembling segments pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2003-0015159U KR200324563Y1 (en) | 2003-05-16 | 2003-05-16 | Assembling segments pier |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030031176A Division KR100563617B1 (en) | 2003-05-16 | 2003-05-16 | Construction method and the structure for assembling segments pier |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200324563Y1 true KR200324563Y1 (en) | 2003-08-25 |
Family
ID=49337505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2003-0015159U KR200324563Y1 (en) | 2003-05-16 | 2003-05-16 | Assembling segments pier |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200324563Y1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100804149B1 (en) | 2006-11-24 | 2008-02-19 | 전영총 | The PC structure pier and manufacturing method thereof |
KR100860591B1 (en) * | 2007-06-19 | 2008-09-26 | 삼성물산 주식회사 | Vertical structure building method using precast concreat block |
KR101029042B1 (en) | 2008-07-21 | 2011-04-15 | 지에스건설 주식회사 | Precasr pier unit using sheath and pier construction method therewith |
KR101245197B1 (en) * | 2010-09-28 | 2013-03-19 | 주식회사 아앤시티 | multi-column type modular pier |
-
2003
- 2003-05-16 KR KR20-2003-0015159U patent/KR200324563Y1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100804149B1 (en) | 2006-11-24 | 2008-02-19 | 전영총 | The PC structure pier and manufacturing method thereof |
KR100860591B1 (en) * | 2007-06-19 | 2008-09-26 | 삼성물산 주식회사 | Vertical structure building method using precast concreat block |
KR101029042B1 (en) | 2008-07-21 | 2011-04-15 | 지에스건설 주식회사 | Precasr pier unit using sheath and pier construction method therewith |
KR101245197B1 (en) * | 2010-09-28 | 2013-03-19 | 주식회사 아앤시티 | multi-column type modular pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100563617B1 (en) | Construction method and the structure for assembling segments pier | |
KR100958014B1 (en) | Construction method of steel composite girder bridge | |
US8695297B2 (en) | Foundation for a wind turbine tower | |
KR102009134B1 (en) | Construction Method of Long Span Girder Bridge | |
US20110278752A1 (en) | Method for constructing precast coping for bridge | |
KR101077821B1 (en) | Tunnel conctruction method using arch pre-cast segmental structural body | |
KR100924746B1 (en) | Method for constructing precast coping by using multi-step tensioning | |
KR101263557B1 (en) | Prefabricated hollow-segment type pier | |
KR20080087778A (en) | Constructing method of precast pier footing for bridge | |
KR101318773B1 (en) | T-shaped composite girder segment integrated by i-shaped girder filled with concrete and slab and construction method of slab by prefabrication of the t-shaped composite girder segment | |
KR100991869B1 (en) | Single and continuous prestressed concrete girder bridge and the construction method | |
US10655287B2 (en) | Reinforcement apparatus for reinforcing a structure comprising a pier and a cross-beam | |
KR101339946B1 (en) | Precast bridge post | |
KR101478131B1 (en) | Construction Method of Precast Pier | |
KR102517707B1 (en) | Construction method of pier and its structure system | |
CN215977351U (en) | Reinforced framework foundation structure and supporting mechanism | |
KR200324563Y1 (en) | Assembling segments pier | |
JP2010047962A (en) | Construction method for pc bridge | |
JP2012017575A (en) | Junction structure and junction method of precast concrete member | |
KR100640244B1 (en) | Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports | |
KR100555046B1 (en) | A tunnel structure and method for constructing of it | |
KR101888001B1 (en) | Superstructure of Girder Bridge, and Constructing Method thereof | |
KR20130074627A (en) | Horizontal shear connector for precast concrete bridge pier | |
CN108104137B (en) | Foundation pit supporting structure and construction method | |
KR20100010122A (en) | Underground laying water tank and construction method of it |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20040805 Year of fee payment: 3 |
|
EXTG | Ip right invalidated |