KR20030031044A - The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure - Google Patents

The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure Download PDF

Info

Publication number
KR20030031044A
KR20030031044A KR1020030015258A KR20030015258A KR20030031044A KR 20030031044 A KR20030031044 A KR 20030031044A KR 1020030015258 A KR1020030015258 A KR 1020030015258A KR 20030015258 A KR20030015258 A KR 20030015258A KR 20030031044 A KR20030031044 A KR 20030031044A
Authority
KR
South Korea
Prior art keywords
hole
rope
anchor
anchor bolt
stage
Prior art date
Application number
KR1020030015258A
Other languages
Korean (ko)
Inventor
이승욱
Original Assignee
이승욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이승욱 filed Critical 이승욱
Priority to KR1020030015258A priority Critical patent/KR20030031044A/en
Publication of KR20030031044A publication Critical patent/KR20030031044A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/02Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
    • F23G5/04Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment drying
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • F23G5/46Recuperation of heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2206/00Waste heat recuperation
    • F23G2206/10Waste heat recuperation reintroducing the heat in the same process, e.g. for predrying
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/12Heat utilisation in combustion or incineration of waste

Abstract

PURPOSE: An interposing/anchoring method of a rope using compressive air is provided to fit the facilities, which require high bearing force, by improving drawing strength. CONSTITUTION: The interposing/anchoring method of a rope using compressive air comprises the steps of interposing a PC steel wire, a wire rope, a reinforced rope, etc. in a hole, and interposing/anchoring a rope(6) and anchor bolts into the hole(7) using a compressive air and a thrust cap(2).

Description

다단앵커볼트의 구조와 압축공기를 이용한 로프의 삽입과 정착 방법{The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure}The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure}

본 발명은 교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 설치하여 프리스트레스트(prestressed)하기 위하여 천공-홀(穿孔-hole)의 길이 또는 깊이가 수십 또는 수백미터의 작은 구멍에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦(穿孔-hole)의 적정위치에 여러 수 개의 다단앵커볼트(多段-anchor bolt)를 정착시켜 포스트텐셔닝(posttensioning)을 하기 위한 방법에 관한 것으로서,The present invention is a PC steel wire in a small hole of several tens or hundreds of meters in length or depth of perforation-hole for prestressed by installing structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc. Inserting wire rope, reinforcing fiber rope, etc. to fix several post-anchor bolts at the proper position of perforation-hole ⑦ (穿孔 -hole) to posttensioning As for

더욱 상세하게는 천공-홀⑦(穿孔-hole)의 지지력(支持力)이 1개의 앵커볼트로 인발강도(引拔强度)에 미치지 못하면 2개 이상의 다단앵커볼트(多段-anchor bolt)를 1개의 로프(rope)또는 철근(鐵筋) 강봉(鋼棒) 등에 장착하여 인발강도(引拔强度)를 향상하기 위한 다단앵커볼트(多段-anchor bolt)의 구성과 압축공기(壓縮空氣)를 이용하여 로프와 앵커볼트를 천공-홀⑦(穿孔-hole)에 삽입 정착하는 방법에 관한 발명이다.More specifically, if the bearing force of the hole-hole ⑦ does not reach the pullout strength with one anchor bolt, two or more multi-anchor bolts may be used. By using a multi-anchor bolt structure and compressed air to improve the pulling strength by attaching to a rope or reinforcing steel bar, etc. The present invention relates to a method of inserting and fixing a rope and an anchor bolt into a hole-hole ⑦ (穿孔 -hole).

따라서 조적식구조(組積式構造, masonry structure)공법으로 시공한 구조용블록(출원번호10-2002-0080088)의 설비구(設備構)와 암반의 천공-홀⑦(穿孔-hole)에 pc강선, 와이어로프, 보강섬유로프를 삽입하고 다단앵커볼트(多段-anchor bolt)를 정착시켜 프리스트레스트(prestressed)하기 위한 것이다.Therefore, the PC steel wire in the hole of the structural block (Application No. 10-2002-0080088) constructed by the masonry structure method and the hole-hole ⑦ of the rock To prestressed by inserting a wire rope, reinforcing fiber rope and fixing a multi-anchor bolt.

그러므로 본 발명의 다단앵커볼트는 선재를 사용함으로서 길이와 깊이의 제한을 받지 않으며, 직선이 아닌 곡선의 천공-홀⑦(穿孔-hole)에도 로프와 앵커볼트의 삽입과 장착하기 편리하며, 다단앵커볼트를 사용함으로서 지지력(支持力)이 부족한 천공-홀에 여러 수 개의 앵커볼트를 동시에 정착 사용함으로서 높은 인장력과 고지지력(高支持力)이 요구되는 시설물에 매우 적합하다.Therefore, the multi-stage anchor bolt of the present invention is not limited in length and depth by using a wire rod, and it is convenient to insert and mount a rope and anchor bolt in a non-linear curved perforation-hole ⑦ (穿孔 -hole), and the multi-stage anchor By using bolts to anchor several bolts at the same time in the drill-hole that lacks the bearing capacity, it is very suitable for the facilities requiring high tensile strength and high bearing capacity.

공지의 앵커볼트는 강봉(鋼棒) 또는 철근(鐵筋) 등 막대기(bar)용 자재에 사용되도록 고안되어있기 때문에 수 미터 또는 십여 미터의 짧은 직선의 천공 홀에 1개의 앵커볼트만을 정착하도록 되어있어 조적식구조의 설비구에는 사용할 수가 없으며, 또한 천공-홀⑦의 지지력이 부족하면 그라우팅(grouting)후 프리스트레스트(prestressed)를 해야 하는 등 많은 문제점이 대두되고 있다.Known anchor bolts are designed to be used in bar materials such as steel bars or rebars, so that only one anchor bolt is settled in a short straight hole of several meters or tens of meters. There is a lot of problems, such as the use of the masonry structure equipment, and the lack of support of the hole-hole ⑦ has to be prestressed after grouting (pre-stressed).

그르므로 본 발명의 압축공기를 이용한 로프의 삽입방법과 다단앵커볼트의 정착방법은 조적식구조 등의 길고 깊은 설비구 뿐만 아니라 지지력이 비교적 적은 연암 등의 천공-홀⑦에도 삽입과 정착이 뛰어나 여러 구조물에 사용하기 편리하다.Therefore, the method of inserting the rope using the compressed air of the present invention and the method of fixing the multi-stage anchor bolt are not only long and deep equipment such as a masonry structure, but also excellent in insertion and fixation in the hole-hole ⑦ such as soft rock, which has a relatively low bearing capacity. It is convenient to use in the structure.

따라서 로프⑥의 삽입을 원활히 하기 위하여 추진-캡②이 천공-홀⑦에 밀착되어 압축공기가 세어나가지 못하도록 탄성이 좋은 재료를 선택하여야 하며, 다단앵커볼트의 완전한 정착을 위하여 앵커너트④에 부착된 스프링⑤은 복원능력이 뛰어나고 날개가 날카로워 설비구와 암벽에 잘 박히거나 잘 고정될 수 있는 강성이 뛰어나야 한다.Therefore, in order to facilitate the insertion of the rope ⑥, select the material with good elasticity so that the pushing-cap ② closes to the perforation-hole ⑦ and prevents the compressed air from leaking, and it is attached to the anchor nut ④ for the complete fixing of the multi-stage anchor bolt. The spring ⑤ should be excellent in its resilience and its stiffness so that it can be well nailed or fixed to the equipment and rock wall.

그리고 1개의 로프⑥에는 여러 수 개의 다단앵커볼트가 소요되어도 선단의 추진-캡②은 반드시 1개만을 사용하여야 한다.And even if several ropes of multi-stage anchor bolts are required for one rope⑥, only one prop-cap② of the tip should be used.

도 1은 다단앵커볼트의 구조도.1 is a structural diagram of a multi-stage anchor bolt.

도 2는 다단앵커볼트의 구조 상세도.Figure 2 is a detailed view of the structure of the multi-stage anchor bolt.

도 3은 압축공기를 주입한 다단앵커볼트의 삽입도.3 is an insertion view of a multi-stage anchor bolt injected with compressed air.

도 4는 로프를 텐션(인장)한 다단앵커볼트의 정착도Figure 4 is a fixing diagram of the multi-stage anchor bolt tensioned (tensioned) rope

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

①그립(grip) ②추진캡(推進-cap) ③정착(定着)쐐기 ④앵커너트(anchor nut) ⑤스프링(spring) ⑥로프[(rope)pc강선·와이어로프·보강섬유로프] ⑦천공-홀(穿孔-hole) ⑧압축공기주입구(壓縮空氣 注入口) ⑨압축공기(壓縮空氣) ⑩텐션(tension)① Grip ② Propulsion cap (推進 -cap) ③ Fixing wedge ④ Anchor nut ⑤ Spring ⑥ Rope [(rope pc steel wire, wire rope, reinforced fiber rope] ⑦ Perforation- Hole ⑧ Compressed air inlet ⑨ Compressed air ⑩Tension

발명의 구성은 다음과 같다.The composition of the invention is as follows.

다단앵커볼트의 선단(先端)에는 탄력성이 좋은 고무·플라스틱·코르크 구조의 추진-캡②(推進-cap), 추진-캡②을 로프⑥(rope)-pc강선, 와이어로프, 보강섬유로프]에 고정할 수 있는 구조의 그립①(grip), ⑩텐션(tension)에 의해 정착(定着)쐐기③를 역 추진할 때 선단부가 열리도록 만든 구조의 앵커너트④,앵커너트④(anchor nut)의 바깥쪽의 역-추진(逆-推進) 방향으로 2∼3개의 복원력(復原力)이 우수한 고탄성(高彈性)의 스프링 강(spring steel)구조의 날개의 끝이 날카로운 스프링⑤(spring)을 부착, 앵커너트④(anchor nut)를 고정할 수 있는 구조의 그립①(grip), 압축공기를 주입하여 추진-캡②을 전진(前進)시킬 수 있는 구조의 압축공기주입구⑧(壓縮空氣 注入口)등으로 구성되어 지며, 선단 부 이하 설치할 다단앵커볼트는 도 1과 같이 추진-캡②을 사용하지 않으며 한 개의 천공-홀⑦에는 하나의 추진-캡②이 필요하다.At the tip of the multi-stage anchor bolt, the prop-cap② and the prop-cap② of the rubber, plastic and cork structure with good elasticity are attached to the rope-pc steel wire, wire rope, and reinforcing fiber rope.] Anchor nut ④ and anchor nut ④ of the structure that the tip is opened when the propulsion of the fixing wedge ③ by the grip and the tension of the structure that can be fixed to A high elastic spring steel structure with excellent restoring force in the counter-propulsion direction on the side has a sharp spring ⑤. Grip ① (grip) that can hold anchor nut ④ (anchor nut), compressed air inlet ⑧ (구조 空氣 入口), which can be used to inject compressed air to advance propulsion-cap ② It is composed of a multi-stage anchor bolt to be installed below the tip portion as shown in Figure 1 does not use a prop-cap② One perforation-hole ⑦ requires one prop-cap②.

따라서 본 발명은 교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 프리스트레스트(prestressed)하기 위한 천공(穿孔)의 길이 또는 깊이가 수십 또는 수백 미터의 홀(hole)속에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦의 필요한 적정부위에 여러 수 개의 다단앵커볼트(多段-anchor bolt)를 정착시켜 포스트텐셔닝(posttensioning)을 하기 위한 것으로 암반의 천공-홀⑦과 조적식구조(組積式構造, masonry structure)공법으로 시공한 구조용블록(출원번호10-2002-0080088)의 설비구(設備構)에 pc강선, 와이어로프, 보강섬유로프를 삽입하고 다단용 앵커볼트를 정착시켜 프리스트레스트(prestressed)하기 위한 것이다.Therefore, the present invention is a PC steel wire, wire rope in a hole of tens or hundreds of meters in length or depth of perforation for prestressing structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc. To post-tensioning by inserting reinforcing fiber ropes and fixing several multi-anchor bolts in the proper area of perforation-hole⑦. Multi-stage anchor bolts are inserted by inserting pc steel wire, wire rope and reinforcing fiber rope into the equipment holes of structural block (Application No. 10-2002-0080088) constructed by the masonry structure method. It is to settle and prestressed.

그러므로 본 발명의 다단앵커볼트는 선재로 된 로프⑥를 사용함으로서 길이와 깊이의 제한을 받지 않으며, 직선이 아닌 곡선의 천공-홀⑦에도 로프⑥삽입과 다단앵커볼트의 장착하기 편리하며, 다단앵커볼트를 사용함으로서 지지력(支持力)이 부족한 천공-홀⑦에 여러 수 개의 다단앵커볼트를 설치 사용함으로서 높은 지지력(支持力)이 요구되는 시설물에 매우 적합하다.Therefore, the multi-stage anchor bolt of the present invention is not limited to the length and depth by using the rope ⑥ made of wire rod, it is convenient to insert the rope ⑥ and the multi-stage anchor bolts in a non-linear curved hole-hole ⑦, multi-stage anchor By using bolts, several multi-stage anchor bolts are installed in the hole-hole ⑦ which lacks the bearing capacity, so it is very suitable for the facilities requiring high bearing capacity.

[발명의 상세한 설명]Detailed description of the invention

이하 첨부된 도면에 의해 상세히 설명하면 다음과 같다.Hereinafter, described in detail by the accompanying drawings as follows.

다단용 앵커볼트란 천공-홀⑦의 지지력(支持力)이 1개의 앵커볼트로 인발강도((引拔强度)에 미치지 못하여도 2개 이상의 앵커볼트를 1개의 로프⑥나 철근 강봉 등에 장착하여 인발강도(引拔强度)를 향상하기 위한 다단앵커볼트의 구성과 압축공기⑨(壓縮空氣)를 이용하여 로프⑥와 다단앵커볼트를 천공-홀⑦에 삽입하여 정착하는 방법에 관한 발명이다.Multi-stage anchor bolts are drawn by attaching two or more anchor bolts to one rope ⑥ or reinforcing steel bar even if the bearing capacity of drilling-hole⑦ is less than one anchor bolt. The present invention relates to a structure of a multi-stage anchor bolt for improving strength and a method of inserting and fixing a rope (6) and a multi-stage anchor bolt into a hole-hole (7) by using compressed air (9).

따라서 본 발명은 교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 프리스트레스트(prestressed)하기 위한 천공(穿孔)의 길이 또는 깊이가 수십 또는 수백 미터의 홀(hole)속에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦의 필요한 적정부위에 여러 수 개의 다단앵커볼트(多段-anchor bolt)를 정착시켜 포스트텐셔닝(posttensioning)을 하기 위한 것으로 암반의 천공-홀⑦과 조적식구조(組積式構造, masonry structure)공법으로 시공한 구조용블록(출원번호10-2002-0080088)의 설비구(設備構)에 pc강선, 와이어로프, 보강섬유로프를 삽입하고 다단용 앵커볼트를 정착시켜 프리스트레스트(prestressed)하기 위한 것이다.Therefore, the present invention is a PC steel wire, wire rope in a hole of tens or hundreds of meters in length or depth of perforation for prestressing structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc. To post-tensioning by inserting reinforcing fiber ropes and fixing several multi-anchor bolts in the proper area of perforation-hole⑦. Multi-stage anchor bolts are inserted by inserting pc steel wire, wire rope and reinforcing fiber rope into the equipment holes of structural block (Application No. 10-2002-0080088) constructed by the masonry structure method. It is to settle and prestressed.

그러므로 본 발명의 다단앵커볼트는 선재로 된 로프⑥를 사용함으로서 길이와 깊이의 제한을 받지 않으며, 직선이 아닌 곡선의 천공-홀⑦에도 로프⑥삽입과 다단앵커볼트의 장착하기 편리하며, 다단앵커볼트를 사용함으로서 지지력(支持力)이 부족한 천공-홀⑦에 여러 수 개의 다단앵커볼트를 설치 사용함으로서 높은 지지력(支持力)이 요구되는 시설물에 매우 적합하다.Therefore, the multi-stage anchor bolt of the present invention is not limited to the length and depth by using the rope ⑥ made of wire rod, it is convenient to insert the rope ⑥ and the multi-stage anchor bolts in a non-linear curved hole-hole ⑦, multi-stage anchor By using bolts, several multi-stage anchor bolts are installed in the hole-hole ⑦ which lacks the bearing capacity, so it is very suitable for the facilities requiring high bearing capacity.

로프⑥와 다단앵커볼트를 천공-홀⑦(穿孔- hole)에 삽입한 순서를 도 1, 도 2, 도 3, 도 4에 따라 설명하면 다음과 같다.The order of inserting the rope ⑥ and the multi-stage anchor bolt into the hole-hole ⑦ (穿孔 -hole) will be described with reference to FIGS. 1, 2, 3, and 4 as follows.

삽입하고자 하는 로프⑥[(rope)의 선단에 그립①(grip)설치하여 추진-캡②이 압축공기에 의해 이탈되지 않도록 고정하고 정착(定着)쐐기③ 로프⑥에 끼우고 스프링⑤ 날개가 부착된 앵커너트④를 그립①을 사용하여 전진과 후진이 도지 않도록 고정하여 천공-홀⑦의 입구에 밀어 넣고 압축공기주입구⑧(壓縮空氣 注入口)를 설치하고 압축공기⑨(壓縮空氣)를 주입하여 일정량의 로프⑤가 삽입되면 설치한 압축공기주입구⑧는 해체하여 또 다른 다단앵커볼트를 같은 방법으로 설치하는 것을 반복하여 로프와 앵커볼트를 삽입한다.Install the grip① (grip) at the tip of the rope⑥ [(rope) to be inserted and fix it so that the prop-cap② is not separated by compressed air, insert it into the fixing wedge③ rope⑥, and have the spring⑤ attached Fix the anchor nut④ by using the grip① to prevent the forward and backward turning, and push it into the inlet of the hole-hole⑦, install the compressed air inlet ⑧ and inject the compressed air ⑨ (壓縮 空 壓縮) When the rope⑤ is inserted, the installed compressed air inlet ⑧ is dismantled and repeats to install another multistage anchor bolt in the same way and insert the rope and anchor bolt.

삽입이 완료된 로프⑤는 인장기계를 사용하여 텐션⑩(tension)하게 되면 로프⑥가 뒤로 밀리면서 다단앵커볼트의 앵커너트④에 부착된 모든 스프링⑤의 날개가 천공-홀⑦의 벽에 의해 1차 가고정(暇固定)되어 앵커너트④를 고정하게 되고 이어서 정착쐐기③가 앙카너트④의 두부에 삽입되면서 앙카너트④를 팽창시켜 천공-홀⑦의 벽에 최종적으로 정착시켜 주게 되는 것이다.When the rope ⑤ has been inserted into the rope ⑤ by tensioning, the rope ⑥ is pushed back and the wings of all the springs ⑤ attached to the anchor nut ④ of the multi-stage anchor bolt are firstly cut by the wall of the hole-hole⑦. It is temporarily fixed and fixed to the anchor nut ④. Then, the fixing wedge ③ is inserted into the head of the anchor nut ④ to inflate the anchor nut ④ and finally fix it to the wall of the hole-hole ⑦.

따라서 다단앵커볼트 삽입할 때 앵커너트④에 부착된 스프링⑤의 날개가 천공-홀⑦이 커지면 많이 펴지고 천공-홀⑦의 크기가 적어지면 오므라져 앵커너트④ 가까이 에 위치하게 된다.Therefore, when inserting the multi-stage anchor bolts, the wings of the spring⑤ attached to the anchor nut④ widen as the drilling-hole ⑦ grows large, and when the size of the drilling-hole ⑦ decreases, they are retracted and positioned near the anchor nut④.

그러므로 앵커너트④에 부착된 스프링⑤의 날개는 항상 천공-홀⑦의 벽에 붙어 있게는 것이다.Therefore, the wings of the spring⑤ attached to the anchor nut④ are always attached to the wall of the hole-hole⑦.

그러므로 본 발명은 교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 프리스트레스트(prestressed)하기 위한 천공(穿孔)의 길이 또는 깊이가 수십 또는 수백 미터의 홀(hole)속에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦의 필요한 적정부위에 여러 수 개의 다단앵커볼트(多段-anchor bolt)를 정착시켜 포스트텐셔닝(posttensioning)을 하기 위한 것으로 암반의 천공-홀⑦과 조적식구조(組積式構造, masonry structure)공법으로 시공한 구조용블록(출원번호10-2002-0080088)의 설비구(設備構)에 pc강선, 와이어로프, 보강섬유로프를 삽입하고 다단용 앵커볼트를 정착시켜 프리스트레스트(prestressed)하기 위한 것이다.Therefore, the present invention is a PC steel wire, wire rope in a hole of tens or hundreds of meters in length or depth of perforation for prestressing structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc. To post-tensioning by inserting reinforcing fiber ropes and fixing several multi-anchor bolts in the proper area of perforation-hole⑦. Multi-stage anchor bolts are inserted by inserting pc steel wire, wire rope and reinforcing fiber rope into the equipment holes of structural block (Application No. 10-2002-0080088) constructed by the masonry structure method. It is to settle and prestressed.

다단앵커볼트는 선재로 된 로프⑥를 사용함으로서 길이와 깊이의 제한을 받지 않으며, 직선이 아닌 곡선의 천공-홀⑦에도 로프⑥삽입과 다단앵커볼트의 장착하기 편리하며, 다단앵커볼트를 사용함으로서 지지력(支持力)이 부족한 천공-홀⑦에 여러 수 개의 다단앵커볼트를 설치 사용함으로서 높은 지지력(支持力)이 요구되는 시설물에 매우 적합하다.Multi-stage anchor bolts are not limited in length and depth by using wire rope ⑥. It is convenient to insert rope ⑥ and multi-stage anchor bolts even in the curved hole-hole ⑦, not straight line. The installation of several multi-stage anchor bolts in the drilling hole (7), which lacks the bearing capacity, makes it suitable for installations requiring high bearing capacity.

다단용 앵커볼트란 천공-홀⑥의 지지력(支持力)이 한 개의 앵커볼트로 인발강도((引拔强度)에 미치지 못하여도 두 개 이상의 앵커볼트를 한 개의 로프⑥나 철근 강봉 등에 장착하여 인발강도를 향상하기 위한 다단앵커볼트의 구성과 압축공기를 이용하여 로프⑥와 다단앵커볼트를 천공-홀⑦에 삽입하여 정착하게되는 것이다.Multi-stage anchor bolts are drawn by attaching two or more anchor bolts to one rope ⑥ or reinforcing steel bar even if the bearing capacity of drilling-hole ⑥ does not reach the pulling strength with one anchor bolt. Rope ⑥ and multi-stage anchor bolts are inserted into perforated-hole ⑦ and fixed by using multi-stage anchor bolts to improve strength and compressed air.

따라서 본 발명은 교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 프리스트레스트(prestressed)하기 위한 천공(穿孔)의 길이 또는 깊이가 수십 또는 수백 미터의 홀(hole)속에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦의 필요한 적정부위에 여러 수 개의 다단앵커볼트(多段-anchor bolt)를 정착시켜 포스트텐셔닝(posttensioning)을 하기 위한 것으로 암반의 천공-홀⑦과 조적식구조(組積式構造, masonry structure)공법으로 시공한 구조용블록(출원번호10-2002-00800888)의 설비구(設備構)에 pc강선, 와이어로프, 보강섬유로프를 삽입하고 다단용 앵커볼트를 정착시켜 프리스트레스트(prestressed)하기 위한 것이다.Therefore, the present invention is a PC steel wire, wire rope in a hole of tens or hundreds of meters in length or depth of perforation for prestressing structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc. To post-tensioning by inserting reinforcing fiber ropes and fixing several multi-anchor bolts in the proper area of perforation-hole⑦. Multi-stage anchor bolts are inserted by inserting pc steel wire, wire rope and reinforcing fiber rope into the equipment block of structural block (application number 10-2002-00800888) constructed by the masonry structure method. It is to settle and prestressed.

그러므로 다단앵커볼트는 선재로 된 로프⑥를 사용함으로서 길이와 깊이의 제한을 받지 않으며, 직선이 아닌 곡선의 천공-홀⑦에도 로프⑥삽입과 다단앵커볼트의 장착하기 편리하며, 다단앵커볼트를 사용함으로서 지지력(支持力)이 부족한 천공-홀⑦에 여러 수 개의 다단앵커볼트를 설치 사용함으로서 높은 지지력(支持力)이 요구되는 시설물에 매우 적합하다.Therefore, the multi-stage anchor bolt is not limited in length and depth by using the wire rope ⑥. It is convenient to insert the rope ⑥ and attach the multi-stage anchor bolt to the curved hole-hole ⑦, not a straight line. By installing several multi-stage anchor bolts in the drilling hole (7), which lacks the bearing capacity, it is very suitable for the facilities requiring high bearing capacity.

Claims (3)

교량, 댐, 터널, 옹벽, 암거, 건축물 등의 구조물을 설치하여 프리스트레스트(prestressed)하기 위하여 천공-홀(穿孔-hole)의 길이 또는 깊이가 수십 또는 수백미터의 구멍에 pc강선, 와이어로프, 보강섬유로프 등을 삽입하여 천공-홀⑦(穿孔-hole)에 압축공기(壓縮空氣)와 추진-캡②을 이용하여 로프⑥와 앵커볼트를 깊은 천공-홀⑦에 삽입 정착하는 방법.To install prestressed structures such as bridges, dams, tunnels, retaining walls, culverts, buildings, etc., PC wires, wire ropes, A method of inserting and fixing a rope ⑥ and an anchor bolt into a deep hole-hole ⑦ by inserting a reinforcing fiber rope into the hole-hole ⑦ using compressed air and a prop-cap ②. 제 1항에 있어서 앵커볼트 삽입할 때 앵커너트④에 부착된 스프링⑤의 날개가 천공-홀⑦이 커지면 많이 펴지고 천공-홀⑦의 크기가 좁아지면 오므라져 앵커너트④ 가까이에 위치하도록 앵커너트④에 부착된 스프링⑤의 날개는 항상 천공-홀⑦의 벽에 붙어 있도록 하여 삽입한 로프를 인장기계를 사용하여 텐션⑩(tension)하게 되면 로프⑥가 뒤로 밀리면서 앵커너트④에 부착된 모든 스프링⑤의 날개가 천공-홀⑦의 벽에 의해 1차 가고정(暇固定)되어 앵커너트④를 고정시켜주고 이어서 정착쐐기③가 앵커너트④의 두부에 삽입되면서 앵커너트④를 팽창시켜 천공-홀⑦의 벽에 최종적으로 정착시켜 주는 다단앵커볼트.The anchor nut ④ according to claim 1, wherein when the anchor bolt is inserted, the wing of the spring ⑤ attached to the anchor nut ④ is widened as the perforation-hole ⑦ becomes large, and when the size of the perforation-hole ⑦ is narrowed, it retracts to be located near the anchor nut ④ Wings of the spring⑤ attached to the wall are always attached to the wall of the hole-hole⑦. When the inserted rope is tensioned using a tensioning machine, all the springs attached to the anchor nut④ are pushed backwards. The wing of the hole is temporarily fixed by the wall of the hole-hole ⑦ to fix the anchor nut ④. Then, the fixing wedge ③ is inserted into the head of the anchor nut ④ to expand the anchor nut ④ to expand the hole-hole ⑦. The multi-stage anchor bolts finally fix the wall. 제 1항과 제 2항에 있어서 지지력(支持力)이 부족한 천공-홀⑦에 여러 수 개의 다단앵커볼트를 정착 사용하여 인발강도(引拔强度)를 높이기 위하여 여러 수 개의 앵커볼트를 사용하여 텐션⑩(tension)하는 방법.The tension of several anchor bolts is used in order to increase the pull-out strength by fixing several multi-stage anchor bolts in the drilling-hole ⑦ according to claim 1 and 2, where the bearing capacity is insufficient. How to tension.
KR1020030015258A 2003-03-06 2003-03-06 The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure KR20030031044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030015258A KR20030031044A (en) 2003-03-06 2003-03-06 The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030015258A KR20030031044A (en) 2003-03-06 2003-03-06 The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure

Publications (1)

Publication Number Publication Date
KR20030031044A true KR20030031044A (en) 2003-04-18

Family

ID=29578752

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030015258A KR20030031044A (en) 2003-03-06 2003-03-06 The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure

Country Status (1)

Country Link
KR (1) KR20030031044A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100910055B1 (en) * 2008-09-12 2009-07-30 장영미 Connecting apparatus and connecting method of precast concrete box units and precast concrete box unit comprising double connecting apparatus
KR101359488B1 (en) * 2013-05-24 2014-02-06 주식회사 비엠테크 Micropile including radially extendable head unit for maximization of supporting force and constructing method of micropile using the same
CN107620603A (en) * 2017-09-26 2018-01-23 中国矿业大学 A kind of novel slurry filling anchor pole with steel loop bar
KR102071403B1 (en) 2019-10-02 2020-01-30 손석환 Seismic multi-stage set anchor unit
CN111691415A (en) * 2019-03-14 2020-09-22 湖北工业大学 Multi-strand glass fiber prestressed anchor rod and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100910055B1 (en) * 2008-09-12 2009-07-30 장영미 Connecting apparatus and connecting method of precast concrete box units and precast concrete box unit comprising double connecting apparatus
KR101359488B1 (en) * 2013-05-24 2014-02-06 주식회사 비엠테크 Micropile including radially extendable head unit for maximization of supporting force and constructing method of micropile using the same
CN107620603A (en) * 2017-09-26 2018-01-23 中国矿业大学 A kind of novel slurry filling anchor pole with steel loop bar
CN107620603B (en) * 2017-09-26 2023-09-22 中国矿业大学 Novel grouting anchor rod with steel loop bar
CN111691415A (en) * 2019-03-14 2020-09-22 湖北工业大学 Multi-strand glass fiber prestressed anchor rod and construction method thereof
CN111691415B (en) * 2019-03-14 2024-04-19 湖北工业大学 Multi-strand glass fiber prestressed anchor rod and construction method thereof
KR102071403B1 (en) 2019-10-02 2020-01-30 손석환 Seismic multi-stage set anchor unit

Similar Documents

Publication Publication Date Title
US7207149B2 (en) Anchor and method for reinforcing a structure
KR100998072B1 (en) Expanded ground pressure type anchor structure
KR100918771B1 (en) Micro pile setting apparatus and settling method using the same
KR20060097957A (en) Earth reinforcement system by using bamboo reinforcement
KR101043127B1 (en) Device and method for reinforcing the ground using pc twisted steel wire
KR20030031044A (en) The insertion of rope and fixed method which is the use of compressive air and multistage anchor bolt structure
KR101059945B1 (en) Multi-step compressive anchor and manufacturing method thereof
KR101202845B1 (en) Hybrid ground reinforcing method by earth anchor and soil nail
KR101222477B1 (en) Fractured zone possible at tension expanded ground pressure type anchor
EP3907331A1 (en) Hybrid anchor
KR20070001706A (en) Use steel material that have spiral plate nailing method and ground anchor method and struction
KR100651607B1 (en) Post-tension soil nailing apparatus and the assembling soil nailing method using the stiff facing plate
KR101017183B1 (en) Ground anchor using steel strand and ground reinforcement method using the same
KR101132809B1 (en) Anchor body and construction method
JP2008031759A (en) Ground anchor and ground anchoring method
CN109208593B (en) Device for compensating prestress loss and construction method thereof
KR100913320B1 (en) Multifunctional complex type anchor body
KR101017412B1 (en) Permanent anchor of friction bearing pressure type and constructing method thereof
KR100830927B1 (en) Slope reinforcement method and devece
KR101386557B1 (en) Method and apparatus for expansive ground pressure type anchor using a stopper system
KR100621435B1 (en) Soil nailing structure of using prestress and method of reinforcing the foundation with it
KR102655153B1 (en) Small-diameter multi-axial stabilizing pile structure and construction method for slope reinforcement
KR20060122381A (en) Swelling reinforced material
JPH1082056A (en) Method of earthquake-resisting pile foundation construction
KR101286937B1 (en) Device for reinforcing the ground

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application