KR200298104Y1 - Mobile form for forming concrete box on construction work - Google Patents

Mobile form for forming concrete box on construction work Download PDF

Info

Publication number
KR200298104Y1
KR200298104Y1 KR2020020027595U KR20020027595U KR200298104Y1 KR 200298104 Y1 KR200298104 Y1 KR 200298104Y1 KR 2020020027595 U KR2020020027595 U KR 2020020027595U KR 20020027595 U KR20020027595 U KR 20020027595U KR 200298104 Y1 KR200298104 Y1 KR 200298104Y1
Authority
KR
South Korea
Prior art keywords
formwork
concrete
sides
support
panel
Prior art date
Application number
KR2020020027595U
Other languages
Korean (ko)
Inventor
정조화
Original Assignee
주식회사 도화종합기술공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 도화종합기술공사 filed Critical 주식회사 도화종합기술공사
Priority to KR2020020027595U priority Critical patent/KR200298104Y1/en
Application granted granted Critical
Publication of KR200298104Y1 publication Critical patent/KR200298104Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 도로, 철도의 암거와 상·하수도 또는 간지공사등의 공동구 공사에서 4각 박스구조물로 설계되는 콘크리트 구체를 성형하기 위한 이동식 거푸집을 개시한다.The present invention discloses a mobile formwork for forming a concrete sphere designed as a quadrilateral box structure in the construction of roads, railways, culverts, and waterworks, sewerage, or geological works.

본 고안은 내부거푸집(10)과 외부거푸집(20)으로 구성된다. 내부거푸집(10)은 죠인트벽부(3)의 내측면에 부착되는 내측 지지대(11)와, 내측 지지대(11)에 얹혀지는 내측벽면성형용 패널(12)과, 내측벽면성형용 패널(12)과 일체로 연결되는 헌치성형용 패널(13) 및 상판슬래브 바닥면성형용 패널(14)과, 내측벽면성형용 패널(12)의 하단부에 장착되는 하단장선재(15) 및 다수의 구동바퀴(16)로 구성되고; 외부거푸집(20)은 죠인트벽부(3)의 외측면에 부착되는 외측 지지대(21)와, 외측 지지대(21) 위에 얹혀지는 외측벽면성형용 패널(22)과, 외측벽면성형용 패널(22)의 상부에 얹혀지는 가로재(23)와, 내측벽면성형용 패널(12)의 상단부에 장착되고 가로재(23)들과 강결되는 상단장선재(25)와, 상단장선재(25)의 상부에 대향하면서 설치되는 서포트바(26)와, 서포트바(26)에 고정되는 거치대(27)와, 거치대(27)의 하부에 장착되는 다수의 구동바퀴(28)로 구성되는 것을 특징으로 하는 기술구성을 제공한다.The present invention consists of an internal formwork 10 and an external formwork 20. The inner formwork 10 includes an inner support 11 attached to the inner side of the joint wall portion 3, an inner wall forming panel 12 mounted on the inner support 11, and an inner wall forming panel 12. Haunches forming panel 13 and upper slab bottom forming panel 14 connected integrally with the lower panel, lower joists 15 and a plurality of driving wheels 16 mounted on the lower end of the inner wall forming panel 12 ); The external formwork 20 includes an outer support 21 attached to the outer side of the joint wall portion 3, an outer wall forming panel 22 mounted on the outer support 21, and an outer wall forming panel 22. The horizontal member 23 mounted on the upper side of the panel, the upper panel member 25 mounted on the upper end of the inner wall forming panel 12 and rigidized with the horizontal member 23, and opposed to the upper panel of the upper panel member 25 Technical support, characterized in that consisting of a support bar (26) which is installed while being, a cradle (27) fixed to the support bar (26), and a plurality of driving wheels (28) mounted on the lower portion of the cradle (27). to provide.

Description

토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집 {Mobile form for forming concrete box on construction work}Mobile form for forming concrete box on construction work

본 고안은 4각 박스형태의 구조물로 설계되는 도로·철도의 암거와 상·하수도 및 단지공사 공동구 등의 기초 및 구체시공에서 설치되는 거푸집에 관한 것으로, 특히 하부 구체 시공시 거푸집을 지지할 수 있는 구조부를 미리 마련하여 두고 그 위에 작업 진행방향으로 이동시키면서 계속적으로 반복사용할 수 있게 한 내·외측 거푸집을 설치함으로써, 공사비용 및 기간을 단축시키는 경제적인 시공법을 구현하여 줄 뿐만 아니라, 완벽한 정밀 규격시공을 이룰 수 있도록 한 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집에 관한 것이다.The present invention relates to the formwork installed in the foundation and concrete construction of road and railway culverts, water, sewerage and complex construction joints, which are designed as quadrangular box-shaped structures, and in particular, it can support the formwork in the lower concrete construction. By providing internal and external formwork that can be repeatedly used while moving forward in the direction of work on the structural part, it not only realizes an economical construction method that shortens the construction cost and period, but also complete precision standard construction. The present invention relates to a movable formwork for concrete sphere molding designed in the form of a box to achieve this.

주지된 바와 같이 4각 박스형태로 된 토목용 콘크리트 구조물은 도로·철도의 암거와 상·하수도 통로 및 단지공사에서의 공동구 등을 지하에 건설하기 위한 구조물이다.As is well known, the civil concrete structure in the form of a quadrangular box is a structure for underground construction of culverts of roads and railways, water and sewage passages, and joint holes in construction of complexes.

현재 이와 같은 구조물을 시공하기 위하여는 버림콘크리트를 타설하여 바닥의 정지작업을 마친 후, 바닥콘크리트를 먼저 시공하고, 그 다음으로 바닥콘크리트에 죠인트시켜 측벽(하측 헌치부 포함)과 상판슬래브를 동시에 타설하거나 별도로 상판슬래브를 시공하는 방법을 통하는 것이 통례이다.At present, in order to construct such a structure, after casting the discarded concrete, finishing the ground work, constructing the floor concrete first, and then joining the floor concrete, then placing the sidewall (including the lower haunt) and the top slab simultaneously Or it is customary to construct the top slab separately.

이때 사용되는 거푸집은 설계된 구체의 벽체와 상판슬래브 등의 크기와 규격을 고려하여 제작한 목제 또는 철제 패널들을 일일이 갖다 짜 맞추면서 버팀목으로 지지시키는 방식에 의존하여 시공되며, 1구간에 대한 콘크리트가 완전히 경화된 후 거푸집을 모두 뜯어서 다음 구간으로 이동 설치하여 다시 콘크리트 타설 작업을 하는 등 이와 같은 작업을 반복하여 시공하고 있다.The formwork used at this time is constructed by relying on the support of wooden or steel panels made in consideration of the size and size of the designed concrete walls and slabs, etc. After this, the molds are removed and all the pieces are moved to the next section.

그러나, 이와 같은 방법으로 콘크리트 구조물을 시공할 때는 거푸집을 설치하고 해체하는데 많은 노동력과 시간이 낭비되는 등 여러 어려움이 있다.However, when constructing concrete structures in this way, there are various difficulties such as wasteful labor and time wasted in installing and dismantling the formwork.

즉, 거푸집을 설치하기 위하여 많은 받침목을 설치하여야 하므로 설치시간이 많이 소요되며 해체할 때도 시간이 많이 허비됨은 물론, 거푸집 패널 자체도 파손이 심하고 수명이 길지 못해 자재가 대량으로 소모되는 문제점이 있었다.In other words, the installation of a large number of supporting wood in order to install the formwork takes a lot of time and time to dismantle, as well as a lot of time, the formwork panel itself has a problem that the material is consumed in large quantities due to severe damage and long life.

또한, 거푸집을 설치하기 위해서 경험이 많고 능숙한 목수공이 꼭 필요하고, 목수기능공의 확보에 어려움이 있어 공기가 지연됨은 물론, 과도한 인건비로 인해 공사비용이 상승되는 문제점이 있었다.In addition, in order to install the formwork experienced and skilled carpenter is necessary, there is a difficulty in securing the carpenter skilled workers delay the air, there was a problem that the construction cost is increased due to excessive labor costs.

이에 따라 최근 들어 공기, 경제성 등의 문제를 해소하기 위해 한 구간에 대한 시공을 완료한 후 완전히 해체하지 않고 다음 구간으로 구름이동시켜 재 설치할 수 있는 이동식 거푸집의 개발이 활발하게 진행되고 있다.Therefore, recently, in order to solve the problems of air and economics, the development of mobile formwork that can be re-installed by moving clouds to the next section without disassembling completely after completing construction on one section is being actively progressed.

그 중 대표적인 것으로서 국내 공개특허번호 특2002-0005537호와 같은 거푸집 장치가 개시된 바 있는데, 이 선행기술은 기초슬래브 위와 기초슬래브 외측에 설치된 레일지지대 위에 레일을 깔고, 그 레일 위에 내·외부 거푸집을 설치하여 구름 이동시키는 방식을 채택하고 있다.As a representative of them, a formwork device such as Korean Patent Application Publication No. 2002-0005537 has been disclosed. The prior art lays a rail on a rail support provided on a foundation slab and an exterior of the foundation slab, and installs an interior and exterior formwork on the rail. To move the clouds.

따라서, 레일의 설치는 물론 레일 위에 설치되는 거푸집의 정밀시공이 요구되어 설치가 까다롭고 난해할 뿐만 아니라, 거푸집구조가 복잡하여 설치비용이 과다하게 소모되는 단점이 있었다.Therefore, not only the installation of the rails but also precise construction of the formwork installed on the rail is required to be difficult and difficult to install, and the formwork is complicated, so that the installation cost is excessively consumed.

또한, 기초슬래브를 먼저 시공한 다음, 그 위에 죠인트시켜 하측 헌치부·측벽체·상측 헌치부 및 상판슬래브를 일괄적으로 시공하도록 거푸집을 구성하고 있기 때문에 하측 헌치부에 콘크리트가 밀실하게 채워지지 않아 부실시공의 원인을 제공하는 문제점이 있었다.In addition, since the formwork is constructed to construct the lower slab, side wall, upper hull and upper slab in a batch after the foundation slab is first constructed, the concrete is not tightly filled in the lower haunt. There has been a problem of providing the cause of the under construction.

즉, 위와 같은 종래 시공방법은 벽체용 거푸집의 상부로부터 콘크리트를 주입하게 되는데, 이때 상부로부터 주입되는 콘크리트가 하부의 헌치부까지 밀려들어가 밀실하게 채워지는 것이 대단히 곤란하였다.In other words, the conventional construction method as described above is to inject concrete from the top of the wall formwork, it was very difficult to be filled in tightly filled concrete injected from the top to the lower haunch.

이로 인해 4각 박스구조물에서 가장 중요한 부분이라 할 수 있는 헌치부가 부실해지고, 이는 거푸집을 탈형한 후 보수·보강을 시행하더라도 회복불가한 구조적 결함으로 그 흔적이 남게 되며, 결과적으로 콘크리트 박스구조물의 품질을 급격히 저하시키는 주요원인으로 작용하는 문제점이 있었다.Due to this, the haunting part, which is the most important part of the quadrangular box structure, becomes insufficiency, and even after repairing and reinforcing the formwork, the trace remains as an unrecoverable structural defect. There was a problem that acts as a major cause of the sharp decline in quality.

이에 따라, 본 고안은 상기와 같이 바닥콘크리트 시공후 헌치 부분과 벽체 부분을 일괄적으로 시공하는 종래기술의 제 문제점을 해결하기 위해 안출한 것으로, 기초슬래브 시공시 하측 헌치부분과 벽체 일부분을 함께 시공하여 콘크리트 죠인트부를 헌치부 상측의 벽체로 올려 조정하고 이 죠인트 부분에 상부 시공시 사용되는 거푸집을 얹혀서 지지할 수 있는 구조부를 미리 마련하여 두고 그 위에 벽체 콘크리트 타설 후 작업 진행방향으로 이동시키면서 계속적으로 반복사용할 수 있게 한 내·외측 거푸집을 설치함으로써, 헌치부의 부실시공을 방지함은 물론 공사비용 및 기간을 단축시키는 경제적인 시공법을 구현하여 줄 뿐만 아니라, 완벽한 정밀 규격시공을 이룰 수 있도록 한 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집을 제공하는데 그 목적이 있다.Accordingly, the present invention was devised to solve the problems of the prior art of collectively constructing the haunch part and the wall part after the construction of the floor concrete as described above, and the lower haunch part and the wall part part together when constructing the foundation slab. The concrete joint part is raised to the wall on the upper side of the haunch part, and the structural part that can be supported by placing the formwork used for the upper construction on the joint part is prepared in advance. By installing the inner and outer formwork that can be used, it prevents secondary construction work, and implements an economical construction method that shortens the construction cost and period, as well as a box form to achieve perfect precision standard construction. To provide a mobile formwork for concrete concrete design To have its purpose.

본 고안의 다른 목적은 내·외측 거푸집을 전체적으로 가요성 있게 연결 제작하고, 거푸집을 이동시키기 위한 레일과 레일의 부대시설이 필요없는 구조로 단순화시켜 내부거푸집은 기초슬래브 상면을 타고 구름 이동시킬 수 있게 하고, 외부거푸집은 앞서 시공된 상판슬래브 상면을 타고 구름이동할 수 있게 함으로써, 거푸집 설치작업이 간단하고 설치비용을 최소화할 수 있게 하여 주는 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집을 제공하는데 있다.Another object of the present invention is to connect the inner and outer formwork in a flexible way as a whole, and to simplify the structure that does not require the rail and the rails for moving the formwork, the inner formwork is able to move the clouds on the upper surface of the foundation slab. In addition, the external formwork is to provide a mobile formwork for concrete concrete molding is designed in the form of a box that makes it possible to simplify the formwork installation and minimize the installation cost by allowing to move on the upper surface of the slab slab previously constructed.

도1은 본 고안의 일 실시예에 의한 이동식 거푸집의 설치상태도1 is an installation state of a movable formwork according to an embodiment of the present invention

도2는 본 고안의 일 실시예에 의한 이동식 거푸집의 하부 고정부를 분리하여 나타낸 단면도Figure 2 is a cross-sectional view showing the lower fixing portion of the movable formwork according to an embodiment of the present invention

도3은 본 고안의 다른 실시예에 의한 이동식 거푸집의 설치상태도Figure 3 is a state of installation of a mobile formwork according to another embodiment of the present invention

도4는 본 고안의 일 실시예에 의한 이동식 거푸집에서 외부거푸집의 상부구조를 나타낸 사시도Figure 4 is a perspective view showing the upper structure of the external formwork in a mobile formwork according to an embodiment of the present invention

도5는 본 고안의 일 실시예에 의한 이동식 거푸집을 이동시키기 위해 탈형시킨 상태를 나타낸 도면Figure 5 is a view showing a state demoulded to move the movable formwork according to an embodiment of the present invention

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

1:기초슬래브 2:하측헌치부 3:죠인트벽부1: Foundation slab 2: Lower haunch part 3: Joint wall part

4:벽체 5:상측헌치부 6:상판슬래브4: wall 5: upper haunting unit 6: top slab

10:내부거푸집 11:내측 지지대 12:내측벽면성형용 패널10: Inner die 11: Inner support 12: Inner wall forming panel

13:헌치성형용 패널 14:바닥면성형용 패널 14a:가로보강재13: Panel for shaving 14: Panel for shaping 14a: Horizontal reinforcement

14b:절곡유도부 15:하단장선재 15a:중간장선재14b: bending guide portion 15: bottom long wire 15a: middle long wire

16:구동바퀴 16a:바퀴지지대 17a:하부버팀재16: Drive wheel 16a: Wheel support 17a: Undercarriage

17b:상부버팀재 18:수직버팀재(대형) 18a:높낮이조절잭17b: Upper brace material 18: Vertical brace material (large) 18a: Height adjustment jack

19:수직버팀재(중형) 20:외부거푸집 21:외측 지지대19: Vertical support material (medium) 20: External formwork 21: Outer support

22:외측벽면성형용 패널 23:가로재 25:상단장선재22: Panel for external wall molding 23: Horizontal material 25: Top long wire rod

25a:중간장선재 26:서포트바 27:거치대25a: Medium length wire 26: Support bar 27: Cradle

27a:연결재 28:구동바퀴 B:볼트봉27a: Connector 28: Drive wheel B: Bolt rod

N:너트 t:턴버클부N: Nut t: Turnbuckle

상기 목적을 달성하기 위한 본 고안은 도로, 철도의 암거와 상·하수도 또는 공동구 공사에서 4각 박스구조물로 설계되는 콘크리트 구체의 기초슬래브·하측헌치부 및 죠인트벽부를 성형한 후, 죠인트벽부 위에 연결·시공하는 벽체·상측헌치부 및 상판슬래브를 성형하기 위한 내부거푸집 및 외부거푸집을 구성함에 있어서,The present invention for achieving the above object is the foundation slab, the lower haunch and the joint wall part of the concrete sphere, which is designed as a quadrilateral box structure in road, railway culvert and water, sewage or joint construction, and then connected to the joint wall part. In constructing the inner formwork and the outer formwork for forming the wall, upper haunches and slab slabs,

상기 내부거푸집은, 구체 진행방향을 따라 상기 죠인트벽부의 내측면에 수평하게 부착되는 내측 지지대와, 상기 내측 지지대에 얹혀져 상부로 수직하게 세워지는 양측의 내측벽면 성형용 패널과, 상기 양측의 내측벽면성형용 패널과 일체로 연결되면서 안쪽으로 경사지게 올라가는 양측의 헌치성형용 패널과, 상기 양측의 헌치성형용 패널을 일체로 연결하면서 수평하게 설치되며 그 패널의 하부를 보강하는 가로보강재의 중간부에 3각형상으로 절취되는 절곡유도부가 형성되는 상판슬래브 바닥면성형용 패널과, 상기 양측의 내측벽면 성형용 패널의 하단부에 각각 장착되는 양측의 하단장선재와, 상기 양측의 하단장선재에 장착되는 다수의 구동바퀴로 구성되고;The inner formwork includes an inner support that is horizontally attached to an inner surface of the joint wall portion along a concrete moving direction, inner wall surface forming panels on both sides mounted on the inner support and erected vertically upwards, and inner wall surfaces of both sides. In the middle of the horizontal reinforcing material which is connected horizontally and integrally connected to the panel for forming the haunch forming panels on both sides and horizontally connecting the haunch forming panels on both sides integrally and reinforcing the lower part of the panel 3 A top slab bottom forming panel having a bending guide portion cut into a rectangular shape, lower end strip members on both sides respectively mounted to lower ends of the inner wall forming panels on both sides, and a plurality of drives mounted on the lower end strip members on both sides. Consisting of wheels;

상기 외부거푸집은, 구체 진행방향을 따라 상기 죠인트벽부의 외측면에 수평하게 부착되는 외측 지지대와, 상기 외측 지지대 위에 얹혀져 상부로 수직하게 세워지는 양측의 외측벽면 성형용 패널과, 상기 양측의 외측벽면 성형용 패널의 상부를 가로지르면서 상부에 얹혀지는 다수의 가로재와, 상기 양측의 외측벽면 성형용 패널의 상단부에 각각 장착되고 상기 가로재들과 힌지로 결합되는 양측의 상단장선재와, 상기 양측의 상단장선재의 상부에 대향하면서 수직하게 고정·설치되며 상하로 연결되는 2쌍의 서포트바와, 양측에서 대향하는 상기 서포트바의 상부에 고정·설치되는 거치대와, 상기 거치대의 하부에 장착되는 다수의 구동바퀴로 구성되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집을 제공한다.The external formwork includes an outer support that is horizontally attached to an outer surface of the joint wall portion along a concrete moving direction, an outer wall forming panel on both sides that is mounted on the outer support and vertically placed upward, and the outer wall surfaces on both sides of the outer formwork. A plurality of horizontal members mounted on the upper part while traversing the upper part of the forming panel, upper end joists of both sides respectively mounted to upper ends of the outer wall forming panels on both sides, and joined to the horizontal members by a hinge, and the both sides Two pairs of support bars vertically fixed and installed while being opposed to the upper part of the upper joist wire of the upper and lower supporters, a cradle fixed and installed on the upper part of the support bars facing from both sides, and a plurality of mounted on the lower part of the cradle In the civil engineering, characterized in that the drive wheels are made of a mobile formwork for concrete concrete molding designed in the form of a box Ball.

이하, 본 고안의 기술구성을 본 고안의 실시예들에 따른 도1 내지 도5의 첨부도면을 참조하여 상세히 설명한다.Hereinafter, the technical configuration of the present invention will be described in detail with reference to the accompanying drawings of FIGS. 1 to 5 according to embodiments of the present invention.

본 고안에 의한 이동식 거푸집은, 도로, 철도의 암거와 상·하수도 또는 공동구 등의 토목공사에서 4각 박스구조물로 설계되는 콘크리트 구체의 기초슬래브 (1)·하측헌치부(2) 및 죠인트벽부(3)를 성형한 후 죠인트벽부(3) 위에 연결·시공하는 벽체(4)·상측헌치부(5) 및 상판슬래브(6)를 성형하는데 사용되며, 크게 대별하면 벽체(4)의 내측면·상측헌치부(5) 및 상판슬래브(6)의 바닥면을 성형하기 위한 내부거푸집(10)과, 벽체(4) 및 상판슬래브(6)의 외측면들을 성형하기 위한 외부거푸집(20)으로 구성된다.The movable formwork according to the present invention is a concrete slab foundation slab (1), a lower haunting portion (2) and a joint wall portion (designed as a quadrangular box structure in civil works such as culverts of roads and railways, and waterworks, sewers, and public buildings). 3) After molding, it is used to form the wall (4), the upper haunches (5) and the upper slab (6) to be connected and constructed on the joint wall (3), and roughly divided into the inner surface of the wall (4) It consists of an inner formwork 10 for forming the bottom surface of the upper haunching section 5 and the upper slab 6, and an outer formwork 20 for forming the outer surfaces of the wall 4 and the upper slab 6. do.

내부거푸집(10)은 구체 진행방향을 따라 상기 죠인트벽부(3)의 내측면에 수평하게 부착되는 내측 지지대(11)와, 상기 내측 지지대(11)에 얹혀져 상부로 수직하게 세워지는 양측의 내측벽면성형용 패널(12)과, 상기 양측의 내측벽면성형용 패널(12)과 일체로 연결되면서 안쪽으로 경사지게 올라가는 양측의 헌치성형용 패널 (13)과, 상기 양측의 헌치성형용 패널(13)을 일체로 연결하면서 수평하게 설치되며그 패널의 하부를 보강하는 가로보강재(14a)의 중간부에 3각형상으로 절취되는 절곡유도부(14b)가 형성되는 상판슬래브 바닥면성형용 패널(14)과, 상기 양측의 내측벽면성형용 패널(12)의 하단부에 각각 장착되는 양측의 하단장선재(15)와, 상기 양측의 하단장선재(15)에 장착되는 다수의 구동바퀴(16)로 구성된다.The inner formwork 10 has an inner support 11 which is horizontally attached to the inner surface of the joint wall portion 3 along a concrete traveling direction, and inner wall surfaces of both sides which are mounted on the inner support 11 and erected vertically upwards. The panel 12 for shaping, the plate forming panel 13 on both sides which are inclined inwardly while being integrally connected to the inner wall panel forming panels 12 on both sides, and the plate forming panel 13 on both sides are The upper plate slab bottom surface forming panel 14, which is installed horizontally while being integrally connected and is formed with a bending guide portion 14b cut in a triangular shape at the middle of the horizontal reinforcement 14a reinforcing the lower part of the panel, The lower side joists 15 on both sides respectively mounted to the lower ends of the inner wall surface forming panels 12 on both sides, and a plurality of driving wheels 16 mounted on the lower joists 15 on both sides.

상기 내측 지지대(11)는 후술하는 외부거푸집(20)의 외측 지지대(21)와 함께 구체 진행방향을 따라 일정간격을 두고 죠인트벽부(3)의 내부에 매설되면서 외부로 돌출되는 볼트봉(B)들의 양끝단부에 관통되고 너트(N)를 통해 체결되어서 죠인트벽부(3)의 내측면에 밀착된 상태로 부착된다.The inner support 11 is a bolt rod (B) protruding to the outside while buried in the inside of the joint wall portion 3 with a predetermined interval along the concrete traveling direction with the outer support 21 of the outer formwork 20 to be described later Penetrating through both ends of the field and fastened through the nut (N) is attached in close contact with the inner surface of the joint wall (3).

상기 구동바퀴(16)는 양측에서 대향하는 바퀴지지대(16a)를 통해 양측의 하단장선재(15)에 장착된다. 이 바퀴지지대(16a)들은 하단장선재(15)와 용착하는 것이 바람직하며, 상기 내측 지지대(11)와 함께 볼트봉(B)에 의해 연통되어 너트(N)로 체결된다.The drive wheel 16 is mounted to the lower end joist 15 on both sides through the wheel support (16a) opposite from both sides. The wheel supports 16a are preferably welded to the lower end joist 15, and are communicated by the bolt rod B together with the inner support 11 to be fastened with a nut N.

양측에서 대향하는 바퀴지지대(16a)들의 사이에는 그것들을 수평하게 연결하면서 지지시켜 주는 하부버팀재(17a)들이 설치된다. 이 하부버팀재(17a)의 중간부에는 횡방향으로 신축가능한 턴버클부(t)가 구비되어서, 필요에 따른 길이로 신장시켜 양측의 내측벽면성형용 패널(12)을 죠인트벽부(3) 측으로 밀어붙여 견고하게 고정하거나, 탈형할 때 축소할 수 있도록 되어 있다.Lower support members 17a are provided between the wheel support members 16a facing each other while supporting them horizontally. The middle portion of the lower bracing material 17a is provided with a turnbuckle portion t that can be stretched in the lateral direction, and is stretched to a length as necessary to push the inner wall forming panels 12 on both sides toward the joint wall portion 3. It can be fixed firmly or shrink when demolding.

상기 양측의 내측벽면성형용 패널(12)의 상부에는 그것들을 수평하게 연결하여 지지하는 상부버팀재(17b)들이 설치된다. 이 상부버팀재(17b) 역시 상기 하부버팀재(17a)와 마찬가지로 중간부에 횡방향으로 신축가능한 턴버클부(t)가 구비되어서 설치 및 탈형시 이용된다.Upper bracing members 17b are installed on the upper side of the inner side wall forming panels 12 on both sides to support them horizontally. Like the lower brace material 17a, the upper brace material 17b is also provided with a turnbuckle portion t that is transversely stretchable in the middle portion and is used for installation and demoulding.

상기 바닥면 성형용 패널의 중간부에는 그 하면을 받쳐주는 수직버팀재(18)가 구체 진행방향을 따라 일정간격으로 다수 설치된다. 이 수직버팀재(18)의 하부에는 높낮이조절잭(18a)이 구비되어 기초슬래브(1) 위에 지지된다.The middle portion of the bottom surface forming panel is provided with a plurality of vertical brace material 18 to support the bottom surface at regular intervals along the concrete traveling direction. A height adjustment jack 18a is provided below the vertical bracing material 18 to be supported on the foundation slab 1.

도1에서 상기 수직버팀재(18)를 1열로 설치된 것을 나타내고 있으나, 구체의 폭이 넓게 설계될 경우(2.5m이상)에는 도3의 도시와 같이 2열 또는 그 이상의 적합한 다수열로 설치하는 것이 바람직하다.Although the vertical support material 18 is shown in FIG. 1 in one row, when the width of the sphere is designed to be wide (2.5 m or more), it is preferable to install in two or more suitable rows as shown in FIG. desirable.

또한, 상기 바닥면성형용 패널(14)의 양측변부에는 그 하면을 받쳐주는 수직버팀재(19)가 구체 진행방향을 따라 일정간격으로 다수 설치된다. 이 수직버팀재 (19) 또한 중간부에 상하로 신축가능한 턴버클부(t)가 구비되어서 설치와 해체시 이용된다.In addition, on both sides of the bottom surface forming panel 14, a plurality of vertical brace material 19 for supporting the bottom surface is provided at regular intervals along the concrete traveling direction. This vertical brace material 19 is also provided with a turnbuckle portion t that can be stretched up and down in the middle portion and is used for installation and dismantling.

외부거푸집(20)은 구체 진행방향을 따라 상기 죠인트벽부(3)의 외측면에 수평하게 부착되는 외측 지지대(21)와, 상기 외측 지지대(21) 위에 얹혀져 상부로 수직하게 세워지는 양측의 외측벽면성형용 패널(22)과, 상기 양측의 외측벽면성형용 패널(22)의 상부를 가로지르면서 상부에 얹혀지는 다수의 가로재(23)와, 상기 양측의 외측벽면성형용 패널(22)의 상단부에 각각 장착되고 상기 가로재(23)들과 힌지 (24)로 결합되는 양측의 상단장선재(25)와, 상기 양측의 상단장선재(25)의 상부에 대향하면서 수직하게 고정·설치되며 상하로 연결되는 2쌍의 서포트바(26)와, 양측에서 대향하는 상기 서포트바(26)의 상부에 고정·설치되는 1쌍의 거치대(27)와,상기 거치대(27)의 하부에 장착되는 다수의 구동바퀴(28)로 구성된다.The outer formwork 20 has an outer support 21 which is horizontally attached to the outer surface of the joint wall portion 3 along a concrete traveling direction, and an outer wall surface of both sides mounted on the outer support 21 and standing vertically upwards. The panel 22 for molding, the plurality of horizontal members 23 mounted on the upper part while crossing the upper portions of the outer wall forming panels 22 on both sides, and the outer wall forming panels 22 on both sides. It is mounted on the upper end and is fixed and installed vertically while facing the upper ends of the top joists 25 on both sides and coupled to the horizontal member 23 and the hinge 24, respectively, the upper and lower vertically Two pairs of support bars 26 connected to each other, a pair of cradles 27 fixed and installed on an upper portion of the support bar 26 facing from both sides, and a plurality of cradles mounted below the cradle 27. It is composed of a drive wheel (28).

상기 외측 지지대(21)는 전술한 바와 같이 내부거푸집(10)의 내측 지지대 (11)와 함께 구체 진행방향을 따라 일정간격을 두고 죠인트벽부(3)의 내부에 매설되면서 외부로 돌출되는 볼트봉(B)들의 양끝단부에 관통되고 너트(N)를 통해 체결되어서 죠인트벽부(3)의 외측면에 밀착된 상태로 부착된다.As described above, the outer support 21 is embedded with the inner support 11 of the internal formwork 10 and bolt rods protruding to the outside while being embedded in the joint wall part 3 at a predetermined interval along a concrete traveling direction ( It is penetrated through both ends of the B) and fastened through the nut (N) and attached in close contact with the outer surface of the joint wall portion (3).

상기 서포트바(26)는 중간부에 턴버클부(t)가 구비되는 상태로 구성된다.The support bar 26 is configured in a state in which the turnbuckle portion t is provided in the middle portion.

상기 1쌍의 거치대(27)는 강제로 된 H빔을 사용하며, 그것들을 다수의 연결재(27a)로 연결·고정하여 비틀리지 않도록 하고 있다.The pair of cradles 27 use forced H beams, and are connected and fixed with a plurality of connecting members 27a so as not to be twisted.

한편, 내부거푸집(10)의 내측벽면성형용 패널(12)과 외부거푸집(20)의 외측벽면성형용 패널(22)에는 앞서 설명한 하단 및 상단 장선재(15)(25)들 외에도 그 중간부에 수평하게 덧대어지는 중간장선재(15a)(25a)들을 일정높이마다 덧대어서 콘크리트 타설시 횡방향으로 작용하는 측압을 지탱하여 주도록 하고 있다.On the other hand, the inner wall forming panel 12 of the inner formwork 10 and the outer wall forming panel 22 of the outer formwork 20, in addition to the lower and upper joists 15, 25 described above in the middle portion Horizontally padded middle joists 15a, 25a are padded at certain heights to support lateral pressures acting in the lateral direction when concrete is poured.

그리고, 중간장선재(15a)(25a)들에는 구체 진행방향을 따라 일정간격으로 내·외측벽면 성형용 패널(12)(22)의 간격을 일정하게 유지하는 볼트봉(B)들이 관통되어 체결된다.In addition, bolt rods B for maintaining the interval between the inner and outer wall forming panels 12 and 22 at a predetermined interval along the concrete traveling direction are penetrated to the intermediate joists 15a and 25a. .

본 고안은 이상과 같이 구성으로 설치되어 일 구간에 대한 벽체(4) 및 상판슬래브(6)의 콘크리트를 타설한 후 일정기간 존치시켜 타설된 콘크리트의 양생을 완료한다.The present invention is installed in the configuration as described above to pour the concrete of the wall (4) and the upper slab (6) for a section and then to survive for a certain period to complete the curing of the poured concrete.

이하, 본 고안에 따른 이동식 거푸집의 탈형 및 다음 시공구간으로의 이동방법을 살펴보면 다음과 같다.Hereinafter, looking at the method of demoulding and moving to the next construction section of the mobile formwork according to the present invention.

본 고안은 최우선적으로 내부거푸집(10) 및 외부거푸집(20)의 하단을 지지하는 내·외측 지지대(11)(21) 및 볼트봉(B)을 제거하고, 내측벽면성형용 패널(12)과 외측벽면성형용 패널(22)을 연결하면서 간격을 유지하는 볼트봉(B)들을 제거하여서, 내·외부거푸집(10)(20)의 상호 구속상태를 해제한 상태에서 내·외부거푸집 (10)(20)의 탈형 및 이동을 독자적으로 시행한다.The present invention is to remove the inner and outer support (11) (21) and the bolt bar (B) supporting the lower end of the inner formwork 10 and the outer formwork 20, and the inner wall forming panel 12 The inner and outer molds 10 in a state in which the mutual restraint state of the inner and outer molds 10 and 20 is removed by removing the bolt bars B that maintain the gap while connecting the outer wall forming panel 22 and the outer wall forming panel 22. (20) Demonstrate and demote independently.

먼저 내부거푸집(10)의 탈형 및 이동방법을 설명한다.First, demolding and moving methods of the internal formwork 10 will be described.

우선 내부거푸집(10)의 바닥면성형용 패널(14)을 양측변부에서 지지하고 있는 수직버팀재(19)들의 상하길이를 턴버클부(t)를 이용해 축소시켜 기초슬래브(1)의 상면을 이격시킨 후 완전히 제거한다.First, the upper and lower lengths of the vertical brace members 19 supporting the bottom surface forming panel 14 of the inner formwork 10 at both sides are reduced by using the turnbuckle part t to separate the upper surface of the foundation slab 1. And remove it completely.

이후, 내부거푸집(10)의 내측벽면성형용 패널(12)을 수평하게 지지하고 있는 상·하부버팀재(17b)(17a)들의 턴버클부(t)를 축소시켜 내측벽면성형용 패널(12)을 안쪽으로 오무려 성형된 콘크리트 벽체(4)로부터 탈리시킨다. 이때 바닥면성형용 패널(14)은 그 중앙의 절곡유도부(14b)를 통해 안쪽으로 구부러지면서 그 양측의 일부분이 헌치성형용 패널(13)과 함께 콘크리트면으로부터 이격된다.Subsequently, the inner wall surface forming panel 12 is reduced by reducing the turnbuckle portion t of the upper and lower support members 17b and 17a horizontally supporting the inner wall forming panel 12 of the inner formwork 10. Is detached from the molded concrete wall (4). At this time, the bottom molding panel 14 is bent inwardly through the bending guide portion 14b at the center thereof, and a portion of both sides thereof is spaced apart from the concrete surface together with the haunch molding panel 13.

이후, 내부거푸집(10)의 바닥면성형용 패널(14)을 중간에서 지지하고 있는 수직버팀재(18)의 높낮이조절잭(18a) 또는 그 중간부에 구비된 턴버클부를 이용해 수직버팀재(18)의 상하길이를 축소시켜 내부거푸집(10)의 바닥면성형용 패널(14)을 콘크리트면으로부터 완전히 탈리시킨 후 수직버팀재(18)을 완전히 제거한다.Thereafter, the vertical brace material 18 using the turn buckle provided at the height adjustment jack 18a of the vertical brace material 18 or the middle portion of the vertical brace material 18 supporting the bottom surface forming panel 14 of the internal formwork 10 in the middle. ) By vertically reducing the vertical length of the bottom surface forming panel 14 of the inner formwork (10) from the concrete surface to completely remove the vertical support material (18).

이렇게 되면 도5의 도시와 같이 본 고안에 의한 내부거푸집(10)이 성형된 벽체(4) 및 기초슬래브(1)로부터 완전히 탈리된 상태가 되며, 하부에 구비된 구동바퀴(16)가 기초슬래브(1)의 상면에 접지된 상태가 된다.In this case, as shown in FIG. 5, the internal formwork 10 according to the present invention is completely detached from the molded wall 4 and the foundation slab 1, and the driving wheel 16 provided in the lower portion is the foundation slab. It becomes a grounded state on the upper surface of (1).

본 고안에 의한 내부거푸집은 위와 같이 탈형한 상태에서 기 시공된 기초슬래브(1)상에서 구동바퀴(16)를 구름이동시켜 다음 시공구간으로 밀고가 앞서 설명한 바와 같은 구성으로 외부거푸집(20)과 함께 연결시키면서 설치한다.The internal formwork according to the present invention pushes the driving wheel 16 to the next construction section by rolling the driving wheel 16 on the pre-installed foundation slab in the demolded state as described above, and together with the external formwork 20 as described above. Install while connecting.

다음 외부거푸집(20)의 해체 및 이동방법을 설명한다.Next, the disassembly and moving method of the external formwork 20 will be described.

우선 벽체(4)의 콘크리트면과 외측벽면성형용 패널(22) 사이의 접착상태를 해제한다.First, the adhesive state between the concrete surface of the wall 4 and the outer wall forming panel 22 is released.

다음으로, 상단장선재(25)와 거치대(27)의 하부에 구비된 구동바퀴(28)를 아래로 내려 성형된 상판슬래브(6)위에 접지시킨다.Next, the driving wheel 28 provided in the lower portion of the top joist 25 and the cradle 27 is lowered to ground on the molded upper slab (6).

이후, 계속해서 구동바퀴(28)를 아래로 더 내리면 서포트바(26)와 연결된 상단장선재(25)가 상부로 이동하고, 이와 동시에 가로재(23)와 외측벽면성형용 패널(22)이 상부로 이동한다.Subsequently, if the driving wheel 28 is further lowered downward, the upper barred wire 25 connected to the support bar 26 moves upward, and at the same time, the cross member 23 and the outer wall forming panel 22 are upper part. Go to.

이후, 외측벽면성형용 패널(22)에서 가로보강재를 제거하고 콘크리트와 격리시키면 도5의 도시와 같이 외측벽면성형용 패널(22)이 벌어지면서 벽체(4) 및 상판슬래브(6)의 측면으로부터 완전히 탈리된다.Then, when the transverse reinforcing material is removed from the outer wall forming panel 22 and is isolated from the concrete, the outer wall forming panel 22 is opened as shown in FIG. 5 and the side wall 4 and the top slab 6 are removed from the sides. Completely detached.

이 상태에서 외부거푸집(20)을 다음 시공구간으로 밀면, 구동바퀴(28)가 기 시공된 상판슬래브(6) 위에서 구르면서 외부거푸집(20) 전체가 전진 이동하게 되며, 기 시공된 상판슬래브(6)가 끝나는 지점에서는 장비와 인력을 동원해 다음 시공구간으로 완전히 이동시키며, 앞서 설명한 바와 같은 구성으로 내부거푸집(10)과 함께 연결시키면서 설치한다.In this state, if the external formwork 20 is pushed to the next construction section, the driving wheel 28 is rolled on the prefabricated upper slab 6 while the entire external formwork 20 is moved forward, and the prefabricated upper slab ( At the end of 6) mobilize the equipment and manpower to move completely to the next construction section, it is installed while connecting with the internal formwork (10) in the configuration as described above.

이상과 같이 구성되는 본 고안은 기초슬래브 시공시 하측 헌치부분과 벽체 일부분을 함께 시공하여 콘크리트 죠인트부를 헌치부 상측의 벽체로 올려 조정하고 이 죠인트 부분에 상부 시공시 사용되는 거푸집을 얹혀서 지지할 수 있는 구조부를 미리 마련하여 두고 그 위에 벽체 콘크리트 타설 후 작업 진행방향으로 이동시키면서 계속적으로 반복사용할 수 있게 한 내·외측 거푸집을 설치함으로써, 헌치부의 부실시공을 방지함은 물론 공사비용 및 기간을 단축시키는 경제적인 시공법을 구현하여 주고, 완벽한 정밀 규격시공을 이룰 수 있게 한다.The present invention constructed as described above can be supported by installing the lower haunting part and the wall part together when constructing the foundation slab by raising the concrete joint part to the wall of the upper part of the haunting part and placing the formwork used for the upper construction part on the joint part. By installing the structural part in advance and installing the inner and outer formwork that can be used repeatedly while moving in the direction of work after wall concrete is placed on it, it prevents the construction work of the haunting part and also shortens the construction cost and period. Implement economic construction method and achieve perfect precision standard construction.

또한, 본 고안은 내·외측 거푸집을 전체적으로 가요성 있게 연결 제작하고, 거푸집을 이동시키기 위한 레일과 레일의 부대시설이 필요없는 구조로 단순화시켜 내부거푸집은 기초슬래브 상면을 타고 구름 이동시킬 수 있게 하고 외부거푸집은 앞서 시공된 상판슬래브 상면을 타고 구름이동할 수 있게 함으로써, 거푸집 설치작업이 간단하고 설치비용이 최소화된다.In addition, the present invention is to make the internal and external formwork connected to the whole flexible, and to simplify the structure that does not require the rail and the rails for moving the formwork, the internal formwork can move the cloud on the upper surface of the foundation slab The external formwork enables to move on the upper surface of the slab slabs previously constructed, thereby simplifying the formwork and minimizing the installation cost.

따라서, 본 고안은 거푸집의 현장 가설작업이 대폭 축소될 뿐만 아니라, 완벽한 정밀 규격시공과 거푸집의 반복사용 및 설치, 해체, 운반을 용이케 한 매우 경제적인 거푸집 시스템을 제공하는 유용한 것이다.Therefore, the present invention not only greatly reduces the field construction work of the formwork, but also provides a very economical formwork system that facilitates perfect precision standard construction and repeated use and installation, dismantling, and transportation of the formwork.

Claims (7)

도로, 철도의 암거와 상·하수도 또는 공동구 공사에서 4각 박스구조물로 설계되는 콘크리트 구체의 기초슬래브(1)·하측헌치부(2) 및 죠인트벽부(3)를 성형한 후, 죠인트벽부(3) 위에 연결·시공하는 벽체(4)·상측헌치부(5) 및 상판슬래브(6)를 성형하기 위한 내부거푸집(10) 및 외부거푸집(20)을 구성함에 있어서,After forming the foundation slab (1), the lower haunting portion (2) and the joint wall portion (3) of the concrete sphere, which are designed as a quadrilateral box structure in road, railroad culverts, and water and sewerage or community construction, the joint wall portion (3) In constructing the inner formwork 10 and the outer formwork 20 for forming the wall 4, the upper haunches 5 and the upper slab 6 to be connected and constructed on the 상기 내부거푸집(10)은, 구체 진행방향을 따라 상기 죠인트벽부(3)의 내측면에 수평하게 부착되는 내측 지지대(11)와, 상기 내측 지지대(11)에 얹혀져 상부로 수직하게 세워지는 양측의 내측벽면성형용 패널(12)과, 상기 양측의 내측벽면성형용 패널(12)과 일체로 연결되면서 안쪽으로 경사지게 올라가는 양측의 헌치성형용 패널(13)과, 상기 양측의 헌치성형용 패널(13)을 일체로 연결하면서 수평하게 설치되며 그 패널의 하부를 보강하는 가로보강재(14a)의 중간부에 3각형상으로 절취되는 절곡유도부(14b)가 형성되는 상판슬래브 바닥면성형용 패널(14)과, 상기 양측의 내측벽면성형용 패널(12)의 하단부에 각각 장착되는 양측의 하단장선재(15)와, 상기 양측의 하단장선재(15)에 장착되는 다수의 구동바퀴(16)로 구성되고;The inner formwork 10 has an inner support 11 which is horizontally attached to the inner surface of the joint wall portion 3 along a concrete traveling direction, and is mounted on the inner support 11 so as to stand vertically upward. Integral to the inner wall forming panel 12, the inner wall forming panels 12 on both sides, and the haunch forming panels 13 on both sides that are inclined inwardly, and the haul forming panels 13 on both sides. ) Is installed horizontally while integrally connecting the upper slab bottom surface forming panel 14 is formed in the middle of the horizontal reinforcing material (14a) reinforcing the lower portion of the panel is bent guide portion 14b cut in a triangular shape And a plurality of driving wheels 16 mounted on both lower end joists 15 mounted on lower ends of the inner side wall forming panels 12 on both sides, and on the lower joists 15 of both sides; 상기 외부거푸집(20)은, 구체 진행방향을 따라 상기 죠인트벽부(3)의 외측면에 수평하게 부착되는 외측 지지대(21)와, 상기 외측 지지대(21) 위에 얹혀져 상부로 수직하게 세워지는 양측의 외측벽면성형용 패널(22)과, 상기 양측의 외측벽면성형용 패널(22)의 상부를 가로지르면서 상부에 얹혀지는 다수의 가로재(23)와, 상기 양측의 내측벽면성형용 패널(12)의 상단부에 각각 장착되고 상기 가로재(23)들과힌지(24)로 결합되는 양측의 상단장선재(25)와, 상기 양측의 상단장선재(25)의 상부에 대향하면서 수직하게 고정·설치되며 상하로 연결되는 2쌍의 서포트바(26)와, 양측에서 대향하는 상기 서포트바(26)의 상부에 고정·설치되는 1쌍의 거치대 (27)와, 상기 거치대(27)의 하부에 장착되는 다수의 구동바퀴(28)로 구성되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.The outer mold 20 has an outer support 21 which is horizontally attached to the outer surface of the joint wall portion 3 along a concrete traveling direction, and is mounted on the outer support 21 to stand vertically upwards. The outer wall forming panel 22, the plurality of horizontal members 23 mounted on the upper side while crossing the upper portions of the outer wall forming panels 22 on both sides, and the inner wall forming panels 12 on both sides. The upper end joists 25 on both sides coupled to the upper ends of the horizontal member 23 and the hinge 24, and are fixed and installed vertically while opposing the upper ends of the top joists 25 on both sides. Two pairs of support bars 26 connected up and down, a pair of cradles 27 fixed and installed on an upper portion of the support bar 26 facing from both sides, and mounted on the lower part of the cradle 27 Box form in civil engineering, characterized in that consisting of a plurality of drive wheels 28 Designed removable formwork for concrete which concrete molding. 제1항에 있어서, 상기 내·외측 지지대(11)(21)들은 구체 진행방향을 따라 일정간격으로 죠인트벽부(3)의 내부에 매설되면서 외부로 돌출되는 볼트봉(B)들의 양끝단부에 결합시켜 죠인트벽부(3)의 내외측 벽면에 부착한 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.According to claim 1, The inner and outer support (11, 21) is coupled to both ends of the bolt rods (B) protruding to the outside while being embedded in the joint wall portion (3) at regular intervals along the concrete progress direction A mobile formwork for concrete concrete molding designed in the form of a box in civil engineering, characterized in that attached to the inner and outer walls of the joint wall portion (3). 제1항에 있어서, 상기 구동바퀴(16)는 양측에서 대향하는 바퀴지지대(16a)를 통해 상기 하단장선재(15)에 장착되고, 상기 바퀴지지대(16a)들에는 양측에서 대향하는 것들을 수평하게 연결하여 지지하는 하부버팀재(17a)들이 설치되며, 그 하부버팀재(17a)의 중간부에는 횡방향으로 연결하는 턴버클부(t)가 구비되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.According to claim 1, The drive wheel 16 is mounted to the lower joist 15 through the wheel support 16a opposing on both sides, the wheel support 16a is connected horizontally to those facing both sides Lower bracing material (17a) to support the installation is installed, the middle of the lower bracing material (17a) is a concrete designed in the form of a box in civil engineering, characterized in that the turnbuckle portion (t) connected in the transverse direction is provided Mobile formwork for sphere molding. 제1항에 있어서, 상기 양측의 내측벽면성형용 패널(12)의 상단부에는 그것들을 수평하게 연결하여 지지하는 상부버팀재(17b)들이 설치되며, 그 상부버팀재 (17b)의 중간부에는 횡방향으로 강결되는 턴버클부(t)가 구비되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.The upper bracing member 17b is installed at upper ends of the inner side wall forming panels 12 on both sides, and the upper bracing members 17b are connected to each other to support them horizontally. Mobile formwork for concrete sphere molding designed in the form of a box in civil engineering, characterized in that the turnbuckle portion (t) which is rigid in the direction. 제1항에 있어서, 상기 바닥면 성형용 패널의 중간부에는 그 하면을 받쳐주는 수직버팀재(18)가 구체 진행방향을 따라 일정간격으로 다수 설치되며, 상기 수직버팀재(18)의 하부에는 높낮이조절잭(18a)이 구비되어 기초슬래브(1) 위에 접지되도록 한 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.The method of claim 1, wherein a plurality of vertical brace material 18 for supporting the bottom surface is installed in the middle portion of the panel for forming the bottom surface at regular intervals along the concrete traveling direction, the lower portion of the vertical brace material 18 A movable formwork for concrete sphere molding designed in the form of a box in civil engineering, characterized in that the height adjustment jack (18a) is provided to be grounded on the foundation slab (1). 제1항에 있어서, 상기 바닥면성형용 패널(14)의 양측변부에는 그 하면을 받쳐주는 수직버팀재(19)가 구체 진행방향을 따라 일정간격으로 다수 설치되며, 그 수직버팀재(19)의 중간부에는 상하로 신축가능한 턴버클부(t)가 구비되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.According to claim 1, On both sides of the bottom surface forming panel 14 is provided with a plurality of vertical braces 19 to support the lower surface at regular intervals along the concrete direction, the vertical braces (19) A movable formwork for concrete sphere molding designed in the box form in the civil engineering, characterized in that the middle portion of the turntable buckle portion (t) is stretchable up and down. 제1항에 있어서, 서포트바(26)는 그 중간부에 턴버클부(t)가 구비되어 상하로 강결되는 것을 특징으로 하는 토목공사에서 박스형태로 설계되는 콘크리트 구체 성형용 이동식 거푸집.The method of claim 1, wherein the support bar 26 is provided with a turn buckle portion (t) in the middle portion of the mobile formwork for concrete sphere molding designed in the form of a box in civil engineering, it characterized in that it is rigid up and down.
KR2020020027595U 2002-09-13 2002-09-13 Mobile form for forming concrete box on construction work KR200298104Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020027595U KR200298104Y1 (en) 2002-09-13 2002-09-13 Mobile form for forming concrete box on construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020027595U KR200298104Y1 (en) 2002-09-13 2002-09-13 Mobile form for forming concrete box on construction work

Publications (1)

Publication Number Publication Date
KR200298104Y1 true KR200298104Y1 (en) 2002-12-12

Family

ID=73078960

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020027595U KR200298104Y1 (en) 2002-09-13 2002-09-13 Mobile form for forming concrete box on construction work

Country Status (1)

Country Link
KR (1) KR200298104Y1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100970959B1 (en) 2008-06-30 2010-07-20 김은하 Method for Construction of Extension Culvert in State Guarantying Footway and Driveway
KR101184299B1 (en) * 2009-11-20 2012-09-18 (주)유경기술단 A passage fabric used to multi slip form and methode there of
KR101243705B1 (en) 2009-10-30 2013-03-14 양준석 Apparatus of Deassembling Precast Concrete Box Automatically and Method Using the Same
KR101386458B1 (en) 2012-05-11 2014-04-17 동도산업 주식회사 Dismantling device for precast pannel
KR101506782B1 (en) * 2013-04-09 2015-03-27 장영미 In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete
CN107419743A (en) * 2017-05-16 2017-12-01 中国建筑第六工程局有限公司 A kind of new city pipe gallery mobile formwork
KR101824062B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
KR101824061B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
CN111636478A (en) * 2020-05-25 2020-09-08 中铁隧道集团二处有限公司 Mechanized equipment is used in concrete piping lane construction
KR20220008541A (en) * 2020-07-14 2022-01-21 김현우 Temporary pole apparatus and scaffold comprising the same

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100970959B1 (en) 2008-06-30 2010-07-20 김은하 Method for Construction of Extension Culvert in State Guarantying Footway and Driveway
KR101243705B1 (en) 2009-10-30 2013-03-14 양준석 Apparatus of Deassembling Precast Concrete Box Automatically and Method Using the Same
KR101184299B1 (en) * 2009-11-20 2012-09-18 (주)유경기술단 A passage fabric used to multi slip form and methode there of
KR101386458B1 (en) 2012-05-11 2014-04-17 동도산업 주식회사 Dismantling device for precast pannel
KR101506782B1 (en) * 2013-04-09 2015-03-27 장영미 In-Site Molding Apparatus for manufacturing In-site Concrete Culverts with assembled Partial Precast Concrete
KR101824062B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
KR101824061B1 (en) * 2015-12-30 2018-01-31 주식회사 용하건설 Construction method of powder magazine
CN107419743A (en) * 2017-05-16 2017-12-01 中国建筑第六工程局有限公司 A kind of new city pipe gallery mobile formwork
CN111636478A (en) * 2020-05-25 2020-09-08 中铁隧道集团二处有限公司 Mechanized equipment is used in concrete piping lane construction
KR20220008541A (en) * 2020-07-14 2022-01-21 김현우 Temporary pole apparatus and scaffold comprising the same
KR102450348B1 (en) * 2020-07-14 2022-10-04 김현우 Temporary pole apparatus and scaffold comprising the same

Similar Documents

Publication Publication Date Title
KR101130923B1 (en) the mold with self-propelled type trolley for construction of continuous structure and the construction method of continuous structure therewith
KR101645462B1 (en) Precast crossing beam manufacturing method for bridge and precast crossing beam construction method for bridge
CN111424570A (en) Assembly type trolley for box culvert construction and construction method thereof
CN109778700B (en) Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road
KR200298104Y1 (en) Mobile form for forming concrete box on construction work
KR101437842B1 (en) Low depth tunnel construction method using variable mould system
KR102384951B1 (en) gangform device for subway construction and method for constructing the same
KR100463032B1 (en) Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
KR101844977B1 (en) Scaffolding frame for tunnel
KR100448221B1 (en) Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
KR101082418B1 (en) mold apparatus for forming concrete slab of bridge
KR101150829B1 (en) The mold with self-propelled type trolley for construction of retaining wall
CN110847065A (en) Prefabricated assembled box channel and construction method
KR101272898B1 (en) Reinforced water conduit and manufacturing apparatus
KR200298103Y1 (en) Form structure for haunch of intermediate wall using footing concrete
CN212316712U (en) Box culvert construction is with assembled platform truck
JPH0143086B2 (en)
CN112411406A (en) Light truss type porous box culvert template system and construction method
CN112376612A (en) Large-section multi-cabin cast-in-place comprehensive pipe gallery top plate formwork construction system and construction method
CN114251106B (en) Integral inverted arch end steel mould convenient to assemble and disassemble and construction method
KR200267831Y1 (en) Movable Steel Form for Constructing Culvert
CN220285305U (en) Adjustable seam unilateral template reinforcing system
JPS63194070A (en) Execution of culvert by moving type mold frame
CN214497236U (en) Light truss type porous box culvert template system
CN212867045U (en) Subway prefabricated assembly column type inspection pit structure

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20111110

Year of fee payment: 10

EXPY Expiration of term