KR200277705Y1 - Granular pile construction equipment having apparatus for preventing air counterflow - Google Patents

Granular pile construction equipment having apparatus for preventing air counterflow Download PDF

Info

Publication number
KR200277705Y1
KR200277705Y1 KR2020020007472U KR20020007472U KR200277705Y1 KR 200277705 Y1 KR200277705 Y1 KR 200277705Y1 KR 2020020007472 U KR2020020007472 U KR 2020020007472U KR 20020007472 U KR20020007472 U KR 20020007472U KR 200277705 Y1 KR200277705 Y1 KR 200277705Y1
Authority
KR
South Korea
Prior art keywords
casing
air
inner tube
construction equipment
seal housing
Prior art date
Application number
KR2020020007472U
Other languages
Korean (ko)
Inventor
김백영
Original Assignee
(주)양광엔지니어링
석정건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)양광엔지니어링, 석정건설주식회사 filed Critical (주)양광엔지니어링
Priority to KR2020020007472U priority Critical patent/KR200277705Y1/en
Application granted granted Critical
Publication of KR200277705Y1 publication Critical patent/KR200277705Y1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비는, 외관 케이싱과, 그 외관케이싱 내부에 설치되는 내관케이싱을 구비하는 그래뉴럴 파일 시공장비에 있어서, 상기 외관케이싱과 내관케이싱으로 이루어지는 이중관 구조체의 상단부의 내,외관 케이싱 사이의 공간에는 에어의 역류에 따른 에어의 외관케이싱 외부로의분출을 방지하기 위한 것으로서, 내관케이싱을 동심축으로 하여 내관케이싱을 에워싸도록 실하우징이 설치되고, 그 실하우징의 내주면과 내관케이싱 사이의 간극에는 다단식 실부재가 설치되며, 상기 실하우징의 상면에는 상기 다단식 실부재와 내관케이싱 간의 간격을 조절하기 위한 실간극 조절레바가 설치되고, 상기 실하우징의 하부 내관케이싱의 외주면 소정 부위에는 에어를 분사함으로써 내,외관 케이싱 간에 일정한 공기압을 형성하기 위한 에어 분사 노즐이 설치된다.The granular pile construction equipment having an air backflow prevention device according to the present invention is a granular pile construction equipment having an exterior casing and an inner tube casing installed inside the exterior casing, the double pipe consisting of the exterior casing and the inner tube casing. The space between the inner and outer casings of the upper end of the structure is to prevent the air from flowing out of the outer casing due to the backflow of the air, and a seal housing is installed to surround the inner casing with the inner tube casing as a concentric axis. A multistage seal member is installed in the gap between the inner circumferential surface of the seal housing and the inner tube casing, and a thread clearance adjusting lever for adjusting a gap between the multistage seal member and the inner pipe casing is installed on the upper surface of the seal housing. Air is injected into a predetermined portion of the outer circumferential surface of the lower inner tube casing between the inner and outer casings. The air injection nozzle for forming a uniform air pressure is provided.

이와 같은 본 고안에 의하면, 내외관 케이싱 사이에 밀폐수단 및 일정 공기압 형성 수단이 마련되어 있어 하부로부터 역류하는 공기를 차단하여 모래나 점토가 내외관 케이싱 사이로 유입되는 것을 방지하게 되며, 이에 따라 그래뉴럴 파일생성 작업 효율을 한층 높일 수 있는 장점이 있다.According to the present invention, a sealing means and a predetermined air pressure forming means is provided between the inner and outer casing to block the air flowing back from the bottom to prevent the sand or clay from flowing between the inner and outer casing, thereby creating a granular pile There is an advantage that can further increase the efficiency.

Description

에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비{Granular pile construction equipment having apparatus for preventing air counterflow}Granular pile construction equipment having apparatus for preventing air counterflow

본 고안은 그래뉴럴 파일(granular pile) 시공장비에 관한 것으로서, 특히 내관 케이싱 하단부의 에어 제트(air jet)에 이용된 에어가 이물질과 함께 역류하는 것을 방지하여 내관 케이싱의 작동이 원활하게 이루어질 수 있도록 하는 에어역류 방지장치를 갖는 그래뉴럴 파일 시공장비에 관한 것이다.The present invention relates to a granular pile construction equipment, and in particular, to prevent backflow of air used in the air jet at the lower end of the inner tube casing with foreign matter so that the inner tube casing can be smoothly operated. It relates to a granular pile construction equipment having an air backflow prevention device.

종래 저진동 저소음 그래뉴럴 파일 시공장비는 도 1에 도시된 바와 같이, 이중 케이싱을 사용하여 외관케이싱(101)은 회전에 의해 관입과 인발 기능을 하고, 내관케이싱(102)은 상하왕복 운동에 의하여 재료(모래나 쇄석)(104)를 하단으로 배출하고 그 단부의 다짐판(103)으로 내관케이싱(102)이 상승시에 외부로 배출된 모래나 쇄석을 다짐으로써 연약지반의 지중에 잘 다져진 모래기둥이나 쇄석기둥을 형성하게 된다. 도 1에서 참조 번호 120은 햄머를 나타낸다.Conventional low vibration low noise granular pile construction equipment, as shown in Figure 1, by using a double casing, the outer casing 101 serves to penetrate and pull out by rotation, the inner tube casing 102 is material by the up and down reciprocating motion (Sand or crushed stone) 104 is discharged to the bottom and the sand pillars well ground in the ground of the soft ground by compacting the sand or crushed stone discharged to the outside when the inner tube casing 102 rises with the compaction plate 103 at its end It will form crushed columns. Reference numeral 120 in FIG. 1 denotes a hammer.

이상과 같은 일련의 과정에 있어서, 재료(104)는 내관케이싱(102)이 하강시에는 내관케이싱(102) 내부로 삽입되고, 내관케이싱(102)의 상승시에는 내관케이싱(102) 내부에 있는 재료(104)가 내관케이싱(102)의 외부로 배출된다. 이때, 외부로 배출된 재료(104)는 내관케이싱(102) 하단에 장착된 다짐판(103)에 의해 외관케이싱(101)의 직경보다 큰 그래뉴럴 파일을 연약지반의 지중에 형성하게 된다.In the series of processes described above, the material 104 is inserted into the inner tube casing 102 when the inner tube casing 102 is lowered, and the material inside the inner tube casing 102 when the inner tube casing 102 is raised. 104 is discharged to the outside of the inner tube casing (102). At this time, the material 104 discharged to the outside forms a granular pile larger than the diameter of the outer casing 101 by the compaction plate 103 mounted at the lower end of the inner tube casing 102 in the ground of the soft ground.

한편, 내관케이싱(102)에 유입된 재료(104)는 케이싱속의 내압과 케이싱 하단의 에어(105)의 분사에 의해 내관케이싱(102)이 상승할 때 케이싱과 함께 따라 올라가지 않고 케이싱 하단으로 원활하게 배출하게 된다.On the other hand, the material 104 introduced into the inner tube casing 102 is smoothly moved to the bottom of the casing without rising along with the casing when the inner tube casing 102 rises due to the internal pressure in the casing and the injection of air 105 at the bottom of the casing. Will be discharged.

이상과 같은 종래 그래뉴럴 파일 시공장비에 의한 그래뉴럴 파일 시공 방식은 내관케이싱(102) 하단부에 에어 제트를 이용하여 내관케이싱(102) 하단부에서 재료(104)의 원활한 분출을 도모하게 된다. 이때, 이용된 에어(105)는 재료(104)와 함께 케이싱 하단부의 외부로 배출된 후 지중으로 소산하게 된다. 그러나, 연약층의 심도가 일정 심도 이상(대략 10m)에서는 에어(105)가 외부로 배출되지 않아, 일부 에어(105)는 지중에 소산되지 않고 내관케이싱(102)과 외관케이싱(101) 사이로 역류하게 된다. 이 역류한 에어(105)는 최종적으로 내,외관 케이싱 사이를 따라 올라가 상단에서 소산하게 된다. 따라서, 내,외관 케이싱(101)(102) 사이로 역류하는 에어의 압력으로 인하여 케이싱 하단부로 분출되는 재료(104)나 연약층의 점토가 에어와 함께 내,외관 케이싱(101)(102) 사이로 유입하게 된다. 이렇게 유입된 재료(104)나 점토는 내관케이싱(102)의 원활한 상하운동을 방해하게 되며, 그에 따라 다짐작업이 곤란하게 되는 경우가 발생하여 다짐효율이 떨어지게 된다.The granular pile construction method by the conventional granular pile construction equipment as described above facilitates the smooth ejection of the material 104 at the lower end of the inner tube casing 102 using an air jet at the lower end of the inner tube casing 102. At this time, the used air 105 is discharged to the outside of the casing bottom with the material 104 and then dissipated to the ground. However, when the depth of the soft layer exceeds a certain depth (approximately 10 m), the air 105 is not discharged to the outside, so that some air 105 does not dissipate in the ground and flows back between the inner tube casing 102 and the outer casing 101. do. The reversed air 105 finally rises between the inner and outer casings and dissipates at the upper end. Therefore, due to the pressure of the air flowing back between the inner and outer casings 101 and 102, the material 104 or the clay of the soft layer that flows to the lower end of the casing flows together with the air to enter the inner and outer casings 101 and 102. do. The material 104 or clay introduced in this way interferes with the smooth up and down movement of the inner tube casing 102, and thus, the compaction operation is difficult to occur, thereby reducing the compaction efficiency.

본 고안은 이상과 같은 종래 그래뉴럴 파일 시공장비에 있어서의 문제점을 개선하기 위하여 안출된 것으로서, 내관 케이싱 하단부의 에어 분사에 이용된 에어가 이물질과 함께 역류하는 것을 방지하여 내관 케이싱의 작동이 원활하게 이루어 질 수 있도록 하는 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비를 제공함에 그 목적이 있다.The present invention is devised to improve the problems in the conventional granular pile construction equipment as described above, the operation of the inner tube casing smoothly by preventing the air used for the air injection of the lower end of the inner tube casing with the foreign matter back flow. It is an object of the present invention to provide a granular pile construction equipment having an air backflow prevention device that can be achieved.

도 1은 종래 그래뉴럴 파일 시공장비의 구성을 보여주는 도면.1 is a view showing the configuration of a conventional granular file construction equipment.

도 2는 본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비의 구성을 보여주는 도면,Figure 2 is a view showing the configuration of the granular pile construction equipment having an air backflow prevention device according to the present invention,

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

101...외관케이싱 102...내관케이싱101 ... exterior casing 102 ... exterior casing

103...다짐판 104...재료(모래 또는 쇄석)103 ... compaction board 104 ... material (sand or crushed stone)

105...에어(air) 110...실하우징105 ... air 110 ... seal housing

111...다단식 실부재 112...실간극 조절레바111 ... Multistage seal member 112 ... Large clearance adjusting lever

120...햄머120 ... hammer

상기의 목적을 달성하기 위하여 본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비는,Granular pile construction equipment having an air backflow prevention device according to the present invention to achieve the above object,

회전운동에 의한 관입과 인발 기능을 갖는 외관케이싱과, 그 외관케이싱 내부에 설치되어 상하왕복 운동에 의해 재료를 하단으로 배출하는 한편 배출된 재료를 다져서 연약지반의 지중에 그래뉴럴 파일을 형성하는 내관케이싱을 구비하는 그래뉴럴 파일 시공장비에 있어서,External casing having penetration and drawing function by rotational movement and inner casing installed inside the exterior casing to discharge material to the lower part by up and down reciprocating motion, and to compact the discharged material to form granular pile in the ground of soft ground. In the granular pile construction equipment having a casing,

상기 외관케이싱과 내관케이싱으로 이루어지는 이중관 구조체의 상단부의 내,외관 케이싱 사이의 공간에는 에어의 역류에 따른 에어의 외관케이싱 외부로의 분출을 방지하기 위한 것으로서, 내관케이싱을 동심축으로 하여 내관케이싱을 에워싸도록 실하우징이 설치되고, 그 실하우징의 내주면과 내관케이싱 사이의 간극에는 다단식 실부재가 설치되며, 상기 실하우징의 상면에는 상기 다단식 실부재와 내관 케이싱 간의 간격을 조절하기 위한 실간극 조절레바가 설치되고, 상기 실하우징의 하부 내관케이싱의 외주면 소정 부위에는 에어를 분사함으로써 내,외관케이싱 간에 일정한 공기압을 형성하기 위한 에어 분사 노즐이 설치되어 있는 점에 그 특징이 있다.In the space between the inner and outer casing of the upper end portion of the double pipe structure consisting of the outer casing and the inner tube casing, the inner casing is formed to prevent the air from flowing out of the outer casing due to the backflow of the air. A seal housing is installed so as to enclose, and a multi-stage seal member is installed in the gap between the inner circumferential surface of the seal housing and the inner tube casing, and a thread gap adjustment for adjusting a gap between the multi-stage seal member and the inner tube casing on the upper surface of the seal housing. The lever is provided, and the air injection nozzle for forming a constant air pressure between the inner and outer casings by spraying air is provided on a predetermined portion of the outer circumferential surface of the lower inner casing of the seal housing.

이하 첨부된 도면을 참조하면서 본 고안의 실시예를 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비의 구성을 보여주는 도면이다.2 is a view showing the configuration of the granular pile construction equipment having an air backflow prevention device according to the present invention.

도 2를 참조하면, 본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일시공장비는 종래 그래뉴럴 파일 시공장비와 마찬가지로 회전운동에 의한 관입과 인발 기능을 갖는 외관케이싱(101)과, 그 외관케이싱(101) 내부에 설치되어 상하왕복운동에 의해 재료(104)를 하단으로 배출하는 한편 배출된 재료(104)를 다져서 연약지반의 지중에 그래뉴럴 파일을 형성하는 내관케이싱(102)을 기본적으로 구비한다.Referring to Figure 2, the granular pile construction equipment having an air backflow prevention device according to the present invention is similar to the conventional granular pile construction equipment exterior casing 101 having a penetration and pull function by the rotational movement, and the exterior casing (101) Basically provided with an inner tube casing (102) installed inside to discharge the material (104) to the bottom by up and down reciprocating motion, while compacting the discharged material (104) to form a granular pile in the ground of the soft ground. do.

그러나, 본 고안의 그래뉴럴 파일 시공장비에 있어서는 상기 외관케이싱(101)과 내관케이싱(102)으로 이루어지는 이중관 구조체의 상단부의 내,외관 케이싱(101)(102) 사이의 공간에 에어(105)의 역류에 따른 에어(105)의 외관캐이싱(101) 외부로의 분출을 방지하기 위한 것으로서, 내관케이싱(102)을 동심축으로 하여 내관케이싱(102)을 에워싸도록 실(seal)하우징(110)이 설치되고, 그 실하우징(110)의 내주면과 내관케이싱(102) 사이의 간극에는 다단식 실부재(111)가 설치되며, 상기 실하우징(110)의 상면에는 상기 다단식 실부재(111)와 내관케이싱(102)간의 간격을 조절하기 위한 실간극 조절레바(112)가 설치되고, 상기 실하우징(110)의 하부 내관케이싱(102)의 외주면 소정 부위에는 에어를 분사함으로써 내,외관케이싱(101)(102) 간에 일정한 공기압을 형성하기 위한 에어 분사 노즐(113)이 설치되어 있는 점이 종래의 그래뉴럴 파일 시공장비와 특징적으로 다르다. 여기서, 상기 다단식 실부재(111)는 다수의(예컨대, 20개의) 고무판의 다층 적층구조로 구성된다.However, in the granular pile construction equipment of the present invention, the air 105 is disposed in the space between the inner and outer casings 101 and 102 of the upper end portion of the double-pipe structure including the outer casing 101 and the inner tube casing 102. As to prevent the outflow of the air 105 outside the casing 101 due to the reverse flow, the seal housing 110 to surround the inner tube casing 102 with the inner tube casing 102 as a concentric shaft. ) Is installed, the multi-stage seal member 111 is installed in the gap between the inner circumferential surface of the seal housing 110 and the inner tube casing 102, and the multi-stage seal member 111 and the upper surface of the seal housing 110. An air gap adjusting lever 112 is installed to adjust the distance between the inner tube casings 102 and the inner and outer casings 101 by spraying air to a predetermined portion of the outer circumferential surface of the lower inner tube casing 102 of the seal housing 110. Air component to create a constant air pressure between the 102 Nozzle 113 is different from the characteristic point is installed in the conventional neural Yes file construction equipment. Here, the multi-stage seal member 111 is composed of a multilayer stack structure of a plurality of (for example, 20) rubber plates.

이상과 같은 구조로 되어 있는 본 고안의 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비에 있어서, 내관케이싱(102)의 상단부는 실린더 샤프트화되어 있고, 그 상단부가 상부의 햄머(120)와 연결되어 있어 내관케이싱(102)이 상하운동을 할 때 그 실린더 샤프트화 되어 있는 상단부도 같이 움직이게 된다. 내,외관 케이싱(101)(102) 사이의 상부 공간으로 에어(105)가 새어 나가지 못하도록 하는 기능은 실하우징(110)이 담당하고, 실린더 샤프트화되어 있는 내관케이싱(102)의 상단부와 실하우징(110) 사이로 에어가 새어 나가지 못하도록 하는 기능은 다단식 실부재(111)부재가 담당하게 된다.In the granular pile construction equipment having the air backflow prevention device of the present invention having the structure as described above, the upper end of the inner tube casing 102 is a cylinder shaft, the upper end is connected to the upper hammer 120 When the inner tube casing 102 moves up and down, the upper end of the cylinder shaft is also moved. The seal housing 110 is responsible for preventing the air 105 from leaking into the upper space between the inner and outer casings 101 and 102, and the upper end of the inner tube casing 102 having a cylinder shaft and seal housing. The function of preventing the air from leaking between the (110) will be in charge of the multi-stage seal member 111 member.

한편, 에어 분사 노즐(113)을 통해 에어를 내관케이싱(102) 하단부와 동시에공급하여 줌으로써 내관케이싱(102)과 외관케이싱(101) 사이에 일정한 공기압이 형성되고, 이에 따라 내관케이싱(102) 하부에서 재료(104)의 분출을 위해 사용된 에어 제트가 다시 역류하지 못하게 된다. 따라서, 모래 또는 점토가 내관케이싱(102)하부에서 쓰인 에어 제트를 따라 내,외관 케이싱(101)(102) 사이로 유입되는 것을 방지하게 되며, 이에 따라 종래와 같이 내,외관 케이싱(101)(102) 사이에 침입한 모래 또는 점토로 인한 내관케이싱(102)의 상하운동에 문제가 발생하는 것을 방지할 수 있고, 그 결과 그래뉴럴 파일 시공 작업 효율을 한층 높일 수 있게 된다.On the other hand, by supplying air at the same time as the lower end of the inner tube casing 102 through the air injection nozzle 113, a constant air pressure is formed between the inner tube casing 102 and the outer casing 101, and accordingly the lower portion of the inner tube casing 102 The jet of air used for the ejection of material 104 is prevented from flowing back again. Therefore, sand or clay is prevented from flowing between the inner and outer casings 101 and 102 along the air jet used under the inner tube casing 102, and thus, the inner and outer casings 101 and 102 as in the prior art. A problem may be prevented from occurring in the vertical motion of the inner tube casing 102 due to sand or clay infiltrated between), and as a result, the work efficiency of the granular pile construction can be further improved.

이상의 설명에서와 같이, 본 고안에 따른 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비는 내외관 케이싱의 상단부 사이 공간에 실하우징 및 다단식 실부재가 마련되고, 그 하부에는 별도의 에어 분사 노즐이 마련되어 내외관 케이싱 상단부를 밀폐하는 한편 내외관 케이싱 사이에 일정한 공기압을 형성함으로써 하부로부터 역류하는 공기를 차단하게 되며, 그에 의해 종래의 그래뉴럴 파일 시공장비에서와 같이 역류하는 공기에 의해 모래나 점토가 함께 내외관 케이싱 사이로 유입되어 내관케이싱의 상하운동을 방해하게 되는 것을 원천적으로 방지할 수 있다. 따라서, 내외관 케이싱 사이로 모래나 점토 등 이물질의 유입으로 인한 작업효율이 떨어지는 것을 방지할 수 있어 다짐능률을 증대시킬 수 있고, 그 결과 그래뉴럴 파일생성 작업 효율을 한층 높일 수 있는 장점이 있다.As described above, the granular pile construction equipment having an air backflow prevention device according to the present invention is provided with a seal housing and a multi-stage seal member in a space between the upper ends of the inner and outer casings, and a separate air injection nozzle is provided under the inner and outer tubes. By closing the upper end of the casing and forming a constant air pressure between the inner and outer casing, it blocks the air flowing back from the bottom, whereby sand or clay is brought together between the inner and outer casing by the air flowing backward as in the conventional granular pile construction equipment. It is possible to prevent the inflow to interfere with the vertical movement of the inner tube casing. Therefore, it is possible to prevent the work efficiency from falling due to the inflow of foreign matter such as sand or clay between the inner and outer casing can increase the compaction efficiency, as a result there is an advantage to further increase the work efficiency of the granular pile.

Claims (1)

회전운동에 의한 관입과 인발 기능을 갖는 외관케이싱과, 그 외관케이싱 내부에 설치되어 상하왕복 운동에 의해 재료를 하단으로 배출하는 한편 배출된 재료를 다져서 연약지반의 지중에 그래뉴럴 파일을 형성하는 내관케이싱을 구비하는 그래뉴럴 파일 시공장비에 있어서,External casing having penetration and drawing function by rotational movement and inner casing installed inside the exterior casing to discharge material to the lower part by up and down reciprocating motion, and to compact the discharged material to form granular pile in the ground of soft ground. In the granular pile construction equipment having a casing, 상기 외관케이싱과 내관케이싱으로 이루어지는 이중관 구조체의 상단부의 내,외관 케이싱 사이의 공간에는 에어의 역류에 따른 에어의 외관케이싱 외부로의 분출을 방지하기 위한 것으로서, 내관케이싱을 동심축으로 하여 내관케이싱을 에워싸도록 실하우징이 설치되고, 그 실하우징의 내주면과 내관케이싱 사이의 간극에는 다단식 실부재가 설치되며, 상기 실하우징의 상면에는 상기 다단식 실부재와 내관 케이싱 간의 간격을 조절하기 위한 실간극 조절레바가 설치되고, 상기 실하우징의 하부 내관케이싱의 외주면 소정 부위에는 에어를 분사함으로써 내,외관케이싱 간에 일정한 공기압을 형성하기 위한 에어 분사 노즐이 설치되어 있는 것을 특징으로 하는 에어 역류 방지장치를 갖는 그래뉴럴 파일 시공장비.In the space between the inner and outer casing of the upper end portion of the double pipe structure consisting of the outer casing and the inner tube casing, the inner casing is formed to prevent the air from flowing out of the outer casing due to the backflow of the air. A seal housing is installed so as to enclose, and a multi-stage seal member is installed in the gap between the inner circumferential surface of the seal housing and the inner tube casing, and a thread gap adjustment for adjusting a gap between the multi-stage seal member and the inner tube casing on the upper surface of the seal housing. A lever having an air backflow prevention device is installed, and an air injection nozzle for forming a constant air pressure between the inner and outer casings by spraying air is provided on a predetermined portion of the outer inner surface of the lower inner casing of the seal housing. Neural pile construction equipment.
KR2020020007472U 2002-03-13 2002-03-13 Granular pile construction equipment having apparatus for preventing air counterflow KR200277705Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020007472U KR200277705Y1 (en) 2002-03-13 2002-03-13 Granular pile construction equipment having apparatus for preventing air counterflow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020007472U KR200277705Y1 (en) 2002-03-13 2002-03-13 Granular pile construction equipment having apparatus for preventing air counterflow

Publications (1)

Publication Number Publication Date
KR200277705Y1 true KR200277705Y1 (en) 2002-06-07

Family

ID=73119322

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020007472U KR200277705Y1 (en) 2002-03-13 2002-03-13 Granular pile construction equipment having apparatus for preventing air counterflow

Country Status (1)

Country Link
KR (1) KR200277705Y1 (en)

Similar Documents

Publication Publication Date Title
US8763719B2 (en) Pile driving systems and methods employing preloaded drop hammer
WO2002012637A1 (en) Underground water pumping device
KR20100101568A (en) Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix
JPH0679651A (en) Striking mechanism using air and liquid pressure
KR102222785B1 (en) method of breaking rock using vibration ripper
KR20190126683A (en) Hydraulic fracturing apparatus and the method using the same
JP3867984B2 (en) Pumping equipment
KR200277705Y1 (en) Granular pile construction equipment having apparatus for preventing air counterflow
CN1472396A (en) Foundation improving method and apparatus
CN210343218U (en) Hydraulic impactor
CN113202087A (en) Air pressure pushing and vibrating device
KR100959342B1 (en) Built-in nozzle for underground propulsion pipe
CN112502128A (en) Rammer capable of automatically dredging air vent
KR200206605Y1 (en) Air piston vibrator
KR102424003B1 (en) vacuum hammer
JP2006299557A (en) Method for apparatus for impact type compaction
JP4523490B2 (en) Down the hole hammer
CN114382440B (en) Oil extraction device
CN212052755U (en) Anti-rotation device for cylinder sleeve of diesel hammer
KR101167885B1 (en) Ground boring apparatus
CN209569369U (en) A kind of one-way water stop grouting device for vertical shaft section of jurisdiction
KR20000020064U (en) An air hammer of piercing machine and structure of the bit
CN108756751A (en) It is a kind of prevention Gas Outburst brill rush automatic switching control equipment and mash gas outburst prevention method
KR101399384B1 (en) Down the hole hammer device for using compression air
CN209457066U (en) Jet pump lifts aeratic hidden hole rock chute forming machine

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20110512

Year of fee payment: 10

EXPY Expiration of term