KR200263621Y1 KR2020010033735U KR20010033735U KR200263621Y1 KR 200263621 Y1 KR200263621 Y1 KR 200263621Y1 KR 2020010033735 U KR2020010033735 U KR 2020010033735U KR 20010033735 U KR20010033735 U KR 20010033735U KR 200263621 Y1 KR200263621 Y1 KR 200263621Y1
Authority
KR
South Korea
Prior art keywords
wire
slope
protection
wire block
slope reinforcement
Prior art date
Application number
KR2020010033735U
Other languages
Korean (ko)
Inventor
재 술 나
Original Assignee
재 술 나
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 재 술 나 filed Critical 재 술 나
Priority to KR2020010033735U priority Critical patent/KR200263621Y1/en
Application granted granted Critical
Publication of KR200263621Y1 publication Critical patent/KR200263621Y1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 고안은 사면 보강 및 보호용 와이어블록(110)에 관한 것으로 수직으로 지지공(111a)을 형성한 중앙지지구(111)와, 상기 중앙지지구(111)를 중심으로 결합된 다양한 형상의 와이어(112)와, 상기 와이어(112)의 외곽에 끼워져 위치하는 아이볼트(113)로 구성하므로 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화할 뿐만 아니라 사면에서 강한 압력이 상승하더라도 붕괴되는 것을 최소화하여 신속하게 복구할 수 있도록 하며 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있고 와이어블록을 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시킬 수 있도록 하는 효과가 있다.The present invention relates to a wire block 110 for slope reinforcement and protection, and a central support 111 having a support hole 111a formed vertically, and wire 112 having various shapes coupled to the center support 111. And, since the eye bolt 113 is inserted into the outer position of the wire 112 is located so as to firmly reinforce and protect the slopes located on the side of the road to maximize its supporting force and collapse even when a strong pressure rises on the slope. Minimizes and allows for rapid recovery.In the event of partial collapse or initial collapse, these parts can be separated and reassembled firmly, or replaced with new wire blocks, and reassembled firmly so that they can be quickly reinforced in case of signs of collapse or partial collapse. The entire slope of the slope can be prevented in advance, and the wire block is installed on the surface of the rockfall protection net to prevent rockfall. There is an effect that can be maximized.

Description

사면 보강 및 보호용 와이어블록{WIRE BLOCK FOR REINFORCING AND PROTECTING THE SLOPE}Wire block for slope reinforcement and protection {WIRE BLOCK FOR REINFORCING AND PROTECTING THE SLOPE}

본 고안은 사면 보강 및 보호용 와이어블록에 관한 것으로, 상세하게는 낙석지역 등의 사면을 보호 및 보강하여 낙석 발생 또는 붕괴되는 것을 미연에 방지할 수 있도록 하는 사면 보강 및 보호용 와이어블록에 관한 것이다.The present invention relates to a wire block for slope reinforcement and protection, and more particularly, to a slope reinforcement and protection wire block that can prevent the fall or collapse of the falling rock by protecting and reinforcing slopes, such as rockfall areas.

일반적으로 종래에는 낙석지역 등의 사면에 낙석방지망을 밀착되게 덮고 낙석방지망의 상면에 와이어를 가로와 세로로 다수개 설치하여 낙석방지망을 견고하게 지지하도록 하여 사면에서 발생될 수 있는 안전사고를 방지하도록 하였다.In general, by covering the rockfall protection net closely on the slope of the rockfall area and the like and installing a plurality of wires horizontally and vertically on the top of the rockfall prevention net so as to firmly support the rockfall prevention net to prevent safety accidents that may occur on the slope. It was.

이러한 종래의 기술은 사면의 지반 거동 등으로 인하여 압력이 크게 발생하는 경우 거의 무용지물에 가까워 사면 전체가 붕괴되어 심각한 안전사고를 일으키는 문제점이 있었다.Such a prior art has a problem that when the pressure is largely generated due to the ground behavior of the slope, the slope is almost obsolete and the entire slope collapses causing serious safety accidents.

특히, 사면은 도로 공사로 인하여 도로의 측면에 주로 위치하게 되므로 사고 발생 후 교통의 흐름을 원활하게 하기 위하여 신속하게 복구하여야 하나 낙석방지망의 경우 사면에 대한 보강이 전혀 없이 단순히 낙석방지망으로 떨어져 내리는 몇 개의 낙석만을 차단하게 되므로 수압 또는 토압에 의한 지반거동 등으로 큰 압력이 작용할 때에 사면 전체가 붕괴될 우려가 높은 문제점이 있었다.In particular, the slope is mainly located on the side of the road due to the road construction, so it must be quickly restored to smooth the flow of traffic after an accident. Since only the rockfalls of the dog are blocked, there is a high possibility that the entire slope will collapse when a large pressure is applied due to ground pressure caused by water pressure or soil pressure.

나아가, 사면 전체가 붕괴되면, 이를 복구하기 위한 시간과 인력이 상당히 투입되어야 하므로 복구비가 상승되고 교통의 흐름을 차단하는 문제점이 발생하였다.In addition, when the entire slope collapsed, a considerable amount of time and personnel must be invested to recover it, resulting in an increase in recovery cost and a problem of blocking traffic flow.

특히 사면 보강의 경우에는 사면에 콘크리트 블록을 표면에 상호 연접되게 다수개 시공하여 보강하는 경우도 있으나 이는 사면에서 직접 거푸집을 순차적으로 설치하고 여기에 철근 골조 등을 설치한 다음 콘크리트 몰탈 등을 부어 경화시켜 사면을 보강하므로 사면의 경사로 인하여 시공이 매우 까다롭고 심지어 경사가 큰 사면인 경우 시공 자체가 불가능한 문제점이 있었다.Particularly, in case of slope reinforcement, a plurality of concrete blocks may be reinforced on the slope to be interconnected to the surface, but this may be reinforced by installing formwork directly on the slope, installing reinforcing frames, etc., and then pouring concrete mortar. Because the slope is reinforced so that the construction is very difficult due to the slope of the slope, even if the slope is a large slope there was a problem that the construction itself is impossible.

나아가 이러한 콘크리트 블록은 가변성이 전혀 없어 지반 거동의 초기 현상이 발생되면 이에 적절하게 대응할 수 없을 뿐만 아니라 부분 붕괴시 지형의 변화로 인하여 재시공하기 거의 불가능하여 넓은 면적을 다시 시공하여야 하는 문제점이 있었다.Furthermore, these concrete blocks are not variable at all, so if an initial phenomenon of ground behavior occurs, not only can not appropriately cope with this problem, it is almost impossible to reconstruct due to the change of the terrain during partial collapse, there was a problem to rebuild a large area.

더불어 이러한 콘크리트 블록은 시공의 번거롭고 까다로움으로 인하여 공사비가 크게 상승되고 공사 기간이 오래 걸릴 뿐만 아니라 사면의 지지력이 거의 표면에서만 작용하므로 사면에 대한 지지력의 떨어지는 문제점이 있었다.In addition, due to the cumbersome and cumbersome construction of the concrete block, the construction cost is greatly increased and the construction period takes a long time, and the bearing capacity of the slope acts only on the surface.

따라서 본 고안의 주 목적은 와이어블록으로 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화하도록 하므로 토압이나 수압의 상승으로 인한 지반 거동이 크게 발생하더라도 사면을 견고하게 지지하여 붕괴되는 것을 억제시킬 수 있도록 하는 사면 보강 및 보호용 와이어블록을 제공하는 데 있다.Therefore, the main purpose of the present invention is to strengthen and protect the slopes located on the side of the road with a wire block to maximize its bearing capacity, so that even if the ground behavior caused by the earth pressure or the increase in water pressure occurs, the slopes are firmly supported and collapsed. It is to provide a wire block for slope reinforcement and protection to be suppressed.

본 고안의 다른 목적은 와이어블록으로 사면에서 강한 압력이 상승하더라도 붕괴되는 것을 최소화하여 신속하게 복구할 수 있도록 하는 사면 보강 및 보호용와이어블록을 제공하는 데 있다.Another object of the present invention is to provide a wire block for slope reinforcement and protection that can be quickly recovered by minimizing collapse even when a strong pressure rises on the slope with the wire block.

본 고안의 다른 목적은 와이어블록으로 사면을 간편하고 신속하게 보호, 보강할 수 있도록 하는 사면 보강 및 보호용 와이어블록을 제공하는 데 있다.Another object of the present invention is to provide a wire block for slope reinforcement and protection that can be easily and quickly protect, reinforced with a wire block.

본 고안의 다른 목적은 와이어블록으로 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있도록 하는 사면 보강 및 보호용 와이어블록을 제공하는 데 있다.Another object of the present invention is that when the initial collapse or partial collapse of the wire block occurs, these parts can be separated and reassembled firmly or replaced with new wire blocks to be reassembled firmly so that they can be quickly reinforced upon signs of collapse or partial collapse. It is to provide a wire block for slope reinforcement and protection to prevent the collapse of the entire slope in advance.

본 고안의 다른 목적은 와이어블록으로 사면을 간편하고 신속하게 보강할 수 있도록 하므로 공사기간을 단축시키고 코스트를 저감할 수 있도록 하는 사면 보강 및 보호용 와이어블록을 제공하는 데 있다.Another object of the present invention is to provide a wire block for slope reinforcement and protection that can be easily and quickly reinforce the slope with a wire block to shorten the construction period and reduce the cost.

본 고안의 다른 목적은 와이어블록을 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시키고 낙석지역을 보강하여 그 효과를 극대화시킬 수 있도록 하는 사면 보강 및 보호용 와이어블록을 제공하는 데 있다.Another object of the present invention is to provide a wire block for slope reinforcement and protection to maximize the effect by installing the wire block on the surface of the rockfall prevention net to maximize the rockfall prevention effect and reinforce the rockfall area.

도 1 은 본 고안에 따른 사면 보강 및 보호용 와이어블록을 설치한 상태를 나타낸 전체 사시도.1 is an overall perspective view showing a state in which a wire block for slope reinforcement and protection according to the present invention is installed.

도 2 는 본 고안에 따른 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 2 is a front view showing a wire block for slope reinforcement and protection according to the present invention.

도 3 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 네일 설치부분을 상세하게 나타낸 단면도.Figure 3 is a cross-sectional view showing in detail the nail installation portion of the slope reinforcement and protection wire block according to the present invention.

도 4 는 본 고안에 따른 사면 보강 및 보호용 와이어블록의 연결상태를 나타낸 상세도.Figure 4 is a detailed view showing the connection state of the slope reinforcement and protection wire block according to the present invention.

도 5 는 본 고안에 따른 사면 보강 및 보호용 와이어블록의 와이어 연결상태를 나타낸 개략도.Figure 5 is a schematic view showing a wire connection state of the slope reinforcement and protection wire block according to the present invention.

도 6 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 중앙지지구를 나타낸 사시도.Figure 6 is a perspective view showing a central support of the wire block for slope reinforcement and protection according to the present invention.

도 7 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 다른 중앙지지구를 나타낸 사시도.Figure 7 is a perspective view showing another central support of the wire block for slope reinforcement and protection according to the present invention.

도 8a 은 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 8a is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention.

도 8b 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 8b is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention.

도 8c 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 8c is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention.

도 8d 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 8d is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention.

도 8e 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도.Figure 8e is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention.

도 9 은 본 고안에 따른 사면 보강 및 보호용 와이어블록을 낙석방지망에 설치한 상태를 나타낸 사시도.Figure 9 is a perspective view showing a state in which the wire reinforcement and protection wire block installed on the rockfall prevention net according to the present invention.

도 10 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 연결부재를 나타낸 사시도.Figure 10 is a perspective view showing a connecting member of the wire block for slope reinforcement and protection according to the present invention.

*도면의 주요 부분의 부호의 설명*Explanation of symbols of main part of drawing

10 : 사면 11 : 그라우팅공10: slope 11: grouting ball

110 : 와이어블록 111 : 중앙지지구110: wire block 111: center support

111a : 지지공 112 : 와이어111a: support hole 112: wire

113 : 아이볼트 113a : 지지공113: eye bolt 113a: support ball

114 : 몰딩부 115 : 걸림핀114: molding 115: locking pin

120 : 연결부재 121 : 나사공120 connection member 121 screw hole

122 : 체결공 123 : 지지공122: fastening hole 123: support hole

130 : 네일 140 : 그라우팅130: Nail 140: Grouting

150 : 낙석방지망150: Rockfall Protection Net

이러한 목적을 달성하기 위하여 본 고안의 사면 보강 및 보호용 와이어블록은 수직으로 지지공을 형성한 중앙지지구와, 상기 중앙지지구를 중심으로 결합된 다양한 형상의 와이어와, 상기 와이어의 외곽에 끼워져 위치하는 아이볼트로 구성함을 그 기술적 구성상의 기본 특징으로 한다.Slope reinforcement and protection wire block of the present invention to achieve this purpose is a central support that forms a vertical support hole, wires of various shapes coupled around the central support, and the eye is fitted to the outside of the wire The construction of bolts is a basic feature of its technical construction.

위와 같이 구성된 본 고안의 바람직한 실시 예를 첨부된 도면을 참조하면서 상세히 설명하면 다음과 같다.When described in detail with reference to the accompanying drawings a preferred embodiment of the present invention configured as described above are as follows.

도 1 은 본 고안에 따른 사면 보강 및 보호용 와이어블록을 설치한 상태를 나타낸 전체 사시도이고, 도 2 는 본 고안에 따른 사면 보강 및 보호용 와이어블록을 나타낸 정면도이며, 도 3 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 네일 설치부분을 상세하게 나타낸 단면도이고, 도 4 는 본 고안에 따른 사면 보강 및 보호용 와이어블록의 연결상태를 나타낸 상세도이며, 도 5 는 본 고안에 따른 사면 보강 및 보호용 와이어블록의 와이어 연결상태를 나타낸 개략도이고, 도 6 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 중앙지지구를 나타낸 사시도이며, 도 7 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 다른 중앙지지구를 나타낸 사시도이고, 도 8a 은 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도이며, 도 8b 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도이고, 도 8c 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도이며, 도 8d 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도이고, 도 8e 는 본 고안에 따른 다른 형상의 사면 보강 및 보호용 와이어블록을 나타낸 정면도이며, 도 9 은 본 고안에 따른 사면 보강 및 보호용 와이어블록을 낙석방지망에 설치한 상태를 나타낸 사시도이고, 도 10 은 본 고안에 따른 사면 보강 및 보호용 와이어블록의 연결부재를 나타낸 사시도이다.1 is an overall perspective view showing a state in which the wire reinforcement and protection wire block installed in accordance with the present invention, Figure 2 is a front view showing a wire reinforcement and protection wire slope according to the present invention, Figure 3 is a slope reinforcement according to the present invention And a cross-sectional view showing in detail the nail installation portion of the protective wire block, Figure 4 is a detailed view showing the connection state of the slope reinforcement and protection wire block according to the present invention, Figure 5 is a slope reinforcement and protection wire block according to the present invention Figure 6 is a schematic view showing a wire connection state of, Figure 6 is a perspective view showing a central support of the wire block for slope reinforcement and protection according to the present invention, Figure 7 is a perspective view showing another central support of the wire block for slope reinforcement and protection according to the present invention 8A is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention 8B is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention, and FIG. 8C is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention, and FIG. 4 is a front view showing a wire block for reinforcement and protection of another shape according to the present invention, Figure 8e is a front view showing a wire block for slope reinforcement and protection of another shape according to the present invention, Figure 9 is a wire reinforcement and protection wire block according to the present invention 10 is a perspective view showing a state installed in the rockfall prevention net, Figure 10 is a perspective view showing the connection member of the wire block for slope reinforcement and protection according to the present invention.

도1 내지 도10에 나타낸 바와 같이, 본 고안의 사면 보강 및 보호용 와이어블록(110)은 수직으로 지지공(111a)을 형성한 중앙지지구(111)와, 상기 중앙지지구(111)를 중심으로 결합된 다양한 형상의 와이어(112)와, 상기 와이어(112)의 외곽에 끼워져 위치하는 아이볼트(113)로 구성된다.As shown in Figures 1 to 10, the wire block 110 for slope reinforcement and protection of the present invention is coupled to the center support 111 and the center support 111 formed with a vertical support hole (111a) vertically Wire 112 having a variety of shapes, and the eye bolt 113 is inserted into the outer position of the wire 112.

상기 중앙지지구(111)는 원형 뿔이나 사각 뿔 형상으로 형성하되 그 형상을 제한하는 것은 아니다.The central support 111 is formed in the shape of a circular horn or a square horn, but the shape is not limited.

여기서 중앙지지구(111)의 지지공(111a)은 그라우팅을 의한 구멍으로 지지공(111a)을 통하여 그라우팅공(11)을 천공하고 네일(130)을 삽입하여 그라우팅(140)하도록 한 다음 노출되는 네일(130)의 단부를 중앙지지구(111)에 볼트링 등으로 결합시키도록 한다.Wherein the support hole (111a) of the central support 111 is a hole through the grouting to drill the grouting hole (11) through the support hole (111a) and insert the nail 130 to grout 140 and then exposed nail End portion 130 is to be coupled to the central support 111, such as bolt ring.

상기 와이어(112)는 한 가닥으로 형성함이 바람직하나 한 가닥 이상으로 형성하여도 무방하다.The wire 112 is preferably formed in one strand, but may be formed in one or more strands.

여기서 와이어(112)는 중앙지지구(111)의 성형할 때 몰딩하여 성형함이 바람직하다.Here, the wire 112 is preferably molded by molding when the center support 111 is molded.

그러나 중앙지지구(111)에 구멍을 뚫어 삽입하거나 걸림핀(115)등을 이용하여 형성시킬 수도 있다.However, it may be formed by inserting a hole in the central support 111 or by using a locking pin (115).

한편 와이어(112)는 상호 교차지점 등에 몰딩부(114)를 형성하여 와이어(112)가 임의의 일정 형상을 유지하도록 할 수 도 있다.On the other hand, the wire 112 may be formed by forming the molding portion 114, such as the intersection point, so that the wire 112 to maintain a certain shape.

나아가 와이어(112)는 중앙지지구(111)를 중심으로 상하나 좌우 또는 상하좌우로 대칭되게 형성하여 상호 연접되어 순차적으로 결합시킬 수 있도록 형성함이 바람직하다.Further, the wire 112 is preferably formed to be symmetrically formed in the top, left, right, up, down, left and right about the center support 111 to be connected to each other sequentially.

상기 아이볼트(113)는 중앙지지구(111)와 와이어(112)를 성형할 때 미리 와이어(112)에 끼워 형성함이 바람직하다.The eye bolt 113 is preferably formed by sandwiching the wire 112 in advance when forming the central support 111 and the wire 112.

나아가, 아이볼트(113)의 와이어(112)가 삽입되는 지지공(113a)은 와이어(112)와 함께 몰딩함이 바람직하다.Furthermore, the support hole 113a into which the wire 112 of the eye bolt 113 is inserted is preferably molded together with the wire 112.

여기서 아이볼트(113)의 몰딩 후에도 지지공(113a)에 형성되게 하여 지지공(113a)을 통하여 상기와 같이 네일(130)을 지중에 그라우팅(140)으로 견고하게 고정시킨 다음 여기에 고정시켜 와이어(112)의 외곽 측을 지지하도록 함이 바람직하다.Here, even after molding the eye bolt 113, the support hole 113a is formed so that the nail 130 is firmly fixed to the ground by the grouting 140 as described above through the support hole 113a, and then fixed thereto. It is preferable to support the outer side of the (112).

그러나 아이볼트(113)의 대용으로는 후크 형상의 볼트 등을 사용할 수 도 있다.However, a hook-shaped bolt or the like may be used as an alternative to the eye bolt 113.

한편 아이볼트(113)는 상호 연접되는 다른 와이어블록(110)의 아이볼트(113)를 연결부재(120)로 연결하여 그 간격을 조절할 수 있도록 한다.Meanwhile, the eye bolt 113 is connected to the eye bolt 113 of the other wire block 110 to be connected to each other by the connecting member 120 to adjust the gap.

여기서 연결부재(120)는 좌우 단에 각각 회전방향이 다른 나사공(121)을 길이 방향으로 형성하고 중앙에 수직으로 상기와 같이 그라우팅(140)하여 네일(130)에 고정시킬 수 있도록 하는 지지공(123)을 형성하되 전후 방향으로 중앙 좌우에 체결공(122)을 형성하여 코너에서 4포인트의 아이볼트(113)를 결합시킬 수 있도록 할 수 도 있다.Here, the connection member 120 is a support hole for fixing the nail 130 by forming a screw hole 121 having a different rotational direction at the left and right ends in the longitudinal direction and grouting 140 as described above perpendicularly to the center. 123 may be formed, but a fastening hole 122 may be formed at the center left and right in the front-rear direction so that the four eye bolts 113 may be coupled at the corners.

또한 연결부재(120)는 일반적인 턴버클을 사용하여 상호 연결할 수 도 있다.In addition, the connection member 120 may be interconnected using a general turnbuckle.

이러한 본 고안의 작용을 설명하면 다음과 같다.Referring to the operation of the present invention is as follows.

먼저, 사면 또는 낙석방지망(150)이 설치된 지역에 와이어블록(110)을 순차적으로 연접되게 결합시킨다.First, the wire block 110 is sequentially coupled to the area where the slope or rockfall prevention net 150 is installed.

이때 최초 와이어블록(110)의 중앙지지구(111)에 형성된 지지공(111a)을 통하여 지중에 그라우팅(140)한 다음 네일(130)을 끼워 여기에 중앙지지구(111)를 고정시켜 세팅하고 다시 연결부재(120)로 다수개의 와이어블록(110)을 연접되게 연결한다.At this time, through the support hole (111a) formed in the center support 111 of the wire block 110, grouting 140 in the ground and then nail (130) to fix the center support 111 set here, and then connected again A plurality of wire blocks 110 are connected to each other by the member 120.

상기 연결작업이 완료되면 지형의 굴곡이나 지질의 특성 등을 감안하여 중앙지지구(111)에 형성된 지지공(111a)이나 연결부재(120)의 지지공(123) 또는 아이볼트(113)의 지지공(113a)을 통하여 선택적으로 그라우팅(140)한 다음 노출되는 네일(130)의 단부에 각각의 지지공(111a,123,113a)을 끼워 볼트링 등으로 견고하게 결합한다.When the connection is completed, the support hole of the support hole 111a or the connection member 120 of the support hole 111a or the connection member 120 formed in the central support 111 in consideration of the characteristics of the terrain, the curve of the geology, etc. After selectively grouting 140 through 113a, the support holes 111a, 123, and 113a are fitted to end portions of the exposed nails 130, and are firmly coupled with bolt rings and the like.

이러한 상태에서 그라우팅(140)이 완전히 경화되면 연결부재(120)를 더욱 조여 와이어블록(110)과 와이어블록(110)이 최대한 당겨지도록 한다.In this state, when the grouting 140 is completely cured, the wire block 110 and the wire block 110 are pulled as much as possible by further tightening the connection member 120.

따라서 조립된 와이어블록(110)은 지면에 완전하게 밀착하게 되고 이로 인하여 사면이 견고하게 보강된다.Therefore, the assembled wire block 110 is completely in close contact with the ground, and thereby the slope is firmly reinforced.

한편, 이러한 본 고안의 와이어블록(110)은 낙석지역에 낙석방지망(150)을 설치한 후 가로 세로로 상호 교차시키는 와이어로프 대용으로 낙석방지망(150)의 표면에서 사면에 설치하는 경우, 사면이 크게 보강되고 와이어블록(110)이 낙석 면에 견고하게 밀착되므로 낙석방지효과를 극대화시킬 수 있다.On the other hand, the wire block 110 of the present invention is installed on the slope from the surface of the rockfall prevention net 150 in place of the wire rope cross each other horizontally and vertically after installing the rockfall prevention net 150 in the rockfall area, the slope is Since it is greatly reinforced and the wire block 110 is firmly adhered to the rockfall surface, it is possible to maximize the rockfall prevention effect.

또한 조립되어 설치된 와이어블록(110)의 부분적인 분리 및 재조립이 가능하여 지반의 붕괴 징후나 낙석의 징후 또는 일부에서 초기 붕괴가 발생되는 경우 이들 부분을 분리하고 재조립하여 그라우팅(140)함으로써 안전사고를 미연에 방지할 수 있을 뿐만 아니라 시공이 간편하고 공사기간을 단축시킬 수 있다.In addition, partial separation and reassembly of the assembled and installed wire block 110 is possible, so that when the initial collapse occurs in the signs of ground collapse or signs of falling or part of these parts by separating and reassembling and grouting (140) safety Not only can the accident be prevented in advance, but the construction is simple and the construction period can be shortened.

이상에서 살펴본 바와 같이, 본 고안의 사면 보강 및 보호용 와이어블록(110)은 수직으로 지지공(111a)을 형성한 중앙지지구(111)와, 상기 중앙지지구(111)를 중심으로 결합된 다양한 형상의 와이어(112)와, 상기 와이어(112)의 외곽 측에 끼워져 위치하는 아이볼트(113)로 구성하므로 도로 측방 등에 위치한 사면을 견고하게 보강, 보호하여 그 지지력을 극대화할 뿐만 아니라 사면에서 강한 압력이 상승하더라도 붕괴되는 것을 최소화하고 신속하게 복구할 수 있도록 하며 부분 붕괴 또는 붕괴 초기 현상이 발생되면 이들 부분을 분리하여 견고하게 재조립하거나 새로운 와이어블록과 교체하여 견고하게 재조립하므로 붕괴 징후 또는 부분 붕괴시 신속하게 보강하여 이로 인한 사면 전체의 붕괴를 사전에 예방할 수 있고 와이어블록을 낙석방지망의 표면에 설치하여 낙석방지효과를 극대화시킬 수 있도록 하는 효과가 있다.As described above, the slope reinforcement and protection wire block 110 of the present invention has a central support 111 and a variety of shapes coupled to the center support 111 formed vertically with the support hole (111a) Since the wire 112 and the eye bolt 113 is inserted and positioned on the outer side of the wire 112, the slope is firmly reinforced and protected on the side of the road to maximize its supporting force and strong pressure on the slope. Even if it rises, it minimizes collapse and allows for rapid recovery, and if a partial collapse or initial collapse occurs, these parts can be separated and reassembled firmly or replaced with new wireblocks to reassemble firmly. Rapid reinforcement prevents the collapse of the entire slope in advance and wire blocks are installed on the surface of the rockfall protection net There is an effect that allows you to maximize the open rockfall protection.

Claims (8)

그라우팅(140) 후 네일(130)에 체결하기 위한 지지공(111a)을 수직으로 형성시킨 중앙지지구(111)와,After the grouting 140 and the central support 111 to form a vertical support hole 111a for fastening to the nail 130, 상기 중앙지지구(111)를 중심으로 다양한 형상으로 형성시킨 와이어(112)로 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.Slope reinforcement and protection wire block, characterized in that consisting of a wire 112 formed in a variety of shapes around the central support (111). 제 1 항에 있어서,The method of claim 1, 상기 와이어(112)의 외곽 측에 끼워 연접되는 와이어(112)를 연결하고 그라우팅(140) 후 네일(130)에 체결하기 위한 지지공(113a)을 형성시킨 아이볼트(113)를 포함하여 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.Consisting the wire 112 connected to the outer side of the wire 112, the eye bolt 113 is formed to form a support hole 113a for fastening to the nail 130 after the grouting (140) Slope reinforcement and protection wire block. 제 1 항에 있어서,The method of claim 1, 상기 와이어(112)는 한 가닥으로 형성하되 중앙지지구(111)의 성형할 때 몰딩하여 일체로 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.The wire 112 is formed of one strand, but when the molding of the central support 111, the slope reinforcement and protection wire block, characterized in that configured integrally by molding. 제 1 항에 있어서,The method of claim 1, 상기 중앙지지구(111)에 와이어(112) 삽입용 구멍 또는 걸림핀(115)을 형성시켜 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.Slope reinforcement and protection wire block, characterized in that formed by forming a hole (112) for inserting the wire (112) in the central support (111). 제 1 항 내지 제 4 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 4, 상기 와이어(112)는 상호 교차지점 등에 몰딩부(114)를 형성하여 와이어(112)가 임의의 일정 형상을 유지하도록 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.The wire 112 is a wire block for slope reinforcement and protection, characterized in that the molding portion 114 is formed to cross each other, such that the wire 112 is configured to maintain a certain shape. 제 1 항 내지 제 4 항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 4, 와이어(112)는 중앙지지구(111)를 중심으로 상하나 좌우 또는 상하좌우로 대칭되게 형성하여 상호 연접되어 순차적으로 결합시킬 수 있도록 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.Wire 112 is a wire block for slope reinforcement and protection, characterized in that the center support 111 is formed symmetrically in the top, left, right, up, down, left and right to be connected to each other in sequence. 제 2 항에 있어서,The method of claim 2, 상기 아이볼트(113)는 지지공(113a)과 와이어(112)를 몰딩하되 상호 연접되는 다른 와이어블록(110)의 아이볼트(113)를 연결하는 연결부재(120)를 포함하여 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.The eye bolt 113 is configured to include a connecting member 120 for molding the support hole 113a and the wire 112, but connecting the eye bolt 113 of the other wire block 110 to be connected to each other. Slope reinforcement and protection wire block. 제 7 항에 있어서,The method of claim 7, wherein 상기 연결부재(120)는 좌우 단에 각각 회전방향이 다른 나사공(121)을 길이 방향으로 형성하고, 중앙에는 수직으로 그라우팅(140)하여 네일(130)에 고정시킬 수 있도록 하는 지지공(123)을 형성하되 전후 방향으로 중앙 좌우에 체결공(122)을 형성하여 코너에서 4포인트의 아이볼트(113)를 결합시킬 수 있도록 구성한 것을 특징으로 하는 사면 보강 및 보호용 와이어블록.The connection member 120 is formed in the longitudinal direction of the screw hole 121, the rotation direction is different in each of the left and right ends, the support hole 123 to be fixed to the nail 130 by vertically grouting 140 in the center Slope reinforcement and protection wire block characterized in that configured to form a fastening hole 122 in the center left and right in the front and rear direction to form a four-point eye bolt 113 at the corner.
KR2020010033735U 2001-11-03 2001-11-03 Wire block for reinforcing and protecting the slope KR200263621Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010033735U KR200263621Y1 (en) 2001-11-03 2001-11-03 Wire block for reinforcing and protecting the slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010033735U KR200263621Y1 (en) 2001-11-03 2001-11-03 Wire block for reinforcing and protecting the slope

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0068368A Division KR100483964B1 (en) 2001-11-03 2001-11-03 Wire block for reinforcing and protecting the slope

Publications (1)

Publication Number Publication Date
KR200263621Y1 true KR200263621Y1 (en) 2002-02-09

Family

ID=73111585

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010033735U KR200263621Y1 (en) 2001-11-03 2001-11-03 Wire block for reinforcing and protecting the slope

Country Status (1)

Country Link
KR (1) KR200263621Y1 (en)

Similar Documents

Publication Publication Date Title
KR101633431B1 (en) Expandable bridge sidewalk and it's construction method
KR100483967B1 (en) Wire block for reinforcing and protecting the slope
KR100483964B1 (en) Wire block for reinforcing and protecting the slope
KR200263621Y1 (en) Wire block for reinforcing and protecting the slope
KR100529504B1 (en) Apparatus of fix wirerope for protecting falling rock using architecture
KR20060038266A (en) A method for one-body type slope protection and reinforcement
KR100451954B1 (en) Constructing method for reinforcing and protecting the slope using wire block
KR100405269B1 (en) Construction method for protecting and reinforcing falling rock of steep slope
KR100466491B1 (en) Rock bolt linking reinforcement equipment
KR100797185B1 (en) Construction method and the apparatus of a ground retaining structures or walls
KR100505154B1 (en) Merhod for protecting and reinforcing slopes
KR200270165Y1 (en) Wire block for reinforcing and protecting the slope
KR20020058928A (en) constructing method for protecting and enforcing the slope
KR100988994B1 (en) wall for prevention of earth and water from being collapsed
KR101489965B1 (en) Safety fences with easy maintenance
KR100566668B1 (en) Reinforcement structure for slope of road canal
KR100668692B1 (en) Jointing instrument for steel frame assembly
KR200376547Y1 (en) Sturcture for protecting and reinforcing slopes
JP3188436B2 (en) Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method
KR200370226Y1 (en) Falling rock prevention watch hweyn su prop
CN218540722U (en) Anti-collapse reinforcing device for foundation construction
KR200309072Y1 (en) Sturcture for protecting and reinforcing slopes
KR200281831Y1 (en) Rockfall prevention fence prefab
KR100520122B1 (en) Sturcture for protecting and reinforcing slopes
KR20060025972A (en) Falling rock prevention watch hweyn su prop

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20050126

Year of fee payment: 4

EXTG Extinguishment