KR200250692Y1 - Main Cable Support For Cable Way System - Google Patents

Main Cable Support For Cable Way System Download PDF

Info

Publication number
KR200250692Y1
KR200250692Y1 KR2020010022082U KR20010022082U KR200250692Y1 KR 200250692 Y1 KR200250692 Y1 KR 200250692Y1 KR 2020010022082 U KR2020010022082 U KR 2020010022082U KR 20010022082 U KR20010022082 U KR 20010022082U KR 200250692 Y1 KR200250692 Y1 KR 200250692Y1
Authority
KR
South Korea
Prior art keywords
construction
mountain
work
support
wire
Prior art date
Application number
KR2020010022082U
Other languages
Korean (ko)
Inventor
이재흥
Original Assignee
이재흥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이재흥 filed Critical 이재흥
Priority to KR2020010022082U priority Critical patent/KR200250692Y1/en
Application granted granted Critical
Publication of KR200250692Y1 publication Critical patent/KR200250692Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 산악지의 건설현장(송전철탑등)에서 자연과 산림을 보호하고 환경훼손을 최소화시키기 위하여, 건설자재를 운반하기 위한 진입로공사를 하지않고 각종 건설장비 및 자재를 운반하고자 삭도를 설치함에 있어 산정상 및 산하부에 간편히 설치할수있는 자재운반삭도용 와이어받힘대에 관한 것이다.In order to protect nature and forests and minimize environmental damage at construction sites (transmission towers, etc.) of mountainous lands, the present invention is to install cableway to transport various construction equipments and materials without carrying out ramps for construction materials. The present invention relates to a wire carrier for material handling cutting which can be easily installed on the top and the bottom of the mountain.

이러한 본 고안은 산 정상 높은 곳에 임시 설치되는 자재운송삭도용 지주를 운반·조립·해체가 단순하고 편리하도록 단위 객체로 구성하되 전체구성은 사다리꼴을 이루도록 하여 고하중에 견딜수 있도록 하며 모든 조립·해체작업을 별도 가설작업대를 이용한 고공에서 실시하지 않고 지면에서 실시하게 함으로써 작업 안정성 및 공정단순화로 공사원가절감 및 공사품질을 확보 할 수 있게된다This design consists of unit objects for simple, convenient transportation, assembling and dismantling of the transportation material assembly, which is temporarily installed on the top of the mountain, but the entire structure is trapezoidal to withstand high loads and all assembly and dismantling work is performed. It is possible to secure the cost of construction and ensure the quality of construction through the stability of the work and the simplification of the process by performing it on the ground instead of high altitude using a separate temporary work bench.

Description

와이어받힘대{Main Cable Support For Cable Way System}Wire Support Stand {Main Cable Support For Cable Way System}

본 고안은 산악지의 건설현장(송전철탑등)에서 자연과 산림을 보호하고 환경훼손을 최소화시키기 위하여, 진입로공사를 하지않고 각종 건설장비 및 자재를 운반하고자 삭도를 설치함에 있어 산 정상 및 산 하부에 간편히 설치할 수 있는 자재운반삭도용 와이어받힘대에 관한 것이다.In order to protect nature and forests and minimize environmental damage in construction sites (transmission towers, etc.) of mountainous lands, the present invention is designed to transport various construction equipment and materials without road access and to install mountain roads at the top and bottom of mountains. The present invention relates to a wire carrier for material handling cutting which can be easily installed.

일반적인 케이블카 및 리프터등은 영구 시설물로서 견고히 고정 설치 되어야하나 진입로 대체용 자재운반삭도는 건설 현장에서 최단시간내 설치하여 포크레인등 건설장비 및 콘크리트등 자재를 운반한 후 최단시간내 해체·이동설치 하여야하나, 지금까지의 와이어받힘대는 5톤 이상의 중장비를 산비탈 수목의 손상없이 높이 들어 운반할 수 있는 강도를 유지할 수 있도록 Truss나 철구조물로 제작되어 규모가 크고 방대하였고,General cable car and lifter should be fixed and installed as a permanent facility, but the material transportation work for substitute driveway should be installed in the shortest time at the construction site, and then dismantled and moved in the shortest time after transporting construction equipment such as fork lane and concrete. Until now, the wire supporter has been made of truss or steel structure to maintain the strength to carry the heavy equipment of 5 tons or more without damage to the hillside trees.

와이어받힘대를 설치하기 위해서는 주변에 가설작업대를 넓고 높게 설치하고 와이어받힘대 구조물을 산 정상 현장에서 하나하나 인력에 의한 조립·설치를 하고있어 많은 인력과 시간이 투자되고 산 정상에 설치된 가설작업대 위에서 간단한 수공구만을 사용하여 시공함으로써 고공에서 행하는 작업 특성상 안전사고 위험 및 공사기간증가, 공사비증대 등으로 공사품질 확보가 어렵고 주변 산림훼손 또한 많은 것이 현실이었다.In order to install the wire restraint, the temporary work bench is installed high and high, and the wire restraint structure is assembled and installed one by one at the top of the mountain, which requires a lot of manpower and time. The construction using only simple hand tools makes it difficult to secure construction quality due to the risk of safety accidents, the increase of construction period, and the increase of construction cost due to the nature of the work done at high altitudes.

본 고안은 산 하부에서 산 정상까지 산비탈의 수목위로 삭도용 케이블을 설치하고자 와이어받힘대를 설치할 때,The present invention, when installing the wire support to install the cable for cableway on the mountain slope from the bottom of the mountain to the top of the mountain,

지주는 설치 해체가 용이하게 조립식으로 제작하고 설치 작업은 별도 설치된 가설작업대를 이용한 고공에서의 작업이 아닌 지면 위에서 실시케 하여 작업 안전성을 높여 작업능률 향상, 공사기간단축, 공사원가절감 등을 통한 공사품질확보에 기여할 수 있게 함을 목적으로 한다.The landlord can easily dismantle the installation, and the installation work can be carried out on the ground rather than at the high altitude using a temporary workbench installed separately to increase work safety, thereby improving work efficiency, shortening construction period, and reducing construction cost. It aims to be able to contribute to quality assurance.

이를 위한 본 고안은 삭도 설치시 산 정상에 높이 설치되는 와이어받힘대의 모든 부분을 분해, 조립이 되도록 설계·제작하고 모든 조립·분해 작업을 가설작업대를 설치하지 않고 지면에서 실시할 수 있도록 하였으며,In order to solve this problem, the present invention was designed and manufactured to disassemble and assemble all parts of the wire support that are installed at the top of the mountain when the cableway is installed, and all assembly and disassembly work can be performed on the ground without installing the temporary work platform.

모든 구조물의 경량화 및 단순화를 통한 운반·조립·설치·해체의 신속성을 실현하고,Realize the speed of transportation, assembly, installation and disassembly by lightening and simplifying all structures.

포크레인등 건설장비를 운반할 때 작용하중에 최대 안정성을 확보하고자 와이어받힘대의 주요부재는 수직하중에 대한 단면성능이 뛰어난 파이프를 사용하며 전체 구조를 사다리꼴을 이루도록 함으로서 고강도·경량화를 실현하여 작업편의성 및 안전을 극대화시키고 공정 단순화를 통한 공사원가절감을 실현하고자 하는 것이다.In order to ensure maximum stability of the working load when transporting construction equipment such as fork-lane, the main member of the wire supporter uses pipe with excellent cross-sectional performance against vertical load, and makes the entire structure trapezoidal to realize high-strength and light weight. The goal is to maximize safety and reduce construction costs by simplifying the process.

도 1은 종래 삭도지주 설치의 일실시도1 is a view showing the installation of conventional cable holders

도 2는 본 고안 와이어고정대의 사시도Figure 2 is a perspective view of the subject innovation wire holder

도 3은 본 고안 와이어고정대의 종단면도Figure 3 is a longitudinal cross-sectional view of the subject innovation wire holder

도 4는 본 고안 와이어고정대의 조립설치도Figure 4 is an assembly installation of the present invention wire fixture

도 5는 본 고안 와이어받힘대를 이용한 삭도 설치도5 is a cableway installation using the present invention wire support

[도면의 주요 부분에 대한 설명][Description of main part of drawing]

1. 하부체 2. 지지대1. Underbody 2. Support

3. 지주 5. 상부거더3. Shore 5. Upper girder

6. 고정핀 7. 브라켓6. Fixing pin 7. Bracket

13. 힌지핀13. Hinge pin

본 고안의 구성은 산 정상에 설치되는 삭도용 와이어받힘대에 관한 것으로 가장 특징적인 구성은 최대한 힘을 균형있게 받을 수 있는 사다리꼴 구조로 설치하되 각 부분은 별도설치된 가설작업대 없이 지면에서 조립 및 해체가 가능토록 하여 산악지의 건설현장에서 공사위험성을 최소화하고 작업 안정성을 극대화하여 공사 원가 절감 및 이를 통한 공사품질 확보를 위한 것이다.The design of the present invention is related to the wire support rack for the cableway installed on the top of the mountain. The most characteristic configuration is the trapezoidal structure that can receive the maximum balance of power, but each part can be assembled and dismantled on the ground without a separate work bench By minimizing construction risks and maximizing work stability in the construction sites of mountainous lands, it is possible to reduce construction costs and secure construction quality.

이러한 본 고안은 지주 하부체(1)의 일부를 산 정상 땅에 묻고, 서로 마주보게 설치된 2개의 하부체(1)는 지지대(2)로 상호 고정하여 유동이 없도록 하고, 좌·우 지주(3)는 다단식으로 필요한 높이만큼 설치하고 지주(3) 측면에는 작업발판(4)을 일정간격으로 외삽 설치하여 작업 원의 이동이 쉽도록 하며, 상부거더(5)는 좌·우 지주(3)와 고정핀(6)으로 고정케 하여 조립해체가 쉽도록 하고 좌·우 지주(3)간의 비틀림이 발생하여 좌·우 지주(3)와 상부거더(5)의 조립이 어려울 때는 조립각도 조정을 할 수 있도록 브라켓(7)에 장방형의 구멍(8)을 가공하여 지주(3)와 조립체결하고 상부거더(5) 하부에는 삭도용 와이어로프(9) 받힘용 도르래(10)를 설치한다.The present invention buried a part of the support lower body (1) to the top of the mountain, and the two lower bodies (1) installed to face each other is fixed to each other with a support (2) so that there is no flow, left and right support (3 ) Is installed in multi-stage as necessary height and extrapolation of the working footrest (4) on the side of the support (3) at regular intervals to facilitate the movement of the worker, the upper girder (5) and the left and right support (3) It is easy to disassemble by fixing with the fixing pin (6). When twisting between left and right struts (3) occurs, it is difficult to assemble the left and right struts (3) and the upper girder (5). The rectangular hole 8 is processed in the bracket 7 so as to be assembled with the support 3, and the pulley 10 for receiving the wire rope 9 for drawing is installed in the lower part of the upper girder 5.

상기 와이어받힘대는 최초 2개의 하부체(1)를 일정간격 땅을 파서 묻어 고정하고 2개의 하부체(1)는 지지대 (2)로 좌·우변형이 없도록 고정한 후,The wire support stand is fixed by burying the first two lower bodies (1) by burying the ground at regular intervals, and fixed the two lower bodies (1) so that there is no left and right deformation with the support (2)

힌지핀(13)으로 연결된 좌·우 지주(3)를 지면에 눕혀 설치에 필요한 높이만큼 다단으로 조립한 후,After assembling the left and right struts (3) connected by the hinge pins (13) to the ground and multistage as necessary for the installation,

지주(3) 상부를 로프 고정하여 당겨서 힌지핀(13)을 중심으로 세워·고정하고 상부거더(5)를 조립하되,Pull and fix the upper part of the support (3) by the rope to stand and fix it around the hinge pin (13), and assemble the upper girder (5),

조립에 의한 누적오차 및 변형으로 좌·우 지주(3)의 각도가 틀어진 경우에는 상부거더(5)를 한쪽의 지주(3)에 고정핀(6)으로 고정한 후 다른 한편의 브라켓(7)의 장 방향 가공된 구멍(8)을 이용하여 지주(3)와의 조립각도를 조정한 후 볼트를 체결하여 고정하고 최초 고정된 반대쪽의 지주(3)와 고정핀(6)으로 고정하되 조립된 전체구조는 사다리꼴을 이루도록 하며 각각의 좌·우 지주(3) 상부에 설치된 고정구멍(12)에 각 방향으로 와이어로프를 지선 고정함으로써 견고히 설치 완료되는 것이다.If the angles of the left and right struts 3 are misaligned due to the cumulative errors and deformations caused by the assembly, the upper girders 5 are fixed to the one strut 3 with the fixing pin 6, and then the brackets 7 of the other After adjusting the assembling angle with the support (3) by using the longitudinally machined hole (8), fasten the bolts and fix them, and then fixed with the support (3) and the fixing pin (6) on the opposite side initially fixed, but assembled Is to form a trapezoid and is firmly installed by fixing the wire rope in each direction to the fixing hole 12 installed on each of the left and right struts (3).

본 고안은 산 정상 높은 곳에 임시 설치되는 자재운송삭도용 와이어받힘대를운반·조립 ·해체가 단순하고 편리하도록 단위 객체로 구성하되 전체구성은 사다리꼴을 이루도록 하여 중하중에 견딜 수 있도록 하며 모든 조립·해체작업을 가설작업대를 설치하지 않고 지상에서 실시하게 함으로써 작업 안정성 및 공정단순화로 공사원가절감 및 공사품질을 확보 할 수 있게되며 와이어받힘대 설치면적을 최소화함으로써 산림훼손을 최소화 할 수 있는 것이다.The present invention consists of unit objects for simple transportation and assembling and disassembly of the wire transport stand for material transportation, which is temporarily installed on the top of the mountain, but the entire structure is trapezoidal to withstand heavy loads. By doing the work on the ground without installing the temporary work bench, it is possible to secure the cost of construction and the quality of construction through the stability of the work and the simplification of the process, and minimize the damage to the forest by minimizing the installation area of the wire support stand.

Claims (2)

산 정상 높은 곳에 삭도 케이블을 고정하고자 설치되는 삭도설치공사용 와이어받힘대에 있어서,In the wire support stand of the cableway installation engineer, which is installed to fix the cableway cable at the top of the mountain, 와이어받힘대의 2개의 하부체(1)는 지지대(2)로 고정하고,The two lower bodies 1 of the wire support stand are fixed with the support stand 2, 하부체(1)는 좌·우 지주(3)와 힌지핀(13)으로 고정하며 지주(3)는 다단으로 조립 설치하되 지주(3) 측면에는 작업발판(4)을 일정간격으로 외삽 설치하고, 좌·우 지주(3)의 상부에는 브라켓(7)을 설치하여 상부거더(5)와 고정핀(6)으로 고정한 것을 특징으로 하는 삭도 공사용 와이어받힘대The lower body (1) is fixed with left and right struts (3) and hinge pins (13), and the struts (3) are assembled and installed in multiple stages, and extrapolating and installing the working scaffold (4) on the sides of the struts (3) at regular intervals. , The upper and left struts (3) of the bracket 7 is installed on the upper girder (5) and the fixing pin (6) fixed to the wire support stand 제1항에 있어서, 브라켓(7)은 지주(3)와의 조립구멍에 장방향의 구멍(8)을 형성하도록 한 것을 특징으로하는 삭도 공사용 와이어받힘대2. The wire receiving stand according to claim 1, wherein the bracket (7) forms a hole (8) in the longitudinal direction in an assembly hole with the support (3).
KR2020010022082U 2001-07-20 2001-07-20 Main Cable Support For Cable Way System KR200250692Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010022082U KR200250692Y1 (en) 2001-07-20 2001-07-20 Main Cable Support For Cable Way System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010022082U KR200250692Y1 (en) 2001-07-20 2001-07-20 Main Cable Support For Cable Way System

Publications (1)

Publication Number Publication Date
KR200250692Y1 true KR200250692Y1 (en) 2001-11-17

Family

ID=73067629

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010022082U KR200250692Y1 (en) 2001-07-20 2001-07-20 Main Cable Support For Cable Way System

Country Status (1)

Country Link
KR (1) KR200250692Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101156098B1 (en) 2011-02-21 2012-06-20 주식회사 한성에스엘씨 Variable construction method of aerial cableway and variable aerial cableway
KR101559667B1 (en) 2014-05-02 2015-11-13 주식회사 한성에스엘씨 Multi rope way
KR101764582B1 (en) * 2015-11-30 2017-08-10 주식회사 씨앤비엔지니어링 Cable tower constructing method for the cableway

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101156098B1 (en) 2011-02-21 2012-06-20 주식회사 한성에스엘씨 Variable construction method of aerial cableway and variable aerial cableway
KR101559667B1 (en) 2014-05-02 2015-11-13 주식회사 한성에스엘씨 Multi rope way
KR101764582B1 (en) * 2015-11-30 2017-08-10 주식회사 씨앤비엔지니어링 Cable tower constructing method for the cableway

Similar Documents

Publication Publication Date Title
US10329781B2 (en) Safety barrier netting system
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
US10801755B1 (en) Apparatuses and methods for simplified installation of solar panels
AU2020213393B2 (en) Beam system and method of erecting a supporting arch
CN103061506B (en) Construction method of steel structure dome
CN102734081B (en) Sheath assembles guiding piece
AU2016384294B2 (en) A bridging system
WO2013150172A1 (en) Bridge crane assembly and a method for installing the same
KR200250692Y1 (en) Main Cable Support For Cable Way System
CN204662501U (en) A kind of pass in and out immersed tube vertical occasional passage
CN215331283U (en) Combined splicing type liftable protective tower
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN210561738U (en) Assembled pier shaft construction protection system
KR200419382Y1 (en) Post assembly for inspecting cable way
CN110080115B (en) Assembled pier construction protection system
US20230323681A1 (en) Support element, support structure and related aspects
SU1416647A1 (en) Power transmission line support
CN219862413U (en) Overhead working platform suspended by bridge wet joints
KR200251215Y1 (en) Sub Support For Cable Way System
JP3100574B2 (en) Suspended scaffold and its erection method
CN104674848A (en) Vertical temporary passage for entering and exiting immersed tube and construction method of vertical temporary passage
KR100496319B1 (en) Quick Erected Modular Steel Tower
KR20000019677A (en) Steel structure work frame for quick assemblage and installation
KR20230108484A (en) Monorail system prefabricated on construction site
GB2432395A (en) Walkway structure for a building

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
LAPS Lapse due to unpaid annual fee
R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20100730

Year of fee payment: 10

EXPY Expiration of term