KR200234673Y1 - An fixing apparatus for PSC beam in bridge - Google Patents

An fixing apparatus for PSC beam in bridge Download PDF

Info

Publication number
KR200234673Y1
KR200234673Y1 KR2020010008054U KR20010008054U KR200234673Y1 KR 200234673 Y1 KR200234673 Y1 KR 200234673Y1 KR 2020010008054 U KR2020010008054 U KR 2020010008054U KR 20010008054 U KR20010008054 U KR 20010008054U KR 200234673 Y1 KR200234673 Y1 KR 200234673Y1
Authority
KR
South Korea
Prior art keywords
psc beam
rail
psc
movable pedestal
pedestal
Prior art date
Application number
KR2020010008054U
Other languages
Korean (ko)
Inventor
김동수
김우태
Original Assignee
주식회사 한국종합기술개발공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국종합기술개발공사 filed Critical 주식회사 한국종합기술개발공사
Priority to KR2020010008054U priority Critical patent/KR200234673Y1/en
Application granted granted Critical
Publication of KR200234673Y1 publication Critical patent/KR200234673Y1/en

Links

Abstract

본 고안은 교량 상판에 설치되는 PSC 빔을 레일을 이용하여 이동시키고 상판에 설치되어 있는 크레인을 이용하여 소정의 장소에 설치할 수 있도록 한 교량 상판의 PSC 빔 설치기구에 관한 것으로서, 교각 상부에 설치되는 레일(30), 상기 레일(30)이 교각(1)에 고정되도록 하는 '∪' 형태의 레일 고정틀(10), 상기 레일(30)을 따라 이동할 수 있고 상부에 소정의 기울기를 갖도록 형성된 PSC 빔 받침대(65)가 설치되어 있는 이동식 받침대(40), 상기 이동식 받침대(40)가 레일(30)을 따라 이동하도록 하는 유압 윈치(35a), 상기 이동식 받침대(40)에 의해 이동된 PSC 빔(3)을 들어올려 소정 장소에 위치시키는 PSC 빔 거치대(70)로 구성되는 것을 특징으로 한다.The present invention relates to a PSC beam installation mechanism of a bridge top plate which allows the PSC beam installed on the bridge top plate to be moved by a rail and installed at a predetermined place by using a crane installed on the top plate. Rail 30, rail fixing frame 10 of the '∪' shape to be fixed to the pier 1, PSC beam which can move along the rail 30 and has a predetermined slope on the top A movable pedestal 40 on which the pedestal 65 is installed, a hydraulic winch 35a for allowing the movable pedestal 40 to move along the rail 30, and a PSC beam 3 moved by the movable pedestal 40. It is characterized by consisting of the PSC beam cradle 70 to lift the position to a predetermined place.

Description

교량 상판의 PSC 빔 설치기구{An fixing apparatus for PSC beam in bridge}An fixing apparatus for PSC beam in bridge}

본 고안은 교량 상판의 빔 설치기구에 관한 것으로, 특히 교량 상판에 설치되는 PSC 빔을 레일을 이용하여 이동시키고 상판에 설치되어 있는 크레인을 이용하여 소정의 장소에 설치할 수 있도록 한 교량 상판의 PSC 빔 설치기구에 관한 것이다.The present invention relates to a beam mounting mechanism of a bridge deck, and in particular, a PSC beam of a bridge deck that can be installed in a predetermined place by moving a PSC beam installed on the bridge deck using a rail and using a crane installed on the deck. It relates to an installation mechanism.

교량 건설시 교량 상판에 설치되는 빔을 설치하기 위해서는 대형 크레인을 사용하는 것이 일반적이다.It is common to use large cranes in order to install beams installed on the bridge deck when building bridges.

도 1은 일반적인 PSC 빔 설치 방법을 나타내는 도면으로서, 교각(1) 상부의 상판의 필요 장소에 크레인(2)을 사용하여 빔(3)을 올려놓는 방식임을 알 수 있다.1 is a view showing a general PSC beam installation method, it can be seen that the method of placing the beam (3) using the crane (2) in the required place of the upper plate on the pier (1).

상기한 방식을 사용하여 PSC 빔을 설치할 경우, 크레인이 교각에 접근해야 한다. 특히 교각 상판의 여러 곳에 PSC 빔이 설치되므로 크레인의 이동 범위가 넓어져야 한다.When installing the PSC beam using the above method, the crane must approach the piers. In particular, since the PSC beam is installed in various places on the pier deck, the movement range of the crane should be widened.

이때 교각밑의 지반이 낮을 경우에는 토사를 매립하여 크레인이 접근할 수 있어야 하고, 지반이 높을 경우에는 흙깍기 작업을 하여야만 하므로, 교각 건설 비용이 상승하는 문제점이 있다.In this case, when the ground under the pier is low, the crane should be accessible by reclaiming the soil, and when the ground is high, the soil must be mowed, so that the construction cost of the pier increases.

본 고안은 상기한 문제점을 해결하기 위한 것으로서, 교각 상판에 레일을 설치하고 크레인을 이용하여 PSC 빔을 레일의 일측에 올려 놓은 상태에서 설치 장소로 PSC 빔을 이동시켜 설치하도록 한 교량 상판의 PSC 빔 설치기구를 제공한다.The present invention is to solve the above problems, PSC beam of the bridge top plate to install the rail on the pier top plate and installed by moving the PSC beam to the installation site with the PSC beam on one side of the rail using a crane Provide installation mechanism.

도 1은 일반적인 PSC 빔 설치 방법을 나타내는 도면.1 is a view showing a general PSC beam installation method.

도 2a는 본 고안에서 사용하는 레일 고정틀의 형태를 나타내는 사시도.Figure 2a is a perspective view showing the form of the rail fixing frame used in the present invention.

도 2b는 본 고안에서 사용하는 레일과 윈치의 형태를 나타내는 사시도.Figure 2b is a perspective view showing the shape of the rail and the winch used in the present invention.

도 2c는 본 고안에서 사용하는 이동식 받침대의 형태를 나타내는 사시도.Figure 2c is a perspective view showing the shape of the movable pedestal used in the present invention.

도 2d는 본 고안에서 사용하는 PSC 빔 거치대의 형태를 나타내는 사시도.Figure 2d is a perspective view showing the shape of the PSC beam holder used in the present invention.

도 3은 본 고안에 따른 교량 상판의 PSC 빔 설치기구의 사용 상태도.Figure 3 is a state of use of the PSC beam installation mechanism of the bridge deck according to the present invention.

< 도면의 주요부분에 대한 부호의 간단한 설명 ><Brief description of symbols for the main parts of the drawings>

10 : 레일 고정틀 20 : 분리대 커버10: rail fixing frame 20: separator cover

30 : 레일 40 : 이동식 받침대30: rail 40: movable base

70 : PSC 빔 거치대70: PSC beam holder

이하, 첨부 도면을 참조하여 본 고안의 구성과 작동 상태를 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operating state of the present invention.

도 3은 본 고안에 따른 교량 상판의 PSC 빔 설치기구의 사용 상태도로서, 교각 상부에 설치되는 레일(30), 상기 레일(30)이 교각(1)에 고정되도록 하는 '∪'형태의 레일 고정틀(10), 상기 레일(30)을 따라 이동할 수 있고 상부에 소정의 기울기를 갖도록 형성된 PSC 빔 받침대(65)가 설치되어 있는 이동식 받침대(40), 상기 이동식 받침대(40)가 레일(30)을 따라 이동하도록 하는 유압 윈치(35a), 상기 이동식 받침대(40)에 의해 이동된 PSC 빔(3)을 들어올려 소정 장소에 위치시키는 PSC 빔 거치대(70)로 구성되어 있음을 도시하고 있다.3 is a diagram showing a state of use of the PSC beam installation mechanism of the bridge top plate according to the present invention, the rail 30 is installed on the top of the bridge, the rail 30 is a '∪' type rail fixing frame to be fixed to the bridge (1) (10), the movable pedestal 40, which is movable along the rail 30 and has a PSC beam pedestal 65 formed to have a predetermined slope thereon, and the movable pedestal 40 supports the rail 30. The hydraulic winch 35a to move along, and the PSC beam stand 70 which lifts the PSC beam 3 moved by the said movable stand 40, and places it in the predetermined place are shown.

도면을 참조하여 본 고안을 설명하면 다음과 같다.Hereinafter, the present invention will be described with reference to the drawings.

우선 교각(1)의 상부에 레일(30)을 설치한다. 레일(30)의 일측에는 유압 윈치(35a)가 같이 설치되어 있다. 이때 레일(30)과 유압 윈치(35a)의 형태가 도 2b에 도시되어 있다.First, the rail 30 is installed in the upper part of the pier 1. One side of the rail 30 is provided with a hydraulic winch 35a. At this time, the form of the rail 30 and the hydraulic winch 35a is shown in Figure 2b.

레일(30)이 설치된 후, 도 2a에 도시되어 있는 바와 같은 '∪' 형태의 레일 고정틀(10)을 교각(1)의 양단 하부에서 끼워 넣고 앙카 볼트를 사용하여 교각에 고정되도록 한다. 또한, 레일 고정틀(10)의 양단에는 볼트가 형성되어 있어, 레일 고정틀(10)이 교각과 고정된 후, 고정 블록(20)을 레일 고정틀(10)에 끼워 넣어 레일 고정틀(10)과 레일(30)이 볼트 고정되도록 한다.After the rail 30 is installed, the rail fixing frame 10 having a '∪' shape as shown in FIG. 2A is inserted at both ends of the piers 1 and fixed to the piers using anchor bolts. In addition, bolts are formed at both ends of the rail fixing frame 10, and after the rail fixing frame 10 is fixed with the piers, the fixing block 20 is inserted into the rail fixing frame 10 so that the rail fixing frame 10 and the rail ( 30) to be bolted.

레일(30)상에는 이동식 받침대(40)가 이동가능하게 설치된다. 이동식 받침대(40)의 상부에는 받침대에 PSC 빔(3)이 위치된 후, PSC 빔(3)을 지지하는 PSC 빔 받침대(65)가 다수개 설치되어 있고, PSC 빔(3)을 고정하는 전도 방지 와이어(55)도 다수개 설치된다. 또한, 이동식 받침대(40)의 일측단에는 윈치 와이어(35b)의 고리(35c)가 끼워질 수 있도록 고리(50)가 형성되어 있다.The movable pedestal 40 is installed on the rail 30 to be movable. After the PSC beam 3 is positioned on the pedestal, a plurality of PSC beam pedestals 65 supporting the PSC beam 3 are provided at the upper portion of the movable pedestal 40, and conduction for fixing the PSC beam 3 is performed. A plurality of prevention wires 55 are also provided. In addition, the hook 50 is formed at one side end of the movable pedestal 40 so that the hook 35c of the winch wire 35b can be fitted thereto.

크레인(2)에 의하여 들어올려진 PSC 빔(3)은 이동식 받침대(40)의 상부에 위치되고, 유압 윈치(35a)의 작동에 의해 이동식 받침대(40)가 소정 장소로 이동할 때에 PSC 빔 받침대(65)와 전도 방지 와이어(55)에 의해 PSC 빔(3)이 자세를 유지하도록 한다.The PSC beam 3 lifted by the crane 2 is located above the movable pedestal 40, and the PSC beam pedestal 65 when the movable pedestal 40 moves to a predetermined place by the operation of the hydraulic winch 35a. ) And the fall prevention wire 55 to keep the PSC beam 3 in a posture.

이동식 받침대(40)가 레일(30)을 이용하여 소정 장소까지 이동한 후에는 미리 설치되어 있는 PSC 빔 거치대(70)에 의해 이동되어진 PSC 빔(3)을 들어올리고 PSC 빔(3)을 필요한 위치에 설치되도록 한다.After the movable base 40 moves to a predetermined place using the rail 30, the PSC beam 3 moved by the PSC beam holder 70 installed in advance is lifted, and the PSC beam 3 is moved to a required position. To be installed on the

이때 PSC 빔 거치대(70)는 직육면체 형태로 구성되고 직육면체의 모서리에 해당하는 부분에 철재빔이 세워지고, 철재빔의 상부에도 각각 철재빔으로 연결되어 있다. 또한, PSC 빔 거치대(70)의 상부에는 PSC 빔(3)을 들어올릴 수 있는 체인 블록(75)이 설치되어 있다.At this time, the PSC beam holder 70 has a rectangular parallelepiped shape, and an iron beam is erected at a portion corresponding to an edge of the rectangular parallelepiped, and is connected to the upper portion of the iron beam by an iron beam, respectively. In addition, the upper portion of the PSC beam holder 70 is provided with a chain block 75 for lifting the PSC beam (3).

본 고안에 의한 교량 상판의 PSC 빔 설치기구를 사용할 경우, PSC 빔을 들어올리는 크레인(2)은 PSC 빔을 교각의 일측에 설치되어 있는 이동식 받침대(40)에 올려놓는 작업만을 하면 되므로, 크레인 접근을 위한 지반 공사가 축소된다.In the case of using the PSC beam installation mechanism of the bridge deck according to the present invention, the crane 2 for lifting the PSC beam only needs to place the PSC beam on the movable pedestal 40 installed on one side of the pier, thereby approaching the crane. Ground work for the project will be reduced.

상기와 같이 구성된 본 고안에 의하면, 크레인이 교각 상부에 설치된 PSC 빔 설치기구에 PSC 빔을 올려 놓으면 레일 상에서 필요한 장소로 PSC 빔을 이동시키므로, 교각 상부에 PSC 빔을 설치하기 위해 크레인의 접근을 위한 지반 공사를 하지 않아도 되어 공사비의 절감 효과를 얻을 수 있다.According to the present invention configured as described above, when the crane puts the PSC beam on the PSC beam installation mechanism installed on the top of the pier to move the PSC beam to the required place on the rail, for the access of the crane to install the PSC beam on the top of the pier There is no need for ground work, which can reduce the cost of construction work.

Claims (1)

교각 상부에 설치되는 레일(30), 상기 레일(30)이 교각(1)에 고정되도록 하는 '∪' 형태의 레일 고정틀(10), 상기 레일(30)을 따라 이동할 수 있고 상부에 소정의 기울기를 갖도록 형성된 PSC 빔 받침대(65)가 설치되어 있는 이동식 받침대(40), 상기 이동식 받침대(40)가 레일(30)을 따라 이동하도록 하는 유압 윈치(35a), 상기 이동식 받침대(40)에 의해 이동된 PSC 빔(3)을 들어올려 소정 장소에 위치시키는 PSC 빔 거치대(70)로 구성되는 것을 특징으로 하는 교량 상판의 PSC 빔 설치기구.Rail 30 is installed on the top of the pier, the rail fixed frame 10 of the '∪' shape to allow the rail 30 is fixed to the pier 1, can move along the rail 30 and a predetermined slope at the top A movable pedestal 40 having a PSC beam pedestal 65 formed to have a movable pedestal, a hydraulic winch 35a for allowing the movable pedestal 40 to move along the rail 30, and a movable pedestal 40. PSC beam mounting mechanism of the bridge deck, characterized in that consisting of a PSC beam cradle 70 for lifting the PSC beam (3) is located in a predetermined place.
KR2020010008054U 2001-03-23 2001-03-23 An fixing apparatus for PSC beam in bridge KR200234673Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010008054U KR200234673Y1 (en) 2001-03-23 2001-03-23 An fixing apparatus for PSC beam in bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010008054U KR200234673Y1 (en) 2001-03-23 2001-03-23 An fixing apparatus for PSC beam in bridge

Publications (1)

Publication Number Publication Date
KR200234673Y1 true KR200234673Y1 (en) 2001-10-08

Family

ID=73098250

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010008054U KR200234673Y1 (en) 2001-03-23 2001-03-23 An fixing apparatus for PSC beam in bridge

Country Status (1)

Country Link
KR (1) KR200234673Y1 (en)

Similar Documents

Publication Publication Date Title
JP2012012835A (en) Construction method of work floor for high altitude work
KR200234673Y1 (en) An fixing apparatus for PSC beam in bridge
JP5702640B2 (en) Bridge crane, bridge erection method, and bridge removal method
KR100627102B1 (en) Upper bridge structure construcion method with precast segment deck or box using a lifting traveller
KR101193470B1 (en) Bearing and constructing method for bridge
KR100402954B1 (en) Bridge seat system for pulling and preventing fall of bridge beam and installation method thereof
KR0163629B1 (en) Bridge deck dismembering method and its equipment
KR200363059Y1 (en) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
KR100348632B1 (en) Apparatus bridge beam using the opposite direction temporary construction bracket and thereof method
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
KR100283091B1 (en) Hook block structure used for crane
GB2495304A (en) Grillage installation apparatus and method
JP4310583B2 (en) Steel tower lifting device
KR200239870Y1 (en) A structure of placing P.S.C beam using a steel beam and rails
JP3471248B2 (en) Portal crane
JPH0878264A (en) Transformer iron core lifting method and its working device
KR102275469B1 (en) Temporary bents for a railway catenary and construction methods thereof
US3880293A (en) Apparatus for lifting and lateral shifting of heavy constructions
CN213867371U (en) A top pushes away handle device for lifting by crane case roof beam
KR200197363Y1 (en) Working automobile hangar facility for check and maintenance of bridges
KR200212376Y1 (en) Mold form moving facility of the cross beam construction work
KR200186872Y1 (en) A counterweight mounting device for a tower crane
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
KR200256842Y1 (en) A movable working pulley of bridge
KR20000061466A (en) Jacking Leg Elevating System

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T601 Decision to invalidate utility model after technical evaluation
LAPS Lapse due to unpaid annual fee