KR200192128Y1 - Pile joint tool - Google Patents

Pile joint tool Download PDF

Info

Publication number
KR200192128Y1
KR200192128Y1 KR2020000009370U KR20000009370U KR200192128Y1 KR 200192128 Y1 KR200192128 Y1 KR 200192128Y1 KR 2020000009370 U KR2020000009370 U KR 2020000009370U KR 20000009370 U KR20000009370 U KR 20000009370U KR 200192128 Y1 KR200192128 Y1 KR 200192128Y1
Authority
KR
South Korea
Prior art keywords
pile
file
ground
connector
work
Prior art date
Application number
KR2020000009370U
Other languages
Korean (ko)
Inventor
길덕기
Original Assignee
길덕기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 길덕기 filed Critical 길덕기
Priority to KR2020000009370U priority Critical patent/KR200192128Y1/en
Application granted granted Critical
Publication of KR200192128Y1 publication Critical patent/KR200192128Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 고안은 파일(pile) 연결구에 관한 것으로, 건축 토목 공사시 지반의 보강을 위해 지반에 삽입되는 파일의 시공에 있어서, 삽입되는 파일을 연속하여 지반에 매설할 때, 파일과 파일을 연결하는 연결구로 사용하는 것으로, 외통과 내통으로 구성되어 연결핀으로 연결된 연결구를 사용하여, 연결되는 파일을 간편하고 신속하게 연결할 수 있어, 작업시간의 단축되어 전체적인 작업의 공기를 단축하여 경제적인 이득과 함께, 양질의 지반보강 공사를 할 수 있도록 고안한 것이다.The present invention relates to a pile connector, in the construction of a file inserted into the ground for reinforcement of the ground during construction civil engineering, when the inserted file is continuously buried in the ground, the connection connecting the file and the file It is used as a sphere, and it is composed of outer and inner cylinders, and can be connected easily and quickly by using a connector connected with a connection pin, which shortens the working time and reduces the air of the whole work with economical benefits. It is designed to be a good ground reinforcement work.

Description

파일 연결구{pile joint tool}File joint {pile joint tool}

본 고안은 파일 연결구에 관한 것으로, 건축토목 공사에서 지반보강을 목적으로 하는 원형 파일(pile)을 연결하는데 사용하는 것으로, 파일과 파일의 연결을 편리하게 한 것이다.The present invention relates to a file connector, which is used to connect a circular pile (pile) for the purpose of reinforcing ground in construction civil engineering, and the connection between the file and the file is convenient.

종래에 토목이나 건축작업 현장에서 지반보강 공사나 기초를 의한 지정공사에 사용되는 원통형 철재파일의 사용에 있어서, 통상적으로 고층건물의 시공을 위해서는 건축될 건축물의 하중을 기초가 지지하기 위해, 기초가 시공될 지반이 기초의 하중을 감당할 수 있도록, 지반을 보강하는 작업을 하여, 건축물을 건설하게 되고, 특히 건축물이 건설될 지반이 연질 지반일 경우에는, 임으로 콘크리트나 철재로 된 지정을 지반에 박아서, 강제로 지반의 압력응력을 증가시켜 경질의 지반을 확보하여야 하므로, 상기의 지반보강 공사를 위해서 시간과 인력을 투자하여 지반을 보강하게 되고, 지반보강을 위해 사용되는 부재들에서 콘크리트 지정에 반해 사용이 편리하고, 시공의 편리성을 추구하기 위해서 해 사용되는 부재가 원통형 철재파일이 사용되고 있으며, 이러한 지반보강 공사를 위해서는 건축물의 하중을 감안하여 충분한 깊이로 지반의 여러곳에 박아서, 경질의 토양층이 형성된 곳이나 암반층이 형성된 곳까지 파일을 설치하여야 하는데, 기존에 공급되는 철재파일의 길이가 일정규격 정해진 표준(standard) 형태로 되어 있어, 현장 작업시 표준형태로 정해져 있는 파일의 길이보다 더 깊은 지반층에 파일을 박기위해서는, 박혀있는 파일의 상측으로 다른 파일을 연결하여 사용하여야 하는데, 이러한 형태의 길이가 긴 파일을 사용하기 위해서 파일을 연결하는 방법이, 두개의 파일의 일측끝이 접하도록 하여 연속된 파일중 상부에 위치한 파일의 상측끝을 건설장비로 타격하여, 연속하여 사용하지만, 두개의 파일이 접하는 면에 연결된 파일 상호간에 고정하여 주는 것이 없어, 작업자가 파일을 접합할 때 정확한 접합이 이루어 지기 어려우며, 또한 파일이 타격될 때에 충격으로 접하고 있는 파일의 면이 어긋나거나 하측에 위치한 파일에서 이탈하게 되어 양질의 지반보강 공사가 이루어지지 않는 문제점이 있으며, 이러한 문제점으로 인해 작업자가 타격되는 파일을 잡고 있는 경우가 많아, 파일 연결시 별도의 작업인력이 필요로 하고, 파일을 타격하는 강한 압력이 파일을 잡고 있는 작업자에게 압박을 가하므로 안전사고가 발생하는 요인이 되어, 이러한 문제점을 해결하기 위해, 연결되는 두개의 파일의 일측이 접하는 부분에 용접을 하는 방법으로 두개의 파일을 하나로 연결하지만, 이러한 용접작업을 위해서는 별도의 작업인력으로 용접공이 필요로 하며, 용접작업을 위해서 산소통과 용접기를 비롯한 여러 가지 용접 기자재를 필요로 하고, 또한 용접작업이 많은 시간과 고도의 기술을 요하는 작업이어서, 두개의 파일을 연결하는 작업공정이 어렵고 불편하여 많은작업시간의 소요와 인력의 낭비로 공기을 지연시키는 문제점으로 작용하고, 용접으로 연결된 파일의 재활용을 하기위해서도, 용접되어 붙어있는 파일을 절단해야 하는 번거로운 이중작업을 해야하는 불편함을 감당하여야 하고, 특히 이러한 작업이 지하현장이나, 작업자가 작업하기 분편한 여건에서 동일한 작업을 해야하는 경우에는, 용접 기자재의 운반과 파일의 접합에 따른 작업시간이 더 증가되므로, 작업의 지연으로 발생되는 공기의 연장으로 인한 경제적인 손실이 아주 크게 발생하는 문제점이 있었다.Background Art In the use of cylindrical steel piles that are conventionally used for ground reinforcement work or designation work based on foundations in civil engineering or construction work sites, the foundation is generally used to support the load of the building to be built for the construction of high-rise buildings. To reinforce the ground so that the ground to be built can bear the load of the foundation, the building will be constructed. Especially when the ground on which the building is to be constructed is a soft ground, concrete or steel designation will be embedded in the ground. In order to secure the hard ground by forcibly increasing the pressure stress of the ground, it is necessary to reinforce the ground by investing time and manpower for the above ground reinforcement work, and to designate concrete from the members used for the ground reinforcement. On the other hand, it is convenient to use and cylindrical steel pile is used for member used to pursue convenience of construction In addition, for such ground reinforcement work, piles should be installed in various places of the ground with sufficient depth in consideration of the load of the building, and the pile should be installed to the place where the hard soil layer or the rock layer is formed. Is a standard type, and in order to put the file on the ground layer deeper than the length of the file set in the standard form during field work, another file must be connected to the upper side of the embedded file. In order to use a long file of this type, the file connecting method uses one end of two piles in contact with the construction equipment by hitting the upper end of the pile located in the upper part of the continuous pile. There is no fixing between the files connected to the two file contact surfaces, so the worker can join the files. It is difficult to make accurate joints at the time, and when the pile is hit, the surface of the pile facing the impact is shifted or is separated from the pile located at the lower side, which prevents high quality ground reinforcement work. Many people are holding a file that is hit, and a separate workforce is required when connecting the file, and a strong pressure hitting the file puts pressure on the worker who is holding the file, causing a safety accident. In order to solve the problem, the two piles are connected to each other by welding one side of the two piles connected to each other, but for this welding work, a welder is required as a separate work man, for welding work Need various welding equipment including oxygen tank and welding machine, Since a welding work requires a lot of time and advanced technology, the process of connecting two files is difficult and inconvenient, which delays the air due to a lot of work time and waste of manpower. In order to recycle the metal, it is necessary to bear the inconvenience of the cumbersome duplication of cutting the welded file, especially if the work is to be carried out in the underground site or in an environment where the worker can work easily. Since the working time due to the transportation of welding equipment and the joining of the pile is further increased, there is a problem in that the economic loss due to the extension of the air caused by the delay of the work is very large.

본 고안은 상기와 같은 문제점을 감안하여, 일측이 접하는 두개의 파일을 용접하지 않고 연결할 수 있도록 외통과 내통으로 구성된 연결구에 연결핀을 형성하여 하나의 연결구로 사용할 수 있도록 하여, 외통은 파일의 외경에 접하고 내통은 파일의 내경이 접합되게 하여, 연결되는 두개의 파일이 이탈되지 않고 연속하여 사용할 수 있도록 한 것으로, 첨부된 도면에 의해 상세히 설명하면 다음과 같다.The present invention in view of the above problems, by forming a connecting pin to the connector consisting of the outer cylinder and the inner cylinder so that one side can be connected without welding the two piles to be used as one connector, the outer cylinder is the outer diameter of the pile The inner cylinder is in contact with the inner diameter of the file to be bonded, so that the two files to be connected can be used continuously without being separated, described in detail by the accompanying drawings as follows.

도1은 본 고안의 사시도1 is a perspective view of the present invention

도2는 본 고안의 결합 상태를 표시한 분리 사시도Figure 2 is an exploded perspective view showing a combined state of the present invention

도3은 본 고안의 사용 상태도3 is a state diagram used in the present invention

도4는 본 고안의 사용 상태도의 요부 단면도Figure 4 is a sectional view of the main part of the state diagram used in the present invention

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

1;외통 2;내통 3;파일 삽입구 4;연결핀 5;연결구1; outer cylinder 2; inner cylinder 3; file insertion port 4; connecting pin 5; connector

6,6';파일(pile) 7;연결핀 삽입구 8;지반6,6 '; pile 7; connection pin insert 8; ground

외통(1)의 내측으로 내통(2)을 형성하여 파일 삽입구(3)를 형성하고, 연결핀(4)으로 고정하여서 된 것이다.The inner cylinder 2 is formed inside the outer cylinder 1 to form the pile insertion hole 3, and is fixed by the connecting pin 4.

이와 같이 외통(1)과 내통(2)으로 구성된 본 고안 연결구(5)를 사용하기 위해서는, 파일(6)(6')의 양측으로 연결구(5)의 연결핀(3)이 삽입될 수 있도록, 연결핀(4)의 외경과 동일한 반원형으로 연결핀 삽입구(7)를 형성한 파일(6)(6')을 지반보강 공사의 파일(6)(6')로 사용하여, 도2와 같이 먼저 지반(8)에 박혀있는 하측 파일(6)의 끝에 연결구(5)의 외통(1)의 내경이 파일(6)의 외경에 접하고, 내통(2)의 외경이 파일(6)의 내경에 접합되도록 파일 삽입구(3)에 파일(5)을 삽입 고정하여, 연결구(5)의 연결핀(4) 절반이 박혀있는 하측 파일(6)의 연결핀 삽입구(7)에 삽입되록 하고, 박혀있는 하측 파일(6)에 연결할 타 파일(6')도 박혀있는 하측 파일(6)과 동일하게 연결구(5)와 접합될 수 있도록, 연결구(5)의 외통(1) 내경에 파일(6')의 외경이 접하고 내통(2)의 외경에 파일(6')의 내경이 접하도록 하여, 하측의 파일(6)의 연결로 절반이 개방되어 있는 연결구(5)의 연결핀(4)에 파일(6')의 연결핀 삽입구(7)가 삽입되게 연결하여, 파일(6)(6') 중간부에 위치한 연결구(5)가 연결핀(4)에 의해 파일(6)(6')에서 떨어지거나 분리되지 않고 고정된 상태로, 하측의 파일(6) 일측과 상측의 파일(6') 일측이 접하도록 연결되는 것이며, 상기와 같은 방법으로 연결구(5)로 파일(6)(6')을 연결하고, 통상의 방법으로 상측의 파일(6')을 타격하여 주면, 타격을 받은 상측의 파일(6')의 압력이, 파일(6)(6')의 연결핀 삽입구(7)를 제외한 면이 서로 접하고 있어, 상측 파일(6')의 압력이 하측 파일(6)로 직접 가해져, 하측의 파일(6)이 박히면서 상측의 파일(6')도 박히게 되는 것이며, 파일(6)(6')의 외경과 내경을 접하고 있는 연결구(5)는, 연결핀(4)으로 인해 파일(6)(6')이 받는 강한 압력에도 영향을 받지않고, 파일(6)(6')에 고정된 채로 연결구(5)의 기능을 가지는 것이며, 사용자가 요구하는 깊이로 파일(6)(6')을 박을 수 있는 것이다.In order to use the inventive connector 5 composed of the outer cylinder 1 and the inner cylinder 2 as described above, the connecting pin 3 of the connector 5 can be inserted into both sides of the pile 6, 6 ′. By using piles 6 and 6 'having the connecting pin insertion holes 7 formed in the same semicircular shape as the outer diameter of the connecting pins 4 as piles 6 and 6' of the ground reinforcement work, as shown in FIG. First, the inner diameter of the outer cylinder 1 of the connector 5 contacts the outer diameter of the pile 6 at the end of the lower pile 6 embedded in the ground 8, and the outer diameter of the inner cylinder 2 is connected to the inner diameter of the pile 6; The file 5 is inserted into and fixed to the file insertion hole 3 so as to be joined to be inserted into the connection pin insertion hole 7 of the lower file 6 in which the connection pin 4 half of the connector 5 is embedded. Pile 6 'in the inner diameter of the outer cylinder 1 of the connector 5 so that the other pile 6' to be connected to the lower pile 6 can be joined with the connector 5 in the same way as the lower pile 6 embedded therein. The outside diameter of the inner cylinder (2) is in contact with the inside diameter of the pile (6 ') The connection pin insertion hole 7 of the pile 6 'is inserted into the connecting pin 4 of the connector 5, which is half opened by the connection of the lower pile 6, so that the pile ( 6) (6 ') The connector 5 located in the middle part is fixed to the pile 6 without being separated or separated from the pile 6 or 6' by the connecting pin 4, and the one side and the upper side of the lower pile 6 are fixed. One side of the file (6 ') of the contact is to be connected, connect the file (6) 6' with the connector 5 in the same way as above, and hit the upper file (6 ') in the usual way In the main surface, the pressure of the upper pile 6 'hit by the upper surface is in contact with each other except the connection pin insertion opening 7 of the pile 6, 6', and the pressure of the upper pile 6 'is lower. Directly applied to (6), the lower pile (6) is studded, the upper pile (6 ') is also studded, and the connector (5) in contact with the outer diameter and the inner diameter of the pile (6) (6') is connected Pin (4) causes pile (6) (6 ') to receive Without being affected by pressure, it has the function of the connector 5 while being fixed to the pile 6, 6 ', and can drive the pile 6, 6' to the depth required by the user. .

이와 같은 본 고안은, 외통(1)과 내통(2)으로 형성된 연결구(5)로 파일(6)(6')을 연결하여 사용하므로, 파일(6)(6')이 접합을 간편하고 신속하여 작업시간이 단축되어, 파일(6)(6')의 연결을 위한 별도의 용접공이나 기타 용접기자재의 사용이 없이도, 파일(6)(6')을 연결하여 사용하므로, 전체적인 작업공기가 단축되고 인력이 감소되어, 이로 인한 경제적인 이득을 추구할 수 있는 것이다.The present invention as described above, because the pile (6) (6 ') is used by connecting the pile (5) formed by the outer cylinder (1) and the inner cylinder (2), the pile (6) (6') is easy and quick to join The working time is shortened so that the overall working air is shortened because the piles 6 and 6 'are connected and used without using a separate welder or other welding equipment for connecting the piles 6 and 6'. And manpower is reduced, which can lead to economic benefits.

Claims (1)

외통(1)의 내측으로 내통(2)을 형성하여 파일 삽입구(3)를 형성하고, 연결핀(4)으로 고정하여서 된 파일 연결구.A pile connector formed by forming an inner cylinder (2) to the inside of the outer cylinder (1) to form a pile insertion hole (3), and fixed with a connecting pin (4).
KR2020000009370U 2000-03-30 2000-03-30 Pile joint tool KR200192128Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000009370U KR200192128Y1 (en) 2000-03-30 2000-03-30 Pile joint tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000009370U KR200192128Y1 (en) 2000-03-30 2000-03-30 Pile joint tool

Publications (1)

Publication Number Publication Date
KR200192128Y1 true KR200192128Y1 (en) 2000-08-16

Family

ID=19650017

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000009370U KR200192128Y1 (en) 2000-03-30 2000-03-30 Pile joint tool

Country Status (1)

Country Link
KR (1) KR200192128Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230235523A1 (en) * 2015-05-11 2023-07-27 Pier Tech Systems, Llc Foundation support system shaft coupler fabrication and assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20230235523A1 (en) * 2015-05-11 2023-07-27 Pier Tech Systems, Llc Foundation support system shaft coupler fabrication and assembly

Similar Documents

Publication Publication Date Title
CA2682816A1 (en) Spiral steel pile
KR101714371B1 (en) Joints Appartus of The Concrete Piles and Steel Pipe
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
KR200192128Y1 (en) Pile joint tool
CN215669558U (en) Front-mounted inclined pile of foundation pit supporting system
JP6584042B1 (en) Steel pipe pile connection member
KR20020064819A (en) Socket type steel pipe pile and construction method for connecting thereof
JP3236541B2 (en) Joint method between knotted pile and steel pipe pile
KR102684324B1 (en) an auxilary pile for constructing PHC pile
JPS61250222A (en) Method and apparatus for connection of pile
JP4473400B2 (en) Foundation of construction and construction method
KR0140595Y1 (en) Concrete pile shoe having a cutting blade
JP3845297B2 (en) Structure of joint between column and beam
CN210857189U (en) Butt joint device for I-shaped steel in SMW construction method pile
JP2879726B2 (en) Pile head joint structure between ready-made concrete pile and foundation slab
JPH11256569A (en) Foundation pile structure and composite pile
JPH11158907A (en) Boom structure of working machine
CN213596965U (en) Prefabricated reinforced concrete soil nailing pile
JPH05132927A (en) Construction method of underground continuous wall
JPS62291317A (en) Quick construction of wide-width underground wall
JPH10311033A (en) Collared steel pipe pile and penetration method therefor
JP3755992B2 (en) Joint between joint pile and steel pipe pile
JP2004316207A (en) Structure for connecting earth retaining wall with floor slab, and construction method therefor
JPH07292858A (en) Structure for connecting pc member
JPH03199523A (en) Striking of steel sheet pile

Legal Events

Date Code Title Description
REGI Registration of establishment
T601 Decision on revocation of utility model registration
LAPS Lapse due to unpaid annual fee