KR200167417Y1 - Reinforcement pipe for cap of steel plate mold - Google Patents

Reinforcement pipe for cap of steel plate mold Download PDF

Info

Publication number
KR200167417Y1
KR200167417Y1 KR2019990015949U KR19990015949U KR200167417Y1 KR 200167417 Y1 KR200167417 Y1 KR 200167417Y1 KR 2019990015949 U KR2019990015949 U KR 2019990015949U KR 19990015949 U KR19990015949 U KR 19990015949U KR 200167417 Y1 KR200167417 Y1 KR 200167417Y1
Authority
KR
South Korea
Prior art keywords
formwork
pipe
reinforcing pipe
reinforcement
cap
Prior art date
Application number
KR2019990015949U
Other languages
Korean (ko)
Inventor
조태섭
Original Assignee
조태섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조태섭 filed Critical 조태섭
Priority to KR2019990015949U priority Critical patent/KR200167417Y1/en
Application granted granted Critical
Publication of KR200167417Y1 publication Critical patent/KR200167417Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3252Protections, e.g. cover, caps, against impaling on starter reinforcement bars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/06Forming boards or similar elements the form surface being of metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses
    • F16L55/115Caps

Abstract

본 고안은 철판 거푸집의 보강파이프용 캡에 관한 것으로서, 종래의 철판 거푸집은 보강파이프의 상하단이 모두 개봉되어 그 내부로 빗물이나 타설되는 콘크리트 등 이물질이 쉽게 들어가 부식되므로 녹물이 흘러서 외관이 보기 흉하게 변하는 등 수명이 짧은 문제점과 날카로운 보강파이프의 양단에 의해 작업인부들이 수시로 부상을 당하게 되는 문제점이 있다.The present invention relates to a cap for reinforcing pipe of a steel sheet formwork, the conventional iron sheet formwork is open and both the upper and lower ends of the reinforcing pipe is easily eroded into the foreign matter such as rainwater or concrete poured into the corrosion, so that the rust water flows unsightly appearance There is a problem that the laborers are often injured due to short lifespan and sharp ends of the reinforcement pipes.

따라서, 본고안은 철판 거푸집(101)의 보강파이프(104)양단에 끼워지도록 본체(100) 하부에는 밀폐부(110)를 형성하고, 상기 보강파이프(104)에 타이트하게 끼워지도록 밀폐부(110)의 외주면 사방에는 리브(114)를 돌출시키며, 상기 밀폐부(110)의 상면에는 상기 밀폐부(110)가 더이상 들어가지 않도록플랜지부(120)를 철판 거푸집의 보강파이프용 캡을 구성한 것으로서, 이러한 본 고안은 보강파이프의 양단으로 빗물이나 타설되는 콘크리트가 유입되는 것을 효과적으로 차단하므로 보강파이프가 부식됨을 방지하여 쉽게 녹슬지 않음에 따라 철판거푸집의 외관이 오랫동안 미려하게 유지되며, 거푸집의 설치 및 해체작업중 인부들이 보강파이프의 날카로운 끝단에 부딪혀 부상당하는 것을 효과적으로 방지할 수 있다.Therefore, the subject matter is to form a sealing portion 110 in the lower portion of the main body 100 to be fitted to both ends of the reinforcement pipe 104 of the iron sheet formwork 101, the sealing portion 110 to fit tightly to the reinforcement pipe (104). Rib 114 is projected on all four sides of the outer circumferential surface, and the flange 120 is configured on the upper surface of the sealing part 110 so that the sealing part 110 does not enter any more. The present invention effectively blocks rainwater or poured concrete from entering both ends of the reinforcing pipe, so that the reinforcing pipe is not easily rusted to prevent corrosion of the reinforcing pipe, so that the appearance of the iron sheet formwork remains beautiful for a long time, and during the installation and dismantling of the formwork. Workers can effectively prevent injury by hitting the sharp end of the reinforcement pipe.

Description

철판 거푸집의 보강파이프용 캡{Reinforcement pipe for cap of steel plate mold}Reinforcement pipe for cap of steel plate mold}

본 고안은 철판 거푸집의 보강파이프용 캡에 관한 것으로, 더욱 상세하게는 철판 거푸집을 지지하기 위해 철판 거푸집에 덧대는 보강파이프의 양측 개구부를 밀폐시켜서 날카로운 보강파이프의 양 단부로부터 작업자들을 보호하고, 빗물이나 이물질들이 보강파이프 내부로 유입되는 것을 방지하여 보강파이프의 내구성을 향상시키면서 외관을 미려하게 유지시키는 철판 거푸집의 보강파이프용 캡에 관한 것이다.The present invention relates to a cap for reinforcing pipe of a sheet metal formwork, more specifically, to protect the workers from both ends of the sharp reinforcing pipe by sealing the openings on both sides of the reinforcing pipe padded on the sheet metal formwork to support the sheet metal formwork, rainwater The present invention relates to a cap for reinforcing pipe of a steel sheet formwork, which prevents foreign substances from flowing into the reinforcing pipe and improves durability of the reinforcing pipe while maintaining a beautiful appearance.

일반적으로, 아파트나 일반주택은 말할 것도 없고 교량, 댐 등의 건설구조물을 시공하려면 먼저 설계된 시방대로 철골을 배치시키고 이 철골 외부로 여러 개의 패널을 연결하여 거푸집을 형성시키고 나서, 이 거푸집 사이에 콘크리트를 충진시켜 양생하는 과정을 거쳐 건축물의 기본 골격을 만든다. 그리고 이 기본 골격을 바탕으로 조적공사를 하고, 미장공사와 도장 및 인테리어공사를 하는 과정을 행하고 있다.In general, in order to construct a building structure such as a bridge or a dam, not to mention an apartment or a general house, the steel frame is first arranged according to the designed specification, and several panels are connected to the outside of the steel frame to form the formwork, and then the concrete is formed between the formwork. Through the process of filling and curing, the basic skeleton of the building is made. Based on this basic framework, masonry construction is carried out, and plastering, painting and interior construction are carried out.

이렇듯이 거푸집은 건축에 있어 초기단계에서 가장 중요한 것이고, 이 거푸집을 이루는 데에는 패널이 필수적이다. 이 패널은 예전에는 합판을 사용하여 한 쪽에는 긴 각목을 대어 뼈대를 이루고 다른 한 쪽에는 양생이 다 된 콘크리트로부터 잘 분리되도록 하기 위하여 기름칠을 하였다.As such, formwork is the most important in the early stages of construction, and panels are essential to this form. The panels were formerly plywood, oiled to ensure good separation from the hardened concrete on one side with a long piece of square wood on the other.

그런데, 이러한 목재 패널은 그 강도가 약하여 서너번 사용하다보면 합판이 파괴되고 또 뼈대로 설치한 각목이 쉽게 부러지며, 또한 빗물이나 지하수 등에 쉽게 썩기 때문에 건축용 부자재로서는 그 내구성이 좋지 못하여 이로인해 소요되는 공사비의 상승을 무시할 수가 없는 실정이다.However, these wood panels are weak in strength and used three or four times, so that the plywood is destroyed and the installed wood blocks are easily broken, and also easily rots in rainwater or groundwater. The rise of cannot be ignored.

따라서, 최근에는 철판을 이용한 새로운 거푸집 패널이 개발되어 많이 사용되고 있다. 이 새로운 철판 거푸집 패널은 일정 크기의 철판을 두고 그 한쪽면에 철판을 보강 지지하기 위하여 다수개의 직사각형 파이프를 일정한 간격으로 배치한 다음 용접 등의 수단으로 부착하여 사용하고 있다.Therefore, in recent years, a new formwork panel using an iron plate has been developed and used a lot. This new iron formwork panel is used by placing a plurality of rectangular pipes at regular intervals and then attaching them by means of welding or the like in order to reinforce and support the iron plate on one side with a certain size of iron plate.

이러한 철재 거푸집 패널은 강도가 강하여 상기한 종래의 목재 거푸집 패널이 갖고 있는 단점을 없애는 효과는 있으나, 철판을 지지하는 보강파이프의 양단이 모두 개봉된 상태에서 외부에 그대로 노출된 상태로 설치되는 것이기 때문에 아래와 같은 여러 가지 문제점이 있다.Such steel formwork panels are effective in eliminating the disadvantages of the conventional wooden formwork panels due to their high strength, but since both ends of the reinforcing pipes supporting the steel plates are installed as they are exposed to the outside as they are. There are several problems as follows.

첫째, 보강파이프의 상하단이 모두 개봉되어 있어서 그 내부로 콘크리트 충진시에 콘크리트나 이물질이 쉽게 들어가게 되고, 유입된 콘크리트가 그대로 양생되어 굳으면 거푸집의 무게가 상당히 나가게 되어 작업이 힘들게 되는 점과 쉽게 부식이 되는 결점이 있다.First, the upper and lower ends of the reinforcement pipe are opened so that the concrete or foreign matter easily enters when the concrete is filled into it. There is a drawback to this.

둘째, 거푸집으로 사용할 때나 또는 적재된 상태에서 빗물 등이 개방된 보강파이프의 내부로 스며들어 부식이 되면 녹물이 흘러 떨어져 외관이 보기 흉하게 변하는 등 불결해 지는 문제점이 있다.Second, when used as a formwork or when the rainwater in the loaded state penetrates into the open reinforcement pipe and is corroded, there is a problem that the rust water flows and the appearance becomes unsightly unsightly.

셋째, 거푸집 패널에 덧대기 위해 일정길이로 절단한 보강파이프의 양단이 날카로운 상태에 있기 때문에 작업인부가 거푸집의 설치 및 해체 작업중에 피부가 찢기는 부상을 입기 쉬우며, 이를 위해 절단된 보강파이프의 날카로운 양 단부를 일일이 그리인더로 갈아 연마하는 것은 거푸집 제작 때의 생산성을 상당히 떨어뜨려서 철판 거푸집의 생산원가를 상승시키게 되는 문제점이 되었다.Third, since both ends of the reinforcing pipe cut to a certain length to be added to the formwork panel are in a sharp state, the worker can easily injure the skin during the installation and dismantlement of the formwork. Grinding both ends with a grinder one by one reduces the productivity at the time of formwork, which leads to a problem of increasing the production cost of the sheet metal formwork.

본 고안은 상기와 같은 종래 철판 거푸집의 문제점을 해결하기 위한 것으로서, 본 고안의 목적은 철판 거푸집 패널을 지지하는 보강파이프의 양 단부를 밀폐시켜 빗물이나 타설되는 콘크리트 등의 유입을 막아 내구성을 향상시키면서 아울러 작업중인 작업인부가 날카로운 보강파이프의 양 단부에 의해 상처입는 것을 효과적으로 보호할 수 있는 철판 거푸집의 보강파이프용 캡을 제공하는데 있다.The present invention is to solve the problems of the conventional iron sheet formwork as described above, the purpose of the present invention is to seal the both ends of the reinforcing pipe supporting the iron sheet formwork panel to prevent rain or water poured into the concrete to improve durability In addition, it is to provide a cap for the reinforcement pipe of the iron sheet formwork that can effectively protect the working personnel injured by both ends of the sharp reinforcement pipe.

본 고안의 상기 목적은 거푸집용 철판의 한쪽면에 부착한 보강파이프들의 내부에 끼워지도록 본체 하부에는 밀폐부를 형성하고, 상기 보강파이프에 타이트하게 끼워지도록 그 밀폐부의 외주면 사방에는 리브를 돌출시키며, 상기 밀폐부의 상면에는 상기 밀폐부가 더 이상 들어가지 않도록 플랜지부를 형성하여 철판 거푸집의 보강파이프용 캡을 구성함으로써 달성되는 것이다.The object of the present invention is to form a sealing portion in the lower part of the main body to fit inside the reinforcing pipes attached to one side of the formwork iron plate, and to project the ribs on all four outer peripheral surfaces of the sealing portion to fit tightly to the reinforcing pipe, It is achieved by forming a flange on the upper surface of the sealing portion so that the sealing portion no longer enters to form a cap for the reinforcement pipe of the iron sheet formwork.

이러한 본 고안은 철판 거푸집 패널을 지지하는 보강파이프의 양단 개구부를 상기 캡이 밀폐시켜 주므로 철판 거푸집을 적재하였을 때나 거푸집으로 사용할 때 빗물 및 타설되는 콘크리트 등의 이물질 유입을 효과적으로 막을 수 있어 부식됨을 방지하므로 내구성이 상당히 향상되고, 날카로운 보강파이프의 양 단부가 상기 캡에 가려지므로 작업인부들이 보다 안전하게 작업할 수 있어 상기 목적을 효과적으로 달성할 수가 있다.Since the cap seals the openings at both ends of the reinforcing pipe supporting the sheet metal formwork panel, it can effectively prevent the inflow of foreign substances such as rainwater and poured concrete when loading the sheet metal formwork or when using the formwork to prevent corrosion. The durability is considerably improved, and both ends of the sharp reinforcing pipe are covered by the cap, so that the workers can work more safely and effectively achieve the above object.

도1은 본 고안의 캡을 철판 거푸집에 설치하는 상태를 일실시예로 예시한 사시도1 is a perspective view illustrating a state in which the cap of the present invention to the iron plate formwork in one embodiment

도2는 도1에 도시된 거푸집의 보강파이프에 캡이 결합된 상태를 도시한 단면도.Figure 2 is a cross-sectional view showing a state in which the cap is coupled to the reinforcement pipe of the formwork shown in FIG.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

100 : 캡 본체 101 : 철판 거푸집100: cap body 101: iron plate formwork

102 : 철판 패널 104 : 보강파이프102: iron plate panel 104: reinforcement pipe

110 : 밀폐부 120 : 플랜지부110: sealing part 120: flange part

114 : 리브114: rib

이하 본 고안의 목적을 효과적으로 달성할 수 있는 바람직한 실시예로서 그 기술 구성 및 작용을 첨부한 별첨의 도면에 의해 보다 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings, which are attached to the accompanying drawings, as a preferred embodiment to effectively achieve the object of the present invention.

도1은 본 고안의 캡을 철판 거푸집에 설치하는 상태를 일실시예로 예시한 사시도이고, 도2는 도1에 도시된 거푸집의 보강파이프에 캡이 결합된 상태를 도시한 단면도이다.1 is a perspective view illustrating an example of installing a cap of the present invention in a formwork form the iron plate, Figure 2 is a cross-sectional view showing a state in which the cap is coupled to the reinforcement pipe of the formwork shown in FIG.

이에 도시된 바와같이 본 고안은 거푸집용 철판 패널(102)을 지지하기 위하여 철판 패널(102)의 한쪽면에 다수의 보강파이프(104)를 설치하는 철판 거푸집(101)에 있어서, 상기 보강파이프(104)의 내부 형상과 상응하는 형상으로 된 밀폐부(110)와; 상기 밀폐부(110)의 외주면 사방에 돌출되어 보강파이프(104)의 양단 내부에 타이트하게 끼워지게 하는 리브(114)와; 상기 보강파이프(104)의 양단에 걸쳐져서 상기 밀폐부(110)가 더 이상 들어가지 않도록 하여 주는 플랜지부(120)로 본체(100)를 구성한 보강파이프용 캡을 특징으로 하는 것이다.As shown in the present invention, in the iron sheet formwork 101 having a plurality of reinforcing pipes 104 installed on one side of the iron plate panel 102 to support the formwork panel 102 for formwork, the reinforcement pipe ( A seal 110 having a shape corresponding to the inner shape of the 104; A rib 114 protruding from an outer circumferential surface of the sealing part 110 to tightly fit inside both ends of the reinforcing pipe 104; It is characterized by a cap for the reinforcing pipe that is formed across the both ends of the reinforcing pipe 104, the main body 100 by a flange portion 120 to prevent the sealing portion 110 from entering any more.

즉, 거푸집 패널의 보강파이프용 캡 본체(100)는 철판 거푸집(101)의 철판 패널(102)을 지지하는 보강파이프(104)의 양단부에 끼워지면서 보강파이프(104)의 내부를 밀폐시키는 것이다.That is, the cap body 100 for the reinforcement pipe of the formwork panel seals the inside of the reinforcement pipe 104 while being fitted to both ends of the reinforcement pipe 104 supporting the iron plate panel 102 of the iron formwork 101.

상기 밀폐부(110)는 상기 철골(104a)의 내부형상(105)과 상응하는 단면의 외부형상을 이루며, 그 외부면에 끼워지는 방향으로 길게 외부로 돌출된 리브(114)를 하나 또는 그 이상으로 형성하는 데, 본 실시예에서는 각 면에 두 개의 리브(114)를 형성한 것으로 도시하였다.The sealing unit 110 forms an outer shape of a cross section corresponding to the inner shape 105 of the steel frame 104a, and one or more ribs 114 protruding outwardly in a direction fitted to the outer surface thereof. In this embodiment, two ribs 114 are formed on each surface.

그리고, 이 밀폐부(110)는 상기 리브(114)가 형성을 마친 부분으로부터 끝부분까지 테이퍼(taper)진 상태로 되어 있어서 상기 캡 본체(100)의 밀폐부(110)를 보강파이프(104)의 양단에 끼웠을 때 캡 본체(100)의 밀폐부(110)가 보강파이프(104)의 내부(105)에 손쉽게 진입하여 끼워질 수 있다.In addition, the sealing portion 110 is tapered from the portion where the rib 114 is formed to the end thereof, so that the sealing portion 110 of the cap body 100 is reinforced with the reinforcing pipe 104. When fitted at both ends of the cap 110 of the cap 110 may easily fit into the interior 105 of the reinforcement pipe 104.

또한, 상기 밀폐부(110)를 보강파이프(104)의 내부로 진입시키면 그 끝단은 보강파이프(104)의 내부 크기보다 작은 크기를 가지므로 쉽게 들어가며 계속 진입시키다 보면 리브(114)가 보강파이프(104)의 내부와 접촉하면서 타이트하게 끼워지게 되므로 그 삽입상태를 견고히 유지시킨다.In addition, when the seal 110 enters into the reinforcement pipe 104, the end thereof has a size smaller than the internal size of the reinforcement pipe 104, and thus the rib 114 is easily reinforced. 104) is tightly fitted while in contact with the inside of it to keep the insertion state firmly.

그리고, 상기 플랜지부(120)는 상기 보강파이프(104)의 단면 외부형상과 상응하는 형상으로 형성됨으로써, 상기 밀폐부(110)가 보강파이프(104)의 내부(105)에 끝까지 진입하면 그 단면에 밀착되어 내부를 완전히 막아주게 되므로 보강파이프(104)의 내부로 빗물이나 타설되는 콘크리트 등의 이물질이 유입되는 것을 방지할 수가 있다.In addition, the flange portion 120 is formed in a shape corresponding to the cross-sectional external shape of the reinforcement pipe 104, so that the end portion of the flange 110 enters the inner portion 105 of the reinforcement pipe 104 to the end thereof. Since it is in close contact with the inside to completely block the inside of the reinforcement pipe 104, it is possible to prevent the inflow of foreign matter such as rainwater or concrete to be poured.

또한, 본 고안은 보강파이프(104)의 날카로운 양 단부에 캡 본체(100)만을 끼워 결합하면 되므로 종래처럼 보강파이프의 양 단부를 일일이 그라인더로 갈아 연마할 필요가 없어 그만큼 철판 거푸집의 생산성을 향상시킬 수 있다.In addition, since the present invention only needs to be fitted by inserting only the cap body 100 at the sharp both ends of the reinforcing pipe 104, there is no need to grind and grind both ends of the reinforcing pipe with a grinder as in the prior art, thereby improving productivity of the iron sheet formwork. Can be.

이상에서 상술한 바와 같이 아울러, 본 고안은 캡 본체를 철판 거푸집의 보강파이프 양단에 끼우기만 하면 상기 갭 본체가 보강파이프의 양단으로 빗물이나 타설되는 콘크리트가 유입되는 것을 효과적으로 차단하여 부식됨을 방지하므로 보강파이프가 쉽게 녹슬지 않아 철판거푸집의 외관이 오랫동안 미려하게 되며, 또한 날카로운 보강파이프 끝단을 가려주어 거푸집의 설치 및 해체작업중 인부들이 보강파이프의 끝단에 부딪혀 부상당하는 것을 효과적으로 방지할 수 있다.In addition, as described above, the present invention only by inserting the cap body on both ends of the reinforcing pipe of the steel sheet formwork, the gap body effectively prevents corrosion by preventing the inflow of rainwater or poured concrete into both ends of the reinforcing pipe to prevent corrosion. The pipe is not easily rusted, so the appearance of the iron sheet formwork is beautiful for a long time, and it also hides the sharp end of the reinforcement pipe, and effectively prevents workers from being injured by hitting the end of the reinforcement pipe during installation and dismantling of the formwork.

Claims (1)

거푸집용 철판 패널(102)을 지지하기 위하여 철판 패널(102)의 한쪽면에 다수의 보강파이프(104)를 설치하는 철판 거푸집(101)에 있어서,In the iron sheet formwork 101, in which a plurality of reinforcing pipes 104 are installed on one side of the iron plate panel 102 to support the iron sheet panel 102 for formwork. 상기 보강파이프(104)의 내부에 끼워지도록 본체(100) 하부에는 밀폐부(110)를 형성하고, 상기 보강파이프(104)에 타이트하게 끼워지도록 상기 밀폐부(110)의 외주면 사방에는 리브(114)를 돌출시키며, 상기 밀폐부(110)의 상면에는 상기 밀폐부(110)가 더 이상 들어가지 않도록 플랜지부(120)를 형성하여 된 것을 특징으로 하는 철판 거푸집의 보강파이프용 캡.The sealing unit 110 is formed in the lower portion of the main body 100 so as to fit inside the reinforcing pipe 104, and ribs 114 are formed on all sides of the outer circumferential surface of the sealing unit 110 so as to fit tightly into the reinforcing pipe 104. ) Protrudes, and the upper surface of the sealing portion 110, the flange portion 120 is formed to form a flange 120 so that the sealing portion 110 no longer enters.
KR2019990015949U 1999-08-05 1999-08-05 Reinforcement pipe for cap of steel plate mold KR200167417Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019990015949U KR200167417Y1 (en) 1999-08-05 1999-08-05 Reinforcement pipe for cap of steel plate mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019990015949U KR200167417Y1 (en) 1999-08-05 1999-08-05 Reinforcement pipe for cap of steel plate mold

Publications (1)

Publication Number Publication Date
KR200167417Y1 true KR200167417Y1 (en) 2000-02-15

Family

ID=19583663

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019990015949U KR200167417Y1 (en) 1999-08-05 1999-08-05 Reinforcement pipe for cap of steel plate mold

Country Status (1)

Country Link
KR (1) KR200167417Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101959053B1 (en) * 2018-10-04 2019-03-15 (주)삼일강업 duct unit
CN112282397A (en) * 2020-09-10 2021-01-29 国网山东省电力公司建设公司 Emergency risk avoiding device for manual excavation foundation construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101959053B1 (en) * 2018-10-04 2019-03-15 (주)삼일강업 duct unit
CN112282397A (en) * 2020-09-10 2021-01-29 国网山东省电力公司建设公司 Emergency risk avoiding device for manual excavation foundation construction
CN112282397B (en) * 2020-09-10 2022-06-14 国网山东省电力公司建设公司 Emergency risk avoiding device for manual excavation foundation construction

Similar Documents

Publication Publication Date Title
CN109826239B (en) Basement outer wall post-pouring strip structure and construction method thereof
KR101978443B1 (en) High strength concrete pannel structure and road safety structure of reinforcent method using the same
KR200167417Y1 (en) Reinforcement pipe for cap of steel plate mold
KR960004044B1 (en) Form for water-proof projections
JP2004124641A (en) Outer form for tunnel entrance, and construction method of tunnel entrance using the same
KR102105771B1 (en) Water proofing plate installed with forms
KR970011195A (en) Pier repair work
CN111894294A (en) Protection architecture in basement outer wall post-cast strip
KR200189807Y1 (en) Precast concrete panel form
KR100403397B1 (en) Repairing method of outdated concrete fabric of creek covered by lid
KR102066817B1 (en) Method of structure reinforcement using fiber-reinforced panel and reinforcement structure for the same
KR100433991B1 (en) Wall Maintenance and Reinforce Engineering Method of Wall On the Water
CN214194679U (en) Reusable temporary sealing device for post-cast strip
CN210563424U (en) Split bolt using waterproof circular plate for formwork support
KR100377689B1 (en) A method of bridge pier mould construction
JPH08333902A (en) Earthquake-resistant reinforcing protector mounting method
KR102187755B1 (en) interlayer joint crack prevention method
CN112814036A (en) Waterproof sealing cover plate structure for underwater manhole and construction method thereof
KR20040081826A (en) Connecting Method and Structure of Precast Concrete Panel
JPH06313304A (en) Structure of high balustrade in concrete structure having high balustrade and construction method for balustrade part
KR20020004411A (en) A Repairing Method for the Foundation of Bridge
KR101569120B1 (en) Deck plate of finishing materials
KR200209618Y1 (en) A sheeting panel of a transparency for inspected a construction
JPH0734961Y2 (en) Concrete formwork dam
KR100449139B1 (en) Cone bolt set

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
LAPS Lapse due to unpaid annual fee
T601 Decision on revocation of utility model registration