KR200209618Y1 - A sheeting panel of a transparency for inspected a construction - Google Patents

A sheeting panel of a transparency for inspected a construction Download PDF

Info

Publication number
KR200209618Y1
KR200209618Y1 KR2020000023310U KR20000023310U KR200209618Y1 KR 200209618 Y1 KR200209618 Y1 KR 200209618Y1 KR 2020000023310 U KR2020000023310 U KR 2020000023310U KR 20000023310 U KR20000023310 U KR 20000023310U KR 200209618 Y1 KR200209618 Y1 KR 200209618Y1
Authority
KR
South Korea
Prior art keywords
formwork
concrete
transparent
plastic plate
transparent plastic
Prior art date
Application number
KR2020000023310U
Other languages
Korean (ko)
Inventor
정승욱
Original Assignee
주식회사한국건설관리공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사한국건설관리공사 filed Critical 주식회사한국건설관리공사
Priority to KR2020000023310U priority Critical patent/KR200209618Y1/en
Application granted granted Critical
Publication of KR200209618Y1 publication Critical patent/KR200209618Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 구조물 검사용 투명 거푸집에 관한 것으로, 기둥(1)이나 벽체를 건조하기 위해 조립 설치되는 거푸집(2)이 구비되되, 상기 거푸집(2)의 패널이 투명 플라스틱판(3)으로 성형되고, 상기 투명 플라스틱판(3)의 배면 테두리에 철재 버팀대(4)가 고정설치됨과 더불어 내측에도 일정간격을 두고 철재 버팀대(4)가 설치되어, 상기 투명 플라스틱판(3)을 통해 내부를 확인할 수 있도록 된 구조로서, 다짐취약부와 검사의 대표성이 있는 부위에 설치하여 투명한 거푸집에 의해 콘크리트 타설전 스페이셔의 설치 상태를 확인할 수 있고, 거푸집 내부의 이물질 포함여부 및 철근결속부위의 파손여부 등 원활한 검측업무가 가능하며, 콘크리트 타설시 바이브레터가 미치지 않는 다짐 취약부위의 다짐여부를 수시로 확인할 수 있기 때문에 타설후 구조물에 생겨지는 곰보현상 등의 콘크리트 표면결함을 최소화할 수 있는 것이다.The present invention relates to a transparent formwork for inspecting the structure, provided with a formwork (2) assembled to dry the column (1) or the wall, the panel of the formwork (2) is molded into a transparent plastic plate (3) In addition, the steel brace 4 is fixedly installed at the rear edge of the transparent plastic plate 3 and the steel brace 4 is installed at a predetermined interval inside, so that the inside can be confirmed through the transparent plastic plate 3. As a structure, it can be installed on the compaction weakness and the representative part of the inspection to check the installation state of the spacing machine before the concrete is placed by the transparent formwork, and to check the inclusion of foreign matters inside the formwork and the damage of the reinforcing bars. It is possible to work, and because it is possible to check the compaction of the weak part where the vibrator does not reach during concrete pouring, it is formed in the structure after pouring. Is to minimize the concrete surface defects, such as pimples.

Description

구조물 검사용 투명 거푸집{A sheeting panel of a transparency for inspected a construction}A sheeting panel of a transparency for inspected a construction}

본 고안은 각종 구조물을 건축하기 위한 거푸집에 관한 것으로, 특히 타설되는 콘크리트의 상태를 육안으로 점검함으로써 콘크리트 표면결함을 최소화함과 더불어 보다 완벽하게 구조물을 건축함으로써 건축물의 결함을 최소화할 수 있도록 한 구조물 검사용 투명 거푸집에 관한 것이다.The present invention relates to a formwork for building various structures, and in particular, to minimize the surface defects by visually checking the state of the concrete to be poured and to more completely construct the structure to minimize the defects of the structure. It relates to a transparent formwork for inspection.

일반적으로 거푸집은 콘크리트를 부어넣어 콘크리트 구조체를 형성하는 거푸집 패널과, 이 것을 정확한 위치로 유지하는 동바리 즉 지지틀의 총칭으로서 콘크리트를 일정한 형상과 치수로 유지시켜 주며, 그 경화에 필요한 수분의 누출을 방지하고, 외기의 영향을 방지함으로써 콘크리트의 적절한 양생의 목적으로 쓰이는 가설물이다.In general, the formwork is a general term for the formwork panel that pours concrete to form a concrete structure, and a group of wheels, or support frames, which maintains it in the correct position. It is a temporary product used for the purpose of proper curing of concrete by preventing and preventing the influence of outdoor air.

즉, 상기와 같이 사용되는 거푸집을 설치하는데 드는 공사비가 일반 건축공사의 10-15%를 차지하고, 골조공사량의 20-30%를 차지하기 때문에 그 비중이 상당히 큰 편이며, 이에 따라 건축공사의 경제성은 거푸집공사의 우열에 달려 있다고 해도 과언이 아니기 때문에 근래에 들어 거푸집공사의 개선과 합리화 방안을 다각도로 연구하고 있는 실정이다.In other words, the construction cost of installing the formwork used as described above occupies 10-15% of general construction work and 20-30% of frame construction work, so the proportion is quite large, and thus the economic feasibility of construction work It is not an exaggeration to say that it depends on the superiority of formwork, and nowadays, the situation is being studied in various ways to improve and rationalize formwork.

여기서, 상기 거푸집을 이루는 거푸집 패널은 거푸집의 가장 중요한 요소로서, 패널의 재질에 따라 목재 거푸집 패널, 합판 거푸집 패널 및, 금속재 거푸집 패널 등으로 구분되는 것이다.Here, the formwork panel constituting the formwork is the most important element of the formwork, it is divided into a wooden formwork panel, a plywood formwork panel, a metal formwork panel and the like according to the material of the panel.

한편, 대부분의 거푸집은 목재나 합판으로 이루어져 건축공사에서 사용되는 바, 상기 거푸집의 종래 구조는 도 1에 도시된 바와 같이, 다수의 거푸집 패널(101)이 내부에 공간을 갖도록 조립설치되고, 상기 거푸집 패널(101)의 외측에 거푸집 패널(101)을 지지고정하는 지지틀(102)이 쐐기 등과 같은 고정수단에 의해 고정설치되어, 이러한 상태에서 상기 거푸집 패널(101)에 콘크리트(103)를 넣어서 양생하도록 된 것이다.On the other hand, most of the formwork is made of wood or plywood used in the building construction bar, the conventional structure of the formwork, as shown in Figure 1, a plurality of formwork panel 101 is installed to have a space therein, the The support frame 102 for fixing the formwork panel 101 to the outside of the formwork panel 101 is fixedly installed by fixing means such as wedges, and in this state, the concrete 103 is put into the formwork panel 101 for curing. It is to be done.

그리고, 콘크리트(103)의 양생이 끝나서 기둥이나 벽체가 완전히 형성되게 되면, 상기 거푸집(104)을 제거한 후 미장작업과 같은 마무리 작업을 수행하도록 된 것이다.When the curing of the concrete 103 is completed and the pillars or walls are completely formed, the form 104 is removed and then finishing work such as plastering is performed.

그런데, 상기 거푸집(104)은 대개 박스형으로 설치되어 그 내부를 들여다 볼 수 없기 때문에 거푸집(104)을 설치한 후 콘크리트(103) 타설전에 철근의 피복유지 및 이상유무와 이물질 혼입여부 등을 확인하기 어렵고, 또한 콘크리트(103) 타설시 다짐 취약부위의 다짐도가 적정한지 혹은 콘크리트(103) 타설의 진행상황 등을 알기 어려우며, 이에 따라 콘크리트(103) 타설 후 구조물이 형성된 상태에서 철근의 피복 두께가 부족하거나 곰보현상과 에어 포켓(air pocket) 등에 의한 표면결함이 나타나게 되고, 구조물 전체의 내구성이 견고하지 못하게 되는 문제점이 있었다.However, since the formwork 104 is usually installed in a box shape and cannot be looked into the inside thereof, the formwork 104 is installed and then before the concrete 103 is poured, it is necessary to check whether the cover of the rebar is abnormal and whether there is an alien substance or not. It is difficult, and it is difficult to know whether or not the compaction degree of the compacted weak part in the concrete 103 is poured or the progress of concrete 103 pouring, and thus, the thickness of the reinforcing bar in the state in which the structure is formed after the concrete 103 is poured. In addition, surface defects caused by the phenomena phenomenon and the air pocket (air pocket), etc. appeared, there was a problem that the durability of the entire structure is not firm.

이에 본 고안은 상기한 바의 문제점을 해소하기 위해 안출된 것으로, 타설되는 콘크리트의 상태를 육안으로 점검함으로써 콘크리트 표면결함을 최소화함과 더불어 보다 완벽하게 구조물을 건축함으로써 건축물의 결함을 최소화할 수 있도록 한 구조물 검사용 투명 거푸집을 제공함에 그 목적이 있는 것이다.Therefore, the present invention was devised to solve the above problems. By minimizing the concrete surface defects by visually checking the state of the concrete being poured, it is possible to minimize the defects of buildings by building the structure more completely. The purpose is to provide a transparent formwork for inspection of a structure.

상기한 바의 목적을 달성하기 위한 본 고안은, 기둥이나 벽체를 건조하기 위해 조립 설치되는 거푸집에 있어서, 상기 거푸집의 패널이 투명 플라스틱판으로 성형되고, 상기 투명 플라스틱판의 배면 테두리에 철재 버팀대가 고정설치됨과 더불어 내측에도 일정간격을 두고 철재 버팀대가 설치되어, 상기 투명 플라스틱판을 통해 내부를 확인할 수 있도록 된 구조이다.The present invention for achieving the above object is, in the formwork is installed to dry the pillars or the wall, the panel of the formwork is molded into a transparent plastic plate, the steel brace on the back edge of the transparent plastic plate In addition to being fixedly installed, a steel brace is installed at a predetermined interval inside, so that the structure can be confirmed through the transparent plastic plate.

즉, 상기와 같이 거푸집을 이루는 패널이 투명 플라스틱판으로 성형됨으로써 투명 거푸집이 제작되고, 상기 투명 거푸집을 통해 콘크리트 타설시 다짐 취약부를 육안으로 확인하면서 작업을 진행할 수 있는 것이다.In other words, the panel forming the formwork is molded into a transparent plastic plate to form a transparent formwork, and the work can proceed while visually confirming the weakness of the compaction when placing concrete through the transparent formwork.

따라서, 상기 투명 거푸집에 의해 콘크리트 타설전 스페이셔의 설치 상태를 확인할 수 있고, 거푸집 내부의 이물질 포함여부 및 철근결속부위의 파손여부 등 원활한 검측업무가 가능하며, 콘크리트 타설시 바이브레터가 미치지 않는 다짐 취약부위의 다짐여부를 수시로 확인할 수 있기 때문에 타설후 구조물에 생겨지는 곰보현상 등의 콘크리트 표면결함을 최소화할 수 있는 것이다.Therefore, the installation of the spacer before the concrete can be confirmed by the transparent formwork, and the smooth inspection work such as the inclusion of foreign substances in the formwork and the damage of the reinforcing bar is possible, and the vibrator does not reach the concrete during the casting. It is possible to minimize the concrete surface defects, such as the pom-bo phenomenon, which occurs in the structure after pouring, because it is possible to check whether the fragile areas are compacted at any time.

도 1은 종래의 기술에 따른 거푸집의 설치상태를 나타낸 상태도,1 is a state diagram showing the installation of the formwork according to the prior art,

도 2는 본 고안에 따른 구조물 검사용 투명 거푸집을 나타낸 사시도,2 is a perspective view showing a transparent formwork for inspecting the structure according to the present invention,

도 3은 본 고안에 따른 투명 거푸집이 설치된 기둥을 나타낸 상태도,Figure 3 is a state diagram showing a pillar installed transparent formwork according to the present invention,

도 4는 본 고안에 따른 투명 거푸집이 설치된 콘크리트 박스의 헌치부를 나타낸 사시도이다.Figure 4 is a perspective view showing the haunch of the concrete box is installed transparent formwork according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 기둥 2 : 거푸집1: pillar 2: formwork

3 : 투명 플라스틱판 4 : 철재 버팀대3: transparent plastic plate 4: steel brace

5 : 콘크리트 박스 6 : 헌치부5: concrete box 6: haunting unit

이하 본 고안을 첨부된 예시도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 고안에 따른 구조물 검사용 투명 거푸집을 도시한 사시도이고, 도 3은 본 고안에 따른 투명 거푸집이 설치된 기둥을 도시한 상태도이며, 도 4는 본 고안에 따른 투명 거푸집이 설치된 콘크리트 박스의 헌치부를 도시한 사시도이다.Figure 2 is a perspective view showing a transparent formwork for inspecting the structure according to the present invention, Figure 3 is a state diagram showing a column installed with a transparent formwork according to the present invention, Figure 4 is a concrete box installed with a transparent formwork according to the present invention It is a perspective view which shows a haunchi part.

상기한 도면들에 의해 본 고안의 구조를 설명하면, 기둥(1)이나 벽체를 건조하기 위해 조립 설치되는 거푸집(2)이 구비되되, 상기 거푸집(2)의 패널이 투명 플라스틱판(3)으로 성형되고, 상기 투명 플라스틱판(3)의 배면 테두리에 철재 버팀대(4)가 고정설치됨과 더불어 내측에도 일정간격을 두고 철재 버팀대(4)가 설치되어, 상기 투명 플라스틱판(3)을 통해 내부를 확인할 수 있도록 된 구조이다.Referring to the structure of the present invention by the above drawings, provided with a formwork (2) assembled to dry the column (1) or the wall, the panel of the formwork (2) is a transparent plastic plate (3) Molded, the steel brace 4 is fixed to the rear edge of the transparent plastic plate 3, and the steel brace 4 is installed at a predetermined interval on the inside, the interior through the transparent plastic plate (3) It is a structure that can be confirmed.

여기서, 상기 거푸집(2)의 특징은 거푸집(2) 패널이 특수 공법으로 강화된 투명 플라스틱판(3)으로 이루어진 것에 있는 바, 상기 거푸집(2)은 기둥(1)이나 벽체를 건조할 때 모든 부위에 설치되는 것이 아니라 콘크리트의 다짐이 취약한 부위에 설치되어 작업자가 취약부를 육안으로 확인하면서 작업할 수 있도록 된 것이다.Here, the feature of the formwork (2) is that the formwork (2) panel is made of a transparent plastic plate (3) reinforced by a special method, the formwork (2) is all when drying the column (1) or wall Rather than being installed at the site, it is installed at the site where the compaction of concrete is vulnerable so that the worker can work while visually checking the vulnerable part.

다시말하자면, 상기와 같이 거푸집(2)을 이루는 패널이 투명 플라스틱판(3)으로 성형됨으로써 투명 거푸집(2)이 제작되고, 상기 거푸집(2)을 통해 콘크리트 타설시 다짐 취약부를 육안으로 확인하면서 작업을 진행할 수 있는 것이다.In other words, the panel forming the formwork (2) as described above is formed into a transparent plastic plate (3) to form a transparent formwork (2), and work while visually confirming the weakness of the compaction when pouring concrete through the formwork (2) You can proceed.

즉, 상기 거푸집(2)은 일정 넓이를 갖는 투명 플라스틱판(3)에 다수의 철재 버팀대(4)가 고정설치된 것으로, 상기 투명 플라스틱판(3)의 전면에 콘크리트가 접촉되고, 배면에 설치된 철재 버팀대(4)에 의해 지지될 수 있도록 된 것이다.That is, the formwork (2) is a plurality of steel braces (4) is fixed to the transparent plastic plate (3) having a predetermined width, the concrete is in contact with the front of the transparent plastic plate (3), the iron installed on the back It is to be supported by the brace (4).

한편, 도 3에 도시된 바와 같이 기둥(1)을 구축하기 위해 설치되는 상기 거푸집(2)의 경우, 기둥(1)의 밑부분에만 설치되어 콘크리트 다짐이 취약한 기둥(1)의 밑부분을 육안으로 검사하면서 작업을 진행할 수 있도록 된 것이다.On the other hand, in the case of the formwork (2) that is installed to build the pillar (1), as shown in Figure 3, it is installed only on the bottom of the pillar (1) with the naked eye on the bottom of the pillar (1) that is weak in concrete You can continue to work while inspecting.

그리고, 도 4에 도시된 바와 같이 콘크리트 박스(5)의 헌치부(6)에 상기 거푸집(2)이 적용될 경우, 상기 헌치부(6)의 내측면을 따라 투명 플라스틱판(3)으로 이루어진 거푸집이 설치됨으로써 콘크리트의 타설로 인해 헌치부(6)로 유입되는 콘크리트의 다짐상황을 육안으로 확인하면서 작업할 수 있도록 된 것이다.And, as shown in Figure 4, when the formwork 2 is applied to the haunting portion 6 of the concrete box 5, formwork made of a transparent plastic plate (3) along the inner surface of the haunting portion (6) This installation is to be able to work while visually confirming the compaction of the concrete flowing into the haunche (6) due to the pouring of concrete.

따라서, 상기와 같이 투명 플라스틱판(3)으로 제작된 거푸집(2)을 다짐취약부와 검사의 대표성이 있는 부위에 설치하여 콘크리트 타설전, 타설 진행중의 작업과정을 육안으로 수시 확인함으로써 보다 철저한 품질관리가 가능해지고, 또한 콘크리트 타설시 잔여 타설물량의 조정 등과 같이 타설 계획상의 문제점을 시공중에 도출하여 이를 해결할 수 있는 것이다.Therefore, by installing the formwork (2) made of a transparent plastic plate (3) as described above in a representative part of the compaction weakness and inspection, and visually check the work process before and during the concrete casting process, more thorough quality control It is also possible to solve this problem by drawing problems in the construction plan, such as adjusting the amount of remaining pours when pouring concrete.

이상에서 설명한 바와 같이 본 고안에 따른 구조물 검사용 투명 거푸집에 의하면, 투명한 거푸집에 의해 콘크리트 타설전 스페이셔의 설치 상태를 확인할 수 있고, 거푸집 내부의 이물질 포함여부 및 철근결속부위의 파손여부 등 원활한 검측업무가 가능하며, 콘크리트 타설시 바이브레터가 미치지 않는 다짐 취약부위의 다짐여부를 수시로 확인할 수 있기 때문에 타설후 구조물에 생겨지는 곰보현상 등의 콘크리트 표면결함을 최소화할 수 있는 효과가 있는 것이다.As described above, according to the transparent formwork for inspecting the structure according to the present invention, it is possible to confirm the installation state of the concrete spacing before the casting by the transparent formwork, and to smoothly detect whether the foreign matter is included in the formwork and whether the reinforcing bar is damaged. It is possible to work, and it is possible to minimize the concrete surface defects such as the bear phenomena that occur in the structure after pouring because it is possible to check the compaction of the weak part where the vibrator does not reach during concrete pouring.

Claims (1)

기둥(1)이나 벽체를 건조하기 위해 조립 설치되는 거푸집에 있어서,In the formwork which is assembled to dry a pillar 1 or a wall, 상기 거푸집(2)의 패널이 투명 플라스틱판(3)으로 성형되고, 상기 투명 플라스틱판(3)의 배면 테두리에 철재 버팀대(4)가 고정설치됨과 더불어 내측에도 일정간격을 두고 철재 버팀대(4)가 설치되어, 상기 투명 플라스틱판(3)을 통해 내부를 확인할 수 있도록 된 것을 특징으로 하는 구조물 검사용 투명 거푸집.The panel of the formwork (2) is molded into a transparent plastic plate (3), and the steel brace (4) is fixedly installed on the rear edge of the transparent plastic plate (3) and the steel brace (4) at regular intervals inside. Is installed, the transparent formwork for inspection of the structure, characterized in that the inside can be confirmed through the transparent plastic plate (3).
KR2020000023310U 2000-08-17 2000-08-17 A sheeting panel of a transparency for inspected a construction KR200209618Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000023310U KR200209618Y1 (en) 2000-08-17 2000-08-17 A sheeting panel of a transparency for inspected a construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000023310U KR200209618Y1 (en) 2000-08-17 2000-08-17 A sheeting panel of a transparency for inspected a construction

Publications (1)

Publication Number Publication Date
KR200209618Y1 true KR200209618Y1 (en) 2001-01-15

Family

ID=73057405

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000023310U KR200209618Y1 (en) 2000-08-17 2000-08-17 A sheeting panel of a transparency for inspected a construction

Country Status (1)

Country Link
KR (1) KR200209618Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100419881B1 (en) * 2001-03-02 2004-03-04 이승복 Transparent panel form and formwork system using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100419881B1 (en) * 2001-03-02 2004-03-04 이승복 Transparent panel form and formwork system using the same

Similar Documents

Publication Publication Date Title
FI123579B (en) Procedure for forming a concrete projection and concrete slab
KR20180045140A (en) The structure of non-binding dismantling formwork beams and deck plates without the need to secure jobs
KR100949785B1 (en) Mold for manufacturing PC beam
KR200209618Y1 (en) A sheeting panel of a transparency for inspected a construction
KR102239768B1 (en) Practicable same time pouring Self-standing expansion joint and method for constructing thereof
JPH1129910A (en) Method for constructing concrete pier
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR200321364Y1 (en) Formwork for Precast Concrete Panels
KR200205908Y1 (en) Structure for supporting for a wall mould of the cement concrete building
JPH084196A (en) Panel for building
KR100339440B1 (en) Construction method using mold equipped with shape steel and plywood
KR0145358B1 (en) Method of building slabs
KR200353773Y1 (en) A construction system of the concret structure
KR200198576Y1 (en) A sheeting panel of a plastics
DE29818408U1 (en) Concrete ceiling and prefabricated wall parts with integrated insulation made of foam plastic panels with simultaneous hollow body effect
KR200418057Y1 (en) wall end panel
RU2292432C2 (en) Method and form tie for wall erection
JP3445408B2 (en) Building dirt prevention method
JPH04277233A (en) Column false part frame molding method and molding plate therefor
JP4010937B2 (en) Half PC board and construction method using it
JP6700384B2 (en) Formwork panel assembly
JPH09256515A (en) Precast wall slab and constructing method of building using the wall slab
JPH0449347Y2 (en)
JPH04247127A (en) Outer wall construction works for underground floor
KR100638495B1 (en) Steel form for constructing a reinforced concrete slab of a construction

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T601 Decision on revocation of utility model registration
LAPS Lapse due to unpaid annual fee