KR20010079234A - Banking Method on Very Weak Soil Using Floating Belt Conveyor System - Google Patents

Banking Method on Very Weak Soil Using Floating Belt Conveyor System Download PDF

Info

Publication number
KR20010079234A
KR20010079234A KR1020010036710A KR20010036710A KR20010079234A KR 20010079234 A KR20010079234 A KR 20010079234A KR 1020010036710 A KR1020010036710 A KR 1020010036710A KR 20010036710 A KR20010036710 A KR 20010036710A KR 20010079234 A KR20010079234 A KR 20010079234A
Authority
KR
South Korea
Prior art keywords
floating
belt conveyor
equipment
ground
landfill
Prior art date
Application number
KR1020010036710A
Other languages
Korean (ko)
Other versions
KR100374996B1 (en
Inventor
김백영
Original Assignee
김백영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김백영 filed Critical 김백영
Priority to KR10-2001-0036710A priority Critical patent/KR100374996B1/en
Publication of KR20010079234A publication Critical patent/KR20010079234A/en
Application granted granted Critical
Publication of KR100374996B1 publication Critical patent/KR100374996B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/12Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for distributing granular or liquid materials
    • E01C19/20Apparatus for distributing, e.g. spreading, granular or pulverulent materials, e.g. sand, gravel, salt, dry binders
    • E01C19/201Apparatus for distributing, e.g. spreading, granular or pulverulent materials, e.g. sand, gravel, salt, dry binders with driven loosening, discharging or spreading parts, e.g. power-driven, drive derived from road-wheels
    • E01C19/2045Apparatus for distributing, e.g. spreading, granular or pulverulent materials, e.g. sand, gravel, salt, dry binders with driven loosening, discharging or spreading parts, e.g. power-driven, drive derived from road-wheels spreading by means of an endless belt or like conveyor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/11Height being adjustable
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0085Geotextiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

PURPOSE: A filling method of a very poor ground by using a floating belt conveyor is provided to carry out the filling for the very poor ground without any damage of the surface course at a low cost by approaching the ground easily. CONSTITUTION: A filling method of a very poor ground by using a floating belt conveyor includes the step of conveying filling soil materials by mounting a track travelling unit(1) having a belt conveyor(11) and a hopper(12) on a minimum approach way toward a reclaimed land, paving the reclaimed land with construction fibers, paving the construction fibers with the filling soil by a predetermined thickness by mounting floating type equipment(3) on the construction fibers, paving the whole reclaimed land with the filling soil once by moving the floating type equipment, and compacting the whole reclaimed land by repeating the paving work, wherein the floating type equipment includes more than one floating wheel(33) on both sides and a belt conveyor(31) and a hopper(32) respectively mounted on the floating wheels.

Description

부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법{Banking Method on Very Weak Soil Using Floating Belt Conveyor System}Banking Method on Very Weak Soil Using Floating Belt Conveyor System}

발명의 분야Field of invention

본 발명은 해양지역과 같이 지반이 매우 약한 초연약지반을 성토하기 위한 공법에 관한 것이다. 보다 구체적으로 본 발명은 부유식 벨트콘베이어를 이용하여 초연약지반의 표층지반의 파괴없이 성토재료를 균일한 두께로 반복하여 포설함으로써 초연약지반을 성토하는 공법에 관한 것이다.The present invention relates to a construction method for filling super soft ground having very weak ground, such as in marine areas. More specifically, the present invention relates to a method of filling a super soft ground by repeatedly laying the fill material with a uniform thickness without destroying the superficial ground of the super soft ground using a floating belt conveyor.

발명의 배경Background of the Invention

우리나라의 서해안이나 남해안에서 해안을 매립하여 부지를 조성하는 경우에, 그 지반이 매우 약하기 때문에 성토재료를 포설하여 지반을 강화하고 있다. 해안을 매립하는 경우에, 종래에는 육지에서 모래나 산토를 운반하여 이들을 주매립재료로 사용하였으나, 운반비 등의 비용문제로 인하여 바다에서 쉽게 구할 수 있는 해성점토를 준설하여 이를 매립재료로 사용하고 있는 실정이다.In the case of land reclamation on the west or south coast of Korea, since the ground is very weak, landfill material is laid to strengthen the ground. In the case of reclaiming the coast, conventionally, they used sand or santo as landfill materials to transport land, but dredged marine clay, which is easily available from the sea due to cost problems such as transportation costs, was used as landfill material. It is true.

매립재료로서 해성점토를 사용하는 경우에, 그 조성된 지반은 함수비가 높고, 압축성이 크고, 장기간에 걸쳐 압밀이 이루어지기 때문에, 그 지반을 안정화시킬 필요가 있다. 이처럼 해안지역의 매립부지를 안정화시키기 위해서는 그 지반 위에 산토 또는 모래 등을 포설한다. 그러나 준설 매립된 지반은 초연약지반이기 때문에 지반을 강화 또는 안정화하기 위하여 필요한 장비와 인력이 쉽게 접근할 수 없는 실정이다.In the case of using marine clay as a buried material, it is necessary to stabilize the ground because its composition has high water content, high compressibility, and consolidation over a long period of time. In order to stabilize the landfill site in the coastal area, sand or sand is laid on the ground. However, since dredged land is ultra soft ground, the equipment and manpower necessary to strengthen or stabilize the ground are not easily accessible.

다시 말해서, 해성점토를 준설매립하여 조성된 매립지에 성토하는 공법은 장비나 인력의 접근이 거의 불가능하고 작은 성토 하중에도 지반이 파괴되기 때문에 효과적인 성토공법의 개발은 많은 토목기술자들의 연구대상이었고 또한 다양한 방법들이 제시되어 왔다. 그러나 이제까지 제시된 성토공법들은 각각의 결점들 때문에 널리 적용되지 못하고 있다.In other words, because the method of laying the marine clay on dredged landfill is almost impossible for equipment or manpower to access, and the ground is destroyed even under small load, the development of effective landfill method has been studied by many civil engineers. Methods have been suggested. However, the landfill methods proposed so far have not been widely applied because of their shortcomings.

매립지역을 성토하는 이제까지의 공법은 매립지반의 표층을 개량하여 성토하중을 지탱하는 방법과 매립지역에 직접 성토하는 방법으로 구분된다.The existing methods of filling landfills are divided into methods of supporting the fill load by improving the surface of landfills and directly filling landfills.

전자의 방법은 매립지반의 약 2∼4 m에 해당하는 표층을 탈수시키거나 고화처리하여 지지력을 확보한 후 습지용 도자와 같은 성토장비를 이용하여 매립재를포설하는 방법으로, 이는 다시 고화처리방법, 수평진공 배수공법 및 PTM공법으로 구분된다. 고화처리방법은 매립지반의 점토와 고화재를 일정비율로 섞어서 단기간에 강도를 발현시켜 요구하는 지지력을 얻는 공법으로 시공이 단순하고 시공을 완료하여 양생 후에 즉시 성토가 가능하다는 장점이 있으나, 시공비가 비싸고 고화에 사용되는 첨가제의 환경적응성 검토가 필요하다. 수평진공 배수공법은 표층에 특수 제작된 드레인 보드를 4∼5 열로 매설한 후 양단에 진공압을 가하여 강제로 탈수시켜 지반내의 간극수를 배출시켜 강도를 증대시키는 방법으로 시공기간이 짧은 장점이 있으나 시공비가 비싸고 토질에 따른 적용성의 검토가 필요하다. PTM공법은 초습지용 트렌칭 장비를 이용하여 일정한 간격으로 골을 형성하여 트렌치 주변의 물을 배출시켜 건조시키는 공법으로, 시공비가 저렴하지만 요구하는 접지압을 얻는데 많은 시간이 소요된다.The former method is to decompose or solidify the surface layer corresponding to about 2 to 4 m of the landfill to secure supporting capacity, and then to install the landfill material by using landfill equipment such as wetland ceramics. , Horizontal vacuum drainage method and PTM method. The solidification treatment method is a method that obtains the required support force by expressing the strength in a short period of time by mixing clay and solidified material of landfill in a certain ratio, and has the advantage of simple construction and completion of construction and curing immediately after curing. It is necessary to examine the environmental compatibility of the additives used for solidification. The horizontal vacuum drainage method has the advantage of shortening the construction period by increasing the strength by draining the gap water in the ground by forcibly dehydrating by applying vacuum pressure to both ends after embedding the drain board specially manufactured on the surface in 4 ~ 5 rows. It is expensive and requires review of applicability according to soil quality. PTM method is a method of forming a valley at regular intervals by using a trench equipment for super-wetland to drain water around the trench and drying it. The construction cost is low, but it takes a lot of time to obtain the required ground pressure.

후자의 방법으로는 펌핑공법(pumping method), 부선에 의한 부설방법, 포크레인(또는 크람쉘)에 의한 포설방법, 및 강제치환형 매립공법이 있다. 펌핑공법은 펌프선을 이용하여 매립재(주로 모래사용)를 물과 희석하여 매립지반에 펌핑하고 물과 함께 이송되어온 모래가 수중에서 일정하게 침강한 후 물을 배수시켜 지반의 파괴없이 성토하는 공법으로 지반의 파괴없이 신속하게 성토가 가능하지만, 펌프선을 접안할 수 있고 또 모래를 희석할 수 있는 물을 공급할 수 있는 현장여건이 구비되어야 한다.The latter method includes a pumping method, a method of laying by barge, a method of laying by fork lane (or clam shell), and a forced replacement type filling method. The pumping method is a method of diluting a landfill material (mainly using sand) with water by using a pumping line to pump it into a landfill ground, and after the sand transported with water is settled in the water uniformly, the water is drained and landed without destroying the ground. Although it is possible to fill the land quickly without destroying the ground, it is necessary to have on-site conditions for supplying water for piercing the pump ship and diluting sand.

부선에 의한 부설방법은 부선(바지선)에 매립재를 싣고서 예인선 또는 윈지앙카에 의하여 이동시킨 후 일정한 두께로 매립재를 반복하여 포설하는 공법으로,시공비가 비교적 저렴하지만, 매립지반에 부선을 운항할 수 있도록 일정한 흘수를 유지할 수 있어야 한다. 포크레인(또는 크람쉘)에 의한 포설방법은 매립지반에 장비의 작업반경마다 격자형 칸막이 호안을 축조한 후 매립재를 얇은 두께로 반복하여 포설하는 방법으로, 시공이 간편하지만, 시공장비 주행에 필요한 많은 격자형 호안을 축조해야 한다. 강제치환형 매립공법은 전단파괴에 관계없이 습지용 도자를 이용하여 직접 매립하는 방법으로, 별도의 처리비가 필요하지 않지만, 매립지반의 함수비에 따라서 강제치환되는 두께가 4∼8 m에 이르며 강제치환으로 융기되는 원지반의 처리가 어려운 결점이 있다.The method of laying by barge is a method of placing landfill material on barge (barge line), moving it by tugboat or Winziangka, and repeatedly placing landfill material to a certain thickness. It must be possible to maintain a constant draft for the flight. The method of laying by fork-lane (or clamshell) is a method of constructing lattice slats in every working radius of the equipment on the landfill ground, and then repeatedly installing the landfill material in thin thickness. Many grid revetments must be constructed. Forced substitution type landfilling method is a method of directly burying using wetland ceramics regardless of shear failure. Although it does not require a separate treatment cost, the thickness to be forcibly substituted is 4-8 m depending on the water content of the landfill. There is a drawback that the processing of the raised base is difficult.

본 발명자는 상기와 같은 종래의 성토공법들이 갖는 결점들을 모두 해결하여 준설매립된 지반 위에 지반안정화 처리를 위한 장비 및 인력의 접근을 위해 초연약 상태의 매립지반 표층에 지반의 파괴없이 성토재료를 균일하게 반복하여 포설함으로써 요구하는 접지압을 확보할 수 있는 획기적인 성토공법을 개발하기에 이른 것이다.The present inventors have solved all the drawbacks of the conventional landfill methods as described above, and uniformly fill the landfill material without destroying the ground on the super soft landfill surface layer for access of equipment and manpower for ground stabilization treatment on dredged ground. It has been developed a groundbreaking landfill method that can secure the required ground pressure by repeatedly laying it.

본 발명의 목적은 해안매립지역과 같이 초연약지반을 성토하기 위한 새로운 공법을 제공하기 위한 것이다.An object of the present invention is to provide a new method for filling ultra soft ground, such as coastal landfill area.

본 발명의 다른 목적은 준설매립된 초연약지반에 장비나 인력이 용이하게 접근하여 초연약지반을 성토할 수 있는 성토공법을 제공하기 위한 것이다.Another object of the present invention is to provide an earthwork method that can easily fill the super soft ground by the equipment or manpower easily accessible to the dredged super soft ground.

본 발명의 또 다른 목적은 초연약지반의 표층의 지반파괴 없이 성토할 수 있는 공법을 제공하기 위한 것이다.Another object of the present invention is to provide a method that can be filled without ground destruction of the surface layer of the ultra soft ground.

본 발명의 또 다른 목적은 시공비가 저렴하고 시공이 간편하여 아무리 연약한 지반이라 하더라도 아무런 문제없이 지반강화를 위한 성토를 할 수 있는 방법을 제공하기 위한 것이다.Another object of the present invention is to provide a method that can be built for reinforcing the ground without any problems, even if the ground is low construction cost and easy construction.

본 발명의 상기 및 기타의 목적들은 하기 상세히 설명되는 본 발명에 의하여 모두 달성될 수 있다.The above and other objects of the present invention can be achieved by the present invention described in detail below.

제1도는 육상부에 위치하여 포설부의 부유식 장비에 성토재료를 공급하도록 벨트콘베이어와 호퍼가 구비된 일반 트랙 주행장비와 초연약지반에 성토재료를 일정한 두께로 포설하기 위한 포설부의 부유식 장비를 개략적으로 도시한 정면 배치도이다.1 is a schematic diagram of a general track driving device equipped with a belt conveyor and a hopper for supplying fill material to a floating part of the installation part and a floating part equipment for installing a deposit material at a predetermined thickness in ultra soft ground. It is the front layout drawing shown in the figure.

제2도는 육상부에 위치하여 이송부의 부유식 장비에 성토재료를 공급하도록 벨트콘베이어와 호퍼가 구비된 일반트랙 주행장비, 성토재료를 상기 일반트랙 주행장비로부터 공급받아 포설부의 부유식 장비로 이송하기 위한 이송부의 부유식 장비, 및 초연약지반에 성토재료를 일정한 두께로 포설하기 위한 포설부의 부유식 장비를 개략적으로 도시한 정면 배치도이다.2 is a general track driving equipment equipped with a belt conveyor and a hopper to supply the fill material to the floating equipment of the conveying part, and the ground material for supplying the fill material from the general track driving equipment to the floating equipment of the installation part. It is a front layout diagram schematically showing the floating equipment of the conveying part, and the floating equipment of the laying part for laying the fill material on the ultra soft ground to a certain thickness.

제3도는 육상부에 위치한 일반트랙 주행장비로부터 성토재료를 공급받아 포설부의 부유식 장비로 이송하기 위한 이송부의 부유식 장비를 개략적으로 도시한 정면도이다.3 is a front view schematically showing the floating equipment of the transport unit for receiving the fill material from the general track driving equipment located on the land and transported to the floating equipment of the installation section.

제4도는 초연약지반에 성토재료를 일정한 두께로 포설하기 위한 포설부의 부유식 장비를 개략적으로 도시한 정면도이다.4 is a front view schematically showing the floating equipment of the laying portion for laying the fill material in a certain thickness on the ultra soft ground.

제5도는 제4도의 포설부의 부유식 장비를 개략적으로 도시한 측면도이다.5 is a side view schematically showing the floating equipment of the installation portion of FIG.

제6도는 제4도의 포설부의 부유식 장비를 개략적으로 도시한 평면도이다.6 is a plan view schematically showing the floating equipment of the installation portion of FIG.

* 도면의 주요부호에 대한 간단한 설명 *Brief description of the main symbols in the drawing

1: 육상부 트랙주행장비 2: 이송부의 부유식 장비1: Track track driving equipment on the track 2: Floating equipment in the transport section

3: 포설부의 부유식 장비 11, 21, 31: 벨트 콘베이어(belt conveyor)3: floating equipment 11, 21, 31: belt conveyor

12, 22, 32: 호퍼(hopper) 23, 33: 부력휠(floating wheel)12, 22, 32: hopper 23, 33: floating wheel

24, 34: 폰툰형 트랙24, 34: pontoon track

발명의 요약Summary of the Invention

본 발명에 따른 성토공법은 성토하고자 하는 매립지에 접근할 수 있는 최소한의 접근로 위에 벨트 콘베이어와 호퍼가 구비된 트랙 주행장비를 설치하여 성토재료를 이송하고, 상기 성토재료를 포설하고자 하는 위치의 상기 토목섬유 위로 복수개의 부력휠이 장착된 초습지용 폰툰형주행장비를 설치하고, 상기 초습지용 주행장비에 구비된 호퍼와 360°회전 및 전후진이 가능한 콘베이어에 의하여 상기 성토재료를 일정한 두께로 포설하고, 상기 초습지용 주행장비를 이동시켜 성토하고자 하는 전체의 매립지에 상기 성토재료를 1회 포설하고, 상기 포설작업을 반복하여 전체의 매립지를 성토하는 단계로 이루어진다.The landfill method according to the present invention installs a track conveyor equipped with a belt conveyor and a hopper on a minimum access path for accessing a landfill to be filled, transfers the landfill material, and places the landfill material to be installed. Install a super wet pontoon type driving equipment equipped with a plurality of buoyancy wheels on the geotextile, and install the fill material to a certain thickness by a hopper and a conveyor capable of 360 ° rotation and forward and backward, equipped with the traveling equipment for the wet paper. Moving the ultra-wetland traveling equipment to install the fill material once in the entire landfill to be filled, and repeating the laying operation consists of filling the entire landfill.

상기 초습지용 주행장비가 상기 트랙주행장비로부터 멀어지는 경우에 성토재료를 이송하기 위한 이송부의 부유식 장비가 최소한 하나 이상 설치될 수 있다.At least one floating device for transporting the fill material when the traveling device for the wetland is far from the track driving device may be installed.

상기 초습지용 주행장비와 이송부의 부유식 장비는 폰툰형 장비로서 필요시그 양쪽에 하나 이상의 부력보충용 부력휠(floating wheel)이 장착되어 이들 장비의 접지압이 0.1 kgf/㎠ 이하이기 때문에 토목섬유가 포설된 곳이면 어느 곳이든지 적용할 수 있다.The floating equipment for the super wetland and the conveying unit are pontoon-type equipment, and one or more buoyancy supplementary buoyancy wheels (floating wheels) are mounted on both sides of the gear, so that the ground pressure of these equipments is 0.1 kgf / ㎠ or less, so that the geotextile You can apply it anywhere.

상기 부력휠은 원통형으로 제작되며, 부력을 발생시켜야 하기 때문에 그 내부에는 공기로 충진된다. 부력휠은 철재 또는 합성수지재료 고무 등으로 제작될 수 있다. 부력휠은 폰툰형 트랙에 조립식으로 장착될 수 있다.The buoyancy wheel is made in a cylindrical shape and filled with air therein because it needs to generate buoyancy. The buoyancy wheel may be made of steel or synthetic rubber. The buoyancy wheel can be prefabricated on the pontoon track.

초습지용 주행장비에는 360°회전 및 전후진이 자유롭게 조절되는 콘베이어가 구비되기 때문에 원을 그리면서 성토재료를 포설할 수 있고 그 원내에서의 포설이 완료되면 다음 지역으로 이동하여 포설작업을 계속한다.The traveling equipment for super wetland is equipped with a conveyor that can freely adjust 360 ° rotation and forward and backward, so that the filling material can be laid in a circle. When the installation is completed in the park, it moves to the next area and continues the installation work.

이하 첨부된 도면을 참고로 본 발명의 내용을 하기에 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the contents of the present invention.

발명의 구체예에 대한 상세한 설명Detailed Description of the Invention

제1도는 육상부, 즉 호안도로와 같은 접근로에 위치하여 포설부의 부유식 장비에 성토재료를 공급하도록 벨트콘베이어(11)와 호퍼(12)가 구비된 일반형의 트랙주행장비(1)와 초연약지반에 성토재료를 일정한 두께로 포설하기 위한 포설부의 부유식 장비(2)를 개략적으로 도시한 정면 배치도이다.FIG. 1 is a general track driving equipment 1 and ultra-soft, which are provided on the land, that is, an access road such as a lake, and are provided with a belt conveyor 11 and a hopper 12 for supplying fill material to the floating equipment of the installation section. It is a front layout diagram schematically showing the floating equipment 2 of the laying portion for laying the fill material on the ground at a constant thickness.

육상부의 트랙주행장비(1)는 백호(back hoe)나 크롤러 크레인(crawler crane)과 같은 일반트랙 주행장비에 호퍼(12)와 벨트콘베이어(11)를 장착한 장비로서, 덤프트럭에 의하여 운반되어 온 성토재료를 백호(back hoe)에 의하여 호퍼(12)에 투입하고, 벨트콘베이어(11)에 의하여 성토재료가 이송된다.Track running equipment 1 of the track and field equipment is equipped with a hopper 12 and a belt conveyor 11 on a general track driving equipment such as a back hoe or crawler crane, and is carried by a dump truck. The filled fill material is introduced into the hopper 12 by a backhoe, and the fill material is conveyed by the belt conveyor 11.

제1도와 같이, 성토하고자 하는 연약지반 위에는 토목섬유가 포설되고, 그 토목섬유 위로 포설부의 부유식 장비(3)가 위치한다. 본 발명의 성토공법에서는 매립하여 조성된 초연약지반의 표층처리를 하지 않고 매립토 위에 토목섬유를 포설하고, 그 토목섬유 위에 성토재료를 포설한다. 토목섬유로는 폴리프로필렌 매트 또는 폴리에스터 매트(mat)가 일반적으로 사용된다.As shown in FIG. 1, geotextiles are installed on the soft ground to be filled, and the floating equipment 3 of the installation portion is positioned above the geotextiles. In the landfill method of the present invention, geotextiles are laid on landfill soil without surface treatment of super soft ground, which is made of landfill, and landfill material is laid on the geotextiles. As geotextiles, polypropylene mats or polyester mats are generally used.

포설부의 부유식 장비는 폰툰형 장비로서 그 양쪽 측부에 하나 이상의 부력휠(33)이 장착되어, 그 장비의 접지압이 0.1 ㎏f/㎠ 이하가 되도록 한다. 폰툰형장비 만으로도 접지압이 충분할 경우 별도의 부력휠은 장착하지 않을 수도 있다. 접지압이 이처럼 낮기 때문에 토목섬유가 포설된 곳이면 어디든지 부유식 장비가 접근하여 포설작업을 할 수 있다. 육상부의 트랙 주행장비(1)로부터 성토재료를 호퍼(32)에 받고, 벨트콘베이어(31)를 따라 성토재료를 이송시키고, 포설하고자 하는 위치에서 성토재료를 차례로 포설한다. 포설부의 부유식 장비(3)에 의하여 1회에 의하여 포설되는 성토재료의 두께는 약 10∼30 ㎝의 범위가 바람직하며 그 두께는 약 10∼30 ㎝의 범위가 바람직하며, 그 두께는 지반의 연약정도에 따라서 조절될 수 있다. 따라서 이러한 두께로 포설한 후 부유식장비(3)는 다음 포설하고자 하는 지역으로 이동한다.Floating equipment of the installation portion is a pontoon-type equipment is equipped with one or more buoyancy wheels 33 on both sides thereof, so that the ground pressure of the equipment is 0.1 kgf / ㎠ or less. If the pontoon type equipment has sufficient ground pressure, a separate buoyancy wheel may not be installed. Because of this low ground pressure, floating equipment can be accessed and laid wherever geotextiles are laid. The landfill material is received from the track traveling equipment 1 of the land part by the hopper 32, the landfill material is transferred along the belt conveyor 31, and the landfill material is sequentially installed at the position to be laid. The thickness of the fill material laid by the floating equipment 3 of the laying portion once is preferably in the range of about 10 to 30 cm, the thickness of which is preferably in the range of about 10 to 30 cm, and the thickness of the ground It can be adjusted according to the degree of weakness. Therefore, after laying at such a thickness, the floating equipment (3) moves to the next area to be laid.

포설부의 부유식 장비(3)가 다음 지역으로 이송하면 육상부의 트랙주행장치(1)로부터 멀어지기 때문에 그 사이에 이송부의 부유식 장비(2)가 설치된다. 이송부의 부유식 장비(2)는 트랙주행장치(1)로부터 포설부의 부유식 장비(3)로 성토재료를 이송하기 위한 장비로서 거리가 먼 경우에는 복수개가 설치될 수 있다. 이송부의 부유식 장비(2)도 초연약지반 위에 설치되기 때문에 그 측부에 각각 하나 이상의 부력휠(23)이 장착되는 폰툰형 장비이다. 다만 이송부의 부유식 장비(2)의 벨트콘베이어(21)는 회전하지 않고 고정되어도 무방하다.When the floating equipment 3 of the installation portion moves to the next area, the floating equipment 2 of the transportation portion is installed between them. Floating equipment (2) of the conveying unit is a device for transferring the fill material from the track running device (1) to the floating equipment (3) of the installation portion, when a long distance can be installed a plurality. Floating equipment (2) of the transfer part is also a pontoon-type equipment, each of which is mounted on one or more buoyancy wheels 23 on the side of the super soft ground. However, the belt conveyor 21 of the floating equipment 2 of the transfer unit may be fixed without rotation.

제3도는 이송부의 부유식 장비(2)의 개략적인 정면도이다. 부유식 장비(2)는 폰툰형 주행장치로 구성되고 그 하부의 양쪽에 부력휠(23)이 장착되고, 그 상부에는 벨트콘베이어(21)와 호퍼(22)가 구비된다. 이송부의 부유식 장비(2)는 육상부의 트랙주행장비(1)와 포설부의 부유식 장비(3)를 연결하는 장비로서 이송거리에 따라 복수대의 장비를 설치할 수 있다. 그럼으로써 광범위한 매립지를 성토하는 경우에도 접근로를 개설하지 않고 성토작업이 가능하다. 그만큼 공사비가 적게드는 것이다.3 is a schematic front view of the floating equipment 2 of the conveying part. Floating equipment (2) is composed of a pontoon-type traveling device and is equipped with a buoyancy wheel (23) on both sides of the lower, the belt conveyor 21 and the hopper 22 on the upper portion. Floating equipment (2) of the transport unit is a device for connecting the track running equipment (1) of the land and the floating equipment (3) of the installation portion can be installed a plurality of equipment according to the transport distance. This makes it possible to work on land without extensive access, even in widespread landfills. The construction cost will be less.

제4도는 포설부의 부유식 장비(3)의 개략적인 정면도이고, 제5도는 그 측면도이고, 제6도는 그 평면도이다. 도시된 바와 같이, 부유식 장비(3)의 양쪽에는 각각 3개씩의 부력휠(33)이 장착되어 폰툰형 트랙의 부력을 보강하도록 했으며 부력에 의하여 장비의 접지압을 적게 할 수 있다. 매립지 지반의 연약 정도에 따라 부력휠(33)의 개수를 조절할 수 있다. 통상 장비의 한쪽에 1∼3개의 부력휠(33)이 조립식으로 고정될 수 있지만 반드시 이에 한정되는 것은 아니다.4 is a schematic front view of the floating equipment 3 of the installation portion, FIG. 5 is a side view thereof, and FIG. 6 is a plan view thereof. As shown, each of the floating equipment (3) is equipped with three buoyancy wheels 33 each to reinforce the buoyancy of the pontoon type track and can reduce the ground pressure of the equipment by buoyancy. The number of buoyancy wheels 33 can be adjusted according to the degree of softness of the landfill ground. Typically, one to three buoyancy wheels 33 on one side of the equipment can be prefabricated, but is not necessarily limited thereto.

부력휠(33)은 고정되는 샤프트의 상하 높이조절장치(도시되지 않음)에 의하여 높이 조절이 가능하다. 즉 부력휠의 높이를 조절함으로써 접지압의 밸랜스(balance)를 조절한다. 부력휠이 과도한 접지압을 받으면 폰툰형에 장착된 트랙이 공회전하여 전후진 되지 않는다. 따라서 부력휠의 접지압과 폰툰형 트랙의접지압이 균형을 이루도록 부력휠의 높이를 조절하여야 하며, 이는 본 발명이 속하는 기술분야의 당업자에 의하여 용이하게 실시 될 수 있다The buoyancy wheel 33 is capable of height adjustment by the vertical height adjustment device (not shown) of the shaft to be fixed. That is, by adjusting the height of the buoyancy wheel to adjust the balance (balance) of ground pressure. If the buoyancy wheel is subjected to excessive grounding pressure, the track mounted on the pontoon type is idle and cannot move forward or backward. Therefore, the height of the buoyancy wheel should be adjusted to balance the grounding pressure of the buoyancy wheel and the grounding pressure of the pontoon type track, which can be easily implemented by those skilled in the art.

부력휠은 원통형으로 제작되며, 부력을 발생시켜야 하기 때문에 그 내부에는 공기로 충진된다. 부력휠은 철재 또는 합성수지 고무재료로 제작될 수 있다. 부력휠은 종래의 폰툰형 장비에 조립식으로 장착될 수 있으며, 필요한 경우 자체구동이 가능하도록 주행장치를 부착할 수 있다.The buoyancy wheel is made of cylindrical shape and filled with air because it needs to generate buoyancy. The buoyancy wheel can be made of steel or synthetic rubber material. The buoyancy wheel can be mounted prefabricated to conventional pontoon type equipment, and can be attached to the traveling device to enable self-drive if necessary.

포설부의 부유식 장비(3)의 벨트콘베이어(31)는 360°로 회전 및 앞뒤로 자유롭게 이동되기 때문에, 원을 그리면서 콘베이어를 전후진시켜 성토재료를 부설하면 10∼30 ㎝의 균일한 포설이 용이하다. 이와 같은 방법으로 전체의 매립지를 1차 성토한 후, 계속 반복한다. 통상 성토두께가 1∼3 m 정도가 되면 일반장비의 접지압이 확보되기 때문에 이를 위해 매립지 전면적에 걸쳐 약 10∼20 회 정도의 포설작업을 반복한다.Since the belt conveyor 31 of the floating equipment 3 of the installation portion moves freely and rotates back and forth at 360 °, when the conveyor material is laid back and forth while drawing a circle, it is easy to install 10-30 cm uniformly. Do. After the first landfill of the entire landfill is completed in this manner, the process is repeated. In general, when the fill thickness is about 1 to 3 m, the grounding pressure of general equipment is secured. Therefore, the laying work is repeated about 10 to 20 times over the entire landfill.

본 발명의 방법에 따라 시공함으로써 초연약지반의 표층의 지반파괴 없이 용이하게 성토작업을 할 수 있다.By constructing according to the method of the present invention, it is possible to easily fill the ground without breaking the surface of the super soft ground.

본 발명에 의하면 해안매립지역과 같이 초연약지반을 성토할 수 있고, 준설매립된 초연약지반에 장비나 인력이 용이하게 접근하여 초연약지반을 성토할 수 있고, 초연약지반의 표층의 지반파괴 없이 성토할 수 있고, 시공비가 저렴하고 시공이 간편하여 아무리 연약한 지반이라 하더라도 아무런 문제없이 지반강화를 위한성토 공법을 제공하는 효과를 갖는다.According to the present invention, the super soft ground can be filled like the coastal landfill area, and equipment or manpower can easily access the dredged super soft ground, and the super soft ground can be filled, and the ground destruction of the super soft ground It is possible to fill in without, and the construction cost is cheap and the construction is easy, no matter how fragile ground has the effect of providing a fill method for soil reinforcement without any problem.

본 발명의 단순한 변형 내지 변경은 이 분야의 통상의 지식을 가진 자에 의하여 용이하게 실시될 수 있으며 이러한 변형이나 변경은 모두 본 발명의 영역에 포함되는 것으로 볼 수 있다.Simple modifications or changes of the present invention can be easily carried out by those skilled in the art, and all such modifications or changes can be seen to be included in the scope of the present invention.

Claims (12)

성토하고자 하는 매립지에 접근할 수 있는 최소한의 접근로 위에 벨트콘베이어와 호퍼가 구비된 트랙 주행장비(1)를 설치하여 성토재료를 이송하고;Installing a track driving device (1) equipped with a belt conveyor and a hopper on a minimum access path for accessing the landfill to be filled; 상기 매립 위에 토목섬유를 포설하고;Laying geotextiles on said landfill; 부설된 토목섬유 위에 포설부의 부유식장비(3)를 설치하여 상기 성토재료를 일정한 두께로 포설하고;Installing the floating equipment (3) of the laying portion on the laid geotextiles and laying the fill material with a certain thickness; 상기 포설부의 부유식장비를 이동시켜 성토하고자 하는 전체의 매립지에 상기 성토재료를 1회 포설하고; 그리고Placing the filling material once in the entire landfill to be filled by moving the floating equipment of the laying portion; And 상기 포설작업을 반복하여 전체의 매립지를 성토하는 단계로 이루어지는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.Filling method of ultra soft ground using a floating belt conveyor, characterized in that the step of filling the entire landfill by repeating the laying operation. 제1항에 있어서, 상기 포설부의 부유식 장비(3)는 양쪽에 하나 이상의 부력휠(33)이 장착되고, 그 상부에는 벨트콘베이어(31)와 호퍼(32)가 구비되는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.According to claim 1, Floating equipment (3) of the installation portion is floating, characterized in that one or more buoyancy wheel (33) is mounted on both sides, the belt conveyor 31 and the hopper 32 is provided on the upper portion Sedimentation of Super Soft Ground Using a Belt Conveyor. 제2항에 있어서, 상기 부유식 장비(3)의 트랙주행장치(34)는 폰툰형이고, 부력을 쉽게 받을 수 있도록 내부는 격벽이 설치된 강구조인 것을 특징으로 하는부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.According to claim 2, The track running device 34 of the floating equipment (3) is a pontoon type, super soft using a floating belt conveyor, characterized in that the inside of the steel structure is installed with a partition wall so as to easily receive buoyancy. Geotechnical Method of Soil. 제2항에 있어서, 상기 부력휠(33)은 원통형으로 제작되며, 그 내부는 공기로 충진되어 있는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 2, wherein the buoyancy wheel (33) is made of a cylindrical shape, the inside of the super soft ground using a floating belt conveyor, characterized in that the earthwork method using a floating belt conveyor. 제2항에 있어서, 상기 부력휠(33)은 상기 부력휠의 접지압과 폰툰형 트랙의 접지압이 균형을 이루도록 높이를 조절하여 설치되는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 2, wherein the buoyancy wheel 33 is installed by adjusting the height so that the grounding pressure of the buoyancy wheel and the grounding pressure of the pontoon type track balances the ground construction method of the super soft ground using a floating belt conveyor. . 제2항에 있어서, 상기 부력휠(33)은 장비의 한쪽에 1∼3개씩 조립식으로 고정되어 설치되는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 2, wherein the buoyancy wheel (33) is installed on the one side of the equipment is fixed to the prefabricated method of super soft ground using a floating belt conveyor, characterized in that installed. 제2항에 있어서, 상기 부력휠(33)은 철재, 합성수지재 또는 고무재질로 제작되는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 2, wherein the buoyancy wheel 33 is made of iron, synthetic resin, or rubber material, the earth-filling method of ultra-soft ground using a floating belt conveyor. 제2항에 있어서, 상기 벨트콘베이어(31)는 360°로 회전 및 전후진이 가능하며 콘베이어 모터를 역회전하여 육상부쪽부터 성토재료를 균일하게 포설한 후, 다시 콘베이어 모터를 정회전하여 육상부 반대쪽부터 성토재료를 균일하게 포설하는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.According to claim 2, The belt conveyor 31 is capable of rotating and advancing to 360 ° and the reverse rotation of the conveyor motor to uniformly install the fill material from the land side side, and then again rotates the conveyor motor forward from the opposite side of the land portion An earthquake drilling method of ultra soft ground using a floating belt conveyor, characterized in that the material is uniformly laid. 제1항에 있어서, 상기 포설부의 부유식 장비(3)는 폰툰형 장비로서 접지압이 0.1 kgf/㎠ 이하인 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 1, wherein the floating equipment (3) of the installation portion is a pontoon-type equipment earth ground pressure method using the floating belt conveyor characterized in that the ground pressure is 0.1 kgf / ㎠ or less. 제1항에 있어서, 상기 포설부의 부유식 장비(3)가 상기 트랙 주행장비(1)로부터 멀어지는 경우, 성토재료를 이송하기 위한 이송부의 부유식 장비(2)를 상기 트랙 주행장비(1)와 포설부의 부유식 장비(3) 사이에 최소한 하나 이상 설치하여 이송부 부유식 장비(2)를 통해 트랙 주행장비(1)로부터 이송된 성토재료를 포설부의 부유식 장비(3)에 이송하는 단계를 더 포함하는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.According to claim 1, When the floating equipment (3) of the installation portion away from the track driving equipment (1), the floating equipment (2) of the conveying portion for conveying the fill material to the track driving equipment (1) Installing at least one between the floating equipment (3) of the laying portion to transfer the fill material transferred from the track traveling equipment (1) to the floating equipment (3) of the laying portion through the transfer portion floating equipment (2) Sedimentation method of ultra soft ground using a floating belt conveyor comprising a. 제10항에 있어서, 상기 이송부의 부유식 장비(2)는 양쪽에 하나 이상의 부력휠(23)이 장착되고, 그 상부에는 벨트콘베이어(21)와 호퍼(22)가 구비되는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The floating device (2) of the conveying part is characterized in that one or more buoyancy wheels (23) are mounted on both sides, and a belt conveyor (21) and a hopper (22) are provided on the upper side. Sedimentation of Super Soft Ground Using a Belt Conveyor. 제1항에 있어서, 상기 1회의 포설작업은 매립지의 성토두께가 10∼30 ㎝ 되도록 하고, 전체의 매립지를 1차 성토한 후, 약 10∼20회 정도의 포설작업을 반복하여 성토두께가 1∼3 m 정도까지 성토하는 것을 특징으로 하는 부유식 벨트 콘베이어를 이용한 초연약지반의 성토공법.The method of claim 1, wherein the one laying work is to make the land thickness of the landfill 10 ~ 30 cm, and after the first landfill of the entire landfill land, repeating about 10 to 20 times of laying work is 1 Filling method of ultra soft ground using floating belt conveyor, characterized in that the soil is filled up to about 3 m.
KR10-2001-0036710A 2001-06-26 2001-06-26 Banking Method on Very Weak Soil Using Floating Belt Conveyor System KR100374996B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0036710A KR100374996B1 (en) 2001-06-26 2001-06-26 Banking Method on Very Weak Soil Using Floating Belt Conveyor System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0036710A KR100374996B1 (en) 2001-06-26 2001-06-26 Banking Method on Very Weak Soil Using Floating Belt Conveyor System

Publications (2)

Publication Number Publication Date
KR20010079234A true KR20010079234A (en) 2001-08-22
KR100374996B1 KR100374996B1 (en) 2003-03-06

Family

ID=19711355

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0036710A KR100374996B1 (en) 2001-06-26 2001-06-26 Banking Method on Very Weak Soil Using Floating Belt Conveyor System

Country Status (1)

Country Link
KR (1) KR100374996B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100458381B1 (en) * 2001-10-30 2004-12-03 삼성중공업 주식회사 Construction method of sand-mat for reinforcing ground of weakness
KR100550674B1 (en) * 2005-03-12 2006-02-13 석정건설주식회사 An apparatus and a spreading method by moving belt sprayer
KR100897870B1 (en) * 2008-08-18 2009-05-15 주식회사 준건설 A system for aggregate scattering and the aggregate scattering method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101962926B1 (en) * 2018-06-04 2019-03-28 (주)미래지반연구소 The construction method for spreading of ground stiffener
KR101962928B1 (en) * 2018-06-04 2019-03-28 (주)미래지반연구소 The construction method for spreading of ground stiffener

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3150811B2 (en) * 1993-01-19 2001-03-26 佐伯建設工業株式会社 Spraying sand on soft ground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100458381B1 (en) * 2001-10-30 2004-12-03 삼성중공업 주식회사 Construction method of sand-mat for reinforcing ground of weakness
KR100550674B1 (en) * 2005-03-12 2006-02-13 석정건설주식회사 An apparatus and a spreading method by moving belt sprayer
KR100897870B1 (en) * 2008-08-18 2009-05-15 주식회사 준건설 A system for aggregate scattering and the aggregate scattering method

Also Published As

Publication number Publication date
KR100374996B1 (en) 2003-03-06

Similar Documents

Publication Publication Date Title
CN101775821B (en) Device and method for vertically transporting earthwork by reverse construction method
CN106192974B (en) A kind of device and method of sludge solidification processing
KR100374996B1 (en) Banking Method on Very Weak Soil Using Floating Belt Conveyor System
CN113897831A (en) Static and dynamic drainage consolidation construction process method for deep soft soil area
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN100392189C (en) Box-depositing dock light quantization
KR20080105213A (en) Construction method of ground reinforcing materials spreader for improvement support force of weakness ground
CN112854117B (en) L-shaped wharf construction method
KR940002457B1 (en) Method and apparatus for increasing bearing capacity of soft soil and constructing cutoff wall
CN104790274A (en) Powder injection treatment device for soft foundation pavement
CN204626184U (en) A kind of road surface with soft subgrade dusts treating apparatus
KR20070078525A (en) Improvement method for soft ground
KR0155668B1 (en) Water loading method of poor subsoil
KR100994242B1 (en) Sand spreader apparatus and method on water
CN205975562U (en) Silt solidification treatment's equipment
CN220644198U (en) Sand soft foundation road engineering pile foundation reinforced structure
CN204626213U (en) A kind of road surface with soft subgrade whitewashing treating apparatus
CN113089645B (en) Slotted hole structure system for reinforcing concrete impervious wall by penetrating silt layer and construction method
KR20130008967A (en) The accelerating method of drain equipments for settling and settlement at reclaimed materials
Roy Site Development
KR100458381B1 (en) Construction method of sand-mat for reinforcing ground of weakness
US3191387A (en) Method for making permeable conduits in subterranean lines of drainage
KR100550674B1 (en) An apparatus and a spreading method by moving belt sprayer
KR100579701B1 (en) Reclaimed land formed in the soft ground of the seashore using dredged soil and sand so as to reinforce bearing power, and forming method thereof
KR100750280B1 (en) A traveling type of spreader and spreading method using the spreader

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070130

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee