KR20010038427A - Ultra higher stories wall type united construction method - Google Patents
Ultra higher stories wall type united construction method Download PDFInfo
- Publication number
- KR20010038427A KR20010038427A KR1019990046392A KR19990046392A KR20010038427A KR 20010038427 A KR20010038427 A KR 20010038427A KR 1019990046392 A KR1019990046392 A KR 1019990046392A KR 19990046392 A KR19990046392 A KR 19990046392A KR 20010038427 A KR20010038427 A KR 20010038427A
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- precast concrete
- slab
- concrete
- floor
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/164—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, only the horizontal slabs being partially cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
본 발명은 초고층 벽식 복합화 공법의 시공방법에 관한 것으로, 특히 현장타설 콘크리트와 프리캐스트 콘크리트(Precast Concrete)를 합리적으로 구분 적용하여 시공성과 품질의 향상은 물론, 구조적으로 안전성을 크게 향상시켜 초고층 프리캐스트 콘크리트 아파트의 시공이 가능하도록 하고 접합부위의 방수성이 향상되며 층간 충격음의 완화 및 차음성능을 향상시키도록 한 초고층 벽식 복합화 공법의 시공방법에 관한 것이다.The present invention relates to a construction method of a high-rise wall composite method, and in particular, the rational application of cast-in-place concrete and precast concrete (Radio-concrete) to improve the construction and quality, as well as structurally greatly improve the safety of ultra-high precast The present invention relates to a construction method of a high-rise wall compounding method that enables the construction of concrete apartments, improves the waterproofness of the joints, and alleviates the impact noise between the floors and improves the sound insulation performance.
현대에는 인구의 증가에도 불구하고 주거용 가옥이나 사무용 건물이 한정되어 있으므로 인구의 과밀 지역인 도시 지역에는 주거 및 사무용 건물을 고층으로 건설하여 인구의 과밀에 따른 주거 및 사무용 공간의 부족분을 해소하고 있음은 이미 잘 알려진 사실이다.In modern times, despite the increase in population, residential houses and office buildings are limited, so in urban areas, which are overcrowded, the residential and office buildings are built on high floors, eliminating the shortage of residential and office space due to overcrowding. This is a well known fact.
그리고 1990년대 초에 프리캐스트 콘크리트를 사용한 아파트의 시공이 활발하였지만, 15층 이상의 고층 아파트가 일반화되면서 점차 감소하는 추세이다.And although the construction of apartments using precast concrete was active in the early 1990s, it is gradually decreasing as high-rise apartments of 15 floors or more are generalized.
이는 기존의 프리캐스트 콘크리트 공법이 법적, 기술적 제약으로 인해 아파트의 초고층화에는 한계가 있게 된다는 점과, 프리캐스트 콘크리트 부재가 공장에서 생산되므로 제반 품질이 우수함에도 불구하고 설계나 시공상의 결함으로 인해 방수 성능이 떨어지는 등 고객의 품질 욕구를 만족시켜주지 못하였기 때문이다.This is because the existing precast concrete method has limitations on the high-rise of apartments due to legal and technical constraints, and because the precast concrete member is produced at the factory, despite the excellent quality, This is because the company failed to satisfy the customer's quality needs such as poor performance.
그러므로 요즈음 건설되는 16층 이상의 많은 고층 건물이 프리캐스트 콘크리트를 사용하지 않고 현장타설 콘크리트만을 사용하여 시공하는 추세이다.Therefore, many high-rise buildings with 16 or more floors that are being constructed these days are constructed using only cast-in-place concrete without using precast concrete.
즉, 건설 현장에서 기초공사를 한 상태에서 그 위에 바닥과 벽체를 모두 현장에서 타설하는 콘크리트를 이용하여 건축하였다.In other words, with the foundation construction at the construction site, both floors and walls were built using concrete that was poured on site.
그러나 상기와 같은 종래의 현장타설 콘크리트만을 이용한 고층 건물의 시공방법에 의하여서는 현장에서 모든 콘크리트를 타설하기 위하여 거푸집을 설치해야 하는 번거로움과 콘크리트가 완전히 굳어야 그 위에 벽체용 콘크리트를 타설할 수 있어 공사기간이 길어지게 되는 단점이 있음은 물론, 현장타설시 사용하였던 건설 폐기물이 발생하여 환경을 오염시키는 원인이 되었다.However, in the construction method of high-rise buildings using only the conventional cast-in-place concrete as described above, it is necessary to install the formwork in order to pour all the concrete in the field and the concrete must be completely solid so that the concrete for the wall can be poured on it. Not only has the disadvantage of lengthening the construction period, but also construction wastes that were used during site casting were generated, causing pollution to the environment.
그리고 건설 인력이 고령화되는 추세에서 현장타설 콘크리트만으로 고층 건물을 건축하기에는 생산성이 저하되는 직접적인 요인이 되었다.In addition, in the trend of aging of construction personnel, building a high-rise building only with cast-in-place concrete has been a direct factor in reducing productivity.
또한 현장타설을 위해 거푸집을 설치하고 해체시키는 비효율적인 작업성과 함께 작업시 소음과 분진이 발생하여 건설 현장의 주변 공기를 오염시키게 되는 등의 문제점이 있었다.In addition, there was a problem such as noise and dust generated at work and polluting the surrounding air at the construction site with inefficient workability to install and dismantle the formwork for site casting.
이에 따라 본 발명은 현장타설 콘크리트와 프리캐스트 콘크리트(Precast Concrete)를 합리적으로 구분 적용하여 시공성과 품질의 향상은 물론, 구조적으로 안전성을 크게 향상시켜 초고층 프리캐스트 콘크리트 아파트의 시공이 가능하도록 하고 접합부위의 방수성이 향상되며 층간 충격음의 완화 및 차음성능을 향상시키도록 한 초고층 벽식 복합화 공법의 시공방법을 제공함을 그 목적으로 한다.Accordingly, the present invention, by rational application of cast-in-place concrete and precast concrete to improve the construction and quality, as well as structurally greatly improve the safety to enable the construction of ultra-high-rise precast concrete apartments and joints The purpose of the present invention is to provide a construction method of the ultra-high wall composite composite method to improve the waterproof performance and to alleviate the impact sound between the layers and to improve the sound insulation performance.
이와 같은 목적을 달성하기 위한 본 발명은 바닥인 슬래브는 현장타설 콘크리트로 건축하고, 벽체는 모두 프리캐스트 콘크리트로 건축하고,In order to achieve the above object, the present invention is a floor slab is built of cast-in-place concrete, the walls are all precast concrete,
층과 층의 사이에 건축되는 계단은 모두 프리캐스트 콘크리트로 건축하고,All stairs built between floors are precast concrete,
전, 후면 발코니는 하프 프리캐스트 콘크리트로 건축하도록 함으로써 시공성과 품질의 향상은 물론, 구조적으로 안전성을 크게 향상시켜 초고층 프리캐스트 콘크리트 아파트의 시공이 가능하도록 하고 접합부위의 방수성이 향상되며 층간 충격음의 완화 및 차음성능을 향상시키고 프리캐스트 콘크리트로만 건축한 경우에 비해 구조적인 일체감이 향상되도록 한 것이다.The front and rear balconies are constructed of half precast concrete, which not only improves construction and quality, but also greatly improves the safety of construction, enabling the construction of high-rise precast concrete apartments, improving the waterproofing of the joints, and reducing the impact noise between floors. And to improve the sound insulation performance and to improve the structural sense of unity compared to the case of building only precast concrete.
도 1은 본 발명의 실시예에 따른 건축물의 시공순서를 개략적으로 도시한 계통도.1 is a schematic diagram showing a construction sequence of a building according to an embodiment of the present invention.
도 2는 본 발명의 실시예에 따른 건축물의 내부 구성을 개략적으로 도시한 평면도.Figure 2 is a plan view schematically showing the internal configuration of the building according to an embodiment of the present invention.
도 3은 본 발명의 실시예에 따라 측벽을 시공하는 상태의 구조를 나타낸 단면도.3 is a cross-sectional view showing a structure of a state of constructing the side wall according to an embodiment of the present invention.
도 4는 본 발명의 실시예에 따라 내벽을 시공하는 상태의 구조를 나타낸 단면도.4 is a cross-sectional view showing a structure of a state of constructing the inner wall according to an embodiment of the present invention.
* 도면의 주요부분에 대한 부호 설명 *Explanation of symbols on the main parts of the drawings
1, 13 : 슬래브 2, 11, 15 : 벽체1, 13: slab 2, 11, 15: wall
3, 4 : 발코니 5 : 계단3, 4: balcony 5: stairs
6 : 전실 7 : 복도6: all rooms 7: hallway
이하 본 발명을 일실시예에 따라 상세히 기술하면 다음과 같다.Hereinafter, the present invention will be described in detail according to an embodiment.
도 1 및 도 2는 본 발명의 일실시예에 따른 건축물의 내부 구성과 시공순서를 도시한 것으로서,1 and 2 illustrate the internal configuration and construction sequence of a building according to an embodiment of the present invention,
기초공사를 포함하는 바닥면 슬래브(1)가 현장타설 콘크리트로 타설 시공되어 양생이 완료된 상태에서,In the state that the bottom surface slab (1) including the foundation work is cast in place cast concrete and completed curing,
상기 바닥면 슬래브(1)의 윗면에 벽체(2)를 프리캐스트 콘크리트로 조립 시공하는 단계(S1)와,Assembling and constructing the wall (2) in the precast concrete on the upper surface of the bottom slab (S1),
상기 바닥면 슬래브(1)에 연결되는 전면 발코니(3)와 후면 발코니(4)를 하프 프리캐스트 콘크리트로 조립 시공하는 단계(S2)와,Assembling and constructing the front balcony 3 and the rear balcony 4 connected to the floor slab 1 with half precast concrete (S2);
층과 층의 사이에 건축되는 계단(5)을 프리캐스트 콘크리트로 조립 시공하는 단계(S3)와,Step (S3) of assembling and constructing the stairs (5) are built between the layers of precast concrete,
상기의 계단(5)과 바닥의 슬래브(1)가 만나는 전실(6)을 하프 프리캐스트 콘크리트로 시공하는 단계(S4)와,Constructing the front chamber 6 where the staircase 5 and the slab 1 of the bottom meet with half-precast concrete (S4),
상기 벽체(2)와 하부벽체 사이의 수직 조인트를 위한 모르타르를 타설하는 단계(S5)와,Placing mortar for the vertical joint between the wall (2) and the lower wall (S5);
상기 벽체(2)의 윗면과 접하는 상단에 건축물의 위층 바닥인 슬래브를 현장타설 콘크리트로 시공하기 위한 거푸집을 설치하는 단계(S6)와,Installing a formwork for constructing the slab, which is the upper floor of the building in the cast-in-place concrete on the upper surface in contact with the upper surface of the wall (2) (S6),
상기 거푸집에 슬래브에 내장되는 철근을 배근하고, 설비용 관들을 배관하며, 전기용 자재들을 매입하는 단계(S7)와,Reinforcing the reinforcing steel bar embedded in the slab to the formwork, pipe pipes for the installation, and the purchase of electrical materials (S7),
상기 거푸집에 현장타설 콘크리트를 타설하여 슬래브를 형성하는 단계(S8)들에 의해 시공하도록 한 것이다.The cast-in-place concrete is poured to form the slab by the steps of forming the slab (S8).
그리고, 도 3 은 본 발명의 실시예에 따라 건물의 측벽을 시공하는 상태의 구조를 나타낸 단면도이고, 도 4 는 본 발명의 실시예에 따라 내벽을 시공하는 상태의 구조를 나타낸 단면도로서,And, Figure 3 is a cross-sectional view showing the structure of the state of constructing the side wall of the building according to an embodiment of the present invention, Figure 4 is a cross-sectional view showing the structure of the state of constructing the inner wall according to an embodiment of the present invention,
도 3 에 도시함과 같이 측벽을 시공할 때에는 아래쪽에 위치하는 프리캐스트 콘크리트로 형성한 제 1 벽체(11)의 상단에서 외부로 돌출된 철근(12)을 연장시키는 상태의 종방향과 횡방향으로 다수의 철근(14)을 내장하면서 바닥인 슬래브(13)를 도면에 도시하지 않은 거푸집의 상단에 현장에서 콘크리트를 타설하면서 시공하여 양생이 완료되어 충분히 굳게되면,As shown in FIG. 3, in the longitudinal direction and the transverse direction in the state in which the reinforcing bars 12 protruding outward from the upper end of the first wall 11 formed of precast concrete located below are extended when the side walls are constructed. When the slab 13, which is a floor with a plurality of reinforcing bars 14, is placed on the top of the formwork not shown in the drawings, the concrete is poured while the curing is completed and sufficiently solidified.
상기 제 1 벽체(11)의 상면과 하면이 접하는 제 2 벽체(15)를 프리캐스트 콘크리트로 조립 설치하고,Assemble and install the 2nd wall 15 which the upper surface and the lower surface of the said 1st wall 11 contact | connects with precast concrete,
상기 제 1 벽체(11)의 상면과 제 2 벽체(15)의 하면이 접하는 부분의 외부측에는 차단재(16)와 백업부재(17)를 삽입하고,A barrier member 16 and a backup member 17 are inserted into an outer side of a portion where the upper surface of the first wall 11 and the lower surface of the second wall 15 contact each other.
상기 제 1 벽체(11)의 돌출된 상면(11a)이 제 2 벽체(15)의 오목한 하면(15a)에 접하는 중앙에는 물을 흡수하지 않으면서 우수한 단열성을 갖는 스펀지 고무재의 충전물(18)을 삽입하고,In the center where the protruding upper surface 11a of the first wall 11 is in contact with the concave lower surface 15a of the second wall 15, a filler 18 made of sponge rubber material having excellent heat insulating property is absorbed without absorbing water. and,
상기 제 1 벽체(11)의 상면이 제 2 벽체(15)의 하면과 접하는 내측에는 깔 모르타르(pad mortar)층(19)을 형성하여 시공한 것이다.The upper surface of the first wall 11 is formed in contact with the lower surface of the second wall 15 by forming a pad mortar layer 19.
위와 같이 구성되는 벽체의 시공에는 본 발명의 초고층 벽식 복합화 공법의 시공방법에 따라 처음에 기초공사를 포함하는 바닥면의 슬래브(1)를 현장에 거푸집을 설치한 상태에서 내부에 철근을 내설하면서 현장타설 콘크리트를 타설한 상태에서,In the construction of the wall structured as described above, according to the construction method of the ultra-high-rise wall composite method of the present invention, the slab (1) of the floor surface including the basic construction at the beginning while the formwork is installed on the site while laying reinforcement inside the site With pour concrete,
상기 바닥면의 현장타설로 형성한 슬래브(1)가 완전히 양생되어 충분히 굳으면 그 윗면에 공장에서 규격화하여 제작한 프리캐스트 콘크리트로 형성된 벽체(2)를 조립하면서 설치한다.When the slab 1 formed by in-situ casting of the bottom surface is completely cured and sufficiently hardened, the slab 1 is installed while assembling the wall 2 formed of precast concrete manufactured on a factory standardized on the upper surface thereof.
상기 바닥면 슬래브(1)에 연결되는 전면 발코니(3)와 후면 발코니(4)를 하프 프리캐스트 콘크리트로 시공한다.The front balcony 3 and the rear balcony 4 connected to the floor slab 1 are constructed of half precast concrete.
즉, 공장에서 철근을 내장하면서 제작한 프리캐스트 콘크리트를 설치하고 그 위에 현장에서 설계에 의한 높이가 되도록 현장타설 콘크리트를 타설하는 하프 프리캐스트 콘크리트의 방법으로 시공한다. 따라서 건물의 외부로 돌출되는 발코니가 공장에서 정밀하고 외면이 미려하게 제작되어 시공 품질이 향상되며, 현장타설 콘크리트로 결합시킴으로 우수한 방수성능과 일체성을 확보할 수 있게 된다.In other words, precast concrete manufactured while reinforcing bars in the factory is installed, and the construction is performed by the method of half precast concrete in which the cast-in-place concrete is poured on the site so as to be the height of design. Therefore, the balcony that protrudes to the outside of the building is manufactured at the factory precisely and the exterior is beautiful, and the construction quality is improved, and by combining with the cast-in-place concrete, it is possible to secure excellent waterproofing performance and integrity.
층과 층의 사이에 건축되는 계단(5)은 공장에서 정확한 크기로 제작한 프리캐스트 콘크리트로 조립 시공한다.Stairs (5), which are built between floors, are assembled from precast concrete manufactured to the exact size in the factory.
또한 상기의 계단(5)과 바닥의 슬래브(1)가 만나는 전실(6)도 하프 프리캐스트 콘크리트로 시공하여 현장타설 콘크리트로 계단(5)과 전실(6)을 연결시킴으로 일체성을 확보할 수 있게 된다. 벽체와 하부벽체 사이의 수직 조인트를 위한 모르타르를 타설하여 상부 벽체와 하부 벽체를 연결하게 된다.In addition, the front chamber 6 where the staircase 5 and the slab 1 of the floor meet may also be constructed with half precast concrete, thereby connecting the staircase 5 and the front chamber 6 with cast-in-place concrete to ensure integrity. Will be. Mortar for the vertical joint between the wall and the lower wall is poured to connect the upper and lower walls.
그리고, 상기 벽체(2)의 윗면과 접하는 상단에 건축물의 위층 바닥인 슬래브를 현장타설 콘크리트로 건축하기 위한 거푸집을 설치하고,And, at the top contacting the upper surface of the wall (2) is installed a formwork for building the slab, which is the upper floor of the building with cast-in-place concrete,
이 때에는 도 3에 도시한 것과 같이 아래쪽에 위치하는 프리캐스트 콘크리트에 의한 제 1 벽체(11)의 상단에서 외부로 돌출된 철근(12)을 연장시키는 상태가 되도록 바닥인 슬래브의 거푸집을 형성하고 그 위에 종방향과 횡방향으로 다수의 철근(14)을 내장하고, 도면에는 나타나지 않지만 기타 수도관, 하수관등의 배관을 형성하고, 전기자재를 내설하도록하여 상기 거푸집에 슬래브(13)를 현장에서 현장타설 콘크리트를 타설하여 슬래브를 시공하게 된다.At this time, as shown in FIG. 3, the formwork of the slab, which is a floor, is formed so as to extend the reinforcing bar 12 protruding outward from the upper end of the first wall 11 by the precast concrete located below. On the other hand, a plurality of reinforcing bars 14 are embedded in the longitudinal direction and the transverse direction, and although not shown in the drawings, pipes such as other water pipes and sewer pipes are formed, and the slab 13 is placed on the form in the field so that the electrical materials are installed. The slab is constructed by pouring concrete.
또한, 상기 제 1 벽체(11)와 상기 슬래브(13)가 접합되는 부분의 제 1 벽체(1)의 내측으로 오목한 전단보강부(11b)가 형성되어 있어서 현장에서 타설되는 콘크리트가 상기 전단보강부(11b)까지 주입되도록 타설되므로 전단변형을 방지할 수 있게 된다.In addition, the shear reinforcement portion 11b concave inwardly of the first wall 1 of the portion where the first wall 11 and the slab 13 are joined is formed so that the concrete poured in the field is the shear reinforcement portion Since it is poured to be injected up to 11b, shear deformation can be prevented.
도 4 에 도시함과 같이 내벽을 시공할 때에는 아래쪽에 위치하는 프리캐스트 콘크리트로 형성한 하측 벽체의 상단에 종방향과 횡방향으로 다수의 철근(14)을 내장하면서 바닥인 슬래브(13)를 도면에 도시하지 않은 거푸집으로 현장에서 콘크리트를 타설하면서 시공하여 양생이 완료되어 충분히 굳게되면,As shown in FIG. 4, when the inner wall is constructed, the slab 13 which is the bottom is embedded while a plurality of reinforcing bars 14 are embedded in the longitudinal and transverse directions at the upper end of the lower wall formed of precast concrete positioned below. When the construction is completed and solidified by pouring concrete at the site with formwork not shown in
상기 제 1 벽체(11)의 상면과 하면이 접하는 제 2 벽체(15)를 프리캐스트 콘크리트로 조립 설치하고,Assemble and install the 2nd wall 15 which the upper surface and the lower surface of the said 1st wall 11 contact | connects with precast concrete,
상기 제 1 벽체(11)의 상면이 제 2 벽체(15)의 하면과 접하는 부위에 깔 모르타르(pad mortar)층(19)을 형성하여 시공한 것이다.The upper surface of the first wall 11 is formed by forming a pad mortar layer 19 at a portion in contact with the lower surface of the second wall 15.
위와 같이 구성되는 벽체의 시공에는 본 발명의 초고층 벽식 복합화 공법의 시공방법에 따라 처음에 기초공사를 포함하는 바닥면의 슬래브(1)를 현장에 거푸집을 설치한 상태에서 내부에 철근을 내설하면서 현장타설 콘크리트를 타설한 상태에서,In the construction of the wall structured as described above, according to the construction method of the ultra-high-rise wall composite method of the present invention, the slab (1) of the floor surface including the basic construction at the beginning while the formwork is installed on the site while laying reinforcement inside the site With pour concrete,
상기 바닥면의 현장타설로 형성한 슬래브(1)가 완전히 양생되어 충분히 굳으면 그 윗면에 공장에서 규격화하여 제작한 프리캐스트 콘크리트로 형성된 벽체(2)를 조립하면서 설치한다.When the slab 1 formed by in-situ casting of the bottom surface is completely cured and sufficiently hardened, the slab 1 is installed while assembling the wall 2 formed of precast concrete manufactured on a factory standardized on the upper surface thereof.
상기 바닥면 슬래브(1)에 연결되는 전면 발코니(3)와 후면 발코니(4)를 하프 프리캐스트 콘크리트로 시공한다.The front balcony 3 and the rear balcony 4 connected to the floor slab 1 are constructed of half precast concrete.
즉, 공장에서 철근을 내장하면서 제작한 프리캐스트 콘크리트를 설치하고 그 위에 현장에서 설계에 의한 높이가 되도록 현장타설 콘크리트를 타설하는 하프 프리캐스트 콘크리트의 방법으로 시공한다. 따라서 건물의 외부로 돌출되는 발코니가 공장에서 정밀하고 외면이 미려하게 제작되어 시공 품질이 향상되며, 현장타설 콘크리트로 결합시킴으로 우수한 방수성능과 일체성을 확보할 수 있게 된다.In other words, precast concrete manufactured while reinforcing bars in the factory is installed, and the construction is performed by the method of half precast concrete in which the cast-in-place concrete is poured on the site so as to be the height of design. Therefore, the balcony that protrudes to the outside of the building is manufactured at the factory precisely and the exterior is beautiful, and the construction quality is improved, and by combining with the cast-in-place concrete, it is possible to secure excellent waterproofing performance and integrity.
층과 층의 사이에 건축되는 계단(5)은 공장에서 정확한 크기로 제작한 프리캐스트 콘크리트로 조립 시공한다.Stairs (5), which are built between floors, are assembled from precast concrete manufactured to the exact size in the factory.
또한 상기의 계단(5)과 바닥의 슬래브(1)가 만나는 전실(6)도 하프 프리캐스트 콘크리트로 시공하여 현장타설 콘크리트로 계단(5)과 전실(6)을 연결시킴으로 일체성을 확보할 수 있게 된다. 벽체와 하부벽체 사이의 수직 조인트를 위한 모르타르를 타설하여 상부 벽체와 하부 벽체를 연결하게 된다.In addition, the front chamber 6 where the staircase 5 and the slab 1 of the floor meet may also be constructed with half precast concrete, thereby connecting the staircase 5 and the front chamber 6 with cast-in-place concrete to ensure integrity. Will be. Mortar for the vertical joint between the wall and the lower wall is poured to connect the upper and lower walls.
그리고, 상기 벽체(2)의 윗면과 접하는 상단에 건축물의 위층 바닥인 슬래브를 현장타설 콘크리트로 건축하기 위한 거푸집을 설치하고,And, at the top contacting the upper surface of the wall (2) is installed a formwork for building the slab, which is the upper floor of the building with cast-in-place concrete,
아래쪽에 위치하는 프리캐스트 콘크리트에 의한 제 1 벽체(11)의 상단에 슬래브의 거푸집을 형성하고 그 위에 종방향과 횡방향으로 다수의 철근(14)을 내장하고, 도면에는 나타나지 않지만 기타 수도관, 하수관등의 배관을 형성하고, 전기자재를 내설하도록하여 상기 거푸집에 슬래브(13)를 현장에서 현장타설 콘크리트를 타설하여 슬래브를 시공하게 된다.Form the slab formwork on the top of the first wall 11 by the precast concrete located below and embed a plurality of reinforcing bars 14 in the longitudinal and transverse directions thereon, and other water pipes, sewer pipes not shown in the drawings. The pipe is formed, and the electrical material is installed so that the slab 13 is cast on-site at the site.
따라서 본 발명의 초고층 벽식 복합화 공법의 시공방법에 의하여서는 바닥인 슬래브는 현장타설 콘크리트로 시공하고, 벽체는 모두 프리캐스트 콘크리트로 시공하고, 층과 층의 사이에 건축되는 계단은 모두 프리캐스트 콘크리트로 시공하고, 전, 후면 발코니는 하프 프리캐스트 콘크리트로 시공하도록 함으로써 시공성과 품질의 향상은 물론, 구조적으로 안전성을 크게 향상시켜 초고층 프리캐스트 콘크리트 아파트의 시공이 가능하도록 하고 접합부위의 방수성이 향상되며 층간 충격음의 완화 및 차음성능을 향상시키고 프리캐스트 콘크리트로만 건축한 경우에 비해 구조적인 일체감이 향상되도록 한 것이다.Therefore, according to the construction method of the ultra-high wall composite method of the present invention, the floor slab is constructed with cast-in-place concrete, all the walls are constructed of precast concrete, and all the stairs between the layers are precast concrete. The construction of the front and rear balconies is made of half precast concrete, which not only improves the construction and quality, but also greatly improves the safety of the structure, enabling the construction of high-rise precast concrete apartments, improving the waterproofing of the joints, and interlayer. The impact sound is improved and the sound insulation performance is improved, and the structural unity is improved as compared with the case of building only precast concrete.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990046392A KR20010038427A (en) | 1999-10-25 | 1999-10-25 | Ultra higher stories wall type united construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990046392A KR20010038427A (en) | 1999-10-25 | 1999-10-25 | Ultra higher stories wall type united construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20010038427A true KR20010038427A (en) | 2001-05-15 |
Family
ID=19616789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990046392A KR20010038427A (en) | 1999-10-25 | 1999-10-25 | Ultra higher stories wall type united construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20010038427A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777931A (en) * | 2019-11-06 | 2020-02-11 | 深圳市正知建筑技术有限公司 | Assembly type building outer wall waterproof structure and construction method thereof |
CN114197696A (en) * | 2021-12-15 | 2022-03-18 | 深圳市东深工程有限公司 | Prefabricated steel plate concrete shear wall and construction method thereof |
-
1999
- 1999-10-25 KR KR1019990046392A patent/KR20010038427A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777931A (en) * | 2019-11-06 | 2020-02-11 | 深圳市正知建筑技术有限公司 | Assembly type building outer wall waterproof structure and construction method thereof |
CN114197696A (en) * | 2021-12-15 | 2022-03-18 | 深圳市东深工程有限公司 | Prefabricated steel plate concrete shear wall and construction method thereof |
CN114197696B (en) * | 2021-12-15 | 2023-07-28 | 深圳市东深工程有限公司 | Precast steel plate concrete shear wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103993679B (en) | Low layer assembling combined wall house bolt connection node structure | |
KR101182536B1 (en) | Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose | |
WO2007134517A1 (en) | Composite concrete shear wall for heat insulation | |
KR101458434B1 (en) | Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same | |
CN106958358A (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
CN110593397A (en) | Multilayer assembled plate type building | |
KR100336870B1 (en) | Wall construction method use of Bar connection sleeve | |
KR102484159B1 (en) | Rapid Construction Structure of Core Part Using Multi-Story Precast Wall | |
KR20010038427A (en) | Ultra higher stories wall type united construction method | |
CN210713792U (en) | Exempt from to tear open heat preservation template system with promote roughness | |
CN211200692U (en) | Multilayer assembled plate type building | |
JP3074599B2 (en) | Half precast slab and floor structure using the same | |
KR100365138B1 (en) | Stairway room construction method use of precast concrete | |
KR100377134B1 (en) | Corridor and balcony of ultra higher stories apartment half slab construction method | |
CN105442729A (en) | Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof | |
KR20010038430A (en) | Structure of join part with water-proof function | |
CN217027529U (en) | Assembled steel construction building column base waterproof construction | |
KR101038681B1 (en) | PC Column-Beam Joint System for Underground Structureand Construction | |
CN215211494U (en) | Standardized full prefabricated combination formula concatenation balcony | |
CN112878562B (en) | Prefabricated lattice type composite floor slab and construction method thereof | |
CN216075705U (en) | Assembled closes and pieces together floor | |
KR100654822B1 (en) | A system and method of constructing the concret structure which is harded the buttom and wall | |
CN219138251U (en) | Modularized elevator hoistway | |
CN114215196B (en) | Waterproof structure of assembled steel structure building column foot and construction method | |
CN107152114B (en) | Assembled drop-free same-floor drainage floor system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
N231 | Notification of change of applicant | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |