CN105442729A CN201510824225.3A CN201510824225A CN105442729A CN 105442729 A CN105442729 A CN 105442729A CN 201510824225 A CN201510824225 A CN 201510824225A CN 105442729 A CN105442729 A CN 105442729A
Authority
CN
China
Prior art keywords
precast concrete
shear wall
layer precast
overlapped shear
concrete slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510824225.3A
Other languages
Chinese (zh)
Inventor
章梦杰
陈力
金星
顾佳宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAOXING BAOYE XIWEIDE PRECAST CONCRETE Co Ltd
Original Assignee
SHAOXING BAOYE XIWEIDE PRECAST CONCRETE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAOXING BAOYE XIWEIDE PRECAST CONCRETE Co Ltd filed Critical SHAOXING BAOYE XIWEIDE PRECAST CONCRETE Co Ltd
Priority to CN201510824225.3A priority Critical patent/CN105442729A/en
Publication of CN105442729A publication Critical patent/CN105442729A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of construction engineering, in particular to a superimposed shear wall with shear-resistant key grooves and a construction and manufacture method thereof. The superimposed shear wall comprises an inner layer precast concrete slab, an outer layer precast concrete slab and a middle cast-in-place concrete layer. The inner layer precast concrete slab and the outer layer precast concrete slab are connected through a steel bar truss. The shear-resistant key grooves are formed in the bottom of the inner layer precast concrete slab and the bottom of the outer layer precast concrete slab. Horizontal steel ribs and vertical steel ribs are arranged in the inner layer precast concrete slab and the outer layer precast concrete slab. Hooks used for hoisting are arranged on the top end face of the inner layer precast concrete slab and the top end face of the outer layer precast concrete slab. Embedded parts used for installation are arranged on the inner layer precast concrete slab. The superimposed shear wall is of an assembled integrated concrete structure and has the advantages of being good in anti-seismic performance, convenient to construct and install, capable of shortening the construction period and the like.

Description

A kind of overlapped shear wall with shearing resistance keyway and construction method thereof
Technical field
The present invention relates to construction engineering technical field, be specifically related to a kind of overlapped shear wall with shearing resistance keyway and construction method thereof.
Background technology
Shear wall structure due to its bear horizontal loading that wind load or geological process cause and vertical load (gravity) ability strong, can prevent structure shear (being cut) from destroying; Meanwhile, shear wall is little due to its breadth of section, in housing construction, does not affect service function of the rooms, therefore shear wall structure is the first-selected form of structure in high residential building.
In recent years, assembled architecture obtains very fast development, existing industry standard " prefabricated concrete structure tecnical regulations " JGJ1-2014 specifies that solid shear wall can adopt metal sleeve to be in the milk and connect or the connection of slurry anchor overlap joint, due to reserved sleeve or reserved opening allowable error little, on-the-spot joint bar quality is difficult to ensure, causes speed of application slow; In addition, post-grouting compactness is difficult to ensure, and the remedial measure do not had.
In view of this, the applicant provides a kind of overlapped shear wall with shearing resistance keyway and construction method thereof, and this case produces thus.
Summary of the invention
The object of the present invention is to provide a kind of overlapped shear wall with shearing resistance keyway and construction method thereof, overlapped shear wall plate in-site installation is convenient, speed of application is fast, and inside and outside two-layer precast concrete plank base plate arranges shearing resistance keyway, is highly resistant to horizontal loading and geological process.
For realizing this technical purpose, the technical scheme that the present invention specifically provides is: a kind of overlapped shear wall with shearing resistance keyway, comprises inside and outside two-layer precast concrete plank and middle cast-in-situ concrete layer; Connected by steel bar girder between described inside and outside two-layer precast concrete plank; Bottom described inside and outside two-layer precast concrete plank, shearing resistance keyway is set; Horizontal reinforcement and vertical reinforcement is provided with in described inside and outside two-layer precast concrete plank; The top end face of described inside and outside two-layer precast concrete plank is provided with the suspension hook for lifting; Described internal layer precast concrete plank is provided with the built-in fitting for installing.
Further, described overlapped shear wall gross thickness is 200 ~ 300mm, and described internal layer precast concrete plank or outer preform concrete slab thickness of slab are 50mm.
Further, described suspension hook is two, is distributed in the top of described overlapped shear wall.
Further, described built-in fitting is two lifting sleeve pipes, and described built-in fitting is 2/3rds of overlapped shear wall overall height to the distance on overlapped shear wall base.
A preparation method for overlapped shear wall with shearing resistance keyway, specifically comprises the steps: a, loose tool clears up and mould of aiding the border areas, and arranges shearing resistance keyway and built-in fitting according to drawing, spraying release agent; Precast concrete plank horizontal reinforcement, vertical reinforcement, steel bar girder and suspension hook in b, layout; C, interior precast concrete plank are built and are vibrated, and carry out inspection adjustment maintenance; D, layout outer preform concrete slab horizontal reinforcement and vertical reinforcement, and carry out building outer precast concrete plank; E, interior precast concrete plank is turned over turnback after be pressed in outer board concrete; F, inspection adjustment maintenance of vibrating, after maintenance completes, the demoulding rises and deposits.
A construction method for overlapped shear wall with shearing resistance keyway, comprises the steps, a, flooring are cleared up, and unwrapping wire and absolute altitude control cushion block and place; B, vertical joint bar adjustment, the precast plate lifting of overlapped shear wall is in place; C, bearing diagonal install coarse adjustment, unload suspension hook accurate adjustment, and arrange steel bar girder, formwork horizontal joint and edge member; D, to inspect for acceptance, and carry out concreting maintenance, last bearing diagonal is removed.
Beneficial effect of the present invention: structure of the present invention is assembled monolithic concrete structure, the advantages such as anti-seismic performance is good, construction install convenience, saving duration that it has.
Accompanying drawing explanation
Fig. 1 is the positive facade structural representation of the present invention; Fig. 2 is the left TV structure schematic diagram of the present invention; Fig. 3 is plan structure schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing and instantiation, the present invention is described in further details.
As shown in Figure 1, Figure 2 and Figure 3, disclosed by the invention is a kind of overlapped shear wall with shearing resistance keyway, comprises inside and outside two-layer precast concrete plank (3,6) and middle cast-in-situ concrete layer 12; Connected by steel bar girder 9 between described inside and outside two-layer precast concrete plank (3,6); Described inside and outside two-layer precast concrete plank (3,6) bottom arranges shearing resistance keyway 13; Horizontal reinforcement (4,7) and vertical reinforcement (5,8) is provided with in described inside and outside two-layer precast concrete plank (3,6); The top end face of described inside and outside two-layer precast concrete plank (3,6) is provided with the suspension hook 10 for lifting; Described internal layer precast concrete plank 3 is provided with the built-in fitting 2 for installing.
Described overlapped shear wall 1 gross thickness is 200 ~ 300mm, and described internal layer precast concrete plank 3 or outer preform concrete slab 6 thickness of slab are 50mm; Described suspension hook 10 is two, is distributed in the top of described overlapped shear wall 1; The lifting sleeve pipe of described built-in fitting 2 M12, horizontal direction four/some layout; Described built-in fitting 2 is 2/3rds of overlapped shear wall 1 overall height to the distance on overlapped shear wall 1 base.
A preparation method for overlapped shear wall with shearing resistance keyway, specifically comprises the steps: a, loose tool clears up and mould of aiding the border areas, and arranges shearing resistance keyway and built-in fitting according to drawing, spraying release agent; Precast concrete plank horizontal reinforcement, vertical reinforcement, steel bar girder and suspension hook in b, layout; C, interior precast concrete plank are built and are vibrated, and carry out inspection adjustment maintenance; D, layout outer preform concrete slab horizontal reinforcement and vertical reinforcement, and carry out building outer precast concrete plank; E, interior precast concrete plank is turned over turnback after be pressed in outer board concrete; F, inspection adjustment maintenance of vibrating, after maintenance completes, the demoulding rises and deposits.
A construction method for overlapped shear wall with shearing resistance keyway, comprises the steps, a, flooring are cleared up, and unwrapping wire and absolute altitude control cushion block and place; B, vertical joint bar adjustment, the precast plate lifting of overlapped shear wall is in place; C, bearing diagonal install coarse adjustment, unload suspension hook accurate adjustment, and arrange steel bar girder, formwork horizontal joint and edge member; D, to inspect for acceptance, and carry out concreting maintenance, last bearing diagonal is removed.
The above; be only embodiments of the invention; not in order to limit the present invention, every above embodiment is done according to this technical spirit of the present invention any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solution of the present invention.

Claims (6)

1. the overlapped shear wall with shearing resistance keyway, is characterized in that: comprise inside and outside two-layer precast concrete plank and middle cast-in-situ concrete layer; Connected by steel bar girder between described inside and outside two-layer precast concrete plank; Bottom described inside and outside two-layer precast concrete plank, shearing resistance keyway is set; Horizontal reinforcement and vertical reinforcement is provided with in described inside and outside two-layer precast concrete plank; The top end face of described inside and outside two-layer precast concrete plank is provided with the suspension hook for lifting; Described internal layer precast concrete plank is provided with the built-in fitting for installing.
2. according to a kind of overlapped shear wall with shearing resistance keyway according to claim 1, it is characterized in that: described overlapped shear wall gross thickness is 200 ~ 300mm, described internal layer precast concrete plank or outer preform concrete slab thickness of slab are 50mm.
3., according to a kind of overlapped shear wall with shearing resistance keyway according to claim 1, it is characterized in that: described suspension hook is two, be distributed in the top of described overlapped shear wall.
4. according to a kind of overlapped shear wall with shearing resistance keyway according to claim 1, it is characterized in that: described built-in fitting is two lifting sleeve pipes, described built-in fitting is 2/3rds of overlapped shear wall overall height to the distance on overlapped shear wall base.
5. a preparation method for the overlapped shear wall with shearing resistance keyway, is characterized in that: specifically comprise the steps: a, loose tool clears up and mould of aiding the border areas, and arranges shearing resistance keyway and built-in fitting according to drawing, spraying release agent; Precast concrete plank horizontal reinforcement, vertical reinforcement, steel bar girder and suspension hook in b, layout; C, interior precast concrete plank are built and are vibrated, and carry out inspection adjustment maintenance; D, layout outer preform concrete slab horizontal reinforcement and vertical reinforcement, and carry out building outer precast concrete plank; E, interior precast concrete plank is turned over turnback after be pressed in outer board concrete; F, inspection adjustment maintenance of vibrating, after maintenance completes, the demoulding rises and deposits.
6. a construction method for the overlapped shear wall with shearing resistance keyway, is characterized in that: comprise the steps, a, flooring are cleared up, and unwrapping wire and absolute altitude control cushion block and place; B, vertical joint bar adjustment, the precast plate lifting of overlapped shear wall is in place; C, bearing diagonal install coarse adjustment, unload suspension hook accurate adjustment, and arrange steel bar girder, formwork horizontal joint and edge member; D, to inspect for acceptance, and carry out concreting maintenance, last bearing diagonal is removed.
CN201510824225.3A 2015-11-24 2015-11-24 Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof Pending CN105442729A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510824225.3A CN105442729A (en) 2015-11-24 2015-11-24 Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510824225.3A CN105442729A (en) 2015-11-24 2015-11-24 Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof

Publications (1)

Publication Number Publication Date
CN105442729A true CN105442729A (en) 2016-03-30

Family

ID=55553322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510824225.3A Pending CN105442729A (en) 2015-11-24 2015-11-24 Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof

Country Status (1)

Country Link
CN (1) CN105442729A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024989A (en) * 2018-09-18 2018-12-18 三筑工科技有限公司 Precast shear wall body and precast shear wall body production method
CN114045958A (en) * 2021-11-29 2022-02-15 江苏科技大学 Synchronous grouting tooth socket applied to fabricated shear wall and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726607A (en) * 2014-01-20 2014-04-16 王睿敏 Wall board for assembling integral shear wall, shear wall and construction method of shear wall
CN204112525U (en) * 2014-09-12 2015-01-21 上海市城市建设设计研究总院 Band perps precast shear wall structure in strong concrete precast frame
JP2015040401A (en) * 2013-08-21 2015-03-02 株式会社竹中工務店 Wall structure
CN104674987A (en) * 2015-02-13 2015-06-03 南京工业大学 Self-heat-preservation superposed shear wall structure and construction process
CN204645318U (en) * 2015-03-31 2015-09-16 浙江工业职业技术学院 A kind of overlaid plate type shear wall
CN204715571U (en) * 2015-06-05 2015-10-21 中建四局第一建筑工程有限公司 A kind of high residential building energy-dissipating and shock-absorbing wall
CN205242695U (en) * 2015-11-24 2016-05-18 绍兴宝业西伟德混凝土预制件有限公司 Take superimposed shear wall of keyway that shears

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040401A (en) * 2013-08-21 2015-03-02 株式会社竹中工務店 Wall structure
CN103726607A (en) * 2014-01-20 2014-04-16 王睿敏 Wall board for assembling integral shear wall, shear wall and construction method of shear wall
CN204112525U (en) * 2014-09-12 2015-01-21 上海市城市建设设计研究总院 Band perps precast shear wall structure in strong concrete precast frame
CN104674987A (en) * 2015-02-13 2015-06-03 南京工业大学 Self-heat-preservation superposed shear wall structure and construction process
CN204645318U (en) * 2015-03-31 2015-09-16 浙江工业职业技术学院 A kind of overlaid plate type shear wall
CN204715571U (en) * 2015-06-05 2015-10-21 中建四局第一建筑工程有限公司 A kind of high residential building energy-dissipating and shock-absorbing wall
CN205242695U (en) * 2015-11-24 2016-05-18 绍兴宝业西伟德混凝土预制件有限公司 Take superimposed shear wall of keyway that shears

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024989A (en) * 2018-09-18 2018-12-18 三筑工科技有限公司 Precast shear wall body and precast shear wall body production method
CN114045958A (en) * 2021-11-29 2022-02-15 江苏科技大学 Synchronous grouting tooth socket applied to fabricated shear wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN105317137B (en) Precast wall body, wallboard and its construction method and prefabricated panel production method
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN110284587A (en) A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN110565974A (en) method for transforming existing building structure
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN204645253U (en) A kind of prefabricated house
CN103821263A (en) Precast assembly self-heat preservation concrete shear wall system and construction method thereof
CN103132660B (en) Concrete precast stairway fixed end support
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN105442729A (en) Superimposed shear wall with shear-resistant key grooves and construction and manufacture method thereof
CN106368445B (en) Existing building reinforces self-supporting heat-insulating integral system and construction method
CN109797902A (en) Prefabrication ash wall body plate
JP5865567B2 (en) Connecting slab and its construction method
CN106223460B (en) The prefabricated construction method of large scale wallboard
KR100726111B1 (en) Bathroom bottom manufacture method using precast concreat slab
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN205242695U (en) Take superimposed shear wall of keyway that shears
CN101761287A (en) Reinforced concrete windowsill coping adverse construction method
CN109853803B (en) Assembled integral floor slab and manufacturing and installing method
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN104047381B (en) Assembled integral rare-reinforcement concrete shear wall structure
Zhao Features and construction of prefabricated buildings
CN210140846U (en) Independent foundation of precast concrete dry type combination
CN104234432B (en) Shed deckhead construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330