KR20010002727A - Construction mold - Google Patents

Construction mold Download PDF

Info

Publication number
KR20010002727A
KR20010002727A KR1019990022666A KR19990022666A KR20010002727A KR 20010002727 A KR20010002727 A KR 20010002727A KR 1019990022666 A KR1019990022666 A KR 1019990022666A KR 19990022666 A KR19990022666 A KR 19990022666A KR 20010002727 A KR20010002727 A KR 20010002727A
Authority
KR
South Korea
Prior art keywords
channel
formwork
vertical
horizontal
slab
Prior art date
Application number
KR1019990022666A
Other languages
Korean (ko)
Other versions
KR100361047B1 (en
Inventor
이경희
Original Assignee
이경희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이경희 filed Critical 이경희
Priority to KR1019990022666A priority Critical patent/KR100361047B1/en
Publication of KR20010002727A publication Critical patent/KR20010002727A/en
Application granted granted Critical
Publication of KR100361047B1 publication Critical patent/KR100361047B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • E04G11/54Girders, beams, or the like as supporting members for forms of extensible type, with or without adjustable supporting shoes, fishplates, or the like
    • E04G11/56Girders, beams, or the like as supporting members for forms of extensible type, with or without adjustable supporting shoes, fishplates, or the like of telescopic type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE: A mold form for construction of building is provided to be reusable, and facilitate installation and removal by standardizing the mold form, so that cost and labor are reduced. CONSTITUTION: A mold form(10) comprises a slab form(11) and a wall form(12) of which the heights are horizontally and vertically adjustable. The slab form comprises; a horizontal channel horizontally installed at the bottom of a metal plate(14); a slab board(18) divided into a right and a left board(17,16); a horizontal connection channel(19) formed in the slab board, and of which both ends are inserted in the horizontal channel; and numerous connection holes(20), fixing pins(21) formed in the horizontal channel and the connection channel to adjust horizontally the height of the divided part of the slab plate. The wall form comprises; a vertical channel(31) fixed in the metal plate; a vertical connection channel(33) fixed in an auxiliary channel(32) in the left and the right board and inserted in the vertical channel; numerous connection holes(34) and pins(35) formed in the channel(31) and the vertical connection channel to adjust the height vertically; a loosing prevention device to prevent the loosing of the slab and the wall form; and a cover plate(61) to cover the horizontal and the vertical connection channel.

Description

건축물 구축용 거푸집{Construction mold}Formwork for building construction

본 발명은 건축물 구축용 거푸집에 관한 것으로서 더욱 상세하게는 일반주택이나, 상가건물 및 아파트와 같은 건축물 구축시 콘크리트를 타설하여 각 층의 벽체와 전정슬라브를 형성할 때 사용되는 거푸집을 개선하여 설치 및 철거의 용이성을 제공함은 물론 재사용이 가능하도록 한 것이다.The present invention relates to a formwork for building construction, and more particularly, to improve the formwork used to form walls and pruning slabs on each floor by pouring concrete during building construction such as general houses, mall buildings, and apartments. The ease of removal is provided as well as reusable.

상가건물이나 일반주택 및 아파트와 같은 건축물을 구축할 때에는 기초공사를 끝낸 후 기둥과 천정슬라브를 형성함으로서 다층으로 구축이 가능하도록 하고 있으며, 기둥과 슬라브 형성시에는 심재로 설치된 철근에 콘크리트를 타설함으로서 기둥과 슬라브와 같은 구축물의 뼈대를 구성하게 된다.When building buildings such as shopping malls, general houses and apartments, after the foundation work, pillars and ceiling slabs are formed so that they can be built in multiple layers.In the case of pillars and slabs, concrete is added to reinforcing bars installed as core materials. It forms the skeleton of constructs such as columns and slabs.

일반적인 상가건물이나 대형고층빌딩의 경우에는 기초위에 H빔과 같은 철구조물로서 구축물의 뼈대를 구성한 후 그 뼈대의 외면에 콘크리트나 몰탈등으로 마감함으로서 경량화하고 신속한 시공등이 가능하도록 하고 있다.In the case of general mall buildings and large-scale high-rise buildings, the structure of the structure is composed of steel structures such as H beams on the foundation, and the exterior of the frame is finished with concrete or mortar to enable lightweight and quick construction.

그러나, 일반주택이나 아파트와 같은 건축물의 구축시에는 특별한 경우를 제외하고는 기초위에 철근을 심재로 하고 콘크리트를 마감재로 한 기둥, 벽체 및 슬라브로서 각 층을 구성하고 각 층의 방을 구획하게 된다.However, when constructing a building such as a general house or apartment, except for special cases, each floor is composed of pillars, walls, and slabs made of reinforcing cores and concrete finishing materials, and the rooms of each floor are divided. .

상기와 같이 각층과 각층의 벽체 및 지붕을 구획하기 위해서는 거푸집을 이용하여 콘크리트가 타설될 수 있는 공간(벽체와 전정슬라브)을 형성하도록 한다.As described above, in order to partition each floor and walls and roofs of each floor, form spaces (walls and pruning slabs) in which concrete can be poured using formwork.

종래에는 이러한 거푸집을 형성할 때에는 평판타입의 합판으로 콘트리트 타설공간을 확보하고, 상기 합판은 비계목이나 버팀목등을 이용하여 공간의 변형이 없도록 지지하고 고정하도록 하고 있다.Conventionally, when forming such a formwork, a concrete pouring space is secured by a plate-type plywood, and the plywood is supported and fixed so that there is no deformation of the space by using a scaffold or a crutch.

상기와 같이 설치한 거푸집은 타설된 콘크리트가 양생되고나면 철거하고 그 위층에서 새로운 거푸집을 설치하여 콘크리트를 타설할 수 있도록 하고 있다.The formwork installed as described above is to be demolished after the poured concrete is cured and to install concrete by installing new formwork on the upper floor.

상기와 같은 종래기술에서는 각 층과 각층의 구획이 끝난 후 다른층에 콘크리트를 타설하기 위해서는 또다른 거푸집을 형성하여야 하는 반복적인 작업을 수행하여야 하기 때문에 불필요한 작업이 연속되고, 기 형성한 거푸집의 재료를 재활용할 수 없는 단점을 가진다.In the prior art as described above, in order to cast concrete on the other floor after the completion of each layer and each layer, it is necessary to perform another work to form another formwork because unnecessary work is continuous, the material of the pre-formed formwork It has the disadvantage that it cannot be recycled.

이는 기 설치된 거푸집의 경우에는 그 재질이 목재이면서도 성형시 견고하게 하기 위하여 못이나 철사등으로 고정하고 조인상태에서 철거할 때에는 무작위로 제거하기 때문에 사용한 재질이 쉽게 파손되기 때문이다.This is because, in the case of pre-installed formwork, the material is made of wood, but it is fixed with nails or wires to be firm during molding, and randomly removed when dismantled in a joined state, so the used material is easily damaged.

이러한 종래의 기술에서는 각 층마다 거푸집을 설치하기 위한 거푸집재료를 각각 구비하여야 하기 때문에 불필요한 재원의 낭비를 가져옴은 물론, 거푸집설치를 위한 전문적인 인력을 장기간 필요로 함으로서 공사비용의 증가와 같은 상당한 요인의 문제점을 가졌었다.In this conventional technology, since each form material must be provided for each formwork, it is not only wasteful of unnecessary resources, but also requires a long-term professional manpower for formwork. Had a problem.

이에 본 발명에서는 상기와 같은 문제점들을 해결하기 위하여 발명된 것으로서 거푸집을 규격화하여 재사용이 가능하도록 함은 물론, 설치와 제거가 용이하여 불필요한 시간과 인적자원의 낭비를 줄여 신속한 공사의 진행을 도울 수 있도록 함을 목적으로 한다.Therefore, the present invention is to solve the problems as described above to standardize the formwork to be reusable, as well as easy to install and remove to help reduce the unnecessary time and waste of human resources to help the progress of construction quickly For the purpose of

이를 위한 본발명에서는 거푸집을 개략 (∩)형상으로 구성하여 구축할 건축물에 따라 높이와 폭조절이 용이하도록 함으로서 범용성있는 사용이 가능하도록 한 것이 특징이다.The present invention for this purpose is characterized in that the formwork in a rough (∩) configuration to make it easy to adjust the height and width according to the building to be built, so that it can be used for universal purposes.

도 1은 본 발명의 기술이 적용된 건축물 구축용 거푸집의 사시도.1 is a perspective view of a building construction formwork to which the technique of the present invention is applied.

도 2는 도 1의 A - A선을 따라서 취한 건축물 구축용 거푸집의 단면도.2 is a cross-sectional view of the building construction formwork taken along the line AA of FIG.

도 3은 도 1의 B부위를 발췌한 사시도.Figure 3 is a perspective view of the portion B of Figure 1;

도 4는 도 2의 C부위를 발췌한 사시도.Figure 4 is a perspective view of the portion C of Figure 2;

도 5는 도 1의 D부위를 발췌한 사시도.5 is a perspective view taken from the portion D of FIG.

도 6은 본 발명인 건축물 구축용 거푸집의 사용상태 사시도.Figure 6 is a perspective view of the use state of the present invention building formwork.

*도면의 주요 부분에 사용된 부호의 설명** Description of the symbols used in the main parts of the drawings *

10; 거푸집10; Formwork

11; 슬라브거푸집11; Slab formwork

12; 벽체거푸집12; Wall formwork

15; 수평채널15; Horizontal channel

18; 슬라브판18; Slab

31; 수직채널31; Vertical channel

40; 유동방지수단40; Flow prevention means

43; 턴버클43; Turnbuckle

50; 보조바퀴50; Auxiliary wheel

이하 첨부되는 도면과 관련하여 상기 목적을 달성하기 위한 본 발명의 바람직한 실시예의 구성과 작용에 대하여 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operation of the preferred embodiment of the present invention for achieving the above object.

도 1은 본 발명의 기술이 적용된 건축물 구축용 거푸집의 사시도, 도 2는 도 1의 A - A선을 따라서 취한 건축물 구축용 거푸집의 단면도, 도 3은 도 1의 B부위를 발췌한 사시도, 도 4는 도 2의 C부위를 발췌한 사시도, 도 5는 도 1의 D부위를 발췌한 사시도, 도 6은 본 발명인 건축물 구축용 거푸집의 사용상태 사시도로서 함께 설명한다.1 is a perspective view of a building construction formwork to which the technique of the present invention is applied, FIG. 2 is a cross-sectional view of a building construction formwork taken along line A-A of FIG. 1, FIG. 3 is a perspective view taken from a portion B of FIG. 4 is a perspective view taken from the portion C of Figure 2, Figure 5 is a perspective view taken from the D portion of Figure 1, Figure 6 will be described together as a perspective view of the use state of the building construction form of the present invention.

본 발명의 기술이 적용되는 건축물 구축용 거푸집(10)은 수평방향으로 길이조절이 자유로운 슬라브거푸집(11)과 수직방향으로 높,낮이조절이 자유로운 벽체거푸집(12)으로 구성한다.The building construction formwork 10 to which the technique of the present invention is applied comprises a slab formwork 11 freely adjustable in the horizontal direction and a wall formwork 12 freely adjustable in height and height in the vertical direction.

상기 슬라브거푸집(11)은 상측에는 타설되는 콘크리트와 연접되는 금속판재(14)의 저면에 상면이 개방된 다수개의 수평채널(15)을 폭방향으로 등간격 배치하여 중앙을 기준으로 좌판(16)과 우판(17)으로 분리한 슬라브판(18)을 구비한다.The slab formwork 11 has a plurality of horizontal channels 15 having an upper surface open at equal intervals in the width direction on the bottom of the metal plate 14 connected to the concrete to be poured on the upper side of the slab formwork 16 based on the center. And a slab plate 18 separated by a right plate 17.

상기 슬라브판(18)의 분리부에는 구축되는 건축물의 천정을 고려하여 길이조절이 가능하도록 양단부가 수평채널(15)에 삽입되는 수평연결채널(19)을 구비하여 수평채널(15)과 수평연결채널(19)에 형성되는 많은수의 연결공(20)을 통하여 핀(21)으로 연결하여 수평방향으로의 길이조절이 가능하도록 한다.Separation part of the slab plate 18 is provided with a horizontal connection channel 19, both ends of which are inserted into the horizontal channel 15 so that the length can be adjusted in consideration of the ceiling of the building to be constructed, the horizontal connection with the horizontal channel 15 It is possible to adjust the length in the horizontal direction by connecting to the pin 21 through a large number of connecting holes 20 formed in the channel (19).

상기 벽체거푸집(12)은 세로방향으로 세워지는 금속판재(30)의 내측에 등간격으로 수직채널(31)을 고정하여 구성한다.The wall formwork 12 is configured by fixing the vertical channel 31 at equal intervals inside the metal plate 30 which is erected in the longitudinal direction.

상기 수직채널(31)의 상부에는 좌,우판(16,17)의 양측에 고정되어 하방으로 돌출되는 보조채널(32)에 고정되는 수직연결채널(33)을 삽입하여 수직채널(31)과 수직연결채널(33)에 형성되는 많은수의 연결공(34)을 통하여 핀(35)으로 연결하여 수직방향으로의 높,낮이조절이 가능하도록 한다.The vertical channel 31 is perpendicular to the vertical channel 31 by inserting a vertical connection channel 33 fixed to both sides of the left and right plates 16 and 17 to the auxiliary channel 32 projecting downward. It connects to the pin 35 through a large number of connection holes 34 formed in the connection channel 33 to enable height, height adjustment in the vertical direction.

상기 수평채널(15)과 수평연결채널(19)상간 및 수직채널(31)과 보조채널(32)에는 상호간의 연결상태를 견고히 하여 슬라브거푸집(11)의 좌,우판(16,17)과 벽체거푸집(12)의 유동을 방지할 수 있는 유동방지수단(40)을 더 구비한다.The left and right plates 16 and 17 and the wall of the slab formwork 11 are firmly connected to each other between the horizontal channel 15 and the horizontal connection channel 19 and the vertical channel 31 and the auxiliary channel 32. It is further provided with a flow preventing means 40 that can prevent the flow of the formwork (12).

상기 유동방지수단(40)은 수평채널(15)과 수직채널(31) 및 보조채널(32)에 고정되는 브라켓(41)에 힌지(42)고정되는 턴버클(43)을 구비함으로서 턴버클(43)의 회동에 의하여 긴장과 이완을 선택할 수 있도록 한다.The flow preventing means 40 has a turnbuckle 43 having a turnbuckle 43 fixed to a hinge 42 on a bracket 41 fixed to a horizontal channel 15, a vertical channel 31, and an auxiliary channel 32. The meetings of the men and women allow them to choose tension and relaxation.

상기 유동방지수단(40)의 다른 예로서는 수평채널(15)과 수직채널(31) 및 보조채널(32)사이의 공간부에 고정되는 고정판(45)과 상기 고정판(45)상간에 연결되는 볼트(46) 및 너트(47)의 조합에 의하여 긴장과 이완을 선택할 수 있도록 하여도 된다.Another example of the flow preventing means 40 is a fixing plate 45 fixed to a space portion between the horizontal channel 15, the vertical channel 31 and the auxiliary channel 32, and a bolt connected between the fixing plate 45 and 46) and the nut 47 may be selected to allow tension and relaxation to be selected.

상기 벽체거푸집(12)의 내측 하방에는 거푸집(10)설치와 제거시 이동이 용이하도록 하기 위한 보조바퀴(50)를 더 구비한다.The inner side of the wall formwork 12 is further provided with an auxiliary wheel 50 to facilitate movement when the formwork 10 is installed and removed.

상기 보조바퀴(50)는 벽체거푸집(12)의 내측에 위치하는 수직채널(31)상간에 고정되는 보강판(51)에 하단부에 캐스터(52)를 장착한 스크류바(53)를 돌출시키고, 상기 스크류바(53)의 상단부는 보강판(51)의 상면과 저면에 결합되는 너트(54)에 의하여 승,강이 조절되도록 구성한다.The auxiliary wheel (50) protrudes a screw bar (53) mounted with a caster (52) at its lower end on a reinforcing plate (51) fixed between the vertical channels (31) located inside the wall formwork (12), The upper end of the screw bar 53 is configured so that the lifting, the steel is adjusted by the nut 54 is coupled to the top and bottom of the reinforcing plate 51.

물론, 상기 거푸집(10)을 구성하는 각채널에는 경량화를 위하여 강도와 연결부위에 지장이 없는 다수곳에 개구부를 형성하는 것이 좋고, 슬라브판(18)을 구성하는 좌,우판(16,17)중 하나의 판과 보조채널(32)에는 콘크리트타설시 노출되는 수평연결채널(19)과 수직연결채널(33)을 커버하기 위한 커버판(61)을 더 구비하는 것이 좋다.Of course, in each channel constituting the formwork (10), it is preferable to form openings in a number of places where there is no problem in strength and connecting portion for light weight, among the left and right plates (16, 17) constituting the slab plate (18) One plate and the auxiliary channel 32 may be further provided with a cover plate 61 for covering the horizontal connection channel 19 and the vertical connection channel 33 exposed during the concrete casting.

상기와 같이 구성된 본 발명의 건축물 구축용 거푸집(10)에 대한 작용관계를 살펴보면 다음과 같다.Looking at the working relationship for the building formwork 10 of the present invention configured as described above are as follows.

본 발명의 거푸집(10)을 이용하여 콘크리트를 타설하여 슬라브와 벽체를 형성하고자 할 경우에는 본 발명의 거푸집(10)을 다수개 연결하여 각층에서 요구하는 방이나 공간만큼을 유지한다.In order to form slabs and walls by pouring concrete using the formwork 10 of the present invention, a plurality of formwork 10 of the present invention is connected to maintain the required room or space in each floor.

각 거푸집(10)과 거푸집(10) 상간에는 콘크리트가 타설될 수 있는 공간을 유지시킨 체 연결하여 벽체가 구성될 수 있도록 함은 당연할 것이다.It will be natural to form a wall by connecting a sieve keeping space where concrete can be placed between each formwork 10 and the formwork 10.

상기 거푸집(10)을 연결할 때에는 각 거푸집(10)의 수평채널(15)과 수직채널(31)에 형성된 연결공(20,34)을 통하여 핀(21,35)으로 연결함으로서 각각의 거푸집(10)이 연결될 수 있도록 하고, 벽체가 형성되도록 공간을 둔 거푸집(10)과 거푸집(10)상간에는 별도의 간격유지구를 개재시켜 확보한 공간의 변화가 없도록 하고, 별도의 연결수단(철사나 링체등)을 이용하여 거푸집(10)또한 유동하지 않도록 한다.When the formwork 10 is connected to each formwork 10 by connecting the pins 21 and 35 through the connecting holes 20 and 34 formed in the horizontal channel 15 and the vertical channel 31 of each formwork 10. ) To be connected, space between the formwork (10) and the formwork (10) spaced so that the wall is formed so that there is no change in the space secured by a separate spacing maintenance zone, and separate connecting means (wire or ring body) Etc.) so that the formwork 10 also does not flow.

물론, 상기와 같이 거푸집(10)의 설치를 완료하기 이전에 각 층의 높이와 슬라브의 길이등을 고려하여 거푸집(10)의 슬라브거푸집(11)과 벽체거푸집(12)의 길이조절과 높,낮이조절을 완료하여 설치함은 당연할 것이다.Of course, the length adjustment and height of the slab formwork 11 and the wall formwork 12 of the formwork 10 in consideration of the height of each layer and the length of the slab before completing the installation of the formwork 10 as described above, It will be natural to install the day adjustment.

상기 슬라브거푸집(11)과 벽체거푸집(12)의 길이조절과 높,낮이조절을 살펴보면;Looking at the length adjustment and height, height adjustment of the slab formwork 11 and the wall formwork 12;

슬라브거푸집(11)의 경우에는 수평채널(15)상간을 연결하고 있는 턴버클(43)을 이완시킨 후 수평채널(15)과 수평연결채널(19)을 단속하고 있는 핀(21)을 이탈시킨 후 좌,우판(16,17)의 폭을 좁히거나 넓힌 후 다시 핀(21)을 연결공(20)에 결합함으로서 완료된다.In the case of the slab formwork 11, after the turnbuckles 43 connecting the horizontal channel 15 phases are relaxed, the pins 21 controlling the horizontal channel 15 and the horizontal connecting channel 19 are separated. After narrowing or widening the left and right plates 16 and 17, the pins 21 are completed by coupling the pins 21 to the connection holes 20.

이러한 상태에서 이완시켰던 턴버클(43)을 긴장시켜 연결된 수평채널(15)과 수평연결채널(19)이 유동하지 않도록 하면 된다.In this state, the relaxed turnbuckles 43 may be tensioned to prevent the connected horizontal channel 15 and the horizontal connection channel 19 from flowing.

그리고, 벽체거푸집(12)의 경우에도 수직채널(31)과 보조채널(32)상간에 구비되는 유동방지수단(40)의 턴버클(43)을 이완시킨 후, 슬라브거푸집(11)의 양측에서 하방으로 돌출되는 보조채널(32)에 고정된 수직연결채널(33)과 수직채널(31)을 연결하고 있는 핀(35)을 이탈시켜 높,낮이를 적절한 상태로 조절한 후 핀(35)을 연결공(34)에 삽입시킨다.In addition, in the case of the wall formwork 12, the turnbuckles 43 of the flow preventing means 40 provided between the vertical channel 31 and the auxiliary channel 32 are relaxed, and then downward from both sides of the slab formwork 11. The pin 35 is separated from the vertical connection channel 33 fixed to the auxiliary channel 32 protruding to the vertical channel 31 and the pin 35 connecting the vertical channel 31. Insert into the connecting hole (34).

그런 후, 상기에서와 같은 방법으로 턴버클(43)을 긴장상태로 만들어 슬라브거푸집(11)과 벽체거푸집(12)의 움직임이 없도록 하면된다.Then, in the same manner as described above to make the turnbuckle 43 in a tensioned state without the movement of the slab formwork 11 and the wall formwork 12.

상기와 같이 거푸집(10)의 설치가 완료되면 콘크리트를 타설하여 슬라브와 벽체가 형성되도록 하고, 양생과정을 거쳐 설치한 거푸집(10)을 이탈시켜 새로운 층으로 이동시킨 후 재 설치하여 사용하면 된다.When the installation of the formwork 10 is completed as described above, the slab and the wall is formed by pouring concrete, and the formwork 10 installed through the curing process is removed and moved to a new floor, and then reinstalled and used.

상기 거푸집(10)에 콘크리트를 타설할 때에는 슬라브판(18)의 좌,우판(16,17)상간의 공간과 보조채널(31)과 수직채널(31)상간의 공간에는 도 6에서와 같이 보조판(60)을 덧대어 타설되는 콘크리트면에 요철부위가 없도록 하는 것이 바람직 하다.When the concrete is poured into the formwork 10, the auxiliary plate is disposed in the space between the left and right plates 16 and 17 of the slab plate 18 and the space between the auxiliary channel 31 and the vertical channel 31. It is desirable to add (60) so that there are no irregularities on the concrete surface to be poured.

상기 거푸집(10)을 이탈시킬 때에는 하나의 거푸집(10)과 거푸집(10)을 연결하고 있는 핀(21,35)과 연결수단을 제거한 후 턴버클(43)이나 볼트(46) 및 너트(47)를 조여 수평채널(15)과 수직채널(31) 및 수직연결채널(33)이 당겨지도록 함으로서 타설되어 양생된 콘크리트와 연접된 거푸집(10)의 급속판재(14,30)가 떨어지게 할 수 있다.When the formwork 10 is detached, the pins 21 and 35 and the connecting means connecting the formwork 10 and the formwork 10 are removed and the turnbuckles 43 or the bolts 46 and the nuts 47 are removed. Tighten the horizontal channel 15, the vertical channel 31 and the vertical connection channel 33 by pulling so that the quick plates (14, 30) of the formwork (10) in contact with the cast concrete cured can fall.

상기와 같이 콘크리트와 이탈된 거푸집(10)은 다시 핀(21,35)으로 연결하고 턴버클(34)을 조은 후 타 작업지로 이동시키면 된다.As described above, the mold 10 separated from the concrete may be connected to the pins 21 and 35 again, tighten the turnbuckles 34, and then move to another work place.

상기 거푸집(10)을 이동시킬 때에는 벽체거푸집(12)의 내측하방에 더 구비되는 보조바퀴(50)를 내려 쉽게 이동할 수 있도록 하면된다.When moving the formwork 10, the auxiliary wheel 50, which is further provided on the inner side of the wall formwork 12 is lowered to be able to move easily.

즉, 콘크리트타설을 위하여 상승시켰던 보조바퀴(50)를 너트(54)를 풀어 스크류바(53)를 하강시켜 캐스터(52)가 벽체거푸집(12)의 하단부보다 돌출되도록 한 후 너트(54)를 고정시킨 후 작업자가 거푸집(10)의 일측만을 들어서 밀거나 당김으로서 쉽게 이동할 수 있게된다.That is, the auxiliary wheel 50, which was raised for concrete pouring, unscrews the nut 54 and lowers the screw bar 53 so that the caster 52 protrudes from the lower end of the wall formwork 12, and then the nut 54. After fixing, the operator can easily move by lifting or pulling only one side of the formwork (10).

상기와 같은 본 발명은 거푸집의 설치와 제거가 용이함은 물론, 건축물의 구축용도(규격)에 맞게 높이와 길이를 자유롭게 조절할 수 있고, 재사용과 이동이 용이하여 불필요한 자재의 낭비와 인력의 낭비를 줄이고 공기를 단축시키는데 기여할 수 있다.The present invention as described above is easy to install and remove the formwork, and can freely adjust the height and length according to the building use (standard) of the building, it is easy to reuse and move to reduce the waste of unnecessary materials and waste of manpower May contribute to shortening the air.

이상과 같은 본 발명은 거푸집을 규격화하여 재사용이 가능하도록 함은 물론, 설치와 제거가 용이하여 불필요한 시간과 인적자원의 낭비를 줄여 신속한 공사의 진행을 도울 수 있는 등의 효과를 가진다.The present invention as described above has the effect of standardizing the formwork to be reused, as well as easy to install and remove to reduce the unnecessary time and waste of human resources to help the rapid construction of the construction.

Claims (4)

건축물 구축시 콘크리트를 타설하여 슬라브와 벽체를 구성하는데 사용되는 거푸집을 구성함에 있어서;In constructing formwork used to construct slabs and walls by pouring concrete in building buildings; 상기 거푸집(10)은 수평방향으로 길이조절이 자유로운 슬라브거푸집(11)과 수직방향으로 높,낮이조절이 자유로운 벽체거푸집(12)으로 구성하고;The formwork (10) comprises a slab formwork (11) freely adjustable in the horizontal direction and a wall formwork (12) freely adjustable in height, height in the vertical direction; 상기 슬라브거푸집(11)은 금속판재(14)의 저면에 폭방향으로 수평채널(15)을 등간격으로 설치하여 좌판(16)과 우판(17)으로 분리되어 구비되는 슬라브판(18)과;The slab formwork 11 is provided with a slab plate 18 provided on the bottom surface of the metal plate 14 in the width direction at equal intervals and separated into a seat plate 16 and a right plate 17; 상기 슬라브판(18)의 분리부 구비되어 양단부가 수평채널(15)에 삽입되는 수평연결채널(19);A horizontal connection channel 19 provided with a separation part of the slab plate 18 and having both ends inserted into the horizontal channel 15; 상기 수평채널(15)과 수평연결채널(19)에는 수평방향으로의 길이조절을 위한 수단으로 다수개 형성하는 연결공(20)과 단속을 위한 핀(21)을 포함하고;The horizontal channel 15 and the horizontal connection channel 19 include a plurality of connecting holes 20 and pins 21 for intermittent formation as means for adjusting the length in the horizontal direction; 상기 벽체거푸집(12)은 세로방향으로 세워지는 금속판재(30)의 내측에 등간격으로 고정되는 수직채널(31)과;The wall formwork 12 includes vertical channels 31 fixed at equal intervals inside the metal plate 30 which is erected in a vertical direction; 상기 좌,우판(16,17)의 양측에 고정되어 하방으로 돌출되는 보조채널(32)에 고정되고 수직채널(31)의 상부에 삽입되는 수직연결채널(33);A vertical connection channel 33 fixed to both sides of the left and right plates 16 and 17 and fixed to an auxiliary channel 32 projecting downward and inserted into an upper portion of the vertical channel 31; 상기 수직채널(31)과 수직연결채널(33)에 수직방향으로 높,낮이조절의 용이성을 제공하기 위하여 다수개 형성하는 연결공(34)과 단속을 위한 핀(35)을 포함하고;A plurality of connecting holes 34 and pins 35 for interrupting the vertical channels 31 and the vertical connecting channels 33 to provide ease of height and height adjustment in the vertical direction; 상기 수평채널(15)과 수평연결채널(19)상간 및 수직채널(31)과 보조채널(32)에는 연결상태를 견고히 하여 슬라브거푸집(11)과 벽체거푸집(12)의 유동을 방지할 수 있는 유동방지수단(40)과;It is possible to prevent the flow of the slab formwork 11 and the wall formwork 12 by firmly connecting the horizontal channel 15 and the horizontal connecting channel 19 and the vertical channel 31 and the auxiliary channel 32. Flow preventing means (40); 상기 슬라브판(18)을 구성하는 좌,우판(16,17)중 하나의 판과 보조채널(32)에는 콘크리트타설시 노출되는 수평연결채널(19)과 수직연결채널(33)을 커버하기 위한 커버판(61)을 더 구비하는 것을 특징으로 하는 건축물 구축용 거푸집.One of the left and right plates 16 and 17 constituting the slab plate 18 and the auxiliary channel 32 cover the horizontal connecting channel 19 and the vertical connecting channel 33 which are exposed during concrete placement. Formwork for building construction, further comprising a cover plate (61). 제 1 항에 있어서;The method of claim 1; 상기 유동방지수단(40)은 수평채널(15)과 수직채널(31) 및 보조채널(32)에 고정되는 브라켓(41)과;The flow preventing means 40 includes a bracket 41 fixed to the horizontal channel 15, the vertical channel 31 and the auxiliary channel 32; 상기 브라켓(41)에 힌지(42)고정되어 긴장과 이완을 선택하는 턴버클(43)로 구성되는 것을 특징으로 하는 건축물 구축용 거푸집.Formwork for building construction, characterized in that the hinge 41 is fixed to the bracket (41) is composed of a turnbuckle (43) to select tension and relaxation. 제 1 항에 있어서;The method of claim 1; 상기 유동방지수단(40)은 수평채널(15)과 수직채널(31) 및 보조채널(32)사이의 공간부에 고정되는 고정판(45)과;The flow preventing means 40 includes: a fixing plate 45 fixed to a space portion between the horizontal channel 15, the vertical channel 31, and the auxiliary channel 32; 상기 고정판(45)상간에 연결되어 긴장과 이완을 선택하는 볼트(46) 및 너트(47)의 조합인 것을 특징으로 하는 건축물 구축용 거푸집.Formwork for building construction, characterized in that the combination of bolts (46) and nuts (47) connected between the fixing plate (45) to select the tension and relaxation. 제 1 항에 있어서;The method of claim 1; 상기 벽체거푸집(12)의 내측 하방에는 거푸집(10)설치와 제거시 이동이 용이하도록 하기 위한 보조바퀴(50)를 더 구비하되;Further provided below the inner side of the wall formwork 12, the auxiliary wheel (50) for easy movement when installing and removing the formwork (10); 상기 보조바퀴(50)는 벽체거푸집(12)의 수직채널(31)상간에 고정되는 보강판(51)과;The auxiliary wheel 50 includes a reinforcing plate 51 fixed between the vertical channel 31 of the wall formwork 12; 상기 보강판(51)의 상면과 저면에서 너트(54)에 의하여 높,낮이가 조절되고 하단부에 캐스터(52)를 장착한 스크류바(53)로 구성되는 것을 특징으로 하는 건축물 구축용 거푸집.Formwork for building construction, characterized in that the upper and lower surfaces of the reinforcing plate 51 is composed of a screw bar 53, the height and the height is adjusted by the nut 54 and the caster 52 is mounted on the lower end.
KR1019990022666A 1999-06-17 1999-06-17 Construction mold KR100361047B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990022666A KR100361047B1 (en) 1999-06-17 1999-06-17 Construction mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990022666A KR100361047B1 (en) 1999-06-17 1999-06-17 Construction mold

Publications (2)

Publication Number Publication Date
KR20010002727A true KR20010002727A (en) 2001-01-15
KR100361047B1 KR100361047B1 (en) 2002-11-22

Family

ID=19592996

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990022666A KR100361047B1 (en) 1999-06-17 1999-06-17 Construction mold

Country Status (1)

Country Link
KR (1) KR100361047B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100761964B1 (en) * 2007-02-22 2007-10-01 서보산업 주식회사 A mold for constructing wall of concrete building
KR101046477B1 (en) * 2009-01-12 2011-07-04 이재순 Variable Formwork Panels
CN109083310A (en) * 2018-09-30 2018-12-25 重庆瑞鑫科五金制品有限公司 It is a kind of can unilateral flexible U-shaped board
KR102117167B1 (en) * 2018-12-03 2020-06-02 장윤근 slab mold system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101189797B1 (en) 2012-07-13 2012-10-10 (주) 신평엔지니어링종합건축사사무소 Slab concrete mold of building
KR101562812B1 (en) * 2015-05-20 2015-10-23 주식회사 정림건축종합건축사사무소 Lintel structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100761964B1 (en) * 2007-02-22 2007-10-01 서보산업 주식회사 A mold for constructing wall of concrete building
KR101046477B1 (en) * 2009-01-12 2011-07-04 이재순 Variable Formwork Panels
CN109083310A (en) * 2018-09-30 2018-12-25 重庆瑞鑫科五金制品有限公司 It is a kind of can unilateral flexible U-shaped board
KR102117167B1 (en) * 2018-12-03 2020-06-02 장윤근 slab mold system

Also Published As

Publication number Publication date
KR100361047B1 (en) 2002-11-22

Similar Documents

Publication Publication Date Title
US4372906A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4211043A (en) Precast concrete building module form
CA2038524C (en) Form and method of constructing a wall from pourable concrete material
US4272050A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4495131A (en) Method for pre-casting steel reinforced concrete box-like modules
JP3569861B2 (en) Construction method of stairs and staircase, staircase support device, and staircase structure
KR100361047B1 (en) Construction mold
JPH0693726A (en) Method for constructing staircase and stair hall and staircase member
US8100378B1 (en) Coupling system for vertically engaging support columns for concrete multi floor construction
KR100433561B1 (en) Wall ascending slab descending concrete casting method
JPH0657956A (en) Construction of concrete structure
JP3701078B2 (en) Road slab construction method
RU2043470C1 (en) Method for erecting monolithic elements of a building, preferentially floor, and concrete form to implement it
JPH0657710A (en) Construction of concrete main tower
JP2884440B2 (en) Formwork for construction of concrete prism and construction method of column using it
JP3114041B2 (en) Stair construction method and unit stairs
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
KR200146508Y1 (en) Scaffold board for a gang form
KR102636240B1 (en) Tableform system and method of disassembling by the same
JP4872301B2 (en) Construction method of RC structure
JP3281421B2 (en) Construction method of horizontal beam erected on tower
KR100473612B1 (en) Form system and frame construction method using the same
KR100336710B1 (en) inconer and outconer assembling apparatus for gang form using segregation pouring method and deck plate equipped reinforced steel bar
KR100386354B1 (en) method of apartment construction for the slip form construction method
JP2657390B2 (en) Construction method of inclined concrete structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee