KR20000074278A - Moving system of parts in circulating type gantry crane - Google Patents

Moving system of parts in circulating type gantry crane Download PDF

Info

Publication number
KR20000074278A
KR20000074278A KR1019990018086A KR19990018086A KR20000074278A KR 20000074278 A KR20000074278 A KR 20000074278A KR 1019990018086 A KR1019990018086 A KR 1019990018086A KR 19990018086 A KR19990018086 A KR 19990018086A KR 20000074278 A KR20000074278 A KR 20000074278A
Authority
KR
South Korea
Prior art keywords
trolley
steel wire
spreader
hoist
holder
Prior art date
Application number
KR1019990018086A
Other languages
Korean (ko)
Other versions
KR100306298B1 (en
Inventor
한만엽
Original Assignee
한만엽
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한만엽 filed Critical 한만엽
Priority to KR1019990018086A priority Critical patent/KR100306298B1/en
Priority to AU46212/00A priority patent/AU4621200A/en
Priority to PCT/KR2000/000503 priority patent/WO2000069768A1/en
Priority to EP00927907A priority patent/EP1194361A1/en
Publication of KR20000074278A publication Critical patent/KR20000074278A/en
Application granted granted Critical
Publication of KR100306298B1 publication Critical patent/KR100306298B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/16Rope, cable, or chain drives for trolleys; Combinations of such drives with hoisting gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/101Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means for containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/002Container cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

PURPOSE: An operation part moving system of a cyclic gantry crane moves swiftly a trolley and a crane, thereby improving the loading and unloading speed and efficiency of a container. CONSTITUTION: A moving system includes a pair of first and second steel wires(60), the trolley(50), the spreader(20), a hoist and an elevator(80). The first and second steel wires(60) are connected with a power source and then form a closed loop moving a gantry crane, are positioned at the lower portion of a hoist(40) and then rotate inside a boom(100). The trolley(50) includes a steel wire holder(52), an unlocker(56), and a wheel(59). The pairs of steel wire holders(52) are formed at the upper portion of the trolley(50) and holds the pair of first(60) or second steel wires(60). The unlocker(56) releases coupling between the steel wire(60) and the holder(52). The wheel(59) rolls on a moving track of the boom(100). The elevator(80) is positioned between the first steel wire(60) and the second steel wire.

Description

순환식 갠트리크레인의 작동부분의 이동시스템{Moving system of parts in circulating type gantry crane}Moving system of parts in circulating type gantry crane

본 발명은 컨테이너 등을 운반하는 순환식 갠트리크레인 또는 트랜스퍼크레인이나 이와 유사한 기능과 작동구조를 갖는 크레인에 관한 것으로, 구체적으로는 트롤리, 후크, 스프레더가 분리 및 결합되며 붐대를 순환이동하는 구조의 크레인에서의 이동시스템에 관한 것이다.The present invention relates to a circulating gantry crane or transfer crane carrying a container or the like, or a crane having a similar function and operation structure, and specifically, a crane having a structure in which a trolley, a hook, and a spreader are separated and coupled to circulate a boom. It relates to a mobile system in.

종래 사용되던 컨테이너 하역용 갠트리크레인은 주탑에 연결된 붐의 이동로를 트롤리와 스프레더가 회전이동중인 강선에 연결된 상태로 이동하도록 되어 있다. 따라서, 견인하고자 하는 컨테이너와 하역위치 상부에 크레인이 정위치해야만 하고 이동후 흔들리는 컨테이너를 정지시켜야 하므로 트롤리의 이동이 정밀하게 조정되어야 한다. 또한 육상측에서 컨테이너를 견인하고 해상측으로 이동하여 컨테이너를 하역한 뒤 다시 육상측으로 복귀하여 정위치하는 왕복운동을 하므로 종래의 크레인은 하역속도 및 하역효율 등의 작업효율이 매우 떨어지는 단점이 있다.Conventionally used container unloading gantry crane is to move the boom connected to the main tower in a state in which the trolley and the spreader are connected to the steel wire in the rotational movement. Therefore, the crane must be positioned on the container to be towed and the unloading position above, and the moving container must be stopped after moving so that the movement of the trolley must be precisely adjusted. In addition, the conventional crane has a disadvantage in that the work efficiency such as the unloading speed and the unloading efficiency is very low since the towing of the container on the land side and moving to the sea side unloads the container and then returns to the land side.

이에 반해 본 발명자의 선등록 특허인 한국특허 제134235호의 수평순환식 크레인이나 한국특허 제143699호 수직순환식 크레인의 경우 트롤리와 스프레더 등이 지속적으로 붐대를 순환운동하므로 기존의 하역방식에 비해 3~4배 이상 처리속도를 향상시킬 수 있는 장점이 있는바, 이에 따라 기존의 갠트리크레인에는 없는 트롤리와 스프레더가 호이스트와 후크에서 분리되어 독자적으로 붐대를 순환하여 이동할 수 있는 이동시스템을 구비해야만 한다.On the contrary, in the case of the horizontally cyclic crane of Korean Patent No. 134235 or the Korean Patent No. 143699 Vertical Cyclic Crane, the trolley and spreader continuously circulate the boom, and thus, compared with the conventional unloading method. There is an advantage of improving the processing speed by more than four times. Therefore, the trolley and the spreader, which are not present in the conventional gantry crane, must be separated from the hoist and the hook and have a mobile system that can move independently of the boom.

본 발명은 종래의 이와 같은 문제점을 개선하고자 고안된 것으로서, 컨테이너의 하역시 하역속도와 효율을 향상시키기 위해 컨테이너의 운반은 트롤리와 스프레더 만에 의해 이루어지고 컨테이너의 견인 및 하역은 호이스트에 의해 이루어지며, 컨테이너의 운반시에는 트롤리와 스프레더를 선회강선에 연결하여 트롤리 자체는 무동력으로 이동이 가능하도록 구성하여, 호이스트에 의한 컨테이너의 견인 및 하역과는 완전히 별도로 트롤리와 크레인을 신속하게 이동시킴으로써 컨테이너의 상하역 속도와 효율을 대폭 향상시킬 수 있도록 하는 것을 주목적으로 한다.The present invention is designed to improve such a conventional problem, in order to improve the unloading speed and efficiency when unloading the container is carried by the trolley and the spreader only and towing and unloading of the container is made by the hoist, When transporting the container, the trolley and the spreader are connected to the turning steel wire so that the trolley itself can be moved without power, and the trolley and crane are moved quickly and completely apart from the towing and unloading of the container by the hoist. Its main purpose is to allow for significant improvements in speed and efficiency.

도 1은 본 발명에 따른 갠트리크레인의 개략도;1 is a schematic view of a gantry crane according to the present invention;

도 2는 본 발명에 따른 갠트리크레인이 컨테이너를 견인하는 과정을 보여주는 상태도;Figure 2 is a state diagram showing the process of the gantry crane towing the container according to the present invention;

도 3은 본 발명에 따른 갠트리크레인이 컨테이너를 하역하는 과정을 보여주는 상태도;3 is a state diagram showing a process for unloading the container gantry crane according to the present invention;

도 4는 갠트리크레인의 각 구성요소의 배치상태도;4 is a layout view of each component of the gantry crane;

도 5는 트롤리와 호이스트의 작용관계를 도시한 상태도;5 is a state diagram showing the operating relationship between the trolley and the hoist;

도 6은 강선의 배치상태도.6 is a layout view of the steel wire.

상기 목적을 달성하기 위한 본 발명에 따른 순환식 갠트리크레인의 작동부분의 이동시스템은,Movement system of the operating part of the circulating gantry crane according to the present invention for achieving the above object,

컨테이너를 견인하는 스프레더(20), 스프레더와 결합하는 후크(30), 후크를 승강시키는 호이스트(40), 및 컨테이너를 견인한 스프레더와 결합하여 붐(100)을 따라 이동하는 트롤리(50)가 서로 분리결합하는 갠트리크레인에 있어서:Spreader 20 to tow the container, hook 30 to engage the spreader, hoist 40 to lift the hook, and trolley 50 to move along the boom 100 in combination with the spreader tow the container is mutually For gantry cranes that are separated in combination:

하단 내측면에 형성되어 트롤리(50)의 이동궤도를 형성하는 트롤리트랙(102), 내측면 중간에 형성되어 호이스트(40)의 이동궤도를 형성하는 호이스트트랙(104), 및 상단면에 형성되어 스프레더(20)의 이동궤도를 형성하는 스프레더트랙(106)을 포함한 기다란 좌우 한쌍의 붐(100);It is formed on the trolley track 102 formed on the lower inner side to form the trajectory of the trolley 50, the hoist track 104 formed on the inner side to form the trajectory of the hoist 40, and is formed on the upper surface A pair of elongated left and right booms 100 including a spreader track 106 forming a trajectory of the spreader 20;

동력원에 연결되어 상기 갠트리크레인을 이동시키는 폐루프를 구성하고, 상기 호이스트 하부에 배치되어 상기 붐(100) 내에서 회전하는 기다란 좌우 한쌍의 제 1 강선(60);A pair of elongated left and right first steel wires 60 connected to a power source to form a closed loop for moving the gantry crane, and disposed under the hoist to rotate in the boom 100;

동력원에 연결되어 상기 갠트리크레인을 이동시키는 폐루프를 구성하고, 상기 호이스트 상부에 배치되어 상기 붐(100) 내에서 회전하는 기다란 좌우 한쌍의 제 2 강선(70);A pair of elongated left and right second steel wires 70 connected to a power source to form a closed loop for moving the gantry crane and disposed above the hoist to rotate in the boom 100;

상기 트롤리의 상부에 전후 2쌍 형성되어 상기 제 1 강선(60) 또는 제 2 강선(60)을 파지하는 강선홀더(52), 상기 홀더(52)와 연결되어 상기 강선(60)과 홀더(52)의 결합을 해제하는 언로커(56), 및 상기 붐대(100)의 트롤리트랙(102)을 구르는 바퀴(59)를 포함하는 트롤리(50);Two pairs of front and rear are formed in the upper portion of the trolley, the steel wire holder 52 holding the first steel wire 60 or the second steel wire 60 and the holder 52 connected to the steel wire 60 and the holder 52. Trolley (50) comprising an unlocker (56) for releasing the coupling) and a wheel (59) for rolling the trolley track (102) of the boom (100);

하단 좌우측에 2쌍의 바퀴(22)가 형성되어 있고, 상기 바퀴가 상기 스프레더트랙(106)을 구르는 스프레더(20);A pair of wheels 22 formed at left and right sides of the lower side, the wheels rolling the spreader tracks 106;

하단 전단부와 후단부에 상기 트롤리의 언로커(56)를 안내하기 위한 경사가이드(42), 및 트롤리(50)를 하부로 견인하고 배출하기 위해 이동가능하며 상기 트롤리(50)와 착탈가능한 견인구(44)가 형성되어 있는 호이스트(40); 및An inclined guide 42 for guiding the unlocker 56 of the trolley at the lower front end and the rear end, and a movable and detachable traction with the trolley 50 for pulling and discharging the trolley 50 downward; Hoist 40 in which sphere 44 is formed; And

상하로 배치된 상기 제 1 강선(60)과 제 2 강선(70)의 양단부 사이에 배치되어 승강가능하고, 높이는 트롤리와 스프레더 결합체보다 높고 폭은 붐대 간격보다 넓은 박스형 엘리베이터(80);를 포함하고,A box-type elevator 80 disposed between both ends of the first steel wire 60 and the second steel wire 70 disposed up and down, the height being higher than that of the trolley and the spreader assembly and the width being wider than the boom spacing. ,

스프레더(20)를 하부에 결합한 트롤리(50)의 강선 홀더(52)가 제 1 강선(60)에 결합하여 이동하면서 상기 호이스트(40) 하부로 진입할 때는, 상기 홀더 누르개(56)의 바퀴(54)가 호이스트(40) 하부의 가이드(42)를 통과하면서 하향으로 눌러져 상기 강선홀더(52)와 강선(60)의 결합이 해제되어 트롤리의 이동이 중단되며, 트롤리(50)가 호이스트(40) 밑에서 벗어날 때는 다시 강선홀더(52)와 강선(60)이 결합되어 트롤리(50)의 이동이 진행되고, 상기 제 1 강선(60)과 제 2 강선(70) 사이의 이동은 상기 엘리베이터(80)에 의해 수행되며, 트롤리(50)와 스프레더(20)가 상부의 제 2 강선(70)에 결합되어 이동할 때는 스프레더(20) 하부의 바퀴(22)가 붐대(100)의 이동궤도를 구르면서 이동하는 것을 특징으로 한다.When the steel wire holder 52 of the trolley 50 to which the spreader 20 is coupled to the lower portion enters the hoist 40 while moving in combination with the first steel wire 60, the wheel of the holder presser 56 ( 54 is pressed downward while passing through the guide 42 in the lower portion of the hoist 40 to release the combination of the steel wire holder 52 and the steel wire 60 to stop the movement of the trolley, the trolley 50 is hoist 40 When moving away from the bottom of the steel wire holder 52 and the steel wire 60 is coupled to move the trolley 50, the movement between the first steel wire 60 and the second steel wire 70 is the elevator 80 When the trolley 50 and the spreader 20 are coupled to the second steel wire 70 of the upper part and move, the wheel 22 of the lower part of the spreader 20 rolls the trajectory of the boom 100. It is characterized by moving.

또, 본 발명에 따른 이동시스템에 있어서, 상기 홀더(52)는 강선(60,70)을 상하로 맞무는 파지부(52-1)와 파지부에서 이어진 수평한 몸체(52-2) 한쌍으로 이루어진 것이 바람직하다.In addition, in the movement system according to the present invention, the holder 52 is a pair of gripping portions 52-1 which vertically fit the steel wires 60 and 70 and a pair of horizontal bodies 52-2 connected to the gripping portions. It is preferable that it is made.

또, 본 발명에 있어서, 상기 언로커(56)는 상기 홀더(52)의 몸체(52-2)의 상부에서 몸체를 누르기 위한 누르개(57)와 상기 누르개(57) 상단부에 장착된 바퀴(58)로 구성되어, 트롤리(50)가 호이스트(40) 밑으로 진입할 때 상기 바퀴(58)가 호이스트의 가이드(42)에 의해 밑으로 눌리면서 누르개(57)가 홀더 몸체(52-2)를 눌러 파지구(52-1)가 벌어짐으로써 홀더(52)와 강선(60)의 결합이 해제되는 것이 바람직하다.In addition, in the present invention, the unlocker 56 is a presser 57 for pressing the body on the upper portion of the body 52-2 of the holder 52 and the wheel 58 mounted to the upper end of the presser 57. When the trolley 50 enters under the hoist 40, the wheel 58 is pushed down by the guide 42 of the hoist, and the presser 57 presses the holder body 52-2. By holding the gripper 52-1, it is preferable that the coupling of the holder 52 and the steel wire 60 be released.

또, 본 발명에 있어서, 상기 엘리베이터(80) 하단부에 갈고리형으로서 전후이동 가능한 안내구(82)가 형성되어 있고, 상기 안내구(82)가 트롤리(50)를 맞물어 스템.Moreover, in this invention, the guide (82) which can move back and forth as a hook-type at the lower end of the said elevator (80) is formed, and the guide (82) engages the trolley (50).

이하, 첨부 도면들을 참조하여 본 발명을 자세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명이 적용되는 갠트리크레인의 전체적인 구성을 도시한 도면이다.1 is a view showing the overall configuration of the gantry crane to which the present invention is applied.

도시된 바와 같이, 본 발명이 적용되는 갠트리크레인은 복수의 트롤리(50) 및 스프레더(20)가 결합한 상태에서 붐(100)을 따라 폐루프의 순환경로를 이동하고, 호이스트(40)는 컨테이너의 견인 및 하역 위치에 정위치하여 있다. 트롤리가 순환하며 이동하는 폐루프는 수평순환식 또는 수직순환식 어느 것도 적용 가능하지만, 본 발명에서는 수직순환식이 바람직하다.As shown, the gantry crane to which the present invention is applied moves the circulation path of the closed loop along the boom 100 in a state in which the plurality of trolleys 50 and the spreader 20 are coupled, and the hoist 40 of the container It is in the towing and unloading position. The closed loop through which the trolley circulates and moves can be applied either horizontally or vertically, but in the present invention, vertically cyclically.

붐(100)에는 대개 2개의 호이스트(40)가 설치된다. 한쪽 호이스트는 육상측에 위치하고, 나머지 호이스트는 해상측에 위치한다. 이들 호이스트(40)는 필요시 화살표(a) 방향으로 이동이 가능하다. 호이스트는 컨테이너(10)를 하역할 위치의 상부에 정위치하는 것이 바람직하다.The boom 100 is usually provided with two hoists 40. One hoist is located on the land side and the other hoist is located on the sea side. These hoists 40 can be moved in the direction of arrow a if necessary. The hoist is preferably positioned on top of the position to unload the container 10.

상기 호이스트(40)에는 후크(30)가 연결되어 있다. 후크(30)는 기계실의 조작에 의해 승강될 수 있어, 후술하는 바와 같이, 스프레더(20)와 결합하여 컨테이너(10)를 승강시킬 수 있다. 컨테이너는 상기 스프레더(20)에 의해 견인되어 트롤리(50)에 의해 필요한 위치로 이동하여 하역된다. 붐(100)을 따라 이동하는 다수의 트롤리(50)는 별도의 동력이 아닌 이동중인 강선(60,70)에 결합되어 선회경로를 따라 이동한다.Hook 30 is connected to the hoist 40. The hook 30 may be lifted by an operation of the machine room, and as described later, the hook 30 may be lifted and coupled to the spreader 20. The container is towed by the spreader 20 and moved to the required position by the trolley 50 to be unloaded. The plurality of trolleys 50 moving along the boom 100 are coupled to the moving steel wires 60 and 70 instead of separate power and move along the turning path.

컨테이너(10) 운반을 위해 트롤리(50), 스프레더(20), 후크(30)는 서로 결합과 분리를 반복한다.For transporting the container 10, the trolley 50, the spreader 20, and the hook 30 are repeatedly coupled and separated from each other.

도 2, 3은 본 발명에 따른 갠트리크레인의 구성요소들이 상기 분리결합을 반복하면서 컨테이너의 하역 및 운반동작을 설명하기 위한 개략도로서, 도 2는 육상측에 정위치한 호이스트(40)의 하부에 도착하고 출발하는 트롤리와 스프레더의 동작을 도시한 도면이고, 도 3은 해상측에 정위치한 호이스트의 하부에 도착하는 트롤리와 스프레더의 동작을 도시한 도면이다. 설명의 편의상, 호이스트(40)를 여러개 도시하였지만, 실제는 하나만이 동작한다.2 and 3 are schematic diagrams for explaining the unloading and transporting operation of the container while the components of the gantry crane in accordance with the present invention repeat the separation, Figure 2 is arriving at the bottom of the hoist 40 is located on the land side Figure 3 is a view showing the operation of the trolley and the spreader starting, Figure 3 is a view showing the operation of the trolley and the spreader arriving at the bottom of the hoist positioned on the sea side. Although several hoists 40 are shown for convenience of description, only one actually operates.

도 2에 도시한 바와 같이, 별도의 운전실(미도시)로부터 원격으로 가동되어 붐(100)을 따라 화살표(b) 방향으로 이동하는 트롤리(50)와 트롤리 하부에 결합된 스프레더(20)는 육상측 호이스트(40)의 하부에 도착하여 정지한다. 평상시, 육상측 호이스트(40)는 컨테이너(10)의 연직 상부에 정위치하여 대기하고 있다. 호이스트 하부에 트롤리(50)가 위치하면, 후크(30)가 트롤리(50)를 관통하여 하강하여 스프레더(20)와 결합하고, 트롤리(50)와 스프레더(20)가 분리된다. 후크의 승강운동은 별도의 운전실(미도시)에서 조정된다. 후크(30)는 스프레더(20)와 함께 계속 하강하여 컨테이너(10) 윗면까지 하강하여, 스프레더(20)에 컨테이너(10)가 결합된다. 컨테이너가 스프레더에 결합되는 동작은 역시 별도의 운전실에서 조작된다.As shown in FIG. 2, the trolley 50 moving remotely from a separate cab (not shown) and moving in the direction of the arrow b along the boom 100 and the spreader 20 coupled to the lower portion of the trolley are on land. It reaches the lower part of the side hoist 40 and stops. Normally, the land-side hoist 40 is standing on the vertical upper portion of the container 10 and waiting. When the trolley 50 is positioned below the hoist, the hook 30 descends through the trolley 50 to engage with the spreader 20, and the trolley 50 and the spreader 20 are separated. The lifting movement of the hook is adjusted in a separate cab (not shown). The hook 30 continues to descend with the spreader 20 and descends to the upper surface of the container 10, so that the container 10 is coupled to the spreader 20. The movement of the container to the spreader is also operated in a separate cab.

스프레더(20)에 컨테이너(10)가 결합되면 후크(30)가 상승한다. 후크가 계속 상승하여 스프레더(20)가 트롤리(50) 직하방에 위치하면, 트롤리(50)와 스프레더(20)가 결합하고 후크(30)와 스프레더(20)는 분리된다. 후크(30)는 스프레더(20)에서 분리된 뒤 트롤리(50) 상부까지 계속 상승된다. 이후, 트롤리(50)는 스프레더 및 컨테이너와 함께 c 방향으로 이동한다.When the container 10 is coupled to the spreader 20, the hook 30 is raised. When the hook continues to rise and the spreader 20 is positioned directly below the trolley 50, the trolley 50 and the spreader 20 are coupled and the hook 30 and the spreader 20 are separated. The hook 30 is separated from the spreader 20 and continues to rise to the top of the trolley 50. The trolley 50 then moves in the c direction with the spreader and the container.

도 3에 도시한 바와 같이, 트롤리(50)는 c 방향으로 이동하여 하역측에 정위치해 있는 해상측 호이스트(40) 하부로 이동한다. 호이스트(40) 하부에 트롤리(50)가 정위치하면, 호이스트(50)에서 후크(30)가 하강한다. 후크(30)는 트롤리(50)를 통과하여 스프레더(20) 상부까지 하강한다. 후크(30)가 스프레더(20) 윗면에 닿으면, 후크(30)와 스프레더(20)가 결합하고, 트롤리(50)와 스프레더(20)는 분리된다. 이후, 후크(30)가 계속 하강하면 스프레더(20) 및 컨테이너(10)는 후크(30)에 견인되어 함께 하강한다. 후크(30)가 계속 하강하여 선박의 하역위치까지 하강하면, 스프레더(20)에서 컨테이너(10)가 분리되어 하역위치에 적재된다. 컨테이너를 내린 빈 스프레더(20)는 후크(30)와 함께 상승하여 트롤리(50)에 결합되고, 후크(30)에서 분리된다. 따라서, 컨테이너를 내린 빈 스프레더(20)는 트롤리(50)에 결합되어 이동궤도를 따라 d 방향으로 이동한다. 후술하는 바와 같이, d 방향으로 이동하여 거의 붐대(100)의 끝가지 이동한 트롤리(50)와 스프레더(20)는 강선(60)의 단부에서 강선과의 결합이 풀리고 엘리베이터(80)에 실려 상승한 뒤, 트롤리가 강선(70)과 결합하여 육상측으로 이동하여 엘리베이터(80)에 의해 하강한 뒤, 강선(70)에 물려 다시 도 2, 3의 동작을 반복하는 폐루프 동작을 형성함으로써,컨테이너 견인작업을 반복할 수 있다(도 6 참조).As shown in FIG. 3, the trolley 50 moves to c direction and moves below the marine side hoist 40 located on the unloading side. When the trolley 50 is positioned below the hoist 40, the hook 30 is lowered from the hoist 50. The hook 30 passes down the trolley 50 to the top of the spreader 20. When the hook 30 contacts the upper surface of the spreader 20, the hook 30 and the spreader 20 are coupled, and the trolley 50 and the spreader 20 are separated. Thereafter, when the hook 30 continues to descend, the spreader 20 and the container 10 are pulled by the hook 30 and lowered together. When the hook 30 continues to descend and descends to the unloading position of the ship, the container 10 is separated from the spreader 20 and loaded at the unloading position. The empty spreader 20 which lowers the container is lifted together with the hook 30, coupled to the trolley 50, and separated from the hook 30. Therefore, the empty spreader 20 which lowers the container is coupled to the trolley 50 and moves in the d direction along the moving trajectory. As will be described later, the trolley 50 and the spreader 20 moved in the d direction and almost moved to the end of the boom stand 100 are uncoupled from the steel wire at the end of the steel wire 60 and lifted up on the elevator 80. After the trolley is combined with the steel wire 70 and moved to the land side and lowered by the elevator 80, the trolley is bitten by the steel wire 70 to form a closed loop operation of repeating the operations of FIGS. Can be repeated (see FIG. 6).

이와 같이, 본 발명에 따른 갠트리크레인은 종래와 달리 트롤리, 스프레더, 후크가 서로 결합과 분리를 반복하면서, 트롤리(50)와 스프레더(20)만이 강선(60,70)에 맞물려 이동궤도를 빠른 속도로 움직이도록 되어있다. 따라서, 본 발명의 갠트리크레인은 강선(60,70)과 트롤리의 분리결합 이동시스템을 구비해야만 한다.As described above, in the gantry crane according to the present invention, the trolley, the spreader, and the hook are repeatedly coupled and separated from each other, and only the trolley 50 and the spreader 20 are engaged with the steel wires 60 and 70 so that the trajectory is fast. It is supposed to move to. Therefore, the gantry crane of the present invention must be provided with a separate combined movement system of the steel wires 60 and 70 and the trolley.

도 4는 본 발명에 따른 갠트리크레인의 각 요소의 배치상태도이다.Figure 4 is a layout view of each element of the gantry crane in accordance with the present invention.

도시된 바와 같이, 붐(100)의 하단 양쪽 내측면에는 트롤리(50)의 이동로를 형성하는 트롤리트랙(102)이 형성되어 있고, 붐(100)의 중간 양쪽 내측면에는 호이스트(40)의 이동로를 형성하는 호이스트트랙(104)이 형성되어 있으며, 호이스트에 동력을 공급하기 위한 동력선트랙(미도시)이 있고, 붐의 최상단에는 트롤리(50)를 회송하기 위해 스프레더(20)가 주행할 수 있는 스프레더트랙(106)이 형성되어 있다. 이들 트랙들 위를 호이스트, 트롤리, 스프레더가 주행이동한다. 즉, 붐(100)의 중간에 이동가능하게 호이스트(40)가 장착되어 있고, 호이스트(40)에 후크(30)가 승강가능하게 매달려 있으며, 붐(100) 하부에 주행가능하게 트롤리(50)가 장착되고, 후크(30) 하부에 스프레더(20)가 배치되어 있으며, 스프레더(20) 하부에 컨테이너(10)가 배치되어 스프레더와 결합한다. 도시된 바와 같이, 호이스트(40) 하부에 배치된 트롤리(50)와 스프레더(20)는 제 1 강선(60)에 맞물려 도 2, 3의 이동경로를 따라 이동할 때의 배치상태이고, 호이스트(40) 상부에 배치된 트롤리(50)와 스프레더(20)는 제 2 강선(70)(도시안됨)에 맞물려 붐(100)의 상부를 이동하여 회송하는 상태의 배치도이다.As shown in the figure, trolley tracks 102 are formed on both inner bottom surfaces of the boom 100 to form a moving path of the trolley 50, and on both inner surfaces of the boom 100 of the hoist 40. The hoist track 104 is formed to form a moving path, and there is a power line track (not shown) for supplying power to the hoist, and the spreader 20 is driven at the top of the boom to return the trolley 50. A spreader track 106 can be formed. Hoists, trolleys and spreaders travel on these tracks. That is, the hoist 40 is mounted in the middle of the boom 100 so as to be movable, the hook 30 is suspended from the hoist 40 so as to be liftable, and the trolley 50 is movable in the lower part of the boom 100. Is mounted, the spreader 20 is disposed under the hook 30, the container 10 is disposed below the spreader 20 is coupled to the spreader. As shown, the trolley 50 and the spreader 20 disposed below the hoist 40 are disposed when the trolley 50 and the spreader 20 are engaged with the first steel wire 60 and move along the movement paths of FIGS. 2 and 3, and the hoist 40. The trolley 50 and the spreader 20 disposed on the upper part are engaged with the second steel wire 70 (not shown) to move and rotate the upper part of the boom 100.

트롤리(50) 하부에는 붐(100)의 궤도를 따라 이동하기 위한 바퀴(59)가 좌우로 장착되어 있다. 또, 상기 바퀴(59)의 상부에는 제 1 강선(60)에 착탈되는 강선홀더(52)가 트롤리 좌우로 돌출 형성되어 있다. 강선홀더(52)는 강선(60)을 맞무는 파지부(52-1)와 파지부에서 수평으로 이루어진 몸체(52-2) 한쌍으로 이루어져 강선(60)을 상하에서 맞물고 있다. 상기 강선의 한쌍의 몸체(52-2)는 소정의 간격을 두고 있다. 강선홀더(52)의 몸체 상부에는 홀더(52)와 강선(60,70)의 결합을 해제하기 위한 언로커(56)가 배치된다. 상기 언로커(56)는 강선홀더(52)의 몸체(52-2)와 거의 직각으로 접촉해 있는 누르개(57)와 상단부의 바퀴(58)로 구성된다. 따라서, 누르개(57)가 몸체(52-2)를 누르면 파지부(52-1)가 벌어져 강선(60)과 강선홀더(52)의 결합이 풀리게 되어, 트롤리(50)가 강선(60)에서 분리된다. 도 4의 확대부분에는 강선홀더(52)와 강선(60)의 결합이 풀린 1차적인 상태를 보여준다.Wheels 59 for moving along the track of the boom 100 are mounted on the lower side of the trolley 50. In addition, a steel wire holder 52 detachably attached to the first steel wire 60 is formed to protrude from the left and right of the trolley to the upper portion of the wheel 59. The steel wire holder 52 is composed of a pair of gripping portions 52-1 engaging the steel wire 60 and a pair of bodies 52-2 formed horizontally in the gripping portion to engage the steel wire 60 with the upper and lower portions. The pair of bodies 52-2 of the steel wires have a predetermined interval. The unlocker 56 for releasing the coupling between the holder 52 and the steel wires 60 and 70 is disposed on the upper portion of the body of the steel wire holder 52. The unlocker 56 is composed of a presser 57 and a wheel 58 of the upper end which are in contact with the body 52-2 of the steel wire holder 52 at a right angle. Therefore, when the presser 57 presses the body 52-2, the grip portion 52-1 is opened to uncouple the steel wire 60 and the steel wire holder 52, so that the trolley 50 is removed from the steel wire 60. Are separated. An enlarged portion of FIG. 4 shows a primary state in which the combination of the wire holder 52 and the wire 60 is loosened.

전술한 바와 같이, 후크(30)는 호이스트(40)에 현수되어 상하로 이동되고, 트롤리(50)와 스프레더(20)가 이동할 때는 트롤리 및 스프레더에서 분리되어 있다. 따라서, 후크와 호이스트는 스프레더와 트롤리의 이동을 방해하지 않는다.As described above, the hook 30 is suspended from the hoist 40 and moved up and down, and is separated from the trolley and the spreader when the trolley 50 and the spreader 20 move. Thus, the hook and hoist do not interfere with the movement of the spreader and trolley.

스프레더(20)는 트롤리(50)와 결합되어 이동한다. 스프레더(20) 하부의 좌우 양단 앞뒤에는 바퀴(22)가 장착된다. 바퀴(22)의 외측에는 가이더(24)가 장착된다. 상기 가이더(24)는 스프레더(20)에 컨테이너(10)를 결합할 때, 컨테이너(10)를 안내하는 역할을 한다. 따라서, 스프레더(20)가 붐(100)을 이동할 때는 이동을 방해하지 않기 위해 가이더(24)는 상부로 접혀진 상태를 유지한다. 스프레더(20)의 바퀴(22)는 트롤리와 스프레더가 컨테이너를 하역한 뒤, 컨테이너 견인 위치로 복귀할 때, 즉 도 2의 상태로 되돌아올 때 붐(100) 상부의 트랙(106)을 따라 구름운동한다. 도 4의 상부에는 이런 복귀상태의 스프레더(20)와 트롤리(50)가 결합되어 바퀴(22)가 트랙(106)을 구르는 상태 및 가이더(24)가 상부로 접혀진 상태가 도시되어 있다. 한편, 트랙(106)의 높이와 위치를 변경시키면 스프레더의 바퀴가 아닌 트롤리의 바퀴를 이용하여 이동하는 것도 가능하다.The spreader 20 moves in conjunction with the trolley 50. Wheels 22 are mounted on both front and rear ends of the lower and lower sides of the spreader 20. The guider 24 is mounted to the outside of the wheel 22. The guider 24 serves to guide the container 10 when the container 10 is coupled to the spreader 20. Therefore, when the spreader 20 moves the boom 100, the guider 24 maintains the folded state in order to not interfere with the movement. The wheels 22 of the spreader 20 roll along the tracks 106 above the boom 100 when the trolley and the spreader unload the container and then return to the container towing position, ie back to the state of FIG. 2. Exercise. The upper part of FIG. 4 shows a state in which the returner 20 and the trolley 50 are coupled so that the wheel 22 rolls the track 106 and the guider 24 is folded upward. On the other hand, if the height and position of the track 106 is changed, it is also possible to move using the wheel of the trolley rather than the wheel of the spreader.

도 5는 트롤리(50)가 호이스트(40) 하부에 진입한 상태의 측단면도 및 트롤리(50)와 스프레더(20)가 결합한 상태로 붐의 상부트랙(106)을 따라 회송하는 상태의 측단면도이다. 트롤리(50)는 강선홀더(52)가 강선(60)에 맞물려 트랙(102)을 따라 주행하면서 호이스트(40) 하부로 진입한다. 강선(60)은 붐(100)의 하부에 폐루푸를 이루면서 위치하여 일정 속도로 회전하고 있다. 따라서, 트롤리(50)가 강선에 맞물린 상태에서는 항상 강선과 동일한 속도로 이동한다. 트롤리(50)의 하부에는 스프레더(20)가 결합된다. 강선홀더(52) 상부에는 바퀴(58)가 달린 언로커(56)가 배치된다.5 is a side cross-sectional view of the trolley 50 entering the lower hoist 40 and a side cross-sectional view of the trolley 50 and the spreader 20 coupled along the upper track 106 of the boom. . The trolley 50 enters under the hoist 40 while the steel wire holder 52 is engaged with the steel wire 60 and travels along the track 102. Steel wire 60 is located at the bottom of the boom 100 to form a closed loop is rotating at a constant speed. Therefore, when the trolley 50 is engaged with the steel wire, it always moves at the same speed as the steel wire. The spreader 20 is coupled to the lower portion of the trolley 50. On the top of the steel wire holder 52, an unlocker 56 with wheels 58 is disposed.

이렇게 강선(60)에 맞물린 트롤리(50)와 스프레더(20)는 강선(60)의 이동에 의해 우측으로 이동하면서 호이스트(40) 밑으로 접근 접근하면서 가이드(42)에 접촉한다. 상기 가이드(42)는 호이스트(40) 하단 전후에 배치되어 상방으로 경사져 있다. 따라서, 트롤리(50)가 호이스트 밑으로 진입하면, 트롤리의 언로커(56)의 바퀴(58)가 가이드(42)를 따라 구르면서 하방으로 내리눌려진다. 이렇게 되면, 언로커(56)의 바퀴(58)에 연결된 누르개(57)가 홀더(52) 몸체(52-2)를 눌러 홀더(52)의 파지부(52-1)를 벌린다. 따라서, 강선(60)에서 홀더(52)가 분리된다(도 4 참조). 트롤리(50)가 호이스트 하부에 위치할 때는 항상 홀더(52)와 강선(60)이 분리되어 있다. 강선(60)에서 분리된 트롤리(50)는 이동을 멈추게 된다. 이후, 호이스트(40) 하단에 장착된 견인구(44)에 의해 트롤리(50)가 견인되어 정위치한다. 전술한 바와 같이, 이렇게 트롤리가 정위치한 상태에서 스프레더와 후크가 결합하고, 트롤리와 스프레더가 분리되어 컨테이너의 결합 및 견인작업이 이루어지게 된다.The trolley 50 and the spreader 20 engaged with the steel wire 60 are in contact with the guide 42 while approaching under the hoist 40 while moving to the right by the movement of the steel wire 60. The guide 42 is disposed before and after the lower end of the hoist 40 and is inclined upward. Therefore, when the trolley 50 enters under the hoist, the wheels 58 of the unlocker 56 of the trolley are pushed down while rolling along the guide 42. In this case, the presser 57 connected to the wheel 58 of the unlocker 56 presses the holder 52 body 52-2 to open the grip portion 52-1 of the holder 52. Thus, the holder 52 is separated from the steel wire 60 (see FIG. 4). When the trolley 50 is located under the hoist, the holder 52 and the steel wire 60 are always separated. The trolley 50 separated from the steel wire 60 stops moving. Thereafter, the trolley 50 is towed by the tow 44 mounted at the bottom of the hoist 40 to be positioned. As described above, the spreader and the hook are coupled in the state where the trolley is in this position, and the trolley and the spreader are separated to engage and pull the container.

컨테이너(10)의 견인작업이 완료되면, 트롤리(50)가 호이스트(40)에서 벗어나 우측으로 이동하게 되는바, 이 이동은 뒤에서 대기중인 트롤리가 이동하여 호이스트 밑에 있는 트롤리를 앞으로 밀어주면서 이루어지게 된다.When the towing operation of the container 10 is completed, the trolley 50 moves away from the hoist 40 to the right, and this movement is performed while the trolley waiting at the rear moves to push the trolley under the hoist forward. .

이렇게 호이스트(40) 하부에서 우측으로 이동하면서 트롤리(50)의 언로커(56)의 바퀴(58)가 호이스트 우측의 가이드(42)를 벗어나면, 언로커(56)가 위로 움직여 강선홀더(52)가 다시 강선(60)에 결합된다. 따라서, 컨테이너(10), 컨테이너를 결합한 스프레더(20) 및 트롤리(50)가 동시에 강선(60)과 동일한 속도로 도 3의 하역위치까지 이동하게 된다. 도 3의 하역위치의 호이스트까지 도달한 트롤리는 전술한 것과 동일한 방식으로 강선(60)과의 결합이 분리되어 컨테이너를 하역한다.When the wheel 58 of the unlocker 56 of the trolley 50 moves away from the lower side of the hoist 40 and moves out of the guide 42 on the right side of the hoist, the unlocker 56 moves upward to move the steel wire holder 52. ) Is coupled to the steel wire 60 again. Therefore, the container 10, the spreader 20 and the trolley 50 combining the containers are simultaneously moved to the unloading position of FIG. 3 at the same speed as the steel wire 60. The trolley, which has reached the hoist in the unloading position of FIG. 3, is uncoupled from the steel wire 60 in the same manner as described above to unload the container.

도 6은 본 발명에 의한 갠트리크레인의 붐(100) 내부의 2개의 강선(60,70)의 배치상태와 트롤리와 스프레더를 상기 2개의 강선 사이에서 이동시키기 위한 엘리베이터(80)를 도시한 측면도이다.FIG. 6 is a side view illustrating an arrangement of two steel wires 60 and 70 in the boom 100 of the gantry crane according to the present invention, and an elevator 80 for moving the trolley and the spreader between the two steel wires. .

도시된 바와 같이, 제 1 강선(60)은 붐(100) 하부에 길게 배치되어 폐루프를 형성하고, 제 2 강선(70)은 붐(100) 상부에 길게 배치되어 폐루프를 형성한다. 2개의 강선(60, 70) 양단부 사이에는 엘리베이터(80)가 배치된다. 제 1 강선(60)은 트롤리와 스프레더가 도 2, 3의 상태로 이동하면서 컨테이너의 견인과 하역을 행하기 위해, 트롤리를 이동시키기 위한 강선이고, 제 2 강선은 하역작업을 완료한 트롤리와 스프레더를 회송하여 원위치시키기 위한 강선이다. 이들 강선은 직선적으로 배치되어야 하므로, 중간중간에 적당한 지지롤러(72)가 배치되어 처짐을 방지하도록 하는 것이 바람직하다.As shown, the first steel wire 60 is disposed long in the lower portion of the boom 100 to form a closed loop, and the second steel wire 70 is disposed longer in the upper portion of the boom 100 to form a closed loop. An elevator 80 is disposed between both ends of the two steel wires 60 and 70. The first steel wire 60 is a steel wire for moving the trolley so that the trolley and the spreader move to the state shown in Figs. 2 and 3, and the trolley and the spreader have completed the unloading work. It is a steel wire to return to its original position. Since these steel wires should be arranged in a straight line, it is preferable that an appropriate support roller 72 is disposed in the middle to prevent sagging.

엘리베이터(80)는 높이는 트롤리와 스프레더의 결합체보다 높으며 폭은 붐(100)의 폭과 비슷한 박스형태가 바람직하다. 제 1 강선(60)에 맞물려 도 3의 d 방향으로 계속 진행하여 강선의 우단부에 도달한 트롤리와 스프레더는 강선에서 분리되어 엘리베이터(80)에 실려 화살표(A) 방향으로 상승된다. 엘리베이터(80)가 상승되면 트롤리가 엘리베이터에서 내려 제 2 강선(70)에 맞물려 스프레더와 함께 제 2 강선과 동일한 속도로 이동한다. 제 1 강선(60)에 맞물린 상태에서는 상부의 트롤리(50)의 바퀴(59)가 붐(100) 하부의 트롤리트랙(102)을 따라 이동하지만, 제 2 강선(70)에 맞물린 상태에서는 하부의 스프레더(20)의 바퀴(22)가 붐(100) 상부의 트랙(106)을 따라 이동한다(도 4 참조). 따라서, 트롤리와 스프레더가 강선(70)에 결합되어 원위치로 복귀할 때는 붐(100)의 중간에 배치되어 있는 호이스트(40)에 걸리지 않고 이동이 가능하다. 강선(70)에 의해 붐(100)의 좌단부까지 이동한 트롤리와 스프레더는 다른 엘리베이터(80)에 의해 화살표(B) 방향으로 하강되어 강선(60)에 맞물린다. 이후, 도 2, 3의 동작이 되풀이된다.The elevator 80 is higher in height than the combination of the trolley and the spreader, the width is preferably in the form of a box similar to the width of the boom 100. The trolley and the spreader, which are engaged with the first steel wire 60 and continue in the d direction of FIG. 3 and reach the right end of the steel wire, are separated from the steel wire and are loaded on the elevator 80 and are lifted in the direction of the arrow A. FIG. When the elevator 80 is raised, the trolley is lowered from the elevator and engaged with the second steel wire 70 to move with the spreader at the same speed as the second steel wire. The wheel 59 of the upper trolley 50 moves along the trolley track 102 below the boom 100 in the engaged state with the first steel wire 60, but the lower wheel in the engaged state with the second steel wire 70. Wheels 22 of spreader 20 move along track 106 above boom 100 (see FIG. 4). Therefore, when the trolley and the spreader are coupled to the steel wire 70 and return to their original positions, the trolley and the spreader may move without being caught by the hoist 40 disposed in the middle of the boom 100. The trolley and the spreader moved to the left end of the boom 100 by the steel wire 70 are lowered in the direction of the arrow B by another elevator 80 to be engaged with the steel wire 60. Thereafter, the operations of FIGS. 2 and 3 are repeated.

트롤리(50)가 강선(60)의 끝까지 도달하여 붐대의 끝까지 이동하여 엘리베이터(80) 전방에 정지된다. 이때, 엘리베이터(80) 하단에 장치되어 전후이동 가능한 갈고리형 안내구(82)가 트롤리(50)에 결합되어 트롤리를 엘리베이터 안으로 견인하여 정위치시킨다. 이어서, 엘리베이터(80)가 상승 또는 하강하고, 안내구(82)가 트롤리를 밀어내어 붐대에 안착시켜 강선(60,70)에 결합시킨다.The trolley 50 reaches the end of the steel wire 60 and moves to the end of the boom to be stopped in front of the elevator 80. At this time, the hook-shaped guide 82 which is installed at the bottom of the elevator 80 and is movable back and forth is coupled to the trolley 50 to tow the trolley into the elevator to position it. Subsequently, the elevator 80 is raised or lowered, and the guide port 82 pushes the trolley to rest on the boom to engage the steel wires 60 and 70.

이와 같이, 붐(100)에 설치되어 있는 다수의 트롤리가 계속 붐을 이동하면서 컨테이너 견인 및 하역작업을 수행하게 된다. 또한, 상기 설명에서는 육상측을 컨테이너 견인측으로, 해상측을 하역측으로 설명하였지만, 반대의 경우도 동일하게 본 발명을 적용할 수 있다.As such, a plurality of trolleys installed in the boom 100 continue to move the boom to perform container towing and unloading. In addition, in the above description, the land side is described as the container towing side and the sea side as the unloading side, but the present invention can be similarly applied to the reverse case.

도면과 명세서는 단지 본 발명의 예시적인 것으로서, 이는 단지 본 발명을 설명하기 위한 목적에서 사용된 것이지 의미한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것은 아니다. 본 발명에 따라 트롤리, 후크, 스프레더가 분리결합되면서 트롤리와 스프레더가 붐을 이동하는 구성은 모두 본 발명의 범위에 포함되는 것으로 해석해야 할 것이다.The drawings and specification are merely exemplary of the invention, which are used for the purpose of illustrating the invention only and are not intended to limit the scope of the invention as defined in the appended claims or claims. According to the present invention, the trolley, the hook, and the spreader are coupled to each other so that the configuration of the trolley and the spreader to move the boom will be construed as being included in the scope of the present invention.

본 발명에 의하면, 스프레더, 후크, 트롤리가 서로 분리 결합을 반복하면서 트롤리와 스프레더만이 붐을 따라 이동하고, 컨테이너 견인 및 하역은 정지상태인 호이스트와 후크에 트롤리와 스프레더가 결합되어 작업할 수 있다. 또한, 트롤리와 스프레더는 붐대를 순환운동하므로 동력공급이나 동작의 제어가 불가능함에도 불구하고, 이들 부품에 동력장치나 제어장치가 없어도 상하역 작업을 하는데 필요한 모든 동작과 작업이 가능케 된다. 또한, 호이스트는 항상 일정한 위치에 정위치하거나, 미리 필요한 위치에 대기되어 있으므로 기존의 크레인처럼 견인 및 하역에 필요한 정밀한 위치제어가 불필요하여 스프레더의 흔들림 문제가 근본적으로 해결되며, 정위치 제어에 필요한 시간이 절감되므로 컨테이너의 하역 및 운반속도를 획기적으로 향상시킬 수 있다.According to the present invention, the trolley and the spreader can be combined with the trolley and the spreader to the hoist and the hook in which the trolley and the spreader move along the boom while the spreader, the hook and the trolley are repeatedly coupled to each other. . In addition, since the trolley and the spreader circulates the boom, it is impossible to control the power supply or the movement, but even without the power unit or the control unit, all the operations and operations necessary for the loading and unloading operation are possible. In addition, since the hoist is always in a fixed position or in a necessary position in advance, it is not necessary to precisely control the towing and unloading like conventional cranes, and the shaker of the spreader is fundamentally solved. This savings can dramatically improve the speed of unloading and transporting containers.

Claims (4)

컨테이너를 견인하는 스프레더(20), 스프레더와 결합하는 후크(30), 후크를 승강시키는 호이스트(40), 및 컨테이너를 견인한 스프레더와 결합하여 붐(100)을 따라 이동하는 트롤리(50)가 서로 분리결합하는 갠트리크레인에 있어서:Spreader 20 to tow the container, hook 30 to engage the spreader, hoist 40 to lift the hook, and trolley 50 to move along the boom 100 in combination with the spreader tow the container is mutually For gantry cranes that are separated in combination: 하단 내측면에 형성되어 트롤리(50)의 이동궤도를 형성하는 트롤리트랙(102), 내측면 중간에 형성되어 호이스트(40)의 이동궤도를 형성하는 호이스트트랙(104), 및 상단면에 형성되어 스프레더(20)의 이동궤도를 형성하는 스프레더트랙(106)을 포함한 기다란 좌우 한쌍의 붐(100);It is formed on the trolley track 102 formed on the lower inner side to form the trajectory of the trolley 50, the hoist track 104 formed on the inner side to form the trajectory of the hoist 40, and is formed on the upper surface A pair of elongated left and right booms 100 including a spreader track 106 forming a trajectory of the spreader 20; 동력원에 연결되어 상기 갠트리크레인을 이동시키는 폐루프를 구성하고, 상기 호이스트 하부에 배치되어 상기 붐(100) 내에서 회전하는 기다란 좌우 한쌍의 제 1 강선(60);A pair of elongated left and right first steel wires 60 connected to a power source to form a closed loop for moving the gantry crane, and disposed under the hoist to rotate in the boom 100; 동력원에 연결되어 상기 갠트리크레인을 이동시키는 폐루프를 구성하고, 상기 호이스트 상부에 배치되어 상기 붐(100) 내에서 회전하는 기다란 좌우 한쌍의 제 2 강선(70);A pair of elongated left and right second steel wires 70 connected to a power source to form a closed loop for moving the gantry crane and disposed above the hoist to rotate in the boom 100; 상기 트롤리의 상부에 전후 2쌍 형성되어 상기 제 1 강선(60) 또는 제 2 강선(60)을 파지하는 강선홀더(52), 상기 홀더(52)와 연결되어 상기 강선(60)과 홀더(52)의 결합을 해제하는 언로커(56), 및 상기 붐대(100)의 트롤리트랙(102)을 구르는 바퀴(59)를 포함하는 트롤리(50);Two pairs of front and rear are formed in the upper portion of the trolley, the steel wire holder 52 holding the first steel wire 60 or the second steel wire 60 and the holder 52 connected to the steel wire 60 and the holder 52. Trolley (50) comprising an unlocker (56) for releasing the coupling) and a wheel (59) for rolling the trolley track (102) of the boom (100); 하단 좌우측에 2쌍의 바퀴(22)가 형성되어 있고, 상기 바퀴가 상기 스프레더트랙(106)을 구르는 스프레더(20);A pair of wheels 22 formed at left and right sides of the lower side, the wheels rolling the spreader tracks 106; 하단 전단부와 후단부에 상기 트롤리의 언로커(56)를 안내하기 위한 경사가이드(42), 및 트롤리(50)를 하부로 견인하고 배출하기 위해 이동가능하며 상기 트롤리(50)와 착탈가능한 견인구(44)가 형성되어 있는 호이스트(40); 및An inclined guide 42 for guiding the unlocker 56 of the trolley at the lower front end and the rear end, and a movable and detachable traction with the trolley 50 for pulling and discharging the trolley 50 downward; Hoist 40 in which sphere 44 is formed; And 상하로 배치된 상기 제 1 강선(60)과 제 2 강선(70)의 양단부 사이에 배치되어 승강가능하고, 높이는 트롤리와 스프레더 결합체보다 높고 폭은 붐대 간격보다 넓은 박스형 엘리베이터(80);를 포함하고,A box-type elevator 80 disposed between both ends of the first steel wire 60 and the second steel wire 70 disposed up and down, the height being higher than that of the trolley and the spreader assembly and the width being wider than the boom spacing. , 스프레더(20)를 하부에 결합한 트롤리(50)의 강선 홀더(52)가 제 1 강선(60)에 결합하여 이동하면서 상기 호이스트(40) 하부로 진입할 때는, 상기 홀더 누르개(56)의 바퀴(54)가 호이스트(40) 하부의 가이드(42)를 통과하면서 하향으로 눌러져 상기 강선홀더(52)와 강선(60)의 결합이 해제되어 트롤리의 이동이 중단되며, 트롤리(50)가 호이스트(40) 밑에서 벗어날 때는 다시 강선홀더(52)와 강선(60)이 결합되어 트롤리(50)의 이동이 진행되고, 상기 제 1 강선(60)과 제 2 강선(70) 사이의 이동은 상기 엘리베이터(80)에 의해 수행되며, 트롤리(50)와 스프레더(20)가 상부의 제 2 강선(70)에 결합되어 이동할 때는 스프레더(20) 하부의 바퀴(22)가 붐대(100)의 이동궤도를 구르면서 이동하는 것을 특징으로 하는 순환식 갠트리크레인 작동부분의 이동시스템.When the steel wire holder 52 of the trolley 50 to which the spreader 20 is coupled to the lower portion enters the hoist 40 while moving in combination with the first steel wire 60, the wheel of the holder presser 56 ( 54 is pressed downward while passing through the guide 42 in the lower portion of the hoist 40 to release the combination of the steel wire holder 52 and the steel wire 60 to stop the movement of the trolley, the trolley 50 is hoist 40 When moving away from the bottom of the steel wire holder 52 and the steel wire 60 is coupled to move the trolley 50, the movement between the first steel wire 60 and the second steel wire 70 is the elevator 80 When the trolley 50 and the spreader 20 are coupled to the second steel wire 70 of the upper part and move, the wheel 22 of the lower part of the spreader 20 rolls the trajectory of the boom 100. Moving system of the circulating gantry crane operating portion, characterized in that moving. 제 1항에 있어서, 상기 홀더(52)는 강선(60,70)을 상하로 맞무는 파지부(52-1)와 파지부에서 이어진 수평한 몸체(52-2) 한쌍으로 이루어진 것을 특징으로 하는 순환식 갠트리크레인 작동부분의 이동시스템.The method of claim 1, wherein the holder 52 is characterized in that consisting of a pair of holding parts 52-1 which vertically fit the steel wire (60, 70) and a horizontal body (52-2) connected from the holding part. Movement system of the circulating gantry crane operating part. 제 2 항에 있어서, 상기 언로커(56)는 상기 홀더(52)의 몸체(52-2)의 상부에서 몸체를 누르기 위한 누르개(57)와 상기 누르개(57) 상단부에 장착된 바퀴(58)로 구성되어, 트롤리(50)가 호이스트(40) 밑으로 진입할 때 상기 바퀴(58)가 호이스트의 가이드(42)에 의해 밑으로 눌리면서 누르개(57)가 홀더 몸체(52-2)를 눌러 파지구(52-1)가 벌어짐으로써 홀더(52)와 강선(60)의 결합이 해제되는 것을 특징으로 하는 순환식 갠트리크레인 작동부분의 이동시스템.3. The locker (56) according to claim 2, wherein the unlocker (56) is a presser (57) for pressing the body on the upper portion of the body (52-2) of the holder (52) and a wheel (58) mounted at the upper end of the presser (57). When the trolley 50 enters under the hoist 40, the wheel 58 is pushed down by the guide 42 of the hoist, and the presser 57 presses the holder body 52-2 so that Movement system of the circulating gantry crane operating part, characterized in that the coupling of the holder (52) and the steel wire (60) is released by opening the earth (52-1). 제 1항에 있어서, 상기 엘리베이터(80) 하단부에 갈고리형으로서 전후이동 가능한 안내구(82)가 형성되어 있고, 상기 안내구(82)가 트롤리(50)를 맞물어 엘리베이터로 출입시키는 것을 특징으로 하는 순환식 갠트리크레인 작동부분의 이동시스템.According to claim 1, wherein the lower end of the elevator 80 is provided with a guide 82 which can be moved back and forth as a hook type, the guide 82 is engaged with the trolley 50 to enter and exit the elevator. A moving system of the circulating gantry crane operating part.
KR1019990018086A 1999-05-19 1999-05-19 Moving system of parts in circulating type gantry crane KR100306298B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1019990018086A KR100306298B1 (en) 1999-05-19 1999-05-19 Moving system of parts in circulating type gantry crane
AU46212/00A AU4621200A (en) 1999-05-19 2000-05-19 Trolley moving mechanism in circulating type gantry crane
PCT/KR2000/000503 WO2000069768A1 (en) 1999-05-19 2000-05-19 Trolley moving mechanism in circulating type gantry crane
EP00927907A EP1194361A1 (en) 1999-05-19 2000-05-19 Trolley moving mechanism in circulating type gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990018086A KR100306298B1 (en) 1999-05-19 1999-05-19 Moving system of parts in circulating type gantry crane

Publications (2)

Publication Number Publication Date
KR20000074278A true KR20000074278A (en) 2000-12-15
KR100306298B1 KR100306298B1 (en) 2001-09-24

Family

ID=19586571

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990018086A KR100306298B1 (en) 1999-05-19 1999-05-19 Moving system of parts in circulating type gantry crane

Country Status (4)

Country Link
EP (1) EP1194361A1 (en)
KR (1) KR100306298B1 (en)
AU (1) AU4621200A (en)
WO (1) WO2000069768A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030006012A (en) * 2001-07-11 2003-01-23 한만엽 Gantry crane having circulating spreader

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010053430B3 (en) * 2010-12-06 2012-01-19 Rainer Kapelski Container bridge for the loading of shipping containers
CN105152042B (en) * 2014-03-13 2016-12-21 骆玲晓 Loading-unloading vehicle for building
CN116002304B (en) * 2023-01-10 2023-09-19 黄石市中城自动化科技有限公司 Tray transferring and hanging system and transferring and hanging tray

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4858775A (en) * 1988-02-12 1989-08-22 Paceco Corp. Personnel trolley and elevator platform for a cargo container handling gantry crane
NL9200376A (en) * 1992-02-28 1993-09-16 Croese Eng Consultants PORT CRANE.

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030006012A (en) * 2001-07-11 2003-01-23 한만엽 Gantry crane having circulating spreader

Also Published As

Publication number Publication date
WO2000069768A1 (en) 2000-11-23
EP1194361A1 (en) 2002-04-10
KR100306298B1 (en) 2001-09-24
AU4621200A (en) 2000-12-05

Similar Documents

Publication Publication Date Title
US5775866A (en) Cargo loading crane
KR101429092B1 (en) Container Transportation System and Method for Transporting Containers Using the Same
KR100306297B1 (en) Power transfer system of gantry crane
KR100306298B1 (en) Moving system of parts in circulating type gantry crane
CN210682200U (en) Multi-variety workpiece automatic identification transfer hanging system based on efficiency improvement
JPH0225779Y2 (en)
JPH01150695A (en) Multi-container-carrier-loader
JP3276308B2 (en) Container crane
JPH072587B2 (en) Container handling method
JPH1122202A (en) Simplified lifting and carrying device
JPH03194013A (en) Mooring facility in dam or the like and method of mooring ship
JP2002019916A (en) Container storage device
JPH02122014A (en) High efficient degassing apparatus
JP2002019915A (en) Container storage device
JPH0243197A (en) Material handling machine
KR20030006012A (en) Gantry crane having circulating spreader
JPH11278790A (en) Container crane
JPH01317995A (en) Container delivery method and apparatus in container crane
KR920006571Y1 (en) Turnover preventing device for brick used in stacking apparatus of brick
US756264A (en) Traveling carrier.
JP4255559B2 (en) Power supply device for container crane
JPH0266025A (en) Cargo device
JPH10316207A (en) Container terminal
JP2000143154A (en) Container crane
JPH03221673A (en) Sky storehouse for boat

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee