KR20000052019A - A wall repairing method - Google Patents
A wall repairing method Download PDFInfo
- Publication number
- KR20000052019A KR20000052019A KR1019990002802A KR19990002802A KR20000052019A KR 20000052019 A KR20000052019 A KR 20000052019A KR 1019990002802 A KR1019990002802 A KR 1019990002802A KR 19990002802 A KR19990002802 A KR 19990002802A KR 20000052019 A KR20000052019 A KR 20000052019A
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- repair
- maintenance
- support
- repaired
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1808—Holders for bricklayers' lines, bricklayers' bars; Sloping braces
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
본 발명은 벽체의 보수방법에 관한 것으로서, 보다 상세하게는 기초 콘크리트 옹벽에 치장 목적으로서 다수의 벽돌이나 블록으로 구축된 벽체가 외부의 기후변화 또는 지반운동에 의해 균열이 발생하거나 내, 외부간의 기온 차에 의한 습기 응집에 의한 외부벽체에 백화현상이 발생하여 벽체에 부분적인 손상이 올 경우에 이러한 부분적인 손상부위를 효과적이며 안전하게 보수 처리하는 벽체의 보수방법에 관한 것이다.The present invention relates to a repair method of the wall, and more specifically, the wall is formed by a plurality of bricks or blocks for the purpose of decoration on the foundation concrete retaining wall cracks caused by the external climate change or ground motion or the temperature between the inside and the outside The present invention relates to a repairing method of a wall that effectively and safely repairs a partial damage part when whitening occurs on an external wall due to moisture agglomeration by a car and a partial damage occurs to the wall.
일반적으로 철근콘크리크 구조가 아닌 벽돌이나 이와 유사한 블록 등에 의한 외부 벽체의 시공법은 기초적으로 구축된 콘크리트 옹벽과 옹벽사이에 콘크리트 블록을 쌓고, 그 외측에 단열재를 시공하고 다시 상기 단열재의 외측에 치장을 목적으로 다수의 벽돌이나 블록 등을 바닥면으로부터 상부로 조적하여 외장처리를 행하게 된다.In general, the construction of external walls using bricks or similar blocks, which are not reinforced concrete structures, aims to lay concrete blocks between the concrete retaining walls and retaining walls, and to insulate the outer walls of the insulation and to redecorate the outer walls. As a result, a plurality of bricks, blocks, and the like are piled up from the bottom to the exterior.
이러한 벽체는 기후의 변화, 즉 온도와 바람의 풍압에 의해 벽돌이나 블록 각각이 접합되는 부분에 수축 및 팽창작용이 반복적으로 발생하면서 시간이 흐를수록 상기 수축 및 팽창을 집중적으로 받는 부분에 부분적인 균열이나 탈락현상으로 인한 손상을 초래하게 된다.This wall has a partial crack in the part which receives the shrinkage and expansion intensively as time passes while the contraction and expansion of the brick or block are repeatedly generated due to climate change, that is, temperature and wind pressure. Or dropout may cause damage.
또한, 이러한 벽체는 지반운동(지진)이나 외력에 의해 벽의 일부분에 손상이 오게되는 경우도 있고, 시공구조에서 오는 내, 외부간의 온도차로 내벽에 응집된 습기(물기)가 외벽으로 스며들어 백화현상이 발생하여 이 부분이 시각적으로 혐오감을 유발하게 되고, 장기간 방치할 경우에는 이 부분에서 쉽게 균열이 오게 된다.In addition, such a wall may be damaged by a ground movement (earthquake) or external force, and a part of the wall may be damaged, and moisture (moisture) condensed on the inner wall by the temperature difference between the inside and the outside from the construction structure may seep into the outer wall. The phenomenon occurs and this part causes visual aversion, and if left for a long time, the part is easily cracked.
이러한 손상부위의 벽체를 보수하기 위해서 벽체를 전체적으로 보수하고자 하면 대공사가 될 수밖에 없고, 벽체 전면의 보수는 상당한 시간과 비용이 소요되므로 바람직하지 않다.If you want to repair the wall as a whole in order to repair the wall of the damaged part, it is inevitable to be a large construction, and repairing the front of the wall is not preferable because it takes considerable time and cost.
결국, 바람직한 보수방법은 상기 손상된 벽체부위만을 보수하는 것이나, 이러한 것은 매우 작업요건이 난이하다.After all, the preferred repair method is to repair only the damaged wall part, but this is very difficult to work with.
왜냐하면, 상기 벽돌이나 블록에 의한 벽돌 벽에서 상기 손상된 부분만을 보수하기 위해서 그 부분을 제거하게 되면 그 상부에 조적위치된 벽돌이나 블록이 자체하중에 의해 견디지 못하고 무너지거나 측면 등이 무너지는 등의 우려가 있어 그 작업이 용이하지 않기 때문이다.This is because, if the part is removed to repair only the damaged part of the brick wall by the brick or the block, the brick or the block placed on the upper part of the brick or block cannot be tolerated by its own load, or the side may collapse. This is because the operation is not easy.
종래의 벽체의 보수방법은 상기와 같은 위험성 및 작업의 난이성으로 인하여 임시변통의 보수방법으로써, 손상부위인 균열부분에는 시멘트몰탈을 충진하고 그 위에 기존의 벽체와 동일 색상의 페인트로 도장 처리하거나, 균열부위에 에폭시본드로 충진하여 정착하는 방법 또는 탈락된 부분에는 시멘트몰탈로서 미장처리하고 상기와 같은 페인트 도장처리로 보수하는 방법이 적용되고 있으나, 이러한 보수방법의 손상부위의 근본적인 원인이 제거되지 않기 때문에 얼마후 다시 균열이나 탈락현상이 발생하여 그 다지 큰 효과를 거두지 못하고 있는 실정이 이었다.Conventional wall repair method is a temporary repair method due to the above-mentioned risks and difficulty of work, filling the cracked part of the damaged part with cement mortar and coating it with paint of the same color as the existing wall, The method of filling with cracks and fixing with epoxy bond or dropping off parts is applied by cement mortar and repaired by the above paint coating process, but the root cause of the damaged part of the repair method is not eliminated. As a result, cracks or dropouts occurred shortly afterwards, and did not produce much effect.
또한, 종래에는 시공 벽체의 손상에 따른 보수가 아니라 벽체의 일부분에 대하여 새로운 변화나 꾸밈에도 손쉽고 용이한 작업방법이 제시되지 않고 있어 기존 건물의 치장변화가 매우 한정적일 수밖에 없었다.In addition, in the related art, a change in decoration of the existing building has not been suggested because an easy and easy work method is not suggested even for a new change or decoration for a part of the wall, rather than a repair due to damage to the construction wall.
본 발명은 상기와 같은 종래의 벽체 보수기술에서 문제시되고 있는 단점을 효과적으로 해소하고자 연구, 개발된 것으로서,The present invention has been researched and developed in order to effectively solve the disadvantage that is a problem in the conventional wall repair technology as described above,
본 발명의 목적은 기존의 벽체의 손상이 안된 부분을 안전하게 유지한 상태에서 손상부위만을 간편하고 신속하게 보수할 수 있는 벽체 보수방법을 제공하는 데 있다.An object of the present invention is to provide a wall repair method that can easily and quickly repair only the damaged part in a state of safely maintaining an undamaged portion of an existing wall.
본 발명의 목적은 저렴한 비용으로서 벽체 전체를 새로이 보수하는 것과 대등소이하게 보수가 가능하여 시간적인 면과 경제적인 면에서 보수효과를 극대화할 수 있는 벽체보수방법을 제공하는 데 있다.An object of the present invention is to provide a wall repair method capable of maximizing the repair effect in terms of time and economics can be repaired at the same cost as a new repair of the entire wall at a low cost.
상기한 바와 같은 본 발명의 목적을 실현하기 위하여, 벽체 보수부분의 상부에 조적탈락방지용 앵커를 설치하고, 상기 보수부분 각 개소의 수직하중을 계산하여 각 개소별 보수부분에 고정앵글설치공을 구축하는 단계,In order to realize the object of the present invention as described above, to install a drop prevention anchor on the upper part of the wall repair portion, to calculate the vertical load of each of the repair portion to build a fixed angle installation hole in each repair portion Steps,
상기 고정앵글설치공을 통하여 기초 콘크리트 옹벽에 고정앵글을 설치하는 단계,Installing a fixed angle on the base concrete retaining wall through the fixed angle installation hole,
상기 고정앵글설치공으로부터 상기 보수부분의 최상단 상부위치에 있는 상부벽돌과 하부벽돌의 시멘트몰탈을 털어 내어 보수지지대의 상부지지구삽입홈을 구비하는 단계,Removing the cement mortar of the upper brick and the lower brick at the uppermost position of the repair portion from the fixed angle installation hole to provide an upper support insertion groove of the repair support;
상기 고정앵글과 상부지지구삽입홈에 보수지지대의 상, 하부 지지구를 고정하고 조정하여 상기 보수부분의 상부벽 수직하중을 상기 보수지지대 및 고정앵글을 통하여 기초콘크리트로 전달되도록 조정 고정하는 단계,Fixing and adjusting the upper and lower supports of the maintenance support to the fixing angle and the upper support insertion groove so that the vertical load of the upper wall of the maintenance part is transmitted to the foundation concrete through the maintenance support and the fixing angle;
상기 보수지지대 사이의 보수부위의 각 개소 벽돌을 분리 제거하는 단계,Separating and removing each location brick of the repair part between the repair support;
상기 벽돌이 제거된 보수부분의 각 개소의 최하부의 기초콘크리트 옹벽에 기초 지지앵글을 설치하고 그 위에 새로운 벽돌로서 조적하여 경화시킨 후, 상기 보수지지대 및 고정앵글을 분리하는 단계 및 ,Installing a base support angle on the base concrete retaining wall at the bottom of each part of the repaired portion from which the brick is removed, and hardening it by masonry as a new brick thereon, and separating the repair support and the fixed angle;
상기 고정앵글설치공에 벽돌을 재조적하고 상부지지구삽입홈에 시멘트몰탈을 충진하여 마감 처리하는 단계를 제공하는 보수방법을 제공한다.It provides a repair method for providing a step of refinishing the brick in the fixed angle installation hole and filling the cement mortar in the upper support insertion groove.
도 1은 본 발명의 공정도.1 is a process diagram of the present invention.
도 2는 도 1에 있어 보수지지대 설치를 위한 앵글설치공단계를 보여주는Figure 2 shows the angle installation work step for installing the maintenance support in Figure 1
도면,drawing,
도 3은 도 2의 "F"부 확대도,3 is an enlarged view of a portion “F” of FIG. 2;
도 4는 도 1에 있어 고정앵글 설치단계를 보여주는 도면,Figure 4 is a view showing a fixed angle installation step in Figure 1,
도 5는 도 4의 발췌 사시도,5 is an exploded perspective view of FIG.
도 6은 도 1에 있어 보수지지대 설치단계를 보여주는 도면,Figure 6 is a view showing a maintenance support installation step in Figure 1,
도 7은 도 6의 발췌 사시도,7 is an exploded perspective view of FIG.
도 8은 보수벽돌의 분리단계 사시도,8 is a perspective view of the separation step of the repair brick,
도 9는 기초앵글의 사시도,9 is a perspective view of the foundation angle,
도 10은 도 1에 있어 벽돌의 재시공 단계를 보여주는 도면,10 is a view showing a reconstruction step of the brick in Figure 1,
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10 : 고정앵글설치공 20 : 고정앵글10: fixed angle installation hole 20: fixed angle
30 : 보수지지대 40 : 상부지지구삽입홈30: maintenance support 40: upper support insertion groove
50 : 상부지지구 60 : 하부지지구50: upper support 60: lower support
70 : 기초지지앵글 80 : 나사조정봉70: basic support angle 80: screw adjustment rod
100 : 기초콘크리트옹벽 200 : 시멘트몰탈100: basic concrete retaining wall 200: cement mortar
이하, 첨부된 도면에 의거하여 본 발명을 상세히 살펴보기로 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명의 방법에 따른 공정도로서, 이러한 본 발명의 공정도를 참조하여 본 발명을 살펴보기로 하되, 상기 공정도의 각 공정에 따른 구체적인 사항은 각 공정에 관련된 도 2 내지 도 10을 참조하여 살펴보기로 한다.1 is a process chart according to the method of the present invention, the present invention will be described with reference to the process chart of the present invention, specific details of each process of the process chart with reference to FIGS. 2 to 10 associated with each process. Let's look at it.
먼저 건축물 벽체 보수할 부분을 선정하고, 상기 벽체 보수부분의 상부에 조적탈락방지용 앵커(9)를 설치하고, 상기 보수부분의 각 개소(A,B,C...)의 수직하중을 계산하여 각 개소별 보수부분에 고정앵글설치공(10)을 구축한다(도 2참조).First, select the part to be repaired on the building wall, install the anchoring prevention prevention anchor 9 on the upper part of the wall repair part, calculate the vertical load of each point (A, B, C ...) of the repair part The fixed angle installation hole 10 is built in the repair part of each location (refer FIG. 2).
상기 고정앵글설치공(10)은 보수부분의 수직하중에 따라 그 개수가 설정되며, 이러한 고정앵글설치공(10)은 도 3에서와 같이 벽돌을 필요한 숫자만큼 헐어내되, 상기 보수부분의 최하단 위치로 구축한다.The fixed angle installation hole 10 is set in accordance with the number of the vertical load of the repair portion, this fixed angle installation hole 10 as shown in Figure 3 to tear off the brick as necessary number, the lowest position of the repair portion To build.
이러한 단계를 취한 후 상기 고정앵글 설치공(10)을 통하여 기초 콘크리트 옹벽(100)에 고정앵글(20)을 설치한다.(도 4 및 도 5참조).After taking this step, a fixed angle 20 is installed on the foundation concrete retaining wall 100 through the fixed angle installation hole 10 (see FIGS. 4 and 5).
이러한 단계를 취한 후 상기 고정앵글설치공(10)으로부터 상기 보수부분의 최상단 상부위치에 있는 상부벽돌과 하부벽돌의 시멘트몰탈(200)을 털어 내어 보수지지대(30)의 상부지지구삽입홈(40)을 구비하고,After taking this step, the upper brick and the mortar 200 of the upper brick and the lower brick at the uppermost position of the repair part from the fixed angle installation hole 10 are shaken off, and the upper support insertion groove 40 of the maintenance support 30 is removed. ),
상기 고정앵글(20)과 상부지지구삽입홈(40)에 보수지지대(30)의 상, 하부 지지구(50,60)를 고정하고 조정하여 상기 보수부분의 상부벽 수직하중을 상기 보수지지대(30) 및 고정앵글(20)을 통하여 기초콘크리트(100)로 전달되도록 조정 고정한다.(도 6 및 도 7참조)Fixing and adjusting the upper and lower supports 50 and 60 of the maintenance support 30 to the fixed angle 20 and the upper support insertion groove 40 to adjust the vertical load of the upper wall of the maintenance portion to the maintenance support ( 30) and fixed to be delivered to the base concrete 100 through the fixing angle 20. (See Figs. 6 and 7)
이러한 단계를 취한 후, 상기 보수지지대(30) 사이의 보수부위의 각 개소(A,B,C...)의 벽돌을 분리 제거한다.(도 8참조)After taking this step, the bricks of the respective parts A, B, C ... of the repair part between the repair support 30 are separated and removed. (See FIG. 8).
이러한 단계를 취한 후, 상기 벽돌이 제거된 보수부분의 각 개소( A,B,C...)의 최하부의 기초콘크리트옹벽(100)에 기초지지앵글(70)을 설치하고 그 위에 새로운 벽돌로서 조적하여 경화시킨 후, 상기 보수지지대(30) 및 고정앵글(20)을 분리한다.After taking this step, the foundation support angle 70 is installed on the base concrete retaining wall 100 at the bottom of each point A, B, C ... of the repaired portion from which the brick is removed, and as a new brick thereon. After hardening by masonry, the maintenance support 30 and the fixed angle 20 are separated.
이러한 단계를 취한 후, 상기 고정앵글설치공(10)에 벽돌을 재조적하고 상부지지구삽입홈(40)에 시멘트몰탈을 충진하고 마감 처리하여 보수부분의 각 개소(A,B,C...)의 보수를 순차적으로 진행하여 완료하게 된다.(도 9 및 도 10참조)After taking these steps, re-assemble the bricks in the fixed angle installation hole 10 and fill the cement mortar in the upper support insertion groove 40 and finish the respective parts (A, B, C .. The maintenance of.) Is performed in order. (See FIG. 9 and FIG. 10)
이러한 본 발명의 단계에 있어, 상기 보수지지대(30)의 설치단계는 상기 상,하부지지구(50,60)가 나사조정봉(80)에서 이동하여 먼저 상기 고정앵글(20)의 체결공(31)과 상기 하부지지구(60)의 체결공(61)을 통하여 볼트 및 너트의 체결수단(32)으로 조립고정하고, 상기 상부지지구(50)는 상기 상부지지구 삽입홈In this step of the present invention, the installation step of the maintenance support 30 is the upper and lower support (50, 60) is moved from the screw adjusting rod 80, the fastening hole 31 of the fixed angle 20 first And fasten the assembly means by the fastening means 32 of the bolt and nut through the fastening hole 61 of the lower support 60, the upper support 50 is the upper support insertion groove
(40)에 조립시공한 다음 상기 나사조정봉(80)에 나사 결합된 상, 하부 조임수단(55,65)을 각각 상, 하부로 조여서 상부벽체의 수직하중을 상기 보수지지대(30) 전체 및 고정앵글(20)을 통하여 기초콘크리트옹벽(100)으로 전달되도록 조정 고정한다.Assemble to 40 and then tighten the upper and lower fastening means (55, 65) screwed to the screw adjusting rod (80) to the upper and lower, respectively to fix the vertical load of the upper wall and the maintenance support (30) Fixed to be transmitted to the base concrete retaining wall 100 through the angle (20).
따라서 상기 보수지지대(30)의 각 개소(A,B,C...)의 보수부분의 벽돌을 안전하게 헐어 분리하고 새로운 벽돌로서 재조적하여 보수작업이 이루어지게 된다.Therefore, the bricks of the repair parts of each of the points A, B, C ... of the repair support 30 are safely torn apart and reassembled as new bricks to perform repair work.
이때, 상기 새로운 벽돌의 조적은 상기 보수부분의 각 개소( A,B,C...)의 최하부의 기초콘크리트옹벽(100)에 기초지지앵글(70)을 설치하고 그 위에 새로운 벽돌로서 조적하여 경화시키고 마감 처리함으로서 상부의 수직하중이 미치어도 상기 기초콘크리트옹벽(100)에 체결되어 견고하게 고정된 기초지지앵글(70)이 떠받쳐주기 때문에 손상될 우려가 없게 된다.At this time, the masonry of the new brick is installed on the foundation concrete retaining wall 100 at the bottom of each point (A, B, C ...) of the repair portion, and installed as a new brick thereon By hardening and finishing, even if the vertical load of the upper end is secured, the foundation support angle 70 fastened to the foundation concrete retaining wall 100 is firmly fixed so that there is no risk of damage.
이상에서 상세히 살펴본 바와 같이 본 발명은 기존의 벽체에 부분적으로 손상(균열, 부분분리)이 올 경우에 손상이 안된 부분을 안전하게 유지한 상태에서 손상부위만을 간편하고 신속하게 보수할 수 있어 작업성이 최대화되는 효과가 있고,As described in detail above, the present invention can easily and quickly repair only the damaged part in the state of maintaining the undamaged part in case of partial damage (cracking, partial separation) to the existing wall, thereby improving workability. Has the effect of being maximized,
또한 적은 인원과 저렴한 비용으로서 벽체 전체를 새로이 보수하는 것과 대등소이하게 보수가 가능하여 시간적인 면과 경제적인 면에서 최소의 시간 및 경비가 제공되는 효과가 있다.In addition, with a small number of people and a low cost, it is possible to repair the entire wall on a par with that of a new one, thus providing the minimum time and expense in terms of time and economy.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990002802A KR100316276B1 (en) | 1999-01-28 | 1999-01-28 | A wall repairing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019990002802A KR100316276B1 (en) | 1999-01-28 | 1999-01-28 | A wall repairing method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20000052019A true KR20000052019A (en) | 2000-08-16 |
KR100316276B1 KR100316276B1 (en) | 2001-12-12 |
Family
ID=19572664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019990002802A KR100316276B1 (en) | 1999-01-28 | 1999-01-28 | A wall repairing method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100316276B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100739840B1 (en) * | 2006-01-16 | 2007-07-16 | 이완섭 | Bricks wall reinforcing method using subsidiary supporter |
CN107165435A (en) * | 2016-02-28 | 2017-09-15 | 叶香竹 | A kind of reinforced construction method for having a crack interior wall |
CN110905225A (en) * | 2019-11-04 | 2020-03-24 | 无为县华标新型墙体材料有限公司 | Cement smearing equipment for lime-sand bricks |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101187668B1 (en) | 2011-11-15 | 2012-10-04 | 한가람건설 주식회사 | Repair method of brisk wall |
KR102409932B1 (en) * | 2021-07-16 | 2022-06-22 | 포엠 주식회사 | Reinforcement method for face brick of building |
-
1999
- 1999-01-28 KR KR1019990002802A patent/KR100316276B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100739840B1 (en) * | 2006-01-16 | 2007-07-16 | 이완섭 | Bricks wall reinforcing method using subsidiary supporter |
CN107165435A (en) * | 2016-02-28 | 2017-09-15 | 叶香竹 | A kind of reinforced construction method for having a crack interior wall |
CN110905225A (en) * | 2019-11-04 | 2020-03-24 | 无为县华标新型墙体材料有限公司 | Cement smearing equipment for lime-sand bricks |
Also Published As
Publication number | Publication date |
---|---|
KR100316276B1 (en) | 2001-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7908804B2 (en) | Structural lintel assembly and building construction method using the same | |
AU2011267375B2 (en) | Tower comprising an adapter piece and method for producing a tower comprising an adapter piece | |
US7240389B2 (en) | Method of constructing partially earth-anchored cable-stayed bridge using thermal prestressing technique | |
KR100922386B1 (en) | Reinforcement method of masonry wall | |
CN104895318A (en) | Aluminum alloy template system and construction method of same | |
KR101681139B1 (en) | Bracket for concrete structure repair-strengthen construction and method thereof | |
US20160201313A1 (en) | High-rise architectural structure and maintenance method therefor | |
US3406946A (en) | Safety rail for concrete building | |
CN108824635A (en) | Support construction and its installation method for steel construction low-rise building | |
KR100316276B1 (en) | A wall repairing method | |
KR102170536B1 (en) | Maintenance apparatus for Brick wall and maintenance method of using the same | |
KR100904516B1 (en) | Assemblable main tower and construction method of the same | |
CN113700305B (en) | Prefabricated partition plate subsection prestress assembling method | |
KR200142434Y1 (en) | Setting-up structure of angle | |
CN112538976A (en) | Positioning device and method for pre-buried screw of assembled stair | |
JP2004339890A (en) | Alc wall panel, and structure and method of fixing alc wall panel to floor slab | |
JP2522080B2 (en) | Method for manufacturing outer wall panel unit | |
KR100732622B1 (en) | The sectional arch tunnel using the tunnel member with a reinforcement rib, and its construction method | |
JPH0988077A (en) | Repair method of falling rock preventive concrete wall of slope | |
KR0152401B1 (en) | Form panel structure | |
JP2000297490A (en) | Wall construction method and its wall structure | |
CN214302952U (en) | Embedded screw rod positioner of assembled stair | |
GB2048334A (en) | Stool for in situ cast beam | |
GB2134562A (en) | Renovation of brick cladding panel | |
WO2009033251A1 (en) | Structural lintel assembly and building construction method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20041117 Year of fee payment: 4 |
|
LAPS | Lapse due to unpaid annual fee |