CN112538976A - Positioning device and method for pre-buried screw of assembled stair - Google Patents

Positioning device and method for pre-buried screw of assembled stair Download PDF

Info

Publication number
CN112538976A
CN112538976A CN202011606595.7A CN202011606595A CN112538976A CN 112538976 A CN112538976 A CN 112538976A CN 202011606595 A CN202011606595 A CN 202011606595A CN 112538976 A CN112538976 A CN 112538976A
Authority
CN
China
Prior art keywords
screw
connecting rod
embedded
screws
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011606595.7A
Other languages
Chinese (zh)
Inventor
朱立城
骆宇亭
尹伟
宣震鹰
袁涛
李�灿
林元伟
张曼芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanjian Construction Group Co Ltd
Original Assignee
Zhejiang Sanjian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sanjian Construction Group Co Ltd filed Critical Zhejiang Sanjian Construction Group Co Ltd
Priority to CN202011606595.7A priority Critical patent/CN112538976A/en
Publication of CN112538976A publication Critical patent/CN112538976A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses an assembly type stair pre-buried screw positioning device and method, which comprises two bases and a connecting rod, wherein first screws are arranged on the bases, first positioning nuts are arranged on the first screws, and the first positioning nuts on the two first screws are positioned at the same height; the connecting rod is horizontally arranged, mounting holes are formed in the two ends of the connecting rod, the mounting holes of the connecting rod are sleeved on the first screw and located above the first positioning nut, and the connecting rod is fixed through the first fastening nut; and the connecting rod is provided with a long slot hole for installing the embedded screw. The connecting rods are used for ensuring that the embedded screws are positioned on the same horizontal line, and the embedded screws are perpendicular to the connecting rods and cannot be inclined in the concrete pouring process, so that the mounting difficulty of the prefabricated staircase is greatly reduced, and the mounting success rate of the prefabricated staircase is improved.

Description

Positioning device and method for pre-buried screw of assembled stair
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to an assembly type stair embedded screw positioning device and method.
Background
In the assembly type building, the integrally cast reinforced concrete stair is split into a rest platform section and a stair section, the rest platform section is usually cast in situ, and the stair section is prefabricated. The link of prefabricated bench of stair has two holes, and when the construction of half space, the pre-buried bolt of two pre-buried area anchor heads, then the concrete reaches after the intensity, begins to hoist. The prefabricated bench is hoisted by the tower crane, and the connecting holes in the prefabricated bench and the pre-buried screws in the rest platform are fixed through filling cement mortar after aligning the holes. In the construction process, if the clear distance between the two embedded screws has deviation or the embedded screws are inclined in the concrete pouring process, the installation difficulty of the prefabricated staircase is greatly increased, and the installation success rate of the prefabricated staircase is influenced.
Disclosure of Invention
The invention aims to solve the problems and provides an assembly type stair embedded screw positioning device and method which can avoid deformation of an embedded screw and reduce installation difficulty of a prefabricated stair.
The first technical scheme of the invention is as follows: an assembly type stair pre-buried screw positioning device comprises two bases and a connecting rod, wherein first screws are mounted on the bases, first positioning nuts are arranged on the first screws, and the first positioning nuts on the two first screws are located at the same height; the connecting rod is horizontally arranged, mounting holes are formed in the two ends of the connecting rod, the mounting holes of the connecting rod are sleeved on the first screw and located above the first positioning nut, and the connecting rod is fixed through the first fastening nut; and the connecting rod is provided with a long slot hole for installing the embedded screw.
Preferably, the base is split heads type structure, including the stabilizer blade of top surface and both sides, is equipped with the screw on the top surface, and first screw rod lower extreme is equipped with the convex spacing ring of round, and first screw rod is installed in the screw, and the spacing ring supports in the screw top.
Preferably, the long slotted hole on the connecting rod is of a slender structure, and the two mounting holes are located at two ends of the long slotted hole.
The second technical scheme of the invention is as follows: the positioning method of the pre-buried screw rod of the assembled stair comprises the following steps of:
1) screwing second positioning nuts into the two embedded screws respectively, and enabling the second positioning nuts to be located at the same positions of the two embedded screws;
2) the two embedded screws penetrate through the long slotted holes of the connecting rod, second fastening nuts are screwed into the embedded screws, the first embedded screw is fixed, then the position of the second embedded screw is adjusted, the second embedded screw is fixed after the distance between the two embedded screws reaches a set value, and the two embedded screws are fixed on the connecting rod and are perpendicular to the connecting rod;
3) after the rest platform formwork is completed and the bottom ribs are bound, fixing the two bases on the formwork according to the preset positions;
4) installing a first screw rod in a screw hole of a base;
5) screwing first positioning nuts into the first screw rod, and adjusting the height to enable the two first positioning nuts to be at the same height;
6) sleeving two ends of a connecting rod on a first screw, screwing a first fastening nut, fixing the connecting rod above a first positioning nut, and leveling two ends of the connecting rod;
7) pouring concrete;
8) after the concrete is initially set, removing the connecting rod and the first screw rod, and placing the lower end of the embedded screw rod in the concrete;
9) repairing the hole left after the first screw rod is removed;
10) and starting to hoist the prefabricated stair sections.
According to the invention, two embedded screws are arranged on the same connecting rod, and the installation heights and the intervals of the two embedded screws are adjusted in advance, so that the intervals of the two embedded screws reach a set value, and the subsequent prefabricated staircase is convenient to install; the connecting rod both ends are injectd by the first set nut of same height for the connecting rod both ends flush, keep the horizontality, guarantee that two pre-buried screw rods are in same water flat line, and two pre-buried screw rods are mutually perpendicular with the connecting rod, can not be crooked at the concrete placement in-process, and the installation degree of difficulty of greatly reduced prefabricated staircase improves the success rate of prefabricated staircase installation.
The embedded screw positioning device provided by the invention has the advantages that the base is remained in the concrete, the connecting rod, the first screw, the matched positioning nut and the matched fastening nut can be detached and can be repeatedly used, and the construction cost is reduced.
Drawings
The following detailed description is made with reference to the accompanying drawings and embodiments of the present invention
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a connecting rod of the present invention;
fig. 3 is a construction process diagram of the present invention.
Labeled as: the concrete formwork comprises a base 1, a connecting rod 2, a mounting hole 21, a long slotted hole 22, a first screw rod 3, a limiting ring 31, a first positioning nut 41, a first fastening nut 42, a second positioning nut 43, a second fastening nut 44, an embedded screw rod 5, a formwork 6 and concrete 7.
Detailed Description
See the drawings. This embodiment pre-buried screw rod positioner, including two bases 1 and connecting rod 2, base 1 is split heads type structure, including the stabilizer blade of top surface and both sides, is equipped with the screw on the 1 top surface of base, installs first screw rod 3 on every base 1, and 3 lower extremes of first screw rod are equipped with the convex spacing ring 31 of round, and first screw rod is installed in the screw, and the spacing ring supports in the screw top. The first screw rods 3 are provided with first positioning nuts 41, and the first positioning nuts 41 on the two first screw rods 3 are at the same height; the connecting rod 2 is horizontally arranged, mounting holes 21 are formed in two ends of the connecting rod 2, the mounting holes 21 of the connecting rod are sleeved on the first screw rods 3 and fixed through first fastening nuts 42, and the connecting rod 2 is located above the first positioning nuts 41; the connecting rod 2 is provided with a long slotted hole 22 for installing the embedded screw, the long slotted hole is of a slender structure, the long slotted hole is parallel to the long edge of the connecting rod, and the two installing holes are arranged at two ends of the long slotted hole.
During construction:
1) as shown in fig. 3 (a), the two embedded screws 5 are respectively screwed with the second positioning nuts 43, and the two second positioning nuts 43 are respectively located at the same positions of the two embedded screws;
2) penetrating two embedded screws 5 through the long slotted holes of the connecting rod 2, screwing second fastening nuts 44 on the embedded screws 5, fixing the first embedded screw, moving the second embedded screw which is not fixed according to the interval in the drawing, and fixing the second embedded screw after the set interval is reached, so that the two embedded screws are fixed on the connecting rod and are perpendicular to the connecting rod;
3) as shown in fig. 3 (b), after the rest platform formwork is completed and the bottom ribs are bound, according to the design drawing, the two bases 1 are nailed on the formwork 6 by using nails;
4) as shown in fig. 3 (c), two first screws 3 are respectively installed in screw holes of two bases 1, the first screws and the screw holes are fixed in a thread fit manner, and a limiting ring can limit the length of the first screws inserted into the bases;
5) screwing a first positioning nut 41 into the first screw rod 3, and adjusting the height to enable the two first positioning nuts to be at the same height; enabling the distance between the bottoms of the two first positioning nuts to be 50CM from the finished surface of the concrete floor slab;
6) as shown in fig. 3 (d), two ends of the connecting rod 2 provided with the embedded screws are sleeved on the first screws 3, and the first fastening nuts 42 are screwed on the first screws to fix the connecting rod; two ends of the connecting rod are positioned above the first positioning nut, so that the two ends are flush;
7) at the moment, the two embedded screws 5 are positioned at the same height, the lower ends of the embedded screws face to the template of the rest platform, and concrete is poured;
8) as shown in fig. 3 (e), after the concrete 7 is initially set, the first screw 3 and the first and second fastening nuts on the embedded screw 5 are unscrewed, the connecting rod 2 and the first and second positioning nuts are removed, and the first screw 3 is removed by using an electric wrench; at the moment, the base 1 is left in the concrete, the lower end of the embedded screw 5 is arranged in the concrete, and other parts can be detached and can be repeatedly used;
9) as shown in fig. 3 (f), holes left after the first screws 3 are removed are repaired, and the embedded screws are smoothly fixed on the resting platform;
10) and starting to hoist the prefabricated stair sections and entering a normal construction stage.

Claims (4)

1. The utility model provides an embedded screw rod positioner of assembled stair which characterized in that: the connecting rod is arranged on the base, the first screw rods are arranged on the first screw rods, and the first positioning nuts on the two first screw rods are positioned at the same height; the connecting rod is horizontally arranged, mounting holes are formed in the two ends of the connecting rod, the mounting holes of the connecting rod are sleeved on the first screw and located above the first positioning nut, and the connecting rod is fixed through the first fastening nut; and the connecting rod is provided with a long slot hole for installing the embedded screw.
2. The positioning device for the pre-embedded screws of the assembled stairway as claimed in claim 1, wherein: the base is a split heads type structure, and includes the stabilizer blade of top surface and both sides, is equipped with the screw on the top surface, and first screw rod lower extreme is equipped with the convex spacing ring of round, and first screw rod is installed in the screw, and the spacing ring supports above the screw.
3. The positioning device for the pre-embedded screws of the assembled stairway as claimed in claim 1, wherein: the long slotted hole on the connecting rod is of a slender structure, and the two mounting holes are positioned at two ends of the long slotted hole.
4. The positioning method of the pre-buried screw rod of the assembled stair is characterized by comprising the following steps: use of a positioning device according to any of claims 1 to 3, comprising the steps of:
1) screwing second positioning nuts into the two embedded screws respectively, and enabling the second positioning nuts to be located at the same positions of the two embedded screws;
2) the two embedded screws penetrate through the long slotted holes of the connecting rod, second fastening nuts are screwed into the embedded screws, the first embedded screw is fixed, then the position of the second embedded screw is adjusted, the second embedded screw is fixed after the distance between the two embedded screws reaches a set value, and the two embedded screws are fixed on the connecting rod and are perpendicular to the connecting rod;
3) after the rest platform formwork is completed and the bottom ribs are bound, fixing the two bases on the formwork according to the preset positions;
4) installing a first screw rod in a screw hole of a base;
5) screwing first positioning nuts into the first screw rod, and adjusting the height to enable the two first positioning nuts to be at the same height;
6) sleeving two ends of a connecting rod on a first screw, screwing a first fastening nut, fixing the connecting rod above a first positioning nut, and leveling two ends of the connecting rod;
7) pouring concrete;
8) after the concrete is initially set, removing the connecting rod and the first screw rod, and placing the lower end of the embedded screw rod in the concrete;
9) repairing the hole left after the first screw rod is removed;
10) and starting to hoist the prefabricated stair sections.
CN202011606595.7A 2020-12-30 2020-12-30 Positioning device and method for pre-buried screw of assembled stair Pending CN112538976A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011606595.7A CN112538976A (en) 2020-12-30 2020-12-30 Positioning device and method for pre-buried screw of assembled stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011606595.7A CN112538976A (en) 2020-12-30 2020-12-30 Positioning device and method for pre-buried screw of assembled stair

Publications (1)

Publication Number Publication Date
CN112538976A true CN112538976A (en) 2021-03-23

Family

ID=75017874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011606595.7A Pending CN112538976A (en) 2020-12-30 2020-12-30 Positioning device and method for pre-buried screw of assembled stair

Country Status (1)

Country Link
CN (1) CN112538976A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114575372A (en) * 2022-05-05 2022-06-03 河南天丰钢结构建设有限公司 High-rise steel structure deep foundation pit raft foundation anchor bolt pre-embedding construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114575372A (en) * 2022-05-05 2022-06-03 河南天丰钢结构建设有限公司 High-rise steel structure deep foundation pit raft foundation anchor bolt pre-embedding construction method
CN114575372B (en) * 2022-05-05 2022-08-12 河南天丰钢结构建设有限公司 Pre-burying construction method for foundation bolts of raft foundation of deep foundation pit with high-rise steel structure

Similar Documents

Publication Publication Date Title
CN101839061A (en) Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof
KR20170072080A (en) Cantilever part for bridge and constructing method thereof
CN113931446B (en) Construction method of one-time pouring bay window formwork erecting structure
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN112538976A (en) Positioning device and method for pre-buried screw of assembled stair
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN214302952U (en) Embedded screw rod positioner of assembled stair
CN212957325U (en) Device for improving installation precision of anchoring ribs at fixed end of prefabricated staircase
KR100463101B1 (en) A method of constructing climbing bracket
CN211368398U (en) Frame climbing structure
CN113846858A (en) Protection system for horizontal hole in building construction process and construction method
CN211368397U (en) Formwork support system
JPH07331830A (en) Handrail mounting method and mounting device in concrete building
CN221119247U (en) Plate thickness control device capable of fixing aluminum die diagonal bracing
CN217232463U (en) Prefabricated staircase and ladder beam connecting device
CN111851997A (en) Construction method for post-cast section template of laminated slab
CN220487028U (en) Prefabricated stair support embedded part bolt fixing device with assembled structure
CN216921374U (en) Mounting and reserving device for casing pipe below placement position of assembled laminated slab
KR100450113B1 (en) Structure for molding a stairs of building
JP3244102U (en) Steel house foundation structure and anchor set used therein
CN216429047U (en) A locating support subassembly that is used for buried bolt in advance on cast-in-place roof beam of accurate fixed stair
JPH0450325Y2 (en)
CN218441029U (en) Comprehensive support connecting device
CN213572404U (en) Pre-buried positioner of prefabricated stair connecting bolt
CN217174347U (en) Bridge ground beam and assembled mounting structure thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination