CN216921374U - Mounting and reserving device for casing pipe below placement position of assembled laminated slab - Google Patents

Mounting and reserving device for casing pipe below placement position of assembled laminated slab Download PDF

Info

Publication number
CN216921374U
CN216921374U CN202122476817.4U CN202122476817U CN216921374U CN 216921374 U CN216921374 U CN 216921374U CN 202122476817 U CN202122476817 U CN 202122476817U CN 216921374 U CN216921374 U CN 216921374U
Authority
CN
China
Prior art keywords
sleeve
template
penetrating part
placement position
bulge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122476817.4U
Other languages
Chinese (zh)
Inventor
何文明
陈元国
罗进祥
陈美蓉
卢忠进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Daxin Engineering Co Ltd
Original Assignee
Nantong Daxin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Daxin Engineering Co Ltd filed Critical Nantong Daxin Engineering Co Ltd
Priority to CN202122476817.4U priority Critical patent/CN216921374U/en
Application granted granted Critical
Publication of CN216921374U publication Critical patent/CN216921374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a mounting and reserving device for a sleeve below a placement position of an assembled composite slab, which comprises a reserved rod (1) and a sleeve (2); the reserved rod (1) comprises a penetrating part (11) and a protruding part (12), one end of the penetrating part (11) is installed on the template (3), and the other end of the penetrating part (11) penetrates through the inner side of the template (3) and is inserted into the sleeve (2); the bulge (12) is arranged at the other end of the penetrating part (11), a positioning hole is formed at the top of the sleeve (2), and the bulge (12) can be inserted into the positioning hole, so that the sleeve (2) is placed on the penetrating part (11) and erected between the two side templates (3). The utility model can install the sleeve between the formworks at the two sides, and keep the stability of the sleeve in the concrete pouring process, so that the sleeve is pre-embedded in the wall.

Description

Mounting and reserving device for casing pipe below placement position of assembled laminated slab
Technical Field
The utility model relates to an auxiliary mounting tool for a sleeve in a building structure, in particular to a mounting reservation device for the sleeve below a laying position of an assembled composite slab.
Background
In order to accelerate the construction progress of the building engineering, the application of the prefabricated components in the building structure is more and more extensive, wherein, the laminated slab is formed by laminating prefabricated slabs and cast-in-situ reinforced concrete layers and can be used as an integral assembled floor slab. During construction, templates on two sides of the wall body need to be erected between the upper and lower laminated slabs, and the concrete of the wall body is cast by reserving a gap between the two laminated slabs. When the template is erected, the edge of the laminated slab is provided with an inclined plane structure with the width of about 10mm, and the edge of the top surface of the laminated slab is flush with the inner wall of the template, so that the edge of the bottom surface of the laminated slab protrudes out of the inner side of the template; meanwhile, the sleeves cannot be kept stable and accurately positioned during the concrete pouring process.
At present, in the actual construction process, when a constructor pours the wall body to the elevation of the sleeve, the part of the edge of the laminated slab protruding out of the template is chiseled by using a tool, then the sleeve is placed between the templates, and then the wall body is continuously poured. The construction method has the following problems: 1. the edge part of the laminated slab is easily damaged in the chiseling process, the structural strength of the laminated slab is influenced, the surface of the chiseling part is uneven, and the later construction and the attractive appearance of the joint of the laminated slab and the wall are influenced; 2. the fragments of the chiseled composite slab fall into the poured concrete between the formworks on the two sides, the cleaning is difficult, and the concrete pouring quality of the wall body is influenced; 3. the workload of constructors is increased, the physical consumption is large, and the construction period is influenced to a certain extent.
Disclosure of Invention
The utility model aims to provide an installation reservation device for a sleeve below a laying position of an assembly type composite slab, which can install the sleeve between two side formworks, and can keep the stability of the sleeve in the concrete pouring process so as to embed the sleeve in a wall in advance.
The utility model is realized by the following steps:
a mounting and reserving device for a sleeve below a placement position of an assembled laminated slab comprises a reserving rod and a sleeve; the reserved rod comprises a through part and a protruding part, one end of the through part is installed on the template, and the other end of the through part penetrates to the inner side of the template and is inserted into the sleeve; the bulge is arranged at the other end of the through part, a positioning hole is formed in the top of the sleeve, and the bulge can be inserted into the positioning hole, so that the sleeve is placed on the through part and erected between the two side templates.
The surface of the through part is provided with an external thread, and a screw hole matched with the external thread is reserved on the template, so that the through part can be screwed on the template in a threaded manner and is locked by a nut.
When the sleeve is placed on the penetrating part, the top surface of the bulge part is flush with the top surface of the sleeve.
When the sleeve is placed on the through part, the top surface of the convex part is higher than the upper surface of the sleeve.
The height of the protruding part extending out of the upper part of the top surface of the sleeve is not more than 4 mm.
Compared with the prior art, the utility model has the following beneficial effects:
1. the sleeve pipe can provide reliable support for the sleeve pipe because the sleeve pipe is arranged on the template and inserted into the sleeve pipe, so that the sleeve pipe is stably erected between the two side templates when the template is erected, the sleeve pipe is convenient to install, the edge convex part of the laminated slab does not need to be chiseled, the sleeve pipe cannot fall off during concrete pouring operation, and the construction quality and the construction efficiency are improved.
2. The reserved rod is positioned in the sleeve, and is inserted and positioned through the protruding part and the positioning hole in the sleeve, so that the embedding precision of the sleeve in the wall can be ensured, and the stability of the sleeve in the concrete pouring of the wall can also be ensured; meanwhile, the protruding part and the sleeve are convenient to insert and detach.
3. The utility model can be suitable for pre-embedding and installing pipelines with different specifications and quantities, can also be suitable for pre-embedding sleeves in building structures with different forms such as walls and the like, has good universality and practicability, is convenient to disassemble and assemble, can be recycled, reduces the construction cost and optimizes the construction process of wall concrete pouring.
The sleeve can be arranged between the formworks on the two sides when the formworks are supported, the protruding part on the edge of the laminated slab does not need to be chiseled off, and meanwhile, the stability of the sleeve can be kept in the concrete pouring process, so that the sleeve is embedded in the wall, the pouring quality of the concrete of the wall is ensured, and the sleeve is convenient to disassemble.
Drawings
FIG. 1 is an assembled cross-sectional view of the installation reservation device of the casing below the assembled superimposed slab resting position of the present invention;
FIG. 2 is an enlarged view at A of FIG. 1;
FIG. 3 is a front view of the installation reservation assembly of the sleeve below the placement position of the fabricated laminate of the present invention;
fig. 4 is a plan view of the installation reservation device of the sleeve below the placement position of the fabricated laminate slab of the present invention.
In the figure, 100 is installed with a reserved device, 1 reserved rod, 11 penetrating part, 111 external thread, 12 convex part, 13 nut, 2 sleeve, 3 template and 4 superimposed plates.
Detailed Description
The utility model is further described with reference to the following figures and specific examples.
Referring to fig. 1 to 4, a prefabricated plywood laying position lower bushing installation reservation device 100 includes a reservation rod 1 and a bushing 2; the reserved rod 1 comprises a penetrating part 11 and a convex part 12, one end of the penetrating part 11 is installed on the template 3, and the other end of the penetrating part 11 penetrates to the inner side of the template 3 and is inserted into the sleeve 2; a boss 12 is provided on the other end of the through-portion 11, a positioning hole (not shown, provided at a position corresponding to the boss 12) is formed at the top of the sleeve 2, and the boss 12 can be inserted into the positioning hole so that the sleeve 2 is placed on the through-portion 11 and erected between the side forms 3. Through the setting of portion 11 that runs through can be when 3 prop up of template synchronous mounting sleeve pipe 2, be located the below that superimposed sheet 4 shelved the position to avoided the unable location of sleeve pipe 2 and falling and the problem that 4 tip of superimposed sheet need the manual work to chisel off pouring quality of wall body at the pouring in-process, and not influenced.
The surface of the through part 11 is formed with an external thread 111, and a screw hole (not shown in the figure and arranged corresponding to the installation elevation position of the sleeve 2) matched with the external thread 111 is reserved on the template 3, so that the through part 11 can be screwed on the template 3 and locked by a nut 13. Under the meshing action of the threads, the through part 11 is reliably connected with the template 3, so that the through part 11 is ensured to reliably support the sleeve 2, and meanwhile, the horizontal position adjustment of the through part 11 can be realized under the screwing-in and screwing-out action of the threads, so that the insertion between the protruding part 12 and the positioning hole is ensured. The reserved rod 1 can also be pushed to realize the position adjustment of the penetrating part 11 by adopting hydraulic pressure, air pressure and other modes, and the detailed description is omitted here.
When the sleeve 2 is placed on the penetrating part 11, the top surface of the protruding part 12 is flush with the top surface of the sleeve 2, so that the effect that the protruding part 12 affects the concrete pouring quality of a wall body can be avoided, and the protruding part 12 and the sleeve 2 can be detached and separated conveniently.
Because the wall thickness of the sleeve 2 is small, in order to improve the connection reliability between the sleeve 2 and the through part 11 and prevent the sleeve 2 from rotating in the pouring process, when the sleeve 2 is placed on the through part 11, the top surface of the convex part 12 is slightly higher than the upper surface of the sleeve 2, and the sleeve 2 can be effectively positioned.
Preferably, the height of the protrusion 12 extending above the top surface of the sleeve 2 is not more than 4mm, i.e. the height of the protrusion 12 is not more than 4mm greater than the wall thickness of the sleeve 2. In order to reduce the influence of the portion of the protruding portion 12 extending above the top surface of the sleeve 2 on the concrete placing quality of the wall body and to make the reserved rod 1 detachable from the sleeve 2, the protruding length of the protruding portion 12 should be as small as possible while ensuring the connection reliability between the penetrating portion 11 and the sleeve 2.
Referring to fig. 1 and 2, the construction method of the installation reservation device 100 of the present invention is:
step 1: according to the pre-buried height of sleeve pipe 2 in the design of wall body, correspond the screw in advance of sleeve pipe 2's elevation department on the template 3 of wall body, will reserve the through part 11 of pole 1 and connect soon on template 3 through screw thread 111 through the external screw thread to fix a position through nut 13 locking.
The setting number of the reserved rods 1 can be adjusted according to the information such as the thickness of the wall body and the weight of the sleeve 2. For example: when the sleeve 2 is a PVC pipe with a short length, a reserved rod 1 can be arranged on the template 3 on one side; when sleeve pipe 2 adopted the great steel pipe of quality or the longer pipeline of length, can all set up one on both sides template 3 and reserve pole 1, set up more many as required even and reserve pole 1 to ensure the effective support to sleeve pipe 2, sleeve pipe 2's stability when guaranteeing concrete placement.
In order to improve the installation stability of the through part 11, screw holes can be reserved on the template 3 and a cushion block fixed on the outer side of the template 3, the length of the fixed segment of the through part 11 is increased, and the through part 11 can provide more reliable supporting force for the sleeve 2.
Step 2: according to the number of the reserved rods 1 and the distance between the convex parts 12 and the inner walls of the templates 3, positioning holes are reserved at the corresponding positions of one end or two ends of the sleeve 2, so that when the sleeve 2 is horizontally erected between the templates 3 on two sides through the reserved rods 1, the reserved rods 1 are inserted into the sleeve 2, and the convex parts 12 can be just inserted into the positioning holes.
And step 3: erecting formworks 3 on two sides of the wall body, and synchronously installing the sleeve 2 when the formworks 3 are erected. The two ends of the sleeve 2 are attached between the two side templates 3, the protruding portions 12 are inserted into the positioning holes, the sleeve 2 is placed on the penetrating portions 11 under the action of gravity, and the sleeve 2 is stably and horizontally erected between the two side templates 3.
And 4, step 4: and (5) pouring concrete of the wall body. Because there is certain clearance between locating hole and bellying 12, concrete grout probably fills in this clearance when pouring, under concrete grout's adhesive action, can effectively avoid reserving the relative motion between pole 1 and the sleeve pipe 2, guarantee the stability of sleeve pipe 2, also guaranteed the quality of pouring of wall body. When pouring, because reserve pole 1 and be located sleeve pipe 2, do not influence the pouring quality of concrete, and easily dismantle.
And 5: when the form is removed, the concrete does not reach the designed strength, and the outer end of the reserved rod 1 is lightly knocked to separate the bulge 12 from the concrete in the gap. Because a certain gap is usually left between the bottom of the template 3 and the lower laminated slab, when the template is disassembled, the template 3 can be slightly moved downwards to separate the convex part 12 from the sleeve 2, and finally, the installation reservation device 100 and the template 3 are synchronously disassembled. The installation reservation device 100 can be detached from the formwork 3 and used in turn in the pre-burying construction of other casings 2.
The present invention is not limited to the above embodiments, and any modifications, equivalent replacements, improvements, etc. within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a sheathed tube installation reservation device below position is shelved to assembled superimposed sheet, characterized by: comprises a reserved rod (1) and a sleeve (2); the reserved rod (1) comprises a penetrating part (11) and a protruding part (12), one end of the penetrating part (11) is installed on the template (3), and the other end of the penetrating part (11) penetrates through the inner side of the template (3) and is inserted into the sleeve (2); the bulge (12) is arranged at the other end of the penetrating part (11), a positioning hole is formed at the top of the sleeve (2), and the bulge (12) can be inserted into the positioning hole, so that the sleeve (2) is placed on the penetrating part (11) and erected between the two side templates (3).
2. The installation reservation device of the sleeve below the assembly type superimposed slab placement position according to claim 1, characterized in that: the surface of the penetrating part (11) is provided with an external thread (111), and a screw hole matched with the external thread (111) is reserved on the template (3), so that the penetrating part (11) can be screwed on the template (3) and locked through a nut (13).
3. The installation reservation device of the sleeve below the assembly type superimposed slab placement position according to claim 1, characterized in that: when the sleeve (2) is rested on the through part (11), the top surface of the bulge part (12) is flush with the top surface of the sleeve (2).
4. The installation reservation device of the sleeve below the assembly type superimposed slab placement position according to claim 1, characterized in that: when the sleeve (2) is placed on the through part (11), the top surface of the bulge part (12) is higher than the upper surface of the sleeve (2).
5. The installation reservation device of the sleeve below the assembly type superimposed slab placement position according to claim 4, characterized in that: the height of the bulge (12) extending out of the upper part of the top surface of the sleeve (2) is not more than 4 mm.
CN202122476817.4U 2021-10-14 2021-10-14 Mounting and reserving device for casing pipe below placement position of assembled laminated slab Expired - Fee Related CN216921374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122476817.4U CN216921374U (en) 2021-10-14 2021-10-14 Mounting and reserving device for casing pipe below placement position of assembled laminated slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122476817.4U CN216921374U (en) 2021-10-14 2021-10-14 Mounting and reserving device for casing pipe below placement position of assembled laminated slab

Publications (1)

Publication Number Publication Date
CN216921374U true CN216921374U (en) 2022-07-08

Family

ID=82223108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122476817.4U Expired - Fee Related CN216921374U (en) 2021-10-14 2021-10-14 Mounting and reserving device for casing pipe below placement position of assembled laminated slab

Country Status (1)

Country Link
CN (1) CN216921374U (en)

Similar Documents

Publication Publication Date Title
CN201635388U (en) Unilateral supporting formwork system for cast-in-place concrete arc outer wall
CN101839061A (en) Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof
KR100533547B1 (en) Structure and Method for Precast Deck-to-Girder Connections
CN112942812A (en) Positioning device for shear wall template and method for mounting template by using same
CN102352690B (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN216921374U (en) Mounting and reserving device for casing pipe below placement position of assembled laminated slab
CN112854442A (en) Self-resetting combined node connecting structure and assembling method for beam column of assembled concrete frame
CN215563552U (en) Vertical joint construction of prefabricated wallboard based on ultra high performance concrete form
CN214942375U (en) Aluminum alloy template anti-floating device for indoor partition water stop table
CN111236681A (en) Hanging die for adding laminated slab at bottom of concrete slab and construction method thereof
CN201103240Y (en) Expansion type drawknot screw
CN205421640U (en) Connecting piece and side fascia installation node
CN112538976A (en) Positioning device and method for pre-buried screw of assembled stair
CN110080516B (en) Method for mounting wall-attached support of attached lifting scaffold
CN209779689U (en) Pipe gallery construction aluminum mould board integral type inner support device
CN214302952U (en) Embedded screw rod positioner of assembled stair
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
JP5130137B2 (en) Renovation method for existing foundation of wooden construction
CN212801928U (en) Prefabricated balcony of assembled
CN216840730U (en) Inclined supporting device capable of being rapidly installed and disassembled
CN217353273U (en) Position controller for pre-embedded bolts of assembled stairs
CN218623332U (en) Post-cast strip template supporting device
CN220705259U (en) Two-section screw anchor bar for masonry structure reinforcement
CN211178478U (en) Positioning system for horizontal prefabricated parts
CN217106161U (en) Assembled building aluminum mould board strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220708