KR20000042158A - Automatic control apparatus of under frequency relay - Google Patents
Automatic control apparatus of under frequency relay Download PDFInfo
- Publication number
- KR20000042158A KR20000042158A KR1019980058261A KR19980058261A KR20000042158A KR 20000042158 A KR20000042158 A KR 20000042158A KR 1019980058261 A KR1019980058261 A KR 1019980058261A KR 19980058261 A KR19980058261 A KR 19980058261A KR 20000042158 A KR20000042158 A KR 20000042158A
- Authority
- KR
- South Korea
- Prior art keywords
- frequency
- low frequency
- relay
- switches
- relays
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/46—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to frequency deviations
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/18—Status alarms
- G08B21/185—Electrical failure alarms
Landscapes
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
본 발명은 저주파수 계전기 자동 제어장치에 관한 것으로서, 특히, 전력계통의 주파수 이상시 부하를 계통에서 분리하는 기능을 수행하는 저주파수 계전기의 동작시 해당 저주파수 계전기에 대응하는 배전선로에 설치된 다수의 차단기를 동시에 일괄적으로 온/오프 제어할 수 있도록 하여 전력 공급에 대한 신뢰도를 향상시킬 수 있도록 한 저주파수 계전기 자동 제어장치에 관한 것이다.The present invention relates to a low-frequency relay automatic control device, in particular, a plurality of circuit breakers installed in the distribution line corresponding to the low-frequency relay at the same time during the operation of the low-frequency relay to perform the function of separating the load from the grid in the event of a frequency abnormality of the power system The present invention relates to a low-frequency relay automatic control device that can be collectively turned on / off control to improve the power supply reliability.
현재 생활수준의 발달로 전기를 필요로 하는 생활용품이 사용되고 있음은 물론이고, 대부분의 공장이나 건물 특히 병원과 같은 곳에서는 항상 전기가 공급될 수 있어야만 한다.In addition to the current development of living standards that require electricity is used, as well as in most factories and buildings, especially hospitals must be able to supply electricity at all times.
따라서, 전력 공급회사에서는 수요자에게 양질의 전기를 공급하되, 그 우선 순위를 정하여 전력이 모자랄 때에는 우선순위가 낮은 지역에서부터 높은 지역의 순으로 전기가 차단되도록 하고 전력이 정상적으로 복구되었을 경우에는 우선 순위가 높은 지역에서부터 낮은 지역의 순으로 전기가 복구되도록 하고 있다.Therefore, the electricity supplier will supply high-quality electricity to the consumer, but set the priority so that when the power is insufficient, the electricity is cut off in order of low priority to high region, and priority when the power is restored normally. Electricity is restored in order from high to low.
예를 들어, 일반주택가를 우선 순위가 가장 낮은 곳으로 선정하고, 공장지역을 중간의 우선 순위 지역으로 선정하며, 병원과 같이 사람의 생명을 다루는 곳을 우선 순위 가장 높은 곳으로 선정하였다면, 전력이 모자랄 때에는 일반주택가→공장지역→병원의 순서대로 전기가 차단되도록 하는 것이며, 전력이 복구되었을 경우에는 병원→공장지역→일반주택가의 순서대로 전기가 복구되도록 하고 있는 것이다.For example, if the general residential area is selected as the lowest priority, the factory area is selected as the middle priority area, and the place where people's lives are treated as the highest priority, such as a hospital, When not enough, electricity is cut off in the order of general residential area → factory area → hospital. When power is restored, electricity is restored in order of hospital → factory area → general residential area.
이와 같이 전력계통의 이상시 배전선로의 부하를 계통별로 즉, 우선 순위별로 분리하는 기능을 수행하는데 사용되는 것이 저주파수 계전기(UFR: Under Frequency Relay)이다.As such, an under frequency relay (UFR) is used to perform a function of separating a load of a distribution line by a system, that is, a priority, in case of an abnormal power system.
그러나, 전력계통의 주파수 이상시 부하를 계통 분리하는 기능을 수행하는 종래의 저주파수 계전기 배전반은 아직 비표준 규격으로 기능 및 사양이 수요처별로 서로 상이하게 적용되고 있는 실정이고, 변전소의 무인화 및 자동화가 급속하게 시행되어 급전분소에서 3∼4개의 변전소를 운전하고 있어 저주파수 계전기의 동작시 동시에 여러 개의 선로 차단기를 조작해야 하므로 장시간이 소요될 뿐만 아니라 원격제어 장애 또는 통신 장애시 작업자가 일일이 순회하면서 차단기를 조작해야 하는 문제점이 있었다.However, the conventional low frequency relay switchgear, which performs the function of separating the load in case of frequency abnormality of the power system, is still a non-standard specification, and its functions and specifications are applied differently by each customer, and unmanned and automated substations are rapidly applied. Since 3 ~ 4 substations are operated at power distribution centers, several line breakers must be operated at the same time when low frequency relays are operated. Therefore, it takes a long time. There was a problem.
따라서, 상기 문제점을 해결하기 위한 본 발명은 전력계통의 주파수 이상시 부하를 계통에서 분리하는 기능을 수행하는 저주파수 계전기의 동작시 해당 저주파수 계전기에 대응하는 배전선로에 설치된 다수의 차단기를 동시에 일괄적으로 온/오프 제어할 수 있도록 하여 전력 공급에 대한 신뢰도를 향상시킬 수 있도록 한 저주파수 계전기 자동 제어장치를 제공함을 목적으로 한다.Accordingly, the present invention for solving the above problems is a batch at the same time a plurality of circuit breakers installed in the distribution line corresponding to the corresponding low frequency relay during the operation of the low frequency relay to perform the function of separating the load from the system when the frequency abnormality of the power system It is an object of the present invention to provide a low-frequency relay automatic control device that can be turned on / off control to improve the reliability of the power supply.
상기 목적달성을 위한 본 발명의 특징은,Features of the present invention for achieving the above object,
전력계통의 주파수 이상시 부하를 주파수 별로 계통 분리하여 단속하도록 된 것에 있어서,In the case where the frequency of the power system is abnormal, the load is separated and intermittent by frequency for
전력계통 전원의 주파수 변화를 감지하고, 감지되는 주파수가 미리 설정된 값의 설정범위를 벗어날 경우 소정의 전기신호를 출력하는 제 1 내지 제 3 저주파수 계전기와;First to third low frequency relays for detecting a frequency change of a power system power source and outputting a predetermined electric signal when the detected frequency is out of a preset range of a preset value;
상기 저주파수 계전기의 동작여부를 선택하기 위한 선택스위치와, 원격제어의 실행여부를 설정하기 위한 스위치로 구성된 선택부와;A selection unit comprising a selection switch for selecting whether to operate the low frequency relay and a switch for setting whether to execute remote control;
저주파수 계전기의 작동 주파수를 설정하는 디지탈 주파수 미터기와;A digital frequency meter for setting an operating frequency of the low frequency relay;
저주파수 계전기의 동작 이상시 경보 표시하는 경보부와;An alarm unit for displaying an alarm when an operation of the low frequency relay is abnormal;
상기 제 1 내지 제 3 저주파수 계전기로 부터의 전원 주파수 감지 결과에 따라 각각의 저주파수 계전기에 대응하는 배전선로에 설치된 차단기가 오프 또는 온 동작하도록 하기 위한 제 1 및 제 2 출력단자가 형성되고, 제 1 내지 제 3 저주파수 계전기의 동작시 전력회사의 재폐로 계전기의 동작에 의한 과전류가 해당선로에 공급되지 않도록 하기 위한 제어신호를 출력하기 위한 제 3 출력단자가 형성된 제어장치부와;First and second output terminals are formed to turn off or on circuit breakers installed in distribution lines corresponding to the respective low frequency relays according to power frequency detection results from the first to third low frequency relays. A control unit formed with a third output terminal for outputting a control signal for preventing overcurrent caused by the operation of the re-closing relay of the power company during the operation of the third low-frequency relay;
상기 제어장치부의 제 1 출력단자로 부터 출력된 제어신호에 의해 온 동작하여 배전선로에 설치된 차단기를 오프시키는 다수의 릴레이 스위치로 구성된 제 1 스위칭부와;A first switching unit comprising a plurality of relay switches to be turned on by a control signal output from a first output terminal of the control unit to turn off a circuit breaker installed in a distribution line;
상기 제어장치부의 제 1 출력단자로 부터 출력된 제어신호에 의해 온 동작하여 배전선로에 설치된 차단기를 온 동작시키는 다수의 릴레이 스위치로 구성된 제 2 스위칭부와;A second switching unit including a plurality of relay switches to be turned on by a control signal output from the first output terminal of the control unit to turn on a circuit breaker installed in a distribution line;
상기 제어장치부의 제 3 출력단자로 부터 출력된 제어신호에 의해 온/오프 동작하여 해당 배전선로가 전력회사측의 재폐로 계전기와 연결 또는 차단되도록 하는 다수의 릴레이 스위치로 구성된 제 3 스위칭부로 구성된 것을 특징으로 한다.A third switching unit including a plurality of relay switches configured to be connected to or disconnected from a reclosing relay of a power company by operating on / off by a control signal output from a third output terminal of the control unit; It features.
그리고, 상기 제어장치부는 전력계통의 주파수 이상시 주파수별로 우선 순위가 결정된 저주파수 계전기 중 최하위로 결정된 저주파수 계전기부터 동작하도록 하며, 그 순서가 지켜지지 않을 때에는 경보부가 동작하도록 제어하는 것을 특징으로 한다.The control unit may operate from the low frequency relay determined as the lowest among the low frequency relays, the priority of which is determined by frequency when the frequency of the power system is abnormal, and the alarm unit operates when the order is not followed.
또한, 상기 제어장치부는 전력선의 주파수 정상 복귀시 주파수별로 우선 순위가 결정된 저주파수 계전기중 최우선 순위로 결정된 저주파수 계전기부터 순서대로 동작하도록 하며, 그 순서가 지켜지지 않을 때에는 경보부가 동작하도록 제어하는 것을 특징으로 한다.In addition, the control unit is to operate in order from the low-frequency relay determined as the highest priority among the low-frequency relays, the priority is determined for each frequency when the power line frequency returns to normal, characterized in that for controlling the alarm to operate when the order is not followed. do.
도 1 은 본 발명의 저주파수 계전기 자동 제어장치를 보인 블럭도.1 is a block diagram showing a low frequency relay automatic control device of the present invention.
도 2 는 본 발명의 차단기 오프과정을 보인 플로우챠트.Figure 2 is a flow chart showing a breaker off process of the present invention.
도 3 은 본 발명의 차단기 복구과정을 보인 플로우챠트.Figure 3 is a flow chart showing the breaker recovery process of the present invention.
도 4 는 본 발명의 차단기 오프과정의 일 실시예를 보인 도면.Figure 4 shows an embodiment of the breaker off process of the present invention.
도 5 는 본 발명의 차단기 복구과정의 일 실시예를 보인 도면.5 is a view showing an embodiment of the breaker recovery process of the present invention.
※도면의 주요부분에 대한 부호의 설명※ Explanation of symbols for main parts of drawing
1∼3: 저주파수 계전기, 4: 키이부,1 to 3: low frequency relay, 4: kiibu,
5: 디지탈 주파수 미터기, 6: 제어장치부,5: digital frequency meter, 6: control unit,
7∼9: 스위칭부, 10: 경보부,7-9: switching part, 10: alarm part,
7A,8A,9A: 릴레이 스위치,7A, 8A, 9A: relay switch,
이하, 첨부된 도면 도 1 내지 도 5 를 참고하여 본 발명의 바람직한 실시예를 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, FIGS. 1 to 5.
상기 도면에 의하면, 본 발명은 제 1 내지 제 3 저주파수 계전기(1∼3), 선택부(4), 디지탈 주파수 미터기(5), 제어장치부(6), 제 1 내지 제 3 스위칭부(7∼9), 경보부(10)로 대별 구성된다.According to the drawings, the present invention provides the first to third low frequency relays 1 to 3, the selector 4, the digital frequency meter 5, the control unit 6, and the first to third switching units 7. 9) It consists of the alarm part 10 roughly.
상기 제 1 내지 제 3 저주파수 계전기(1∼3)는 전력계통의 주파수를 감지하고, 이상이 감지되었을 때 소정의 전기신호를 제어장치부(6)로 출력하는 것으로서, 각각의 저주파수 계전기(1∼3)는 소정의 감지주파수를 갖고 있으며, 해당 배전선로의 주파수가 미리 설정된 감지주파수에 해당될 경우 소정의 전기신호를 출력한다.The first to third low frequency relays 1 to 3 detect the frequency of the power system and output a predetermined electrical signal to the control unit 6 when an abnormality is detected. 3) has a predetermined sensing frequency, and outputs a predetermined electrical signal when the frequency of the distribution line corresponds to a preset sensing frequency.
그리고, 상기 제 1 내지 제 3 저주파수 계전기(1∼3)는 전력계통의 주파수 이상이 발생했을 때 동작순서와 주파수 이상이 복구됐을 때의 동작순서가 설정되며, 그 설정순서에 따라 동작한다.The first to third low frequency relays 1 to 3 set an operation order when the frequency abnormality of the power system occurs and an operation order when the frequency abnormality is restored, and operate according to the setting procedure.
즉, 제 1 저주파수 계전기(1)가 59Hz, 제 2 저주파수 계전기(2)가 58Hz, 제 3 저주파수 계전기(3)가 57Hz를 감지하도록 설정되고, 그 동작 우선 순위가 '제 1 저주파수 계전기〈 제 2 저주파수 계전기 〈 제 3 저주파수 계전기'의 순서로 설정되었다면, 전력계통의 주파수 이상이 발생했을 경우에는 제 1 저주파수 계전기(1)에서 부터 동작하고, 전력계통의 주파수 이상이 복구되었을 경우에는 제 3 저주파수 계전기(3)부터 동작하는 것이다.That is, the first low frequency relay 1 is set to detect 59 Hz, the second low frequency relay 2 is 58 Hz, and the third low frequency relay 3 is 57 Hz, and its operation priority is' first low frequency relay <second. If the low frequency relay is set in the order of <third low frequency relay ', when the frequency abnormality of the power system occurs, it operates from the first low frequency relay (1), and when the frequency abnormality of the power system is restored, the third low frequency relay is performed. It starts from (3).
상기 선택부(4)는 제 1 내지 제 3 저주파수 계전기(1∼3)의 작동여부를 사용자가 설정할 수 있는 3개의 온동작스위치(S2,S4,S6)와 오프동작스위치(S1,S3,S5)와, 원격제어(SCADA) 여부를 설정하기 위한 스위치(S7)로 구성된다.The selector 4 includes three on-operation switches S2, S4, S6 and off-operation switches S1, S3, and S5, which the user can set whether the first to third low frequency relays 1 to 3 are operated. ), And a switch (S7) for setting whether or not the remote control (SCADA).
상기 디지탈 주파수 미터기(5)는 전력계통의 저주파수 이상이 해소되며 원상으로 복귀되었을 때 이에 관련된 차단기를 동작순서에 따라 복귀하도록 복귀신호를 출력한다.The digital frequency meter 5 outputs a return signal so that the breaker associated with the low frequency abnormality of the power system is eliminated and the circuit breaker associated with the power system is returned in the operation order.
상기 제어장치부(6)는 제 1 내지 제 3 저주파수 계전기(1∼3)의 동작여부에 따라 각각의 저주파수 계전기(1∼3)에 대응하는 배전선로와 설치된 차단기를 온/오프 시키는 것으로, 해당 차단기를 온/오프 시키기 위한 제 1 및 제 2 출력단자(6a,6b)와 각각의 저주파수 계전기(1∼3)에 대응하는 배전선로와 재폐로 계전기의 동작에 연관된 제 3 출력단자(6c)를 포함하여 구성된다.The control unit 6 turns on / off a distribution line corresponding to each of the low frequency relays 1 to 3 and a circuit breaker installed according to whether the first to third low frequency relays 1 to 3 operate. The first and second output terminals 6a and 6b for turning on / off the circuit breaker and the third output terminal 6c associated with the operation of the distribution line and the reclose relay corresponding to the respective low frequency relays 1 to 3 are connected. It is configured to include.
한편, 상기 제 1 스위칭부(7)는 상기 제어장치부(6)의 제 1 출력단자(6a)로 부터 입력되는 제어신호에 의해 온 동작하여 제 1 내지 제 3 저주파수 계전기(1∼3)의 감지영역에 해당하는 배전선로에 설치된 차단기를 오프(차단)시키는 다수의 릴레이 스위치(7A1∼7An)로 구성된다.On the other hand, the first switching unit 7 is turned on by a control signal input from the first output terminal 6a of the control unit 6 to operate the first to third low frequency relays 1 to 3. It is composed of a plurality of relay switches 7A1 to 7An for turning off (breaking) the circuit breaker provided in the distribution line corresponding to the sensing area.
즉, 전력계통의 주파수 이상시 제 1 저주파수 계전기(1)가 동작하여 제어장치부(6)의 제 1 출력단자(6a)로 제어신호가 출력되면, 제 1 저주파수 계전기(1)에 대응하는 배전선로에 설치된 차단기와 연결된 해당 릴레이 스위치(7A1∼7An)가 온 동작하여 해당 차단기가 오프되어 배전선로가 차단되는 것이며, 제 2 및 제 3 저주파수 계전기가 동작하여 제어장치부(6)의 제 1 출력단자(6a)로 제어신호가 출력되면 이 제어신호에 의해 해당 릴레이 스위치(7A1∼7An)가 온 동작하여 배전선로가 차단되는 것이다.That is, when the first low frequency relay 1 operates when the frequency of the power system is abnormal and the control signal is output to the first output terminal 6a of the control unit 6, the distribution line corresponding to the first low frequency relay 1 The relay switch 7A1 to 7An connected to the circuit breaker installed in the furnace is turned on, the circuit breaker is turned off to cut off the distribution line, and the second and third low frequency relays are operated to output the first output of the control unit 6. When a control signal is outputted to the terminal 6a, the relay switches 7A1 to 7An are turned on by the control signal and the distribution line is cut off.
상기 제 2 스위칭부(8)는 상기 제어장치부(6)의 제 2 출력단자(6b)로 부터 입력되는 제어신호에 의해 온 동작하여 제 1 내지 제 3 저주파수 계전기(1∼3)의 감지영역에 해당하는 배전선로에 설치된 차단기를 온 동작(복귀)시키는 다수의 릴레이 스위치(8A1∼8An)로 구성된다.The second switching unit 8 is turned on by a control signal input from the second output terminal 6b of the control unit 6 so as to detect the first to third low frequency relays 1 to 3. And a plurality of relay switches 8A1 to 8An which turn on (return) the circuit breaker provided in the distribution line corresponding thereto.
즉, 전력계통의 주파수 이상이 복원되었을때 제 3 저주파수 계전기(3)가 동작하여 제어장치부(6)의 제 1 출력단자(6b)로 제어신호가 출력되면, 제 3 저주파수 계전기(3)에 대응하는 배전선로에 설치된 차단기와 연결된 해당 릴레이 스위치(8A1∼8An)가 온 동작하여 해당 차단기가 온(복귀)되어 배전선로가 온(복귀)되는 것이다.That is, when the frequency abnormality of the power system is restored, when the third low frequency relay 3 operates to output the control signal to the first output terminal 6b of the control unit 6, the third low frequency relay 3 The relay switches 8A1 to 8An connected to the circuit breakers installed in the corresponding distribution lines are turned on, so that the circuit breakers are turned on (return) and the distribution lines are turned on (return).
상기 제 3 스위칭부(9)는 상기 제어장치부(6)의 제 3 출력단자(6c)로 부터 입력되는 제어신호에 의해 온/오프되어 제 1 내지 제 3 저주파수 계전기(1∼3)의 감지영역에 해당하는 배전선로가 전력회사측의 재폐로 계전기와 연결 또는 차단되도록 하여 배전선로의 주파수 이상시 해당 배전선로의 차단기가 차단된 상태에서 재폐로 계전기의 동작에 의한 과전류가 배전선로에 가해지지 않도록 하고, 배전선로의 주파수 이상이 복구되었을 때에는 해당 배전선로가 재폐로 계전기와 연결되도록 하는 것이다.The third switching unit 9 is turned on / off by a control signal input from the third output terminal 6c of the control unit 6 to detect the first to third low frequency relays 1 to 3. The distribution line corresponding to the area is connected to or disconnected from the reclosing relay of the power company, so if the frequency of the distribution line is abnormal, the overcurrent by the operation of the reclosing relay is not applied to the distribution line when the circuit breaker of the distribution line is blocked. When the frequency of the distribution line is restored, the distribution line is connected to the reclose relay.
상기 경보부(10)는 제어장치부(6)의 제어에 따라 점등되는 램프(BL), 부저음 출력부(BZ), 스위치(HS)(RESET) 등으로 구성된다.The alarm unit 10 includes a lamp BL, a buzzer sound output unit BZ, a switch HS RESET, and the like, which are turned on under the control of the control unit 6.
이와 같이 구성된 본 발명의 동작을 도 4 와 도 5 를 참고하여 설명하면 다음과 같다.The operation of the present invention configured as described above will be described with reference to FIGS. 4 and 5.
먼저, 전력계통에 저주파수가 발생하면, 제 1 저주파수 계전기(1)가 제일 먼저 동작하여 제어장치부(6)로 소정의 전기신호를 출력한다.First, when a low frequency occurs in the power system, the first low frequency relay 1 operates first to output a predetermined electric signal to the control unit 6.
상기 제 1 저주파수 계전기(1)로 부터 전기신호를 입력받은 제어장치부(6)는 제 1 출력부(6a)를 통해 제 1 스위칭부(7)로 소정의 제어신호를 출력하여 해당 릴레이 스위치(7A1∼7An)를 온 동작시키고 일정시간 지연 후에는 제 3 스위칭부(9)로 제어신호를 출력하여 해당 릴레이 스위치(9A1∼9An)를 온 시킴으로서, 제 1 저주파수 계전기(1)와 대응하는 배전선로에 설치된 차단기가 오프되어 해당 배전선로가 차단되도록 함은 물론 차단된 배전선로가 재폐로 계전기와 차단되도록 한다.The control unit 6 receiving the electrical signal from the first low frequency relay 1 outputs a predetermined control signal to the first switching unit 7 through the first output unit 6a to provide a corresponding relay switch ( Switching line corresponding to the first low frequency relay 1 by turning on 7A1 to 7An and turning on the corresponding relay switch 9A1 to 9An by outputting a control signal to the third switching unit 9 after a predetermined time delay. The circuit breaker installed in the circuit is turned off so that the corresponding distribution line is blocked, and the blocked distribution line is blocked from the reclosing relay.
이후에도 전력계통의 주파수 이상이 계속되면 다음으로 우선 순위가 낮은 제 2 저주파수 계전기(2)가 동작하고, 그 다음에는 마지막으로 우선 순위가 가장 높은 제 3 저주파수 계전기(3)가 동작하며, 상기 제 2 및 제 3 저주파수 계전기(2)(3)의 동작에 대해 제어장치부(6)가 응답하여 제 1 스위칭부(7)와 제 3 스위칭부(9)의 해당 릴레이 스위치(7A1∼7An)(9A1∼9An)를 동작시켜 제 2 및 제 3 저주파수 계전기(2)(3)와 대응하는 배전선로에 설치된 차단기들이 오프되어 해당 배전선로가 차단되도록 함은 물론 차단된 배전선로가 재폐로 계전기와 차단되도록 한다.Thereafter, when the frequency abnormality of the power system continues, the second low frequency relay 2 having the lowest priority operates next, and the third low frequency relay 3 having the highest priority operates afterwards, and the second And the control unit 6 responds to the operation of the third low frequency relay 2, 3, corresponding relay switches 7A1 to 7An of the first switching unit 7 and the third switching unit 9A1. ~ 9An) to turn off the circuit breakers installed on the distribution lines corresponding to the second and third low frequency relays (2) and (3) to turn off the corresponding distribution lines, as well as to block the disconnected distribution lines from the reclosing relays. do.
만약, 상기 설명과 같이 제 1 저주파수 계전기(1)에서 제 3 저주파수 계전기(3)의 순서대로 동작하지 않고 처음부터 제 3 저주파수 계전기(3)가 동작하거나 아니면 제 2 저주파수 계전기(2)가 동작하게 되면 제어장치부(6)는 경보부(10)를 동작시켜 경보음과 경보등이 점등되도록 한 후 다시 각각의 제 1 및 제 3 저주파수 계전기(1∼3)가 정상적인 순서대로 동작하기를 기다리며, 이후에도 정상적인 동작이 이루어지지 않게되면 시스템을 정지한다.If, as described above, the first low frequency relay 1 does not operate in the order of the third low frequency relay 3 and the third low frequency relay 3 operates from the beginning, or the second low frequency relay 2 operates. When the control unit 6 operates the alarm unit 10 so that the alarm sound and the alarm light are turned on, the control unit 6 waits for the first and third low frequency relays 1 to 3 to operate in the normal order again. If no action is taken, the system is stopped.
한편, 상기 설명과 같이 전력계통의 주파수 이상이 발생하여 배전선로를 차단하는 동작이 완료된 후 전력계통의 주파수 이상이 복구되면,On the other hand, if the frequency abnormality of the power system is restored after the operation of breaking the power distribution line is completed, as described above, the frequency abnormality occurs,
먼저, 우선순위가 가장 높은 제 3 저주파수 계전기(3)가 동작하고, 제어장치부(6)는 제 2 스위칭부(8)의 해당 릴레이 스위치(8A1∼8An)를 온 동작시켜 차단된 상태로 존재하던 제 3 저주파수 계전기(3)와 연관된 차단기를 약 0.1∼1sec의 간격으로 온 동작시켜 해당 배전선로를 원래의 상태로 복귀시키므로서 전력이 해당 배전선로를 통해 병원과 같은 주요지역에 신속하게 자동적으로 전력이 공급된다.First, the third low frequency relay 3 having the highest priority is operated, and the control unit 6 is in a blocked state by turning on the corresponding relay switch 8A1 to 8An of the second switching unit 8. The circuit breaker associated with the third low frequency relay 3 was turned on at an interval of about 0.1 to 1 sec to return the distribution line to its original state, and the power was automatically and quickly transferred to the main area such as a hospital through the distribution line. Power is supplied.
그리고, 배전선로의 차단기가 복귀된 후에는 해당 배전선로와 연관된 제 3 스위칭부(9)의 릴레이 스위치(9A1∼9An)를 온 동작시켜 다시 재폐로 계전기와 배전선로가 연결되도록 한다.After the breaker of the distribution line is returned, the relay switches 9A1 to 9An of the third switching unit 9 associated with the distribution line are turned on so that the reclose relay and the distribution line are connected again.
상기 설명과 같이 제 3 저주파수 계전기(3)가 동작한 후에는 다시 제 2 저주파수 계전기(2)와 제 1 저주파수 계전기(1)가 순서적으로 작동하게 되고, 제어장치부(6)는 제 2 저주파수 계전기(2)및 제 1 저주파수 계전기(1)와 연관된 차단기를 약 0.1∼1sec의 간격으로 온 동작시켜 해당 배전선로를 원래의 상태로 복귀시킴과 동시에 해당 배전선로와 연관된 제 3 스위칭부(9)의 릴레이 스위치(9A1∼9An)를 온 동작시켜 다시 재폐로 계전기와 배전선로가 연결되도록 함으로서, 차단되었던 배전선로를 원래의 상태로 완전히 복귀하는 것이다.As described above, after the third low frequency relay 3 is operated, the second low frequency relay 2 and the first low frequency relay 1 are operated in sequence, and the control unit 6 includes the second low frequency. The circuit breaker associated with the relay 2 and the first low frequency relay 1 is turned on at intervals of about 0.1 to 1 sec to return the distribution line to its original state, and at the same time, the third switching unit 9 associated with the distribution line. The relay switches 9A1 to 9An of ON are operated again so that the relay and the distribution line are re-closed again, thereby completely returning the disconnected distribution line to its original state.
배전선로 복귀동작에서도 제어장치부(6)는 제 3 내지 제 1 저주파수 계전기(3∼1)가 정상적인 순서대로 동작하지 않으면 제어장치부(6)는 경보부(10)를 동작시키게 된다.Even in the distribution line return operation, the control unit 6 causes the alarm unit 10 to operate if the third to first low frequency relays 3 to 1 do not operate in the normal order.
상기 설명과 같은 배전선로 차단 및 복귀동작은 제어장치부(6)에 의해 자동으로 수행되므로, 전력계통의 주파수 이상이 발생되더라도 작업자가 일일이 순회하면서 차단기를 조작하지 않아도 된다.Since the distribution line blocking and returning operation as described above is automatically performed by the control unit 6, even if a frequency abnormality of the power system occurs, the operator does not need to operate the breaker while circulating one by one.
그리고, 상기 설명에서는 3개의 저주파수 계전기사 사용된 것을 예로 하였으나 그 이상의 저주파수 계전기를 사용하여도 무방하다.In the above description, three low frequency relay yarns are used as an example, but more low frequency relays may be used.
이상에서 설명한 바와 같이 본 발명은 전력계통의 주파수 이상시 부하를 계통에서 분리 차단하는 기능을 수행하는 저주파수 계전기와 이에 대응하는 배전선로에 설치된 다수의 차단기를 신속하게 자동적으로 온/오프 제어할 수 있도록 하여 전력 공급에 대한 신뢰도를 향상시킬 수 있도록 한 저주파수 계전기 자동 제어장치이다.As described above, the present invention provides a low frequency relay that performs a function of separating and disconnecting a load from a system in the event of a frequency abnormality of a power system and a plurality of circuit breakers installed in a corresponding distribution line so as to quickly and automatically control on / off. Low-frequency relay automatic control device to improve the power supply reliability.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980058261A KR20000042158A (en) | 1998-12-24 | 1998-12-24 | Automatic control apparatus of under frequency relay |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019980058261A KR20000042158A (en) | 1998-12-24 | 1998-12-24 | Automatic control apparatus of under frequency relay |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20000042158A true KR20000042158A (en) | 2000-07-15 |
Family
ID=19565404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019980058261A KR20000042158A (en) | 1998-12-24 | 1998-12-24 | Automatic control apparatus of under frequency relay |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20000042158A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050090809A (en) * | 2004-03-10 | 2005-09-14 | 삼성탈레스 주식회사 | Method for protecting a receiving circuit of multiple radio transmission apparatus |
KR100855639B1 (en) * | 2006-10-11 | 2008-09-01 | 이충석 | High voltage circuit breaker having function of preventing opening and closing surge |
WO2009075394A1 (en) * | 2007-12-10 | 2009-06-18 | Chung Suk Lee | High voltage circuit breaker having function of preventing opening and closing surge |
-
1998
- 1998-12-24 KR KR1019980058261A patent/KR20000042158A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050090809A (en) * | 2004-03-10 | 2005-09-14 | 삼성탈레스 주식회사 | Method for protecting a receiving circuit of multiple radio transmission apparatus |
KR100855639B1 (en) * | 2006-10-11 | 2008-09-01 | 이충석 | High voltage circuit breaker having function of preventing opening and closing surge |
WO2009075394A1 (en) * | 2007-12-10 | 2009-06-18 | Chung Suk Lee | High voltage circuit breaker having function of preventing opening and closing surge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1005133B1 (en) | Power distribution system with circuit breakers remotely resetable by signals transmitted over the power lines | |
CA2354533C (en) | Intelligent power distribution network | |
EP0482767A2 (en) | Fault detection arrangement | |
CA2643729A1 (en) | Devices, systems, and methods for providing electrical power | |
CA2030114A1 (en) | Multiple circuit interrupter address identification system | |
KR20000042158A (en) | Automatic control apparatus of under frequency relay | |
CN111799749A (en) | Electrical protection system and method | |
KR20000015748A (en) | Digital motor control center unit using contact-pointless device | |
CN113140971A (en) | Anti-vibration high tension switchgear circuit breaker anti-jumping system | |
KR100288156B1 (en) | Apparatus for preventing failure spread in power system | |
JP2000013933A (en) | Control switchboard | |
JPH11299087A (en) | Bus protecting system for spot network power receiving equipment | |
JPH10108321A (en) | Distribution board provided with earthquake sensing relay | |
EP0748016B1 (en) | Electric power supply switch box, particularly for household use | |
Ahmed | New Supervisory Control and Data Acquisition (SCADA) based fault isolation system for low voltage distribution systems | |
JPH04364329A (en) | Distribution board | |
JPH03245730A (en) | Distribution board | |
JPH06261439A (en) | Distribution board | |
JP3031685B2 (en) | Switchboard | |
JP2968017B2 (en) | Switchboard | |
KR200272900Y1 (en) | Unification type digital motor control apparatus | |
JP3587392B2 (en) | Residential distribution monitoring device | |
JPH03245731A (en) | Distribution board | |
JPH03243123A (en) | Distribution board | |
JPH1014100A (en) | Ground self-breaking type automatic section switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |