breakers
restored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10188200A
Other languages
Japanese (ja)
Inventor
Mitsuaki Morita
満秋 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Engineering Ltd
Original Assignee
NEC Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Engineering Ltd filed Critical NEC Engineering Ltd
Priority to JP10188200A priority Critical patent/JP2000013933A/en
Publication of JP2000013933A publication Critical patent/JP2000013933A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To suppress the rush current which is generated when the power supply is restored or returns by issuing an alarm before the consumed exceeds a preset current value and controlling branch circuit breakers in the order of priority. SOLUTION: The measurement of a consumed current is performed by using the current transformer of a measuring section 3 and branch circuit breakers 10 indicate their cutoff or thrown-in states by flickering a digital indicator 7 or changing the indicating color of the indicator 7. When the power supply is interrupted, in addition, all of the breakers 10 (1)-(4) are cut-off. When the power supply is restored, the breakers 10 (1)-(4) are successively thrown in the order of, for example, priority by deciding their delay time. Consequently, a rush current suppressing function which can avoid the malfunction of a controlled switchboard by a peak current by inhibiting the rush current (a momentary large current) which is generated when the power supply is restored is obtained. When a power failure occurs, all of the branch circuit breakers are cut-off and, when the power supply is restored, the circuit breakers are successively thrown in accordance their prescribed delay time.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、制御配電盤、特に
電気の使い過ぎによる警報の発生、分岐ブレーカーの遮
断・投入を行う家庭用ピークカット制御配電盤に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control switchboard, and more particularly to a home-use peak cut control switchboard for generating an alarm due to excessive use of electricity and for turning off / on a branch breaker.

【0002】[0002]

【従来の技術】家電製品の普及により、家庭での電気使
用料は益々増加の一途である。家庭での電気使用量が予
め定めたレベルを超すと自動的に遮断又は警告する機器
が使用されている。
2. Description of the Related Art With the spread of home electric appliances, household electric charges are increasing more and more. Devices that automatically shut off or warn when the amount of electricity used at home exceeds a predetermined level are used.

【0003】例えば、特開平3−285518号公報に
は過電流時に優先順位に従って家庭電気機器の供給を順
次停止させる家電用電力制御装置が開示されている。
For example, Japanese Unexamined Patent Publication No. Hei 3-285518 discloses a power control device for home electric appliances in which the supply of home electric appliances is sequentially stopped in accordance with a priority order when an overcurrent occurs.

【0004】[0004]

【発明が解決しようとする課題】上述した従来の制御配
電装置にあっては、契約電流を超過すると予め定めた遮
断順位に従って予告なしに順次電気機器を遮断する。従
って、各機器の遮断リレーを予定順序で動作させ給電を
個別に停止するので、現在どの機器が動作又は動作停止
しているか不明である。
In the above-mentioned conventional control and distribution device, when the contract current is exceeded, the electric devices are sequentially cut off without prior notice according to a predetermined cut-off order. Therefore, since the cutoff relays of the respective devices are operated in the scheduled order and the power supply is individually stopped, it is unknown which device is currently operating or stopped.

【0005】そこで、本発明の目的は、電気の使い過ぎ
を警報音等で居住者に知らせて注意を促し、優先順位に
従ってブレーカーの遮断/投入を行い、電源が停電した
後に復電又は復帰した場合のラッシュ電流(瞬間的大電
流)を抑圧することが可能な家庭で有効な制御配電装置
を提供することにある。
Accordingly, an object of the present invention is to notify the occupant of an excessive use of electricity with an alarm sound or the like to alert the occupant, to switch on / off the breaker according to the priority order, and to restore or recover after a power failure. It is an object of the present invention to provide a control and distribution device effective at home that can suppress a rush current (a large instantaneous current) in such a case.

【0006】[0006]

【課題を解決するための手段】前述の課題を解決するた
めに、本発明による制御配電盤は、次のような特徴的な
構成を備えている。
In order to solve the above-mentioned problems, a control switchboard according to the present invention has the following characteristic configuration.

【0007】(1)契約ブレーカー、主幹ブレーカー及
び複数の分岐ブレーカーを含む制御配電盤において、消
費電流計測部を設け、前記消費電流が予め設定した電流
値を超過する前に警報を発生する警報手段を有すること
を特徴とする制御配電盤。
(1) In a control switchboard including a contract breaker, a main breaker and a plurality of branch breakers, a current consumption measuring section is provided, and an alarm means for generating an alarm before the current consumption exceeds a preset current value is provided. A control switchboard characterized by having.

【0008】(2)前記複数の分岐ブレーカーに予め優
先順位を設け、前記消費電流計測部の計測値に応じて前
記複数の分岐ブレーカーを優先順位に従って遮断/投入
する上記(1)の制御配電盤。
(2) The control switchboard according to (1), wherein priorities are assigned to the plurality of branch breakers in advance, and the plurality of branch breakers are turned on / off according to the priorities in accordance with the values measured by the current consumption measuring unit.

【0009】(3)前記複数の分岐ブレーカーの遮断/
投入状態を示す表示部を有する上記(1)又は(2)の
制御配電盤。
(3) shutting off the plurality of branch breakers;
The control switchboard according to the above (1) or (2), further comprising a display unit that indicates a closed state.

【0010】(4)電源が停電した場合に、前記複数の
分岐ブレーカーを全て遮断し、復電時には前記複数の分
岐ブレーカーを所定遅延時間に従って投入してラッシュ
電流を抑える上記(1)、(2)又は(3)の制御配電
盤。
(4) When the power supply is interrupted, all of the plurality of branch breakers are shut off, and when the power is restored, the plurality of branch breakers are turned on according to a predetermined delay time to suppress the rush current. (1), (2) ) Or the control switchboard of (3).

【0011】(5)前記分岐ブレーカーの遮断/投入を
制御する制御部を付勢するバッテリーを内蔵する上記
(1)乃至(4)のいずれかの制御配電盤。
(5) The control switchboard according to any one of the above (1) to (4), including a battery for energizing a control section for controlling the turning on / off of the branch breaker.

【0012】(6)前記バッテリーは電源により自動充
電される充電式バッテリーである上記(5)の制御配電
盤。
(6) The control switchboard of (5), wherein the battery is a rechargeable battery that is automatically charged by a power supply.

【0013】[0013]

【発明の実施の形態】以下、本発明の制御配電盤の好適
実施形態例を添付図を参照して詳細に説明する。図1は
本発明の制御配電盤の好適実施形態例のブロック図であ
る。図2は、図1の制御配電盤のブレーカー遮断動作説
明用フローチャートである。図3は、図1の制御配電盤
のブレーカー投入動作説明用フローチャートである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of a control switchboard according to the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 is a block diagram of a preferred embodiment of the control switchboard of the present invention. FIG. 2 is a flowchart for explaining a breaker cutoff operation of the control switchboard of FIG. FIG. 3 is a flowchart for explaining a breaker closing operation of the control switchboard of FIG.

【0014】先ず、図1を参照して本発明の制御配電盤
の構成を説明する。この制御配電盤は、契約ブレーカー
1、主幹ブレーカー2及び分岐ブレーカー10( 乃
至 を有する点で、従来の一般家庭の引き込み口に設
置されている家庭用配電盤と同様である。しかし、本発
明の制御配電盤は、上述したものの外に、制御部5、優
先順位設定部6、デジタル表示7、スピーカー8、バッ
テリー9及び計測部(CT)3を追加している。
First, the configuration of the control switchboard of the present invention will be described with reference to FIG. This control switchboard is the same as a conventional switchboard installed at a service entrance of a general household in that it has a contract breaker 1, a main breaker 2, and a branch breaker 10 (to). Includes a control unit 5, a priority setting unit 6, a digital display 7, a speaker 8, a battery 9, and a measurement unit (CT) 3 in addition to the above-described components.

【0015】次に、図2及び図3を参照して、本発明の
制御配電盤の動作を説明する。先ず、スタート20の
後、初期設定21において、優先順位設定部6で分岐ブ
レーカ10の優先順位、第一段処理及び第二段処理の設
定値、復電処理の分岐ブレーカー10の投入遅延時間を
設定する。
Next, the operation of the control switchboard of the present invention will be described with reference to FIGS. First, after the start 20, in the initial setting 21, the priority order of the branch breakers 10, the set values of the first stage processing and the second stage processing, and the closing delay time of the branch breaker 10 of the power recovery processing are set by the priority order setting unit 6. Set.

【0016】消費電流監視1ステップ22で、消費電流
値を読み先に初期設定21で設定した第一段処理値をオ
ーバーしているか否か判定する。もし第一段処理値をオ
ーバーしていれば、スピーカー8により警報音(ブザ
ー)23を発生させる。第二段処理値をオーバーした場
合には、優先順位設定部6で設定した優先順位の低い分
岐ブレーカー を遮断する(ステップ24)。
In the consumption current monitoring 1 step 22, it is determined whether or not the consumption current value exceeds the first-stage processing value set in the initialization 21 in the reading destination. If the first stage processing value is exceeded, a warning sound (buzzer) 23 is generated by the speaker 8. If the second stage processing value is exceeded, the branch breaker with a low priority set by the priority setting section 6 is cut off (step 24).

【0017】消費電流監視2のステップ25で再び消費
電流値を読む。この読み取られた消費電流が第二処理値
をオーバーしているか否か判断する。第二処理値をオー
バーしているときは、次の優先順位の分岐ブレーカー
を遮断する(ステップ26)。以下、消費電流監視3
(ステップ27)を同様に繰り返して、第二処理値より
小さい値になるまで分岐ブレーカー 、 を遮断す
る。
In step 25 of the current consumption monitoring 2, the current consumption value is read again. It is determined whether the read current consumption exceeds the second processing value. If the second processing value is exceeded, the next priority branch breaker
Is shut off (step 26). Hereinafter, consumption current monitoring 3
(Step 27) is repeated in the same manner, and the branch breakers are cut off until the value becomes smaller than the second processing value.

【0018】次に、何らかの原因で消費電流が所定値ま
で減少した場合には、図3に示す手順(ステップ30乃
至37)に従って順次分岐ブレーカー10を投入する。
これらステップ30乃至37は、実質的に図2のブレー
カー遮断フローチャートのステップ20乃至27と同様
であるので詳細説明は省略する。但し、分岐ブレーカー
10の投入は、優先順位の高い 乃至 の順に、遮断
の場合とは逆の順序で行う。
Next, when the current consumption decreases to a predetermined value for some reason, the branch breakers 10 are sequentially turned on in accordance with the procedure (steps 30 to 37) shown in FIG.
Steps 30 to 37 are substantially the same as steps 20 to 27 in the breaker cut-off flowchart of FIG. 2, and a detailed description thereof will be omitted. However, the turning on of the branch breaker 10 is performed in the order of higher priority or lower, and in the reverse order to the case of shutting off.

【0019】尚、これら動作において、消費電流の計測
は、計測部3の変流器を使用して行う。また、分岐ブレ
ーカー10は、遮断又は投入された状態をデジタル表示
7の点滅又は表示色の切替えにより表示可能である。
In these operations, the current consumption is measured using the current transformer of the measuring unit 3. In addition, the branch breaker 10 can display the shut-off or closed state by blinking the digital display 7 or switching the display color.

【0020】また、電源が停電した場合には、分岐ブレ
ーカー10の 乃至 の全てを遮断する。復電した場
合には、遅延時間を定めて、例えば優先順位に従って分
岐ブレーカー 乃至 を順次投入する。これにより、
復電時のラッシュ電流を阻止し、ピーク電流による制御
配電盤の誤動作を回避するラッシュ電流抑圧機能が得ら
れる。
When the power supply is interrupted, all of the branch breakers 10 to are shut off. When the power is restored, a delay time is determined, and branch breakers to are sequentially turned on in accordance with, for example, the priority order. This allows
A rush current suppression function is provided that prevents a rush current at the time of power restoration and prevents a malfunction of the control switchboard due to a peak current.

【0021】本発明の制御配電盤にあっては、ブレーカ
ー10の遮断/投入は内蔵バッテリー9により作動する
のが好ましい。これにより、電源の停電時にも確実にブ
レーカー10の遮断や投入が可能である。また、このバ
ッテリー9は、充電式(二次バッテリー)とし、電源の
正常時(停電でないとき)に自動的に充電することによ
り、十分長時間の停電時にも対処可能である。
In the control switchboard of the present invention, the turning on / off of the breaker 10 is preferably operated by the built-in battery 9. Thus, the breaker 10 can be reliably turned off or turned on even when the power is cut off. Further, the battery 9 is a rechargeable (secondary battery) and is automatically charged when the power supply is normal (when there is no power failure), so that it is possible to cope with a power failure for a sufficiently long time.

【0022】以上、本発明の制御配電盤の好適実施形態
例の構成及び動作を説明した。しかし、本発明は、その
要旨を逸脱することなく種々の変形変更が可能であるこ
とが当業者には容易に理解できよう。分岐ブレーカーは
乃至 の4個に限定されず、必要に応じて任意数と
なし得る。また、これら分岐ブレーカーの遮断/投入の
優先順位や停電後の復電時のブレーカー投入の遅延時間
等は図示しない操作ボタン等により自由に選定可能であ
る。
The configuration and operation of the preferred embodiment of the control switchboard of the present invention have been described above. However, those skilled in the art can easily understand that the present invention can be variously modified without departing from the gist thereof. The number of branch breakers is not limited to four, and may be any number as necessary. In addition, the priority order for turning on / off these branch breakers, the delay time for turning on the breakers when the power is restored after a power failure, and the like can be freely selected by operating buttons (not shown).

【0023】[0023]

【発明の効果】上述の説明から理解される如く、本発明
の制御盤によると、使用する電気機器の重要度に応じて
予め優先順位を設定し、消費電力が契約値をオーバーし
そうな場合には、これをブザーで警報し、第二段として
優先順位の低い分岐ブレーカーから順次遮断するので、
負荷の使い過ぎによる影響を最小限にとどめることが可
能である。また、分岐ブレーカーの遮断/投入状態は表
示することが可能である。更に、停電時には、分岐ブレ
ーカーを全て遮断し、復電時には所定遅延時間に従って
分岐ブレーカーを投入することによりラッシュ電路を阻
止することが可能である。従って、家庭用配電盤等に有
効である。
As will be understood from the above description, according to the control panel of the present invention, priorities are set in advance according to the importance of the electric equipment to be used, and when the power consumption is likely to exceed the contract value, Will warn this with a buzzer, and as a second step, it will shut off sequentially from the lower priority branch breaker,
It is possible to minimize the effects of overloading. Further, it is possible to display the cutoff / closing state of the branch breaker. Further, at the time of a power failure, it is possible to shut off all the branch breakers, and to turn on the branch breakers according to a predetermined delay time at the time of power recovery, thereby preventing the rush electric circuit. Therefore, it is effective for home switchboards and the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の制御配電盤の好適実施形態例のブロッ
ク図である。
FIG. 1 is a block diagram of a preferred embodiment of a control switchboard of the present invention.

【図2】図1に示す制御配電盤の分岐ブレーカーの遮断
動作を説明するフローチャートである。
FIG. 2 is a flowchart illustrating a shut-off operation of a branch breaker of the control switchboard shown in FIG.

【図3】図1に示す制御配電盤の分岐ブレーカーの投入
動作を説明するフローチャートである。
FIG. 3 is a flowchart illustrating a closing operation of a branch breaker of the control switchboard shown in FIG. 1;

【符号の説明】[Explanation of symbols]

1 契約ブレーカー 2 主幹ブレーカー 3 消費電流計測部 5 制御部 6 優先順位設定部 7 デジタル表示 8 スピーカー 9 バッテリー 10 分岐ブレーカー DESCRIPTION OF SYMBOLS 1 Contract breaker 2 Main breaker 3 Current consumption measurement part 5 Control part 6 Priority setting part 7 Digital display 8 Speaker 9 Battery 10 Branch breaker

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】契約ブレーカー、主幹ブレーカー及び複数
の分岐ブレーカーを含む制御配電盤において、 消費電流計測部を設け、前記消費電流が予め設定した電
流値を超過する前に警報を発生する警報手段を有するこ
とを特徴とする制御配電盤。
In a control switchboard including a contract breaker, a main breaker, and a plurality of branch breakers, a current consumption measuring section is provided, and an alarm means for generating an alarm before the current consumption exceeds a preset current value is provided. A control switchboard characterized in that:
【請求項2】前記複数の分岐ブレーカーに予め優先順位
を設け、前記消費電流計測部の計測値に応じて前記複数
の分岐ブレーカーを優先順位に従って遮断/投入するこ
とを特徴とする請求項1に記載の制御配電盤。
2. A method according to claim 1, wherein priorities are assigned to said plurality of branch breakers in advance, and said plurality of branch breakers are turned on / off in accordance with a priority order according to a value measured by said current consumption measuring section. Control switchboard as described.
【請求項3】前記複数の分岐ブレーカーの遮断/投入状
態を示す表示部を有することを特徴とする請求項1又は
2に記載の制御配電盤。
3. The control switchboard according to claim 1, further comprising a display unit that indicates a cut-off / on state of the plurality of branch breakers.
【請求項4】電源が停電した場合に、前記複数の分岐ブ
レーカーを全て遮断し、復電時には前記複数の分岐ブレ
ーカーを所定遅延時間に従って投入してラッシュ電流を
抑えることを特徴とする請求項1、2又は3に記載の制
御配電盤。
4. The power supply according to claim 1, wherein all of said plurality of branch breakers are cut off when a power supply is interrupted, and said rush current is suppressed by returning said plurality of branch breakers according to a predetermined delay time when power is restored. 4. The control switchboard according to 2 or 3.
【請求項5】前記分岐ブレーカーの遮断/投入を制御す
る制御部を付勢するバッテリーを内蔵することを特徴と
する請求項1乃至4のいずれかに記載の制御配電盤。
5. The control switchboard according to claim 1, further comprising a battery for energizing a control unit for controlling the turning on / off of the branch breaker.
【請求項6】前記バッテリーは電源により自動充電され
る充電式バッテリーであることを特徴とする請求項5に
記載の制御配電盤。
6. The control switchboard according to claim 5, wherein the battery is a rechargeable battery that is automatically charged by a power supply.
JP10188200A 1998-06-18 1998-06-18 Control switchboard Pending JP2000013933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10188200A JP2000013933A (en) 1998-06-18 1998-06-18 Control switchboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10188200A JP2000013933A (en) 1998-06-18 1998-06-18 Control switchboard

Publications (1)

Publication Number Publication Date
JP2000013933A true JP2000013933A (en) 2000-01-14

Family

ID=16219535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10188200A Pending JP2000013933A (en) 1998-06-18 1998-06-18 Control switchboard

Country Status (1)

Country Link
JP (1) JP2000013933A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7412304B2 (en) 2004-03-25 2008-08-12 Ip Power Systems Corporation Power system for area containing a set of power consumers
JP2012115110A (en) * 2010-11-26 2012-06-14 Kyocera Corp Controller and control method
WO2014208061A1 (en) * 2013-06-28 2014-12-31 パナソニックIpマネジメント株式会社 Power distribution control device and method for controlling power distribution
JP2015173592A (en) * 2010-12-10 2015-10-01 東芝ライテック株式会社 Distribution board device
JP2017042041A (en) * 2016-11-04 2017-02-23 パナソニックIpマネジメント株式会社 Power supply device and power supply method
JP2018042402A (en) * 2016-09-08 2018-03-15 東京瓦斯株式会社 Power suppression support device, power suppression support method, and power suppression support program

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7412304B2 (en) 2004-03-25 2008-08-12 Ip Power Systems Corporation Power system for area containing a set of power consumers
JP2012115110A (en) * 2010-11-26 2012-06-14 Kyocera Corp Controller and control method
JP2015173592A (en) * 2010-12-10 2015-10-01 東芝ライテック株式会社 Distribution board device
WO2014208061A1 (en) * 2013-06-28 2014-12-31 パナソニックIpマネジメント株式会社 Power distribution control device and method for controlling power distribution
US9859750B2 (en) 2013-06-28 2018-01-02 Panasonic Intellectual Property Management Co., Ltd. Power distribution control apparatus, electricity storage system, and power distribution control method
JP2018042402A (en) * 2016-09-08 2018-03-15 東京瓦斯株式会社 Power suppression support device, power suppression support method, and power suppression support program
JP2017042041A (en) * 2016-11-04 2017-02-23 パナソニックIpマネジメント株式会社 Power supply device and power supply method

Similar Documents

Publication Publication Date Title
CA2150198C (en) Digitally controlled circuit interrupter with improved automatic selection of sampling interval for 50 hz and 60 hz power systems
CA2503035C (en) Method and circuit breaker for reducing arc flash during maintenance in a low voltage power circuit
EP0482767B1 (en) Fault detection arrangement
JP3441672B2 (en) Automotive power supply monitoring device
US20080179958A1 (en) Automatic Transfer Switch With Monitor Mode and Method Employing the Same
EP2664046B1 (en) Trip unit providing remote electrical signal to remotely indicate that an arc reduction maintenance mode is remotely enabled, and electrical switching apparatus including the same
JP2000013933A (en) Control switchboard
JP2008072852A (en) Switch controller, and switchgear
JP2005094930A (en) Current control device for interior light wire
JP2008220136A (en) Protection relay system of distribution system
JP2018518006A (en) Power distribution system for connection to AC voltage network
US20110172840A1 (en) Centrally controlled protection system having reduced energy let-through mode
JP2000156935A (en) Method and apparatus for controlling self power generation system
JPH08205378A (en) Load control device
KR20000042158A (en) Automatic control apparatus of under frequency relay
JPH03245730A (en) Distribution board
JPH08203392A (en) Device for closing and tripping circuit breaker
JPH08294223A (en) Power supply cutoff apparatus
JPH09135527A (en) Over current protective relay with settling pattern automatic changing-over function
JPH06284573A (en) Power breaking controller
JP2623933B2 (en) Gas switchgear
CN113872154A (en) Over-excitation protection device and method for generator-transformer set and generator-transformer set equipment
JPH077977A (en) Motor overload protector
JPH06237530A (en) Changeover switchgear
JPH0984281A (en) Circuit breaker controller for cubicle