KR19990015428U - Ground construction file - Google Patents
Ground construction file Download PDFInfo
- Publication number
- KR19990015428U KR19990015428U KR2019970028724U KR19970028724U KR19990015428U KR 19990015428 U KR19990015428 U KR 19990015428U KR 2019970028724 U KR2019970028724 U KR 2019970028724U KR 19970028724 U KR19970028724 U KR 19970028724U KR 19990015428 U KR19990015428 U KR 19990015428U
- Authority
- KR
- South Korea
- Prior art keywords
- ground
- pile
- piles
- shaped
- time
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/223—Details of top sections of foundation piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
- E02D2200/1692—Shapes conical or convex
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본고안은 연약지반이나 기초가 불안한 지반을 보강하는데 사용하는 지반구축용 파일에 관한 것으로, 특히 팽이형상으로 된 콘크리트 파일 다수개를 일체시켜 하나의 덩어리로 구성토록 한 지반 구축용 파일에 관한 것이다.This paper relates to the ground construction piles used to reinforce soft ground or unstable ground, and more particularly, to the ground construction piles in which a plurality of concrete piles having a top shape are integrated into a single mass.
종래 팽이형상의 콘크리트 파일은 원형의 상면을 가지며, 상면의 중앙에는 고리가 돌출되어지며, 그 반대편에는 원추형 저면을 가지며, 원추형 저면 중앙에는 축이 돌설되어지는 형상을 갖게 된다.Conventional top-shaped concrete pile has a circular top surface, a ring protrudes in the center of the top surface, has a conical bottom surface on the opposite side, and has a shape in which the shaft is protruded in the center of the conical bottom surface.
이와 같은 팽이형상의 콘크리트 파일을 시공할 때 한번에 1개씩 밖에 운반할 수 없어 작업능률이 저하되는 것을 감안하여 이를 해결하고자 본고안이 안출된 것으로, 통상의 팽이형 콘크리트 파일 다수개(4-8개)를 일체로 연결하여 하나의 덩어리로 구성하여 한번 운반에 4-8개의 팽이형 콘크리트 파일을 한번에 운반할 수 있음으로 인해 작업 능률이 향상되며, 작업공기를 단축할 수 있도록 한 것이다.In order to solve this problem, only one can be transported one time at a time when constructing such top-shaped concrete piles. ) Can be integrated into a single mass to transport 4-8 pentagonal concrete piles at a time, thereby improving work efficiency and shortening working air.
Description
본고안은 연약지반이나 기초가 불안한 지반을 보강하는데 사용하는 지반 구축용 파일에 관한 것으로, 특히, 팽이형상으로 된 콘크리트 파일 다수개를 일체시켜 하나의 덩어리로 구성토록 한 지반 구축용 파일에 관한 것이다.This paper relates to the ground construction pile used to reinforce soft ground or unstable ground. In particular, the present invention relates to the ground construction pile in which a plurality of concrete piles having a top shape are integrated into a single mass. .
연약지반이란 수분 함유가 많거나 다져지지 않아 기초가 불안한 지반으로 이에 구조물을 건설함에 있어서는 지지력이 부족하게 되어 침하가 예상된다. 따라서, 연약지반에 구조물을 건설하기 전에는 구조물의 규모 및 사용용도에 따라 지반을 보강 구축해야만 한다.Soft ground is an unstable ground due to high moisture content or lack of compaction. Therefore, it is expected to settle due to lack of support in constructing structures. Therefore, before constructing a structure on a soft ground, the ground must be reinforced according to the size and use of the structure.
종래, 연약지반을 보강하는 수단으로는 10-30m 정도의 콘크리트 말뚝을 땅에 박아 지반의 기초를 보강하는 콘크리트 말뚝 기초 공법이 있으며, 그물망과 같은 매트를 연약지반 위에 겹겹이 깔고 그 사이 사이에 흙을 채워 넣는 지반을 보강하는 매트공법이 있으며, 팽이형상의 콘크리트 파일을 사용하는 지반 보강공법등 여러 가지 지반 보강공법이 사용되고 있다.Conventionally, as a means of reinforcing the soft ground, there is a concrete pile foundation method for reinforcing the foundation of the foundation by embedding concrete piles of about 10-30m in the ground. There is a mat method for reinforcing the ground to be filled, and various ground reinforcement methods such as a ground reinforcement method using a top-shaped concrete pile are used.
본고안은 상기 팽이형상의 콘크리트 파일을 이용한 지반공법에 사용되는 팽이형상의 콘크리트 파일의 변형 형태에 관한 것으로, 종래 개개로된 팽이형상의 콘크리트 파일 다수개를 서로 연결 고정시켜 일체로 되도록 한 것이다.The present invention relates to a deformation form of a top-shaped concrete pile used in the ground method using the top-shaped concrete pile, and is to connect and fix a plurality of conventional top-shaped concrete piles connected to each other to be integrated.
종래 팽이 형상의 콘크리트 파일의 구조를 살펴보면 다음과 같다.Looking at the structure of the conventional top-shaped concrete pile as follows.
즉, 종래 팽이형상의 콘크리트 파일(11)은 원형의 상면(12)을 가지며, 상면(12)의 중앙에는 고리(13)가 돌출되어지며, 그 반대편에는 원추형 저면(14)을 가지며, 원추형상의 저면 중앙에는 축(15)이 돌설되는 형상을 갖게 된다.That is, the conventional top-shaped concrete pile 11 has a circular top surface 12, a ring 13 protrudes in the center of the top surface 12, and has a conical bottom surface 14 on the opposite side thereof, and has a conical shape In the center of the bottom surface, the shaft 15 is projected.
이와 같은 팽이형상의 콘크리트 파일(11)은 원추형상의 넓은 저면(14)을 가지며, 원추형저면은 30-50°의 경사를 이룸으로 인하여 위에서 아래로 작용하는 상재하중을 사방으로 분산시킴으로 인하여 매우 높은 지반 보강효과를 얻게 된다.The top-shaped concrete pile 11 has a wide conical bottom 14, and the conical bottom has a very high ground due to dispersing the floor loads acting from the top to the bottom due to the inclination of 30-50 °. Reinforcement effect is obtained.
또한, 팽이형상의 콘크리트 파일(11)을 대상 지반에 설치하기 위해서는 대상 지반위에 콘크리트 파일의 축(15)을 삽치할 수 있게 삽치구(22)가 마련된 철망(21)을 포설한 다음 삽치구(22)에 팽이형상의 콘크리트 파일의 축(15)을 박아 끼운 다음 상면의 중앙에 돌출시킨 고리(13)를 가로, 세로의 연결철근(23)으로 연결 고정하며, 팽이형파일과 팽이형 파일 사이의 공간부에 잡석을 채워 넣어 지반을 보강하게 되는 것이다.In addition, in order to install the top-shaped concrete pile 11 on the target ground, after installing the wire mesh 21 provided with the insertion tool 22 so as to insert the shaft 15 of the concrete pile on the target ground, 22) the shaft 15 of the top-shaped concrete pile is screwed in, and then the ring 13 protruding in the center of the upper surface is connected and fixed with horizontal and vertical connecting bars 23, and between the top-shaped pile and the top-shaped pile It will reinforce the ground by filling rubble in the space.
이와 같은 팽이형 파일은 통상 그 무게가 60-80kg의 중량물이므로 성인남자가 겨우 들 수 있는 무게에 해당된다. 따라서, 팽이형상의 콘크리트 파일을 운반하거나 지면에 설치할 경우에는 기중기를 사용하여 작업을 하게 된다. 본고안은 이와 같은 종래 팽이형상의 파일 다수개를 서로 부착하여 일체로 되게 하므로써 작업시간을 단축할 수 있도록 한 것이다.This type of top pile is usually a weight of 60-80kg, so the adult man barely fits the weight. Therefore, when carrying a top-shaped concrete pile or installed on the ground is to use a crane to work. This proposal is intended to shorten the working time by attaching a plurality of such conventional top-shaped piles to one another.
종래 팽이형상의 콘크리트 파일은 그 무게가 60-80kg의 중량물이며, 이는 성인남자가 겨우 들 수 있는 무게에 해당하나 작업에 있어서는 기중기를 사용하여 운반 및 설치하게 된다. 따라서, 종래에 있어서는 기중기를 사용하여 팽이형상의 파일을 운반할 경우 한번에 하나씩 운반함으로 인하여 작업에 많은 시간이 소요되며, 특히, 대상지반에 파일을 박아 세울 때 수평을 맞추는데 많은 시간 및 노력이 수반되었다.Conventional top-shaped concrete pile is a heavy weight of 60-80kg, which corresponds to the weight that an adult man can barely carry, but is carried and installed using a crane in operation. Therefore, in the related art, when carrying a top-shaped pile using a crane, it takes a lot of time to carry the work one at a time, and in particular, it takes a lot of time and effort to level the pile when the pile is piled on the target ground. .
이와 같은 것을 감안하여 본고안이 안출된 것으로 통상의 팽이형상의 콘크리트 파일 다수개(4-8개)를 일체로 함으로 말미암아 한번 운반에 다수개의 팽이형 파일을 운반하는 효과를 갖게 되며, 이로 인해 작업시간이 단축 되어지며, 또한, 지면을 박을 때 수평으로 박을 수 있는 잇점을 갖게 되어 작업향상을 기할 수 있도록 한 것이다.In view of this, the draft has been devised, and by integrating a plurality of ordinary top-shaped concrete piles (4-8), it has the effect of carrying a plurality of top-shaped piles in one transportation. The time is shortened, and also has the advantage that can be driven horizontally when driving the ground to improve the work.
도 1 - a, b는 본고안의 사시도.1-a, b are perspective views of the present invention.
도 2 - 본고안의 또다른 형태의 사시도.2-a perspective view of another form of the present article.
도 3 - 본고안의 또다른 형태의 사시도.3-a perspective view of another form of the present article.
도 4 - 본고안의 단면도.4-A cross-sectional view of the subject matter.
도 5 - 종래 제품의 사시도.5-a perspective view of a conventional product.
도 6 - 종래 제품의 사용상태 사시도.6-perspective view of the state of use of the conventional product.
통상의 상면이 원형으로 된 팽이형상의 콘크리트 파일 4-8개를 연결하여 일체로 된 하나의 파일(1)로 되게 하며, 상기 각각의 팽이형상의 콘크리트 파일 중심에 삽치되는 각각 ∩형 철근(2)은 가로 및 세로 연결철근(3)(4)에 의해 서로 연결 고정되도록 한 것이다.The ordinary top surface is connected to 4 to 8 circular top-shaped concrete piles so as to be a single pile (1), and each curved rebar inserted into the center of each top-shaped concrete pile (2). ) Is to be connected to each other by the horizontal and vertical connecting bars (3) (4).
또다른 실시예로는 상면이 육각형으로 된 팽이형상의 콘크리트 파일 4-8개를 일체로 연결 구성 할 수 있으며, 상면이 팔각형으로 된 팽이형상의 콘크리트 파일 4-8개를 일체로 연결 구성할 수도 있다.In another embodiment, four to eight top-shaped concrete piles of hexagonal tops may be integrally connected, and four to eight top-shaped concrete piles of octagonal tops may be integrally connected. have.
본고안은 종래 팽이형 콘크리트 파일은 운반 및 시공에 있어 한번에 하나씩 운반 및 설치함으로 인하여 작업시간이 과다하게 소요되며, 대상지면에 각각 박아 서로 연결시킴에 있어 각각의 팽이파일을 정위치에 삽치하며, 수평으로 설치하기가 쉽지 않았으나, 각각의 팽이형상의 콘크리트 파일 4-8개를 일체로 되게 함으로써 한번 운반에 다수개 즉, 4-8개의 팽이형 콘크리트 파일을 한번에 운반 가능하여 작업시간을 단축할 수 있게 된다.In this paper, the conventional top-type concrete piles take too much work time by transporting and installing one at a time in transportation and construction. Although it was not easy to install horizontally, it is possible to shorten the working time by carrying four to eight top-shaped concrete piles at one time by integrating 4-8 concrete piles with each top shape. Will be.
또한, 팽이형 콘크리트 파일 다수개(4-8개)를 일체로 연결한 것은 각각의 것보다 수평을 맞추기가 용이하여 팽이형 파일과 팽이형 파일을 수평으로 맞추는 시간을 절약할 수 있는 효과를 갖게 된다.In addition, by connecting a plurality of top-shaped concrete piles (4-8 pieces) integrally, it is easier to level them than each one, and the time-saving time for leveling the top-type pile and the top-type piles can be saved. do.
또한, 각각의 팽이형 콘크리트 파일 중심에 삽치되는 각각의 ∩형 철근(2)과 가로, 세로 연결 철근(3)(4)으로 서로 연결 고정함으로 인하여 연결부위가 쉽게 분리되지 않게 된다.In addition, the connection parts are not easily separated by fixing each other with each of the fin-shaped reinforcing bars 2 and the horizontal and vertical connecting bars 3 and 4 inserted into the center of each top-shaped concrete pile.
이와 같은 본고안은 종래 각각의 팽이형상의 콘크리트 파일보다 간단히 설치할 수 있어 작업공기를 단축할 수 있으며, 소수의 작업 인원으로 작업 가능토록 한 아주 유용한 고안인 것이다.Such a proposal can be installed more simply than each top-shaped concrete pile conventionally can shorten the working air, it is a very useful design to be able to work with a small number of workers.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019970028724U KR200161668Y1 (en) | 1997-10-16 | 1997-10-16 | Foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2019970028724U KR200161668Y1 (en) | 1997-10-16 | 1997-10-16 | Foundation pile |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19990015428U true KR19990015428U (en) | 1999-05-15 |
KR200161668Y1 KR200161668Y1 (en) | 1999-12-01 |
Family
ID=19512080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2019970028724U KR200161668Y1 (en) | 1997-10-16 | 1997-10-16 | Foundation pile |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200161668Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100748204B1 (en) * | 2006-02-09 | 2007-08-09 | 시지이엔씨주식회사 | Cast in place and fabricated type top base set case and it's reinforced complex foundation method |
KR101102824B1 (en) * | 2011-07-19 | 2012-01-05 | 주식회사 대왕콘 | Top base concrete block, and the molding frame, and the forming apparatus and forming method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101088357B1 (en) | 2011-03-10 | 2011-12-01 | 주식회사 에이스올 | Method of construction using mesh micro foundation |
-
1997
- 1997-10-16 KR KR2019970028724U patent/KR200161668Y1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100748204B1 (en) * | 2006-02-09 | 2007-08-09 | 시지이엔씨주식회사 | Cast in place and fabricated type top base set case and it's reinforced complex foundation method |
KR101102824B1 (en) * | 2011-07-19 | 2012-01-05 | 주식회사 대왕콘 | Top base concrete block, and the molding frame, and the forming apparatus and forming method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR200161668Y1 (en) | 1999-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2730172A1 (en) | Geometrical structural system | |
KR101019302B1 (en) | Gabion, gabion manufacturing method, and construction method by the gabion | |
KR200161668Y1 (en) | Foundation pile | |
PL199698B1 (en) | Grate-type panel with mounting brackets arranged at different spacings from each other | |
KR101695408B1 (en) | Modular Unit and Modular Structure Using Concrete Filled Steel Tube | |
US10246878B2 (en) | Stackable wall spacer for supporting reinforcement in concrete constructions | |
KR101028288B1 (en) | The top pile for a tenderness ground reinforce | |
CN106256649A (en) | A kind of multifunctional turnover trolley | |
JP2012031667A (en) | Construction method for peg-top type pile | |
JP5990071B2 (en) | Ground improvement structure | |
US20040237432A1 (en) | Foundation structure, components therefor and method of constructing a foundation | |
KR200183184Y1 (en) | A concrete pile in the shape of a top | |
JPH11107293A (en) | Foundation structure of building, foundation construction method, and block for foundation | |
JP6856435B2 (en) | Position adjustment jig | |
JPH10292378A (en) | Earth retaining wall | |
JPH01131724A (en) | Fortified soil structure | |
CN214144152U (en) | Embedded part placing device | |
CN218143408U (en) | Container frame structure | |
KR200454905Y1 (en) | Top pile | |
JP2935841B2 (en) | Top type block assembly for foundation | |
CN217710817U (en) | Prefabricated foundation of prefabricated building | |
KR102006630B1 (en) | Traditional fence reinforcement structure, traditional fence comprising it and its construction method | |
KR0136773Y1 (en) | Base Block Block for Block Reinforced Earth Retaining Wall Construction | |
JP7017033B2 (en) | Foundation structure and foundation structure construction method | |
JPS5834075Y2 (en) | Multi-hopper silo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20110905 Year of fee payment: 13 |
|
EXPY | Expiration of term |