KR100748204B1 - Cast in place and fabricated type top base set case and it's reinforced complex foundation method - Google Patents

Cast in place and fabricated type top base set case and it's reinforced complex foundation method Download PDF

Info

Publication number
KR100748204B1
KR100748204B1 KR1020060012720A KR20060012720A KR100748204B1 KR 100748204 B1 KR100748204 B1 KR 100748204B1 KR 1020060012720 A KR1020060012720 A KR 1020060012720A KR 20060012720 A KR20060012720 A KR 20060012720A KR 100748204 B1 KR100748204 B1 KR 100748204B1
Authority
KR
South Korea
Prior art keywords
factory
hollow
pile
cast
place
Prior art date
Application number
KR1020060012720A
Other languages
Korean (ko)
Inventor
장혁수
이정영
홍기채
Original Assignee
시지이엔씨주식회사
장혁수
이정영
홍기채
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 시지이엔씨주식회사, 장혁수, 이정영, 홍기채 filed Critical 시지이엔씨주식회사
Priority to KR1020060012720A priority Critical patent/KR100748204B1/en
Application granted granted Critical
Publication of KR100748204B1 publication Critical patent/KR100748204B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1692Shapes conical or convex

Abstract

A cast-in-place and prefabricated type top-base set case and the reinforced complex foundation method using the same is provided to construct an off-the-shelf case binding at least four individual top bases into one set as a cast-in-place and prefabricated type top-base set case to thereby secure constructability, economical efficiency, and stability. A cast-in-place and prefabricated type top-base set case comprises a set of two or more top bases(P), each of which includes a hollow top(10) having a wide top and a narrow bottom, a hollow pile body(20) extending from the bottom of the hollow top, and a pile tip(30) having a cross section reduced gradually from a lower end of the hollow pile body. The top bases are bonded to form a bridge(40). A bearing plate(50) is bonded near the bridge.

Description

공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법{cast in place and fabricated type top base set case and it's reinforced complex foundation method}BACKGROUND OF THE INVENTION Field of the Invention [0001] The present invention relates to a container-

도 1은 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 사시도,FIG. 1 is a perspective view showing a factory-built, field-inverted top pile collecting container according to the present invention,

도 2는 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 정면도,FIG. 2 is a front view showing a factory-built, field-inverted top pile collecting container according to the present invention;

도 3은 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 평면도,FIG. 3 is a plan view showing a factory-built, field-inverted top pile collecting container according to the present invention,

도 4a 내지 4f는 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 이용하여 기초를 시공하는 과정을 도시한 공정도.FIGS. 4A to 4F are process drawings showing a process of constructing a foundation using a factory-built, field-installed topsheet pile collecting container according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Description of the Related Art [0002]

10: 팽이부 20: 파일본체부10: top part 20:

30: 파일선단부 40: 결합부30: file tip 40:

50: 받침판 50:

C: 공장제작형 현장타설 팽이파일 집합체 용기C: Factory-built model

CC: 콘크리트 CS: 채움쇄석CC: Concrete CS: Filled Crushed stone

FS: 위치철근 JS: 연결철근FS: Position Reinforcement JS: Reinforced Reinforcement

P: 팽이파일 S: 공간부P: Top file S: Space part

본 발명은 공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법에 관한 것으로, 특히 각각의 팽이파일을 4개를 1조로 하여 시공성을 향상시킨 공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법에 관한 것이다.Field of the Invention The present invention relates to a factory-built on-site top-mounted top pile assemblage container and a combined basic construction method using the same. More particularly, the present invention relates to a factory-built top-mounted top pile assembly container in which four top- The present invention relates to a composite foundation method.

일반적으로 팽이파일은 상광하협으로 형성됨과 동시에 가운데 속이 빈 중공으로 형성되는 팽이부와, 상기 팽이부의 하부로 소정의 길이가 연장됨과 동시에 속이 빈 중공으로 형성되는 파일본체부와, 상기 파일본체부의 하단부로부터 일정한 각도로 단면이 축소 형성되는 파일선단부로 구성된다.In general, the top file comprises a top portion formed as a top of the top cover and formed with a hollow hollow at the center thereof, a file main body portion having a predetermined length extending to a lower portion of the top portion and hollow, And a tip end portion of which the cross section is reduced at an angle from the tip end portion.

상기한 바와 같은 구성으로 이루어진 종래의 팽이파일은 현장에서 팽이시공시 팽이파일을 각각 1개씩 설치하는 경우로 콘크리트 타설시 불필요하게 콘크리트의 손실이 발생하며, 팽이파일 타설 작업시 팽이파일 상부에 별도의 받침판이 없으므로 콘크리트 타설이 상당히 난해한 문제가 있으며, 각각의 팽이파일 연결시 과도한 연결고리의 사용이 발생되며, 특히 개별적으로 팽이파일을 시공함으로써 시공성 이 떨어지는 문제점이 있다.Conventional top file having the above-described structure is installed when each top file is installed at the time of top construction in the field, and consequently, concrete is lost unnecessarily when the concrete is laid. When the top file is put in operation, There is a problem in that concrete pouring is very difficult due to the lack of a base plate, excessive linkage is used in connection of each top file, and in particular, construction workability is lowered by individually installing a top file.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 개별적으로 시공하는 팽이파일을 4개 또는 적절한 개수를 묶은 1셋트를 공장제작형 현장타설 팽이파일 집합체 용기로 된 기성품으로 시공하여, 시공성과 경제성 및 안정성을 확보할 수 있도록 한 공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법을 제공하는데 그 목적이 있다.SUMMARY OF THE INVENTION Accordingly, the present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide an apparatus and method for constructing a single- To provide a plant-made top-mounted top-pile collecting container and a composite basic method using the same, which can ensure workability, economy, and stability.

상기한 목적을 달성하기 위한 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기는 상광하협으로 형성됨과 동시에 가운데 속이 빈 중공으로 형성되는 팽이부와, 상기 팽이부의 하부로 소정의 길이가 연장됨과 동시에 속이 빈 중공으로 형성되는 파일본체부와, 상기 파일본체부의 하단부로부터 일정한 각도로 단면이 축소 형성되는 파일선단부로 구성되는 팽이파일에 있어서, 적어도 2개 이상의 팽이파일이 접합되어 결합부가 형성되며, 상기 결합부의 좌우로 받침판이 접합 결합됨을 특징으로 한다.In order to accomplish the above object, according to the present invention, there is provided a factory-built, field-inverted top pile collecting container comprising a top portion formed as a top-bottomed lower portion and a center hollow portion formed in a hollow shape, A topsheet comprising a pile hollow main body portion and a pile end portion having a reduced cross section at a predetermined angle from a bottom end portion of the pile main body portion, wherein at least two tops are joined to form a coupling portion, And the support plate is joined to the left and right of the coupling portion.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 복합기초공법은 적어도 2개 이상의 팽이파일을 접합하여 공장제작형 현장타설 팽이파일 집합체 용기를 형성하는 단계; 상기 공장제작형 현장타설 팽이파일 집합체 용기를 설치할 지반을 소정의 깊이로 굴착하여 일정한 공간 부를 형성하는 단계; 상기 공간부내에 위치철근을 설치하는 단계; 상기 설치된 위치철근 위에 다수개의 공장제작형 현장타설 팽이파일 집합체 용기를 거치하는 단계; 상기 공장제작형 현장타설 팽이파일 집합체 용기 내에 콘크리트를 충전하는 단계; 상기 공장제작형 현장타설 팽이파일 집합체 용기의 사이의 공극에 채움 쇄석을 채우는 단계; 상기 콘크리트가 충전된 공장제작형 현장타설 팽이파일 집합체 용기의 상면을 연결철근으로 배근 및 결속하는 단계로 이루어짐을 특징으로 한다.In accordance with another aspect of the present invention, there is provided a method of assembling a factory-built top-mounted topsheet file assembly, comprising: forming at least two tops of a top- Forming a predetermined space by excavating the ground to be installed with the factory-built type field-standing top pile collecting container at a predetermined depth; Installing a position reinforcing bar in the space; Placing a plurality of factory-made on-site top-loading topsheet collection containers on the installed position reinforcing bars; Filling the concrete in the factory built type field-standing top pile collecting container; Filling the gap between the factory built type field-standing top pile collecting containers with a filling crushed stones; And a step of arranging and binding the top surface of the factory-built, field-inverted top pile collecting container filled with the concrete to the connecting reinforcing bars.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 사시도이며, 도 2는 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 정면도이며, 도 3은 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 도시한 평면도이다.FIG. 1 is a perspective view showing a factory-built on-site top-mounted top pile collecting container according to the present invention, FIG. 2 is a front view showing a factory- FIG. 2 is a plan view showing a factory-built type top-mounted top pile collecting container according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기는 상광하협으로 형성됨과 동시에 가운데 속이 빈 중공으로 형성되는 팽이부(10)와, 상기 팽이부(10)의 하부로 소정의 길이가 연장됨과 동시에 속이 빈 중공으로 형성되는 파일본체부(20)와, 상기 파일본체부(20)의 하단부로부터 일정한 각도로 단면이 축소 형성되는 파일선단부(30)로 구성되는 팽이파일에 있어서,As shown in these drawings, the factory-built, field-inverted top pile collecting container according to the present invention includes a top portion 10 formed of a top surface and an intermediate hollow portion, And a file end portion (30) having a cross section reduced at a predetermined angle from a lower end portion of the file main body portion (20). The file body portion (20) In this case,

적어도 2개 이상의 팽이파일(P)이 접합되어 결합부(40)가 형성되며, 상기 결합부(40)의 좌우로 받침판(50)이 접합 결합된 구조이다.At least two top files P are joined to form a coupling portion 40 and the support plates 50 are joined to the left and right sides of the coupling portion 40.

즉, 각각의 팽이파일(P)를 2개 이상을 공장에서 접합하여 1셋트의 공장제작형 현장타설 팽이파일 집합체 용기(C)로 구성됨을 특징으로 한다.That is, two or more of the top files P are connected to each other at a factory to constitute one set of factory-built type top-mounted top collecting pile file containers C.

여기서, 상기 받침판(50)은 공장제작형 현장타설 팽이파일 집합체 용기(C)내로 콘크리트(CC) 충전시 작업발판으로 사용할 수 있으며, 또한 공장제작형 현장타설 팽이파일 집합체 용기(C)간의 공간에 채움쇄석(CS)을 채우는 것을 용이하게 하기 위해 설치한 것이다.Here, the bed plate 50 can be used as a scaffold for filling a concrete (CC) into a factory-built, site-mounted topsheet pile collecting container (C) It is installed to facilitate the filling of crushed stone (CS).

또한, 상기 받침판(50)은 팽이파일 집합체 용기(C)의 결합부(40)뿐만 아니라 다른 부위에도 접합 설치할 수도 있음을 밝혀둔다.It is also noted that the support plate 50 may be attached not only to the coupling portion 40 of the top file aggregation container C but also to other portions.

이때는 받침판(50)의 외면을 라운딩 처리하여 공장제작형 현장타설 팽이파일 집합체 용기(C)의 운반을 원활하게 함이 바람직하다.In this case, it is preferable that the outer surface of the support plate 50 is subjected to a rounding treatment so as to facilitate the transportation of the factory-made top-mounted, floating topsheet assembly container C.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기(C)를 이용한 기초 시공에 대해 설명한다.The basic construction using the factory-made, site-installed topsheet pile collecting container (C) according to the present invention having the above-described configuration will be described.

도 4a 내지 4f는 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 이용하여 기초를 시공하는 과정을 도시한 공정도이다.FIGS. 4A to 4F are process diagrams illustrating a process of constructing a foundation using a factory-built, field-installed topsheet pile collecting container according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 이용한 복합기초공법은 적어도 2개 이상의 팽이파일(P)을 접합하여 1셋트로 된 공장제작형 현장타설 팽이파일 집합체 용기(C)를 형성하는 단계; 상기 공장제작형 현장타설 팽이파일 집합체 용기(C)를 설치할 지반을 소정의 깊이로 굴착하여 일정한 공간부(S)를 형성하는 단계; 상기 공간부(S)내에 위치철근(FS)을 설치하는 단계; 상기 위치철근(FS) 위에 다수개의 공장제작형 현장타설 팽이파일 집합체 용기(C)를 거치하는 단계; 상기 공장제작형 현장타설 팽이파일 집합체 용기 (C)내에 콘크리트(CC)를 충전하는 단계; 상기 공장제작형 현장타설 팽이파일 집합 체 용기(C)의 사이의 공극에 채움쇄석(CS)을 채우는 단계; 상기 콘크리트(CC)가 충전된 공장제작형 현장타설 팽이파일 집합체 용기(C)의 상면을 연결철근(JS)으로 배근 및 결속하는 단계로 이루어진다. As shown in these drawings, the combined foundation method using the factory-made field-inverted top pile collecting container according to the present invention comprises at least two top piles P which are joined to form one set of factory- Forming an aggregate container (C); Forming a predetermined space S by excavating the ground to be installed with the factory-built type field-standing top pile collecting container C at a predetermined depth; Installing a position reinforcing bar (FS) in the space (S); Placing a plurality of factory-made on-site top-mounted topsheet collection containers (C) on the position bar (FS); Filling the concrete (CC) in the factory-built type top-mounted topsheet pile collecting container (C); Filling the pores between the factory-built type field-standing top pile collecting container (C) with a filling crushed stones (CS); And a step of arranging and binding the upper surface of the factory-made, site-installed top-mounted tops collection container C filled with the concrete CC with the connection reinforcing bars JS.

즉, 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기를 이용한 복합기초공법은 응력분산효과를 기대할 수 있는 45도 면의 팽이부(10)와 측방 유동억제를 고려할 수 있는 뿌리형의 파일본체부(20) 및 파일선단부(30)로 구성된 팽이파일(P)을 2개 이상을 공장에서 결합하여 1셋트의 현장타설 팽이 집합체(C)를 제작한 후, 이를 현장에 반입한 후, 현장타설 팽이 집합체(C)를 포설된 위치철근(FS)의 시공위치에 거치한 다음, 공장제작형 현장타설 팽이파일 집합체 용기(C)의 용기 내에 일반콘크리트(CC)나 조강콘크리트 또는 쇄석 그라우트를 충전하여 고결시킨 후, 공극에 채움쇄석(CS)을 충전하여 다짐하고 연결철근(JS)을 배근 및 결속하여 기초부를 시공하는 것이다.In other words, the combined foundation method using the factory-made site-struck top pile collecting container according to the present invention includes a top part (10) with a 45-degree surface in which a stress dispersion effect can be expected, and a root- Two or more top files P constituted by the unit 20 and the file distal end portion 30 are assembled at a factory to produce one set of the field stagnant top aggregate C and then brought into the field, (CC), crude steel concrete, or crushed stone grout is filled in the container of the factory-made site-standing top pile collecting container (C) after the top aggregate (C) After consolidation, the pores are filled with filled crushed stones (CS) and reinforced with connecting reinforcing bars (JS) to bond and bind the foundations.

따라서, 상기한 바와 같은 구성 및 시공으로 이루어진 공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법은 공장에서 각각의 팽이파일(P)을 적어도 2개 이상을 접합하여 하나의 현장타설 팽이파일 집합체 용기를 제작하고 현장으로 반입후 시공함으로써 현장반입의 용이성과 간편한 시공성이 있는 작용효과가 있다.Therefore, the factory-built, field-inverted top pile collecting container having the above-described construction and construction, and the composite basic pile manufacturing method using the same can be manufactured by joining at least two top piles (P) There is an action effect with ease of site bringing and easy workability by constructing the container of collective body and putting it in the field after construction.

이상에서 설명한 바와 같이, 본 발명에 따른 공장제작형 현장타설 팽이파일 집합체 용기 및 이를 이용한 복합기초공법은 개별적으로 시공하는 팽이파일을 4개 또는 적절한 개수로 묶어서 하나의 공장제작형 현장타설 팽이파일 집합체 용기를 제작하고, 이를 현장에서로 시공함으로써 팽이파일 집합체 용기의 시공성과 경제성 및 안정성을 확보할 수 있는 이점이 있다.As described above, according to the present invention, there is provided a factory-built on-site top-mounted top pile assembly container and a combined basic construction method using the same, wherein the top-mounted pile files are bundled into four or an appropriate number, The container can be manufactured, and the container can be installed in the field so that the workability, economical efficiency and stability of the container for the top pile can be secured.

Claims (2)

상광하협으로 형성됨과 동시에 가운데 속이 빈 중공으로 형성되는 팽이부(10)와, 상기 팽이부(10)의 하부로 소정의 길이가 연장됨과 동시에 속이 빈 중공으로 형성되는 파일본체부(20)와, 상기 파일본체부(20)의 하단부로부터 일정한 각도로 단면이 축소 형성되는 파일선단부(30)로 구성되는 팽이파일(P)에 있어서,A pile portion 10 which is formed as a hollow upper end and which is formed hollow hollow at the center, a pile main body portion 20 having a hollow portion formed with a predetermined length extending to the lower portion of the pile portion 10, And a file tip end portion (30) whose cross section is reduced at a predetermined angle from a lower end portion of the file main body portion (20) 적어도 2개 이상의 팽이파일(P)이 접합되어 결합부(40)가 형성되며, 상기 결합부(40)의 좌우로 받침판(50)이 접합 결합됨을 특징으로 하는 공장제작형 현장타설 팽이파일 집합체 용기.Wherein at least two top files (P) are joined to form an engaging portion (40), and a receiving plate (50) is joined to the left and right of the engaging portion (40) . 삭제delete
KR1020060012720A 2006-02-09 2006-02-09 Cast in place and fabricated type top base set case and it's reinforced complex foundation method KR100748204B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060012720A KR100748204B1 (en) 2006-02-09 2006-02-09 Cast in place and fabricated type top base set case and it's reinforced complex foundation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060012720A KR100748204B1 (en) 2006-02-09 2006-02-09 Cast in place and fabricated type top base set case and it's reinforced complex foundation method

Publications (1)

Publication Number Publication Date
KR100748204B1 true KR100748204B1 (en) 2007-08-09

Family

ID=38602521

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060012720A KR100748204B1 (en) 2006-02-09 2006-02-09 Cast in place and fabricated type top base set case and it's reinforced complex foundation method

Country Status (1)

Country Link
KR (1) KR100748204B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100913346B1 (en) * 2007-08-13 2009-08-21 문형록 Ground reinforcing method using pile and top pile reinforcing member
KR100913347B1 (en) * 2007-08-13 2009-08-21 문형록 Ground reinforcing method using top pile
KR101750177B1 (en) * 2015-11-16 2017-06-22 한국건설기술연구원 Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same
CN112359816A (en) * 2020-11-05 2021-02-12 中铁十局集团第三建设有限公司 Construction method for treating gyroscope pile on soft foundation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980078096A (en) * 1997-04-25 1998-11-16 히로요시 이이즈까 Basic structure by top type block assembly
KR19990015428U (en) * 1997-10-16 1999-05-15 김수관 Ground construction file

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980078096A (en) * 1997-04-25 1998-11-16 히로요시 이이즈까 Basic structure by top type block assembly
KR19990015428U (en) * 1997-10-16 1999-05-15 김수관 Ground construction file

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100913346B1 (en) * 2007-08-13 2009-08-21 문형록 Ground reinforcing method using pile and top pile reinforcing member
KR100913347B1 (en) * 2007-08-13 2009-08-21 문형록 Ground reinforcing method using top pile
KR101750177B1 (en) * 2015-11-16 2017-06-22 한국건설기술연구원 Punching shear stiffening member of cutting bridge type and method for constructing footing using of the same
CN112359816A (en) * 2020-11-05 2021-02-12 中铁十局集团第三建设有限公司 Construction method for treating gyroscope pile on soft foundation

Similar Documents

Publication Publication Date Title
KR101842475B1 (en) Monolithically poured top pile foundation with cast-in-placed lower reinforced part and construction method thereof
CN105401605B (en) Deformation joint structure and its construction method
CN101787708A (en) Integrally-assembled cantilever-type retaining wall and construction method thereof
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
KR100748204B1 (en) Cast in place and fabricated type top base set case and it's reinforced complex foundation method
KR100890828B1 (en) Geosynthetic reinforced soil and reinforced concrete retaining wall
CN106436732B (en) A kind of strip footing is replaced as the reinforcement means and ruggedized construction of raft foundation
KR200185875Y1 (en) Reinforced earth retaining-wall for using sand-bag
CN203411993U (en) Simple and fast retaining wall
CN106164380B (en) Wind-driven generator fabricated base
CN104358202B (en) Road surface structare layer and its paving method
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
KR101370102B1 (en) Cast-in-place type top-pile and construction process of the same
CN103233537B (en) Heavy load overlapping overhead terrace and construction method
JP7101407B2 (en) On-site placement reinforcement top type pile foundation and its construction method
CN103510458B (en) Pile type continuous rigid frame bridge and construction method thereof
KR100799848B1 (en) In place assembling top type block
CN107288153B (en) Prefabricated gravity type barricade
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
KR101111655B1 (en) method for reinforced of soft ground by using top pile
CN207812457U (en) Foundation pit supporting construction and underground structure, basic integrated structure
JP5915074B2 (en) How to form an underground space under a ground transportation
KR100780216B1 (en) Method for constructing a honeycomb-shaped mat
KR100919921B1 (en) Retaining Wall using Panel and Constructing Method thereof
KR100798689B1 (en) Construction method of ground-making using assembling unit of base pile

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120822

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130816

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140724

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee