KR19980011071U - Insulation Plate-Round Plate Assembly for Railway Rail - Google Patents

Insulation Plate-Round Plate Assembly for Railway Rail Download PDF

Info

Publication number
KR19980011071U
KR19980011071U KR2019960024562U KR19960024562U KR19980011071U KR 19980011071 U KR19980011071 U KR 19980011071U KR 2019960024562 U KR2019960024562 U KR 2019960024562U KR 19960024562 U KR19960024562 U KR 19960024562U KR 19980011071 U KR19980011071 U KR 19980011071U
Authority
KR
South Korea
Prior art keywords
plate
rail
shoulders
buffer
insulation
Prior art date
Application number
KR2019960024562U
Other languages
Korean (ko)
Other versions
KR200262565Y1 (en
Inventor
허영준
Original Assignee
허영준
팬드롤-대원주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 허영준, 팬드롤-대원주식회사 filed Critical 허영준
Priority to KR2019960024562U priority Critical patent/KR200262565Y1/en
Publication of KR19980011071U publication Critical patent/KR19980011071U/en
Application granted granted Critical
Publication of KR200262565Y1 publication Critical patent/KR200262565Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/68Pads or the like, e.g. of wood, rubber, placed under the rail, tie-plate, or chair
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/38Indirect fastening of rails by using tie-plates or chairs; Fastening of rails on the tie-plates or in the chairs
    • E01B9/44Fastening the rail on the tie-plate
    • E01B9/46Fastening the rail on the tie-plate by clamps
    • E01B9/48Fastening the rail on the tie-plate by clamps by resilient steel clips
    • E01B9/483Fastening the rail on the tie-plate by clamps by resilient steel clips the clip being a shaped bar
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2201/00Fastening or restraining methods
    • E01B2201/08Fastening or restraining methods by plastic or elastic deformation of fastener

Landscapes

  • Engineering & Computer Science (AREA)
  • Railway Tracks (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Abstract

본 고안은 철도레일용 절연판-완충판조립체에 관한 것으로, 침목(14)상에서 레일(10)이 전개되는 위치에 쇼울더(12)(12')가 고정되고 이 쇼울더(12)(12') 사이에 측면요구(15)가 형성된 판상의 완충판(16)을 전개하여 레일(10)을 전개하고 쇼울더(12)(12')와 레일(10)의 저면플랜지(18) 사이에 하향턱(22)이 삽입되는 절연판(20)을 배치하여 레일고정클립(24)으로 고정토록 한다. 본 고안에 따라서 완충판(16)의 측면요구(15)에 다시 내측으로 걸림요구(28)를 형성하고 절연판(20)의 하향턱(22)에 하향연장부(30)를 형성하여 완충판(16)의 걸림요구(28)에 결합토록 한다.The present invention relates to an insulation plate-buffer plate assembly for railway rails, in which a shoulder 12, 12 'is fixed at a position at which a rail 10 is deployed on a sleeper 14, and between the shoulders 12, 12'. The plate-shaped buffer plate 16 having the side demands 15 is developed to deploy the rail 10, and the lower jaw 22 is disposed between the shoulders 12 and 12 ′ and the bottom flange 18 of the rail 10. Place the insulating plate 20 to be inserted to be fixed to the rail fixing clip (24). According to the present invention, the locking demand 28 is formed on the side surface 15 of the buffer plate 16 and the downward extension part 30 is formed on the lower jaw 22 of the insulating plate 20. It is to be coupled to the locking demand (28).

Description

철도레일용 절연판-완충판조립체Insulation Plate-Round Plate Assembly for Railway Rail

제 1도는 본 고안을 이용하여 레일조정클립으로 철도레일을 침목에 고정하는 것을 보인 분해사시도1 is an exploded perspective view showing the railroad rail fastening rail to the sleeper using the present invention

제 2도는 본 고안의 분리사시도2 is an exploded perspective view of the present invention

제 3도는 본 고안의 결합시 절연판과 완충판의 상대위치를 보인 단면도3 is a cross-sectional view showing the relative position of the insulating plate and the buffer plate in the combination of the subject innovation

제 4도는 본 고안의 사용상태 단면도4 is a cross-sectional view of the use state of the present invention

*도면의 주요부분에 대한 부호설명** Description of Signs of Main Parts of Drawings *

10…레일14…침목10... Rail 14.. sleeper

15…측면요구16…완충판15... Side requirements 16... Buffer plate

18…저면플랜지20…절연판18... Bottom flange 20.. Insulation plate

22…하향턱28…걸림요구22... Lower jaw 28... Jam request

30…하향연장부30... Downward extension

본 고안은 철도레일용 절연판-완충판조립체에 관한 것으로, 철도레일과 침목 사이에 전개되는 완충판에 레일고정클립의 탄지부가 결합되는 절연판이 결합될 수 있도록 하여 완충판에 대한 절연판의 위치선정이 정확히 이루어지도록 하고 절연판이 레일의 길이방향으로 유동하는 것을 방지할 수 있도록 한 철도레일용 절연판-완충판조립체에 관한 것이다.The present invention relates to an insulation plate-buffer plate assembly for a railroad rail, so that an insulation plate coupled with a finger joint of a rail fixing clip can be coupled to a buffer plate that is developed between a railroad rail and a sleeper so that the positioning of the insulation plate with respect to the buffer plate can be made accurately. And it relates to an insulation plate-buffer plate assembly for railway rails to prevent the insulation plate from flowing in the longitudinal direction of the rail.

일반적으로 소위 e클립으로 불리는 레일고정클립을 사용하여 레일을 침목에 고정토록 한 것에 있어서는 침목의 양측에 레일이 지나는 위치에 한쌍의 대향된 쇼울더 앵커가 매입고정되며 쇼울더 앵커 사이에 레일과 침목 사이의 충격을 완화시키기 위한 완충판이 전개되며 이 완충판상에 레일이 전개된 후에 쇼울더와 레일의 저면플랜지 사이에 ㄱ자형의 절연판이 개재된 후에 e클립, 즉 레일고정클립이 쇼울더에 결합되고 선단탄지부가 절연판을 통하여 레일의 저면플랜지를 탄력적으로 지지고정할 수 있게 되어 있다. 여기에서, 완충판은 대체로 판상의 형태로 표면과 이면에 완충효과를 얻기 위한 돌기나 요구가 배열되어 있으며, 양측에는 쇼율더가 삽입되는 측면요구가 형성되어 있는 형태로 되어 있다. 그리고 절연판은 잘 열려진 바와 같이 대체로 측면 형상시 ㄱ자의 형상이며 배면에 쇼울더에 결합되는 결합요구를 가지고 전면부가 레일의 저면플랜지상에 얹히는 형태로 되어 있다. 이러한 절연판은 쇼울더와 레일의 저면플랜지 사이에 결합되어 레일고정클립이 결합시 레일의 저면플랜지와 레일고정클립 사이의 절연을 돕고 또한 레일고정클립의 선단탄지부가 효과적으로 레일저면플랜지를 가압할 수 있도록 한다. 그러나, 현재에 레일전개 및 고정작업이 자동화되고 있는 추세에 있으며, 작업성을 높이기 위하여 각기 독립된 완충판과 절연판은 이들의 전개시에 서로 기계적으로 결합되어 완충판에 대한 절연판의 초기위치선정이 간편히 이루어지도록 하는 한편, 절연판의 초기위치선정 후와 절연판의 고정 후에 절연판이 물리적인 외부의 힘에 의하여 레일의 길이방향으로 이동되는 것이 방지되도록 하는 것이 좋다.In the case where a rail is fixed to a sleeper using a rail fixing clip, commonly referred to as an e-clip, a pair of opposed shoulder anchors are secured to a position where the rail passes through both sides of the sleeper, and between the rail and the sleeper between the shoulder anchors. A shock absorbing plate is developed to alleviate the impact, and after the rail is deployed on the shock absorbing plate, an L-shaped insulating plate is interposed between the shoulder and the bottom flange of the rail. Through the bottom flange of the rail can be elastically supported and fixed. Here, the buffer plate is generally in the form of a plate, and protrusions or demands for obtaining a buffer effect are arranged on the front and back surfaces thereof, and sides are formed on both sides to form side requests for inserting show rates. And the insulation plate is generally in the shape of the letter 'A' when the side is opened, and has a coupling request coupled to the shoulder on the back, and the front part is mounted on the bottom flange of the rail. This insulation plate is coupled between the shoulder and the bottom flange of the rail to help insulate between the bottom flange of the rail and the rail fixing clip when the rail fixing clip is coupled, and also to allow the tip of the rail fixing clip to pressurize the rail bottom flange effectively. . However, in the current trend of automating the rail deployment and fixing, in order to improve the workability, the independent buffer plates and the insulating plates are mechanically coupled to each other at the time of their deployment, so that the initial positioning of the insulating plates relative to the buffer plates can be easily performed. On the other hand, it is good to prevent the insulation plate from moving in the longitudinal direction of the rail by physical external force after initial positioning of the insulation plate and after fixing the insulation plate.

본 고안에 있어서는 종래의 이와 같은 점을 감안하여 안출한 것으로, 완충판의 측면요구 내에 걸림요구를 형성하고 레일의 저면플랜지의 측면에 접하는 절연판의 하향턱 중앙에 하향연장부를 형성하여 절연판의 하향연장부가 완충판의 걸림요구 내에 삽입결합되게 하므로써 초기 완충판의 위치선정이 용이하게 이루어질 수 있도록 하는 한편 설치완료 후에는 절연판이 완충판에 대하여 레일방향의 측방향이동이 방지될 수 있도록 한 것인 바, 이를 첨부도면에 의거하여 보다 상세히 설명하면 다음과 같다.In the present invention, in view of such a conventional point of view, the draw extension is formed in the center of the lower jaw of the insulating plate to form a latching request in the side request of the buffer plate and abut the side of the bottom flange of the rail to extend the downward extension of the insulating plate The insertion of the shock absorbing plate into the locking demands facilitates the initial positioning of the shock absorbing plate, and after completion of installation, the insulating plate prevents lateral movement of the rail with respect to the shock absorbing plate. In more detail based on the following.

레일(10)이 전개되는 위치에 양측으로 쇼울더(12)(12')가 고정되는 침목(14)상에 쇼울더(12)(12')측으로 삽입되게 측면요구(15)가 형성된 판상의 완충판(16)을 전개하고 완충판(16)상에 레일(10)의 저면플랜지(18)가 얹히도록 레일(10)을 전개한 다음 쇼울더(12)(12')와 레일(10)의 저면플랜지(18) 사이에 절연판(20)의 하향턱(22)이 삽입되게 저면플랜지(18)상에 절연판(20)을 배치하고 쇼울더(12)(12')에 레일고정클립(24)을 결합하여 그 선단탄지부(26)가 절연판(20)상에서 레일(10)의 저면플랜지(18)를 탄력적으로 가압고정토록 한 것에 있어서, 완충판(16)의 측면요구(15)에 다시 내측으로 걸림요구(28)를 형성하고 절연판(20)의 하향턱(22)에는 하향연장부(30)를 형성하여 완충판(16)의 걸림요구(28)에 결합토록 하여서된 구조이다.A plate-shaped buffer plate in which the side demands 15 are formed so as to be inserted into the shoulders 12 and 12 'on the sleepers 14 on which the shoulders 12 and 12' are fixed to both sides at the position where the rail 10 is deployed ( 16 and deploy rail 10 so that bottom flange 18 of rail 10 rests on buffer plate 16, and then shoulder 12, 12 'and bottom flange 18 of rail 10. The insulation plate 20 is disposed on the bottom flange 18 so that the lower jaw 22 of the insulation plate 20 is inserted between the ends of the insulation plate 20, and the rail fixing clip 24 is coupled to the shoulders 12 and 12 ′. In the case in which the tungsten part 26 elastically presses and fixes the bottom flange 18 of the rail 10 on the insulating plate 20, the demand 28 is latched back to the side demand 15 of the buffer plate 16. And a downward extension portion 30 on the lower jaw 22 of the insulating plate 20 to be coupled to the locking demand 28 of the buffer plate 16.

이와 같은 본 고안은 침목(14)의 쇼울더(12)(12') 사이에 완충판(16)을 전개하여 레일(10)을 전개하고, 레일고정클립(24)을 결합하기 전에 절연판(20)을 배치하게 된다. 이때에 절연판(20)은 그 하향턱(22)이 쇼울더(12)(12')와 레일(10)의 저면플랜지(18) 사이에 삽입되며, 하향턱(22)에서 다시 하측으로 연장된 하향연장부(30)가 완충판(16)의 측면요구(15) 내에 형성된 걸림요구(28)에 삽입되어 절연판(20)의 위치선정이 정확하게 이루어지며 절연판(20)의 설치중 또는 설치 후에 레일고정클립(24)이 결합되었을 때에 이 절연판(20)이 측방향으로 이동되는 것이 방지되는 효과가 있다.The present invention develops the rail 10 by deploying the buffer plate 16 between the shoulders 12 and 12 'of the sleeper 14, and the insulating plate 20 before the rail fixing clip 24 is coupled. Will be deployed. At this time, the insulating plate 20 is inserted between the shoulder 12, 12 'and the bottom flange 18 of the rail 10, the lower jaw 22, the downwardly extending downward from the lower jaw (22) The extension part 30 is inserted into the locking demand 28 formed in the side demand 15 of the shock absorbing plate 16 so that the positioning of the insulating plate 20 can be accurately performed, and the rail fixing clip is installed during or after the installation of the insulating plate 20. When the 24 is engaged, the insulating plate 20 is prevented from moving laterally.

Claims (1)

침목(14)상에서 레일(10)이 전개되는 위치에 쇼울더(12)(12')가 고정되고 이 쇼울더(12)(12') 사이에 측면요구(15)가 형성된 판상의 완충판(16)을 전개하여 레일(10)을 전개하고 쇼울더(12)(12')와 레일(10)의 저면플랜지(18) 사이에 하향턱(22)이 삽입되는 절연판(20)을 배치하여 레일고정클립(24)으로 고정토록 한 것에 있어서, 완충판(16)의 측면요구(15)에 다시 내측으로 걸림요구(28)를 형성하고 절연판(20)의 하향턱(22)에 하향연장부(30)를 형성하여 완충판(16)의 걸림요구(28)에 결합토록 하여서된 철도레일용 절연판-완충판조립체.On the sleepers 14, the shoulders 12, 12 'are fixed to the position where the rail 10 is deployed, and the plate-shaped buffer plate 16 having the side demands 15 formed between the shoulders 12, 12'. Unfold the rail 10 and deploy the insulating plate 20 into which the lower jaw 22 is inserted between the shoulders 12, 12 ′ and the bottom flange 18 of the rail 10. ), The locking demand 28 is formed on the side surface 15 of the buffer plate 16 and the downward extension 30 is formed on the lower jaw 22 of the insulating plate 20. Insulation plate-buffer plate assembly for railway rails, which is adapted to be coupled to a locking demand (28) of the buffer plate (16).
KR2019960024562U 1996-08-16 1996-08-16 Insulation Plates for Railway Rails-Buffer Plate Assembly KR200262565Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019960024562U KR200262565Y1 (en) 1996-08-16 1996-08-16 Insulation Plates for Railway Rails-Buffer Plate Assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019960024562U KR200262565Y1 (en) 1996-08-16 1996-08-16 Insulation Plates for Railway Rails-Buffer Plate Assembly

Publications (2)

Publication Number Publication Date
KR19980011071U true KR19980011071U (en) 1998-05-25
KR200262565Y1 KR200262565Y1 (en) 2002-06-20

Family

ID=53972646

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019960024562U KR200262565Y1 (en) 1996-08-16 1996-08-16 Insulation Plates for Railway Rails-Buffer Plate Assembly

Country Status (1)

Country Link
KR (1) KR200262565Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001036749A1 (en) * 1999-11-18 2001-05-25 Lee, Gye, Jun Support for supporting rail of railway
KR20140137340A (en) * 2011-12-19 2014-12-02 에이치에프 홀딩 에스.에이. Rail pad with seal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001036749A1 (en) * 1999-11-18 2001-05-25 Lee, Gye, Jun Support for supporting rail of railway
KR20140137340A (en) * 2011-12-19 2014-12-02 에이치에프 홀딩 에스.에이. Rail pad with seal

Also Published As

Publication number Publication date
KR200262565Y1 (en) 2002-06-20

Similar Documents

Publication Publication Date Title
JP4887381B2 (en) Railway rail fixing clip
US20040056108A1 (en) Railway rail fastening clip and assembly
US6702192B2 (en) Rail retaining device
DE69422170D1 (en) IMPROVED RAILWAY SLEEPER
KR200262565Y1 (en) Insulation Plates for Railway Rails-Buffer Plate Assembly
TW410245B (en) Fastening structure of base plate used for a railway switch
KR101822572B1 (en) cover of a protective wall
RU2392364C2 (en) Insulator for rail anchor
KR20110009373U (en) installation structure of railway
KR20000007605U (en) Railroad Fastening Plate
JP4189533B2 (en) Elastic rail fastening device
RU60085U1 (en) Rail fastening
JPH11124803A (en) Rail elastic clamping device
KR100268160B1 (en) A device for fastening rail of rail way
KR100661608B1 (en) Elastic device for fastening rails to crossties on railroad tie
KR101070641B1 (en) Rail fastening plate
KR200322037Y1 (en) Apparatus for coupling insulating rail joint using a concrete sleeper
KR830001191Y1 (en) Hanging door of railway rail fixed spring creep
KR200236034Y1 (en) crossway resisting power reinforcement device for a sleeper of railroad
KR200197752Y1 (en) Apparatus of expansion connect in railway rails
KR0121796Y1 (en) Clips for fastening rails on sleeper
KR20240099955A (en) Current blocking device between girder and rail
KR100611675B1 (en) The rail and linking construction
KR200362099Y1 (en) Clip for fixing rails
CZ277098A3 (en) Mechanism for attaching rail to wooden railway sleepers

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20110107

Year of fee payment: 10

EXPY Expiration of term