KR102489400B1 - Smart supervision and construction project management system for efficient construction management - Google Patents

Smart supervision and construction project management system for efficient construction management Download PDF

Info

Publication number
KR102489400B1
KR102489400B1 KR1020220122947A KR20220122947A KR102489400B1 KR 102489400 B1 KR102489400 B1 KR 102489400B1 KR 1020220122947 A KR1020220122947 A KR 1020220122947A KR 20220122947 A KR20220122947 A KR 20220122947A KR 102489400 B1 KR102489400 B1 KR 102489400B1
Authority
KR
South Korea
Prior art keywords
supervision
terminal
unit
construction
report
Prior art date
Application number
KR1020220122947A
Other languages
Korean (ko)
Inventor
방재웅
Original Assignee
방재웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 방재웅 filed Critical 방재웅
Priority to KR1020220122947A priority Critical patent/KR102489400B1/en
Application granted granted Critical
Publication of KR102489400B1 publication Critical patent/KR102489400B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/13Receivers
    • G01S19/14Receivers specially adapted for specific applications
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B17/00Fire alarms; Alarms responsive to explosion
    • G08B17/12Actuation by presence of radiation or particles, e.g. of infrared radiation or of ions
    • G08B17/125Actuation by presence of radiation or particles, e.g. of infrared radiation or of ions by using a video camera to detect fire or smoke
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Abstract

The present invention relates to a smart supervision and construction project management system for efficient construction management. The smart supervision and construction project management system for efficient construction management comprises: a connection part allowing a terminal for information delivery and an external device for image acquisition for a construction site to be connected thereto to transmit data; a supervisor checklist and schedule notification part providing a checklist, a supervision schedule, and a construction regulation required for supervision for a terminal of a supervisor connected to the connection part; an information reception recording part checking a construction site in real time by providing an image transmitted from the external device for the terminal, and storing the image; a report writing part using information inputted from the terminal of the supervisor and an image provided from the external device to write a supervision report, a measurement report, and a quality certificate, notifying the terminal of the supervisor of report writing in accordance with legal report time, and providing a written report for a designated terminal; and a database part storing a checklist and a supervision schedule provided by the supervisor checklist and schedule notification part, an image provided by the information reception recording part, and a supervision report and a quality certificate written by the report writing part for each construction site. According to the present invention, photographs, videos, and documents acquired at a supervision site can be easily recorded and managed, thereby easily and efficiently performing and managing supervision.

Description

효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템{Smart supervision and construction project management system for efficient construction management}Smart supervision and construction project management system for efficient construction management}

본 발명은 스마트 감리 및 건설사업관리시스템에 관한 것으로서, 보다 상세하게는 감리 현장에서 획득되는 사진, 동영상 및 문서 등의 기록과 관리가 용이하도록 하고, 이로 인해 감리의 효율적인 수행 및 관리가 용이하도록 하는 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 관한 것이다.The present invention relates to a smart supervision and construction project management system, and more particularly, to facilitate the recording and management of photos, videos, and documents obtained from the supervision site, thereby facilitating efficient execution and management of supervision It is about smart supervision and construction project management system for efficient construction management.

일반적으로, 건축 공사는 많은 시간, 인력 및 비용이 소요되는 일로서, 그 관리 여하에 따라 공사의 완성도 뿐만 아니라, 공사 비용도 크게 차이가 나는 대규모 종합 프로젝트 업무영역에 해당된다.In general, construction work takes a lot of time, manpower, and cost, and corresponds to a large-scale comprehensive project business area in which not only the completion of the construction work but also the construction cost varies greatly depending on how it is managed.

건축 공사는 법에서 정하는 바에 따라 건축물 및 건축 설비 또는 공작물이 설계도서의 내용대로 제대로 시공되는지 여부를 확인하고, 품질 관리, 공정(공사 일정) 관리 및 안전 관리 등에 대하여 지도 및 감독하도록 하는 감리를 필요로 하는데, 이에는 비상주감리, 상주감리, 책임감리로 구분되어 있다.Construction work requires supervision to ensure that buildings and construction facilities or structures are properly constructed according to the design documents, and to guide and supervise quality control, process (construction schedule) management, and safety management, etc., as prescribed by law. It is divided into non-resident supervision, resident supervision, and responsible supervision.

이러한 감리는 사업주의 기업 이념 반영, 설계자의 설계 의도 반영, 사업주 및 시공자에게 각종 기술 및 자재에 대한 자문, 사업주와 시공자 간의 이해관계 조정 등의 역할을 수행하게 되는데, 사업주에게 해당 프로젝트가 정해진 공기 및 예산 내에서 가장 바람직한 품질로 완성된다는 확신의 제공과, 시공하는 모든 프로젝트의 품질 향상을 위한 기술 축적 등을 기본적인 목표로 하고 있다.This supervision serves the role of reflecting the business owner's corporate ideology, reflecting the design intention of the designer, consulting on various technologies and materials to the business owner and constructor, and adjusting the interests between the business owner and the constructor. The basic goal is to provide assurance that the project will be completed in the most desirable quality within the budget and to accumulate technology to improve the quality of all construction projects.

최근에는 정보 및 통신 산업의 발달로 인해, 감리의 업무 효율과 건축주의 요구를 충족시키기 위한 기술이 개발되고 있는데, 이와 관련된 종래 기술로서, 한국등록특허 제10-2148367호의 "모바일 기술을 활용한 건축 현장 감리 및 보안 시스템"이 제시된 바 있는데, 이는 공사가 진행중인 건축물 내측 공간 전체를 촬영하도록 건축물 내측에 설치되며, 사물이 움직이는 경우에 사물감지신호를 생성하는 제1모션센서를 포함하는 360도카메라; 상기 360도카메라와 결합되어 상기 360도카메라를 지지하는 카메라지지대; 공사가 진행중인 건축물 내측 공간 전체를 투광하도록 건축물 내측에 설치되며, 사물이 움직이는 경우에 사물감지신호를 생성하는 제2모션센서를 포함하는 360도조명; 상기 360도조명과 결합되어 상기 360도조명을 지지하는 조명지지대; 상기 360도카메라가 촬영한 영상을 입력받아 저장하되 상기 건축물 내측에서 공종별 작업 진행상황을 원격으로 촬영하여 공종별 원격 영상정보로 저장하는 원격감리모드, 상기 360도카메라가 촬영한 영상을 입력받아 저장하되 상기 건축물 내측에서 공종별 작업 진행상황을 수동으로 촬영하여 공종별 수동 영상정보로 저장하는 수동감리모드 및, 상기 360도카메라가 상기 360도조명과 연동하여 사물을 촬영하되 상기 360도조명이 상기 제2모션센서가 감지한 사물감지신호에 따라 움직이는 사물에 광을 조사한 상태에서 상기 360도카메라가 상기 제1모션센서가 감지한 사물감지신호에 따라 사물을 촬영하도록 하는 보안모드를 포함하는 감리자료서버; 및 상기 감리자료서버와 연동하여 상기 원격감리모드와 상기 수동감리모드 및 상기 보안모드를 가운데 어느 하나의 모드가 실행되도록 상기 감리자료서버를 제어하는 관리자단말;을 포함한다.Recently, due to the development of the information and communication industries, technologies for meeting the work efficiency of supervision and the needs of building owners have been developed. A "site supervision and security system" has been proposed, which is installed inside the building to photograph the entire inner space of the building under construction, and includes a 360-degree camera including a first motion sensor that generates an object detection signal when an object moves; a camera support coupled to the 360-degree camera to support the 360-degree camera; 360-degree lighting installed inside the building to transmit light to the entire inner space of the building under construction and including a second motion sensor that generates an object detection signal when an object moves; a lighting support that is coupled with the 360-degree lighting and supports the 360-degree lighting; A remote supervision mode in which the image taken by the 360-degree camera is input and stored, but the work progress by work type is remotely filmed from inside the building and stored as remote image information by work type, and the image taken by the 360-degree camera is input and stored A manual supervision mode in which the work progress for each work type is manually photographed inside the building and stored as manual video information for each work type, and the 360-degree camera photographs objects in conjunction with the 360-degree lighting, but the 360-degree lighting is the second motion sensor a supervision data server including a security mode allowing the 360-degree camera to photograph an object according to the object detection signal detected by the first motion sensor in a state in which light is irradiated to a moving object according to the detected object detection signal; and a manager terminal for controlling the supervision data server to execute any one of the remote supervision mode, the manual supervision mode, and the security mode in conjunction with the supervision data server.

그러나, 종래 기술은 단지 진행상황에 대한 영상과 보안에 대한 기능만을 구현함으로써, 감리로서 요구되는 여러 가지 기능 뿐만 아니라, 건축에 유용한 기능을 제공하는데 한계를 가지는 문제점을 가지고 있었다. 특히, 건축물의 신축, 증축, 리모델링이 활발해짐으로써, 감리의 중요성이 증가하고 있고, 모든 감리 현장의 기록이 중요해짐에도, 감리자의 노령화 및 건설 예산 한계 문제로 인하여, 기존의 감리 방식으로는 효율적인 관리가 어렵다는 문제점을 가지고 있었다.However, the prior art has a problem in that it has limitations in providing functions useful for construction as well as various functions required for supervision by implementing only functions for video and security for progress. In particular, as new construction, extension, and remodeling of buildings become more active, the importance of supervision is increasing, and even though records of all supervision sites become important, due to aging of supervisors and limitations in construction budgets, existing supervision methods are efficient It had problems with management.

상기한 바와 같은 종래 기술의 문제점을 해결하기 위하여, 본 발명은 감리 현장에서 획득되는 사진, 동영상 및 문서 등의 기록과 관리가 용이하도록 하고, 이로 인해 감리의 효율적인 수행 및 관리가 용이하도록 하며, 감리자의 노동 강도를 줄이면서 감리에 대한 만족도를 높이도록 하는데 목적이 있다.In order to solve the problems of the prior art as described above, the present invention facilitates the recording and management of photos, videos and documents obtained at the supervision site, thereby facilitating the efficient execution and management of supervision, and the supervisor The purpose is to increase the satisfaction of supervision while reducing the labor intensity of the supervisor.

또한 본 발명은 빠르게 개정되는 건설 관련 법규를 시스템에 갱신 적용함으로써, 놓치기 쉬운 개정 법률에 대한 체크를 진행하여, 합법적인 건축물 신축 등이 이루어지도록 하는데 목적이 있다.In addition, an object of the present invention is to update and apply rapidly changing construction-related laws and regulations to the system, thereby proceeding with a check on revised laws that are easy to miss, so that legal new construction of buildings and the like can be achieved.

본 발명의 다른 목적들은 이하의 실시례에 대한 설명을 통해 쉽게 이해될 수 있을 것이다.Other objects of the present invention will be easily understood through the description of the following embodiments.

상기한 바와 같은 목적을 달성하기 위해, 본 발명의 일측면에 따르면, 건설 현장에 대한 영상 획득을 위한 외부 기기와 정보 전달을 위한 단말기가 데이터의 전송을 위해 접속하도록 하는 접속부; 상기 접속부에 접속된 감리자의 단말기에 감리에 필요한 체크리스트, 감리 일정 및 건축 법규를 제공하도록 하는 감리자체크리스트및일정알림부; 상기 외부 기기로부터 전송되는 영상을 상기 단말기에 제공함으로써 실시간으로 건설 현장을 확인하도록 하고, 상기 영상을 저장하도록 하는 정보수신기록부; 상기 외부 기기로부터 제공되는 영상과 상기 감리자의 단말기로부터 입력되는 정보를 사용하여 감리보고서, 검측 리스트 및 품질 확인서를 작성하도록 하고, 상기 감리자의 단말기에 법적 보고 시기에 따른 보고서 작성을 알림하며, 작성을 마친 보고서를 정해진 단말기에 제공하도록 하는 보고서작성부; 및 상기 감리자체크리스트및일정알림부에 의해 제공되는 체크리스트 및 감리 일정, 상기 정보수신기록부에 의해 제공되는 영상, 상기 보고서작성부에 의해 작성되는 감리보고서 및 품질 확인서를 건설 현장 별로 저장하도록 하는 데이터베이스부;를 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템이 제공된다.In order to achieve the above object, according to one aspect of the present invention, a connection unit for connecting an external device for image acquisition and a terminal for information transfer to a construction site for transmission of data; a supervision self-list and schedule notification unit for providing a checklist, supervision schedule, and building regulations necessary for supervision to a supervisor's terminal connected to the connection unit; an information reception and recording unit configured to check a construction site in real time by providing the image transmitted from the external device to the terminal and to store the image; Use the video provided from the external device and the information input from the supervisor's terminal to create a supervision report, inspection list, and quality confirmation document, notify the supervisor's terminal of report creation according to the legal reporting period, and prepare a report creation unit to provide a finished report to a designated terminal; and a database for storing the checklist and supervision schedule provided by the supervision self-list and schedule notification unit, the video provided by the information reception recording unit, and the supervision report and quality confirmation document prepared by the report preparation unit for each construction site. There is provided a smart supervision and construction project management system for efficient construction management, including;

상기 외부 기기로부터 제공되는 영상에 대한 영상 처리에 의해 화재를 감지하고, 화재센서의 감지신호를 수신받아 화재를 감지하며, 화재의 감지시 정해진 안전담당의 단말기에 화재 알람을 제공하고, 상기 외부 기기로부터 제공되는 영상에 대한 영상 처리에 의해 작업자가 정해진 보호장구를 착용하지 않은 경우, 감리자의 단말기에 상기 영상과 함께 보호장구 미착용 사실을 제공하는 안전관리알림부를 더 포함할 수 있다.A fire is detected by image processing of the image provided from the external device, a fire is detected by receiving a detection signal from a fire sensor, a fire alarm is provided to a terminal in charge of safety when a fire is detected, and a fire alarm is provided to the external device When the worker does not wear the prescribed protective equipment by image processing of the image provided from, a safety management notification unit may be further included to provide the supervisor's terminal with the fact that the protective equipment is not worn along with the image.

상기 외부 기기로부터 제공되는 영상을 통해서 건설 현장에 대한 실시간 모니터링을 수행하도록 하는 실시간모니터링부; 및 상기 실시간모니터링부에 의한 실시간 모니터링을 위한 장소를 제공하는 스마트CM관제모듈;을 더 포함하고, 상기 스마트CM관제모듈은, 건설 현장과 건설 작업과 관련된 정보를 디스플레이하기 위한 모니터가 다수로 설치되는 관제실과, 서버가 수용되는 서버실이 각각 마련되고, 통신안테나와 경보스피커가 루프에 설치되는 메인구조물; 상기 메인구조물을 지면으로부터 이격시키도록 상기 메인구조물의 하측에 다수로 마련되는 기둥; 및 상기 기둥으로 인해 지면으로부터 이격되는 상기 메인구조물과 상기 지면 사이에 건설 현장에서 사용하는 공정 장비가 수용되도록 마련되는 수용공간;을 포함할 수 있다.a real-time monitoring unit to perform real-time monitoring of the construction site through images provided from the external device; And a smart CM control module providing a place for real-time monitoring by the real-time monitoring unit; further comprising, wherein the smart CM control module has a plurality of monitors installed to display information related to the construction site and construction work. A main structure in which a control room and a server room in which servers are accommodated are provided, respectively, and a communication antenna and an alarm speaker are installed in the roof; A plurality of pillars provided on the lower side of the main structure to separate the main structure from the ground; and an accommodating space provided to accommodate process equipment used at a construction site between the ground and the main structure spaced apart from the ground due to the pillars.

작업자가 휴대하는 출입관리센서를 감지함으로써, 건설 현장에서 정해진 영역에 대한 출입을 허용 및 확인하도록 설치되는 센서감지부의 감지신호를 수신받아, 상기 감리자의 단말기에 작업자의 출입 기록을 제공하는 출입관리부; 및 상기 작업자의 단말기에 마련되는 GPS를 이용하여 확인되는 상기 작업자의 위치 정보와 공정 장비에 마련되는 GPS를 이용하여 확인되는 상기 공정 장비의 위치 정보를 정해진 단말기로부터 요청시 제공하고, 상기 작업자 및 상기 공정 장비를 관리자의 요청에 따라 정해진 위치로 이동하기 위한 정보를 상기 작업자의 단말기 및 상기 공정 장비의 조작자의 단말기에 제공하는 위치관제부;를 더 포함할 수 있다.An access control unit that detects an access control sensor carried by a worker, receives a detection signal from a sensor detection unit installed to permit and confirm access to a designated area at a construction site, and provides a worker's access record to the supervisor's terminal; And providing the location information of the operator confirmed using the GPS provided in the terminal of the worker and the location information of the process equipment confirmed using the GPS provided in the process equipment upon request from a predetermined terminal, It may further include a location control unit that provides information for moving the process equipment to a predetermined location according to a manager's request to the worker's terminal and the process equipment operator's terminal.

건설 현장 내에서 작업자의 단말기에 마련되는 GPS를 이용하여 작업자 각각의 이동 궤적을 추적하는 이동궤적추출부; 상기 이동궤적추출부에 의해 추적하는 이동 궤적 각각에서 작업자가 최장 시간 동안 정지한 최장 시간 영역을 추출하는 최장영역추출부; 상기 최장영역추출부에 의해 각각 추출되는 상기 작업자 각각의 최장 시간 영역이 정해진 개수만큼 겹쳐지는 중첩 영역을 추출하는 중첩영역추출부; 상기 중첩 영역에 대한 작업 영상을 상기 외부 기기에 해당하는 CCTV카메라, 액션캠, 스마트폰, 드론, 스마트헬멧 및 3D 카메라 중에서 일부로부터 획득하는 영상획득부; 상기 영상획득부에 의해 획득되는 영상을 미리 설정된 전문가의 단말기에 제공함과 아울러, 상기 데이터베이스부에 저장하고, 상기 전문가의 단말기로부터 회신된 양부 판정이나 개선 의견을 상기 중첩 영역에서 작업한 작업자의 단말기 각각에 제공함과 아울러, 상기 데이터베이스부에 저장하는 작업개선부; 및 상기 영상획득부에 의해 획득되는 영상으로부터 작업의 종류를 추출하고, 상기 작업의 종류에 해당하는 작업 계획을 추후에 수립시, 상기 최장영역추출부에 의해 산출되는 상기 최장 시간에 개선이 가능하도록 보정한 시간을 작업 소요 시간으로 사용하도록 하는 계획보정부;를 더 포함할 수 있다.A movement trajectory extraction unit for tracking the movement trajectory of each worker using GPS provided in the terminal of the worker in the construction site; a longest area extracting unit extracting a longest time area in which the operator has stopped for the longest time in each of the moving trajectories tracked by the moving trajectory extracting unit; an overlapping region extracting unit extracting overlapping regions overlapping a predetermined number of the longest temporal regions of each operator extracted by the longest region extracting unit; an image acquisition unit that acquires a working image of the overlapping area from some of CCTV cameras, action cams, smart phones, drones, smart helmets, and 3D cameras corresponding to the external devices; The image obtained by the image acquisition unit is provided to the preset expert's terminal, stored in the database unit, and the quality judgment or improvement opinion returned from the expert's terminal is provided to each terminal of the worker who worked in the overlapping area. In addition to providing to, work improvement unit for storing in the database unit; And extracting the type of work from the image acquired by the image acquisition unit, and when establishing a work plan corresponding to the type of work later, to enable improvement in the longest time calculated by the longest area extraction unit. A plan correction unit for using the corrected time as the required work time; may further include.

상기 감리자체크리스트및일정알림부는, 상기 건축 법규에 대한 개정 법률을 업데이트하여, 검측시 개정 법률에 따른 검측체크리스트 및 서류를 검토할 수 있도록 상기 감리자의 단말기에 제공할 수 있다.The supervision self-list and schedule notification unit may update the amended laws for the building regulations and provide the inspection checklist and documents according to the amended laws to the supervisor's terminal so that the inspection checklist and documents according to the amended laws can be reviewed.

상기 단말기로부터 제공되는 공정표를 통해서 파악되는 예정 공정과 현재 공정을 그래프로 비교하여, 지연되는 공사 일정을 확인할 수 있도록 하고, 공사 지연에 대한 개선 대책을 정해진 단말기에 제공하도록 하는 공사일정단축검토부를 더 포함할 수 있다.A construction schedule shortening review unit that compares the scheduled process and the current process identified through the process table provided from the terminal with a graph to check the delayed construction schedule and provides improvement measures for the construction delay to the designated terminal can include

본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 의하면, 감리 현장에서 획득되는 사진, 동영상 및 문서 등의 기록과 관리가 용이하도록 할 수 있고, 이로 인해 감리의 효율적인 수행 및 관리가 용이하도록 할 수 있으며, 감리자의 노동 강도를 줄이면서 감리에 대한 만족도를 높이도록 하고, 공사 일정 체크 후 문제점 검토를 통한 공사 기간의 단축을 위한 공정 관리와, 현장 내 안전 관리와, 제품의 성능과 재료 품질 등의 관리에 대한 효율성을 높이도록 하는 효과를 가진다.According to the smart supervision and construction project management system for efficient construction management according to the present invention, it is possible to easily record and manage photos, videos, documents, etc. obtained from the supervision site, thereby efficiently performing and managing supervision. process management to shorten the construction period through problem review after checking the construction schedule, safety management in the field, and product performance It has the effect of increasing the efficiency of management such as and material quality.

또한 본 발명은 빠르게 개정되는 건설 관련 법규를 시스템에 갱신 적용함으로써, 놓치기 쉬운 개정 법률에 대한 체크를 진행하여, 합법적인 건축물 신축 등이 이루어지도록 하는 효과를 가진다.In addition, the present invention has an effect of enabling a legal construction of new buildings and the like by proceeding with a check on amended laws that are easy to miss by updating and applying construction-related laws and regulations that are rapidly amended to the system.

도 1은 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템을 도시한 구성도이다.
도 2는 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 사용되는 스마트 CM 관제 구조물을 도시한 사시도이다.
도 3은 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 사용되는 스마트 CM 관제 구조물의 내부를 도시한 사시도이다.
도 4는 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 사용되는 스마트 CM 관제 구조물을 도시한 정단면도이다.
도 5는 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 사용되는 스마트 CM 관제 구조물을 도시한 측단면도이다.
도 6은 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 사용되는 스마트 CM 관제 구조물을 도시한 다른 측단면도이다.
1 is a configuration diagram showing a smart supervision and construction project management system for efficient construction work management according to the present invention.
2 is a perspective view showing a smart CM control structure used in a smart supervision and construction project management system for efficient construction management according to the present invention.
3 is a perspective view showing the inside of a smart CM control structure used in a smart supervision and construction project management system for efficient construction management according to the present invention.
4 is a front cross-sectional view showing a smart CM control structure used in a smart supervision and construction project management system for efficient construction management according to the present invention.
5 is a side cross-sectional view showing a smart CM control structure used in a smart supervision and construction project management system for efficient construction management according to the present invention.
6 is another cross-sectional side view showing a smart CM control structure used in a smart supervision and construction project management system for efficient construction management according to the present invention.

본 발명은 다양한 변경을 가할 수 있고, 여러 가지 실시례를 가질 수 있는 바, 특정 실시례들을 도면에 예시하고, 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니고, 본 발명의 기술 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 식으로 이해되어야 하고, 여러 가지 다른 형태로 변형될 수 있으며, 본 발명의 범위가 하기 실시례에 한정되는 것은 아니다. Since the present invention can make various changes and have various embodiments, specific embodiments will be illustrated in the drawings and described in detail. However, this is not intended to limit the present invention to specific embodiments, and should be understood in such a way as to include all changes, equivalents, or substitutes included in the technical spirit and scope of the present invention, and may be modified in various other forms. However, the scope of the present invention is not limited to the following examples.

이하, 첨부된 도면을 참조하여 본 발명에 따른 실시례를 상세히 설명하며, 도면 부호에 관계없이 동일하거나 대응하는 구성요소에 대해서는 동일한 참조 번호를 부여하고, 이에 대해 중복되는 설명을 생략하기로 한다.Hereinafter, embodiments according to the present invention will be described in detail with reference to the accompanying drawings, the same reference numerals will be assigned to the same or corresponding components regardless of reference numerals, and redundant descriptions thereof will be omitted.

도 1은 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템을 도시한 구성도이다.1 is a configuration diagram showing a smart supervision and construction project management system for efficient construction work management according to the present invention.

도 1을 참조하면, 본 발명의 일 실시례에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템(100)은 접속부(101), 감리자체크리스트및일정알림부(102), 정보수신기록부(103), 보고서작성부(104) 및 데이터베이스부(105)를 포함할 수 있다.Referring to FIG. 1, the smart supervision and construction project management system 100 for efficient construction management according to an embodiment of the present invention includes a connection unit 101, a supervision self-list and schedule notification unit 102, and an information reception record unit. (103), a report preparation unit 104 and a database unit 105 may be included.

접속부(101)는 건설 현장에 대한 영상 획득을 위한 외부 기기(1,2,3,4,5,6,24)와 정보 전달을 위한 단말기(11,12,13,14)가 데이터의 전송을 위해 접속하도록 하는데, 특히 단말기(11,12,13,14)와의 접속을 위하여 웹페이지를 제공하는 웹서버를 포함할 수 있다. 접속서버(101)는 외부 기기(1,2,3,4,5,6,24) 및 단말기(11,12,13,14)와의 접속시 본인이나 정당함을 인증받기 위한 아이디 및 패스워드의 입력이나, 공인인증서, 휴대폰 또는 신용카드 등을 이용한 인증 절차 또는 정해진 신호의 입력이나 식별코드 등의 입력 내지 출력 등에 의해 기기 연결을 수행하도록 할 수 있다. 여기서 외부 기기(1,2,3,4,5,6,24)는 영상 획득을 위하여, 촬영 기능을 가진 다양한 기기로서, 예컨대, CCTV카메라(1), 액션캠(2), 스마트폰(3), 드론(4), 스마트헬멧(5), 360도카메라(6) 및 라이다센서를 구비한 3D 카메라(24)일 수 있다. 외부 기기(1,2,3,4,5,6,24)는 개별적으로 통신모듈이 마련됨으로써 접속부(101)에 통신망으로 접속되도록 구성되거나, 별도의 통신장치를 매개로 접속부(101)에 통신망으로 접속되도록 구성될 수 있다. 또한 단말기(11,12,13,14)는 본 발명에서 제공하는 서비스의 수행을 위한 어플리케이션이나 프로그램의 실행에 의해 정해진 프로세스를 수행하도록 하고, 외부 기기와의 통신을 수행하는 스마트폰이나 태블릿 PC 또는 노트북이나 PC 등이 사용될 수 있고, 감리자의 단말기(11), 작업자의 단말기(12), 전문가의 단말기(13) 및 안전담당의 단말기(14)를 비롯하여 다양한 관계자의 단말기가 해당될 수 있다.The connection unit 101 transmits data between the external devices 1, 2, 3, 4, 5, 6, and 24 for acquiring images of the construction site and the terminals 11, 12, 13, and 14 for transmitting information. In particular, it may include a web server that provides a web page for connection with the terminals 11, 12, 13, and 14. The connection server 101 inputs an ID and password to authenticate the user or legitimacy when connecting to external devices (1, 2, 3, 4, 5, 6, 24) and terminals (11, 12, 13, 14). However, device connection may be performed by an authentication procedure using a public certificate, a mobile phone or a credit card, or input or output of a predetermined signal or input or output of an identification code. Here, the external devices 1, 2, 3, 4, 5, 6, and 24 are various devices having a shooting function for image acquisition, for example, a CCTV camera 1, an action cam 2, and a smartphone 3 ), a drone 4, a smart helmet 5, a 360-degree camera 6, and a 3D camera 24 equipped with a lidar sensor. The external devices 1, 2, 3, 4, 5, 6, and 24 are configured to be connected to the connection unit 101 through a communication network by individually providing communication modules, or connected to the connection unit 101 through a communication network through a separate communication device. It can be configured to be connected to. In addition, the terminals 11, 12, 13, and 14 allow a process determined by the execution of an application or program for the execution of the service provided by the present invention, and a smartphone or tablet PC or A laptop computer or PC may be used, and terminals of various stakeholders, including a supervisor's terminal 11, a worker's terminal 12, an expert's terminal 13, and a safety officer's terminal 14, may correspond.

감리자체크리스트및일정알림부(102)는 접속부(101)에 접속된 감리자의 단말기(11)에 감리에 필요한 체크리스트, 감리 일정 및 건축 법규를 제공하도록 한다. 즉 감리자체크리스트및일정알림부(102)는 접속부(101)에 의해 감리자로서 본인 인증을 마친 감리자의 단말기(11)에 요청에 따라 체크리스트, 감리 일정 및 건축 법규를 제공하도록 한다. 여기서, 체크리스트 및 감리 일정은 감리 전문가에 의해 미리 짜여진 여러 종류의 정형화된 체크리스트 및 감리 일정일 수 있고, 감리자의 단말기(11)에 의해 일부가 수정되도록 구성될 수 있다. 정형화된 감리 일정은 감리자의 단말기(11)를 통해서 시기 또는 종기의 설정에 의해 원하는 기간의 감리 일정으로 사용되도록 구성될 수도 있다. 건축 법규는 건축에 관련된 모든 법규가 해당될 수 있고, 최신 개정법으로 업데이트되며, 개정 예정을 부가 내용으로 제공할 수도 있다. The supervision self-list and schedule notification unit 102 provides the supervisor's terminal 11 connected to the connection unit 101 with a checklist, supervision schedule, and building regulations necessary for supervision. That is, the supervision self-list and schedule notification unit 102 provides a checklist, supervision schedule, and building regulations to the terminal 11 of a supervisor who has completed authentication as a supervisor through the connection unit 101, upon request. Here, the checklist and supervision schedule may be various types of standardized checklists and supervision schedules prepared in advance by a supervision expert, and may be configured to be partially modified by the supervisor's terminal 11 . The standardized supervision schedule may be configured to be used as a supervision schedule of a desired period by setting a period or end period through the supervisor's terminal 11 . Building laws and regulations may correspond to all laws and regulations related to construction, be updated to the latest revised laws, and may provide additional content regarding scheduled revisions.

감리자체크리스트및일정알림부(102)는 건축 법규에 대한 개정 법률을 업데이트하여, 검측시 개정 법률에 따른 검측체크리스트 및 서류를 검토할 수 있도록 감리자의 단말기(11)에 제공하도록 할 수 있다. 여기서 검측체크리스트 및 서류는 건축 관련 법규로서 최신 개정 법률에 명시된 검측을 위한 체크리스트와 감리 등에 필요한 각종 서류가 포함될 수 있다.The supervision self-list and schedule notification unit 102 may update the amended laws for building regulations and provide the inspection checklist and documents according to the amended laws to the supervisor's terminal 11 for review during inspection. Here, the inspection checklist and documents are construction-related laws and may include checklists for inspection specified in the latest revised law and various documents required for supervision.

정보수신기록부(103)는 외부 기기(1,2,3,4,5,6,24)로부터 전송되는 영상을 단말기(11,12,13,14)에 제공함으로써 실시간으로 건설 현장을 확인하도록 하고, 영상을 데이터베이스부(105)에 저장하도록 할 수 있다. 따라서, 단말기(11,12,13,14)를 통해서 건설 현장의 모니터링을 가능하도록 할 수 있다. 한편 정보수신기록부(103)는 외부 기기(1,2,3,4,5,6,24)로부터 전송되는 영상을 단말기(11,12,13,14)에 실시간으로 전송하는 것 외에도, 녹화에 의해 제공하도록 구성될 수 있다.The information reception recording unit 103 provides the terminals 11, 12, 13, and 14 with images transmitted from the external devices 1, 2, 3, 4, 5, 6, and 24 to check the construction site in real time, , the image can be stored in the database unit 105. Therefore, it is possible to monitor the construction site through the terminals 11, 12, 13, and 14. On the other hand, the information reception recording unit 103 transmits images transmitted from external devices 1, 2, 3, 4, 5, 6, and 24 to the terminals 11, 12, 13, and 14 in real time, as well as for recording. It can be configured to provide

보고서작성부(104)는 외부 기기(1,2,3,4,5,6,24)로부터 제공되는 영상과 감리자의 단말기(11)로부터 입력되는 정보를 사용하여 감리보고서, 검측 리스트 및 품질 확인서 등을 작성할 수 있고, 감리자의 단말기(11)에 법적 보고 시기에 따른 보고서 작성을 알림하며, 작성을 마친 보고서를 정해진 단말기(미도시)에 제공하도록 할 수 있다. 여기서, 품질 확인서는 시험 성적서, 납품 확인서, 각종 인증서 등이 포함될 수 있다. 법적 보고 시기는 주간보고, 월간보고, 중간보고, 완료보고 등에 대한 각각의 시기로서, 보고서작성부(104)는 이러한 미리 정해진 보고 시기에 대한 정보로부터 시간을 카운트하여 해당 보고 시기를 설정된 시간 전에 감리자의 단말기(11)에 제공하도록 할 수 있다. 또한 보고서를 제공받는 단말기는 통신망을 통해 보고서를 파일로서 제공받도록 할 수 있는데, 예컨대 발주처의 단말기일 수 있다.The report preparation unit 104 uses images provided from external devices 1, 2, 3, 4, 5, 6, and 24 and information input from the supervisor's terminal 11 to obtain a supervision report, inspection list, and quality confirmation document. etc., notify the supervisor's terminal 11 of report creation according to the legal reporting period, and provide the completed report to a designated terminal (not shown). Here, the quality confirmation may include a test report, a delivery confirmation, and various certificates. The legal reporting time is each time for weekly report, monthly report, interim report, final report, etc., and the report preparation unit 104 counts the time from the information on the predetermined reporting time and sets the reporting time to the supervisor before the set time. can be provided to the terminal 11 of In addition, the terminal receiving the report may receive the report as a file through a communication network, and may be, for example, a terminal of an ordering party.

보고서작성부(104)는 외부 기기(1,2,3,4,5,6,24)로부터 제공되는 영상으로부터 추출되는 이미지와 감리자의 단말기(11)로부터 입력되는 내용을 부가하여 보고서를 생성하여 데이터베이스부(105)에 업로드되도록 할 수 있다. 데이터베이스부(105)에 업로드된 감리보고서를 감리자의 단말기(11)나 시공사나 발주자 등의 단말기에 제공할 수 있다. 여기서, 보고서작성부(104)는 외부 기기(1,2,3,4,5,6,24)의 획득 영상으로부터 감리자의 단말기(11)를 통해서 이미지를 추출할 수 있도록 하는 이미지 추출 기능을 부여할 수 있다. 감리보고서는 보고서작성부(104)에 의해, 정해진 내용의 필드에 대한 내용 채움으로 인해 자동으로 정해진 양식으로 생성되도록 구성될 수 있다. The report writer 104 generates a report by adding the image extracted from the video provided from the external devices 1, 2, 3, 4, 5, 6, 24 and the content input from the supervisor's terminal 11. It can be uploaded to the database unit 105. The supervision report uploaded to the database unit 105 may be provided to the supervisor's terminal 11 or a terminal such as a construction company or an owner. Here, the report writer 104 grants an image extraction function to extract images from the acquired images of the external devices 1, 2, 3, 4, 5, 6, 24 through the supervisor's terminal 11. can do. The supervision report may be configured to be automatically generated in a predetermined form by the report writing unit 104 by filling in the contents of the fields of the predetermined contents.

데이터베이스부(105)는 감리자체크리스트및일정알림부(102)에 의해 제공되는 체크리스트 및 감리 일정, 정보수신기록부(103)에 의해 제공되는 영상, 보고서작성부(104)에 의해 작성되는 감리보고서 및 건설 확인서를 건설 현장 별로 저장하고, 필요에 따라 이를 제공하도록 한다. 또한 데이터베이스부(105)는 인증된 단말기(11,12,13,14)에 대한 정보 및 사용자들의 정보, 이 밖에도 본 발명에서 제공하는 기능의 구현에 필요한 각종 데이터나 프로그램을 저장할 수 있다.The database unit 105 includes the checklist and supervision schedule provided by the supervision self-list and schedule notification unit 102, the video provided by the information reception recording unit 103, and the supervision report prepared by the report preparation unit 104. and construction confirmation documents are stored for each construction site and provided as needed. In addition, the database unit 105 may store information on the authenticated terminals 11, 12, 13, and 14, user information, and various other data or programs necessary for implementing the functions provided by the present invention.

본 발명의 일 실시례에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템(100)은 안전관리알림부(106), 실시간모니터링부(107), 스마트CM관제모듈(200; 도 2 참조), 출입관리부(108) 및 위치관제부(109)를 더 포함할 수 있다.Smart supervision and construction project management system 100 for efficient construction management according to an embodiment of the present invention includes a safety management notification unit 106, a real-time monitoring unit 107, and a smart CM control module 200; see FIG. 2 ), an access management unit 108 and a location control unit 109 may be further included.

안전관리알림부(106)는 외부 기기(1,2,3,4,5,6,24)로부터 제공되는 영상에 대한 영상 처리에 의해 화재를 감지할 수 있고, 화재센서(10)의 감지신호를 수신받아 화재를 감지할 수 있으며, 화재의 감지시 정해진 안전담당의 단말기(14)에 화재 알람을 제공할 수 있고, 외부 기기(1,2,3,4,5,6,24)로부터 제공되는 영상에 대한 영상 처리에 의해 작업자가 정해진 보호장구를 착용하지 않은 경우, 감리자의 단말기(11)에 영상과 함께 보호장구 미착용 사실을 제공하도록 할 수 있다. 안전관리알림부(106)는 영상 처리에 의해 작업자가 정해진 색상이나 형태의 헬멧이나 작업복 또는 작업화 등의 미착용을 확인하기 위하여, 영상처리부가 마련될 수 있고, 실시간으로 보장구 미착용을 감시하도록 할 수 있다. 화재센서(10)는 직접 마련되는 통신모듈이나 별도로 마련되는 통신모듈에 의해 접속부(101)와의 통신을 수행하고, 이러한 통신에 의해 화재에 대한 감지신호가 접속부(101)를 통해서 안전관리알림부(106)에 제공되도록 할 수 있다.The safety management notification unit 106 can detect a fire by image processing of images provided from external devices 1, 2, 3, 4, 5, 6, and 24, and the detection signal of the fire sensor 10 A fire can be detected by receiving a fire alarm, and a fire alarm can be provided to the terminal 14 in charge of safety when a fire is detected, and provided from external devices 1, 2, 3, 4, 5, 6, 24. When the worker does not wear the prescribed protective equipment through image processing of the image to be used, the supervisor's terminal 11 may be provided with the image and the fact that the protective equipment is not worn. The safety management notification unit 106 may be provided with an image processing unit to check whether a worker is not wearing a helmet, work clothes, or work shoes of a predetermined color or shape by image processing, and can monitor non-wearing of assistive devices in real time. . The fire sensor 10 performs communication with the connection unit 101 by a communication module provided directly or a communication module provided separately, and the detection signal for the fire is transmitted through the connection unit 101 by this communication to the safety management notification unit ( 106) can be provided.

실시간모니터링부(107)는 외부 기기(1,2,3,4,5,6,24)로부터 제공되는 영상을 통해서 건설 현장에 대한 실시간 모니터링을 수행하도록 할 수 있다. 실시간모니터링부(107)는 영상의 실시간 모니터링 뿐만 아니라, 외부 정보를 제공받아 이를 모니터링하도록 제어할 수 있다. 또한 실시간모니터링부(107)는 건설 현장에서 계측이 필요한 곳에 설치된 계측기(9)에 의해 측정된 값을 접속부(101)를 매개로 통신망을 통해 전달받아 정해진 모니터를 통해서 제공하도록 구성될 수 있다.The real-time monitoring unit 107 may perform real-time monitoring of a construction site through images provided from external devices 1, 2, 3, 4, 5, 6, and 24. The real-time monitoring unit 107 may receive external information and control it to be monitored, as well as real-time monitoring of images. In addition, the real-time monitoring unit 107 may be configured to receive a value measured by the measuring instrument 9 installed in a place where measurement is required at a construction site through a communication network via the connection unit 101 and provide it through a predetermined monitor.

도 2 내지 도 6을 참조하면, 스마트CM관제모듈(200)은 실시간모니터링부(107)에 의한 실시간 모니터링을 위한 장소를 제공하도록 하는데, 이를 위해, 예컨대 메인구조물(210), 기둥(220) 및 수용공간(221)을 포함할 수 있다.Referring to Figures 2 to 6, the smart CM control module 200 is to provide a place for real-time monitoring by the real-time monitoring unit 107, for this purpose, for example, the main structure 210, pillars 220 and An accommodation space 221 may be included.

메인구조물(210)은 건설 현장과 건설 작업과 관련된 정보를 디스플레이하기 위한 모니터(231,232,233,234)가 다수로 설치되는 관제실(211)과, 서버(236)가 수용되는 서버실(212)이 각각 마련되고, 통신안테나(237)와 경보스피커(238)가 루프에 설치될 수 있다. 여기서, 관제실(211)에는 작업자의 업무에 필요한 업무용가구(242)가 설치될 수 있다. The main structure 210 has a control room 211 in which a plurality of monitors 231, 232, 233, 234 are installed to display information related to the construction site and construction work, and a server room 212 in which a server 236 is accommodated, respectively. A communication antenna 237 and an alarm speaker 238 may be installed in the loop. Here, the control room 211 may be installed with business furniture 242 necessary for the worker's work.

메인구조물(210)은 기둥(220)에 의해 2층 높이에 위치하므로, 지면으로부터의 출입이 가능하도록 일측에 스텝(215)이 마련될 수 있고, 출입을 위해 개폐되는 도어(216)와 환기 및 관망을 위한 윈도우(217)가 마련될 수 있다.Since the main structure 210 is located at the height of the second floor by the pillar 220, a step 215 may be provided on one side to allow entry and exit from the ground, and a door 216 that is opened and closed for entry and exit and ventilation and A window 217 for the pipe network may be provided.

메인구조물(210)은 모니터(231,232,233,234)가 CCTV모니터(231), 날씨정보모니터(232), 작업내용모니터(233) 및 공정체크모니터(234)를 포함할 수 있고, 일측에 베드(241)가 설치되는 휴게실(233)이 마련될 수 있다. In the main structure 210, the monitors 231,232,233,234 may include a CCTV monitor 231, a weather information monitor 232, a work content monitor 233, and a process check monitor 234, and a bed 241 on one side A resting room 233 may be provided.

CCTV모니터(231)는 적어도 하나 이상으로 이루어질 수 있고, 실시간모니터링부(107)에 의해 CCTV카메라(1)로부터 제공되는 건설 현장에 대한 영상을 디스플레이하도록 할 수 있다. 날씨정보모니터(232)는 실시간모니터링부(107)에 의해 각종 날씨 정보 제공 시스템으로부터 제공받은 날씨 정보를 디스플레이하도록 할 수 있다. 작업내용모니터(233)는 실시간모니터링부(107)에 의해 데이터베이스부(105)에 미리 저장된 작용내용 정보를 제공받아 디스플레이하도록 할 수 있다. 공정체크모니터(234)는 실시간모니터링부(107)에 의해 데이터베이스부(105)에 미리 저장된 건설 공정을 디스플레이하도록 할 수 있고, 감리자의 단말기(11)나 지정된 작업자의 단말기(12)를 통해서 완료된 공정 정보를 제공받아 현재의 공정 정도 내지 공정 단계를 디스플레이하도록 할 수 있다.The CCTV monitor 231 may be composed of at least one, and may display an image of the construction site provided from the CCTV camera 1 by the real-time monitoring unit 107 . The weather information monitor 232 may display weather information provided from various weather information providing systems by the real-time monitoring unit 107 . The work content monitor 233 may receive and display action content information previously stored in the database unit 105 by the real-time monitoring unit 107 . The process check monitor 234 can display the construction process previously stored in the database unit 105 by the real-time monitoring unit 107, and the process completed through the supervisor's terminal 11 or the designated worker's terminal 12 Information may be provided and the current process level or process step may be displayed.

메인구조물(210)은 건설 현장에서 지정된 장소에 설치되거나, 작업자에게 설치된 기기, 예컨대, 액션캠(2), 드론(4), 스마트헬멧(5), 360카메라(6)의 유지 및 보수를 위한 스마트장비유지보수장비(239)가 마련되는 스마트장비유지보수실(214)이 마련될 수 있다. 여기서, 유지 및 보수는 기기의 충전 뿐만 아니라, 소모품의 교체 또는 간단한 수리 등을 수행하는 작업이 포함될 수 있다.The main structure 210 is installed in a designated place at a construction site or for maintenance and repair of devices installed on workers, such as action cams (2), drones (4), smart helmets (5), and 360 cameras (6). A smart equipment maintenance room 214 in which a smart equipment maintenance equipment 239 is provided may be provided. Here, maintenance and repair may include not only charging of the device, but also replacement of consumables or simple repair.

기둥(220)은 메인구조물(210)을 지면으로부터 이격시키도록 메인구조물(210)의 하측에 다수로 마련되도록 하는데, 기초 위에 설치되고, 구조 설계에 따라 적정한 구조 및 개수로 이루어질 수 있다. The pillars 220 are provided in plurality on the lower side of the main structure 210 to separate the main structure 210 from the ground, are installed on the foundation, and may be made of an appropriate structure and number according to the structural design.

수용공간(221)은 기둥(220)으로 인해 지면으로부터 이격되는 메인구조물(210)과 지면 사이에 건설 현장에서 사용하는 공정 장비(21,22)가 사용되도록 마련될 수 있다. 여기서, 공정 장비(21,22)는 건설 공사에 사용되는 다양한 이동형 건설 장비로서, 필요에 따라 관제실(211)에 마련되는 관제장비(240)에 의해 무선으로 원격 제어가 가능하도록 할 수 있다.The accommodating space 221 may be provided between the main structure 210 spaced apart from the ground by the pillar 220 and the ground so that process equipment 21 and 22 used at the construction site are used. Here, the process equipment 21 and 22 are various mobile construction equipment used in construction work, and can be remotely controlled wirelessly by the control equipment 240 provided in the control room 211 as needed.

도 1을 참조하면, 출입관리부(108)는 작업자가 휴대하는 출입관리센서(7)를 감지함으로써, 건설 현장에서 정해진 영역에 대한 출입을 허용 및 확인하도록 설치되는 센서감지부(8)의 감지신호를 수신받아, 감리자의 단말기(11)에 작업자의 출입 기록을 제공하도록 할 수 있다. 출입관리센서(7)는 바코드, QR코드 등의 전자코드를 사용하거나, RFID(Radio Frequency identification)태그나 광전센서 등을 비롯하여 다양한 인식장치가 사용될 수 있다. 센서감지부(8)는 출입관리센서(7)로부터 미리 저장된 출입 허용 작업자 각각에 해당하는 신호를 수신받아 이를 통신망을 통해 접속부(101)에 제공하면, 출입관리부(108)는 접속부(101)로부터 제공되는 신호를 제공받아, 작업자 각각에 대한 출입 기록을 정보로서 추출하고, 이를 감리자의 단말기(11)에 제공하도록 할 수 있다.Referring to FIG. 1, the access control unit 108 detects the access control sensor 7 carried by a worker, thereby permitting and confirming access to a designated area at a construction site. is received, it is possible to provide a worker's access record to the supervisor's terminal 11. The access control sensor 7 may use an electronic code such as a barcode or QR code, or may use various recognition devices including a radio frequency identification (RFID) tag or a photoelectric sensor. When the sensor detecting unit 8 receives signals corresponding to each of the workers allowed to enter in advance from the access control sensor 7 and provides them to the connection unit 101 through a communication network, the access control unit 108 receives signals from the connection unit 101. Upon receiving the provided signal, access records for each operator may be extracted as information and provided to the supervisor's terminal 11 .

위치관제부(109)는 작업자의 단말기(12)에 마련되는 GPS(미도시)를 이용하여 확인되는 작업자의 위치 정보와 공정 장비(21,22)에 마련되는 GPS(23)를 이용하여 확인되는 공정 장비(21,22)의 위치 정보를 정해진 단말기(11,12)로부터 요청시 제공할 수 있고, 작업자 및 공정 장비(21,22)를 관리자의 요청에 따라 정해진 위치로 이동하기 위한 정보를 작업자의 단말기(12) 및 공정 장비(21,22)의 조작자의 단말기(미도시)에 제공할 수 있다.The position control unit 109 is confirmed using the position information of the worker confirmed using a GPS (not shown) provided in the terminal 12 of the worker and the GPS 23 provided in the process equipment 21 and 22 Location information of the process equipment 21 and 22 can be provided upon request from the predetermined terminals 11 and 12, and information for moving the worker and the process equipment 21 and 22 to a predetermined location at the request of the operator is provided. It can be provided to the terminal (not shown) of the terminal 12 and the operator of the process equipment (21, 22).

본 발명의 일 실시례에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템(100)은 이동궤적추출부(111), 최장영역추출부(112), 중첩영역추출부(113), 영상획득부(114), 작업개선부(115) 및 계획보정부(116)를 더 포함할 수 있고, 나아가서, 공사일정단축검토부(117)를 더 포함할 수 있다.Smart supervision and construction project management system 100 for efficient construction management according to an embodiment of the present invention includes a movement trajectory extraction unit 111, a longest area extraction unit 112, an overlapping area extraction unit 113, an image It may further include an acquisition unit 114, a work improvement unit 115, and a plan correction unit 116, and furthermore, a construction schedule reduction review unit 117 may be further included.

이동궤적추출부(111)는 건설 현장 내에서 작업자의 단말기(12)에 마련되는 GPS를 이용하여 작업자 각각의 이동 궤적을 추적하도록 한다. 작업자는 자신의 단말기(12)가 접속부(101)에 접속하여 위치 추적을 허용하도록 동의할 수 있다. The movement trajectory extraction unit 111 tracks the movement trajectory of each worker by using the GPS provided in the terminal 12 of the worker within the construction site. The operator may agree to have his/her terminal 12 access the connection 101 and allow location tracking.

최장영역추출부(112)는 이동궤적추출부(111)에 의해 추적하는 이동 궤적 각각에서 작업자가 최장 시간 동안 정지한 최장 시간 영역을 추출할 수 있다. 즉, 최장영역추출부(112)는 작업자의 이동 궤적에서 작업자가 설정된 반경, 예컨대 0.5 ~ 1m 이내에서 벗어나지 않은 시간을 타이머부(미도시)에 의해 카운트하여, 최장 시간 동안 머물게 되는 영역, 즉 최장 시간 영역을 추출하도록 할 수 있다. 이러한 최장 시간 영역은 작업자가 건설 작업에서 가장 많은 시간을 할애한 작업 영역으로, 이러한 최장 시간의 할애가 작업자의 숙련도 문제이거나, 작업 과정에서의 기술적인 문제가 발생하는 이유가 될 수 있다.The longest area extraction unit 112 may extract the longest time area in which the operator has stopped for the longest time from each of the movement trajectories tracked by the movement trajectory extraction unit 111 . That is, the longest area extraction unit 112 counts the time the operator does not deviate from a set radius, for example, within a range of 0.5 to 1 m in the operator's movement trajectory by a timer unit (not shown), and determines the area where the operator stays for the longest time, that is, the longest area. You can extract the time domain. This longest time area is a work area where workers spend the most time in the construction work, and this longest time may be a problem of the worker's skill level or a reason for technical problems in the work process.

중첩영역추출부(113)는 최장영역추출부(112)에 의해 각각 추출되는 작업자 각각의 최장 시간 영역이 정해진 개수만큼 겹쳐지는 중첩 영역을 추출하도록 할 수 있다. 즉 중첩영역추출부(113)는 최장영역추출부(112)에 의해 각각 추출되는 작업자 각각의 최장 시간 영역이 예컨대 2~4개 겹쳐질 경우, 작업자의 숙련도에 의해 발생되는 문제 또는 기술적인 문제 등으로 인해 작업자가 함께 모여서 많은 시간을 할애하는 것으로 판단되므로, 이에 대한 확인 및 해결이 필요한 경우에 해당할 수 있다.The overlapping region extracting unit 113 may extract overlapping regions in which the longest temporal regions of each operator extracted by the longest region extracting unit 112 overlap by a predetermined number. That is, the overlapping region extracting unit 113 overlaps, for example, 2 to 4 longest time regions of each operator extracted by the longest region extracting unit 112, a problem caused by the skill level of the operator or a technical problem, etc. Because of this, it is judged that workers gather together and spend a lot of time, so it may correspond to a case where it is necessary to check and solve it.

영상획득부(114)는 상기의 중첩 영역에 대한 작업 영상을 외부 기기(1,2,3,4,5)에 해당하는 CCTV카메라(1), 액션캠(2), 스마트폰(3), 드론(4), 스마트헬멧(5) 및 3D 카메라(24) 중에서 일부로부터 획득하도록 한다. 영상획득부(114)는 접속부(101)에 접속된 외부 기기(1,2,3,4,5,24)로부터 제공되는 영상을 시간별, 장소별, 작업자별로 실시간 기록하고, 이러한 영상 중에서 중첩 영역에 작업자가 머물던 시간 동안, 해당 작업자가 사용하는 기기나 해당 영역을 촬영하는 기기로부터 영상을 추출하도록 구성될 수 있고, 필요에 따라, 중첩 영역에 대한 작업, 즉 문제가 되었던 시간 동안 작업자가 자신의 제어가 가능한 기기로부터 획득한 영상을 제공받도록 작업자의 단말기(12)에 영상 요청 메시지를 제공할 수 있다.The image acquisition unit 114 transmits the working image of the overlapping area to the external devices 1, 2, 3, 4, 5, such as a CCTV camera 1, an action cam 2, a smartphone 3, It is obtained from some of the drone 4, the smart helmet 5, and the 3D camera 24. The image acquisition unit 114 records images provided from the external devices 1, 2, 3, 4, 5, and 24 connected to the connection unit 101 in real time by time, place, and operator, and among these images, overlapping areas can be configured to extract images from a device used by the operator or a device that shoots the area during the time the operator stays in, and, if necessary, to work on the overlapping area, that is, during the time that was a problem, the operator can An image request message may be provided to the operator's terminal 12 so that the image obtained from the controllable device is provided.

작업개선부(115)는 영상획득부(114)에 의해 획득되는 영상을 미리 설정된 전문가의 단말기(13)에 제공함과 아울러, 데이터베이스부(105)에 저장할 수 있고, 전문가의 단말기(13)로부터 회신된 양부 판정이나 개선 의견을 중첩 영역에서 작업한 작업자의 단말기(13) 각각에 제공함과 아울러, 데이터베이스부(105)에 저장할 수 있다. 여기서 전문가는 건설업에 대해서 해박한 지식이나 자격을 가진 자로서, 미리 심사를 거쳐 정해질 수 있고, 자문에 대한 자문료 역시 제공받을 수 있으며, 제공받은 영상을 통해서 중첩 영역에서의 작업이 정상적으로 마무리되었는지를 확인하여 이상 여부에 대한 양부 판정을 제공할 수 있고, 작업 과정에서 잘못하여 개선이 필요한 부분에 대해서는 개선에 대한 해결 방안을 제공하도록 할 수 있다. 따라서, 작업자는 자신의 단말기(12)를 통해서 전문가의 양부 판정이나 개선 의견을 제공받아, 정확한 건설 시공을 가능하도록 하면서, 향후 동일한 문제에 대한 해결 능력을 보유하도록 할 수 있다.The work improvement unit 115 provides the image acquired by the image acquisition unit 114 to the expert's terminal 13, stores it in the database unit 105, and sends a reply from the expert's terminal 13. The resultant judgment or improvement opinion may be provided to each of the terminals 13 of workers who worked in the overlapping area, and stored in the database unit 105 . Here, an expert is a person with in-depth knowledge or qualifications about the construction industry, and can be determined through a pre-screening, can also be provided with consulting fees for advice, and can check whether the work in the overlapping area has been completed normally through the provided video. It is possible to check and provide a judgment on whether or not there is an abnormality, and to provide a solution for improvement in the part that needs improvement due to an error in the work process. Therefore, the worker can be provided with an expert's quality judgment or improvement opinion through his/her terminal 12, enabling accurate construction work and retaining the ability to solve the same problem in the future.

계획보정부(116)는 영상획득부(114)에 의해 획득되는 영상으로부터 작업의 종류를 추출하고, 작업의 종류에 해당하는 작업 계획을 추후에 수립시, 최장영역추출부(112)에 의해 산출되는 최장 시간에 개선이 가능하도록 보정한 시간을 작업 소요 시간으로 사용하도록 할 수 있다. 계획보정부(116)는 영상획득부(114)에 의해 획득되는 영상에 대한 영상 처리에 의해 획득되는 영상 정보와 미리 샘플링된 작업 영상 정보의 매칭에 의해 작업의 종류를 판단하거나, 관리자가 확인하여 입력되는 작업에 대한 정보로부터 작업의 종류를 판단할 수 있다. 계획보정부(116)는 최장 시간에 관리자가 미리 설정한 비율을 곱한 시간을 보정한 시간으로 제공할 수 있다. 여기서 미리 설정한 비율은 전문가에 의한 개선 정도를 감안하여, 0.7 ~ 1.0의 범위 내에서 정해질 수 있다. The plan correction unit 116 extracts the type of work from the image acquired by the image acquisition unit 114, and when a work plan corresponding to the type of work is later established, it is calculated by the longest area extractor 112. The time corrected so that improvement is possible in the longest possible time can be used as the required work time. The plan correction unit 116 determines the type of work by matching the image information acquired by image processing on the image acquired by the image acquisition unit 114 and pre-sampled work image information, or the manager confirms It is possible to determine the type of work from information on the input work. The plan correction unit 116 may provide a time obtained by multiplying the longest time by a ratio preset by the manager as the corrected time. Here, the preset ratio may be set within a range of 0.7 to 1.0 in consideration of the degree of improvement by experts.

공사일정단축검토부(117)는 단말기, 예컨대, 공사 일정에 대한 공정표를 관리하는 담당자의 단말기로부터 제공되는 공정표를 통해서 파악되는 예정 공정과 현재 공정을 그래프로 비교하여, 지연되는 공사 일정을 확인할 수 있도록 하고, 공사 지연에 대한 개선 대책을 정해진 단말기, 예컨대 감리자의 단말기(11)나 작업자의 단말기(12) 등에 제공하도록 할 수 있다. 여기서, 개선 대책은 지연되는 공사 일정에 따른 개선을 위한 대책을 건설 공사 전문가 등으로부터 제공받아 데이터 베이스화하여 해당하는 대책으로 제공받는 것을 의미할 수 있으며, 반드시 이에 한하는 것은 아니며, 다양한 방법으로 제공받도록 할 수 있다.The construction schedule shortening review unit 117 compares the current process with a scheduled process identified through a process table provided from a terminal, for example, a terminal of a person in charge of managing a process schedule for a terminal, and confirms a delayed construction schedule. It is possible to provide improvement measures for construction delays to a predetermined terminal, for example, a supervisor's terminal 11 or a worker's terminal 12. Here, the improvement measures may mean that measures for improvement according to the delayed construction schedule are provided from construction experts, etc., and converted into a database to be provided as corresponding measures. can do.

본 발명의 일 실시례에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템(100)은 판단, 비교 및 추출 등에 있어서, 다양한 방식의 인공지능(AI) 알고리즘이나 머신 러닝 알고리즘을 사용할 수 있다.Smart supervision and construction project management system 100 for efficient construction management according to an embodiment of the present invention may use various artificial intelligence (AI) algorithms or machine learning algorithms in determining, comparing, and extracting .

이와 같은 본 발명에 따른 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템에 따르면, 감리 현장에서 획득되는 사진, 동영상 및 문서 등의 기록과 관리가 용이하도록 할 수 있고, 이로 인해 감리의 효율적인 수행 및 관리가 용이하도록 할 수 있으며, 감리자의 노동 강도를 줄이면서도 감리에 대한 만족도를 높일 수 있다. According to the smart supervision and construction project management system for efficient construction management according to the present invention, it is possible to easily record and manage photos, videos, and documents obtained from the supervision site, thereby efficiently performing supervision. and management can be made easy, and the satisfaction with the supervision can be increased while reducing the labor intensity of the supervisor.

또한 본 발명은 공사 일정 체크 후 문제점 검토를 통한 공사 기간의 단축을 위한 공정 관리와, 현장 내 안전 관리와, 제품의 성능과 재료 품질 등의 관리에 대한 효율성을 높일 수 있다. In addition, the present invention can increase the efficiency of process management for shortening the construction period through problem review after checking the construction schedule, safety management in the field, and management of product performance and material quality.

또한 본 발명은 빠르게 개정되는 건설 관련 법규를 시스템에 갱신 적용함으로써, 놓치기 쉬운 개정 법률에 대한 체크를 진행하여, 합법적인 건축물 신축 등이 이루어지도록 할 수 있다.In addition, the present invention updates and applies rapidly changing construction-related laws and regulations to the system, so that new laws that are easy to miss are checked, so that new buildings can be legally constructed.

이와 같이 본 발명에 대해서 첨부된 도면을 참조하여 설명하였으나, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 수정 및 변형이 이루어질 수 있음은 물론이다. 그러므로, 본 발명의 범위는 설명된 실시례에 한정되어서는 아니되며, 후술하는 특허청구범위뿐만 아니라 이러한 특허청구범위와 균등한 것들에 의해 정해져야 한다.As described above, the present invention has been described with reference to the accompanying drawings, but various modifications and variations can be made without departing from the technical spirit of the present invention. Therefore, the scope of the present invention should not be limited to the described embodiments, and should be defined by not only the claims to be described later, but also those equivalent to these claims.

1 : CCTV카메라 2 : 액션캠
3 : 스마트폰 4 : 드론
5 : 스마트헬멧 6 : 360도카메라
7 : 출입관리센서 8 : 센서감지부
9 : 계측기 10 : 화재센서
11 : 감리자의 단말기 12 : 작업자의 단말기
13 : 전문가의 단말기 14 : 안전담당의 단말기
21 : 공정장비 22 : 공정 장비
23 : GPS 24 : 3D 카메라
101 : 접속부 102 : 감리자체크리스트및일정알림부
103 : 정보수신기록부 104 : 보고서작성부
105 : 데이터베이스부 106 : 안전관리알림부
107 : 실시간모니터링부 108 : 출입관리부
109 : 위치관제부 110 : 계측모니터링부
111 : 이동궤적추출부 112 : 최장영역추출부
113 : 중첩영역추출부 114 : 영상획득부
115 : 작업개선부 116 : 계획보정부
117 : 공사일정단축검토부 200 : 스마트CM관제모듈
210 : 메인구조물 211 : 관제실
212 : 서버실 213 : 휴게실
214 : 스마트장비유지보수실 215 : 스텝
216 : 도어 220 : 기둥
221 : 수용공간 231 : CCTV모니터
232 : 날씨정보모니터 233 : 작업내용모니터
234 : 공정체크모니터 235 : 통신모뎀
236 : 서버 237 : 통신안테나
238 : 경보스피커 239 : 스마트장비유지보수장비
240 : 관제장비 241 : 베드
242 : 업무용가구
1: CCTV Camera 2: Action Cam
3: Smartphone 4: Drone
5: Smart helmet 6: 360-degree camera
7: access control sensor 8: sensor detection unit
9: instrument 10: fire sensor
11: Supervisor's terminal 12: Worker's terminal
13: expert's terminal 14: safety manager's terminal
21: process equipment 22: process equipment
23: GPS 24: 3D camera
101: connection unit 102: supervision self-list and schedule notification unit
103: information reception record unit 104: report creation unit
105: database unit 106: safety management notification unit
107: real-time monitoring unit 108: access management unit
109: position control unit 110: measurement monitoring unit
111: movement trajectory extraction unit 112: longest region extraction unit
113: overlapping area extraction unit 114: image acquisition unit
115: work improvement department 116: planning correction department
117: Construction schedule reduction review unit 200: Smart CM control module
210: main structure 211: control room
212: server room 213: rest room
214: smart equipment maintenance room 215: staff
216: door 220: pillar
221: accommodation space 231: CCTV monitor
232: weather information monitor 233: work content monitor
234: process check monitor 235: communication modem
236: server 237: communication antenna
238: alarm speaker 239: smart equipment maintenance equipment
240: control equipment 241: bed
242: business furniture

Claims (7)

건설 현장에 대한 영상 획득을 위한 외부 기기와 정보 전달을 위한 단말기가 데이터의 전송을 위해 접속하도록 하는 접속부;
상기 접속부에 접속된 감리자의 단말기에 감리에 필요한 체크리스트, 감리 일정 및 건축 법규를 제공하도록 하는 감리자체크리스트및일정알림부;
상기 외부 기기로부터 전송되는 영상을 상기 단말기에 제공함으로써 실시간으로 건설 현장을 확인하도록 하고, 상기 영상을 저장하도록 하는 정보수신기록부;
상기 외부 기기로부터 제공되는 영상과 상기 감리자의 단말기로부터 입력되는 정보를 사용하여 감리보고서, 검측 리스트 및 품질 확인서를 작성하도록 하고, 상기 감리자의 단말기에 법적 보고 시기에 따른 보고서 작성을 알림하며, 작성을 마친 보고서를 정해진 단말기에 제공하도록 하는 보고서작성부;
상기 감리자체크리스트및일정알림부에 의해 제공되는 체크리스트 및 감리 일정, 상기 정보수신기록부에 의해 제공되는 영상, 상기 보고서작성부에 의해 작성되는 감리보고서 및 품질 확인서를 건설 현장 별로 저장하도록 하는 데이터베이스부;
건설 현장 내에서 작업자의 단말기에 마련되는 GPS를 이용하여 작업자 각각의 이동 궤적을 추적하는 이동궤적추출부;
상기 이동궤적추출부에 의해 추적하는 이동 궤적 각각에서 작업자가 최장 시간 동안 정지한 최장 시간 영역을 추출하는 최장영역추출부;
상기 최장영역추출부에 의해 각각 추출되는 상기 작업자 각각의 최장 시간 영역이 정해진 개수만큼 겹쳐지는 중첩 영역을 추출하는 중첩영역추출부;
상기 중첩 영역에 대한 작업 영상을 상기 외부 기기에 해당하는 CCTV카메라, 액션캠, 스마트폰, 드론, 스마트헬멧 및 3D 카메라 중에서 일부로부터 획득하는 영상획득부;
상기 영상획득부에 의해 획득되는 영상을 미리 설정된 전문가의 단말기에 제공함과 아울러, 상기 데이터베이스부에 저장하고, 상기 전문가의 단말기로부터 회신된 양부 판정이나 개선 의견을 상기 중첩 영역에서 작업한 작업자의 단말기 각각에 제공함과 아울러, 상기 데이터베이스부에 저장하는 작업개선부; 및
상기 영상획득부에 의해 획득되는 영상으로부터 작업의 종류를 추출하고, 상기 작업의 종류에 해당하는 작업 계획을 추후에 수립시, 상기 최장영역추출부에 의해 산출되는 상기 최장 시간에 개선이 가능하도록 보정한 시간을 작업 소요 시간으로 사용하도록 하는 계획보정부;
를 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
A connection unit for connecting an external device for acquiring images of a construction site and a terminal for transmitting information to transmit data;
a supervision self-list and schedule notification unit for providing a checklist, supervision schedule, and building regulations necessary for supervision to a supervisor's terminal connected to the connection unit;
an information reception and recording unit configured to check a construction site in real time by providing the image transmitted from the external device to the terminal and to store the image;
Use the video provided from the external device and the information input from the supervisor's terminal to create a supervision report, inspection list, and quality confirmation document, notify the supervisor's terminal of report creation according to the legal reporting period, and prepare a report creation unit to provide a finished report to a designated terminal;
A database unit for storing the checklist and supervision schedule provided by the supervision self-list and schedule notification unit, the video provided by the information reception recording unit, the supervision report prepared by the report preparation unit, and the quality confirmation report for each construction site. ;
A movement trajectory extraction unit for tracking the movement trajectory of each worker using GPS provided in the terminal of the worker in the construction site;
a longest area extracting unit extracting a longest time area in which the operator has stopped for the longest time in each of the moving trajectories tracked by the moving trajectory extracting unit;
an overlapping region extracting unit extracting overlapping regions overlapping a predetermined number of the longest temporal regions of each operator extracted by the longest region extracting unit;
an image acquisition unit that acquires a working image of the overlapping area from some of CCTV cameras, action cams, smart phones, drones, smart helmets, and 3D cameras corresponding to the external devices;
The image obtained by the image acquisition unit is provided to the preset expert's terminal, stored in the database unit, and the quality judgment or improvement opinion returned from the expert's terminal is provided to each terminal of the worker who worked in the overlapping area. In addition to providing to, work improvement unit for storing in the database unit; and
The type of work is extracted from the image acquired by the image acquisition unit, and when a work plan corresponding to the type of work is later established, correction is made to enable improvement in the longest time calculated by the longest area extraction unit. a planning correction unit that allows one hour to be used as the time required for work;
Smart supervision and construction project management system for efficient construction management, including.
청구항 1에 있어서,
상기 외부 기기로부터 제공되는 영상에 대한 영상 처리에 의해 화재를 감지하고, 화재센서의 감지신호를 수신받아 화재를 감지하며, 화재의 감지시 정해진 안전담당의 단말기에 화재 알람을 제공하고, 상기 외부 기기로부터 제공되는 영상에 대한 영상 처리에 의해 작업자가 정해진 보호장구를 착용하지 않은 경우, 감리자의 단말기에 상기 영상과 함께 보호장구 미착용 사실을 제공하는 안전관리알림부를 더 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
The method of claim 1,
A fire is detected by image processing of the image provided from the external device, a fire is detected by receiving a detection signal from a fire sensor, a fire alarm is provided to a terminal in charge of safety when a fire is detected, and a fire alarm is provided to the external device For efficient construction work management, further comprising a safety management notification unit that provides the supervisor's terminal with the fact that the protective equipment is not worn, along with the image, when the worker is not wearing the prescribed protective equipment by image processing of the image provided from Smart supervision and construction project management system.
청구항 1에 있어서,
상기 외부 기기로부터 제공되는 영상을 통해서 건설 현장에 대한 실시간 모니터링을 수행하도록 하는 실시간모니터링부; 및
상기 실시간모니터링부에 의한 실시간 모니터링을 위한 장소를 제공하는 스마트CM관제모듈;을 더 포함하고,
상기 스마트CM관제모듈은,
건설 현장과 건설 작업과 관련된 정보를 디스플레이하기 위한 모니터가 다수로 설치되는 관제실과, 서버가 수용되는 서버실이 각각 마련되고, 통신안테나와 경보스피커가 루프에 설치되는 메인구조물;
상기 메인구조물을 지면으로부터 이격시키도록 상기 메인구조물의 하측에 다수로 마련되는 기둥; 및
상기 기둥으로 인해 지면으로부터 이격되는 상기 메인구조물과 상기 지면 사이에 건설 현장에서 사용하는 공정 장비가 수용되도록 마련되는 수용공간;
을 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
The method of claim 1,
a real-time monitoring unit to perform real-time monitoring of the construction site through images provided from the external device; and
It further includes; a smart CM control module that provides a place for real-time monitoring by the real-time monitoring unit;
The smart CM control module,
A control room in which a plurality of monitors for displaying information related to a construction site and construction work are installed, a server room in which servers are accommodated, and a main structure in which a communication antenna and an alarm speaker are installed in a roof;
A plurality of pillars provided on the lower side of the main structure to separate the main structure from the ground; and
An accommodation space provided to accommodate process equipment used in a construction site between the ground and the main structure spaced apart from the ground due to the pillar;
Smart supervision and construction project management system for efficient construction management, including.
청구항 1에 있어서,
작업자가 휴대하는 출입관리센서를 감지함으로써, 건설 현장에서 정해진 영역에 대한 출입을 허용 및 확인하도록 설치되는 센서감지부의 감지신호를 수신받아, 상기 감리자의 단말기에 작업자의 출입 기록을 제공하는 출입관리부; 및
상기 작업자의 단말기에 마련되는 GPS를 이용하여 확인되는 상기 작업자의 위치 정보와 공정 장비에 마련되는 GPS를 이용하여 확인되는 상기 공정 장비의 위치 정보를 정해진 단말기로부터 요청시 제공하고, 상기 작업자 및 상기 공정 장비를 관리자의 요청에 따라 정해진 위치로 이동하기 위한 정보를 상기 작업자의 단말기 및 상기 공정 장비의 조작자의 단말기에 제공하는 위치관제부;
를 더 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
The method of claim 1,
An access control unit that detects an access control sensor carried by a worker, receives a detection signal from a sensor detection unit installed to permit and confirm access to a designated area at a construction site, and provides a worker's access record to the supervisor's terminal; and
The location information of the worker identified using the GPS provided in the terminal of the worker and the location information of the process equipment confirmed using the GPS provided in the process equipment are provided upon request from a predetermined terminal, and the worker and the process a location control unit providing information for moving equipment to a predetermined location according to a manager's request to the operator's terminal and the operator's terminal of the process equipment;
Further comprising, smart supervision and construction project management system for efficient construction management.
삭제delete 청구항 1 내지 청구항 4 중 어느 한 항에 있어서,
상기 감리자체크리스트및일정알림부는,
상기 건축 법규에 대한 개정 법률을 업데이트하여, 검측시 개정 법률에 따른 검측체크리스트 및 서류를 검토할 수 있도록 상기 감리자의 단말기에 제공하도록 하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
The method according to any one of claims 1 to 4,
The supervision self-list and schedule notification unit,
A smart supervision and construction project management system for efficient construction management that updates the amended laws for the building regulations and provides them to the supervisor's terminal so that the inspection checklist and documents according to the amended laws can be reviewed during inspection.
청구항 1 내지 청구항 4 중 어느 한 항에 있어서,
상기 단말기로부터 제공되는 공정표를 통해서 파악되는 예정 공정과 현재 공정을 그래프로 비교하여, 지연되는 공사 일정을 확인할 수 있도록 하고, 공사 지연에 대한 개선 대책을 정해진 단말기에 제공하도록 하는 공사일정단축검토부를 더 포함하는, 효율적인 건설 공사 관리를 위한 스마트 감리 및 건설사업관리시스템.
The method according to any one of claims 1 to 4,
A construction schedule shortening review unit that compares the scheduled process and the current process identified through the process table provided from the terminal with a graph to check the delayed construction schedule and provides improvement measures for the construction delay to the designated terminal Including, smart supervision and construction project management system for efficient construction management.
KR1020220122947A 2022-09-28 2022-09-28 Smart supervision and construction project management system for efficient construction management KR102489400B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220122947A KR102489400B1 (en) 2022-09-28 2022-09-28 Smart supervision and construction project management system for efficient construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220122947A KR102489400B1 (en) 2022-09-28 2022-09-28 Smart supervision and construction project management system for efficient construction management

Publications (1)

Publication Number Publication Date
KR102489400B1 true KR102489400B1 (en) 2023-01-18

Family

ID=85106556

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220122947A KR102489400B1 (en) 2022-09-28 2022-09-28 Smart supervision and construction project management system for efficient construction management

Country Status (1)

Country Link
KR (1) KR102489400B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113806170A (en) * 2021-09-07 2021-12-17 广东世纪信通网络科技有限公司 Method, system, medium and terminal for automatically generating engineering industry supervision log
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268760A (en) * 1996-03-28 1997-10-14 Shimizu Corp Schedule control support system
KR20180082168A (en) * 2017-01-10 2018-07-18 주식회사 한화건설 Method and system for inspection business use solution
KR102398413B1 (en) * 2021-08-20 2022-05-17 엄태성 Method and apparatus for providing a construction integration platform
KR20220122227A (en) * 2021-02-26 2022-09-02 주식회사 대림 A mobile safety box for integrated safety management at construction sites

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268760A (en) * 1996-03-28 1997-10-14 Shimizu Corp Schedule control support system
KR20180082168A (en) * 2017-01-10 2018-07-18 주식회사 한화건설 Method and system for inspection business use solution
KR20220122227A (en) * 2021-02-26 2022-09-02 주식회사 대림 A mobile safety box for integrated safety management at construction sites
KR102398413B1 (en) * 2021-08-20 2022-05-17 엄태성 Method and apparatus for providing a construction integration platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113806170A (en) * 2021-09-07 2021-12-17 广东世纪信通网络科技有限公司 Method, system, medium and terminal for automatically generating engineering industry supervision log
CN113806170B (en) * 2021-09-07 2024-04-05 广东世纪信通科技股份有限公司 Method, system, medium and terminal for automatically generating supervision log of engineering industry
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things
CN116644943B (en) * 2023-07-26 2023-09-29 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things

Similar Documents

Publication Publication Date Title
KR102489400B1 (en) Smart supervision and construction project management system for efficient construction management
CN110971878B (en) Engineering field management system
CN104700211A (en) RFID management system for site construction worker safety
CN109557934B (en) Unmanned aerial vehicle cruise control method and device based on fabricated building platform
US11321982B2 (en) Livestock biosecurity system and method of use
US11232652B2 (en) System for management of verification of project commencement and completion
KR102282433B1 (en) Smart supervision system
CN110287859A (en) A kind of personnel's material dispatching system based on artificial intelligence technology
CN105405296A (en) Vehicle passage control system and method based on license plate identification
CN107240166A (en) Point inspection terminal and its data processing method
CN107239868A (en) End message processing method and processing device for security cruising inspection system
CN111626707A (en) Intelligent remote operation safety control method and device
CN106295947A (en) Public lavatory environmental sanitation keep a public place clean intelligent operation and check management system
KR102513608B1 (en) Smart inspection system for quality control of construction
CN111178465A (en) Transformer substation construction operator safety control system based on information passive storage and active positioning
JP5288762B2 (en) Entrance / exit management system and entrance / exit management method
KR101691125B1 (en) After-sales service system for apparatus in remote area
KR20220133620A (en) Construction site safty control system using video analysis technology
CN116011859A (en) Complete set management method for digital concrete engineering construction
CN108573557A (en) The application method of seal protecting box and seal protecting box
CN110830558A (en) Mobile inspection system for power monitoring equipment
CN111240382B (en) Intelligent laboratory management method, device and system
KR102391545B1 (en) Smart supervision system using drone
CN112085523A (en) BIM engineering information management method and system
KR102489399B1 (en) Smart supervision and construction project management system for efficient and safe demolition works

Legal Events

Date Code Title Description
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant