KR102375415B1 - spacing and aligning device for flanges of pipes - Google Patents

spacing and aligning device for flanges of pipes Download PDF

Info

Publication number
KR102375415B1
KR102375415B1 KR1020210128810A KR20210128810A KR102375415B1 KR 102375415 B1 KR102375415 B1 KR 102375415B1 KR 1020210128810 A KR1020210128810 A KR 1020210128810A KR 20210128810 A KR20210128810 A KR 20210128810A KR 102375415 B1 KR102375415 B1 KR 102375415B1
Authority
KR
South Korea
Prior art keywords
flanges
bolt
lifting operation
flange
operation bolt
Prior art date
Application number
KR1020210128810A
Other languages
Korean (ko)
Inventor
박정현
Original Assignee
건호이엔씨(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 건호이엔씨(주) filed Critical 건호이엔씨(주)
Priority to KR1020210128810A priority Critical patent/KR102375415B1/en
Application granted granted Critical
Publication of KR102375415B1 publication Critical patent/KR102375415B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/02Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for connecting objects by press fit or detaching same
    • B25B27/023Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for connecting objects by press fit or detaching same using screws
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/003Auxiliary devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/18Appliances for use in repairing pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Flanged Joints, Insulating Joints, And Other Joints (AREA)

Abstract

The present invention relates to a spaced alignment device for pipe flanges provided between the flanges of two pipes coupled in a fastening manner between the facing flanges so that the gap between the two flanges is widened for insertion or removal of a gasket after the fastening operation. According to the present invention, the spaced alignment device for pipe flanges comprises: a jig body having an upper end spaced apart from the narrow portion between the two flanges; a lifting operation bolt provided so as to be able to ascend and descend vertically with respect to the narrow portion between the two flanges by rotation operation; and a flange opening key provided so that the front end is engaged in the gap between the two flanges when descending and the rotation is suppressed by the lifting and lowering of the lifting operation bolt. Accordingly, it is possible to prevent a safety accident in advance due to the operator's fingers being pressed between the flanges when replacing, inserting, or removing the gasket, and the gasket replacement operation can be performed safely and easily.

Description

배관 플랜지용 이격 정렬장치 {spacing and aligning device for flanges of pipes}Spacing and aligning device for flanges of pipes

본 발명은 배관 플랜지용 이격 정렬장치에 관한 것으로, 더욱 상세하게는 서로 맞대는 플랜지 간의 체결 방식으로 결합 되는 두 배관의 플랜지 사이에 구비되어 체결 작업 이후에라도 가스켓의 삽입 또는 탈거를 위해 두 플랜지 사이의 간격이 손쉽고 간편하게 벌어지도록 하여, 기존에 배관 플랜지들 사이에 개재된 가스켓을 교체하거나 삽입 또는 탈거시 작업자의 손가락이 플랜지들 사이에 협착 되어 안전사고가 발생 되는 것을 미연에 방지하고, 가스켓 교체 작업의 어려움도 해결되도록 하므로 가스켓 교체 작업이 안전하고 용이하게 이뤄지도록 할 수 있는 배관 플랜지용 이격 정렬장치에 관한 것이다. The present invention relates to a spaced alignment device for a pipe flange, and more particularly, provided between the flanges of two pipes coupled by a fastening method between the flanges facing each other, so that the gasket is inserted or removed between the two flanges for insertion or removal even after the fastening operation. By making the gap easy and convenient, when replacing, inserting, or removing the gasket interposed between the pipe flanges, it prevents a safety accident from occurring due to the operator's fingers being pinched between the flanges in advance. It also relates to a spacing alignment device for pipe flanges that can make gasket replacement work safe and easy as it also solves difficulties.

일반적으로 배관 플랜지는 배관과 배관 사이를 이음 연결할 때에 사용되는 것으로서, 배관의 이음 부분이 되는 플랜지에는 다수의 볼트구멍이 형성되고, 중앙에는 배관이 삽입 고정되기 위한 소켓이 삽입되어 용접되며, 이 소켓 내에 배관의 각 단부를 삽입하여 배관의 소재에 따라 용접 또는 융착으로서 소켓과 배관이 연결되도록 하는 구조이다.In general, a pipe flange is used when connecting a pipe and a pipe, and a plurality of bolt holes are formed in the flange, which is a joint part of the pipe, and a socket for inserting and fixing the pipe is inserted and welded in the center, and this socket It is a structure in which each end of the pipe is inserted into the pipe so that the socket and the pipe are connected by welding or fusion depending on the material of the pipe.

또한, 소켓에 대해 각각 대응되는 플랜지의 볼트구멍을 통해서는 플랜지 조임 볼트가 너트 체결방식으로 플랜지가 체결되도록 하는 구조이며, 상기 플랜지의 사이에는 배관으로부터 흐르는 액체 또는 기체의 누출을 방지하기 위한 목적으로 기밀소재인 합성수지, 우레탄, 가죽 등의 소재로 된 가스켓이 개재된다.In addition, through the bolt hole of the flange corresponding to the socket, the flange tightening bolt has a structure such that the flange is fastened in a nut fastening method, and between the flanges for the purpose of preventing leakage of liquid or gas flowing from the pipe Gaskets made of materials such as synthetic resin, urethane, and leather, which are airtight materials, are interposed.

종래기술에 따른 배관 플랜지의 연결구조의 일 예가 대한민국 실용신안 등록번호 제20-0403574호(2005년12월05일자 등록, 이하 '특허문헌 1'이라 함) 등에 개시되어 있다. An example of a connection structure of a pipe flange according to the prior art is disclosed in Republic of Korea Utility Model Registration No. 20-0403574 (registered on December 05, 2005, hereinafter referred to as 'Patent Document 1') and the like.

그러나, 종래기술에 따른 배관 플랜지의 연결구조는 플랜지들 사이에 개재된 가스켓을 교체하거나 삽입 또는 탈거시 작업자의 손가락이 플랜지들 사이에 협착 되어 안전사고가 쉽게 발생 되고, 오래된 배관일수록 가스켓의 교체 작업이 어려워질 수 있다는 문제점이 있다. However, in the connection structure of the pipe flange according to the prior art, when replacing, inserting, or removing a gasket interposed between the flanges, a safety accident easily occurs because the fingers of the operator are pinched between the flanges. The problem is that this can be difficult.

대한민국 실용신안 등록번호 제20-0403574호(2005년12월05일자 등록)Republic of Korea Utility Model Registration No. 20-0403574 (Registered on December 05, 2005)

본 발명의 목적은, 서로 맞대는 플랜지 간의 체결 방식으로 결합 되는 두 배관의 플랜지 사이에 구비되어 체결 작업 이후에라도 가스켓의 삽입 또는 탈거를 위해 두 플랜지 사이의 간격이 손쉽고 간편하게 벌어지도록 하여, 기존에 배관 플랜지들 사이에 개재된 가스켓을 교체하거나 삽입 또는 탈거시 작업자의 손가락이 플랜지들 사이에 협착 되어 안전사고가 발생 되는 것을 미연에 방지하고, 가스켓 교체 작업의 어려움도 해결되도록 하므로 가스켓 교체 작업이 안전하고 용이하게 이뤄지도록 할 수 있는 배관 플랜지용 이격 정렬장치를 제공하는 것이다.It is an object of the present invention to be provided between the flanges of two pipes coupled by a fastening method between the flanges facing each other so that the gap between the two flanges is easily and conveniently widened for insertion or removal of the gasket even after the fastening operation, so that the existing pipe When replacing, inserting, or removing a gasket interposed between the flanges, it prevents a safety accident from occurring due to the operator's fingers becoming entangled between the flanges, and also solves the difficulty of replacing the gasket. It is to provide a spaced alignment device for a pipe flange that can be easily achieved.

상기 목적을 달성하기 위해 본 발명에 따라, 서로 맞대는 플랜지 간의 체결 방식으로 결합 되는 두 배관의 플랜지 사이에 구비되어 체결 작업 이후 가스켓의 삽입 또는 탈거를 위해 두 플랜지 사이의 간격이 벌어지도록 하는 배관 플랜지용 이격 정렬장치에 있어서, 상기 두 배관의 플랜지들 중 어느 하나의 볼트구멍에서 다른 하나의 볼트구멍으로 관통되게 하단이 끼워져 고정되며, 상하 수직으로 연장되되 상단부가 상기 두 플랜지 사이의 협착부분으로부터 상부로 이격 되게 구비된 지그 몸체; 상기 지그 몸체의 상단부에 나사 결합 방식으로 조립되어 회전 조작에 의해 상기 두 플랜지 사이의 협착부분에 대해 상하로 승강 가능하게 구비된 승강 조작 볼트; 및, 상기 두 플랜지 사이의 협착부분에 대해서 하강시 선 접촉 및 삽입이 이뤄지도록 하단에 형성된 선단부는 측면 상 쐐기형태를 이루며 정면상 일정 폭을 갖도록 면 따기 가공되어 마련되고, 상기 승강 조작 볼트의 단부에 착탈 가능 및 회전 가능하게 조립되어 상기 승강 조작 볼트의 승강에 따라 함께 승강 되되, 하강시 상기 두 플랜지 사이의 틈새에 선단부가 맞물려 회전은 억제되도록 구비된 플랜지 벌림 키이;를 포함하는 것을 특징으로 한다.According to the present invention, in order to achieve the above object, a pipe plan provided between the flanges of two pipes coupled in a fastening manner between the flanges facing each other so that the gap between the two flanges is widened for the insertion or removal of the gasket after the fastening operation In the spaced alignment device for fat, the lower end is fitted and fixed to penetrate from one bolt hole to the other one of the flanges of the two pipes, and the upper end extends vertically from the upper end to the upper end from the constriction between the two flanges. A jig body provided to be spaced apart; an elevating operation bolt assembled to the upper end of the jig body in a screw-coupled manner and provided to move up and down with respect to the constricted portion between the two flanges by rotational operation; And, the front end formed at the lower end to make line contact and insertion when descending with respect to the constricted portion between the two flanges is a wedge shape on the side and is provided by face picking to have a predetermined width on the front, the end of the lifting operation bolt It is detachably and rotatably assembled to the lift operation bolt and lifted together according to the lifting and lowering of the lifting operation bolt, and a flange opening key provided such that the front end is engaged with the gap between the two flanges during descending to inhibit rotation; characterized in that it comprises a .

여기서, 상기 지그 몸체는, 하단에 구비되어 상기 두 배관의 플랜지들 중 어느 하나의 볼트구멍에서 다른 하나의 볼트구멍으로 관통되어 걸림 고정되도록 하는 고정 바아와, 측면 상 ‘ㄱ’자의 형상을 갖도록 형성되며 상기 고정 바아의 상부 일측에 편심 되게 연장되어 상기 고정 바아와 함께 측면 상 ‘ㄷ’자의 형태를 이루도록 구비된 연장 바디와, 상기 연장 바디의 상단부에서 타측 단부에 구비되어 상기 두 플랜지 사이의 협착부분으로부터 이격 되게 구비되며 상기 승강 조작 볼트가 나사 결합 방식으로 조립되는 볼트 지지 너트를 포함하는 것이 바람직하다.Here, the jig body is provided at the lower end and penetrates from one bolt hole of the flanges of the two pipes to the other bolt hole and is formed to have a 'L' shape on the side and a fixing bar to be caught and fixed. and an extension body extending eccentrically to one upper side of the fixing bar to form a 'C' shape on the side with the fixing bar, and a constriction portion between the two flanges provided at the other end from the upper end of the extension body It is provided to be spaced apart from and preferably includes a bolt support nut to which the lifting operation bolt is assembled by screwing.

그리고, 상기 승강 조작 볼트와 상기 플랜지 벌림 키이의 사이에는 상기 승강 조작 볼트의 회전시 상기 플랜지 벌림 키이의 회전은 억제되며 상기 승강 조작 볼트의 승강에 따라서 상기 플랜지 벌림 키이가 함께 승강만 가능해지도록 상기 승강 조작 볼트에 대한 상기 플랜지 벌림 키이의 회전을 지지하는 스러스트 베어링이 구비된 것이 바람직하다.And, between the lifting operation bolt and the flange opening key, the rotation of the flange opening key is suppressed when the lifting operation bolt is rotated, and the lifting and lowering so that only the flange opening key can be lifted together according to the lifting and lowering of the lifting operation bolt. Preferably, a thrust bearing is provided to support rotation of the flange spread-out key with respect to the operation bolt.

본 발명에 따르면, 서로 맞대는 플랜지 간의 체결 방식으로 결합 되는 두 배관의 플랜지 사이에 구비되어 체결 작업 이후에라도 가스켓의 삽입 또는 탈거를 위해 두 플랜지 사이의 간격이 손쉽고 간편하게 벌어지도록 하여, 기존에 배관 플랜지들 사이에 개재된 가스켓을 교체하거나 삽입 또는 탈거시 작업자의 손가락이 플랜지들 사이에 협착 되어 안전사고가 발생 되는 것을 미연에 방지하고, 가스켓 교체 작업의 어려움도 해결되도록 함으로써, 가스켓 교체 작업이 안전하고 용이하게 이뤄지도록 할 수 있는 배관 플랜지용 이격 정렬장치를 제공할 수 있다.According to the present invention, it is provided between the flanges of two pipes coupled by a fastening method between the flanges facing each other so that the gap between the two flanges is easily and conveniently widened for insertion or removal of the gasket even after the fastening operation, so that the existing pipe flanges When replacing, inserting, or removing a gasket interposed between the gaskets, it prevents a safety accident in advance due to the operator's fingers being pinched between the flanges, and also solves the difficulty of replacing the gasket. It is possible to provide a spaced alignment device for a pipe flange that can be easily achieved.

도 1은 본 발명에 따른 배관 플랜지용 이격 정렬장치의 구성을 도시한 도면,
도 2는 도 1의 배관 플랜지용 이격 정렬장치가 분해된 상태를 도시한 도면,
도 3은 도 1의 플랜지 벌림 키이의 사시도,
도 4는 본 발명에 따른 배관 플랜지용 이격 정렬장치가 배관의 플랜지 연결부분에 적용되기 전 상태를 도시한 도면,
도 5는 도 4의 배관 플랜지용 이격 정렬장치의 고정 바아가 볼트구멍으로 끼워져 두 플랜지 사이의 간격을 벌리기 전 상태를 도시한 도면,
도 6은 도 5의 배관 플랜지용 이격 정렬장치의 승강 조작 볼트를 회전시켜 플랜지 벌림 키이가 하강 됨에 따라 두 플랜지 사이의 간격을 벌리며 가스켓의 탈거 및 삽입에 의해 가스켓을 교체하는 과정을 도시한 도면,
도 7은 본 발명의 또 다른 실시예에 따른 배관 플랜지용 이격 정렬장치의 구성을 도시한 도면이다.
1 is a view showing the configuration of a spaced alignment device for a pipe flange according to the present invention;
2 is a view showing an exploded state of the separation arrangement device for the pipe flange of FIG. 1;
Figure 3 is a perspective view of the flange open key of Figure 1;
Figure 4 is a view showing a state before the pipe flange spacing alignment device according to the present invention is applied to the flange connection portion of the pipe,
5 is a view showing a state before the fixing bar of the spacing alignment device for the pipe flange of FIG. 4 is inserted into the bolt hole to widen the gap between the two flanges;
6 is a view showing the process of replacing the gasket by removing and inserting the gasket while widening the gap between the two flanges as the flange opening key is lowered by rotating the lifting operation bolt of the spacing alignment device for the pipe flange of FIG. 5;
7 is a view showing the configuration of a spaced alignment device for a pipe flange according to another embodiment of the present invention.

이하에서는 첨부된 도면을 참조하여 본 발명에 대해 상세히 설명한다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 배관 플랜지용 이격 정렬장치는, 도 1 및 도 2에 도시된 바와 같이, 서로 맞대는 플랜지(20) 간의 체결 방식으로 결합 되는 두 배관(10)의 플랜지(20) 사이에 구비되어 체결 작업 이후 가스켓(40)의 삽입 또는 탈거를 위해 두 플랜지(20) 사이의 간격이 벌어지도록 하는 것으로서, 두 배관(10)의 플랜지(20)들 중 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 관통되게 하단이 끼워져 고정되며 상하 수직으로 연장되되 상단부가 두 플랜지(20) 사이의 협착부분으로부터 상부로 이격 되게 구비된 지그 몸체(100)와, 지그 몸체(100)의 상단부에 나사 결합 방식으로 조립되어 회전 조작에 의해 두 플랜지(20) 사이의 협착부분에 대해 상하로 승강 가능하게 구비된 승강 조작 볼트(200)와, 두 플랜지(20) 사이의 협착부분에 대해서 하강시 선 접촉 및 삽입이 이뤄지도록 하단에 형성된 선단부는 측면 상 쐐기형태를 이루며 정면상 일정 폭을 갖도록 면 따기 가공되어 마련되고 승강 조작 볼트(200)의 단부에 착탈 가능 및 회전 가능하게 조립되어 승강 조작 볼트(200)의 승강에 따라 함께 승강 되되 하강시 두 플랜지(20) 사이의 틈새에 선단부가 맞물려 회전은 억제되도록 구비된 플랜지 벌림 키이(300)를 포함한다.As shown in FIGS. 1 and 2, the spaced alignment device for a pipe flange according to the present invention is provided between the flanges 20 of two pipes 10 coupled in a fastening manner between the flanges 20 facing each other. The gap between the two flanges 20 is widened for insertion or removal of the gasket 40 after the fastening operation, and the bolt hole 21 of one of the flanges 20 of the two pipes 10 is The lower end is fitted and fixed through the bolt hole 21 of the jig body 100 and the jig body 100 is extended vertically and the upper end is spaced apart from the constriction part between the two flanges 20 and the jig body 100 The lifting operation bolt 200 is assembled at the upper end in a screw-coupled manner and is provided so as to be able to move up and down with respect to the constriction between the two flanges 20 by rotation operation, and the constriction between the two flanges 20 is lowered. The tip formed at the bottom to make eye contact and insertion is a wedge shape on the side and is prepared by face picking to have a certain width on the front, and is detachably and rotatably assembled at the end of the lifting operation bolt 200 for lifting operation The bolt 200 is lifted together according to the elevation of the bolt 200 and includes a flange opening key 300 provided so that the front end is engaged in the gap between the two flanges 20 and rotation is suppressed when descending.

이에 따라, 도 4 내지 도 6에 도시된 바와 같이, 서로 맞대는 플랜지(20) 간의 체결 방식으로 결합 되는 두 배관(10)의 플랜지(20) 사이에 구비되어 체결 작업 이후에라도 가스켓(40)의 삽입 또는 탈거를 위해 두 플랜지(20) 사이의 간격이 손쉽고 간편하게 벌어지도록 하여, 기존에 배관 플랜지(20)들 사이에 개재된 가스켓(40)을 교체하거나 삽입 또는 탈거시 작업자의 손가락이 플랜지(20)들 사이에 협착 되어 안전사고가 발생 되는 것을 미연에 방지하고, 가스켓(40) 교체 작업의 어려움도 해결되도록 함으로써, 가스켓(40) 교체 작업이 안전하고 용이하게 이뤄지도록 할 수 있는 배관 플랜지용 이격 정렬장치를 제공할 수 있다.Accordingly, as shown in FIGS. 4 to 6, the gasket 40 is provided between the flanges 20 of the two pipes 10 coupled in a fastening manner between the flanges 20 facing each other, even after the fastening operation. The gap between the two flanges 20 is easily and conveniently widened for insertion or removal, so that when replacing the gasket 40 interposed between the pipe flanges 20 or inserting or removing the flange 20, the operator's finger ), to prevent a safety accident from occurring in advance, and to solve the difficulty of replacing the gasket 40, so that the gasket 40 replacement operation can be performed safely and easily. An alignment device may be provided.

도 4는 본 발명에 따른 배관 플랜지용 이격 정렬장치가 배관(10)의 플랜지(20) 연결부분에 적용되기 전 상태를 도시한 도면이고, 도 5는 도 4의 배관 플랜지용 이격 정렬장치의 고정 바아(110)가 볼트구멍(21)으로 끼워져 두 플랜지(20) 사이의 간격을 벌리기 전 상태를 도시한 도면이며, 도 6은 도 5의 배관 플랜지용 이격 정렬장치의 승강 조작 볼트(200)를 회전시켜 플랜지 벌림 키이(300)가 하강 됨에 따라 두 플랜지(20) 사이의 간격을 벌리며 가스켓(40)의 탈거 및 삽입에 의해 가스켓(40)을 교체하는 과정을 도시한 도면이다.Figure 4 is a view showing a state before the pipe flange spacing alignment device according to the present invention is applied to the flange 20 connection portion of the pipe 10, Figure 5 is the fixing of the spacing alignment device for the pipe flange of Fig. 4 It is a view showing a state before the bar 110 is inserted into the bolt hole 21 to widen the gap between the two flanges 20, and FIG. It is a view showing a process of replacing the gasket 40 by removing and inserting the gasket 40 while widening the gap between the two flanges 20 as the flange opening key 300 is lowered by rotating.

지그 몸체(100)는, 도 1 및 도 2에 도시된 바와 같이, 하단에 구비되어 두 배관(10)의 플랜지(20)들 중 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 관통되어 걸림 고정되도록 하는 고정 바아(110)와, 측면 상 ‘ㄱ’자의 형상을 갖도록 형성되며 고정 바아(110)의 상부 일측에 편심 되게 연장되어 고정 바아(110)와 함께 측면 상 ‘ㄷ’자의 형태를 이루도록 구비된 연장 바디(120)와, 연장 바디(120)의 상단부에서 타측 단부에 구비되어 두 플랜지(20) 사이의 협착부분으로부터 이격 되게 구비되며 승강 조작 볼트(200)가 나사 결합 방식으로 조립되는 볼트 지지 너트(130)를 포함한다.As shown in FIGS. 1 and 2 , the jig body 100 is provided at the lower end of one of the flanges 20 of the two pipes 10 from one bolt hole 21 to the other bolt hole 21 . ) and the fixing bar 110 to be caught and fixed, and formed to have a 'L' shape on the side and extended eccentrically to the upper one side of the fixing bar 110 to be 'c' on the side with the fixing bar 110 The extended body 120 provided to form a 'shape, and provided at the other end from the upper end of the extended body 120 to be spaced apart from the constriction between the two flanges 20, and the lifting operation bolt 200 is screwed and a bolt support nut 130 assembled in this manner.

이에 따라, 도 4 내지 도 6에 도시된 바와 같이, 고정 바아(110)에 의해 본 발명에 따른 배관 플랜지용 이격 정렬장치를 플랜지(20)에 손쉽고 간편하게 고정한 상태에서 볼트 지지 너트(130)에 조립된 승강 조작 볼트(200)를 회전시켜 상하로 승강 되도록 하여 가스켓(40)의 교체를 위한 두 플랜지(20) 사이의 간격이 용이하게 벌어지도록 할 수 있다.Accordingly, as shown in FIGS. 4 to 6 , the spaced alignment device for a pipe flange according to the present invention is easily and conveniently fixed to the flange 20 by the fixing bar 110 and assembled to the bolt support nut 130 . By rotating the lifting operation bolt 200 to be lifted up and down, the gap between the two flanges 20 for replacement of the gasket 40 can be easily widened.

또한, 두 플랜지(20)의 볼트구멍(21)에 고정 바아(110)가 끼워진 상태에서 두 플랜지(20) 사이의 간격이 서로 벌어지도록 함으로써, 두 플랜지(20)가 서로 이격 되더라도 그 정렬 상태가 흐트러지지 않고 온전히 유지되도록 할 수 있다.In addition, by making the gap between the two flanges 20 widen each other in a state in which the fixing bar 110 is fitted in the bolt hole 21 of the two flanges 20, the alignment state is maintained even if the two flanges 20 are spaced apart from each other. You can make sure it stays intact without being disturbed.

승강 조작 볼트(200)는, 도 2에 도시된 바와 같이, 외주 상에 수나사 산이 형성된 길이가 긴 장 볼트로 마련되고, 하단부와 그 상부의 이격된 위치에는 후술할 베어링 고정 너트(330)와 속 너트(350)의 결합을 위하여 분할핀(210)이 끼워져 체결되는 핀 체결공(211)이 형성된다.As shown in FIG. 2, the lifting operation bolt 200 is provided with a long bolt having an external thread formed on the outer periphery, and the lower end and the upper portion are spaced apart from each other with a bearing fixing nut 330 to be described later. In order to couple the nut 350, a pin fastening hole 211 into which the split pin 210 is inserted and fastened is formed.

플랜지 벌림 키이(300)는, 도 1 내지 도 3에 도시된 바와 같이, 승강 조작 볼트(200)의 회전과는 무관하게 자유 회전 가능하도록 승강 조작 볼트(200)에 조립된다. As shown in FIGS. 1 to 3 , the flange opening key 300 is assembled to the lifting operation bolt 200 to be freely rotatable regardless of the rotation of the lifting operation bolt 200 .

여기서, 두 배관(10)의 플랜지(20) 사이에 개재된 가스켓(40)의 두께는 대략 4.5 mm 정도여서 두 배관(10)의 플랜지(20)를 플랜지 조임 볼트로 서로 체결한 이후에는 두 플랜지(20) 사이의 간격도 대략 4.5 mm 정도 이상이 되고, 플랜지 벌림 키이(300)의 선단부 두께는 대략 3 mm 정도로 마련되어 승강 조작 볼트(200)의 하강시 평면상 정방형 또는 장방형의 형태를 갖도록 마련된 플랜지 벌림 키이(300)도 함께 하강 되며 두 플랜지(20) 사이의 이격된 틈새 사이로 들어가 플랜지(20)에 대해 선 접촉 및 삽입이 이뤄지게 된다.Here, the thickness of the gasket 40 interposed between the flanges 20 of the two pipes 10 is about 4.5 mm. The interval between the (20) is also about 4.5 mm or more, and the thickness of the tip of the flange opening key 300 is about 3 mm. The open key 300 is also lowered together and enters between the spaced gaps between the two flanges 20 to make line contact and insertion with respect to the flange 20 .

본 발명의 일실시예로서, 도 1 및 도 2에 도시된 바와 같이, 승강 조작 볼트(200)와 플랜지 벌림 키이(300)의 사이에는 승강 조작 볼트(200)의 회전시 플랜지 벌림 키이(300)의 회전은 억제되며 승강 조작 볼트(200)의 승강에 따라서 플랜지 벌림 키이(300)가 함께 승강만 가능해지도록 승강 조작 볼트(200)에 대한 플랜지 벌림 키이(300)의 회전을 지지하는 스러스트 베어링(310)이 구비된 것이 바람직하다.As an embodiment of the present invention, as shown in FIGS. 1 and 2 , between the lifting operation bolt 200 and the flange opening key 300 , the flange opening key 300 when the lifting operation bolt 200 rotates. rotation of the thrust bearing 310 supporting the rotation of the flange opening key 300 with respect to the lifting operation bolt 200 so that only the flange opening key 300 can only ascend and descend together according to the lifting and lowering of the lifting operation bolt 200 . ) is preferably provided.

이에 따라, 도 5 및 도 6에 도시된 바와 같이, 승강 조작 볼트(200)의 회전 조작에 의해 승강 조작 볼트(200)의 하강시 플랜지 벌림 키이(300)가 함께 하강 되어 플랜지 벌림 키이(300)의 선단부가 기존의 가스켓(40)이 삽입 개재되어 있던 두 플랜지(20) 사이의 이격된 틈새 사이로 맞물리게 되면, 플랜지 벌림 키이(300)는 승강 조작 볼트(200)의 회전과는 더 이상 무관하게 회전은 억제되며 오히려 승강 조작 볼트(200)와는 별도로 승강 조작 볼트(200)에 대해 자유 회전되어 승강 조작 볼트(200)는 계속 회전되고 플랜지 벌림 키이(300)는 고정되며 두 플랜지(20) 사이의 간격을 점차 더 벌리도록 하강만 계속 되도록 할 때에, 승강 조작 볼트(200)에 대한 플랜지 벌림 키이(300)의 자유 회전이 원활히 이뤄지도록 스러스트 베어링(310)에 의해 마찰 접촉이 최소화되게 지지 되도록 할 수 있고, 두 플랜지(20) 사이의 간격이 충분히 벌어진 후에는 기존의 가스켓(40)은 용이하게 탈거 되며 새로운 가스켓(40)이 삽입 및 개재되도록 할 수 있다.Accordingly, as shown in FIGS. 5 and 6, when the lifting operation bolt 200 is lowered by the rotation operation of the lifting operation bolt 200, the flange opening key 300 is descended together with the flange opening key 300. When the front end of the gasket 40 is interposed between the two flanges 20 in which the gasket 40 is inserted, the flange widening key 300 rotates independently of the rotation of the lifting operation bolt 200 any longer. is suppressed and is rather freely rotated with respect to the lifting operation bolt 200 separately from the lifting operation bolt 200 so that the lifting operation bolt 200 continues to rotate, the flange opening key 300 is fixed, and the gap between the two flanges 20 When only descending is continued so as to gradually spread the , after the gap between the two flanges 20 is sufficiently widened, the existing gasket 40 can be easily removed and a new gasket 40 can be inserted and interposed.

스러스트 베어링(310)은, 도 1 및 도 2에 도시된 바와 같이, 중심부를 통해 승강 조작 볼트(200)가 관통되게 승강 조작 볼트(200)를 감싸는 고리의 형태로 마련되고, 내부에는 다수의 볼 베어링 또는 롤러 베어링이 구비되어 승강 조작 볼트(200)의 길이방향인 축 방향 하중은 견디면서 반경 방향의 하중은 지지하도록 마련된다.As shown in FIGS. 1 and 2 , the thrust bearing 310 is provided in the form of a ring surrounding the lifting operation bolt 200 so that the lifting operation bolt 200 is penetrated through the center, and a plurality of balls therein Bearings or roller bearings are provided to withstand the longitudinal load of the lifting operation bolt 200 in the axial direction while supporting the load in the radial direction.

여기서, 도 1 내지 도 3에 도시된 바와 같이, 플랜지 벌림 키이(300)의 상면 중심부에는 스러스트 베어링(310)이 삽입 안착되는 베어링 안착홈(320)이 함몰 형성되고, 베어링 안착홈(320)에 안착된 스러스트 베어링(310)의 상부에는 스러스트 베어링(310)의 상부로의 이탈이 억제되게 베어링 고정 너트(330)가 구비되되, 베어링 고정 너트(330)는 승강 조작 볼트(200)의 상하 두 핀 체결공(211) 중 상측의 핀 체결공(211)으로 끼워지는 분할핀(210)에 의해 승강 조작 볼트(200)에 고정 결합된 것이 바람직하다.Here, as shown in FIGS. 1 to 3 , a bearing seating groove 320 into which the thrust bearing 310 is inserted and seated is recessed in the center of the upper surface of the flange widening key 300 , and is formed in the bearing seating groove 320 . A bearing fixing nut 330 is provided on the seated upper portion of the thrust bearing 310 to suppress the thrust bearing 310 from moving to the upper portion. It is preferable to be fixedly coupled to the lifting operation bolt 200 by the split pin 210 fitted into the upper pin fastening hole 211 among the fastening holes 211 .

한편, 도 1 내지 도 3에 도시된 바와 같이, 플랜지 벌림 키이(300)의 내부에는 스러스트 베어링(310)을 관통하게 되는 승강 조작 볼트(200)의 하단부가 플랜지 벌림 키이(300)의 내부로 진입되도록 베어링 안착홈(320)에 연통 되는 너트 수용부(340)가 형성되고, 너트 수용부(340)에는 승강 조작 볼트(200)의 상하 두 핀 체결공(211) 중 하측의 핀 체결공(211)으로 끼워지는 분할핀(210)에 의해 승강 조작 볼트(200)의 하단부에 고정 결합되는 속 너트(350)가 수용되도록 속 너트(350)의 크기에 대응되게 너트 수용부(340)가 형성된 것이 바람직하다.On the other hand, as shown in FIGS. 1 to 3 , the lower end of the lifting operation bolt 200 passing through the thrust bearing 310 in the flange opening key 300 enters the inside of the flange opening key 300 . A nut accommodating part 340 communicating with the bearing seating groove 320 is formed so as to be in communication with the nut accommodating part 340, and the lower pin fastening hole 211 of the upper and lower two pin fastening holes 211 of the lifting operation bolt 200 is formed. ), it is preferable that the nut receiving portion 340 is formed to correspond to the size of the inner nut 350 so that the inner nut 350 fixedly coupled to the lower end of the lifting operation bolt 200 is accommodated by the split pin 210 fitted with Do.

이에 따라, 도 1 및 도 6에 도시된 바와 같이, 승강 조작 볼트(200)의 하단부에 결합되며 너트 수용부(340)의 내부로 수용되는 속 너트(350)가 너트 수용부(340)의 내부에서 걸리게 되는 구조로 마련됨으로써, 플랜지 벌림 키이(300)가 승강 조작 볼트(200)의 하부에서 이탈되는 것은 억제되도록 함과 동시에 스러스트 베어링(310) 및 베어링 고정 너트(330)와 함께 승강 조작 볼트(200)의 회전과는 별개로 플랜지 벌림 키이(300)가 승강 조작 볼트(200)에 대하여 상대 회전이 원활하게 이뤄지도록 할 수 있다.Accordingly, as shown in FIGS. 1 and 6 , the inner nut 350 coupled to the lower end of the lifting operation bolt 200 and accommodated in the nut receiving portion 340 is inside the nut receiving portion 340 . By being provided with a structure to be caught in, the flange opening key 300 is suppressed from being separated from the lower part of the lifting operation bolt 200, and at the same time, the lifting operation bolt together with the thrust bearing 310 and the bearing fixing nut 330 ( Independently of the rotation of the 200), the flange opening key 300 can be smoothly rotated relative to the lifting operation bolt 200 .

한편, 본 발명의 또 다른 실시예로서, 도 7에 도시된 바와 같이, 두 배관(10)의 플랜지(20)들 중 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 관통되어 걸림 고정되는 고정 바아(110)는 어느 하나의 볼트구멍(21)으로 끼워지는 부분과 다른 하나의 볼트구멍(21)으로 끼워지는 부분의 사이에 유연성을 갖는 재질로 마련되어 구비된 연성부재(111)를 포함하는 것이 바람직하다.On the other hand, as another embodiment of the present invention, as shown in FIG. 7 , one bolt hole 21 of the flanges 20 of the two pipes 10 penetrates through the other bolt hole 21 . The fixed bar 110, which is caught and fixed, is made of a flexible material and provided with a flexible member 111 between a part fitted into one bolt hole 21 and a part fitted through the other bolt hole 21. ) is preferred.

이에 따라, 두 플랜지(20) 사이의 틈새를 벌려주게 되는 플랜지 벌림 키이(300)의 하강 진입시 두 플랜지(20) 사이의 틈새가 양측으로 동일하게 벌어지지 않고 플랜지 벌림 키이(300)가 진입되는 부분으로만 먼저 벌어지게 되어 두 플랜지(20) 사이의 틈새가 하측으로 갈수록 협소해지는 형태로 되더라도 고정 바아(110)의 휨 변형에 따른 손상이 방지되도록 할 수 있고, 두 플랜지(20)의 직경이 서로 상이하더라도 이에 유동적으로 대응하여 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 고정 바아(110)가 끼워지도록 하는 작업이 더욱 용이하게 이뤄지도록 할 수 있다.Accordingly, the gap between the two flanges 20 does not spread equally on both sides when the flange spreads key 300 that widens the gap between the two flanges 20 enters into the lower part, and the flange spreads the key 300 enters. to prevent damage due to bending deformation of the fixing bar 110 even if the gap between the two flanges 20 becomes narrower toward the lower side because the Even if they are different, the operation of fitting the fixing bar 110 from one bolt hole 21 to the other bolt hole 21 can be made more easily in response to this flexibly.

여기서, 도 7에 도시된 바와 같이, 연성부재(111)의 전방과 후방으로는 수나사산이 외주 상에 형성된 체결 볼트부(113)가 구비되고, 고정 바아(110)에는 체결 볼트부(113)와 너트 결합 방식으로 조립되도록 내측으로 암나사산이 형성된 체결 너트부가 형성되어 연성부재(111)가 고정 바아(110)의 사이에 착탈 가능하게 조립되는 구조를 갖도록 마련된 것이 바람직하다.Here, as shown in FIG. 7 , a fastening bolt part 113 having an external thread formed on the outer periphery is provided in front and rear of the flexible member 111 , and the fastening bolt part 113 is provided on the fixing bar 110 . It is preferable that a fastening nut portion having a female thread formed on the inside is formed so as to be assembled in a nut coupling manner so that the flexible member 111 is detachably assembled between the fixing bars 110 .

상기에 의해 설명되고 첨부된 도면에서 그 기술적인 면이 기술되었으나, 본 발명의 기술적인 사상은 그 설명을 위한 것이고, 그 제한을 두는 것은 아니며 본 발명의 기술분야에서 통상의 기술적인 지식을 가진 자는 본 발명의 기술적인 사상을 이하 후술 될 특허청구범위에 기재된 기술영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다. Although the technical aspects have been described above and in the accompanying drawings, the technical idea of the present invention is for the description, and does not limit the invention, and those of ordinary skill in the art It will be understood that various modifications and changes of the present invention can be made without departing from the technical scope of the present invention as set forth in the claims to be described below.

100 : 지그 몸체 110 : 고정 바아
111 : 연성부재 120 : 연장 바디
130 : 볼트 지지 너트 200 : 승강 조작 볼트
300 : 플랜지 벌림 키이 310 : 스러스트 베어링
320 : 베어링 안착홈 330 : 베어링 고정 너트
340 : 너트 수용부 350 : 속 너트
100: jig body 110: fixed bar
111: flexible member 120: extended body
130: bolt support nut 200: lifting operation bolt
300: flange widening key 310: thrust bearing
320: bearing seating groove 330: bearing fixing nut
340: nut receiving part 350: inner nut

Claims (3)

서로 맞대는 플랜지(20) 간의 체결 방식으로 결합 되는 두 배관(10)의 플랜지(20) 사이에 구비되어 체결 작업 이후 가스켓(40)의 삽입 또는 탈거를 위해 두 플랜지(20) 사이의 간격이 벌어지도록 하는 배관 플랜지용 이격 정렬장치에 있어서,
상기 두 배관(10)의 플랜지(20)들 중 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 관통되게 하단이 끼워져 고정되며, 상하 수직으로 연장되되 상단부가 상기 두 플랜지(20) 사이의 협착부분으로부터 상부로 이격 되게 구비된 지그 몸체(100);
상기 지그 몸체(100)의 상단부에 나사 결합 방식으로 조립되어 회전 조작에 의해 상기 두 플랜지(20) 사이의 협착부분에 대해 상하로 승강 가능하게 구비된 승강 조작 볼트(200); 및
상기 두 플랜지(20) 사이의 협착부분에 대해서 하강시 선 접촉 및 삽입이 이뤄지도록 하단에 형성된 선단부는 측면 상 쐐기형태를 이루며 정면상 일정 폭을 갖도록 면 따기 가공되어 마련되고, 상기 승강 조작 볼트(200)의 단부에 착탈 가능 및 회전 가능하게 조립되어 상기 승강 조작 볼트(200)의 승강에 따라 함께 승강 되되, 하강시 상기 두 플랜지(20) 사이의 틈새에 선단부가 맞물려 회전은 억제되도록 구비된 플랜지 벌림 키이(300);
를 포함하고,
상기 지그 몸체(100)는, 하단에 구비되어 상기 두 배관(10)의 플랜지(20)들 중 어느 하나의 볼트구멍(21)에서 다른 하나의 볼트구멍(21)으로 관통되어 걸림 고정되도록 하는 고정 바아(110)와, 측면 상 ‘ㄱ’자의 형상을 갖도록 형성되며 상기 고정 바아(110)의 상부 일측에 편심 되게 연장되어 상기 고정 바아(110)와 함께 측면 상 ‘ㄷ’자의 형태를 이루도록 구비된 연장 바디(120)와, 상기 연장 바디(120)의 상단부에서 타측 단부에 구비되어 상기 두 플랜지(20) 사이의 협착부분으로부터 이격 되게 구비되며 상기 승강 조작 볼트(200)가 나사 결합 방식으로 조립되는 볼트 지지 너트(130)를 포함하며,
상기 승강 조작 볼트(200)와 상기 플랜지 벌림 키이(300)의 사이에는 상기 승강 조작 볼트(200)의 회전시 상기 플랜지 벌림 키이(300)의 회전은 억제되며 상기 승강 조작 볼트(200)의 승강에 따라서 상기 플랜지 벌림 키이(300)가 함께 승강만 가능해지도록 상기 승강 조작 볼트(200)에 대한 상기 플랜지 벌림 키이(300)의 회전을 지지하는 스러스트 베어링(310)이 구비되고,
상기 플랜지 벌림 키이(300)의 상면 중심부에는 상기 스러스트 베어링(310)이 삽입 안착되는 베어링 안착홈(320)이 함몰 형성되며, 상기 베어링 안착홈(320)에 안착된 상기 스러스트 베어링(310)의 상부에는 상기 스러스트 베어링(310)의 상부로의 이탈이 억제되게 베어링 고정 너트(330)가 구비되되, 상기 베어링 고정 너트(330)는 상기 승강 조작 볼트(200)의 상하 두 핀 체결공(211) 중 상측의 핀 체결공(211)으로 끼워지는 분할핀(210)에 의해 상기 승강 조작 볼트(200)에 고정 결합되고,
상기 플랜지 벌림 키이(300)의 내부에는 상기 스러스트 베어링(310)을 관통하게 되는 상기 승강 조작 볼트(200)의 하단부가 상기 플랜지 벌림 키이(300)의 내부로 진입되도록 상기 베어링 안착홈(320)에 연통 되는 너트 수용부(340)가 형성되며, 상기 너트 수용부(340)에는 상기 승강 조작 볼트(200)의 상하 두 핀 체결공(211) 중 하측의 핀 체결공(211)으로 끼워지는 분할핀(210)에 의해 상기 승강 조작 볼트(200)의 하단부에 고정 결합되는 속 너트(350)가 수용되도록, 상기 속 너트(350)의 크기에 대응되게 상기 너트 수용부(340)가 형성된 것을 특징으로 하는 배관 플랜지용 이격 정렬장치.

It is provided between the flanges 20 of the two pipes 10 coupled by a fastening method between the flanges 20 facing each other, and the gap between the two flanges 20 is increased for insertion or removal of the gasket 40 after the fastening operation. In the spaced alignment device for a pipe flange,
Among the flanges 20 of the two pipes 10, the lower end is inserted and fixed so as to penetrate from one bolt hole 21 to the other bolt hole 21, and the upper end is vertically extended in the two flanges ( 20) a jig body 100 provided to be spaced upward from the constriction between the two;
a lifting operation bolt 200 assembled to the upper end of the jig body 100 in a screw-coupled manner so as to be able to ascend and descend vertically with respect to the constricted portion between the two flanges 20 by rotational operation; and
The tip formed at the lower end so as to make line contact and insertion when descending with respect to the constricted portion between the two flanges 20 forms a wedge shape on the side and is prepared by face picking to have a certain width on the front, and the lifting operation bolt ( 200) is detachably and rotatably assembled at the end of the lift operation bolt 200 and lifts together according to the lift, and when lowering, the front end engages in the gap between the two flanges 20 to inhibit rotation. open key (300);
including,
The jig body 100 is provided at the lower end and penetrates from one bolt hole 21 of the flanges 20 of the two pipes 10 to the other bolt hole 21 and is fixed to be caught. It is formed to have a 'L' shape on the side with the bar 110 and extends eccentrically to an upper side of the fixing bar 110 to form a 'C' shape on the side with the fixing bar 110 The extension body 120 and the extension body 120 are provided at the other end from the upper end of the extension body 120 to be spaced apart from the constriction between the two flanges 20, and the lifting operation bolt 200 is assembled in a screwed manner. Includes a bolt support nut 130,
Between the lifting operation bolt 200 and the flange opening key 300, when the lifting operation bolt 200 rotates, the rotation of the flange opening key 300 is suppressed, and the lifting operation bolt 200 is Therefore, a thrust bearing 310 for supporting the rotation of the flange opening key 300 with respect to the lifting operation bolt 200 is provided so that only the flange opening key 300 can lift and lower together,
A bearing seating groove 320 into which the thrust bearing 310 is inserted and seated is recessed in the center of the upper surface of the flange widening key 300 , and an upper portion of the thrust bearing 310 seated in the bearing seating groove 320 . is provided with a bearing fixing nut 330 to prevent the thrust bearing 310 from moving upward, and the bearing fixing nut 330 is one of the upper and lower two pin fastening holes 211 of the lifting operation bolt 200 . It is fixedly coupled to the lifting operation bolt 200 by a split pin 210 fitted into the upper pin fastening hole 211,
In the inside of the flange widening key 300 , the lower end of the lifting operation bolt 200 passing through the thrust bearing 310 enters into the flange widening key 300 in the bearing seating groove 320 . A nut accommodating part 340 communicating with each other is formed, and the nut accommodating part 340 has a split pin ( 210) so that the inner nut 350 fixedly coupled to the lower end of the lifting operation bolt 200 is accommodated, characterized in that the nut receiving portion 340 is formed to correspond to the size of the inner nut 350 Spacing Alignment for Pipe Flanges.

삭제delete 삭제delete
KR1020210128810A 2021-09-29 2021-09-29 spacing and aligning device for flanges of pipes KR102375415B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210128810A KR102375415B1 (en) 2021-09-29 2021-09-29 spacing and aligning device for flanges of pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210128810A KR102375415B1 (en) 2021-09-29 2021-09-29 spacing and aligning device for flanges of pipes

Publications (1)

Publication Number Publication Date
KR102375415B1 true KR102375415B1 (en) 2022-03-17

Family

ID=80936326

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210128810A KR102375415B1 (en) 2021-09-29 2021-09-29 spacing and aligning device for flanges of pipes

Country Status (1)

Country Link
KR (1) KR102375415B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117287570A (en) * 2023-11-24 2023-12-26 张家港市锦力标准件制造有限公司 Pipeline fastener and supporting system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200403574Y1 (en) 2005-09-30 2005-12-09 주식회사 아세아유니온 Jointing structure of flange for piping
KR20130004654U (en) * 2012-01-20 2013-07-30 삼성중공업 주식회사 Apparatus for Flange Gasket For Pipe Arrangement
KR200493635Y1 (en) * 2019-12-30 2021-05-07 주식회사 한국가스기술공사 flange arrangement jig for pipe connection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200403574Y1 (en) 2005-09-30 2005-12-09 주식회사 아세아유니온 Jointing structure of flange for piping
KR20130004654U (en) * 2012-01-20 2013-07-30 삼성중공업 주식회사 Apparatus for Flange Gasket For Pipe Arrangement
KR200493635Y1 (en) * 2019-12-30 2021-05-07 주식회사 한국가스기술공사 flange arrangement jig for pipe connection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117287570A (en) * 2023-11-24 2023-12-26 张家港市锦力标准件制造有限公司 Pipeline fastener and supporting system
CN117287570B (en) * 2023-11-24 2024-02-06 张家港市锦力标准件制造有限公司 Pipeline fastener and supporting system

Similar Documents

Publication Publication Date Title
KR102375415B1 (en) spacing and aligning device for flanges of pipes
JP6442509B2 (en) Swivel joint
CN102705507A (en) Sealing device for compression test of pressure vessel
US20180001359A1 (en) Lock Ring
US8931595B2 (en) Grease packing jig for bearing
US20050092500A1 (en) Large diameter flush-joint pipe handling system
US10028338B1 (en) Electrode torque lift
EP0365430B1 (en) Lifting ring for laterally accepting heavy loads
US4435816A (en) Method and article for protecting tapered threaded electrode joints by use of an alignment mechanism
CN212398589U (en) Chain type self-locking device
US2996887A (en) Core structures for driving and retapping shell type piles
US2969845A (en) Drill pipe saving device
JP6540652B2 (en) Removal mechanism
JP6415246B2 (en) Pipe joint joining device
CN103171978B (en) Quick connector and tower crane with same
EP1652623A2 (en) Pins at the tips of a manual tool
RU51362U1 (en) CORRECTOR CENTER
KR102399448B1 (en) gasket replacing method between two flanges of pipes
CN213139096U (en) Heavy overhead device operating platform for mooring leg dismantling
CN215402654U (en) Be applied to turning device of sealed quiet ring of EPR unit main pump
KR200275587Y1 (en) T branch tube for middle pressure drill
CN210068032U (en) Guide, blowout preventer and Christmas tree
CN213837762U (en) Wall form support frame
CN217772897U (en) Liftable infusion support of adjusting
CN216519069U (en) Split pin shaft with conical section

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant