KR102369701B1 - Transitional zone available deformation absorption and subsidence reduction and constructing method therefor - Google Patents

Transitional zone available deformation absorption and subsidence reduction and constructing method therefor Download PDF

Info

Publication number
KR102369701B1
KR102369701B1 KR1020200029845A KR20200029845A KR102369701B1 KR 102369701 B1 KR102369701 B1 KR 102369701B1 KR 1020200029845 A KR1020200029845 A KR 1020200029845A KR 20200029845 A KR20200029845 A KR 20200029845A KR 102369701 B1 KR102369701 B1 KR 102369701B1
Authority
KR
South Korea
Prior art keywords
side wall
backfill
deformation
buffer
integrated
Prior art date
Application number
KR1020200029845A
Other languages
Korean (ko)
Other versions
KR20210114296A (en
Inventor
김대상
김웅진
Original Assignee
한국철도기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도기술연구원 filed Critical 한국철도기술연구원
Priority to KR1020200029845A priority Critical patent/KR102369701B1/en
Publication of KR20210114296A publication Critical patent/KR20210114296A/en
Application granted granted Critical
Publication of KR102369701B1 publication Critical patent/KR102369701B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

뒤채움과 완충부를 선시공하고, 구조물의 측벽부와 상판을 후시공하는 구조물 접속부 시공에 있어, 뒤채움과 상기 구조물 측벽부와 상판 사이의 완충부가 구조물로부터 전달되는 변형을 보다 효과적으로 흡수하면서, 구조물 접속부의 측벽과 완충부를 분리시킴으로서, 완충부의 효과적인 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법이 개시되며, 연직방향으로 함께 완충부가 전면에 일체화되도록 형성된 뒤채움; 상기 뒤채움과 완충부의 양 측방으로 형성된 측벽; 및 상기 뒤채움의 전면에 일체화된 측벽부와 상판을 포함하며, 상기 측벽의 단부와 서로 연결된 구조물;을 포함하여 구성된다.In the construction of the structure connection part in which the backfill and the buffer part are pre-constructed, and the side wall part of the structure and the top plate are post-constructed, the buffer part between the backfill and the structure side wall part and the top plate more effectively absorbs the deformation transmitted from the structure, and the structure connection part By separating the side wall and the buffer of the buffer, a structure connection part capable of effective deformation absorption and settlement reduction of the buffer part and a construction method thereof are disclosed, and the backfill formed so that the buffer part is integrated with the front surface together in the vertical direction; sidewalls formed on both sides of the backfill and buffer; and a structure including a side wall unit and a top plate integrated with the front surface of the backfill, and connected to an end of the side wall.

Description

변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법{TRANSITIONAL ZONE AVAILABLE DEFORMATION ABSORPTION AND SUBSIDENCE REDUCTION AND CONSTRUCTING METHOD THEREFOR}Structure connection part capable of absorbing deformation and reducing settlement and its construction method

본 발명은 변형흡수 침하저감이 가능한 구조물 접속부 및 그 시공방법에 관한 것이다, 더욱 구체적으로 뒤채움과 완충부를 선시공하고, 구조물의 측벽부와 상판을 후시공하는 구조물 접속부 시공에 있어, 뒤채움과 상기 구조물 측벽부와 상판 사이의 완충부가 구조물로부터 전달되는 변형을 보다 효과적으로 흡수하면서, 구조물 접속부의 측벽과 완충부를 분리시킴으로서, 완충부의 효과적인 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법에 관한 것이다.The present invention relates to a structure connection part capable of reducing settling by strain absorption and a construction method thereof, and more specifically, in the construction of a structure connection part in which the backfill and the buffer part are pre-constructed, and the side wall part and the upper plate of the structure are post-constructed, the backfilling and the above-mentioned It relates to a structure connection part capable of effectively absorbing deformation and reducing settlement of the buffer part by separating the buffer part from the side wall of the structure connection part while more effectively absorbing the deformation transmitted from the structure by the buffer part between the side wall part of the structure and the top plate, and a method for constructing the same.

도 1a는 종래 교량구조물의 교량접속부 시공도이다. 1A is a construction diagram of a bridge connection part of a conventional bridge structure.

즉, 철도가 통행하는 교량구조물에 있어 교량받침과 신축이음장치를 설치한 상태의 시공도를 도시한 것이다.That is, the construction diagram shows a state in which a bridge bearing and an expansion joint device are installed in a bridge structure through which railroads pass.

이때 상기 교량받침은 거더와 교량하부구조물 사이에 설치되고, 신축이음장치는 교대부와 거더 단부 사이에 각각 별도 시공된다.At this time, the bridge bearing is installed between the girder and the bridge substructure, and the expansion joint device is separately constructed between the abutment and the end of the girder.

이에 신축이음장치 및 교량받침에 의한 초기 건설비와 유지관리비의 과다 소요될 수 밖에 없고,Accordingly, the initial construction cost and maintenance cost due to expansion joint devices and bridge bearings are inevitably excessive.

콘크리트교 등 교량구조물의 경간장 증가 시 온도 및 열차 종방향 시제동하중 증가에 따른 교량접속부 응력이 증가할 수 밖에 없고, 나아가, 교량받침에서의 과도한 응력 발생하기 때문에 교대기초에 시공되는 말뚝기초 등 교대 기초에 과도한 하중 전달로 기초 건설비용 증대할 수 밖에 없음을 알 수 있다.When the span length of a bridge structure such as a concrete bridge increases, the stress at the bridge connection part inevitably increases due to the increase in temperature and the longitudinal braking load of the train. It can be seen that the cost of foundation construction is inevitably increased due to excessive load transfer.

도 1b는 종래 라멘구조물에서의 교량접속부 시공도이다.1b is a construction diagram of a bridge connection part in a conventional Ramen structure.

이와 같이, 상판과 측벽부가 서로 일체화 시공되는 라멘구조물(50)은 교량접속부(20)와 토공부(10)에서 측벽부(41)으로 가해지는 수평력에는 측벽부과 상판이 서로 일체화되어 있어 수평변위에 효과적으로 저항할 수 있지만, 상판으로부터의 온도 및 교통하중에 의하여 사용 중 다양한 변형모드를 경험하게 되어 상기 라멘구조물 (50)의 측벽부(51) 역시 역시 비대하게 설계할 수 밖에 없는 문제점이 있게 됨을 알 수 있다.In this way, in the ramen structure 50 in which the upper plate and the side wall part are integrated with each other, the horizontal force applied from the bridge connection part 20 and the earthwork part 10 to the side wall part 41 has the side wall part and the upper plate integrated with each other, so that the horizontal displacement It can be effectively resisted, but various deformation modes are experienced during use due to the temperature and traffic load from the upper plate, so that the side wall portion 51 of the ramen structure 50 is also designed to be enlarged. can

또한, 종래 측벽부(41)을 선시공하고 뒤채움(10)을 후시공하는 교량접속부 시공 순서로는 측벽부(41)은 강성체인 철근콘크리트, 뒤채움(10)은 시멘트 처리된 자갈등을 사용하기 때문에 사용재료의 압축성의 큰 차이로 인하여 침하 문제를 원천적으로 해결하는 것은 한계가 있게 된다.In addition, in the order of construction of the bridge connection part in which the conventional side wall part 41 is pre-constructed and the backfill 10 is post-constructed, the side wall part 41 is rigid reinforced concrete, and the backfill 10 is cement-treated gravel. Therefore, there is a limit to fundamentally solving the settlement problem due to the large difference in compressibility of the materials used.

도 1c 및 도 1d는 종래 강성 구조체인 교량구조물의 측벽부과 토공부 사이의 교량접속부 침하를 방지하기 위한 보강시공도를 예시한 것이다.1c and 1d illustrate a reinforcement construction diagram for preventing subsidence of the bridge connection part between the earthwork part and the side wall part of a bridge structure, which is a conventional rigid structure.

즉, 강성 구조체인 교량의 측벽부(30)이 시공될 위치의 후방에서 토공부(10)의 선침하를 유도하기 위하여 토공부(10)를 먼저 형성하고;That is, the earthwork portion 10 is first formed in order to induce pre-settlement of the earthwork portion 10 at the rear of the position where the sidewall portion 30 of the bridge, which is a rigid structure, will be constructed;

상기 토공부(10)의 경사면(좌측)에는 상기 교량의 측벽부(21)의 배면에 접하게 될 수직부와 지면에 나란한 수평부로 구성된 보강재(22)를 설치하고, On the inclined surface (left side) of the earthwork 10, a reinforcing material 22 composed of a vertical part to be in contact with the rear surface of the side wall part 21 of the bridge and a horizontal part parallel to the ground is installed,

상기 보강재(22)의 수평부 상면으로는 토목섬유(23)를 포설하고, 상기 토목섬유(23)의 상면은 채움재(24)로 채워 접속부층(21)을 형성하며;a geotextile 23 is laid on the upper surface of the horizontal part of the reinforcing material 22, and the upper surface of the geotextile 23 is filled with a filler 24 to form a connection layer 21;

상기 접속부층(21)은 보강재(22) 설치, 토목섬유(23)의 포설 및 채움재(24)의 충진 작업을 반복하여 측벽부(30)의 높이가 되도록 적층하여 교량 접속부(20)를 형성하고 있음을 알 수 있다.The connection layer 21 is laminated to the height of the side wall 30 by repeating the installation of the reinforcement 22, the installation of the geotextile 23, and the filling of the filler 24 to form the bridge connection 20, and It can be seen that there is

이때, 도 1d와 같이, 보강재(22)의 수직부 전면으로 돌출되도록 노출철근(25)을 상기 보강재(22)에 연결 설치하며, At this time, as shown in Fig. 1d, the exposed reinforcing bar 25 is connected to the reinforcing material 22 and installed so as to protrude toward the front of the vertical part of the reinforcing material 22,

상기 노출철근(25)이 상기 측벽부(30)에 매립되도록 측벽부(30)의 형성을 위한 거푸집(미도시)을 설치하고 콘크리트를 타설함으로써, 상기 측벽부(30)가 상기 교량 접속부(20)와 일체가 되도록 한 것이다.By installing a formwork (not shown) for the formation of the side wall part 30 so that the exposed reinforcing bar 25 is embedded in the side wall part 30 and pouring concrete, the side wall part 30 is connected to the bridge connection part 20 ) to become one with

이에 교량 접속부(20)와 토공부(10)를 먼저 시공하여 잔류침하를 수렴시킨 후 측벽부(30)를 연결 시공하여 부등침하를 최소화함으로서 이동하중이나 기타 작용하중에 대한 강성 구조체 접속부의 안정성을 최대한 확보할 수 있도록 하고 있음을 알 수 있다.Therefore, the bridge connection part 20 and the earthwork part 10 are first constructed to converge the residual settlement, and then the side wall part 30 is connected and constructed to minimize the differential settlement, thereby improving the stability of the rigid structure connection part against moving loads or other applied loads. It can be seen that they are trying to secure as much as possible.

이에 교량 접속부(20)와 토공부(10)를 먼저 시공하는 공법으로 교량 접속부의 침하를 방지할 수 있기는 하지만, 교량 접속부(20)에서 측벽부(30)으로 가해지는 수평토압, 지진하중등에 의한 신축(수평변형, 변위)가 고려되지 않아 실제 측벽부(30) 단면은 단면이 커질 수 밖에 없고, 이에 효율성과 경제성이 저하될 수 밖에 없다는 한계가 있었다.Accordingly, although the bridge connection part 20 and the earthwork part 10 are first constructed, the settlement of the bridge connection part can be prevented, but horizontal earth pressure applied from the bridge connection part 20 to the side wall part 30, the earthquake load, etc. Since expansion and contraction (horizontal deformation, displacement) is not taken into account, the cross-section of the actual side wall portion 30 has no choice but to increase, and thus there is a limit in that efficiency and economic efficiency are inevitably reduced.

대한민국 특허 제 10-1006900호(발명의 명칭: 강성 구조체의 뒷채움 보강구조의 시공방법, 공개일자: 2009년12월24일)Korean Patent No. 10-1006900 (Title of the invention: Construction method of backfill reinforcement structure of rigid structure, publication date: December 24, 2009) 대한민국 특허 제 10-1175098호(발명의 명칭: 중간 보조지지대를 이용하여 수직도를 유지하는 강성 구조체와 뒷채움부의 결속구조 및 결속시공방법, 공개일자: 2012년08월21일)Republic of Korea Patent No. 10-1175098 (Title of the invention: Binding structure and binding construction method of a rigid structure maintaining verticality using an intermediate auxiliary support and a backfilling part, publication date: August 21, 2012) 대한민국 특허 제 10-1896403호(발명의 명칭: 일체식 교량구조물 및 그 시공방법, 공개일자: 2018년02월26일)Republic of Korea Patent No. 10-1896403 (Title of the invention: Integrated bridge structure and its construction method, publication date: February 26, 2018) 대한민국 특허 제 10-0971004호(발명의 명칭: 벽체를 이루는 패널과 강성 벽체구조를 이용한 보강토 옹벽, 공개일자: 2009년09월02일)Republic of Korea Patent No. 10-0971004 (Title of the invention: Reinforced earth retaining wall using a panel forming a wall and a rigid wall structure, publication date: September 02, 2009)

이에 본 발명은 교량구조물의 상판, 거더, 교대부로터 전달되는 변형을 완충부가 보다 효과적으로 흡수할 수 있도록 함으로서, 교량구조물에 설치되는 신축이음장치를 설치하지 않아도 되도록 하여 보다 신속하고 경제적인 교량구조물 시공이 가능한 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.Accordingly, the present invention allows the buffer part to more effectively absorb the deformation transmitted from the upper plate, the girder, and the abutment of the bridge structure, thereby eliminating the need to install an expansion joint installed on the bridge structure, thereby constructing a faster and more economical bridge structure. It is a technical task to solve the structural connection part and its construction method that can absorb deformation and reduce settlement.

또한, 본 발명은 상기 완충부를 구조물 접속부의 측벽과 분리(비일체화)시켜 완충부의 변형을 보다 월활하게 함으로서 완충부의 효율성을 높일 수 있으며 침하저감에 효과적인 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, the present invention can increase the efficiency of the buffer part by separating (non-integrating) the sidewall of the buffer part from the side wall of the structure connection part to make the deformation of the buffer part smoother, and the structure connection part that can effectively absorb deformation and reduce settlement and its construction Provide a method as a technical problem to be solved.

또한, 상기 완충부는 구조물 접속부의 측벽을 이용하여 교량구조물의 측벽부와 서로 연결되도록 함으로서 교량구조물이 변형에 보다 효율적으로 대응할 수 있도록 함으로서 완충부 시공의 효율성을 높일 수 있는 변형흡수 침하저감이 가능한 구조물 접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, the buffer part is connected to the side wall part of the bridge structure by using the side wall of the structure connection part, so that the bridge structure can respond more efficiently to deformation, thereby increasing the efficiency of the buffer part construction. It is a technical task to solve the provision of the connection part and its construction method.

또한, 완충부와 완충부 후방의 뒤채움은 서로 다른 재료적 구성으로 시공함으로서 교량구조물의 횡방향 변형에도 효과적으로 대응할 수 있는 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법 제공을 해결하고자 하는 기술적 과제로 한다.In addition, by constructing the buffer part and the backfilling of the buffer part with different material configurations, it is a technical solution to provide a structural connection part capable of absorbing deformation and reducing settlement that can effectively respond to lateral deformation of the bridge structure and its construction method make it a task

상기 과제를 달성하기 위한 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법은, 연직방향으로 함께 완충부가 전면에 일체화되도록 형성된 뒤채움; 상기 뒤채움과 완충부의 양 측방으로 형성된 측벽; 및 상기 뒤채움의 전면에 일체화된 측벽부와 상판을 포함하며, 상기 측벽의 단부와 서로 연결된 구조물;을 포함하며, 상기 뒤채움의 전면에 일체화되도록 형성된 완충부는 구조물의 교대부와 상판으로부터 전달되는 하중에 의한 변형을 흡수하도록 하되, 상기 뒤채움는 측벽과 일체화되고, 상기 완충부와는 분리되도록하여 완충부가 구조물의 종방향 및 횡방향 변형을 모두 흡수하도록 하게 된다.The structure connection part and its construction method capable of absorbing deformation and reducing settlement of the present invention for achieving the above object include: backfill formed so that the buffer part is integrated with the front surface together in the vertical direction; sidewalls formed on both sides of the backfill and buffer; and a structure that includes a side wall part and a top plate integrated with the front surface of the backfill, and is connected to the end of the side wall, and a buffer part formed to be integrated with the front surface of the backfill is delivered from the alternating part of the structure and the top plate To absorb the deformation due to the load, the backfill is integrated with the sidewall and separated from the buffer so that the buffer absorbs both the longitudinal and lateral deformations of the structure.

본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부 및 그 시공방법에 의하면 교량구조물의 상판, 교대부, 거더를 일체화 하여 교량구조물과 구조물 접속부 침하저감 및 구조적 안정성 향상된다.According to the structure connection part and its construction method capable of absorbing deformation and reducing settlement of the present invention, the bridge structure and the structure connection part settlement reduction and structural stability are improved by integrating the upper plate, abutment part, and girders of the bridge structure.

또한, 구조물 접속부의 측벽과 뒤채움, 완충부의 분리 및 일체화를 통해 교량구조물의 횡방향 변형에도 효과적으로 대응할 수 있어 보다 효과적인 완충부 제공이 가능한 완충부의 변형이 용이한 구조물 접속부 및 그 시공방법 제공이 가능하게 된다.In addition, it is possible to effectively respond to lateral deformation of the bridge structure through the sidewall and backfilling of the structure connection part, and separation and integration of the buffer part. will do

또한, 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부에 의하면 교량구조물의 교대부에 있어 신축이음장치를 설치하지 않아도 되기 때문에 유지보수비용 절감이 가능하고, 종방향 및 횡방향 변형을 완충부가 흡수해주기 때문에 교대부와 교대부기초의 슬림화가 가능하여 공사비용 절감이 가능하게 된다.In addition, according to the structure connection part capable of absorbing deformation and reducing settlement of the present invention, it is possible to reduce maintenance costs because it is not necessary to install an expansion joint device in the abutment part of the bridge structure, and the longitudinal and lateral deformations are absorbed by the buffer part This makes it possible to reduce the construction cost by making it possible to slim the abutment part and the abutment part foundation.

도 1a는 종래 교량구조물의 교량접속부 시공도,
도 1b는 종래 라멘구조물에서의 교량접속부 시공도,
도 1c 및 도 1d는 종래 강성 구조체인 교량구조물의 측벽부과 토공부 사이의 교량접속부 침하를 방지하기 위한 보강시공도,
도 2a 및 도 2b는 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부의 시공개념도 및 구성도,
도 3a 및 도 3b는 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부 시공방법의 순서도 및 시공도를 도시한 것이다.
Figure 1a is a construction diagram of a bridge connection part of a conventional bridge structure;
1b is a construction view of a bridge connection part in a conventional Ramen structure;
1c and 1d are reinforcing construction diagrams to prevent subsidence of the bridge connection part between the side wall part and the earthwork part of a bridge structure, which is a conventional rigid structure;
Figures 2a and 2b is a construction conceptual diagram and configuration diagram of a structure connection part capable of absorbing deformation and reducing settlement of the present invention;
3a and 3b show a flow chart and construction diagram of a structure connection part construction method capable of absorbing deformation and reducing settlement of the present invention.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art can easily implement them. However, the present invention may be embodied in several different forms and is not limited to the embodiments described herein. And in order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are attached to similar parts throughout the specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a part "includes" a certain element, it means that other elements may be further included, rather than excluding other elements, unless otherwise stated.

[ 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부(100) ][Structure connection part 100 capable of absorbing deformation and reducing settlement of the present invention]

도 2a 및 도 2b는 본 발명의 변형흡수 및 침하저감이 가능한 구조물 접속부(100)의 시공개념도 및 구성도를 도시한 것이다.2a and 2b show a construction conceptual diagram and a configuration diagram of the structure connection part 100 capable of absorbing deformation and reducing settlement of the present invention.

먼저, 상기 구조물 접속부(100)는 예컨대, 도로, 철도를 횡단하는 교량구조물(200)을 시공하는 과정에서 교량구조물(200)과 접속되는 뒤채움(110)을 포함하는 토공부 사이의 경계구간을 의미한다.First, the structure connection part 100 is, for example, in the process of constructing a bridge structure 200 that crosses a road and a railroad, the boundary section between the earthworks including the backfill 110 connected to the bridge structure 200 it means.

또한, 구조물 접속부(100)에서 도 2a와 같이, 교량구조물(200)과 뒤채움(110) 사이에는 완충부(120)가 시공되며, 상기 완충부(120)와 뒤채움(110)은 서로 종방향으로 일체화 시공되도록 하되 양 측방(횡방향)으로 측벽(140)이 시공된다.In addition, as shown in FIG. 2a in the structure connection part 100, the buffer part 120 is constructed between the bridge structure 200 and the backfill 110, and the buffer part 120 and the backfill 110 are longitudinal to each other. The side walls 140 are constructed in both sides (transverse direction) so as to be integrally constructed in the direction.

또한, 상기 완충부(120)는 도 2b와 같이, 교량구조물(200)의 측벽부(210)와 상판(220)이 일체로 시공되도록 한 것을 이용하고, 연결재(240)을 이용하여 서로 연결시키게 되며, 완충부(110)는 교량구조물(200)의 온도하중, 열차하중등에 의한 종방향 및 횡방향 변형을 흡수하는 역할을 하게 된다.In addition, the buffer part 120 uses the one in which the side wall part 210 and the upper plate 220 of the bridge structure 200 are integrally constructed, as shown in FIG. 2B , and is connected to each other using the connecting material 240 The buffer unit 110 serves to absorb longitudinal and lateral deformation caused by temperature load, train load, etc. of the bridge structure 200 .

또한, 상기 측벽(140)은 도 2b와 같이, 완충부(120)와 뒤채움(110) 양 측방으로 위치하도록 하여 수용하도록 하고, 교량구조물의 측벽부(210)와 서로 측방연결재(141)을 이용하여 서로 연결시키게 된다.In addition, as shown in FIG. 2b , the side wall 140 is positioned on both sides of the buffer unit 120 and the backfill 110 to accommodate it, and the side wall unit 210 of the bridge structure and the side connecting material 141 are connected to each other. are used to connect them to each other.

이에 상기 교량구조물(200)은 도 2a 및 도 2b와 같이, 양 측벽부(210)와 상판(220)을 포함하여 구성되며, 양 측벽부(210) 상부 내측 사이에 상판(220)이 일체화 시공되며 상판(220)은 슬래브로서 상면에 포장층이 시공될 수 있다.Accordingly, the bridge structure 200 is configured to include both side wall parts 210 and a top plate 220, as shown in FIGS. 2A and 2B, and the top plate 220 is integrated between the upper inner sides of both side wall parts 210. And the top plate 220 is a slab, and a pavement layer may be installed on the top surface.

이러한 교량구조물(200)은 도 2a 및 도 2b와 같이, 콘크리트로 시공하기 때문에 온도에 의하여 종방향 및 횡“W향으로 변형이 발생하게 되며, 이러한 변형은 도 1a를 참조하면 주로 신축이음장치와 교량받침에 의하여 상쇄시키게 된다.As shown in FIGS. 2A and 2B, since the bridge structure 200 is constructed of concrete, deformation occurs in the longitudinal and lateral “W” directions depending on the temperature. It is offset by bridge bearings.

하지만 이러한 신축이음장치와 교량받침은 유지관리 비용이 많이 소요되기 때문에 본 발명은 신축이음장치와 교량받침을 설치하지 않고, 양 측벽부(210)와 상판(220)의 온도에 의한 종방향 및 횡방향 변형을 후술되는 완충부(120)에 의하여 흡수할 수 있도록 하게 된다.However, since the expansion joint device and the bridge bearing require a lot of maintenance cost, the present invention does not install the expansion joint device and the bridge support, and the longitudinal and lateral directions due to the temperature of both side wall parts 210 and the upper plate 220 . It is made to be able to absorb the directional deformation by the buffer part 120 to be described later.

이로서 본 발명은 교량구조물(200)의 유지관리 비용을 절감할 수 있게 되며, 신축이음장치와 교량받침을 설치하지 않기 때문에 교량구조물의 단면을 슬림화시킬 수 있어 효율적이고 경제적인 교량구조물(200) 시공이 가능하게 된다.As a result, the present invention can reduce the maintenance cost of the bridge structure 200, and since the expansion joint device and the bridge support are not installed, the cross section of the bridge structure can be slimmed down, so that the bridge structure 200 construction is efficient and economical. This becomes possible.

구체적으로는, 먼저 상기 측벽부(210)는 도 2a 및 도 2b와 같이, 일종의 수직판 구조물로서 현장타설콘크리트등에 의하여 시공 될수 있으며 측벽부(210) 사이에는 교각부가 적어도 1개 이상 일체로 시공될 수 있다.Specifically, first, the side wall part 210 is a kind of vertical plate structure as shown in FIGS. 2A and 2B, and may be constructed by cast-in-place concrete, etc. can

다음으로 상판(220)은 상면에 포장층이 형성되도록 하고, 양 측벽부(210) 상부 내측 사이에 일체로 시공되도록 하게 된다.Next, the top plate 220 is formed such that a pavement layer is formed on the top surface, and is integrally constructed between the upper inner side of the side wall parts 210 .

이에 상기 교량구조물(200)은 온도하중, 교통하중이 작용하게 되면 종방향 및 횡방향으로 변형이 발생하게 되는데 이러한 변형을 교량구조물(200)의 양 측벽부(210) 배면에 일체화시공된 구조물 접속부(100)의 완충부(120)를 이용하여 흡수하게 된다.Accordingly, the bridge structure 200 is deformed in the longitudinal and lateral directions when a temperature load and a traffic load are applied. It is absorbed using the buffer part 120 of (100).

이때 상기 구조물 접속부(100)는 도 2a 및 도 2b와 같이, 뒤채움(110), 완충부(120), 기준틀(130), 측벽(140)을 포함한다.At this time, the structure connection part 100 includes a backfill 110 , a buffer part 120 , a frame of reference 130 , and a side wall 140 , as shown in FIGS. 2A and 2B .

먼저, 상기 뒤채움(110)은 도 2a 및 도 2b와 같이, 교량구조물(200)의 양 측벽부(210) 배면(A)쪽으로 연직방향으로 자립성토 되도록 시공된 것으로서, 양 측벽부(210) 배면(A)으로부터 이격되어 완충부(120)가 양 측벽부(210) 배면(A)과 뒤채움(110) 사이에 형성될 수 있도록 시공되는 토공체이다.First, the backfill 110 is constructed so as to be self-reliant in the vertical direction toward the rear surface A of both side wall parts 210 of the bridge structure 200, as shown in FIGS. 2A and 2B, both side wall parts 210 It is an earthwork body that is spaced apart from the rear surface (A) so that the buffer part 120 can be formed between the side wall parts 210, the back surface (A) and the backfill (110).

이러한 뒤채움(110)은 일정한 높이를 가진 토공체이기 때문에 하방으로 갈수록 커지는 토압에 저항하면서 연직 자립을 위해 보강재(111)를 이용하여 측벽부(210) 배면(A)과 이격되어 연직 자립되도록 시공하게 된다.Since this backfill 110 is an earthwork body having a certain height, it is constructed so that it is spaced apart from the rear surface (A) of the side wall part 210 and vertically independent by using the reinforcement material 111 for vertical independence while resisting the earth pressure that increases downward. will do

이때 상기 뒤채움(110)이 양 측벽부(210) 배면(A)쪽에 연직으로 자립성토되도록 시공하는 이유는 뒤채움(110)을 양 측벽부(210)보다 먼저 시공하기 때문에 시공 시 자립이 가능하도록 하기 위한 것으로서, 뒤채움(110)의 자립 및 연직도 향상 및 완충부(120)를 함께 시공하기 위하여 보강재(111)를 이용하여 전면부(B)를 보강하게 된다.At this time, the reason for constructing the backfill 110 so that the backfill 110 is vertically self-reliant on the rear surface A of both side wall parts 210 is that the backfill 110 is constructed before both side wall parts 210, so it is possible to stand on its own during construction. In order to do this, the front part B is reinforced using the reinforcing material 111 in order to improve the independence and verticality of the backfill 110 and to construct the buffer part 120 together.

이러한 뒤채움(110)은 시멘트 처리된 토사 또는 자갈을 일정높이 포설, 다짐하여 적층시켜 가면서 일정한 높이(H)로 시공하게 되는데 1회 적층 시 마다 상면에 보강재(111, 지반보강용 지오그리드등)를 포설하여 다수 적층된 뒤채움(110)이 상,하로 일체화되도록 하게 된다.This backfill 110 is constructed with a certain height (H) while laying and compacting cement-treated soil or gravel at a certain height, and each time lamination, a reinforcing material (111, geogrid for ground reinforcement, etc.) By laying a plurality of stacked backfill 110 is to be integrated in the top and bottom.

이에 상기 뒤채움(110)은 양 측벽부(210)의 배면(A) 쪽으로 연직으로 자립성토 되도록 하되, 양 측벽부(210)의 저면을 기준으로 상판(220)까지 연직으로 자립된 저면폭이 상면폭 보다 큰 사다리꼴 단면 형태로 시공되며 보강재(111)도 다층으로 시공되며, 작용 토압에 대응하여 상부로 갈수록 수평 연장길이가 짧아지도록 시공되고 있음을 알 수 있다.Accordingly, the backfill 110 is vertically self-reliant toward the rear surface (A) of both side wall parts 210, but the bottom width vertically independent from the bottom surface of both side wall parts 210 to the top plate 220 is It is constructed in the form of a trapezoidal cross-section larger than the width of the upper surface, and the reinforcement 111 is also constructed in multiple layers, and it can be seen that the construction is being constructed so that the horizontal extension length becomes shorter toward the upper part in response to the applied earth pressure.

또한, 시멘트 처리되어 후술되는 측벽(140)과 서로 구속되기 때문에 측벽 내측에서 변형을 흡수하는 완충부(120)를 효과적으로 지지할 수 있게 된다. 즉 측벽(140)과 접하는 부위는 뒤채움(110)이 일체화되지만, 후술되는 완충부(120)는 일체화되지 않고 분리되므로 완충부(120)의 횡방향 변형을 효과적으로 확보할 수 있게 된다.In addition, since it is cemented and is constrained with the side wall 140 to be described later, it is possible to effectively support the buffer unit 120 that absorbs deformation from the inside of the side wall. That is, the backfill 110 is integrated in the portion in contact with the side wall 140 , but the buffer part 120 to be described later is separated without being integrated, so that it is possible to effectively secure the lateral deformation of the buffer part 120 .

다음으로 상기 완충부(120)는 도 2a 및 도 2b와 같이, 뒤채움(110)과 교량구조물(200)의 양 측벽부(210)와 상판(220) 배면(A) 사이에 연직으로 형성된 공간(S)에 형성되도록 하되, 뒤채움(110)의 전면부(B)에 함께 연직으로 형성될 수 있도록 기준틀(130)을 이용하여 상기 공간(S)에 위치하도록 형성시키게 된다.Next, the buffer part 120 is a space formed vertically between the backfill 110 and both side wall parts 210 of the bridge structure 200 and the back surface A of the upper plate 220, as shown in FIGS. 2a and 2b. It is formed in (S), but is formed to be located in the space (S) using the reference frame 130 so that it can be formed vertically together on the front part (B) of the backfill (110).

이러한 완충부(120)는 교량구조물(200)의 양 측벽부(210)와 상판(220)으로부터 전달되는 열차를 포함하는 차량의 제어하중, 온도하중등에 의한 양 측벽부(210)의 변형을 흡수하면서, 뒤채움(110) 시공에 의하여 교량구조물(200)의 양 측벽부(210)와 상판(220)에 작용하는 수평토압, 지진하중등에 의한 변형을 흡수하여 교량구조물(200)의 양 측벽부(210)와 상판(220)이 부담하는 토압, 하중을 감소시켜 단면 슬림화가 가능하도록 하는 역할을 하게 된다.The buffer unit 120 absorbs the deformation of both side wall parts 210 due to the control load, temperature load, etc. of the vehicle including the train transmitted from both side wall parts 210 and the top plate 220 of the bridge structure 200 . Meanwhile, both side wall portions of the bridge structure 200 by absorbing deformation caused by horizontal earth pressure and seismic load acting on both side wall portions 210 and the upper plate 220 of the bridge structure 200 by the backfill 110 construction It serves to reduce the earth pressure and load borne by the 210 and the upper plate 220 to make the cross-sectional slimming possible.

이러한 완충부(120)는 수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 신축을 흡수하도록 하는 역할을 하게 된다.The buffer unit 120 uses soil or gravel that does not use cement to be deformed by horizontal force and load, so that the constituent particles are bound to each other and do not act as a rigid body, and to absorb the expansion and contraction of the bridge structure. will do

즉, 교량구조물(200)의 양 측벽부(210)와 상판(220) 배면과 뒤채움(110) 사이에 토사 또는 자갈연직층인 완충부(120)를 형성시켜 교량구조물(200)의 양 측벽부(210)와 상판(220) 배면 쪽 신축을 흡수하도록 한 것이다.That is, between the sidewall portions 210 of the bridge structure 200 and the backside of the top plate 220 and the backfill 110 , the buffer portion 120 that is a vertical layer of soil or gravel is formed to form both sidewalls of the bridge structure 200 . The part 210 and the upper plate 220 are designed to absorb the stretch on the back side.

또한, 시멘트 처리되지 않게 되어 후술되는 측벽(140)과도 서로 구속되지 않으면서 측벽 내측에 수용되기 때문에 교량구조물(200)의 횡방향 변형이 발생함에 있어서도 효과적인 흡수가 가능하다는 장점도 있게 된다.In addition, since it is not treated with cement and is accommodated inside the side wall without being constrained to each other with the side wall 140 to be described later, effective absorption is possible even when the lateral deformation of the bridge structure 200 occurs.

이에 본 발명과 달리 상기 완충부(120)를 두지 않게 되면 종래와 같이 상기 신축에 저항하는 교량구조물(200)의 양 측벽부(210)와 상판(220)을 시공해야 하기 때문에 단면강성 확부를 위한 단면적이 커지기 때문에 교량구조물 시공비용과 품질관리가 어려워지게 되므로 본 발명은 이를 해결할 수 있도록 완충부(120)를 뒤채움(110)과 함께 시공하게 된다.Therefore, unlike the present invention, if the buffer part 120 is not provided, both side wall parts 210 and the upper plate 220 of the bridge structure 200 that resist the expansion and contraction must be constructed as in the prior art. Since the cross-sectional area increases, the construction cost and quality control of the bridge structure become difficult. In the present invention, the buffer part 120 is constructed together with the backfill 110 to solve this problem.

또한 보강재(111)는 도 2b와 같이, 뒤채움(110)의 적층 상면과 완충부(120)의 저면에 포설되도록 하면서 교량구조물(200)의 양 측벽부(210)와 상판(220)의 배면을 따라 상방으로 연장되면서 뒤채움(110)과 완충부(120)의 측면을 감싸도록 ㄷ자 형태로 배치시키게 되며, 상기 뒤채움(110), 완충부(120)와 보강재(111)의 배치 위치를 사전에 표시하여 작업성을 높이기 위하여 사용되는 것이 기준틀(130)이다.In addition, the reinforcing material 111 is installed on the stacked upper surface of the backfill 110 and the bottom surface of the buffer 120, as shown in FIG. 2b, while both side wall portions 210 and the upper plate 220 of the bridge structure 200. The backfill 110 and the buffer part 120 are arranged in a U shape to surround the sides while extending upward, and the arrangement position of the backfill 110, the buffer part 120 and the reinforcing material 111 is The reference frame 130 is used to increase workability by displaying in advance.

이에, 상기 기준틀(130)은 도 2a 및 도 2b와 같이, 교량구조물(200)의 양 측벽부(210)와 상판(220)의 내부철근(230)과 연결시켜 외부로 노출시킨 수평연결재(240)에 연결된 ㄴ자형태의 철근망을 이용하면 되는데, 수직부가 양 측벽부(210)와 상판(220)의 배면에 접하도록 하고, 수평부가 완충부(120)쪽으로 연장배치되도록 하는 방식으로 설치하게 된다.Accordingly, the frame of reference 130 is connected to both side wall portions 210 of the bridge structure 200 and the inner reinforcing bars 230 of the upper plate 220, as shown in FIGS. 2A and 2B, and the horizontal connecting material 240 exposed to the outside. ) connected to the L-shaped reinforcing bar network, the vertical part is in contact with both side wall parts 210 and the back surface of the top plate 220, and the horizontal part is installed in such a way that it is extended toward the buffer part 120. .

상기 수평부를 기준으로 하여 상면에 보강재(111)를 포설하고, 완충부(120)를 적층한 후, 뒤채움(110)도 함께 적층하고, 수직부를 기준으로 뒤채움(110)과 완충부(120)의 측면을 감싸 보강재(111)가 완충부(120) 상면에 수평으로 연장되도록 하여 ㄷ자형태의 보강재로서 설치가 가능하도록 하게 된다.After laying the reinforcing material 111 on the upper surface based on the horizontal part, and stacking the buffer part 120, the backfill 110 is also laminated together, and the backfill 110 and the buffer part 120 based on the vertical part. ) so that the reinforcing material 111 extends horizontally on the upper surface of the buffer unit 120 by wrapping the side surface, so that it can be installed as a U-shaped reinforcing material.

이러한 기준틀(130)은 교량구조물(200)의 양 측벽부(210)와 상판(220) 배면에 1층의 뒤채움(110)과 완충부(120)와 보강재(111)를 시공함에 있어 사용되므로 다층으로 설치되며 도 1d와 같은 형태로 제작된 것을 이용하게 된다.This frame of reference 130 is used in constructing the backfill 110, the buffer part 120, and the reinforcement 111 of the first layer on both side wall parts 210 and the top plate 220 of the bridge structure 200. It is installed in multiple layers, and the one manufactured in the form as shown in FIG. 1D is used.

다음으로 상기 측벽(140)은 도 2a 및 도 2b와 같이, 뒤채움(110)과 완충부(120)가 양 측방으로 접하도록 하면서 뒤채움(110)과 완충부(120)가 내측에 수용하도록 하는 벽체로 형성된다. 구조물 접속부(100)를 감싸는 역할을 하도록 하는 콘크리트 수직벽체로서 뒤채움(110)과는 일체화되고, 완충부(120)와는 분리되도록 하여 완충부(120)가 교량구조물(200)의 종방향 및 횡방향 변형을 효과적으로 흡수하도록 하는 역할을 하게 된다.Next, the sidewall 140 is, as shown in FIGS. 2A and 2B, so that the backfill 110 and the buffer part 120 are in contact with both sides while the backfill 110 and the buffer part 120 are accommodated inside. formed by a wall that As a concrete vertical wall that serves to surround the structure connection part 100, it is integrated with the backfill 110 and is separated from the buffer part 120 so that the buffer part 120 is longitudinal and lateral of the bridge structure 200. It plays a role in effectively absorbing directional deformation.

특히, 상기 측벽(140)은 측벽부(210)와 상판(220)의 배면 외측방으로 연장되도록 하여 L형 형강과 같은 측벽연결재(141)을 이용하여 위치 세팅되도록 함으로서 안정적인 수직시공이 가능하도록 하게 됨을 알 수 있다.In particular, the side wall 140 extends to the outside of the rear surface of the side wall portion 210 and the upper plate 220 so that the position is set using a side wall connecting member 141 such as an L-shaped steel, so that stable vertical construction is possible. it can be seen that

이는 예측하지 못한 지진하중등에 의한 충격등에 있어 보강수단의 역할을 함으로서 보아 안정적인 구조물 접속부(100) 시공이 가능하도록 하게 된다.This makes it possible to construct the stable structure connection part 100 by acting as a reinforcing means in the case of an impact caused by an unexpected earthquake load, etc.

[ 본 발명의 변형흡수 침하저감이 가능한 구조물 접속부 시공방법 ][ Construction method of structure connection part capable of reducing deformation absorption settlement of the present invention ]

도 3a 및 도 3b는 본 발명의 변형흡수 침하저감이 가능한 구조물 접속부(100) 시공방법의 시공순서도를 도시한 것이다.3a and 3b show a construction flow diagram of the construction method of the structure connection part 100 capable of reducing the strain absorption settlement of the present invention.

상기 구조물 접속부(100) 시공은 도 3a와 같이, 뒤채움(110)과 완충부(120) 및 측벽(140)을 선시공하여 발생된 침하를 수용하면서, 측벽부(210)를 기준틀(130)을 이용하여 완충부(120)에 연결시키는 후시공을 하게 되며, 측벽부(210) 상부 내측 사이에 상판(220)을 시공하는 방식으로 시공하게 된다.The structure connection part 100 construction is, as shown in FIG. 3a, the backfill 110, the buffer part 120, and the side wall 140 while accommodating the subsidence generated by the pre-construction, the side wall part 210 is the reference frame 130. The post-construction to be connected to the buffer unit 120 is carried out by using it, and the construction is performed in a manner of constructing the upper plate 220 between the upper inner side of the side wall unit 210 .

이때 상기 측벽(140)은 완충부(120)와는 분리시키고, 뒤채움(110)과는 일체화시켜 시공하게 된다.At this time, the side wall 140 is constructed by separating it from the buffer unit 120 and integrating it with the backfill 110 .

이에 도 3a에 의하면, 먼저 기준틀(130)을 이용하여 보강재(111)를 적층하면서, 완충부(120)와 함께 뒤채움(110)을 역시 적층 형성시키되, 최종 뒤채움(110) 상면에는 포장층이 형성되도록 하여 선시공하고 있음을 알 수 있다. 뒤채움 배면도 성토층으로서 역시 함께 시공하게 된다..Accordingly, according to FIG. 3A, first, while laminating the reinforcement material 111 using the reference frame 130, the backfill 110 is also laminated together with the buffer unit 120, and the final backfill 110 has a packaging layer on the upper surface. It can be seen that the pre-construction is being carried out so that this is formed. The backfill backside will also be constructed as a fill layer.

이에 상기 포장층 상면이 상판(220)의 상면과 높이가 동일해지도록 하되, 양 측벽부(210)의 내부철근(230)에 연결되어 측벽부(210)와 상판(220) 배면(A) 사이에 연직으로 형성된 공간(S)에 노출시킨 수평연결재(240)를 이용하여 연결시키는 방식으로 완충부(120)와 측벽부(210)를 서로 서로 일체화되도록 하여 시공하게 되며 최종 상판(220)은 측벽부(210) 상부 내측 사이에 일체화 시공하게 된다.Accordingly, the upper surface of the pavement layer is made to have the same height as the upper surface of the upper plate 220, and is connected to the inner reinforcing bars 230 of both side wall parts 210 and between the side wall part 210 and the upper plate 220, the rear surface (A). The buffer part 120 and the side wall part 210 are integrated with each other in such a way that they are connected using the horizontal connector 240 exposed to the space S formed vertically on the The unit 210 is integrally constructed between the upper and inner sides.

이에 측벽연결재(141)를 이용하여 측판(140)과 측벽부(210) 및 상판(220)을 서로 일ㅊ화시키게 된다.Accordingly, the side plate 140, the side wall portion 210, and the top plate 220 are united with each other by using the side wall connecting material 141.

이로서 도 3b와 같이, 교량구조물(200)이 최종 완성되면 교량구조물(200)의 온도하중, 차량하중등에 의하여 종방향 및 횡방향으로 변형(신축)이 발생하게 되면 이를 완충부(120)에서 흡수하게 되며, 구조물 접속부(100)의 침하도 완충부와 뒤채움에 의하여 보강재(111)을 통해 저감할 수 있게 된다.As a result, as shown in FIG. 3b , when the bridge structure 200 is finally completed, when deformation (extension) occurs in the longitudinal and lateral directions due to the temperature load, vehicle load, etc. of the bridge structure 200, it is absorbed by the buffer unit 120 And, the subsidence of the structure connection part 100 can also be reduced through the reinforcing material 111 by the buffer part and backfilling.

이로서 교량구조물(200)에는 달리 신축이음장치와 교량받침이 설치되고 있지 않음을 알 수 있어 교량구조물(200)의 단면 슬림화, 측벽부(210) 기초부의 말뚝 시공과 단면 슬림화가 가능하게 됨을 알 수 있다. As a result, it can be seen that the bridge structure 200 is not equipped with an expansion joint device and a bridge support, so that the cross-section of the bridge structure 200, the pile construction of the side wall part 210, and the cross-section slimming are possible. there is.

특히 양 측벽부(210) 사이의 경간장이 증가함에 따른 변형(신축)이 증가되더라도 측벽부(210)와 상판(220)의 단면 효율성 증대로 공사비 절감이 가능하게 되며, 특히 철도차량에 의한 시제동하중에도 효과적으로 신축을 관리할 수 있게 된다.In particular, even if the deformation (contraction) is increased as the span length between the both side wall parts 210 increases, it is possible to reduce the construction cost by increasing the cross-sectional efficiency of the side wall part 210 and the top plate 220, especially the trial braking load by the railroad car. It is also possible to effectively manage the new construction.

또한, 완충부(120)의 종방향 변형과 횡방향 변형은 측벽(140)과의 분리에 의하여 달리 구속되지 않도록 하면서, 측벽(140)과 측벽부(210)를 연결시공함으로서 안정적인 시공관리가 가능하게 된다.In addition, stable construction management is possible by connecting the side wall 140 and the side wall part 210 while preventing the longitudinal and lateral deformation of the buffer part 120 from being otherwise constrained by separation from the side wall 140 . will do

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustration, and those of ordinary skill in the art to which the present invention pertains can understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative in all respects and not restrictive. For example, each component described as a single type may be implemented in a dispersed form, and likewise components described as distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the following claims rather than the above detailed description, and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be interpreted as being included in the scope of the present invention. do.

100: 완충부의 변형이 용이한 구조물 접속부
110: 뒤채움 120: 완충부
130: 기준틀
140: 측벽 141: 측벽연결재
200: 구조물
210: 측벽부 220: 상판
230: 내부철근 240: 연결재
A : 교량구조물의 배면 B: 완충부의 전면부
100: structure connection part with easy deformation of the buffer
110: backfill 120: buffer part
130: frame of reference
140: side wall 141: side wall connector
200: structure
210: side wall 220: top plate
230: internal reinforcing bar 240: connecting material
A: Back side of bridge structure B: Front part of buffer part

Claims (10)

연직방향으로 함께 완충부(120)가 전면에 일체화되도록 형성된 뒤채움(110);
상기 뒤채움(110)과 완충부(120)의 양 측방으로 형성된 측벽(140); 및
상기 뒤채움(110)의 전면에 일체화된 측벽부(210)와 상판(220)을 포함하며, 상기 측벽(140)의 단부와 서로 연결된 구조물(200);을 포함하며,
상기 뒤채움(110)의 전면에 일체화되도록 형성된 완충부(120)는 구조물(200)의 측벽부(210)와 상판(220)으로부터 전달되는 하중에 의한 변형을 흡수하도록 하되,
상기 뒤채움(110)은 측벽(140)과 일체화되고, 상기 완충부(120)와는 분리되도록하여 완충부(120)가 구조물(200)의 종방향 및 횡방향 변형을 모두 흡수하도록 하며, 상기 측벽(140)은 측벽부(210)와 상판(220)의 배면 외측방으로 연장되도록 하여 L형 형강을 포함하는 측벽연결재(141)을 이용하여 위치 세팅되도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부.
Backfill 110 formed so that the buffer unit 120 is integrated with the front surface together in the vertical direction;
Sidewalls 140 formed on both sides of the backfill 110 and the buffer unit 120; and
It includes a structure 200 that includes a side wall portion 210 and a top plate 220 integrated on the front surface of the backfill 110, and is connected to an end of the side wall 140 with each other;
The buffer part 120 formed to be integrated with the front surface of the backfill 110 absorbs the deformation caused by the load transmitted from the side wall part 210 and the top plate 220 of the structure 200,
The backfill 110 is integrated with the side wall 140 and separated from the buffer unit 120 so that the buffer unit 120 absorbs both longitudinal and lateral deformation of the structure 200, and the side wall 140 is a structure connecting portion capable of absorbing deformation and reducing settling that extends outward from the rear of the side wall portion 210 and the upper plate 220 so as to be positioned using a side wall connecting member 141 including an L-shaped steel.
제 1항에 있어서,
상기 완충부(120)는
수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 종방향 및 횡방향 변형을 흡수하도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부.
The method of claim 1,
The buffer unit 120 is
By using cement-free soil or gravel so that it can be deformed by horizontal force and load, the constituent particles are bound to each other and do not act as a rigid body, and the deformation absorption and settlement to absorb longitudinal and lateral deformation of the bridge structure. Structural connections that can be reduced.
제 1항에 있어서,
상기 측벽(140)은
수평력 및 하중에 의하여 변형이 구속되도록 시멘트를 사용하는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하도록 하여 구조물 접속부의 변형을 흡수하도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부.
The method of claim 1,
The side wall 140 is
By using soil or gravel that uses cement to restrain deformation by horizontal force and load, the constituent particles bind to each other and act as a rigid body to absorb the deformation of the structure connecting part.
제 1항에 있어서,
상기 완충부(120)는
뒤채움(110)와 구조물(200)의 측벽부와 상판의 배면(A) 사이에 연직으로 형성된 공간(S)에 형성되도록 하되, 뒤채움(110)의 전면에 함께 형성되도록 기준틀(130)을 이용하여 상기 공간(S)에 위치하도록 형성시키는 변형흡수 및 침하저감이 가능한 구조물 접속부.
The method of claim 1,
The buffer unit 120 is
To be formed in the space (S) formed vertically between the backfill 110 and the side wall portion of the structure 200 and the back surface (A) of the upper plate, the frame of reference 130 is formed together on the front side of the backfill 110 A structure connection part capable of absorbing deformation and reducing settling that is formed so as to be located in the space (S) by using it.
삭제delete 삭제delete (a) 연직방향으로 함께 완충부(120)가 전면에 일체화되도록 형성된 뒤채움(110)를 시공하는 단계;
(b) 상기 뒤채움(110)과 완충부(120)의 양 측방으로 형성된 측벽(140)을 시공하는 단계; 및
(c) 상기 뒤채움(110)의 전면에 일체화된 측벽부(210)와 상판(220)을 포함하며, 상기 측벽(140)의 단부와 서로 연결된 구조물(200)을 시공하는 단계;를 포함하며,
상기 뒤채움(110)의 전면에 일체화되도록 형성된 완충부(120)는 구조물(200)의 측벽부(210)와 상판(220)으로부터 전달되는 하중에 의한 변형을 흡수하도록 하되, 상기 뒤채움(110)는 측벽(140)과 일체화되고, 상기 완충부(120)와는 분리되도록하여 완충부(120)가 구조물(200)의 종방향 및 횡방향 변형을 모두 흡수하도록 하며, 상기 측벽(140)은 측벽부(210)와 상판(220)의 배면 외측방으로 연장되도록 하여 L형 형강을 포함하는 측벽연결재(141)을 이용하여 위치 세팅되도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부 시공방법.
(a) constructing the backfill 110 formed so that the buffer unit 120 is integrated with the front surface together in the vertical direction;
(b) constructing sidewalls 140 formed on both sides of the backfill 110 and the buffer unit 120; and
(c) including the side wall portion 210 and the top plate 220 integrated on the front surface of the backfill 110, and constructing a structure 200 connected to the end of the side wall 140 with each other; and ,
The buffer part 120 formed to be integrated with the front surface of the backfill 110 absorbs deformation due to the load transmitted from the side wall part 210 and the top plate 220 of the structure 200, but the backfill 110 ) is integrated with the sidewall 140 and separated from the buffering part 120 so that the buffering part 120 absorbs both longitudinal and lateral deformations of the structure 200, and the sidewall 140 is a sidewall A method of constructing a connection part for a structure capable of absorbing deformation and reducing settling so that the part 210 and the upper plate 220 extend to the outside of the rear surface and set the position using the side wall connection member 141 including an L-shaped steel.
제 7항에 있어서,
상기 (a)단계의 완충부(120)는 수평력 및 하중에 의하여 변형이 가능하도록 시멘트를 사용하지 않는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하지 않고, 교량구조물의 종방향 및 횡방향 변형을 흡수하도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부 시공방법.
8. The method of claim 7,
The buffer unit 120 of step (a) uses soil or gravel that does not use cement to be deformable by horizontal force and load, so that the constituent particles are bound to each other and do not act as a rigid body, and the longitudinal direction of the bridge structure and a structural connection part construction method capable of absorbing deformation and reducing settling to absorb lateral deformation.
제 7항에 있어서,
상기 (b)단계의 측벽(140)은 수평력 및 하중에 의하여 변형이 구속되도록 시멘트를 사용하는 토사 또는 자갈을 이용함으로서, 구성 입자들이 서로 결속되어 강성체로 작용하도록 하여 구조물 접속부의 변형을 흡수하도록 하는 변형흡수 및 침하저감이 가능한 구조물 접속부 시공방법.
8. The method of claim 7,
The side wall 140 in step (b) uses soil or gravel using cement so that deformation is constrained by horizontal force and load, so that the constituent particles are bound to each other and act as a rigid body to absorb the deformation of the structure connection A method of constructing a connection part for a structure that can absorb deformation and reduce settling.
제 7항에 있어서,
상기 (c) 단계의 구조물(200)은 측벽부(210)와 상판이 서로 일체로 형성된 교량구조물로 시공되는 변형흡수 및 침하저감이 가능한 구조물 접속부 시공방법.
8. The method of claim 7,
The structure 200 of step (c) is a structure connection part construction method capable of absorbing deformation and reducing settlement in which the side wall part 210 and the upper plate are constructed as a bridge structure integrally formed with each other.
KR1020200029845A 2020-03-10 2020-03-10 Transitional zone available deformation absorption and subsidence reduction and constructing method therefor KR102369701B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200029845A KR102369701B1 (en) 2020-03-10 2020-03-10 Transitional zone available deformation absorption and subsidence reduction and constructing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200029845A KR102369701B1 (en) 2020-03-10 2020-03-10 Transitional zone available deformation absorption and subsidence reduction and constructing method therefor

Publications (2)

Publication Number Publication Date
KR20210114296A KR20210114296A (en) 2021-09-23
KR102369701B1 true KR102369701B1 (en) 2022-03-04

Family

ID=77926476

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200029845A KR102369701B1 (en) 2020-03-10 2020-03-10 Transitional zone available deformation absorption and subsidence reduction and constructing method therefor

Country Status (1)

Country Link
KR (1) KR102369701B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102562385B1 (en) * 2021-10-22 2023-08-02 한국철도기술연구원 Protrusive transitional zone available deformation absorption and subsidence reduction and constructing method therefor
CN115217026B (en) * 2022-07-28 2023-03-14 石家庄铁道大学 Integral flexible abutment and abutment-roadbed structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321452A (en) * 2006-06-01 2007-12-13 Railway Technical Res Inst Construction method for bridge and bridge structure thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100971004B1 (en) 2008-02-29 2010-07-20 한국철도기술연구원 Retaining Wall with Panels
KR101006900B1 (en) * 2008-06-16 2011-01-14 한국철도기술연구원 Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
KR101177394B1 (en) * 2010-06-09 2012-08-27 한국철도기술연구원 Fill-Up Structure for Back-Area of Rigid Wall Structure and Construction Method of the Same
KR101175098B1 (en) 2011-10-25 2012-08-21 주식회사 한화건설 Fill-up structure for back-area of rigid wall structure and construction method of the same
KR101896403B1 (en) * 2016-08-16 2018-09-07 한국토지주택공사 Integral bridge structure and construction method thereof
KR20190006671A (en) * 2017-07-11 2019-01-21 한국철도기술연구원 Structural continuation method of reinforcing concrete structure and earth transitional zone

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321452A (en) * 2006-06-01 2007-12-13 Railway Technical Res Inst Construction method for bridge and bridge structure thereof

Also Published As

Publication number Publication date
KR20210114296A (en) 2021-09-23

Similar Documents

Publication Publication Date Title
KR101006900B1 (en) Construction Method of Fill-Up Structure for Back-Area of Rigid Structure
KR100971004B1 (en) Retaining Wall with Panels
KR101507523B1 (en) Slab track structure for railway with lattice approach block, and construction method for the same
KR20090118433A (en) Construction method of semi-integral abutment bridge using steel box girder
KR102369701B1 (en) Transitional zone available deformation absorption and subsidence reduction and constructing method therefor
KR20190006671A (en) Structural continuation method of reinforcing concrete structure and earth transitional zone
KR102063701B1 (en) Construction method for the rahmen bridge using reinforced wall and approach slab
KR101653606B1 (en) Method for constructing integral abutment bridge
KR101185423B1 (en) Reinforcement retaining wall
KR20210007420A (en) Intergrated structure transitional zone using damping section and constructing method thereof
KR20140037658A (en) Hybrid wall for supporting reinforced base of rail track and constructing method thereof
KR101198286B1 (en) Non-wale strut system for top-down construction and top-down construction method thereby
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
CN111705576A (en) Steep slope high-filling roadbed structure adopting high-density EPS filler
KR100956280B1 (en) Reinforced Retaining Wall and Construction Method Thereof
KR102562385B1 (en) Protrusive transitional zone available deformation absorption and subsidence reduction and constructing method therefor
KR101973657B1 (en) Inverted Arcuate Structure to prevent Lateral Flow of the Bridge Abutments and Reparing Method using the Same
KR102377895B1 (en) Hinge-type abutment embankment transition for monent reduction and and constructing method thereof
KR102027480B1 (en) Construction method for the rahmen bridge using facing of geosynthetics reinforced soil retaining wall
KR102562383B1 (en) Bridge abutment embankment transition for horizontal earth pressure reduction and and constructing method thereof
CN210315650U (en) Anchor rod reinforced composite retaining wall
KR102097122B1 (en) Precast mold for platform on piles system and concrete slab track construction method therewith
CN111677006A (en) Structure and method for preventing and controlling differential settlement of roadbed at edge of linear underground structure
KR101733110B1 (en) Roadbed reinforcement stiffness and its construction methods
KR20090130904A (en) Framework and retaining wall using such framework

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right