KR102348737B1 - Tie cable installation device using buoyancy - Google Patents

Tie cable installation device using buoyancy Download PDF

Info

Publication number
KR102348737B1
KR102348737B1 KR1020210071041A KR20210071041A KR102348737B1 KR 102348737 B1 KR102348737 B1 KR 102348737B1 KR 1020210071041 A KR1020210071041 A KR 1020210071041A KR 20210071041 A KR20210071041 A KR 20210071041A KR 102348737 B1 KR102348737 B1 KR 102348737B1
Authority
KR
South Korea
Prior art keywords
tie cable
cable
tie
buoyancy
installation device
Prior art date
Application number
KR1020210071041A
Other languages
Korean (ko)
Inventor
심석래
Original Assignee
주식회사 동아특수건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 동아특수건설 filed Critical 주식회사 동아특수건설
Priority to KR1020210071041A priority Critical patent/KR102348737B1/en
Application granted granted Critical
Publication of KR102348737B1 publication Critical patent/KR102348737B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16GBELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
    • F16G11/00Means for fastening cables or ropes to one another or to other objects; Caps or sleeves for fixing on cables or ropes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/60Rope, cable, or chain winding mechanisms; Capstans adapted for special purposes

Abstract

The present invention relates to a tie cable installation device using buoyancy. The tie cable installation device (100) using buoyancy according to the present invention comprises: a plurality of structures (10) inserted vertically into the sea and fixed in order to install a port structure; a tie cable buoyancy module (50) assembling a plurality of cable floats (300), a recovering rope (370), a sagging-preventing rope (360), and a tie cable (200) into a set on the ground and floating the set on the sea to interpose the set between both of the structures (10); a body (110) assembled and installed into both sides or one side of the structure (10); and a tensile winding device (130) disposed on the body (110) to pull and wind the tie cable (200). Accordingly, work of a diver can be minimized and a construction period can be shortened and costs can be saved while how complete the installed tie cable is increased in constructing a variety of port structures such as mooring facilities, the seawall, and the like, so that quality and reliability of the tie cable installation device will be greatly enhanced to satisfy various needs of a user such as a diver and a worker and provide a good image of the product.

Description

부력을 이용한 타이케이블 설치장치{Tie cable installation device using buoyancy}Tie cable installation device using buoyancy}

본 발명의 실시예는 부력을 이용한 타이케이블 설치장치에 관한 것으로, 보다 상세하게는 각종 항만 구조물(예: 계류시설, 방파제 등)을 시공함에 있어 잠수부의 작업을 최소화하고, 타이케이블의 설치 완성도를 높이면서 공사기간을 단축하고 코스트(비용)도 절약할 수 있도록 한 것이고, 이로 인해 타이케이블 설치장치의 품질과 신뢰성을 대폭 향상시키므로 사용자인 잠수부 및 작업자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 것이다.An embodiment of the present invention relates to a tie cable installation device using buoyancy, and more specifically, minimizes the work of divers in constructing various harbor structures (eg, mooring facilities, breakwater, etc.) It is designed to shorten the construction period while increasing the cost (cost), and thereby greatly improve the quality and reliability of the tie cable installation device, thereby satisfying the various needs (needs) of divers and workers, users of a good image. so that it can be planted.

주지하다시피 타이케이블(Tie cable)은 일반적으로 교량의 장력증가, H-파일, 시트파일, 강관파일 등과 함께 쓰이며, 항만 구조물(계류시설)의 인장재나 해상교량, 가설구조물(흙막이, 물막이 등)의 인장재로 사용된다.As is well known, tie cables are generally used together with bridge tension increase, H-piles, sheet piles, and steel pipe piles. used as a tension member for

한편, 상기 계류시설(Mooring facilities, Berthing facilities, 繫留施設)은 선박이 접안해서 화물을 적·양화하고 승객이 승강(乘降)을 하는 접안 설비를 총칭해서 계류시설이라고 말한다. 안벽, 잔교, 부잔교, 물양장(物揚場, lighter’s wharf, 거룻배 부두), 돌핀(dolphin), 계류부이 등의 시설을 총칭한다. 계류시설은 계선시설(繫船施設)이라고도 한다.On the other hand, the mooring facilities (berthing facilities, 繫留施設) refers to berthing facilities where a ship docks, loads and unloads cargo, and passengers get on and off the mooring facilities. It is a generic term for facilities such as quay walls, piers, piers, water wharfs, dolphins, and mooring buoys. Mooring facilities are also called mooring facilities.

그러나 상기한 종래의 타이 케이블을 이용한 항만 구조물(계류시설)의 설치시에는 다음과 같은 많은 문제점이 발생되었다However, when installing the port structure (mooring facility) using the conventional tie cable, many problems such as the following occurred.

첫째, 다수의 잠수부가 물에 들어가서 타이케이블을 잡고 당기면서 일측에서 타측으로 이동시켜야 하는 커다란 문제점이 발생 되었고, 이 과정에서 잠수부가 과도한 일로 인해 잠수병에 걸리거나 기타 안전사고가 많이 발생하게 되는 커다란 문제점이 발생 되었다.First, a large number of divers entered the water, grabbed and pulled the tie cable, and had to move it from one side to the other. This happened.

둘째, 잠수부가 무거은 타이케이블을 잡고 이동하기에 어려움이 있고, 지속적인 작업에 한계가 있다는 문제점이 발생 되었다.Second, there were problems that it was difficult for a diver to move while holding a heavy tie cable, and there was a limit to continuous work.

셋째, 잠수부의 작업 한계가 있기 때문에 작업시간이 길어지고, 설치완성도가 빈약하고, 코스트(비용)가 많이 소요되는 커다란 문제점이 발생 되었다.Third, since there is a limit to the work of the diver, the work time is long, the completeness of the installation is poor, and a large amount of cost (cost) was generated.

상기한 문제점을 해결하기 위해 종래에는 아래와 같은 선행기술문헌들이 개발되었으나, 여전히 상기한 종래 기술의 문제점을 일거에 해결하지 못하는 커다란 문제점이 발생 되었다.In order to solve the above problems, the following prior art documents have been developed in the prior art, but there is still a big problem in that the problems of the prior art cannot be solved at once.

대한민국 등록특허공보 제2051553호(2019. 11. 27)가 등록된바 있다.Republic of Korea Patent Publication No. 2051553 (2019. 11. 27) has been registered. 대한민국 등록특허공보 제1630246호(2016. 06. 08)가 등록된바 있다.Republic of Korea Patent Publication No. 1630246 (2016. 06. 08) has been registered. 대한민국 등록특허공보 제1782456호(2017. 09. 21)가 등록된바 있다.Republic of Korea Patent Publication No. 1782456 (September 21, 2017) has been registered. 대한민국 등록특허공보 제1871103호(2018. 06. 19)가 등록된바 있다.Republic of Korea Patent Publication No. 1871103 (June 19, 2018) has been registered.

본 발명은 상기와 같은 종래 기술의 제반 문제점을 해소하기 위하여 안출한 것으로, 타이케이블 설치장치에 몸체와 장치부구, 인장권취장치와 타이케이블, 연결구와 케이블부구, 부구통과 길이조절홈 및 처짐방지줄이 구비됨을 제1목적으로 한 것이고, 상기한 기술적 구성에 의한 본 발명의 제2목적은 각종 항만 구조물(예: 계류시설, 방파제 등)을 시공함에 있어 잠수부의 작업을 최소화하고, 제3목적은 타이케이블의 설치 완성도를 높이면서 공사기간을 단축하고 코스트(비용)도 절약할 수 있도록 한 것이고, 제4목적은 부력을 이용하여 타이케이블을 원하는 일정 깊이로 유지시키면서 권취장치로 당겨 감을 수 있도록 하여 안전하고, 설치시간을 대폭 단축시킬 수 있도록 한 것이며, 제5목적은 종래와 같이 잠수부가 물에 들어가서 타이케이블을 잡고 당기면서 일측에서 타측으로 이동할 필요가 없다는 장점이 있고, 제6목적은 종래와 같이 잠수부가 과도한 일로 인해 잠수병에 걸리거나 기타 안전사고가 발생하지 않도록 한 것이고, 제7목적은 종래와 같이 잠수부가 무거은 타이케이블을 잡고 이동하지 않아도 되고, 지속적인 작업을 할 필요가 없다는 장점이 있고, 제8목적은 잠수 작업이 많지 않기 때문에 작업 한계가 없고, 이로 인해 작업시간을 대폭 절약할 수 있고, 설치 완성도도 좋고, 코스트(비용)가 대폭 절약되는 장점이 있도록 한 것이고, 제9목적은 이로 인해 타이케이블 설치장치의 품질과 신뢰성을 대폭 향상시키므로 사용자인 잠수부 및 작업자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 부력을 이용한 타이케이블 설치장치를 제공한다.The present invention has been devised to solve the problems of the prior art as described above, and the body and the device part, the tension winding device and the tie cable, the connector and the cable part, the length adjustment groove and the sagging line in the tie cable installation device. This is provided for the first purpose, and the second object of the present invention by the above technical configuration is to minimize the work of divers in constructing various port structures (eg, mooring facilities, breakwaters, etc.), and the third purpose is It is designed to shorten the construction period and save cost while increasing the completeness of the installation of the tie cable. The fourth purpose is to use buoyancy to keep the tie cable to a desired depth while allowing it to be pulled and wound with a winding device. It is safe and can significantly shorten the installation time, and the fifth purpose has the advantage that there is no need to move from one side to the other while a diver enters the water and grabs and pulls the tie cable as in the prior art. Likewise, it is to prevent divers from getting caught in divers or other safety accidents due to excessive work. The eighth purpose is to have the advantages of not having a work limit because there are not many diving works, and thereby greatly saving work time, good installation perfection, and greatly saving cost. As a result, the quality and reliability of the tie cable installation device are greatly improved, and thus, a tie cable installation device using buoyancy is provided to provide a good image by satisfying the various needs (needs) of users, divers and workers.

이러한 목적 달성을 위하여 본 발명은 부력을 이용한 타이케이블 설치장치에 관한 것으로, 항만 구조물을 설치하기 위해 바다에 수직으로 삽입 고정된 복수개의 구조물; 복수개의 케이블부구와 회수줄 그리고 처짐방지줄과 타이케이블을 육상에서 한 셋트로 조립한 후 바다에 띄워 상기 양 구조물의 사이에 위치시키는 타이케이블 부력모듈; 상기 구조물의 양쪽 또는 어느 일측에 조립 설치되는 몸체; 및 상기 몸체에 구비되며, 타이케이블을 당겨 권취하는 인장권취장치;가 포함됨을 특징으로 하는 부력을 이용한 타이케이블 설치장치를 제공한다.In order to achieve this object, the present invention relates to a tie cable installation device using buoyancy, comprising: a plurality of structures inserted and fixed vertically into the sea to install a harbor structure; A tie cable buoyancy module for assembling a plurality of cable buoys and recovery lines, sagging prevention lines, and tie cables as a set on land and floating them in the sea to position them between the two structures; a body assembled and installed on both sides or either side of the structure; and a tension winding device provided on the body and winding the tie cable by pulling it.

상기에서 상세히 살펴본 바와 같이 본 발명은 타이케이블 설치장치에 몸체와 장치부구, 인장권취장치와 타이케이블, 연결구와 케이블부구, 부구통과 길이조절홈 및 처짐방지줄이 구비되도록 한 것이다.As described in detail above, the present invention is such that the tie cable installation device is provided with a body and a device part, a tension winding device and a tie cable, a connector and a cable part, a length adjustment groove through the bugu, and an anti-sag line.

상기한 기술적 구성에 의한 본 발명은 각종 항만 구조물(예: 계류시설, 방파제 등)을 시공함에 있어 잠수부의 작업을 최소화할 수 있도록 한 것이다.The present invention according to the above technical configuration is to minimize the work of the diver in the construction of various harbor structures (eg, mooring facilities, breakwaters, etc.).

또한 본 발명은 타이케이블의 설치 완성도를 높이면서 공사기간을 단축하고 코스트(비용)도 절약할 수 있도록 한 것이다.In addition, the present invention is to increase the completeness of the installation of the tie cable, shorten the construction period and to save the cost (cost).

그리고 본 발명은 부력을 이용하여 타이케이블을 원하는 일정 깊이로 유지시키면서 권취장치로 당겨 감을 수 있도록 하여 안전하고, 설치시간을 대폭 단축시킬 수 있도록 한 것이다.And the present invention is made to be safe and to significantly shorten the installation time by allowing the tie cable to be pulled and wound with a take-up device while maintaining the tie cable to a desired predetermined depth using buoyancy.

또한 본 발명은 종래와 같이 잠수부가 물에 들어가서 타이케이블을 잡고 당기면서 일측에서 타측으로 이동할 필요가 없다는 장점이 있다.In addition, the present invention has the advantage that there is no need to move from one side to the other while the diver enters the water and grabs and pulls the tie cable as in the prior art.

그리고 본 발명은 종래와 같이 잠수부가 과도한 일로 인해 잠수병에 걸리거나 기타 안전사고가 발생하지 않도록 한 것이다.And the present invention is to prevent the divers from getting caught in divers or other safety accidents due to excessive work as in the prior art.

아울러 본 발명은 종래와 같이 잠수부가 무거은 타이케이블을 잡고 이동하지 않아도 되고, 지속적인 작업을 할 필요가 없다는 장점이 있다.In addition, the present invention has the advantage that the diver does not have to move while holding a heavy tie cable as in the prior art, and there is no need to continuously work.

더하여 본 발명은 잠수 작업이 많지 않기 때문에 작업 한계가 없고, 이로 인해 작업시간을 대폭 절약할 수 있고, 설치 완성도도 좋고, 코스트(비용)가 대폭 절약되는 장점이 있도록 한 것이다.In addition, the present invention does not have a work limit because there are not many submersible works, and thus it is possible to significantly save work time, the installation completion is good, and the cost (cost) is greatly saved.

본 발명은 상기한 효과로 인해 타이케이블 설치장치의 품질과 신뢰성을 대폭 향상시키므로 사용자인 잠수부 및 작업자들의 다양한 욕구(니즈)를 충족시켜 좋은 이미지를 심어줄 수 있도록 한 매우 유용한 발명인 것이다.The present invention is a very useful invention that significantly improves the quality and reliability of the tie-cable installation device due to the above-described effect, thereby satisfying the various needs (needs) of divers and workers who are users, thereby providing a good image.

이하에서는 이러한 효과 달성을 위한 본 발명의 바람직한 실시 예를 첨부된 도면에 따라 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention for achieving these effects will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명에 적용된 부력을 이용한 타이케이블 설치장치의 전체 구성
도로, 타이케이블이 물속에 잠긴 상태를 도시한 것이다.
도 2 는 본 발명에 적용된 부력을 이용한 타이케이블 설치장치의 전체 구성
도로, 타이케이블을 잡아당겨 수면에 근접되게 위치시킨 상태를 도시
한 것이다.
도 3 은 본 발명에 적용된 부력을 이용한 타이케이블 설치장치의 요부 구성
도로, 타이케이블을 권취장치에 권취하기 전 상태를 도시한 것이다.
도 4 는 본 발명에 적용된 부력을 이용한 타이케이블 설치장치의 요부 구성
도로, 타이케이블을 권취장치에 권취한 상태를 도시한 것이다.
도 5 는 본 발명에 적용된 권취장치의 락킹 및 언락킹 상태를 도시한 것이
다.
도 6 은 본 발명에 적용된 부구를 도시한 구성도이다.
1 is an overall configuration of a tie cable installation device using buoyancy applied to the present invention;
The road and tie cables are submerged in water.
Figure 2 is the overall configuration of the tie cable installation device using the buoyancy applied to the present invention
Shows the state in which the road and tie cables are pulled and placed close to the water surface
did it
3 is a main part configuration of a tie cable installation device using buoyancy applied to the present invention;
It shows the state before winding the road and the tie cable on the winding device.
4 is a main part configuration of the tie cable installation device using the buoyancy applied to the present invention;
It shows the state in which the road and the tie cable are wound on the winding device.
Figure 5 shows the locking and unlocking state of the winding device applied to the present invention
All.
6 is a block diagram illustrating a floating device applied to the present invention.

본 발명에 적용된 부력을 이용한 타이케이블 설치장치는 도 1 내지 도 6 에 도시된 바와 같이 구성되는 것이다.The tie cable installation device using the buoyancy applied to the present invention is configured as shown in FIGS. 1 to 6 .

하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략할 것이다.In the following description of the present invention, if it is determined that a detailed description of a related well-known function or configuration may unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted.

그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 설정된 용어들로서 이는 생산자의 의도 또는 관례에 따라 달라질 수 있으므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.And the terms described below are terms set in consideration of the function in the present invention, which may vary according to the intention or custom of the producer, so the definition should be made based on the content throughout this specification.

또한 도면에서 나타난 각 구성의 크기 및 두께는 설명의 편의를 위해 임의로 나타내었으므로, 본 발명이 반드시 도면에 도시된 바에 한정되지 않는다.In addition, since the size and thickness of each component shown in the drawings are arbitrarily indicated for convenience of description, the present invention is not necessarily limited to the bars shown in the drawings.

먼저, 본 발명은 부력을 이용한 타이케이블 설치장치(100)에 관한 것으로, 이하의 기술적 구성으로 구비된다.First, the present invention relates to a tie cable installation apparatus 100 using buoyancy, and is provided with the following technical configuration.

즉, 본 발명은 항만 구조물을 설치하기 위해 바다에 수직으로 삽입 고정된 복수개의 구조물(10)이 구비된다.That is, the present invention is provided with a plurality of structures 10 vertically inserted and fixed to the sea in order to install a harbor structure.

또한 본 발명은 복수개의 케이블부구(300)와 회수줄(370) 그리고 처짐방지줄(360)과 타이케이블(200)을 육상에서 한 셋트로 조립한 후 바다에 띄워 상기 양 구조물(10)의 사이에 위치시키는 타이케이블 부력모듈(50)이 구비된다.In addition, the present invention assembling a plurality of cable part 300, recovery line 370, sagging prevention line 360 and tie cable 200 as a set on land and floating in the sea between the two structures (10) A tie cable buoyancy module 50 to be located is provided.

그리고 본 발명은 상기 구조물(10)의 양쪽 또는 어느 일측에 조립 설치되는 몸체(110)가 구비된다.And the present invention is provided with a body 110 that is assembled and installed on both sides or either side of the structure (10).

또한 본 발명은 상기 몸체(110)에 구비되며, 타이케이블(200)을 당겨 권취하는 인장권취장치(130)가 포함된 부력을 이용한 타이케이블 설치장치를 제공한다.The present invention also provides a tie cable installation device using buoyancy provided in the body 110, including a tension winding device 130 for pulling and winding the tie cable 200.

본 발명에 적용된 상기 구조물(10)에는 아래의 기술적 구성이 포함된다.The structure 10 applied to the present invention includes the following technical configuration.

즉, 본 발명은 타이케이블(200)을 끼워 통과시킬 수 있도록 일정 간격으로 복수개 형성된 제1구멍(11)이 구비된다.That is, the present invention is provided with a plurality of first holes 11 formed at regular intervals to allow the tie cable 200 to pass therethrough.

또한 본 발명은 상기 구조물(10)의 외측 상하단에 각각 이격되게 구비되어 몸체(110)를 지지하는 H빔(15)이 구비된다.In the present invention, the H-beam 15 is provided at the outer upper and lower ends of the structure 10 to be spaced apart from each other to support the body 110 .

한편, 본 발명에 적용된 상기 타이케이블 부력모듈(50)은 다음과 같이 구성된다.On the other hand, the tie cable buoyancy module 50 applied to the present invention is configured as follows.

즉, 본 발명은 일단은 반대편 구조물(10)에 연결되고, 타단은 일측 구조물(10)에 연결되는 회수줄(370)이 구비된다.That is, in the present invention, one end is connected to the opposite structure 10 , and the other end is provided with a recovery line 370 connected to one side structure 10 .

또한 본 발명은 상기 회수줄(370)에 일정 간격으로 복수개가 연결 설치된 케이블부구(300)가 구비된다.In addition, in the present invention, a plurality of cable parts 300 are provided in connection with the collection line 370 at regular intervals.

그리고 본 발명은 상단은 각 케이블부구(300)의 길이조절홈에 끼워지고, 하단은 타이케이블(200)에 연결된 처짐방지줄(360)이 구비된다.And in the present invention, the upper end is fitted into the length adjustment groove of each cable part 300 , and the lower end is provided with a sagging prevention line 360 connected to the tie cable 200 .

또한 본 발명은 상기 각 처짐방지줄(360)의 하단에 걸쳐지며, 인장권취장치(130)의 구동에 의해 들어 올려지는 타이케이블(200)이 구비된다.In addition, the present invention is provided with a tie cable 200 that spans the lower end of each anti-sag line 360 , and is lifted by the driving of the tension winding device 130 .

이때 상기 타이케이블(200)의 선단에는 나사부(210)가 형성되되, 이 나사부에는 연결구(220)가 조립되고, 이 연결구에는 드럼(131)에 권취되는 와이어(230)가 연결됨이 바람직하다.At this time, a threaded portion 210 is formed at the tip of the tie cable 200, a connector 220 is assembled to the threaded portion, and a wire 230 wound around the drum 131 is preferably connected to the connector.

본 발명에서는 상기 연결구(220) 없이 와이어(230)를 나사부(210)에 감아서 당길 수 있음은 물론이다.Of course, in the present invention, the wire 230 can be wound around the screw portion 210 without the connector 220 and pulled.

또 한편, 본 발명에 적용된 상기 타이케이블 설치장치(100)는 다음과 같이 구비된다.On the other hand, the tie cable installation device 100 applied to the present invention is provided as follows.

즉, 본 발명은 일측에 타이케이블(200)을 끼워 통과시킬 수 있도록 일정 간격으로 복수개의 제2구멍(111)이 형성된 몸체(110)가 구비된다.That is, the present invention is provided with a body 110 in which a plurality of second holes 111 are formed at regular intervals so that the tie cable 200 can be passed through one side thereof.

그리고 본 발명은 상기 몸체(110)에 구비되며, 타이케이블(200)에 연결된 와이어(230)를 선택적으로 권취하는 드럼(131)이 구비된다.And the present invention is provided in the body 110, the drum 131 for selectively winding the wire 230 connected to the tie cable 200 is provided.

또한 본 발명은 상기 드럼(131)의 어느 일측에 구비되며, 드럼을 자동으로 회전시키는 모터(140) 또는 드럼을 수동으로 회전시키는 손잡이(150)가 구비된다.In addition, the present invention is provided on either side of the drum 131, a motor 140 for automatically rotating the drum or a handle 150 for manually rotating the drum is provided.

이때 상기 드럼(131)의 어느 일측에는 드럼(131)과 함께 회전하는 래치(170)의 외주면에 형성된 이빨홈에 걸려서 역회전됨을 방지하는 걸쇠(171)가 구비되되, 이 걸쇠는 힌지축(172)을 중심으로 손잡이(175)에 의해 선택적으로 회전 작동하도록 구성된다.At this time, one side of the drum 131 is provided with a clasp 171 to prevent reverse rotation by being caught in the tooth groove formed on the outer peripheral surface of the latch 170 rotating together with the drum 131, and the clasp is a hinge shaft 172 ) is configured to selectively rotate around the handle 175 .

그리고 상기 제2구멍(111)의 인근 몸체에는 당겨진 타이케일블(200)을 긴밀히 파지하여 후퇴하지 못하도록 잡아주는 복수개의 락킹편(161)이 구비되되, 이 락킹편(161)이 가이드편(160)에 배치되되, 가이드편 상에서 슬라이딩 동작되도록 구성된다.In addition, a plurality of locking pieces 161 are provided in the body adjacent to the second hole 111 to hold the pulled tie cable 200 so that it cannot be retracted, and the locking pieces 161 are the guide pieces 160 . ) is arranged, and is configured to slide on the guide piece.

또한 상기 몸체(110)의 상단에는 타이케이블 설치장치(100)를 작업 전후로 이동하거나 또는 작업중 움직이지 않도록 케이블을 감아 고정시키는 복수개의 고리(115)가 구비됨이 바람직하다.In addition, it is preferable that a plurality of rings 115 are provided at the upper end of the body 110 to wind and fix the cable so that the tie cable installation device 100 does not move before and after the operation or during operation.

그리고 몸체(110)의 하단에는 타이케이블 설치장치(100)를 수면상에 띄운 상태로 작업할 수 있도록 서포트해주는 장치부구(120)가 구비됨이 바람직하다.And it is preferable that the lower end of the body 110 is provided with a device part 120 for supporting the tie cable installation device 100 to work in a floating state on the water surface.

마지막으로 본 발명에 적용된 상기 케이블부구(300)의 외주면에는 처짐방지줄(360)의 길이를 선택적으로 늘리거나 풀어서 길게 조절할 수 있고, 처짐방지줄(360)의 이탈을 방지하는 길이조절홈(350)이 지그재그 요홈으로 형성된다.Finally, on the outer peripheral surface of the cable part 300 applied to the present invention, the length of the anti-sag line 360 can be adjusted to be lengthened by selectively increasing or loosening, and a length adjustment groove 350 for preventing the detachment of the anti-sagging line 360 . ) is formed as a zigzag groove.

이때 상기 케이블부구(300)에는 복수개의 요홈(330)을 형성하고, 이 요홈에는 케이블부구(300)의 부력 높낮이를 선택적으로 조절할 수 있는 복수개의 무게추(340)가 구비됨이 바람직하다.At this time, it is preferable that a plurality of grooves 330 are formed in the cable part 300 , and a plurality of weights 340 that can selectively adjust the height of the buoyancy of the cable part 300 are provided in the grooves.

또한 상기 케이블부구(300)의 외주면에는 야간이나 어두운 날씨에도 식별이 가능하도록 야광표시부(320)가 구비되되, 이 야광표시부는 야광테이프 또는 야광도료가 도포되게 구성할 수 있다.In addition, a luminous display unit 320 is provided on the outer circumferential surface of the cable unit 300 to enable identification even at night or in dark weather.

한편 본 발명은 상기의 구성부를 적용함에 있어 다양하게 변형될 수 있고 여러 가지 형태를 취할 수 있다.On the other hand, the present invention can be variously modified and can take various forms in applying the above-mentioned constituent parts.

그리고 본 발명은 상기의 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 발명의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.And it is to be understood that the present invention is not limited to the particular form mentioned in the above detailed description, but rather, it is intended to cover all modifications and equivalents and substitutes falling within the spirit and scope of the present invention as defined by the appended claims. should be understood as

상기와 같이 구성된 본 발명 부력을 이용한 타이케이블 설치장치의 작용효과를 설명하면 다음과 같다.The effect of the tie cable installation device using the buoyancy of the present invention configured as described above will be described as follows.

우선, 본 발명은 각종 항만 구조물(예: 계류시설, 방파제 등)을 시공함에 있어 잠수부의 작업을 최소화하고, 타이케이블의 설치 완성도를 높이면서 공사기간을 단축하고 코스트(비용)도 절약할 수 있도록 한 것이다.First, the present invention minimizes the work of divers in constructing various port structures (eg, mooring facilities, breakwaters, etc.) did it

이를 위해 본 발명에 적용된 도 1 은 본 발명에 적용된 부력을 이용한 타이케이블 설치장치(100)의 전체 구성도로, 타이케이블(200)이 물속에 잠긴 상태를 도시한 것이다.For this purpose, FIG. 1 applied to the present invention is an overall configuration diagram of a tie cable installation apparatus 100 using buoyancy applied to the present invention, and shows a state in which the tie cable 200 is submerged in water.

즉, 상기한 상태는 육상에서 타이케이블 부력모듈(50)을 한 셋트로 조립한 후 바지선을 이용하여 바다로 가져와 띄운 상태를 도시한 것이다.That is, the above state shows a state in which the tie-cable buoyancy module 50 is assembled as a set on land and then brought to the sea using a barge and floated.

이때 케이블부구(300)는 수면상에 위치하게 되고, 타이케이블(200)은 무게에 의해 바다 속으로 잠김 상태인데, 처짐방지줄(360)에 의해 "∪" 모양으로 받쳐져 있게 된다.At this time, the cable part 300 is positioned on the water surface, and the tie cable 200 is submerged into the sea by the weight, and is supported in a "∪" shape by the anti-sag line 360 .

특히 본 발명 상기 케이블부구(300)의 외주면에는 도 6 에 도시된 바와 같이 길이조절홈(350)이 지그재그 요홈으로 형성되어 있어서 작업자가 처짐방지줄(360)의 길이를 선택적으로 늘리거나 풀어서 길게 조절할 수 있고, 처짐방지줄(360)의 이탈을 방지하게 된다.In particular, the length adjustment groove 350 is formed as a zigzag groove on the outer peripheral surface of the cable part 300 of the present invention as shown in FIG. It is possible to prevent the departure of the anti-sag line (360).

그리고 상기 케이블부구(300)에는 복수개의 요홈(330)을 형성하고, 이 요홈에는 복수개의 무게추(340)가 구비되어 케이블부구(300)의 부력 높낮이를 선택적으로 조절할 수 있게 된다.In addition, a plurality of grooves 330 are formed in the cable part 300 , and a plurality of weights 340 are provided in the grooves so that the height of the buoyancy of the cable part 300 can be selectively adjusted.

또한 상기 케이블부구(300)의 외주면에는 야광표시부(320)가 구비되어 야간이나 어두운 날씨에도 식별이 가능하도록 하고, 야광표시부는 야광테이프 또는 야광도료가 도포되게 구성할 수 있다.In addition, a luminous display unit 320 is provided on the outer peripheral surface of the cable part 300 to enable identification at night or in dark weather, and the luminous display unit may be configured to be coated with a luminous tape or luminescent paint.

도 2 는 본 발명에 적용된 부력을 이용한 타이케이블 설치장치(100)의 전체 구성도로, 타이케이블(200)을 잡아당겨 수면에 근접되게 위치시킨 상태를 도시한 것이다.2 is an overall configuration diagram of the tie cable installation apparatus 100 using the buoyancy applied to the present invention, showing a state in which the tie cable 200 is pulled and positioned close to the water surface.

즉, 상기한 상태는 타이케이블 설치장치(100)에 구비된 인장권취장치(130)의 구동에 의해 타이케이블(200)이 당겨진 상태를 보인 것으로, 늘어져 있던 처짐방지줄(360)이 타이케이블(200)의 상승에 의해 수면상에 위치하게 된다.That is, in the above state, the tie cable 200 is pulled by the driving of the tension winding device 130 provided in the tie cable installation device 100, and the sagging anti-sag line 360 is the tie cable ( 200) and is positioned on the water surface.

한편, 도 3 은 본 발명에 적용된 부력을 이용한 타이케이블 설치장치(100)의 요부 구성도로, 타이케이블(200)을 인장권취장치(130)에 권취하기 전 상태를 도시한 것이다.On the other hand, FIG. 3 is a structural diagram of the tie cable installation apparatus 100 using the buoyancy applied to the present invention, and shows a state before winding the tie cable 200 to the tension winding device 130 .

도 4 는 본 발명에 적용된 부력을 이용한 타이케이블 설치장치(100)의 요부 구성도로, 타이케이블(200)을 인장권취장치(130)에 권취한 상태를 도시한 것으로, 이를 보다 상세히 설명하면 다음과 같다.4 is a structural diagram of a tie cable installation device 100 using the buoyancy applied to the present invention, showing a state in which the tie cable 200 is wound around the tension winding device 130, which will be described in more detail as follows. same.

본 발명은 타이케이블(200)의 선단 나사부(210)에 연결구(220)를 조립한다. 이때 상기 연결구(220)에는 드럼(131)에 권취될 와이어(230)가 연결된다.The present invention assembles the connector 220 to the tip screw 210 of the tie cable 200 . At this time, the wire 230 to be wound on the drum 131 is connected to the connector 220 .

이어서 상기 타이케이블(200)을 구조물(10)의 제1구멍(11)과 몸체(110)의 제2구멍(111)을 통과시킨 후 와어어(230)를 드럼(131)에 권취시킨 후 감게 되면 연결구(220)가 타이케이블(200)을 당기게된다.Then, after passing the tie cable 200 through the first hole 11 of the structure 10 and the second hole 111 of the body 110, the wire 230 is wound around the drum 131 and then wound. Then, the connector 220 pulls the tie cable 200 .

상기 드럼(131)에 와이어(230)를 권취하는 방법은 인장권취장치(130)의 구동에 의해 가능하고, 이때 상기 드럼(131)은 모터(140)의 구동(도면상 미 도시된 스위치 작동)에 의해 자동으로 권취되게 할 수 있고 또는 작업자가 손잡이(150)를 회전시켜 수동으로 드럼(131)에 권취시킬 수 있다.The method of winding the wire 230 on the drum 131 is possible by driving the tension winding device 130, in which case the drum 131 is driven by the motor 140 (switch operation not shown in the drawing). It can be automatically wound by the operator or by rotating the handle 150 can be manually wound on the drum (131).

이때 상기 드럼(131)에 권취되는 와이어(230)가 풀리지 않도록 하기 위해 도 5(본 발명에 적용된 권취장치의 락킹 및 언락킹 상태를 도시한 것이다) 에 도시된 바와 같이 드럼(131)의 일측에 연결된 래치(170)에 걸쇠(171)가 걸려지면 풀림을 방지하게 되고, 걸쇠(171)가 래치(170)에서 이격되면 정,역 회전이 가능하다. 그리고 상기 걸쇠(171)는 손잡이(175)의 작동에 의해 힌지축(172)을 중심으로 회전 작동하게 된다.At this time, in order to prevent the wire 230 wound on the drum 131 from unwinding, as shown in FIG. 5 (showing the locking and unlocking state of the winding device applied to the present invention), as shown in When the latch 171 is caught on the connected latch 170, loosening is prevented, and when the latch 171 is spaced apart from the latch 170, forward and reverse rotation is possible. And the clasp 171 is rotated about the hinge shaft 172 by the operation of the handle 175 .

본 발명은 상기 과정에서 몸체(110)의 상단에는 케이블을 감아 고정시키는 복수개의 고리(115)가 구비되어 타이케이블 설치장치(100)를 작업 전후로 이동하거나 또는 작업중 움직이지 않도록 해주게 된다.In the present invention, a plurality of loops 115 for winding and fixing the cable are provided on the upper end of the body 110 in the above process to prevent the tie cable installation device 100 from moving before and after the operation or from moving during the operation.

그리고 상기 몸체(110)의 하단에는 장치부구(120)가 구비되어 타이케이블 설치장치(100)를 수면상에 띄운 상태로 작업할 수 있도록 서포트 해주게 된다.And a device part 120 is provided at the lower end of the body 110 to support the tie cable installation device 100 so that it can work while floating on the water surface.

본 발명은 상기 전술한 동작의 역순으로 작동하게 되면 타이케이블 설치장치(100)를 간단하게 최초의 상태로 위치시킬 수 있게 된다.In the present invention, when the operation is performed in the reverse order of the above-described operation, the tie-cable installation device 100 can be simply positioned in the initial state.

상기와 같이 본 발명은 각종 항만 구조물(예: 계류시설, 방파제 등)을 시공함에 있어 잠수부의 작업을 최소화하고, 타이케이블의 설치 완성도를 높이면서 공사기간을 단축하고 코스트(비용)도 절약할 수 있도록 한 것이고, 부력을 이용하여 타이케이블을 원하는 일정 깊이로 유지시키면서 권취장치로 당겨 감을 수 있도록 하여 안전하고, 설치시간을 대폭 단축시킬 수 있도록 한 것이며, 종래와 같이 잠수부가 물에 들어가서 타이케이블을 잡고 당기면서 일측에서 타측으로 이동할 필요가 없다는 장점이 있고, 종래와 같이 잠수부가 과도한 일로 인해 잠수병에 걸리거나 기타 안전사고가 발생하지 않도록 한 것이고, 종래와 같이 잠수부가 무거은 타이케이블을 잡고 이동하지 않아도 되고, 지속적인 작업을 할 필요가 없다는 장점이 있고, 잠수 작업이 많지 않기 때문에 작업 한계가 없고, 이로 인해 작업시간을 대폭 절약할 수 있고, 설치 완성도도 좋고, 코스트(비용)가 대폭 절약되는 장점이 있도록 한 효과를 제공하게 된다.As described above, the present invention minimizes the work of a diver in constructing various harbor structures (eg, mooring facilities, breakwater, etc.) It is designed to be safe and to significantly shorten the installation time by using the buoyancy force to keep the tie cable to a desired depth and to be able to pull and wind it with a winding device. The advantage is that there is no need to move from one side to the other while holding and pulling, and as in the prior art, the divers are prevented from getting caught in divers or other safety accidents due to excessive work. It has the advantage that there is no need to continuously work, and there is no work limit because there are not many diving works, and this has the advantage that work time can be significantly saved, the installation completeness is good, and the cost (cost) is greatly saved It provides an effect that makes it possible.

본 발명 부력을 이용한 타이케이블 설치장치의 기술적 사상은 실제로 동일결과를 반복 실시 가능한 것으로, 특히 이와 같은 본원발명을 실시함으로써 기술발전을 촉진하여 산업발전에 이바지할 수 있어 보호할 가치가 충분히 있다.The technical idea of the tie-cable installation device using the buoyancy of the present invention is that the same result can be repeatedly implemented.

<도면의 주요 부분에 대한 부호의 설명>
10: 구조물
15: H빔
50: 타이케이블 부력모듈
100: 타이케이블 설치장치
110: 몸체
120: 장치부구
130: 인장권취장치
200: 타이케이블
220: 연결구
300: 케이블부구
310: 부구통
350: 길이조절홈
360: 처짐방지줄
<Explanation of symbols for main parts of the drawing>
10: structure
15: H beam
50: tie cable buoyancy module
100: tie cable installation device
110: body
120: device bugu
130: tension winding device
200: tie cable
220: connector
300: cable buoy
310: colic
350: length adjustment groove
360: anti-sag line

Claims (5)

부력을 이용한 타이케이블 설치장치(100)에 관한 것으로,
항만 구조물을 설치하기 위해 바다에 수직으로 삽입 고정된 복수개의 구조물(10); 복수개의 케이블부구(300)와 회수줄(370) 그리고 처짐방지줄(360)과 타이케이블(200)을 육상에서 한 셋트로 조립한 후 바다에 띄워 상기 양 구조물(10)의 사이에 위치시키는 타이케이블 부력모듈(50); 상기 구조물(10)의 양쪽 또는 어느 일측에 조립 설치되는 몸체(110); 및 상기 몸체(110)에 구비되며, 타이케이블(200)을 당겨 권취하는 인장권취장치(130);가 포함되되,
상기 타이케이블 부력모듈(50)은, 일단은 반대편 구조물(10)에 연결되고, 타단은 일측 구조물(10)에 연결되는 회수줄(370); 회수줄(370)에 일정 간격으로 복수개가 연결 설치된 케이블부구(300); 상단은 각 케이블부구(300)의 길이조절홈에 끼워지고, 하단은 타이케이블(200)에 연결된 처짐방지줄(360); 및 각 처짐방지줄(360)의 하단에 걸쳐지며, 인장권취장치(130)의 구동에 의해 들어 올려지는 타이케이블(200);이 포함되고,
상기 케이블부구(300)의 외주면에는 처짐방지줄(360)의 길이를 선택적으로 늘리거나 풀어서 길게 조절할 수 있고, 처짐방지줄(360)의 이탈을 방지하는 길이조절홈(350)이 지그재그 요홈으로 형성되고,
상기 타이케이블 설치장치(100)는, 일측에 타이케이블(200)을 끼워 통과시킬 수 있도록 일정 간격으로 복수개의 제2구멍(111)이 형성된 몸체(110); 몸체(110)에 구비되며, 타이케이블(200)에 연결된 와이어(230)를 선택적으로 권취하는 드럼(131); 및 드럼(131)의 어느 일측에 구비되며, 드럼을 자동으로 회전시키는 모터(140) 또는 드럼을 수동으로 회전시키는 손잡이(150);가 포함되고,
상기 타이케이블(200)의 선단에는 나사부(210)가 형성되되, 이 나사부에는 연결구(220)가 조립되고, 이 연결구에는 드럼(131)에 권취되는 와이어(230)가 연결되고,
상기 제2구멍(111)의 인근 몸체에는 당겨진 타이케일블(200)을 긴밀히 파지하여 후퇴하지 못하도록 잡아주는 복수개의 락킹편(161)이 구비되되, 이 락킹편(161)이 가이드편(160)에 배치되되, 가이드편 상에서 슬라이딩 동작되도록 구성되고,
상기 몸체(110)의 상단에는 타이케이블 설치장치(100)를 작업 전후로 이동하거나 또는 작업중 움직이지 않도록 케이블을 감아 고정시키는 복수개의 고리(115)가 구비되고,
상기 몸체(110)의 하단에는 타이케이블 설치장치(100)를 수면상에 띄운 상태로 작업할 수 있도록 서포트해주는 장치부구(120)가 포함됨을 특징으로 하는 부력을 이용한 타이케이블 설치장치.
It relates to a tie cable installation device 100 using buoyancy,
A plurality of structures 10 vertically inserted and fixed to the sea to install a harbor structure; A tie placed between the two structures 10 after assembling a plurality of cable parts 300 and the recovery line 370 and the anti-sag line 360 and the tie cable 200 as a set on land and floating in the sea cable buoyancy module 50; a body 110 assembled and installed on both sides or either side of the structure 10; and a tension winding device 130 provided on the body 110 and winding the tie cable 200 by pulling it.
The tie cable buoyancy module 50, one end is connected to the opposite structure 10, the other end is a recovery line 370 connected to one side structure 10; a plurality of cables connected to and installed at regular intervals on the recovery line 370; The upper end is fitted into the length adjustment groove of each cable part 300 , and the lower end is a sagging line 360 connected to the tie cable 200 ; and a tie cable 200 that spans the lower end of each anti-sag line 360 and is lifted by the driving of the tension winding device 130;
On the outer circumferential surface of the cable part 300, the length of the anti-sag line 360 can be adjusted to be lengthened by selectively lengthening or loosening, and a length adjustment groove 350 for preventing the detachment of the anti-sagging line 360 is formed as a zigzag groove. become,
The tie cable installation device 100 includes a body 110 in which a plurality of second holes 111 are formed at regular intervals so that the tie cable 200 can be passed through one side thereof; a drum 131 provided on the body 110 and selectively winding the wire 230 connected to the tie cable 200; And it is provided on either side of the drum 131, the motor 140 for automatically rotating the drum or a handle 150 for manually rotating the drum; includes;
A threaded part 210 is formed at the tip of the tie cable 200, a connector 220 is assembled to the threaded part, and a wire 230 wound around the drum 131 is connected to this connector,
A plurality of locking pieces 161 are provided in a body adjacent to the second hole 111 to tightly grip the pulled tie cable 200 so as not to retreat, and the locking pieces 161 are the guide pieces 160 . Doedoe arranged in, configured to slide on the guide piece,
A plurality of rings 115 are provided at the upper end of the body 110 to wind and fix the cable so as not to move the tie cable installation device 100 before and after the operation or move during the operation,
A tie cable installation device using buoyancy, characterized in that the lower end of the body 110 includes a device part 120 that supports the tie cable installation device 100 to work in a floating state on the water surface.
청구항 1 에 있어서,
상기 구조물(10)에는,
타이케이블(200)을 끼워 통과시킬 수 있도록 일정 간격으로 복수개 형성된 제1구멍(11); 및
구조물(10)의 외측 상하단에 각각 이격되게 구비되어 몸체(110)를 지지하는 H빔(15);이 포함됨을 특징으로 하는 부력을 이용한 타이케이블 설치장치.
The method according to claim 1,
In the structure 10,
A plurality of first holes 11 formed at regular intervals to allow the tie cable 200 to pass therethrough; and
A tie cable installation device using buoyancy, characterized in that it includes; an H beam (15) provided to be spaced apart from each other on the outer upper and lower ends of the structure (10) to support the body (110).
삭제delete 삭제delete 삭제delete
KR1020210071041A 2021-06-01 2021-06-01 Tie cable installation device using buoyancy KR102348737B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210071041A KR102348737B1 (en) 2021-06-01 2021-06-01 Tie cable installation device using buoyancy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210071041A KR102348737B1 (en) 2021-06-01 2021-06-01 Tie cable installation device using buoyancy

Publications (1)

Publication Number Publication Date
KR102348737B1 true KR102348737B1 (en) 2022-01-10

Family

ID=79347255

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210071041A KR102348737B1 (en) 2021-06-01 2021-06-01 Tie cable installation device using buoyancy

Country Status (1)

Country Link
KR (1) KR102348737B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114590363A (en) * 2022-03-21 2022-06-07 广东海洋大学 Cable device for fishing boat
CN114771734A (en) * 2022-04-10 2022-07-22 重庆交通大学 Self-adaptive water level lifting and plane constraint positioning method for floating facility
CN114771733A (en) * 2022-04-10 2022-07-22 重庆交通大学 Floating equipment with self-adaptive water level lifting and plane constraint positioning functions

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4048686A (en) * 1976-07-09 1977-09-20 Kloften & Kloften A/S Buoyancy device and method
JP2007253752A (en) * 2006-03-22 2007-10-04 Hitachi Zosen Corp Pile type mooring device
KR101630246B1 (en) 2014-07-15 2016-06-15 대우조선해양 주식회사 Cable winch robot for buoyancy control underwater
KR101782456B1 (en) 2016-05-31 2017-09-27 유한회사 티오씨 Submarine cable laying apparatus and laying method
KR101871103B1 (en) 2017-02-02 2018-06-26 주식회사 리영에스엔디 Nomad Buoy for Multi-purpose Marine Platform with Submarine Cable Connection
KR102051553B1 (en) 2018-04-12 2019-12-05 주식회사 동아특수건설 Tie cable binding device and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4048686A (en) * 1976-07-09 1977-09-20 Kloften & Kloften A/S Buoyancy device and method
JP2007253752A (en) * 2006-03-22 2007-10-04 Hitachi Zosen Corp Pile type mooring device
KR101630246B1 (en) 2014-07-15 2016-06-15 대우조선해양 주식회사 Cable winch robot for buoyancy control underwater
KR101782456B1 (en) 2016-05-31 2017-09-27 유한회사 티오씨 Submarine cable laying apparatus and laying method
KR101871103B1 (en) 2017-02-02 2018-06-26 주식회사 리영에스엔디 Nomad Buoy for Multi-purpose Marine Platform with Submarine Cable Connection
KR102051553B1 (en) 2018-04-12 2019-12-05 주식회사 동아특수건설 Tie cable binding device and its construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114590363A (en) * 2022-03-21 2022-06-07 广东海洋大学 Cable device for fishing boat
CN114771734A (en) * 2022-04-10 2022-07-22 重庆交通大学 Self-adaptive water level lifting and plane constraint positioning method for floating facility
CN114771733A (en) * 2022-04-10 2022-07-22 重庆交通大学 Floating equipment with self-adaptive water level lifting and plane constraint positioning functions
CN114771733B (en) * 2022-04-10 2024-04-12 重庆交通大学 Floating equipment capable of self-adapting water level lifting and plane constraint positioning
CN114771734B (en) * 2022-04-10 2024-04-12 重庆交通大学 Floating facility self-adaptive water level lifting and plane constraint positioning method

Similar Documents

Publication Publication Date Title
KR102348737B1 (en) Tie cable installation device using buoyancy
US3540396A (en) Offshore well apparatus and system
US10207773B2 (en) Corrosion-and-chafing-resistant, buoy system and method
CN100387783C (en) Method of installation of a tension leg platform
US8801327B2 (en) Marine ropeway
US4048945A (en) Removable anchor having retrievable ballast
KR101675527B1 (en) Pontoon having device for maintaining tension of anchor
US4687378A (en) Temporarily terminating laying of underwater pipe line
EP1318072A2 (en) Mooring systems
JP7116621B2 (en) Removal method of tension mooring type floating structure
KR101789060B1 (en) Easy to install and recover silt protector
US3929087A (en) Method of retrieving anchors
US20020162497A1 (en) Anchor assembly for boats and watercrafts in general
JP6949690B2 (en) Floating body mooring method and floating body
CN112356987A (en) Novel buoy
CN109515622B (en) Double-drum tidal range compensation mooring device
JP2668040B2 (en) Facility and method for installing large offshore structures
US20070201953A1 (en) Containment boom guide system and method
KR20220026931A (en) Floating type quaywall mooring apparatus and system thereof
JP3484413B2 (en) Mooring lines for floating structures
JP2001199383A (en) Laying/mooring method of structure
US5431123A (en) Anchoring apparatus
JP5106435B2 (en) Mooring equipment
Lorentz Rapid Deployment CALM 6uoy System
JP2915335B2 (en) Lane setting method, lane buoy mooring method and mooring structure, and lane rope for lane setting

Legal Events

Date Code Title Description
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant