KR102348253B1 - Fixing control device for supporting post - Google Patents

Fixing control device for supporting post Download PDF

Info

Publication number
KR102348253B1
KR102348253B1 KR1020210082119A KR20210082119A KR102348253B1 KR 102348253 B1 KR102348253 B1 KR 102348253B1 KR 1020210082119 A KR1020210082119 A KR 1020210082119A KR 20210082119 A KR20210082119 A KR 20210082119A KR 102348253 B1 KR102348253 B1 KR 102348253B1
Authority
KR
South Korea
Prior art keywords
hole
upper pipe
pipe
plate portion
head support
Prior art date
Application number
KR1020210082119A
Other languages
Korean (ko)
Inventor
김명수
Original Assignee
김명수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김명수 filed Critical 김명수
Priority to KR1020210082119A priority Critical patent/KR102348253B1/en
Application granted granted Critical
Publication of KR102348253B1 publication Critical patent/KR102348253B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483Supporting heads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/061Shores or struts; Chocks telescopic with parts held together by positive means by pins

Abstract

The present invention relates to a fixing spacer for a supporting post and, more specifically, to a fixing spacer for a supporting post, which can level or fix a sleeper and a joist while being maintained to be leveled with respect to the ground by being applied to the supporting post installed on the bottom surface of a slab in pouring concrete to construct a building or structure. The fixing spacer for a supporting post comprises: a lower pipe with a threaded pipe portion formed therein; an upper pipe having a threaded portion formed on the outer circumferential surface thereof to be coupled to the threaded pipe portion of the lower pipe, and having a support portion formed on an upper portion thereof; and a control screw for adjusting the height of the upper pipe. The fixing spacer further comprises: a head support part which has an insertion hole formed in the center of the upper pipe, has a bottom plate portion seated and coupled to an upper end of the upper pipe, has a through hole formed in the center thereof to communicate with the insertion hole of the upper pipe, has a coupling hole formed in the outer circumferential surface of an upper portion of the through hole, and has both side surface portions provided on both ends of the bottom plate portion to protrude vertically; a spacer which has a horizontal plate portion having a protrusion portion formed in a lower portion thereof so that the horizontal plate portion is seated in the coupling hole formed in the bottom plate portion of the head support part, has side surface portions formed on both ends of the horizontal plate portion to form an accommodating space portion, and has wing pieces provided ends of upper ends of the side surface portions to extend downward and be bent to have a predetermined inclination angle and to extend further downward than the horizontal plate portion so that the side surface portions of the head support part are supported; and a central pin part provided at the center of the bottom surface of the horizontal plate portion of the spacer to be installed into the insertion hole of the upper pipe through the through hole of the head support part. Therefore, the fixing spacer for a supporting post can shorten construction time and secure stability, thereby reducing construction costs.

Description

동바리용 고정유격제 {Fixing control device for supporting post}Fixed gait agent for Dongbari {Fixing control device for supporting post}

본 발명은 동바리용 고정유격제에 관한 것으로 보다 상세하게는 건축물 또는 구조물을 구축하기 위한 콘크리트 타설시 슬라브의 저면에 설치하는 동바리를 적용하여 지면과 수평을 유지하면서 멍에 및 장선의 수평 또는 고정시킬 수 있도록 한 동바리용 고정유격제에 관한 것이다. The present invention relates to a fixed gait agent for dongbari, and more particularly, by applying dongbari installed on the bottom surface of a slab when pouring concrete for constructing a building or structure, while maintaining the level with the ground, the yoke and joists can be horizontally or fixed It is about a fixed gait agent for Dongbari.

일반적으로 토목 또는 건축 현장에서 콘크리트를 타설하고 양생하기까지 그 하부를 지지하는 지지장치가 사용되는데, 그 대표적인 예가 파이프 형상의 건축용 서포트가 사용되고, 이 건축용 서포트는 공사현장에 다수개가 사용됨으로써, 공사 중 국부적으로 가해지는 과다한 상판 구조물의 압축하중을 균일한 분포하중으로 흡수시켜 지지하는 기능을 하게 된다.In general, in civil engineering or construction sites, a support device that supports the lower part of the concrete is used until it is poured and cured. It functions to support by absorbing the locally applied excessive compressive load of the upper structure as a uniformly distributed load.

즉, 건물을 시공할 경우에 상, 하의 층을 구획하는 슬래브(slad)를 시공하기 위해서는 우선 슬래브를 시공하여야 할 부분의 하부에 슬래브 거푸집을 설치하게 되는데, 그 시공과정에서 장선 및 멍에목과 같은 가설빔(Beam)들에 의해 상기 거푸집을 지지하고, 상기 가설빔들의 하부를 동바리들이 지지하게 된다. That is, when constructing a building, in order to construct a slad that divides the upper and lower floors, the slab formwork is first installed in the lower part of the part where the slab is to be constructed. The formwork is supported by beams, and the lower portions of the temporary beams are supported by the pilgrims.

그리고 상기 가설빔들의 지지높이를 맞추기 위하여 동바리는 일반적으로 높이조절이 가능한 구조로 조립된다. And in order to match the support height of the temporary beams, the dongbari is generally assembled in a height-adjustable structure.

이러한 건축용 동바리는 도 1에 도시된 바와 같이 핸들(11)을 중심으로 한쪽은 오른나사(12)가 형성되고 다른 한쪽은 왼 나사(13)가 형성된 스크루 봉(10)과 상기의 스크루 봉(10)의 오른나사(12)와 맞물리는 오른나사(21)가 형성되고 단턱(22)이 형성된 부재내입부(23)를 형성한 제1몸체(20)와 상기의 제1몸체(20)의 부재 내입부(23)에 삽입되어 단턱(22)에 고정되는 버팀 부재(30)와 상기의 버팀 부재(30)가 내입되어 고정되는 단턱(41)을 형성한 부재 내입부(42)와 볼트 공(43)을 형성한 제2몸체(40)와 상기의 스크루 봉(10)의 왼 나사(13)와 맞물리는 왼 나사(51)가 형성되고 단턱(52)이 형성된 부재 내입부(53)를 형성한 제1몸체(50)와 상기의 제1몸체(50)의 부재 내입부(53)에 삽입되어 단턱(52)에 고정되는 버팀 부재(30)와 상기의 버팀 부재(30)가 내입되어 고정되는 단턱(61)을 형성한 부재 내입부(62)와 볼트 공(63)을 형성한 제2몸체(60)로 구성되어, 스크루 봉(10)의 회전을 통하여 제2 몸체(40)(60)의 간격이 조절되어 이루어진 구조이다. As shown in FIG. 1, this construction copper bar has a right-hand thread 12 on one side and a left-hand thread 13 on the other side of the handle 11, as shown in FIG. 1, the screw rod 10 and the screw rod 10 ) of the first body 20 and the member of the first body 20 having a right-hand screw 21 engaged with the right-hand screw 12 of The holding member 30 inserted into the inner mouth 23 and fixed to the step 22 and the member inner portion 42 and the bolt ball ( 43) is formed, and a left-hand screw 51 engaged with the left-hand screw 13 of the screw rod 10 is formed and a stepped 52 is formed inside the member 53 is formed. A first body 50 and the holding member 30 inserted into the member inner mouth 53 of the first body 50 and fixed to the step 52 and the holding member 30 are inserted and fixed It is composed of a second body 60 having a member inner part 62 and a bolt hole 63 formed with a stepped 61, and through the rotation of the screw rod 10, the second body 40, 60 ) is a structure in which the spacing is adjusted.

상기한 바와 같은 건축용 동바리에 따르면, 스크루 봉(10)의 회전에 따라 상기 제1몸체(20)에 결합된 버팀부재(30)가 상승하거나 하강시킨 후 상기 제2몸체(40)에 멍에목 또는 장선을 지지하도록 하고 있다. According to the construction copper bar as described above, according to the rotation of the screw rod 10, the holding member 30 coupled to the first body 20 is raised or lowered, and then the yoke neck or joist is attached to the second body 40. to support

그러나 가설빔(장선 또는 멍에목)을 지지하는 제2몸체에 안착되는 장선 또는 멍에목의 높낮이를 조절할 수 있으나 충격에 의해 동바리의 중심축으로 부터 이격되어 안전한 지지력을 확보할 수 없고, 또한 멍에목 또는 장선을 고정지지할 수 없는 문제점이 있다. However, although the height of the joist or yoke neck that is seated on the second body supporting the temporary beam (joist or yoke neck) can be adjusted, it is spaced apart from the central axis of the pole by the impact, so it is not possible to secure a safe bearing capacity. There is a problem that cannot be fixedly supported.

대한민국 실용신안 출원 제 2009-0003322호Korea Utility Model Application No. 2009-0003322

본 발명은 상기한 종래 기술의 문제점을 해소하기 위해 안출되는 것으로 건축물 또는 구조물을 구축하기 위한 콘크리트 타설시 슬라브의 저면에 설치되는 멍에 또는 장선을 흔들림 없이 수평, 높이, 정확한 센터를 유지하므로써 시공시간 단축 및 안정성을 확보하여 할 수 있어 건축비용을 절감할 수 있는 동바리용 고정유격제를 제공하는데 그 목적이 있다. The present invention is devised to solve the problems of the prior art, and it reduces the construction time by maintaining the horizontal, height, and accurate center without shaking the yoke or joist installed on the bottom of the slab when pouring concrete for constructing a building or structure It is an object of the present invention to provide a fixed clearance agent for Dongbari that can reduce construction costs by securing stability.

상기한 본 발명의 목적은 내부에 나사관부가 형성된 하부파이프와 상기 하부파이프의 나사관부에 결합되도록 외주면에 나사부가 형성되고 상부에는 받침부가 형성된 상부파이프와 상기 상부파이프의 높낮이를 조절하는 조절나사부로 이루어진 동바리에 있어서, 상기 상부파이프의 중심부에 삽입공이 형성되고 상기 상부파이프의 상단에 안착결합된 바닥판부가 형성되되 중심부에는 상기 상부파이프의 삽입공과 연통된 통공이 형성되고 상기 통공 상부 외주연에는 결합공이 형성되며 상기 바닥판부의 양측단에는 수직방향으로 돌출된 측면부가 구비된 헤드받침부와 상기 헤드받침부의 바닥판부에 형성된 결합공에 안착되도록 하부에 돌기부가 형성된 수평판부가 구비하되 상기 수평판부의 양측단에는 수용공간부를 형성하도록 상부로 돌출된 측면부가 형성되고 상기 측면부의 상단 끝단에는 상기 헤드받침부의 측면부를 지지하도록 소정의 경사각을 갖도록 하부로 연장절곡되어 상기 수평판부 면보다 하부로 더 돌출된 날개편이 구비된 유격제와 상기 유격제의 수평판부 바닥면 중심부에는 상기 헤드받침부의 통공을 관통하여 상기 상부파이프의 삽입공에 내설되는 중심핀부를 포함하여 이루어진 것을 특징으로 하는 동바리용 고정유격제에 의해 달성된다. The above object of the present invention is to adjust the height of the upper pipe and the upper pipe having a screw portion formed therein and a screw portion formed on the outer circumferential surface so as to be coupled to the screw portion of the lower pipe and a support portion on the upper portion of the lower pipe. In the dongbari made, an insertion hole is formed in the center of the upper pipe, and a bottom plate part seated and coupled to the upper end of the upper pipe is formed, a through hole communicating with the insertion hole of the upper pipe is formed in the center, and the through hole is coupled to the upper outer periphery A ball is formed and both ends of the bottom plate part are provided with a head support part having side portions protruding in the vertical direction, and a horizontal plate part having protrusions formed at the bottom so as to be seated in a coupling hole formed in the bottom plate part of the head support part, but the horizontal plate part The side portions protruding upward to form a receiving space are formed at both ends, and the upper end of the side portion is extended and bent downward to have a predetermined inclination angle to support the side portion of the head support portion, and the wing protrudes further downward than the horizontal plate portion surface. By a fixed gait agent for Dongbari, characterized in that it comprises a gait agent provided with a piece and a central pin installed in the insertion hole of the upper pipe through the through hole of the head support part in the center of the bottom surface of the horizontal plate part of the gait agent is achieved

삭제delete

삭제delete

삭제delete

삭제delete

또한, 상기 상부파이프의 상단측면에는 상기 상부파이프의 삽입공과 연통된 관통공이 형성되고 상기 상부파이프의 삽입공에는 단턱부가 형성되며 상기 중심핀부의 측면부에 내설통공이 형성하되 상기 내설통공 양측단에는 힌지축이 구비되며 상기 힌지축에 결합되어 회동할 수 있는 걸림바가 설치되고 상기 중심핀부의 하부에는 탄성스프링이 설치되어 상기 상부파이프의 삽입공에 형성된 단턱부에 안착되어 이루어진 것을 특징으로 한다. In addition, a through hole communicating with the insertion hole of the upper pipe is formed on the upper side surface of the upper pipe, a stepped portion is formed in the insertion hole of the upper pipe, and an inner through hole is formed on a side surface of the central pin, but the inner through hole is formed at both ends of the inner through hole with a hinge A shaft is provided, and a rotatable locking bar is installed by being coupled to the hinge shaft, and an elastic spring is installed at a lower portion of the center pin portion to be seated on a stepped portion formed in the insertion hole of the upper pipe.

위에서 상술한 바와 같이 본 발명의 동바리용 고정유격제는 건축물 또는 구조물을 구축하기 위한 콘크리트 타설시 슬라브의 저면에 설치되는 멍에 또는 장선을 설치시 흔들림 없이 수평, 높이, 정확한 센터를 유지하므로써 시공시간 단축 및 안정성을 확보하므로써 건축비용을 절감할 수 있는 효과가 있다. As described above, the fixed clearance agent for Dongbari of the present invention reduces construction time by maintaining the horizontal, height, and accurate center without shaking when installing the yoke or joist installed on the bottom of the slab when pouring concrete for constructing a building or structure. And it has the effect of reducing the construction cost by securing stability.

도 1에 도시된 바와 같이 건축용 동바리를 나타낸 분해사시도.
도 2는 본 발명의 동바리용 고정유격제를 나타낸 사시도.
도 3은 본 발명의 동바리용 고정유격제를 나타낸 단면도.
도 4는 본 발명의 유격제를 나타낸 사시도.
도 5a,5b는 본 발명의 유격제를 나타낸 실시예.
도 6은 본 발명의 유격제를 나타낸 다른 실시예.
도 7a,7b는 도 6에 대한 실시예.
도 8a,8b는 본 발명의 동바리용 고정유격제를 나타낸 다른 실시예.
도 9는 본 발명의 동바리용 고정유격제를 나타낸 다른 실시예.
도 10은 본 발명의 동바리용 고정유격제를 나타낸 다른 실시예.
도 11a,11b는 도 10에 대한 실시예.
As shown in FIG. 1, an exploded perspective view showing a dongbari for construction.
Figure 2 is a perspective view showing a fixed play agent for dongbari of the present invention.
Figure 3 is a cross-sectional view showing the fixed play agent for dongbari of the present invention.
Figure 4 is a perspective view showing the pacifier of the present invention.
5a, 5b is an embodiment showing the pacifier of the present invention.
Figure 6 is another embodiment showing the pacifier of the present invention.
Figures 7a and 7b are the embodiment of Figure 6;
Figure 8a, 8b is another embodiment showing a fixed gait agent for dongbari of the present invention.
Figure 9 is another embodiment showing a fixed gait agent for dongbari of the present invention.
Figure 10 is another embodiment showing the fixed gait agent for dongbari of the present invention.
11A and 11B are an embodiment with respect to FIG. 10;

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 보다 상세히 설명하기로 한다. 이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings. Prior to this, the terms or words used in the present specification and claims should not be construed as being limited to conventional or dictionary meanings, and the inventor should properly understand the concept of the term in order to best describe his invention. Based on the principle that it can be defined, it should be interpreted as meaning and concept consistent with the technical idea of the present invention.

따라서 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.Therefore, the configuration shown in the embodiments and drawings described in this specification is only the most preferred embodiment of the present invention and does not represent all of the technical idea of the present invention, so various equivalents that can be substituted for them at the time of the present application It should be understood that there may be water and variations.

도 2 내지 도 4에 도시된 바와 같이 본 발명의 동바리용 고정유격제(1)는 내부에 나사관부가 형성된 하부파이프(100)와 상기 하부파이프(100)의 나사관부에 결합되도록 외주면에 나사부가 형성되고 상부에는 받침부가 형성된 상부파이프(200)와 상기 상부파이프(200)의 높낮이를 조절하는 조절나사부(300)로 이루어진 동바리에 있어서, 상기 상부파이프(200)의 중심부에 삽입공(210)이 형성되고 상기 상부파이프(200)의 상단에 안착결합된 바닥판부(12)가 형성되되 중심부에는 상기 상부파이프(200)의 삽입공(210)과 연통된 통공(12-2)이 형성되고 상기 바닥판부(12)의 양측단에는 수직방향으로 돌출된 측면부(14)가 구비된 헤드받침부(10)와 상기 헤드받침부(10)의 바닥판부(12)에 안착되도록 수평판부(22)가 구비하되 상기 수평판부(22)의 양측단에는 수용공간부(22-2)를 형성하도록 상부로 돌출된 측면부(24)가 형성되고 상기 측면부(24)의 상단 끝단에는 상기 헤드받침부(10)의 측면부(14)를 지지하도록 소정의 경사각을 갖도록 하부로 연장절곡된 날개편(26)이 구비된 유격제(20)와 상기 유격제(20)의 수평판부(22) 바닥면 중심부에는 상기 헤드받침부(10)의 통공(12-2)을 관통하여 상기 상부파이프(200)의 삽입공(210)에 내설되는 중심핀부(30)를 포함하여 이루어진 구조이다. As shown in Figures 2 to 4, the fixed clearance agent for copper (1) of the present invention has a screw portion on the outer peripheral surface so as to be coupled to the lower pipe 100 and the screw tube portion of the lower pipe 100 having a screw tube portion formed therein. In the dongbari consisting of an upper pipe 200 formed with a support part on the upper part and an adjusting screw part 300 for adjusting the height of the upper pipe 200, an insertion hole 210 in the center of the upper pipe 200 is A bottom plate portion 12 is formed and seated and coupled to the upper end of the upper pipe 200, and a through hole 12-2 communicating with the insertion hole 210 of the upper pipe 200 is formed in the center, and the bottom plate portion 12 is formed. Both ends of the plate part 12 are provided with a head support part 10 having side parts 14 protruding in the vertical direction and a horizontal plate part 22 to be seated on the bottom plate part 12 of the head support part 10 . However, at both ends of the horizontal plate part 22, the side part 24 protruding upward to form the accommodation space part 22-2 is formed, and at the upper end of the side part 24, the head support part 10 At the center of the bottom surface of the horizontal plate 22 of the spacer 20 and the spacer 20 provided with a wing piece 26 extending downward to have a predetermined inclination angle to support the side portion 14, the head support It has a structure including the central pin part 30 which penetrates the through hole 12-2 of the part 10 and is built into the insertion hole 210 of the upper pipe 200.

상기 유격제(20)는 도 5a에 도시된 바와 같이 상기 헤드받침부(10)의 바닥판부(12)로 안착시 상기 유격제(20)의 날개편(26)을 가압하여 내설함과 도 5b에 도시된 바와 같이 상기 유격제(20)의 수용공간부(22-2)에 멍에목 또는 장선이 내설시 상기 유격제(20)의 날개편(26)이 상기 헤드받침부(10)의 측면부(14)를 지지하는 동시에 상기 유격제(20)의 수용공간부(22-2)에 내설된 멍에목 또는 장선을 지지할 수 있도록 탄성체로 이루어지는 것이 바람직하다.As shown in FIG. 5A, the spacer 20 is installed inside by pressing the wing piece 26 of the spacer 20 when it is seated on the bottom plate 12 of the head support part 10, as shown in FIG. 5B. As shown in Fig., when a yoke neck or joist is installed in the receiving space portion 22-2 of the clearance agent 20, the wing piece 26 of the clearance agent 20 is placed on the side of the head support unit 10 ( 14) and at the same time supporting the yoke neck or the joist built in the receiving space 22-2 of the clearance agent 20, it is preferably made of an elastic body.

이와 같이 상기 유격제(20)가 상기 헤드받침부(10)의 바닥판부(12)로 유입시 상기 유격제(20)의 날개편(26)이 상기 헤드받침부(10)의 측면부(14)를 지지하는데 보다 지지력을 향상시킬 수 있도록 도 4 내지 도 5에 도시된 바와 같이 상기 유격제(20)의 날개편(26) 끝단에는 수직방향으로 연장된 지지편(26-2)이 더 구비되어 이루어지는 것이 바람직하다.As such, when the clearance agent 20 flows into the bottom plate portion 12 of the head support unit 10 , the wing pieces 26 of the clearance agent 20 move to the side portions 14 of the head support unit 10 . As shown in FIGS. 4 to 5 to further improve the supporting force to support It is desirable to do

즉, 상기 유격제(20)의 날개편(26) 끝단에 지지편(26-2)이 더 구비되어 상기 헤드받침부(10)의 측면부(14)과 맞닿은 면적을 크게하므로써 지지력을 향상시킬 수 있는 효과가 있다. That is, the support piece 26-2 is further provided at the end of the wing piece 26 of the spacer 20 to increase the area in contact with the side portion 14 of the head support portion 10, thereby improving the support force. there is an effect

상기와 같이 상기 유격제(20)가 상기 헤드받침부(10)의 바닥판부(12)에 안착되어 상기 유격제(20)의 수용공간부(22-2)에 삽입되는 멍에목 또는 장선을 더욱더 가압하여 지지할 수 있도록 도 6에 도시된 바와 같이 상기유격제(20)의 날개편(26)은 상기 유격제(20)의 수평판부(22) 면보다 하부로 더 돌출(L1)되어 이루어진 것이 바람직하다. As described above, the spacer 20 is seated on the bottom plate portion 12 of the head support unit 10 and further presses the yoke neck or joist inserted into the receiving space 22-2 of the spacer 20 as described above. As shown in FIG. 6, the wing piece 26 of the spacer 20 is preferably made to protrude further (L1) lower than the horizontal plate portion 22 surface of the spacer 20 to support it. .

즉, 도 7a에 도시된 바와 같이 상기 유격제(20)가 상기 헤드받침부(10)의 바닥면부(12)로 유입되어 안착시 상기 유격제(20)의 날개편(26)이 상기 유격제(20)의 수평판부(22) 면보다 하부로 더 돌출(L1)되어 이루어져 도 7b에 도시된 바와 같이 상기 유격제(20)의 수용공간부(22-2)에 멍에목 또는 장선을 내설하여 하부로 가압하면 상기 유격제(20)의 수평판부(22)가 상기 헤드받침부(10)의 바닥면부(12)에 안착되는 동시에 상기 유격제(20)의 날개편(26)이 내측 가압되므로써 더욱더 상기 유격제(20)의 수용공간부(22-2)에 내설된 멍에목 또는 장선을 가압하여 지지할 수 있어 결속력을 증대할 수 있는 효과가 있다.That is, as shown in FIG. 7A , when the spacer 20 is introduced into the bottom surface 12 of the head support part 10 and is seated, the wing pieces 26 of the spacer 20 become the spacer As shown in Fig. 7b, it is made to protrude (L1) further lower than the plane of the horizontal plate part 22 of (20). When pressurized, the horizontal plate portion 22 of the spacer 20 is seated on the bottom surface 12 of the head support portion 10, and at the same time, the wing piece 26 of the spacer 20 is pressed inward, making the It is possible to press and support the yoke neck or joist built into the receiving space 22-2 of the clearance agent 20, thereby increasing the binding force.

위에서 상술한 바와 같이 상기 유격제(20)가 상기 헤드받침부(10)의 바닥판부(12) 중심부에 안착시 상기 헤드받침부(10)의 바닥판부(12)에 구비된 중심핀부(30)가 상기 헤드받침부(10)의 바닥판부(12)에 형성된 통공(12-2)을 관통하여 상기 상부파이프(200)의 삽입공(210)에 내설되는 구조로써 상기 중심핀부(30)는 상기 유격제(20)가 상기 헤드받침부(10) 중심부에 내설되도록 유도되는 것으로 보다 상기 헤드받침부(10)의 바닥판부(12) 중심부에 위치함과 이동되지 않도록 도 8a,8b에 도시된 바와 같이 상기 상부파이프(200)의 상단에는 상기 상부파이프(200)의 삽입공(210)과 연통된 통공(220)이 형성되고 상기 중심핀부(30)의 측면에는 관통공(32)이 형성되며 상기 상부파이프(200)의 통공(220)과 상기 중심핀부(30)의 관통공(32)을 관통공하여 서로 체결되도록 결합핀(40)이 구비되어 이루어지는 것이 바람직하다. As described above, when the clearance agent 20 is seated in the center of the base plate 12 of the head support part 10, the center pin part 30 provided in the base plate part 12 of the head support part 10. is built into the insertion hole 210 of the upper pipe 200 through the through hole 12-2 formed in the bottom plate part 12 of the head support part 10, and the center pin part 30 is the As shown in Figs. 8a and 8b, so that the clearance agent 20 is located in the center of the bottom plate 12 of the head support 10 and does not move rather than being guided to be built-in in the center of the head support 10. Similarly, at the upper end of the upper pipe 200, a through hole 220 communicating with the insertion hole 210 of the upper pipe 200 is formed, and a through hole 32 is formed in the side surface of the central pin part 30, and the It is preferable that the coupling pin 40 is provided so as to pass through the through hole 220 of the upper pipe 200 and the through hole 32 of the center pin part 30 to be fastened to each other.

즉, 상기 유격제(20)가 탄성체로 이루어져 충격에 의해 동바리 중심축으로 부터 이탈되거나 흔들림이 발생될 수 있기 때문에 이를 방지하고자 상기 상부파이프(200)의 상단에는 상기 상부파이프(200)의 삽입공(210)과 연통된 통공(220)이 형성되고 상기 중심핀부(30)의 측면에는 관통공(32)이 형성되며 상기 상부파이프(200)의 통공(220)과 상기 중심핀부(30)의 관통공(32)을 관통공하여 서로 체결되도록 결합핀(40)으로 이루어져 충격에 의해 흔들림을 방지할 수 있어 안전하게 멍에 또는 장선을 지지할 수 있는 효과가 있다. That is, in order to prevent this, the insertion hole of the upper pipe 200 is located at the upper end of the upper pipe 200 because the clearance agent 20 is made of an elastic material and may be separated from the central axis of the dongbari or shake due to an impact. A through hole 220 communicating with the 210 is formed, a through hole 32 is formed in a side surface of the central pin part 30, and the through hole 220 of the upper pipe 200 and the central pin part 30 are penetrated. It is made of a coupling pin 40 so as to be fastened to each other through a through hole of the ball 32 to prevent shaking due to impact, thereby having the effect of safely supporting a yoke or joist.

상기와 같이 상기 중심핀부(30)의 관통공(32)과 상기 상부파이프(200)의 통공(220)에 삽입되는 결합핀(40)에 의해 상기 유격제(20)이 고정될 수 있으나 다른실시예로 도 9에 도시된 바와 같이 상기 헤드받침부(10)의 바닥판부(12)에 형성된 통공(12-2) 상부 외주연에는 결합공(12-4)이 형성되고 이와 대응되는 상기 유도부재(20)의 수평판부(22) 하부에 돌기부(22-4)가 형성되어 이루어지는 것이 바람직하다. As described above, the clearance 20 may be fixed by the through hole 32 of the center pin part 30 and the coupling pin 40 inserted into the through hole 220 of the upper pipe 200, but in another implementation For example, as shown in FIG. 9, a coupling hole 12-4 is formed in the upper outer periphery of the through hole 12-2 formed in the bottom plate part 12 of the head support part 10, and the corresponding induction member It is preferable that the protrusion part 22-4 is formed in the lower part of the horizontal plate part 22 of (20).

즉, 상기 헤드받침부(10)의 바닥판부(12)으로 상기 유도부재(20)가 내설되며 상기 유도부재(20)의 수용공간부(22-2)로 멍에 또는 장선이 내설되며 상기 유도부재(20)가 하부로 이동되는 동시에 상기 유도부재의 돌기부(22-4)가 상기 헤드받침부(10)의 결합공(12-4)에 체결결합되어 고정하므로써 보다 용이하게 동바리 중심축에 고정될 수 있는 효과가 있다. That is, the guiding member 20 is internally built into the bottom plate portion 12 of the head support part 10 , and a yoke or joist is internally installed into the receiving space 22-2 of the guiding member 20 , and the induction member 20 is internally installed. At the same time as 20 is moved downward, the protrusion 22-4 of the induction member is fastened to and fixed to the coupling hole 12-4 of the head support part 10, so that it can be more easily fixed to the central axis of the dongbari. can have an effect.

이와 같이 상기 유격제(20)가 상기 헤드받침부(10)에 고정됨에 있어 보다 용이하게 체결결합되어 작업의 편리함을 증대 및 결속력을 증대할 수 있도록 도 10 에 도시된 바와 같이 상기 상부파이프(200)의 상단측면에는 상기 상부파이프(200) 의 삽입공(210)과 연통된 관통공(220)이 형성되고 상기 상부파이프(200)의 삽입공(210)에는 단턱부(220-2)가 형성되며 상기 중심핀부(30)의 측면부에 내설통공(34)이 형성하되 상기 내설통공(34) 양측단에는 힌지축(36)이 구비되며 상기 힌지축(36)에 결합되어 회동할 수 있는 걸림바(38)가 설치되고 상기 중심핀부(30)의 하부에는 탄성스프링(50)이 설치되어 상기 상부파이프(200)의 삽입공(210)에 형성된 단턱부(220-2)에 안착되어 이루어지는 것이 바람직하다.As described above, the upper pipe 200 as shown in FIG. 10 so that the clearance agent 20 is more easily fastened and coupled in being fixed to the head support part 10 to increase the convenience of work and increase the binding force. ), a through hole 220 communicating with the insertion hole 210 of the upper pipe 200 is formed on the upper side of the upper pipe 200, and a stepped portion 220-2 is formed in the insertion hole 210 of the upper pipe 200 The inner through hole 34 is formed on the side surface of the central pin part 30, and the hinge shaft 36 is provided at both ends of the inner through hole 34, and is coupled to the hinge shaft 36 and can be rotated. 38 is installed, and an elastic spring 50 is installed in the lower portion of the center pin part 30 to be seated on the stepped part 220-2 formed in the insertion hole 210 of the upper pipe 200. do.

이때 상기 힌지축(36)에 결합되어 회동하는 걸림바(38)는 상기 중심핀부(30)이 상,하로 이동시 상기 상부파이프(200)의 관통공(220)으로부터 이탈 및 체결될 수 있도록 탄성스프링(36-2)이 구비되어 이루어진다. At this time, the locking bar 38 coupled to the hinge shaft 36 and rotating is an elastic spring so that it can be separated from and fastened to the through hole 220 of the upper pipe 200 when the center pin part 30 moves up and down. (36-2) is provided.

즉, 도 11a에 도시된 바와 같이 상기 유격제(20)의 수용공간부(22-2)에 멍에 또는 장선을 내설시 상기 유격제(20)가 하방향으로 이동하는데 이때, 상기 상부파이프(200)의 삽입공(210)으로 유입된 상기 중심핀부(30)의 걸림바(38)가 회동하여 상기 상부 파이프(200)의 관통공(220)에 체결결합되어 상기 유격제(20)를 고정시키며,That is, as shown in FIG. 11A , when a yoke or joist is installed in the receiving space 22-2 of the clearance agent 20, the clearance agent 20 moves downward. At this time, the upper pipe 200 ), the locking bar 38 of the central pin part 30 introduced into the insertion hole 210 rotates and is fastened to the through hole 220 of the upper pipe 200 to fix the clearance agent 20, ,

이와 반대로 상기 유격제(20)의 수용공간부(22-2)에 멍에 또는 장선을 이탈시키면 도 11b에 도시된 바와 같이 상기 중심부핀부(30)의 하부에 설치된 탄성스프링(50)에 의해 상승되는데 이때 상기 상부 파이프(200)의 관통공(220)에 체결결합된 상기 중심핀부(30)의 걸림바(38)가 회동하여 상기 상부파이프(200)의 삽입공(210)으로 유입되어 손쉽게 유격제를 해체할 수 있는 효과가 있다. Conversely, when the yoke or joist is separated from the receiving space 22-2 of the clearance agent 20, it is raised by the elastic spring 50 installed under the central pin 30 as shown in FIG. 11b. At this time, the locking bar 38 of the central pin part 30 fastened to the through hole 220 of the upper pipe 200 rotates and flows into the insertion hole 210 of the upper pipe 200 to easily remove the gap. has the effect of dismantling it.

위에서 상술한 바와 같이 본 발명의 동바리용 고정유격제는 건축물 또는 구조물을 구축하기 위한 콘크리트 타설시 슬라브의 저면에 설치되는 멍에 또는 장선을 설치시 흔들림 없이 수평, 높이, 정확한 센터를 유지하므로써 시공시간 단축 및 안정성을 확보하므로써 건축비용을 절감할 수 있는 효과가 있다. As described above, the fixed clearance agent for Dongbari of the present invention reduces construction time by maintaining the horizontal, height, and accurate center without shaking when installing the yoke or joist installed on the bottom of the slab when pouring concrete for constructing a building or structure. And it has the effect of reducing the construction cost by securing stability.

1 : 동바리용 고정유격제
10 : 헤드받침부 12 : 바닥판부
12-2 : 통공 12-4 : 결합공
14 : 측면부
20 : 유격제 22 : 수평판부
22-2 : 수용공간부 22-4 : 돌기부
24 : 측면부
26 : 날개편 26-2 : 지지편
30 : 중심핀부 32 : 관통공
34 : 내설통공 36 : 힌지축
36-2 : 탄성스프링 38 : 걸림바
40 : 결합핀 50 : 탄성스프링
100 : 하부파이프 200 : 상부파이프
210 : 삽입공 220 : 통공
220-2 : 단턱부 300 : 조절나사부
1: Fixed gait agent for Dongbari
10: head support part 12: bottom plate part
12-2: through hole 12-4: coupling hole
14: side part
20: gait agent 22: horizontal plate part
22-2: receiving space 22-4: protrusion
24: side part
26: wing piece 26-2: support piece
30: center pin 32: through hole
34: internal through hole 36: hinge shaft
36-2: elastic spring 38: catch bar
40: coupling pin 50: elastic spring
100: lower pipe 200: upper pipe
210: insertion hole 220: through hole
220-2: stepped part 300: adjusting screw part

Claims (6)

내부에 나사관부가 형성된 하부파이프와 상기 하부파이프의 나사관부에 결합되도록 외주면에 나사부가 형성되고 상부에는 받침부가 형성된 상부파이프와 상기 상부파이프의 높낮이를 조절하는 조절나사부로 이루어진 동바리에 있어서,
상기 상부파이프의 중심부에 삽입공이 형성되고 상기 상부파이프의 상단에 안착결합된 바닥판부가 형성되되 중심부에는 상기 상부파이프의 삽입공과 연통된 통공이 형성되고 상기 통공 상부 외주연에는 결합공이 형성되며 상기 바닥판부의 양측단에는 수직방향으로 돌출된 측면부가 구비된 헤드받침부와;
상기 헤드받침부의 바닥판부에 형성된 결합공에 안착되도록 하부에 돌기부가 형성된 수평판부가 구비하되 상기 수평판부의 양측단에는 수용공간부를 형성하도록 상부로 돌출된 측면부가 형성되고 상기 측면부의 상단 끝단에는 상기 헤드받침부의 측면부를 지지하도록 소정의 경사각을 갖도록 하부로 연장절곡되어 상기 수평판부 면보다 하부로 더 돌출된 날개편이 구비된 유격제와;
상기 유격제의 수평판부 바닥면 중심부에는 상기 헤드받침부의 통공을 관통하여 상기 상부파이프의 삽입공에 내설되는 중심핀부;를 포함하여 이루어진 것을 특징으로 하는 동바리용 고정유격제.
A lower pipe having a screw tube portion formed therein, an upper pipe having a screw portion formed on the outer peripheral surface to be coupled to the screw tube portion of the lower pipe, and an upper pipe having a support portion formed on the upper portion, and an adjusting screw portion for adjusting the height of the upper pipe,
An insertion hole is formed in the center of the upper pipe, a bottom plate portion seated and coupled to the upper end of the upper pipe is formed, a through hole communicating with the insertion hole of the upper pipe is formed in the center, and a coupling hole is formed in the upper outer periphery of the through hole, and the bottom a head support portion provided with side portions protruding in the vertical direction at both ends of the plate portion;
A horizontal plate portion having protrusions formed thereon is provided at the lower portion to be seated in the coupling hole formed in the bottom plate portion of the head support portion, and side portions protruding upward to form an accommodation space portion are formed at both ends of the horizontal plate portion, and the upper end of the side portion has the a play agent provided with a wing piece extending downward to have a predetermined inclination angle to support the side surface of the head support part and protruding further lower than the surface of the horizontal plate part;
Fixed play agent for Dongbari, characterized in that it comprises a; in the center of the bottom surface of the horizontal plate part of the play material, a central pin part that penetrates the through hole of the head support part and is built into the insertion hole of the upper pipe.
삭제delete 삭제delete 삭제delete 삭제delete 제 1항에 있어서,
상기 상부파이프의 상단측면에는 상기 상부파이프의 삽입공과 연통된 관통공이 형성되고 상기 상부파이프의 삽입공에는 단턱부가 형성되며 상기 중심핀부의 측면부에 내설통공이 형성하되 상기 내설통공 양측단에는 힌지축이 구비되며 상기 힌지축에 결합되어 회동할 수 있는 걸림바가 설치되고 상기 중심핀부의 하부에는 탄성스프링이 설치되어 상기 상부파이프의 삽입공에 형성된 단턱부에 안착되어 이루어진 것을 특징으로 하는 동바리용 고정유격제.
The method of claim 1,
A through hole communicating with the insertion hole of the upper pipe is formed on the upper side surface of the upper pipe, a stepped portion is formed in the insertion hole of the upper pipe, and an inner through hole is formed on a side surface of the central pin, but a hinge shaft is provided at both ends of the inner through hole It is provided with a locking bar that is coupled to the hinge shaft and can rotate, and an elastic spring is installed on the lower part of the central pin, and is seated on the stepped part formed in the insertion hole of the upper pipe. .
KR1020210082119A 2021-06-24 2021-06-24 Fixing control device for supporting post KR102348253B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210082119A KR102348253B1 (en) 2021-06-24 2021-06-24 Fixing control device for supporting post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210082119A KR102348253B1 (en) 2021-06-24 2021-06-24 Fixing control device for supporting post

Publications (1)

Publication Number Publication Date
KR102348253B1 true KR102348253B1 (en) 2022-01-06

Family

ID=79347641

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210082119A KR102348253B1 (en) 2021-06-24 2021-06-24 Fixing control device for supporting post

Country Status (1)

Country Link
KR (1) KR102348253B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090003322A (en) 2006-05-25 2009-01-09 미쓰비시덴키 가부시키가이샤 Control device for vehicle
JP2010168859A (en) * 2009-01-26 2010-08-05 For Build Co Ltd Metal fitting for installing support
KR20140057034A (en) * 2012-11-02 2014-05-12 도원태 Supporting post for construction
KR101843315B1 (en) * 2017-07-11 2018-03-29 김명수 Supporting post for head controlling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090003322A (en) 2006-05-25 2009-01-09 미쓰비시덴키 가부시키가이샤 Control device for vehicle
JP2010168859A (en) * 2009-01-26 2010-08-05 For Build Co Ltd Metal fitting for installing support
KR20140057034A (en) * 2012-11-02 2014-05-12 도원태 Supporting post for construction
KR101843315B1 (en) * 2017-07-11 2018-03-29 김명수 Supporting post for head controlling

Similar Documents

Publication Publication Date Title
US10612263B2 (en) Columnic actuated spring loader system
KR102348253B1 (en) Fixing control device for supporting post
KR100660740B1 (en) Curb support and rapid construction method using the same
CN114150773B (en) Concrete built-in fitting reinforced structure
CN207632371U (en) A kind of soft soil foundation Super High tower crane firm banking
KR200384367Y1 (en) A support pipe for construction
JP2007050967A (en) Crane base isolation supporting beam structure
CN214695706U (en) A antidetonation formula building pile structure for building engineering
KR20060037137A (en) Space preservation device for construction support
JP5386214B2 (en) Foundation structure
KR101177072B1 (en) apparatus for building and removing a gang form and system having the same
JP2007262691A (en) Sliding support, method of mounting it, and base isolation structure
CN211340431U (en) Force balance supporting structure of longitudinal slope cast-in-place box girder
KR200386937Y1 (en) A support pipe with clamp for construction
KR100745024B1 (en) Balancing device for form panels
KR102250673B1 (en) Leveling device and installation method of external panel for building
KR20110078593A (en) Support for reinforcing bar, manufacturing method thereof and construction method for foundation using that
KR200378145Y1 (en) Curb support
CN205382607U (en) Empty core plate norm box fixed bolster
KR100485262B1 (en) Device fixing horizentally a mold panel
KR102618685B1 (en) N-shaped fixing control device for supporting post
CN217580582U (en) Building shock insulation support mounting structure
KR20240048648A (en) Support fixing control device for supporting post
KR200357084Y1 (en) Curb support
KR102570994B1 (en) Bridge column with earthquake resistance

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant