KR102197759B1 - A grouting apparatus for simultaneous injecting 2.0shot grout material - Google Patents

A grouting apparatus for simultaneous injecting 2.0shot grout material Download PDF

Info

Publication number
KR102197759B1
KR102197759B1 KR1020200087502A KR20200087502A KR102197759B1 KR 102197759 B1 KR102197759 B1 KR 102197759B1 KR 1020200087502 A KR1020200087502 A KR 1020200087502A KR 20200087502 A KR20200087502 A KR 20200087502A KR 102197759 B1 KR102197759 B1 KR 102197759B1
Authority
KR
South Korea
Prior art keywords
grouting
steel pipe
injection
materials
inner space
Prior art date
Application number
KR1020200087502A
Other languages
Korean (ko)
Inventor
주광영
Original Assignee
주광영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주광영 filed Critical 주광영
Priority to KR1020200087502A priority Critical patent/KR102197759B1/en
Application granted granted Critical
Publication of KR102197759B1 publication Critical patent/KR102197759B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Architecture (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a grouting apparatus for simultaneously injecting 2.0-shot grouting materials, which can use quick-setting and high-strength injecting materials in a deep perforation hole by compressively mixing two kinds of the grouting materials and allowing the same to be spread to the ground around the perforation hole after two kinds of the grouting materials are simultaneously injected into a steel pipe while the steel pipe is inserted into the perforation hole on the ground. To this end, the grouting apparatus for simultaneously injecting 2.0-shot grouting materials comprises: a steel pipe inserted into the perforation hole perforated on the ground; one- and two-liquid grouting injection hoses for injecting different kinds of grouting injection materials from each other into an inner space of the steel pipe, respectively; and a mixing block connected to the one- and two-liquid grouting injection hoses and spraying the mixed grouting injection materials to the inner space of the steel pipe while two kinds of the grouting injection materials injected through the one- and two-liquid grouting injection hoses are mixed.

Description

2.0숏 그라우팅재 동시 주입 그라우팅 장치{A grouting apparatus for simultaneous injecting 2.0shot grout material}2.0 shot grouting material simultaneous injection grouting apparatus

본 발명은 2.0숏 그라우팅재 동시 주입 그라우팅 장치에 관한 것으로서, 더욱 상세하게는 지반의 천공홀에 강관을 삽입한 상태에서 상기 강관의 내부로 두 가지의 그라우팅재를 동시 주입한 후, 압축 혼합하여 천공홀 주변 지반으로 확산되도록 하여 급결성이 빠르며 고강도의 주입재를 장심도의 천공홀에 사용할 수 있도록 한 2.0숏 그라우팅재 동시 주입 그라우팅 장치에 관한 것이다.The present invention relates to a grouting device for simultaneous injection of 2.0 shot grouting material, and more specifically, two grouting materials are simultaneously injected into the inside of the steel pipe in a state in which a steel pipe is inserted into a perforated hole in the ground, followed by compression mixing and drilling. The present invention relates to a simultaneous injection grouting device for 2.0 shot grouting material that allows it to diffuse into the ground around the hole so that rapid setting is quick and that a high-strength injection material can be used for long-depth drilling holes.

일반적으로, 지하 및 시추공간은 주로 토사나 암반으로 구성되어 있는 지반을 굴착하여 확보하게 되는 데, 이때 굴착면을 구성하는 지반이 안정하지 않으면 붕괴 등의 위험성을 안고 있어 굴착을 진행할 수 없게 된다. In general, underground and drilling spaces are secured by excavating a ground mainly composed of soil or rock, and at this time, if the ground constituting the excavation surface is not stable, there is a risk of collapse, and the excavation cannot proceed.

따라서 굴착시 필수적으로 지하 및 시추공간이 안정하도록 다양한 방법으로 강화하거나 보강을 행하고 있으며, 이러한 공법으로 nailing, rock bolt, anchor, 강관 다단 그라우팅 공법 등이 사용되고 있다.Therefore, during excavation, it is essential to strengthen or reinforce in various ways to stabilize the underground and drilling space, and nailing, rock bolts, anchors, steel pipe multi-stage grouting methods, etc. are used as these methods.

토목 기초pile 및 주변 고강도 지반보강 및 차수지반보강 설치공법으로는 1.0숏(예 LW 고분자우레탄 고결공법), 2.0숏(SCR 급결성 및 속경고강도 주입재료공법), 터널 보강용 강관 다단&파이프 루프 공법, 사면소일내일링 압력식공법, 협소구간 압력식 마이크로파일 공법, 싱크홀 보강작업 공법, 협소공간 차수보강구간 적용 가능하며, 복합용으로 통합으로 사용 적용할 수 있는 시스템이며, 기존 시공 품질보다 고품격으로 현장 여건에 맞춤형으로 시공할 수 있는 굴착이 예정된 지반이 토사 또는 풍화가 많이 진행되어 있거나, 절리, 층리, 파쇄대 등이 발달하여 암질이 불량한 경우, 굴착시 과도한 변형, 또는 붕괴가 될 수 있어 적절히 보강을 행하면서 굴착이 진행되어야 한다.For civil engineering foundation piles and surrounding high-strength ground reinforcement and secondary ground reinforcement installation methods, 1.0 shot (e.g. LW high-molecular urethane solidification method), 2.0 shot (SCR rapid setting and fast-hardening high strength injection material method), tunnel reinforcement steel pipe multistage & pipe loop It is a system that can be applied as a combined use and applied for a combination of construction method, slope soiling pressure method, narrow section pressure micropile method, sinkhole reinforcement work method, narrow space order reinforcement section If the ground for excavation that can be customized to the site conditions with high quality has a lot of soil or weathering, or the rock quality is poor due to the development of joints, stratification, and crushing zones, excessive deformation or collapse may occur during excavation. Excavation should proceed with appropriate reinforcement.

지하 및 굴착 공간 보강 공법을 적용하고자 하는 대표적인 공사로서 터널공사나 절개면 시추공사가 있으며, 특히, 터널 공사를 행할 때 굴착시 붕괴 위험에 가장 쉽게 노출된 것이 터널 상단부이다.As a representative construction to apply the underground and excavation space reinforcement method, there are tunnel construction or cut-out drilling construction. In particular, the upper part of the tunnel is most easily exposed to the risk of collapse during excavation when performing tunnel construction.

굴착 공사시 굴착면이 불량한 경우, 일반적으로 많이 사용하고 있는 Rock bolt나 Nailing 공법은 약간 하향 각도로 설치가 되는 경우가 많다. 한편, 절토사면에서의 보강과 달리 터널 상단부 보강에 주로 사용되는 강관다단 그라우팅의 경우, 보강부의 끝부분이 굴착면으로부터 상방향으로 설치해야 하기 때문에 보강재와 천공홀 사이에 그라우팅을 하고자 할 때 그라우트가 역류하는 문제점이 있다.When the excavation surface is poor during excavation work, the Rock bolt or Nailing method, which is generally used, is often installed at a slightly downward angle. On the other hand, in the case of steel pipe multi-stage grouting, which is mainly used for reinforcing the upper part of the tunnel, unlike reinforcement on the cut slope, the end of the reinforcement must be installed upward from the excavation surface, so when grouting is performed between the reinforcement and the drilled hole, the grout is There is a problem of backflow.

이러한 문제점을 해소하기 위해 팩커 또는 코킹재를 사용하여 그라우트의 역류를 방지하고 있다.In order to solve this problem, a backflow of grout is prevented by using a packer or a caulking material.

한편, 지반보강을 행할 때 천공홀에 투입된 보강재에 의한 보강뿐만 아니라 터널 벽 주변 지반의 그라우팅 효과를 필요로 하는 경우 강관다단 그라우팅 공법(Steel Pipe Reinforced Multi-step Grouting)을 시행한다.On the other hand, when ground reinforcement is required, not only reinforcement by the reinforcement inserted into the perforated hole but also the grouting effect of the ground around the tunnel wall is required, the Steel Pipe Reinforced Multi-step Grouting method is implemented.

일반적으로, 강관 다단 그라우팅 공법은, 천공 후 강관을 투입하고 천공홀 입구를 코킹재로 막고 강관과 천공홀 사이를 실링(sealing)시킨 다음에 강관 내부에 팩커를 설치하여 팩커를 이동시키면서 다단계로 그라우팅을 수행하는 공법이다. 이러한 강관 보강형 다단식 그라우팅 공법은 강관에 의한 지반 보강 효과와 그라우팅에 의한 차수 효과를 동시에 얻을 수 있다.In general, the steel pipe multi-stage grouting method is to insert a steel pipe after perforation, close the entrance of the perforated hole with caulking material, seal between the steel pipe and the perforated hole, and then install a packer inside the steel pipe to move the packer in multi-step grouting. It is a method of performing. This steel pipe reinforcement type multi-stage grouting method can simultaneously obtain the ground reinforcement effect by the steel pipe and the order effect by grouting.

종래의 기술에 따른 강관 보강형 다단 그라우팅 공법은, 통상적으로 천공, 강관 삽입, 코킹(Caulking) 및 실링(Sealing), 그라우팅(Grouting) 수순으로 진행하여 주로 연약 풍화암층의 차수 및 보강용으로 사용되고 있다.The steel pipe reinforcement type multi-stage grouting method according to the prior art generally proceeds in the order of perforation, steel pipe insertion, caulking and sealing, and grouting, and is mainly used for ordering and reinforcing the soft weathered rock layer.

구체적으로, 천공 과정은 천공구멍의 붕괴시 케이싱 롯드를 이용하여 천공하고, 그렇지 않은 경우 일반 롯드 천공도 가능하다. 강관의 삽입은 케이싱 롯드인 경우 강관을 삽입한 후에 케이싱을 제거한다. 천공주입구의 코킹은 지하수 유입의 방지와 그라우팅재의 역류를 방지하기 위해 코킹을 실시한다. 강관의 주변부 실링은 실링재의 부피 감소가 없고 실링 효과를 충분히 발휘하는 제품을 사용한다.Specifically, in the perforation process, when the perforation hole is collapsed, it is perforated using a casing rod, otherwise, a general rod perforation is also possible. In the case of a casing rod, when inserting a steel pipe, remove the casing after inserting the steel pipe. The caulking of the hole inlet is caulked to prevent groundwater inflow and backflow of grouting material. For sealing the periphery of a steel pipe, use a product that does not reduce the volume of the sealing material and exhibits sufficient sealing effect.

다단식 그라우팅재 주입은 지반 조건에 따라 결정된 주입 길이에 맞추어 단계별로 주입한다.Multistage grouting material injection is performed in stages according to the injection length determined according to the ground conditions.

그라우팅 주입재는 통상 1액형 주입재료와, 2액형 주입재료를 서로 혼합한 상태에서 강관 내부로 주입하여 지반 보강 및 차수그라우팅을 실시하게 된다.The grouting injection material is usually injected into a steel pipe in a state in which a one-component injection material and a two-component injection material are mixed with each other to perform ground reinforcement and order grouting.

그러나 종래 선행기술은 통상적으로 1.0숏, 이나 1.5숏 방식의 그라우팅재 주입법을 채택하고 있으며, 이러한 주입법은 1액형 주입재료와, 2액형 주입재료를 외부에서 혼합한 다음, 펌프와 같은 펌핑수단을 동원해 혼합액을 호스를 통해 강관 내부로 주입시키는 방식으로서, 이러한 주입방식은 소정의 길이 이상을 가진 장심도의 강관에 접목시킬 경우, 제 1, 2액형의 혼합된 주입재료가 호스를 통과하는 동안 시간이 지연되어 호스 내부에서 경화되어 굳어버리게 됨으로서 사용이 불가능하다.However, conventional prior art generally adopts a 1.0 shot or 1.5 shot type grouting material injection method, and this injection method mixes a 1-component injection material and a 2-component injection material from the outside, and then uses a pumping means such as a pump. As a method of injecting the mixed liquid into the steel pipe through a hose, this injection method takes time while the first and second liquid mixed injection materials pass through the hose when grafted to a long-depth steel pipe having a predetermined length or more. It is not possible to use as it is delayed and hardens and hardens inside the hose.

더욱이, 길이가 짧은 강관의 경우라 하더라도 호스를 통과할 수 있을 정도의 충분한 시간동안 경화가 느리게 일어나는 주입재료만 선택할 수 없는 데, 이러한 재료는 급결성이 낮아 지반으로 스며든 후, 경화되는 시간이 늦어 지반 누수와 지반 보강에 취약한 단점이 있다.Moreover, even in the case of short steel pipes, only injection materials that harden slowly for a sufficient time to pass through the hose cannot be selected.These materials have low rapid setting, so the time to harden after soaking into the ground is reduced. It has the disadvantage of being vulnerable to ground leakage and ground reinforcement in the late period.

문헌 1: 대한민국 특허청 등록특허공보 등록번호 제 10-1045727 호Document 1: Korean Intellectual Property Office Registered Patent Publication No. 10-1045727 문헌 2: 대한민국 특허청 공개특허공보 공개번호 제 10-2017-0126170 호Document 2: Korean Patent Office Publication No. 10-2017-0126170

따라서 상기한 바와 같은 문제점을 해결하기 위한 본 발명은 지반의 천공홀에 강관을 삽입한 상태에서 상기 강관의 내부로 두 가지의 그라우팅재를 동시 주입한 후, 압축 혼합하여 천공홀 주변 지반으로 확산되도록 하여 급결성이 빠르며 고강도의 주입재를 장심도의 천공홀에 사용할 수 있도록 한 2.0숏 그라우팅재 동시 주입 그라우팅 장치를 제공함에 있다.Therefore, the present invention for solving the above-described problem is to simultaneously inject two grouting materials into the inside of the steel pipe in a state in which the steel pipe is inserted into the perforated hole of the ground, and then compress and mix it to diffuse into the ground around the perforated hole. Therefore, it is to provide a grouting device for simultaneous injection of 2.0 shot grouting material, which allows quick setting and high strength injection material to be used in long-depth drilling holes.

상술한 목적을 달성하기 위한 본 발명은 2.0숏 그라우팅재 동시 주입 그라우팅 장치에 있어서, 지반에 천공된 천공홀에 삽입되는 강관, 상기 강관의 내부 공간으로 서로 다른 종류의 그라우팅 주입재를 각각 주입하는 제 1, 2액형 그라우팅 주입호스 및 상기 제 1, 2액형 그라우팅 주입호스에 연결되며 상기 제 1, 2액형 그라우팅 주입호스에서 주입된 두 가지의 그라우팅 주입재를 믹싱시킨 상태로 상기 강관의 내부 공간으로 분사시키는 혼합블럭으로 구성함을 특징으로 한다.The present invention for achieving the above object is a 2.0 shot grouting material simultaneous injection grouting apparatus, a steel pipe inserted into a perforated hole drilled in the ground, a first injecting different types of grouting injection material into the inner space of the steel pipe, respectively. , Two-component grouting injection hose and the first, two-component grouting injection hose connected to the injection hose, the mixing of the two grouting injections injected from the first and two-component grouting injection hoses mixed and sprayed into the inner space of the steel pipe It is characterized by consisting of blocks.

상기 혼합블럭의 일측에는 상기 제 1, 2액형 그라우팅 주입호스와 각각 연결되는 두 개의 제 1, 2유입구가 형성되고 그 타측에는 하나의 배출구가 형성되며, 상기 혼합블럭의 내부에는 상기 제 1, 2유입구와 연결되는 제 1, 2유입유로 및 상기 제 1, 2유입유로와 상기 배출구를 연결하는 하나의 배출유로가 형성되도록 구성함이 바람직하다.At one side of the mixing block, two first and second inlets connected to the first and two-component grouting injection hoses are formed, and one outlet is formed at the other side, and the first and second inlets are formed inside the mixing block. It is preferable that the first and second inflow passages connected to the inlet port and one discharge passage connecting the first and second inflow passages and the outlet are formed.

본 발명은 제 1, 액형 그라우팅 주입재를 혼합하는 수단을 강관 내부 공간에 미리 삽입시켜 혼합블럭에서 각각 주입된 주입재를 혼합시켜 강관 내부 공간에 분사시키도록 하여 겔타임 시간이 5초에서 20초내의 빠른 급결성을 가진 종류의 액형 그라우팅 주입재를 강관 내부 공간으로 주입할 수 있어 천공홀 주변의 누수를 신속하게 차단함과 더불어 높은 보강성을 가질 수 있다.In the present invention, the first, means for mixing the liquid grouting injection material is inserted into the inner space of the steel pipe in advance, and the injection material injected from the mixing block is mixed and sprayed into the inner space of the steel pipe, so that the gel time is fast within 5 to 20 seconds. Liquid grouting injection material with rapid setting can be injected into the inner space of the steel pipe, so that leakage around the perforated hole can be quickly blocked and high reinforcement can be obtained.

또한, 각각의 그라우팅 주입재가 따로 주입된 상태에서 강관의 내부 공간에서 곧바로 혼합이 이뤄지도록 함으로서 주입과정에서 그라우팅 주입재의 경화로 인한 호스의 막힘과 같은 문제점을 극복할 수 있어 길이가 긴 장심도의 강관에도 효과적으로 접목시켜 그라우팅 시공을 행할 수 있는 효과를 가진다.In addition, it is possible to overcome problems such as clogging of the hose due to hardening of the grouting injection material during the injection process by allowing the mixture to be carried out directly in the inner space of the steel pipe while each grouting injection material is separately injected. It also has the effect of being able to perform grouting by effectively grafting.

도 1은 본 발명의 2.0숏 그라우팅재 동시 주입 그라우팅 장치의 전체 구성을 도시한 도면.
도 2는 도 1의 혼합블럭의 구조를 발췌하여 입체적으로 도시한 도면.
도 3은 도 2의 단면을 도시한 도면.
1 is a view showing the overall configuration of a 2.0 shot grouting material simultaneous injection grouting apparatus of the present invention.
FIG. 2 is a three-dimensional view showing the structure of the mixing block of FIG.
Figure 3 is a view showing a cross-section of Figure 2;

이하 본 발명의 실시 예를 첨부된 도면을 참조하여 설명하면 다음과 같다. 후술될 상세한 설명에서는 상술한 기술적 과제를 이루기 위해 본 발명에 있어 대표적인 실시 예를 제시할 것이다. 그리고 본 발명으로 제시될 수 있는 다른 실시 예들은 본 발명의 구성에서 설명으로 대체한다.Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the detailed description to be described later, representative embodiments of the present invention will be presented in order to achieve the above-described technical problem. And other embodiments that may be presented by the present invention are replaced by descriptions in the configuration of the present invention.

통상 토목 기초pile 및 주변 고강도 지반보강 및 차수지반보강 설치공법으로는 1.0숏(예 LW 고분자우레탄 고결공법), 2.0숏(SCR 급결성 및 속경고강도 주입재료공법), 터널 보강용 강관 다단&파이프 루프 공법, 사면소일내일링 압력식공법, 협소구간 압력식 마이크로파일 공법, 싱크홀 보강작업 공법, 협소공간 차수보강구간 적용 가능하며, 복합용으로 통합으로 사용 적용할 수 있는 시스템이며, 기존 시공 품질보다 고품격으로 현장 여건에 맞춤형으로 시공할 수 있는 2.0숏 그라우팅재 동시 주입 그라우팅 장치를 이용한 공법이다.In general, the installation methods for high-strength ground reinforcement and secondary ground reinforcement for civil engineering foundations and surroundings include 1.0 shot (e.g. LW high-molecular urethane solidification method), 2.0 shot (SCR rapid setting and fast-hardening high strength injection material method), tunnel reinforcement steel pipe multistage & pipe Roof construction method, slope soiling pressure method, narrow section pressure micropile construction method, sinkhole reinforcement work method, narrow space order reinforcement section can be applied, and it is a system that can be used and applied in an integrated manner for complex purposes, and the existing construction quality It is a construction method using a grouting device that simultaneously injects 2.0 shot grouting material that can be customized to the site conditions with higher quality.

시공방법은 복합시스템 2.0숏 동시 그라우팅 장치 주입관으로 선단부, 중부, 상부 부분의 주입장치를 특수 제작 가공을 조합하여 장착 후 주입 재료를 복합적으로 보강지반의 지층에 따라, 급결성 고강도 주입재료 및 차수보강용 재료를 각각 동시 주입하여 지반보강 및 차수 그라우팅을 실시하며, 연속으로 지반 보강 및 차수 그라우팅을 시공한다.The construction method is a composite system 2.0 shot simultaneous grouting device injection pipe, which combines special manufacturing and processing of injection devices at the tip, middle, and upper parts, and then combines the injection materials according to the stratum of the reinforced ground, with high-strength injection material and order of rapid setting. Ground reinforcement and order grouting are carried out by simultaneously injecting reinforcing materials, respectively, and ground reinforcement and order grouting are continuously applied.

시공사양은 주입관 매몰형 규격은 최소 60㎜~1000㎜ 까지 규격 및 현장 여건에 따라 주입이 가능하다.For construction specifications, the injection tube buried type can be injected according to the specifications and site conditions from at least 60mm to 1000mm.

회수용 주입관으로도 제작 사용 가능하며, 회수구간은 특수제작 주입관 설치 규격은 최소 60㎜~150㎜ 이내 기준 적용 가능하다. 주입관 용도는 매몰형과 회수용으로 규격별 대분류 2종류로 구분할 수 있다.It can also be manufactured and used as an injection pipe for recovery, and the standard for installation of a specially manufactured injection pipe for the recovery section is applicable within a minimum of 60mm~150mm. The use of the injection pipe can be divided into two main categories by standard for buried type and for recovery.

본 발명의 2.0숏 그라우팅재 동시 주입 그라우팅 장치는 1.5숏 방식의 매립형 주입관의 단점인 급결주입재를 사용할 수 없어 장심도 강관에는 사용이 불가능한 단점을 해소한 장치로서, 우레탄 주입재 또는 급결제 속경시멘트 등을 사용하여 장심도에도 사용 가능한 시스템장치이다. 현장 여건에 따라 현장 조립 가공도 가능하다. 그리고 겔타임 시간 5초~20초내 지반 내 보강주입재료를 사용 가능하며, 장심도 3.0m~50m 이상에도 적용할 수 있다.The 2.0 shot grouting material simultaneous injection grouting device of the present invention is a device that solves the shortcomings that cannot be used for long-depth steel pipes because the rapid setting injection material cannot be used, which is the disadvantage of the 1.5 shot buried injection pipe, such as urethane injection material or rapid setting cement. It is a system device that can be used for long depths by using. On-site assembly processing is also possible depending on the site conditions. In addition, it is possible to use reinforcing injection material in the ground within 5 to 20 seconds of gel time, and it can be applied to a depth of 3.0 m to 50 m or more.

첨부된 도 1은 본 발명의 2.0숏 그라우팅재 동시 주입 그라우팅 장치의 전체 구성을 도시한 도면이고, 도 2는 도 1의 혼합블럭의 구조를 발췌하여 입체적으로 도시한 도면이며, 도 3은 도 2의 단면을 도시한 도면이다.1 is a diagram showing the overall configuration of a grouting apparatus for simultaneous injection of a 2.0 shot grouting material of the present invention, FIG. 2 is a three-dimensional view showing the structure of the mixing block of FIG. 1, and FIG. 3 is It is a view showing a cross section of.

도 1 내지 도 3에서 도시하고 있는 바와 같이, 본 발명의 2.0숏 그라우팅재 동시 주입 그라우팅 장치는 크게 강관(10), 적어도 하나 이상의 팩커, 다수개의 제 1, 2액형 공급호스(50, 52) 및 적어도 하나 이상의 혼합블럭(100)을 포함하여 구성한다.As shown in Figures 1 to 3, the 2.0 shot grouting material simultaneous injection grouting apparatus of the present invention is largely a steel pipe 10, at least one packer, a plurality of first and two-component supply hoses (50, 52) and It comprises at least one or more mixing blocks (100).

상기 강관(10)은 지반에 천공된 천공홀(200)에 삽입되는 관으로서, 천공홀(200)의 깊이에 맞추어 소정의 길이를 가지도록 제작하며 내부에는 공간(12)이 형성된다. The steel pipe 10 is a pipe inserted into the perforated hole 200 drilled in the ground, and is manufactured to have a predetermined length according to the depth of the perforated hole 200, and a space 12 is formed therein.

강관(10)의 외경에는 적어도 하나 이상의 그라우팅재 분출공(11)이 관통 형성되며, 상기 그라우팅 분출공(11)은 강관(10)의 내부에 충진된 그라우팅 주입재가 강관 외부로 분출되어 천공홀(200) 주변 지반으로 확산되도록 하여 지반을 그라우팅 하도록 한다.At least one grouting material ejection hole 11 is formed through the outer diameter of the steel pipe 10, and in the grouting ejection hole 11, the grouting injection material filled in the inside of the steel pipe 10 is ejected to the outside of the steel pipe, 200) Grouting the ground by spreading it to the surrounding ground.

상기 팩커는 상기 강관(10)의 내부 공간(12)에 일정간격 떨어진 상태로 설치되며 상기 강관의 내부공간을 일정구역의 단위공간으로 구획시키는 수단으로서 내부에 충진재가 채워지면 팽창하는 유연성을 가진 재질로 제작한다.The packer is installed at a certain interval in the inner space 12 of the steel pipe 10 and is a means for dividing the inner space of the steel pipe into a unit space of a certain area, and a material having flexibility that expands when a filler is filled therein. It is made with.

본 발명에서는 팩커를 3개의 단위팩커(20, 22, 24), 바람직하게는 제 1 내지 제 3단위팩커(20, 22, 24)로 구성하고, 상기 제 1 내지 제 3단위팩커(20, 22, 24)는 충진재 주입호스(26)에 각각 연결 구성되어, 상기 충진재 주입호스(26)를 통해 주입되는 충진재에 의해 팽창하며 강관(10)의 내부 공간(12)을 제 1 내지 제 3단위공간(14, 16, 18)으로 구획시킨다.In the present invention, the packer is composed of three unit packers (20, 22, 24), preferably first to third unit packers (20, 22, 24), and the first to third unit packers (20, 22). , 24) are respectively connected to the filler injection hose 26, expand by the filler injected through the filler injection hose 26, and expand the inner space 12 of the steel pipe 10 to the first to third unit spaces. It is divided into (14, 16, 18).

상기 혼합블럭(100)은 강관(10)의 내부공간에 삽입되며 외부에 설치된 펌프의 펌핑 압력으로 제 1액형 그라우팅 주입재와, 제 2액형 그라우팅 주입재를 일정 압력으로 공급받은 상태에서 이들 제 1, 2액형 그라우팅 주입재를 서로 믹싱시킨 상태에서 분사노즐(42)을 통해 강관(10)의 내부 공간(12)으로 혼합 분사시키는 블럭이다.The mixing block 100 is inserted into the inner space of the steel pipe 10 and is supplied with a first liquid type grouting injection material and a second liquid type grouting injection material at a predetermined pressure at a pumping pressure of a pump installed outside. It is a block for mixing and spraying the liquid grouting injection material into the inner space 12 of the steel pipe 10 through the spray nozzle 42 in a state where they are mixed with each other.

즉, 본 발명의 2.0숏 그라우팅재 동시 주입 그라우팅 장치는 외부에서 제 1, 2액형 그라우팅 주입재를 먼저 혼합한 후, 지반에 삽입되어 있는 강관(10)의 내부 공간(12)으로 호스를 통해 주입시키는 방식이 아니라, 제 1, 액형 그라우팅 주입재를 혼합하는 수단을 강관(10) 내부 공간(12)에 미리 삽입시켜 제 1, 2액형 그라우팅 주입재가 각각의 호스를 통해 상기 강관(10) 내부 공간(12)으로 주입되고 나면 상기 강관(10) 내부 공간(12)에 미리 삽입되어 있는 혼합블럭(40)에서 각각 주입된 주입재를 혼합시켜 강관(10) 내부 공간(12)에 분사시키도록 하고 있으며, 이를 통해 겔타임 시간이 5초에서 20초내의 빠른 급결성을 가진 종류의 액형 그라우팅 주입재를 강관(10) 내부 공간(12)으로 주입할 수 있으며, 이러한 빠른 급결성을 가진 주입재가 강관(10) 내부 공간(12)으로 주입되어 그라우팅 분출공(11)을 통해 천공홀 주변 지반으로 확산되면 천공홀 주변의 누수를 신속하게 차단함과 더불어 높은 보강성을 가질 수 있게 된다.That is, the 2.0 shot grouting material simultaneous injection grouting device of the present invention mixes the first and two-component grouting injection materials from the outside first, and then injects them into the inner space 12 of the steel pipe 10 inserted into the ground through a hose. Instead of a method, a means for mixing the first, liquid grouting injection material is inserted in advance into the inner space 12 of the steel pipe 10, so that the first and two liquid grouting injection material is passed through the respective hoses to the inner space 12 of the steel pipe 10 ), the injection material injected from the mixing block 40 previously inserted into the inner space 12 of the steel pipe 10 is mixed and sprayed into the inner space 12 of the steel pipe 10. Through this, it is possible to inject a type of liquid grouting injection material having a quick setting of within 5 seconds to 20 seconds into the inner space 12 of the steel pipe 10, and the injection material having such rapid setting is inside the steel pipe 10 When injected into the space 12 and diffused into the ground around the perforated hole through the grouting ejection hole 11, water leakage around the perforated hole can be quickly blocked and high reinforcement can be obtained.

더욱이 두가지 주입재의 혼합이 외부가 아닌, 상기 혼합블럭(100)을 통해 강관(10)의 내부 공간(12)에서 이루어지면 강관(10)의 길이가 매우 긴 50m이상의 길이를 가진 강관(10)에서도 사용이 가능한 데, 이는 혼합과 동시에 굳어지기 시작하는 특성을 가진 두 가지 종류의 제 1, 2액형 그라우팅 주입재를 외부에서 혼합한 상태에서 강관(10) 내부로 투입하는 것이 아니라, 강관(10) 내부 공간(12)으로 각각의 그라우팅 주입재가 따로 주입된 상태에서 강관(10)의 내부 공간(12)에서 곧바로 혼합이 이뤄지도록 함으로서 주입과정에서 그라우팅 주입재의 경화로 인한 호스의 막힘과 같은 문제점을 극복할 수 있어 길이가 긴 장심도의 강관에도 효과적으로 접목시켜 그라우팅 시공을 행할 수 있는 것이다.Moreover, if the mixing of the two injection materials is made in the inner space 12 of the steel pipe 10 through the mixing block 100, not the outside, the length of the steel pipe 10 is very long, even in the steel pipe 10 having a length of 50 m or more. It can be used, but it is not inserted into the steel pipe 10 in a state in which two types of first and two-component grouting injection materials having the characteristics of starting to harden at the same time as mixing are mixed from the outside, but inside the steel pipe 10 In the state where each grouting injection material is separately injected into the space 12, mixing is performed directly in the inner space 12 of the steel pipe 10, thereby overcoming problems such as clogging of the hose due to hardening of the grouting injection material during the injection process. It is possible to perform grouting construction by effectively grafting even long long-depth steel pipes.

첨부된 도 2와 도 3에서 도시하고 있는 바와 같이, 혼합블럭(100)은 직육면체 형태로 일측에는 두 개의 제 1, 2유입구(30, 32)가 형성되고 그 타측에는 하나의 배출구가 형성된다.As shown in FIGS. 2 and 3, the mixing block 100 has a rectangular parallelepiped shape and has two first and second inlets 30 and 32 on one side, and one outlet on the other side.

상기 혼합블럭(100)의 내부에는 상기 제 1, 2유입구(30, 32)와 연결되는 제 1, 2유입유로(34, 36) 및 상기 제 1, 2유입유로(34, 36)와 상기 배출구(40)를 연결하는 하나의 배출유로(38)가 형성된다.The mixing block 100 includes first and second inflow passages 34 and 36 connected to the first and second inlet ports 30 and 32, and the first and second inflow passages 34 and 36 and the outlet. One discharge passage 38 connecting the 40 is formed.

상기 혼합블럭(100)의 제 1유입구(30)에는 제 1액형 그라우팅 주입재를 주입하기 위한 제 1액형주입호스(50)의 끝단이 연결되고, 상기 제 2유입구(32)에는 제 2액형 그라우팅 주입재를 주입하기 위한 제 2액형주입호스(52)의 끝단이 연결된다.The first inlet 30 of the mixing block 100 is connected to the end of the first liquid type injection hose 50 for injecting the first liquid type grouting injection material, and the second inlet 32 has a second liquid type grouting injection material The end of the second liquid type injection hose 52 for injecting is connected.

상기 제 1, 2액형 주입호스(50, 52)의 선단은 강관(10) 외부에 설치되어 있는 제 1, 2액형 공급탱크에 각각 연결되어 그라우팅 주입재를 펌프의 펌핑동작에 따라 제 1, 2유입구로 공급한다.The tips of the first and two-component injection hoses 50 and 52 are connected to the first and two-component supply tanks installed outside the steel pipe 10, respectively, to feed the grouting injection material into the first and second inlets according to the pumping operation of the pump. To be supplied.

상기 제 1, 2유입구(30, 32)로 공급된 제 1, 2액형 그라우팅 주입재는 상기 제 1, 2유입구(30, 32)에 연결되어 있는 제 1, 2유입유로(34, 36)를 거쳐 하나의 배출유로(38)를 통과하는 과정에서 두 가지의 제 1, 2액형 그라우팅 주입재는 서로 믹싱되기 시작하며, 믹싱된 제 1, 2액형 그라우팅 주입재는 상기 배출유로(38)에 연결되어 있는 배출구(40)를 통해 외부로 배출되어 강관(10)의 내부 공간(12)으로 분사된다. 즉, 두 개의 제 1, 2유입유로(34, 36)를 통과하는 주입재는 하나의 배출유로(38)를 통과하는 과정에서 높은 압력을 받게 됨으로서 상기 배출유로(38)를 통과하는 동안 제 1, 2액형 그라우팅 주입재는 충분하게 믹싱되어 진다.The first and second liquid grouting injection material supplied to the first and second inlets (30, 32) passes through the first and second inlet passages (34, 36) connected to the first and second inlets (30, 32). In the process of passing through one discharge passage 38, the two first and two-component grouting injection materials start to be mixed with each other, and the mixed first and two-component grouting injection material is an outlet connected to the discharge passage 38 It is discharged to the outside through 40 and is sprayed into the inner space 12 of the steel pipe 10. That is, the injection material passing through the two first and second inflow passages 34 and 36 is subjected to high pressure in the process of passing through one discharge passage 38, so that the first, The two-component grouting injection material is thoroughly mixed.

상기 혼합블럭(100)의 배출구(40)에는 분사노즐(42)이 연결 설치된다. 상기 분사노즐(42)은 상기 배출구(40)로 배출되는 혼합 그라우팅 주입재를 강관(10)의 내부 공간(12)으로 분사시키게 된다.A spray nozzle 42 is connected to the outlet 40 of the mixing block 100. The injection nozzle 42 injects the mixed grouting injection material discharged through the outlet 40 into the inner space 12 of the steel pipe 10.

상기 강관(10)의 내부 공간(12)으로 분사된 혼합 그라우팅 주입재는 강관(10)의 외경에 형성되어 있는 그라우팅 분출공(11)을 통해 천공홀의 주변 지반으로 확산되어 지고, 이 과정에서 그라우팅 주입재는 경화되며 지반 보강 및 차수 그라우팅을 시공하게 된다.The mixed grouting injection material injected into the inner space 12 of the steel pipe 10 is diffused into the ground around the perforated hole through the grouting ejection hole 11 formed in the outer diameter of the steel pipe 10, and in this process, the grouting injection material Is hardened and ground reinforcement and order grouting are applied.

한편, 상기 혼합블럭(100)은 동일한 구조로 하여 제 1 내지 제 3단위팩커(20, 22, 24)를 통해 강관(10) 내부 공간(12)에 구획된 제 1 내지 제 3단위공간(14, 16, 18)에 각각 하나씩 설치하여 구성함이 바람직하다.Meanwhile, the mixing block 100 has the same structure, and the first to third unit spaces 14 partitioned in the inner space 12 of the steel pipe 10 through the first to third unit packers 20, 22, 24 , 16, 18) are preferably installed and configured.

또한 제 1 내지 제 3단위공간(14, 16, 18)에 각각 설치된 혼합블럭(100)은 개수에 맞춰 제 1, 2 액형 그라우팅 주입재를 공급하기 위해 별도의 제 1, 2액형 주입호스(50, 52)를 더 마련함이 바람직하다.In addition, the mixing blocks 100 installed in the first to third unit spaces 14, 16, 18, respectively, are provided with separate first and two-component injection hoses 50 to supply the first and second liquid grouting injection materials according to the number. It is desirable to further provide 52).

한편, 상기한 혼합블럭(100)은 통상 매몰형으로 제작되는 데, 필요에 따라 회수용 주입관으로 제작 사용할 수 있도록 한다.혼합블럭을 회수용으로 사용할 때에는 회수구간은 특수제작 주입관 설치 규격은 최소 60㎜~150㎜ 사이에 적용할 수 있다.On the other hand, the mixing block 100 is usually manufactured in an buried type, and can be manufactured and used as a recovery injection pipe if necessary. When the mixing block is used for recovery, the recovery section is a specially manufactured injection pipe installation standard. It can be applied between at least 60mm~150mm.

이하, 본 발명에 따른 2.0숏 그라우팅재 동시 주입 그라우팅 장치를 이용한 시공방법을 기술한다.Hereinafter, a construction method using the simultaneous injection grouting apparatus of 2.0 shot grouting material according to the present invention will be described.

먼저, 지반보강을 위해 천공홀(200)을 천공한 다음, 상기 천공홀(200)에 강관(10)을 삽입한다.First, a perforation hole 200 is perforated for ground reinforcement, and then a steel pipe 10 is inserted into the perforated hole 200.

다음, 상기 강관(10)의 내부 공간(12)에 패커주입호스(26)로 연결 설치되어 있는 제 1 내지 제 3단위팩커(20, 22, 24)를 삽입한다.Next, the first to third unit packers 20, 22, and 24, which are connected and installed by a packer injection hose 26, are inserted into the inner space 12 of the steel pipe 10.

이때 상기 제 1 내지 제 3단위팩커(20, 22, 24)의 사이 사이에는 혼합블럭(100)이 위치하게 되고, 상기 각 혼합블럭(100)에는 제 1, 2액형 주입호스(50, 52)가 연결되도록 한다. 즉, 3개의 혼합블럭이 제 1 내지 제 3단위팩커(20, 22, 24) 사이 사이에 배치되면, 세 쌍의 제 1, 2액형 주입호스(50 ,52)가 각 혼합블럭에 한 쌍씩 연결되도록 한다.At this time, the mixing block 100 is positioned between the first to third unit packers 20, 22, and 24, and the first and two component injection hoses 50 and 52 are provided in each of the mixing blocks 100. Is connected. That is, when three mixing blocks are disposed between the first to third unit packers 20, 22, and 24, three pairs of first and two component injection hoses 50 and 52 are connected to each mixing block. Make it possible.

다음, 패커주입호스(26)를 통해 상기 제 1 내지 제 3단위팩커(20, 22, 24)의 내부에 충진재를 채워넣어 제 1 내지 제 3단위팩커(20, 22, 24)를 팽창시켜 강관(10)의 내부 공간(12)을 제 1 내지 제 3단위공간(14, 16, 18)으로 구획시키도록 한다.Next, the first to third unit packers 20, 22, 24 are expanded by filling the first to third unit packers 20, 22, 24 with fillers through the packer injection hose 26 to expand the steel pipe. The inner space 12 of (10) is divided into first to third unit spaces 14, 16, and 18.

이어서 각 제 1, 2액형 주입호스(50, 52)를 통해 두 가지 종류인 제1 ,2액형 그라우팅 주입재를 혼합블럭(100)으로 공급하면, 제 1, 2액형 그라우팅 주입재는 혼합블럭(100)의 제 1, 2유입유로(34, 36)를 거쳐 하나의 배출유로(38)를 통과하는 과정에서 서로 믹싱되기 시작하며, 믹싱된 그라우팅 주입재는 배출유로(36)에 연결되어 있는 배출구(40)를 통해 외부로 배출되어 강관(10)의 내부 공간(12)으로 분사되고, 분사된 믹싱 그라우팅 주입재는 강관(10의 그라우팅 분출공(11)을 통해 천공홀(200)의 주변으로 확산되며 지반 보강 및 차수 그라우팅을 실시한다.Subsequently, when two types of first and second liquid grouting injection materials are supplied to the mixing block 100 through each of the first and two component injection hoses 50 and 52, the first and two liquid grouting injection materials are mixed with the mixing block 100. In the process of passing through one discharge passage 38 through the first and second inflow passages 34 and 36, the mixed grouting injection material is the discharge port 40 connected to the discharge passage 36 It is discharged to the outside through the steel pipe 10 and injected into the inner space 12 of the steel pipe 10, and the sprayed mixing grouting injection material diffuses to the periphery of the perforated hole 200 through the grouting spout 11 of the steel pipe 10 and reinforces the ground. And order grouting.

이와 같이 그라우팅 주입재를 외부에서 혼합한 상태에서 강관 내부로 주입하는 것이 아니라, 제 1, 2액형 그라우팅 주입재를 각각 강관(10) 내부로 주입한 후, 상기 강관(10) 내부에 설치되어 있는 혼합블럭(100)에서 혼합시킨 상태에서 강관(10) 내부 공간(12)으로 분사됨에 따라 주입과정에서 그라우팅 주입재의 경화로 인한 호스의 막힘과 같은 문제점을 극복할 수 있어 길이가 긴 장심도의 강관에도 효과적으로 접목시켜 그라우팅 시공을 행할 수 있다.In this way, the grouting injection material is not injected into the steel pipe while the grouting injection material is mixed from the outside, but after the first and two-component grouting injection materials are injected into the steel pipe 10, respectively, a mixing block installed inside the steel pipe 10 As it is sprayed into the inner space 12 of the steel pipe 10 in the state mixed at 100, it is possible to overcome problems such as clogging of the hose due to hardening of the grouting injection material during the injection process, so it is effective even for long-depth steel pipes. By grafting, grouting can be performed.

10: 강관 12: 공간
20: 제 1단위팩터 22: 제 2단위팩터
24: 제 3단위팩터 34: 제 1유입호스
36: 제 2유입호스 38: 배출호스
50: 제 1액형주입호스 52: 제 2액형주입호스
100: 혼합블럭
10: steel pipe 12: space
20: first unit factor 22: second unit factor
24: 3rd unit factor 34: 1st inflow hose
36: second inlet hose 38: discharge hose
50: first component injection hose 52: second component injection hose
100: mixed block

Claims (2)

2.0숏 그라우팅재 동시 주입 그라우팅 장치에 있어서,
지반에 천공된 천공홀(200)에 삽입되며 내부에는 공간(12)이 형성된 강관(10);
상기 강관(10)의 내부 공간(12)에 일정간격 떨어진 상태로 설치되며 상기 강관(10)의 내부공간(12)을 일정구역의 제 1 내지 제 3단위공간(14, 16, 18)으로 구획시키는 제 1 내지 제 3단위팩커(20, 22, 24);
상기 제 1 내지 제 3단위팩커(20, 22, 24)에 연결 구성되며 상기 제 1 내지 제 3단위팩커(20, 22, 24)로 충진재를 주입하여 팽창시키는 충진재 주입호스(26);
상기 강관(10)의 제 1 내지 제 3단위공간(12)으로 서로 다른 종류의 제 1, 2액형 그라우팅 주입재를 각각 주입하는 제 1, 2액형 그라우팅 주입호스(50, 52) 및 ;
상기 제 1, 2액형 그라우팅 주입호스(50, 52)에 연결되며 상기 제 1, 2액형 그라우팅 주입호스(50, 52)에서 주입된 제 1, 2액형 그라우팅 주입재를 믹싱시킨 상태로 상기 강관(10)의 내부 공간(12)으로 분사시키는 혼합블럭(100)으로 구성하며;
상기 혼합블럭(100)의 일측에는 상기 제 1, 2액형 그라우팅 주입호스(50, 52)와 각각 연결되는 두 개의 제 1, 2유입구(30, 32)가 형성되고 그 타측에는 하나의 배출구(40)가 형성되며;
상기 혼합블럭(100)의 내부에는 상기 제 1, 2유입구(30, 32)와 연결되는 제 1, 2유입유로(34, 36) 및 상기 제 1, 2유입유로(34, 36)와 상기 배출구(40)를 연결하는 하나의 배출유로(38)가 형성되도록 구성하며;
상기 혼합블럭(100)의 제 1, 2유입유로(34, 36)로 유입된 제 1, 2액형 그라우팅 주입재는 하나의 배출유로(38)를 통과하는 과정에서 서로 혼합된 상태에서 상기 배출구(40)를 통해 배출되도록 하며;
상기 혼합블럭(100)은 동일한 구조로 하여 상기 제 1 내지 제 3단위공간(14, 16, 18)에 각각 하나씩 설치하며;
상기 제 1 내지 제 3단위공간(14, 16, 18)에 각각 설치된 혼합블럭(100)마다 제 1, 2액형 주입호스(50, 52)가 각각 개별적으로 더 연결 구성되도록 함을 특징으로 하는 2.0숏 그라우팅재 동시 주입 그라우팅 장치.
In the 2.0 shot grouting material simultaneous injection grouting device,
A steel pipe 10 inserted into the perforated hole 200 drilled in the ground and having a space 12 formed therein;
It is installed at a certain interval in the inner space 12 of the steel pipe 10 and divides the inner space 12 of the steel pipe 10 into first to third unit spaces 14, 16, 18 of a certain area 1st to 3rd unit packers 20, 22, 24 to make;
A filler injection hose (26) connected to the first to third unit packers (20, 22, 24) and for injecting and expanding the filler material into the first to third unit packers (20, 22, 24);
First and two-component grouting injection hoses 50 and 52 for injecting different types of first and two-component grouting injection materials into the first to third unit spaces 12 of the steel pipe 10, respectively;
The steel pipe 10 is connected to the first and two-component grouting injection hoses 50 and 52 and mixed with the first and two-component grouting injection materials injected from the first and two-component grouting injection hoses 50 and 52. Consisting of a mixing block 100 for spraying into the inner space 12 of );
One side of the mixing block 100 is formed with two first and second inlets 30 and 32 respectively connected to the first and two component grouting injection hoses 50 and 52, and one outlet 40 at the other side thereof. ) Is formed;
The mixing block 100 includes first and second inflow passages 34 and 36 connected to the first and second inlet ports 30 and 32, and the first and second inflow passages 34 and 36 and the outlet. It is configured so that one discharge passage 38 connecting the 40 is formed;
The first and second liquid grouting injection materials introduced into the first and second inflow passages 34 and 36 of the mixing block 100 are mixed with each other in the process of passing through one discharge passage 38, and the discharge port 40 ) To be discharged through;
The mixing blocks 100 have the same structure and are installed one by one in the first to third unit spaces 14, 16, 18;
2.0, characterized in that the first and second liquid injection hoses 50 and 52 are individually further connected for each mixing block 100 installed in the first to third unit spaces 14, 16, 18, respectively. Shot grouting material simultaneous injection grouting device.
삭제delete
KR1020200087502A 2020-07-15 2020-07-15 A grouting apparatus for simultaneous injecting 2.0shot grout material KR102197759B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200087502A KR102197759B1 (en) 2020-07-15 2020-07-15 A grouting apparatus for simultaneous injecting 2.0shot grout material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200087502A KR102197759B1 (en) 2020-07-15 2020-07-15 A grouting apparatus for simultaneous injecting 2.0shot grout material

Publications (1)

Publication Number Publication Date
KR102197759B1 true KR102197759B1 (en) 2021-01-04

Family

ID=74127420

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200087502A KR102197759B1 (en) 2020-07-15 2020-07-15 A grouting apparatus for simultaneous injecting 2.0shot grout material

Country Status (1)

Country Link
KR (1) KR102197759B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101045727B1 (en) 2010-04-13 2011-07-04 (주)한토건설 A multistaged equipment of pipe grouting by double packer system and its constructing method
JP2012163291A (en) * 2011-02-08 2012-08-30 Mitsubishi Heavy Ind Ltd Distributor
KR20170126170A (en) 2016-05-09 2017-11-17 (주)한세지반엔지니어링 Grouting packer device for a active controlling of underground injection pressure
KR102065297B1 (en) * 2019-03-19 2020-01-13 나로지반기술 주식회사 A special injection packer equipped with two grout pipes and a filling material mixing device, and complex grouting method used the above a special injection packer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101045727B1 (en) 2010-04-13 2011-07-04 (주)한토건설 A multistaged equipment of pipe grouting by double packer system and its constructing method
JP2012163291A (en) * 2011-02-08 2012-08-30 Mitsubishi Heavy Ind Ltd Distributor
KR20170126170A (en) 2016-05-09 2017-11-17 (주)한세지반엔지니어링 Grouting packer device for a active controlling of underground injection pressure
KR102065297B1 (en) * 2019-03-19 2020-01-13 나로지반기술 주식회사 A special injection packer equipped with two grout pipes and a filling material mixing device, and complex grouting method used the above a special injection packer

Similar Documents

Publication Publication Date Title
US20020057948A1 (en) Multi grouting system
JP2004027813A (en) Packer for pressure type soil nailing and method of soil nailing using it
KR101657058B1 (en) Double inflatable grouting equipment and the grouting method using the same
KR101259364B1 (en) Ground reinforcing apparatus
CN109798140B (en) Splitting grouting reinforcement support method for kilometer deep well soft rock
KR20200047881A (en) Simultaneous injection method of permeation grouting for reinforcing tunnel using outer packer
KR100937237B1 (en) Multiple soil-nailing ground reinforcement apparatus and multiple soil-nailing method
CN102877470A (en) Combined soil nailing construction method
KR101851959B1 (en) Grout same time injection apparatus and a method of construction using the same
KR100668130B1 (en) Feeding device of agent for reinforcing foundation
KR102234214B1 (en) Fast permeating method and system for grouting of weak ground
KR200352267Y1 (en) Slope-reinforcing structure for soil nailing having function of drainage
KR101095393B1 (en) Method and apparatus for improving ground using cement grouting
KR102233686B1 (en) Multi-step grouting device and underground grouting construction method using it
KR101095388B1 (en) Method and apparatus for improving ground using cement grouting
KR102197759B1 (en) A grouting apparatus for simultaneous injecting 2.0shot grout material
US3783624A (en) Method of providing a pile in a ground formation having a high resistance to movement
KR101095390B1 (en) Method and apparatus for improving ground using cement grouting
KR102518428B1 (en) Tunnel grouting method using grout and simultaneous injection steel pipe
KR20170125457A (en) A soil nailing method to have the functions of the shearing resistance force improvement and retaining wall panel cutting the ground
KR20140062914A (en) Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same
RU2324788C2 (en) Method of compressing soil and device for its implementation
KR100756536B1 (en) Grout same time injection apparatus and a method of construction type reinforcement steel pipe
RU2258141C1 (en) Grouting method for water-bearing horizon rock during vertical pit shaft building
KR100418366B1 (en) Tunnel formation tunnel structure form of construction work and tunnel structure

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant