KR102197032B1 - Structure of steel pipe for work area to facilitate dismantling - Google Patents
Structure of steel pipe for work area to facilitate dismantling Download PDFInfo
- Publication number
- KR102197032B1 KR102197032B1 KR1020180162764A KR20180162764A KR102197032B1 KR 102197032 B1 KR102197032 B1 KR 102197032B1 KR 1020180162764 A KR1020180162764 A KR 1020180162764A KR 20180162764 A KR20180162764 A KR 20180162764A KR 102197032 B1 KR102197032 B1 KR 102197032B1
- Authority
- KR
- South Korea
- Prior art keywords
- pipe
- buried
- steel pipe
- work
- take
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 50
- 239000010959 steel Substances 0.000 title claims abstract description 50
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 16
- 238000000034 method Methods 0.000 abstract description 9
- 238000009412 basement excavation Methods 0.000 abstract description 4
- 239000002689 soil Substances 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 3
- 239000011435 rock Substances 0.000 abstract description 3
- 238000007599 discharging Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000011324 bead Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/06—Lining shafts; Linings therefor with iron or steel
- E21D5/10—Lining shafts; Linings therefor with iron or steel in the form of tubbing or of rings composed of profile elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/012—Use of fluid-tight or anti-friction material on outside of, or between, lining layers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D7/00—Shaft equipment, e.g. timbering within the shaft
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
본 발명은 해체를 용이하게 하는 작업구용 강관의 구조에 관한 것으로, 더욱 상세하게는 도시 기반 시설 확충을 위해 실드(Shield) 및 세미실드(Semi-shield)공법에 의해 지하터널이나 하수구를 구축할 때 굴착기계의 설치하고 굴진시 발생하는 토사와 암반을 지상으로 배출시키는 통로 역할을 하는 수직의 작업구를 구축하는 강관을 터널공사 완료 후 취출이 용이하도록 분할 결합하여 강관을 보다 쉽게 취출할 수 있도록 한 해체를 용이하게 하는 작업구용 강관의 구조에 관한 것이다.
본 발명의 해체를 용이하게 하는 작업구용 강관의 구조는 터널 작업후 지중에 매설되는 매설관과 터널 작업후 취출되는 취출관으로 분할 구성되어 이를 연결한 전체 길이가 작업구의 계획심도에 대응하는 길이로 이루어지고 상기 매설관과 취출관은 다수개의 연결장치로서 일체가 되게 연결되어 이루어짐을 특징으로 한다.The present invention relates to a structure of a steel pipe for a work area that facilitates dismantling, and more particularly, when constructing an underground tunnel or a sewer by a shield and semi-shield method for expanding urban infrastructure After the tunnel construction is completed, the steel pipes that build up a vertical work area that serves as a passage for discharging the soil and rock mass generated during excavation after the installation of the excavation machine are divided and combined so that the steel pipe can be removed more easily. It relates to a structure of a steel pipe for a work tool that facilitates disassembly.
The structure of the steel pipe for the work tool that facilitates the dismantling of the present invention is divided into a buried pipe buried in the ground after the tunnel work and a discharge pipe taken out after the tunnel work, so that the total length connecting them is a length corresponding to the planned depth of the work tool. It is made and the buried pipe and the discharge pipe is characterized in that it is made integrally connected as a plurality of connecting devices.
Description
본 발명은 해체를 용이하게 하는 작업구용 강관의 구조에 관한 것으로, 더욱 상세하게는 도시 기반 시설 확충을 위해 실드(Shield) 및 세미실드(Semi-shield)공법에 의해 지하터널이나 하수구를 구축할 때 굴착기계를 설치하고 굴진시 발생하는 토사와 암반을 지상으로 배출시키는 통로 역할을 하는 수직의 작업구를 구축하는 강관을 터널공사 완료 후 취출이 용이하도록 분할 결합하여 강관을 보다 쉽게 취출할 수 있도록 한 해체를 용이하게 하는 작업구용 강관의 구조에 관한 것이다. The present invention relates to a structure of a steel pipe for a work area that facilitates dismantling, and more particularly, when constructing an underground tunnel or a sewer by a shield and semi-shield method for expanding urban infrastructure After the tunnel construction is completed, the steel pipes that form a vertical work area that serves as a passageway for discharging the soil and rock mass generated during excavation are divided and combined to facilitate extraction so that the steel pipes can be removed more easily. It relates to a structure of a steel pipe for a work tool that facilitates disassembly.
일반적으로 작업구(수직구)는 터널이나 하수구 등을 굴착하기 위하여 지상으로부터 지하 터널까지 수직으로 연결해주는 일종의 수직터널로서 터널 공사 시에는 각종 장비 및 건설 자재들을 지상으로부터 운반 및 이동시키고, 터널 굴진 시에 발생되는 토사와 암반을 지상으로 배출시키는 통로 역할을 하며, 터널이 완성된 후에는 관리자의 이동통로 및 통신구나 전력구의 각종 케이블을 지하 터널로부터 지상으로 연결시켜 주고, 점검과 수리등을 하기 위해 출입하는 맨홀로서 사용하게 된다.In general, a work tool (vertical port) is a type of vertical tunnel that connects vertically from the ground to an underground tunnel in order to excavate a tunnel or sewer. During tunnel construction, various equipment and construction materials are transported and moved from the ground. It serves as a passage to discharge the soil and rock generated in the ground to the ground, and after the tunnel is completed, it connects the mobile passage of the manager and various cables of communication or power outlets from the underground tunnel to the ground, and for inspection and repair. It is used as a manhole to enter and exit.
실드 및 세미실드 공법은 지하터널을 굴착을 위하여 굴착기계를 목표로 하는 지하심도에 기계를 설치한 후 목표로 하는 터널 경로를 따라 기계가 수평으로 굴착을 하게 되는 데, 이때 굴착기계를 지하의 일정한 심도에 설치하기 위한 작업구를 굴착시에는 벽체가 붕괴하는 것을 방지하기 위하여 스트라트(Strut)공법, 라이닝(Lining)공법, JSP 지반개량공법, SEC 지하연속벽 공법 및 트랜치 커터(Trench Cutter)에 의한 지하연속벽 공법등의 벽체 가시설 공법이 적용되고 있다.In the shield and semi-shield construction method, after installing the machine in the underground depth targeting the excavation machine to excavate the underground tunnel, the machine excavates horizontally along the target tunnel path. In order to prevent the wall from collapsing when excavating a work tool for installation at a depth, the strut method, lining method, JSP ground improvement method, SEC underground continuous wall method and trench cutter are used. Wall temporary facility construction methods such as the underground continuous wall construction method are applied.
그러나, 이와같은 공법들은 차수 및 가 시설 공사가 완료된 후에 지표로 부터 지하로 수직방향으로 설계 심도까지 지반을 굴착하고 지하에서 벽체 구조물을 시공하게 되는 과정을 거치는 공정상의 어려움이 있고 이로 인해 공기가 지연되고 공사비용이 증가하며 가시설 공사에 요구되는 대형장비로 인하여 교통 불편을 유발하고 소음이 많이 발생하게 되는 문제점이 있다.However, these construction methods have difficulty in the process of excavating the ground from the surface to the basement vertically to the design depth after completion of the order and temporary facility construction, and constructing the wall structure from the basement. The construction cost increases, and there is a problem in that traffic inconvenience and noise are generated due to the large equipment required for temporary facility construction.
따라서, 협소한 도로지역, 주택 인접지역 등 지하 매설물이 많고 연약한 지반에서 종래와 같이 별도의 가시설 벽체를 시공하는 번거러움이 없이 주변지반의 교란과 지하수 유출에 따른 인접 지반의 침하를 방지하면서 안전하게 작업구를 형성하는 시공방법으로 강관작업구를 압입 시공하는 방법이 많이 사용되고 있다.Therefore, without the hassle of constructing a separate temporary facility wall on a soft ground with a lot of underground materials such as narrow road areas and neighborhoods adjacent to houses, it is safe to prevent the subsidence of the adjacent ground due to disturbance of the surrounding ground and outflow of groundwater. As a construction method of forming a steel pipe work tool, a method of press-fitting construction is widely used.
그러나, 터널 공사가 끝나면 하부에 사람이 출입할 수 있는 맨홀을 남겨두고 나머지는 되메우기하여 작업구를 막게 되는 데 이때에는 맨홀이 위치한 강관의 하부 일부를 제외하고 원주를 따라 절단하여 절단된 상부 강관을 인발기등으로 취출한 후 되메우기 작업을 하게 된다.However, after the tunnel construction is finished, the work area is blocked by leaving a manhole that can be accessed by people at the bottom and filling the rest. In this case, the upper steel pipe cut along the circumference excluding the lower part of the steel pipe where the manhole is located is removed. After taking out with a drawer, etc., backfilling is performed.
이와같이 강관을 취출하기 위해 절단작업을 하게 되면 절단된 부위로 부터 지하수가 내부로 유입되는 경우가 허다하여 절단작업을 하기 전에 절단부의 외측 지중에 그라우팅재를 주입시켜 차수작업을 먼저 한 후 절단을 하게 되므로 그라우팅작업에 따른 작업상의 번거러움과 별도의 비용이 소요될 뿐 아니라 절단기로서 비교적 큰 직경으로서 두께를 가진 강관을 절단하는 시간도 많이 소요되며 공사기간이 길어지는 등 여러가지의 문제를 가지고 있었다. In this way, when cutting to take out a steel pipe, groundwater from the cut part is often introduced into the interior, so before cutting, grouting material is injected into the ground outside of the cutting part, and then cutting is done first. Therefore, it takes a lot of trouble and extra cost in the work according to the grouting work, and it takes a lot of time to cut a steel pipe having a relatively large diameter and thickness as a cutter, and it has various problems such as lengthening the construction period.
본 발명의 목적은 상기한 문제점을 해소하기 위한 것으로 강관을 취출관과 매설관으로 분할하되 분리 가능하도록 서로 연결하여 터널 작업이 끝난 후 취출할 때 종래와 같은 그라우팅 주입을 하지 않고 간단한 분리작업으로 취출관만을 취출할 수 있게 함으로써 강관 취출을 매우 효율적으로 편리하게 할 수 있는 해체를 용이하게 하는 작업구용 강관의 구조를 제공하는 데 있다. An object of the present invention is to solve the above-described problems, and the steel pipes are divided into an extraction pipe and a buried pipe, but they are connected to each other so that they can be separated. It is to provide a structure of a steel pipe for a work tool that facilitates disassembly that can take out the steel pipe very efficiently and conveniently by allowing only the pipe to be taken out.
본 발명은 이러한 목적을 달성하기 위한 수단으로, 터널 작업후 지중에 매설되는 매설관과 터널 작업후 취출되는 취출관으로 분할 구성되어 이를 연결한 전체 길이가 작업구의 계획심도에 대응하는 길이로 이루어지고 상기 매설관과 취출관은 연결장치로서 해체 가능하도록 일체로 연결되어 이루어진 작업구용 강관에 있어서, 상기 연결장치는 매설관과 취출관의 연결단부의 내측에 대칭되게 단입시킨 ㄱ 자 형상의 단입부와, 상기 단입부에 끼워져 연결단부 사이의 간격을 수밀되게 차단하는 고무판과, 상기 고무판의 외면에 밀착되어 각 연결단부에 볼트로서 각각 고정되는 두개의 철판과, 취출관과 매설관의 연결단부 내측에서 취출관과 매설관을 일체로 연결되게 용착하는 다수개의 ㄷ 자 형상의 연결구로 이루어짐을 특징으로 하는 해체를 용이하게 하는 작업구용 강관의 구조를 제공한다. The present invention is a means for achieving this object, and is divided into a buried pipe buried in the ground after a tunnel operation and a discharge pipe taken out after the tunnel operation, and the total length connecting them is made of a length corresponding to the planned depth of the work tool. The buried pipe and the take-out pipe are a steel pipe for work tools that are integrally connected so as to be disassembled as a connection device, wherein the connection device includes an a-shaped single entry part symmetrically inserted into the inside of the connection end of the buried pipe and the take-out pipe , A rubber plate that is inserted into the single entry portion to watertightly block the gap between the connection ends, two iron plates that are in close contact with the outer surface of the rubber plate and fixed by bolts to each connection end, and from the inside of the connection end of the take-out pipe and the buried pipe. It provides a structure of a steel pipe for a work tool that facilitates disassembly, characterized in that it consists of a plurality of c-shaped connectors that are welded together to connect the take-out pipe and the buried pipe.
삭제delete
이와 같이 본 발명은 작업구를 구성하는 강관을 원주를 따라 강관을 분할 절단하는 작업이나 그라우팅 작업을 할 필요없이 간단한 몇개의 연결간 만을 절단하는 작업으로 강관을 쉽게 분할할 수 있으므로 강관의 취출작업을 매우 효율적으로 할 수 있고 원주를 따라 강관 전체를 절단하는 작업이 필요하지 않아 오랜 시간의 절단작업에 따른 각종 폐해를 감소시킬 뿐아니라 작업시간이 단축되어 공기를 단축할 수 있으며 절단작업과 그라우팅작업에 따른 비용을 대폭 절감하여 경제적인 효과를 제공하는 점에서 매우 유용한 발명이다. As described above, the present invention can easily divide the steel pipe by cutting only a few simple connections without the need to divide and cut the steel pipe along the circumference or grouting the steel pipe constituting the work tool. It can be done very efficiently and does not require the work of cutting the entire steel pipe along the circumference, so it not only reduces various harmful effects caused by long cutting work, but also shortens the working time and reduces the time required for cutting and grouting work. It is a very useful invention in that it provides an economical effect by significantly reducing the resulting cost.
도 1은 본 발명의 일 실시예에 따른 강관의 설치 상태 단면도
도 2는 도 1의 "A" 부 확대 전개사시도
도 3은 본 발명에 따른 강관의 평면도
도 4는 도 3의 "가-가" 선 단면도
도 5는 취출관의 인출시 고무판이 찢어진 상태를 나타낸 예시도
도 6은 연결장치의 해체에 따른 취출관의 취출상태 예시도1 is a cross-sectional view of an installation state of a steel pipe according to an embodiment of the present invention
FIG. 2 is an enlarged exploded perspective view of part "A" of FIG. 1
3 is a plan view of a steel pipe according to the present invention
4 is a cross-sectional view taken along line "A-A" of FIG.
5 is an exemplary view showing a state in which the rubber plate is torn when the take-out pipe is withdrawn
6 is an exemplary view of the take-out state of the take-out pipe according to the dismantling of the connecting device
이하 본 발명을 첨부도면에 참조하여 상세히 설명하면 다음과 같다. Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도 1 내지 도 6에 도시된 바와 같이, 본 발명은 터널 작업후 지중에 매설되는 매설관(10)과 터널 작업후 취출되는 취출관(20)으로 분할 구성되어 이를 연결한 전체 길이가 작업구의 계획심도에 대응하는 길이로 이루어지고 상기 매설관(10)과 취출관(20)은 연결장치(30)로서 해체 가능하도록 일체로 연결되어 이루어진 작업구용 강관에 있어서, 상기 연결장치(30)는 매설관(10)과 취출관(20)의 연결단부(10')(20')의 내측에 대칭되게 단입시킨 ㄱ 자 형상의 단입부(11)(21)와, 상기 단입부(11)(21)에 끼워져 연결단부(10')(20') 사이의 간격을 수밀되게 차단하는 고무판(40)과, 상기 고무판(40)의 외면에 밀착되어 각 연결단부(10')(20')에 볼트(50)(50')로서 각각 고정되는 두개의 철판(60)(60')과, 취출관(20)과 매설관(10)의 연결단부(10')(20') 내측에서 취출관(20)과 매설관(10)을 일체로 연결되게 용착하는 다수개의 ㄷ 자 형상의 연결구(70)(70')로 이루어짐을 특징으로 한다. As shown in Figs. 1 to 6, the present invention is divided into a buried
삭제delete
도면 중 미설명 부호 80은 맨홀이고, 81은 맨홀(80)과 연결 설치하는 사다리관이다. In the drawings,
이와같이 된 본 발명은 작업구를 형성하는 강관(100)을 종래와 같이 한 개의 관체로 구성하지 않고 분할 구성하여 연결장치(30)에 의거 연결함으로써 터널 완성후 연결장치(30)만을 제거하면 매설관(10)과 취출관(20)이 간단히 분리되어 취출관(20)의 취출을 용이하게 할 수 있게 한 데 특징이 있는 것으로 연결장치(30)에 의거 연결된 강관(100)의 전체 길이는 계획심도에 대응하는 길이로 이루어지게 되는 데 이같이 취출관(20)과 매설관(10)으로 분할 구성된 강관(100)을 연결하는 연결장치(30)는 매설관(10)과 취출관(20)의 연결단부(10')(20')의 내측에 ㄱ 자 형상으로 대칭되게 형성한 단입부(11)(21)와 상기 단입부(11)(21)에 끼워져 수밀을 유지하는 고무판(40)과 상기 고무판(40)의 외면에 밀착되어 각 연결단부(10')(20')에 볼트(50)(50')로서 각각 고정되는 두개의 철판(60)(60')과, 취출관(20)과 매설관(10)의 연결단부(10')(20') 내측에서 취출관(20)과 매설관(10)을 일체로 연결되게 용착하는 다수개의 ㄷ 자 형상의 연결구(70)(70')로 이루어져 수밀유지와 함께 작업구를 형성하기 위해 지중으로 압입시 서로를 강건하게 연결하는 목적을 달성하게 된다. In the present invention as described above, the
상기한 연결장치(30)의 연결과정을 보다 구체적으로 설명하면, 매설관(10)과 취출관(20)을 연결단부(10')(20')의 내측에 형성된 ㄱ 자 형상의 단입부(11)(21)가 마주보도록 연결하게 되면 ㄱ 자 형상의 단입부(11)(21)는 두개의 단입부(11)(21)가 합쳐져 ㄷ 자 형상의 복합단입부를 형성하므로 이에 비교적 두꺼운 고무판(40)을 끼워 넣고 그 외면에 두개의 분할된 철판(60)(60')을 밀착시켜 각각의 철판(60)(60')을 볼트(50)(50')로서 매설관(10)과 취출관(20)에 각각 나사 고정하게 되면 매설관(10)과 취출관(20)은 고무판(40)에 의해 사이 간격이 수밀되는 상태로 연결되며 이 상태에서 ㄷ 자 형상의 연결구(70)(70')로서 매설관(10)과 취출관(20)을 용착하게 되면 두개의 분할된 관체는 일체로 연결되어 작업구의 계획심도에 대응하는 길이의 단일체의 강관(100)을 형성하게 된다. When explaining the connection process of the above-described
따라서, 종래의 단일체로 된 강관(100)과 같이 지중에 압입하여 작업구를 형성하게 되고 분할된 매설관(10)과 취출관(20)의 사이 간격은 단입부(11)(21)에 끼워져 두개의 철판(60)(60')으로 밀착 고정된 고무판(40)에 의거 외부의 물이 내부로 유입되지 않도록 차단되는 데 고무판(40)의 외면에는 철판(60)(60')이 밀착되어 볼트(50)(50')로서 나사 고정되어 있으므로 고무판(40)을 강관(100)을 지중에 압입시 토사가 침투하거나 토사에 의해 파손되지 못하도록 보호되어 밀착력이 감소되는 것을 방지하게 된다. Therefore, as in the conventional
이러한 고무판(40)은 취출관(20)과 매설관(10)의 틈새를 차단하는 역할을 하므로 볼트(50)(50')로서 가압시 압착되는 것을 감안하여 비교적 두꺼운 두께를 가지며 내구성이 우수한 소재로 이루어진다. This
그리고 상기와 같이 고무판(40)으로 연결된 매설관(10)과 취출관(20)을 일체로 고정하는 연결구(70)(70')는 ㄷ 자 형상의 금속재로서 이루어져 매설관(10)과 취출관(20)을 단일체로 강건하게 연결하게 되는 데 첨부도면의 실시예와 같이 십자형상으로 4개 정도 용착하면 일체화 된 강관(100)을 형성하는 데 문제가 없으나 필요에 따라 가감하여 설치하게 된다.And the connector 70 (70') for integrally fixing the buried
터널 작업 후 강관(100)을 해체할 때에는 연결장치(30)를 해체하여 매설관(10)은 지중에 매설된 상태에 두고 취출관(20)만을 지상으로 인발하여 취출하게 되는 데 이때에는 다수개 용착된 ㄷ 자 형상의 연결간을 용착한 용접비드를 불어내어 제거하거나 절단하게 되면 취출관(20)과 매설관(10)은 강도가 약한 고무판(40)으로만 연결된 상태이므로 인발기를 이용하여 취출관(20)을 요동하면서 인발하게 되면 고무판(40)은 쉽게 찢어지게 되는 데 이때 고무판(40)은 도 5에 도시된 바와 같이 외면에 밀착 고정한 두개의 철판(60)(60') 사이가 찢어지게 되므로 취출관(20)과 매설관(10)의 연결구조가 해체되어 취출관(20)만을 인발장치에 의해 지상으로 취출할 수 있게 되고 취출 후 작업구를 되메우기 하면 된다. When dismantling the
작업구에 내에 첨부도면의 실시예와 같이 맨홀(80)이 설치될 때에는 맨홀(80)과 연결된 사다리관(81)을 지상으로 연결되게 설치한 상태에서 취출관(20)을 취출하고 되메우기를 시도하면 된다. When the
이와같이 본 발명은 강관(100)을 단일체로 구성하지 않고 매설관(10)과 취출관(20)으로 분할하여 연결장치(30)에 의해 임시 연결한 상태로 지중에 매설되어 작업구를 형성하고 터널 작업이 완료된 후에는 연결장치(30)를 해체하여 취출관(20)만을 취출할 수 있게 한 것이므로 종래와 같이 원주를 따라 절단작업을 해야 하는 번거러움과 작업상의 어려움이 없고 특히 차수를 위한 그라우팅작업을 필요로 하지 않으므로 공사비의 절감과 공기를 단축할 수 있는 등 그 효과가 매우 크다.In this way, the present invention does not constitute a single body of the
10 : 매설관 10', 20' : 연결단부 11, 21 : 단입부 20 : 취출관 30 : 연결장치 40 : 고무판 50, 50' : 볼트 60, 60' : 철판 70, 70' : 연결구 80 : 맨홀 81 : 사다리관 100 : 강관10: buried pipe 10', 20':
Claims (2)
The buried pipe 10 is divided into a buried pipe 10 buried in the ground after the tunnel work and an outlet pipe 20 taken out after the tunnel work, and the total length connected thereto is made of a length corresponding to the planned depth of the work zone, and the buried pipe 10 And the take-out pipe 20 is a steel pipe for a work tool made integrally connected to be disassembled as a connection device 30, the connection device 30 is the connection end 10 of the buried pipe 10 and the take-out pipe 20 ') (20') between the a-shaped cutout (11) (21) symmetrically inserted into the inner side, and the connecting end (10') (20') inserted into the cutout (11) (21) A rubber plate 40 that blocks the gap in a watertight manner, and two iron plates that are in close contact with the outer surface of the rubber plate 40 and fixed as bolts 50 and 50 ′ to each connection end 10 ′ and 20 ′. 60) (60'), and from the inside of the connecting end (10') (20') of the take-out pipe (20) and the buried pipe (10), weld the take-out pipe (20) and the buried pipe (10) to be integrally connected. Structure of a steel pipe for a work tool that facilitates disassembly, characterized in that consisting of a plurality of C-shaped connector (70) (70').
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180162764A KR102197032B1 (en) | 2018-12-17 | 2018-12-17 | Structure of steel pipe for work area to facilitate dismantling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180162764A KR102197032B1 (en) | 2018-12-17 | 2018-12-17 | Structure of steel pipe for work area to facilitate dismantling |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20200074412A KR20200074412A (en) | 2020-06-25 |
KR102197032B1 true KR102197032B1 (en) | 2020-12-31 |
Family
ID=71400332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020180162764A KR102197032B1 (en) | 2018-12-17 | 2018-12-17 | Structure of steel pipe for work area to facilitate dismantling |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102197032B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102515341B1 (en) * | 2020-12-21 | 2023-03-30 | 주식회사 아이언몰 | the degree structure of the steel pipe for the work equipment in which the dismantlement facilitates |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006265941A (en) * | 2005-03-24 | 2006-10-05 | Raito Kogyo Co Ltd | Construction method making utilizing casing |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0823165B2 (en) * | 1993-02-26 | 1996-03-06 | 西武ポリマ化成株式会社 | Underdrain fittings |
JP2632776B2 (en) * | 1993-06-04 | 1997-07-23 | 泰成興業株式会社 | Earth retaining material for shafts |
-
2018
- 2018-12-17 KR KR1020180162764A patent/KR102197032B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006265941A (en) * | 2005-03-24 | 2006-10-05 | Raito Kogyo Co Ltd | Construction method making utilizing casing |
Also Published As
Publication number | Publication date |
---|---|
KR20200074412A (en) | 2020-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101040066B1 (en) | Method of constructing non-excavation type tunnel | |
KR20170102397A (en) | The Tunnel construction method to use retangular pipe | |
KR102197032B1 (en) | Structure of steel pipe for work area to facilitate dismantling | |
CN110735641B (en) | Construction method of transfer passage of underpass pipeline | |
KR20100137085A (en) | Method for installing waterproofing steel plate and soil-drop preventing plate in construction of undergound tunnel | |
KR100217845B1 (en) | Construction process of underground structure | |
JP5806576B2 (en) | Pipe roof and pipe roof construction method | |
KR102310091B1 (en) | Underground structure installation method that does not require the installation of temporary pillars | |
KR101153313B1 (en) | Subsidiary casing and construction method for underground watertight wall using the same | |
KR102135566B1 (en) | Non excavation type underground tunnel construction method using steel pipe | |
KR101407632B1 (en) | Underground auxiliary tunnel structure and construction method for underground auxiliary tunnel structure using presssed pipe | |
KR101968968B1 (en) | Reinforcement and waterproof device of vertical shafts-utility tunnels interface and the consructing method thereof | |
KR101736117B1 (en) | Construction equipment and construction method of underground watertight wall | |
KR102515341B1 (en) | the degree structure of the steel pipe for the work equipment in which the dismantlement facilitates | |
JP6592331B2 (en) | Survey method of circumferential shield machine | |
JPS6317999B2 (en) | ||
JP2693028B2 (en) | Construction method of human hole in middle of pipeline | |
JP3996162B2 (en) | Propulsion pipe underground propulsion base and construction method thereof | |
JPH0517354B2 (en) | ||
KR101620787B1 (en) | underground excavation construction method | |
JP3868959B2 (en) | Waterway construction method | |
JP2010090562A (en) | Rectangular tunnel and method for constructing the same | |
JP2006265827A (en) | Construction method for underground penetration body, and steel-shell element therefor | |
JP4319122B2 (en) | Branch and junction structure of branching tunnel and its construction method | |
JP2023068271A (en) | Construction method of steel shell element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
J301 | Trial decision |
Free format text: TRIAL NUMBER: 2020101000041; TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20200107 Effective date: 20201116 |
|
GRNO | Decision to grant (after opposition) |