KR101620787B1 - underground excavation construction method - Google Patents
underground excavation construction method Download PDFInfo
- Publication number
- KR101620787B1 KR101620787B1 KR1020150087272A KR20150087272A KR101620787B1 KR 101620787 B1 KR101620787 B1 KR 101620787B1 KR 1020150087272 A KR1020150087272 A KR 1020150087272A KR 20150087272 A KR20150087272 A KR 20150087272A KR 101620787 B1 KR101620787 B1 KR 101620787B1
- Authority
- KR
- South Korea
- Prior art keywords
- steel pipe
- manhole structure
- existing underground
- underground manhole
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 238000009412 basement excavation Methods 0.000 title claims description 14
- 238000000034 method Methods 0.000 claims abstract description 61
- 229910000831 Steel Inorganic materials 0.000 claims description 150
- 239000010959 steel Substances 0.000 claims description 150
- 238000009434 installation Methods 0.000 claims description 23
- 239000000463 material Substances 0.000 claims description 10
- 239000002689 soil Substances 0.000 claims description 8
- 230000000903 blocking effect Effects 0.000 claims description 5
- 238000005520 cutting process Methods 0.000 claims description 4
- 238000009415 formwork Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000003754 machining Methods 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims 1
- 238000007796 conventional method Methods 0.000 description 11
- 238000011161 development Methods 0.000 description 3
- 239000004566 building material Substances 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
본 발명의 목적은 기존 지중 맨홀 구조물에 전력선 등을 연결하기 위해 새로운 지중 관로를 기존 지중 맨홀 구조물에 연결시키는 공사를 비개착식 공법에 의한 강관압입추진공법으로 진행할 수 있게 하여 별도의 도로 교통을 차단하지 않아도 되고, 그에 따른 경비를 절감할 수 있으며, 공사 기간을 단축시켜 공사 비용을 절감할 수 있게 한 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법을 제공한다. The object of the present invention is to connect a new underground channel to an existing underground manhole structure in order to connect a power line to an existing underground manhole structure, The present invention provides a method of connecting and installing existing underground manhole structures by using an unbonded method that can reduce the construction cost and reduce the construction cost by reducing the construction cost.
Description
본 발명은 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 관한 것으로, 더욱 상세하게는 기존 지중 맨홀 구조물에 새로운 지중 관로(강관 등)를 연결하는 공사를 비개착식 공법에 의한 강관압입추진공법으로 진행할 수 있게 하여 별도의 도로 교통을 차단하지 않고 공사를 함에 의해 경비를 절감하고, 공사 기간을 단축시켜 공사 비용을 절감할 수 있게 한 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 관한 것이다. More particularly, the present invention relates to a method of connecting a new underground pipe (steel pipe) to an existing underground manhole structure by using a non-opening method, Construction of existing underground manhole structure by non-installation method that can reduce the construction cost by reducing the cost by constructing the road without blocking road traffic by making it possible to proceed with the propulsion method. ≪ / RTI >
일반적으로 지중에 구조물을 축조하는 방식으로는 개착 및 비개착에 의한 구조물 축조방식이 있다. Generally, as a method of constructing a structure in the ground, there is a method of constructing a structure by opening and closing.
기존 도로 및 철도 하부를 횡단해서 하수암거나 지하차도, 터널구조물 등을 설치해야 하는 경우 공사에 따른 지장물의 이전이 곤란하거나, 지장물 저촉, 차량 소통 장애 등으로 개착이 불가능하여 비개착공법이 요구된다.If it is necessary to install underground roads, tunnel structures, etc. by crossing existing roads and railways, it is not possible to transfer the obstacles due to construction work, do.
비개착에 의한 구조물 축조 공법에는 횡단하는 도로나 지장물의 양측으로 작업구 개념의 전진기지와 도달기지가 필수적이며, 대표적인 비개착식 지중구조물 축조 공법으로는 함체견인공법과 강관루프공법 등을 들 수 있다.For the construction method of non-installation structure, forward bases and reaching bases of the concept of the work center are necessary for both sides of the road or obstacle crossing. Typical non-installation foundation construction methods are the chassis-traction method and the steel pipe loop method. have.
함체견인공법은, 함체가 통과할 지중에 미리 600mm내외의 함체지지용 가설용 강관을 전진기지에서 도달기지까지 수평으로 압입 관통시킨 후, 견인할 함체의 반대 측 도달기지로부터 지중을 횡단하여 이어진 다수의 P.C 강선을 현장에서 제작된 함체와 결속한 후, 견인하여 함체 내의 내부토사를 제거하고, 이와 같은 견인과 굴착작업을 반복하여 지중에 구조물을 설치하는 공법이다.The armor pulling method is a method in which a steel pipe for supporting the enclosure of about 600 mm in advance is penetrated horizontally from a forward base to a reaching base and then a large number of steel pipes traversing the ground from the reaching base of the opposite side of the body to be towed Of the PC steel wire is bound to the body made in the field, and then pulled to remove the internal soil from the enclosure, and the structure is installed in the ground by repeating such traction and excavation work.
또한, 비개착식 지중구조물 축조공법으로 강관루프 공법이 많이 적용되고 있는 실정이다.In addition, the steel pipe loop construction method is widely applied by the construction method of the non-slip type underground structure.
강관루프 공법은, 이웃하는 강관들을 서로 맞댄 상태로 연결시켜 그 횡방향 강성이 확고해지도록 함으로써, 별도의 횡방향 지지보 없이도 시공이 가능하도록 한 강관루프 구조체 및 이 강관루프 구조체의 시공방법이 대한민국 특허 공개번호 제2006-0097891호로 알려져 있다.The steel pipe loop construction method is a method of constructing a steel pipe loop structure in which neighboring steel pipes are connected to each other in a mutually aligned state so that their lateral rigidity is secured and construction is possible without a separate transverse support beam, And is known as Patent Publication No. 2006-0097891.
또한, 강관루프 구조체와 관계된 기술로서 대한민국 특허 등록번호 제10-0737328호의 강관루프 구조체 및 그 시공방법과, 대한민국 특허 등록번호 제10-0770159호의 강관루프 구조체가 알려져 있다.As a technique related to a steel pipe loop structure, there is known a steel pipe loop structure of Korean Patent Registration No. 10-0737328, a construction method thereof, and a steel pipe loop structure of Korean Patent Registration No. 10-0770159.
이와 같은 강관루프 구조체는, 횡단할 도로나 지장물의 양측에 작업구를 설치한 후, 설치될 구조물의 외곽선에 맞추어 순차적으로 압입 설치되는 것으로서, 각각 일측에 수평방향으로 수평홈이 형성되고, 상기 수평홈의 내측으로는 이 수평홈에 의해 하중에 따라 찌그러지는 것을 방지하도록 일정간격을 두고 상하에 걸쳐 복수의 지지대가 설치되며, 상기 수평홈의 타측에는 이 수평홈과 대응하는 앵글이 설치된 다수의 강관들이 상호 정렬된 상태로 측방향 결합되는 구성을 갖는다.Such a steel pipe loop structure is a steel pipe loop structure in which a work hole is provided on both sides of a road to be traversed or obstacle, and is sequentially press fitted into the outline of a structure to be installed. Horizontal grooves are horizontally formed on one side thereof, A plurality of supports are provided on the inner side of the groove at upper and lower portions with a predetermined distance therebetween so as not to be crushed by the horizontal grooves due to the load, and a plurality of steel pipes Are laterally coupled with each other in an aligned state.
또한, 강관루프 구조체를 이루는 강관들을 지중에 압입, 추진하는 방법으로는, 비트 등의 기계를 이용하여 지중을 굴착하면서 동시에 강관을 압입, 추진하는 방법과, 작업자가 강관의 선단측 지중을 일정깊이씩 굴착한 후, 굴착된 만큼 강관을 압입, 추진하는 방법이 있다.As a method of pushing and pushing the steel pipes constituting the steel pipe loop structure into the ground, there are a method of pushing and pushing the steel pipe while excavating the ground by using a machine such as a bit, There is a method of pushing and pushing steel pipes as excavated after excavation.
한편, 도시개발 등을 통해 새로운 신도시를 개방하는 경우, 위에서 설명한 비개착에 의한 구조물 축조 공법으로 상수도관, 가스관, 통신관, 송유관 등 각종 관체를 지하에 매설하게 된다. 이때, 차량 등의 통행을 제한할 필요가 없어 교통에 지장을 주지 않게 되는 장점을 갖는다. On the other hand, when a new city is opened through urban development, etc., various pipes such as a water pipe, a gas pipe, a communication pipe, and a pipeline are buried underground by the above-described construction method of a non-installed structure. At this time, there is no need to restrict the traffic of the vehicle or the like, and it has an advantage that it does not hinder traffic.
그러나 도시개발에 따른 지중에 구조물을 매설하는 경우, 이미 설치되어 있는 기존 지중 맨홀 구조물에 강관이 연결되도록 매설하는 경우가 있다. 예를 들어, 기존에 설치되어 있는 지중 맨홀 구조물에서 전력선 등을 연결하기 위해서는 기존 지중 맨홀 구조물에 강관이 연결되도록 지중에 매설하여야만 기존 지중 맨홀 구조물로부터 전력선 등을 연결할 수 있다. However, when buried in the ground due to urban development, there are cases where buried steel pipe is connected to the existing underground manhole structure already installed. For example, in order to connect a power line to an existing underground manhole structure, a power line may be connected to an existing underground manhole structure so that the existing underground manhole structure can be connected to a steel pipe.
이와 같이 기존 지중 맨홀 구조물에 새로운 지중 관로(강관 등)가 연결되게 매설하기 위한 지중 관로(강관)의 매설 공사가 필요하고, 또 기존 지중 맨홀 구조물 내에서 전력선 등을 연결하기 위한 지중 맨홀 구조물의 공간 확장이 필요하다. In this way, it is necessary to install an underground pipeline (steel pipe) in order to connect a new underground channel (steel pipe) to the existing underground manhole structure and to connect the power line in the existing underground manhole structure. Extension is required.
이러한 공사를 함에 있어, 현재까지는 비개착식 공법으로 할 수 없기 때문에 교통을 통제한 후 개착식으로 공사를 하고 있는 실정이다. 즉, 기존 지중 맨홀 구조물의 공간 확장을 위한 공사시 맨홀 주위를 파내야 됨으로, 도로 교통을 통제한 후 개착식으로 밖에 공사를 할 수 없었다. In this construction, since it is not possible to use the non-installation method until now, it is the situation that the construction is carried out after the traffic is controlled. In other words, since the existing manhole should be digged around the existing manhole structure for the expansion of the existing underground manhole structure, it could not be constructed only after controlling the road traffic and opening it.
이 때문에 일정 구간마다 교통을 통제하고 작업이 이루어지는 것이 필수적으로 요구되며, 이는 교통이 정체된다는 문제가 발생된다. 즉, 반복되는 교통차단으로 인하여 교통 정체시간의 증가가 불가피하며, 이로 인하여 통행불편 및 통행인 민원과 사회적 간접 손실 비용의 발생 증가 등의 문제가 있다. Therefore, it is indispensable that the traffic is controlled and the work is performed at every predetermined interval, which causes a problem that the traffic is stagnant. In other words, traffic congestion time is inevitably increased due to repetitive traffic blockage, which causes problems such as traffic inconvenience, passenger complaints, and increased incidence of social indirect loss costs.
본 발명은 상기한 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 기존 지중 맨홀 구조물에 전력선 등을 연결하기 위해 새로운 지중 관로를 기존 지중 맨홀 구조물에 연결시키는 공사를 비개착식 공법에 의한 강관압입추진공법으로 진행할 수 있게 하여 별도의 도로 교통을 차단하지 않아도 됨으로 그에 따른 경비를 절감하고, 공사 기간을 단축시켜 공사 비용을 절감할 수 있게 한 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법을 제공하는데 있다. SUMMARY OF THE INVENTION It is an object of the present invention to provide a method of connecting a new underground channel to an existing underground manhole structure in order to connect a power line to an existing underground manhole structure, , It is possible to reduce the construction cost and the construction cost by reducing the construction cost by eliminating the need to cut off road traffic by allowing the construction to proceed to the method of pressurizing the steel pipe by the method of the present invention. And to provide a method of constructing a connection.
상기 목적을 달성하기 위한 본 발명은, 횡단할 도로나 지장물의 일측에 작업구를 설치한 후, 그 작업구에서 설치될 구조물의 외곽선에 맞추어 지중을 굴착하면서 기존 지중 맨홀 구조물의 하부에 연결될 계획 지점까지 정밀하게 제1 강관을 수평 방향으로 순차적으로 압입 추진하는 제1 단계; 상기 제1 단계에 의해 형성된 제1 강관의 내부에서 기존 지중 맨홀 구조물의 하부로 연결되도록 상부로 제2 강관을 수직 방향으로 순차적으로 압입 추진하는 제2 단계; 및 상기 제2 단계에 의해 형성된 수직 방향의 제2 강관과 상기 제1 단계에 의해 수평 방향의 제1 강관을 통해 작업자가 기존 지중 맨홀 구조물의 내부로 이동하면서 기존 지중 맨홀 구조물의 바닥 콘크리트 파쇄물과 그 하부의 굴착토사 및 가설자재를 운반하여 맨홀 구조물의 내부로 반입하거나 외부로 반출하면서 기존 지중 맨홀 구조물의 하부에 새로운 공간부를 확장하여 수직구조물을 완성하는 제3 단계;를 포함하되, 상기 제3 단계는: 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄하는 단계; 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄한 후, 그 하부를 터파기하면서 흙막이 가설재를 설치하는 단계; 기존 지중 맨홀 구조물의 하부에 굴착 및 가설재를 설치하면서 단계적으로 수직 방향의 제2 강관의 철거와 수평 방향의 제1 강관의 일부를 철거하여 기존 지중 맨홀 구조물의 하부에 연결될 계획 지점의 바닥까지 굴착하는 단계; 및 기존 지중 맨홀 구조물의 하부에 연결될 계획 지점의 바닥까지 굴착이 완료된 후, 철근 가공조립과 거푸집 설치 및 레미콘 타설에 의해 기존 지중 맨홀 구조물 하부의 굴착 부위에 수직구조물을 완성하는 단계;로 이루어지는 것이 바람직하다.In order to accomplish the above object, the present invention is characterized in that after a work hole is installed on one side of a road or obstacle to be traversed, a ground is excavated in accordance with the outline of a structure to be installed in the work hole, A first step of successively pushing and pushing the first steel pipe in a horizontal direction in a precise manner; A second step of sequentially pressing the second steel pipe vertically in the upper part so as to be connected to the lower part of the existing underground manhole structure inside the first steel pipe formed by the first step; And the second steel pipe in the vertical direction formed by the second step and the first steel pipe in the horizontal direction by the first step, the worker moves to the inside of the existing underground manhole structure and the bottom concrete of the existing underground manhole structure, And a third step of conveying the excavated soil and the lower material to the inside of the manhole structure or carrying the excavated soil and the construction material to the outside of the manhole structure and extending the new space portion to the lower part of the existing underground manhole structure to complete the vertical structure, : Crushing the floor concrete of the existing underground manhole structure; Dismantling the floor concrete of the existing underground manhole structure and disposing the earth retaining material while tearing the lower portion thereof; Excavation and installation of the existing underground manhole structure and demolition of the second steel pipe in the vertical direction and part of the first steel pipe in the horizontal direction are performed stepwise to excavate to the floor of the planned point to be connected to the lower part of the existing underground manhole structure step; And completing the vertical structure at the excavation site under the existing underground manhole structure by reinforcing machining assembly, formwork installation and remicon casting after completion of excavation to the floor of the planned site to be connected to the lower part of the existing underground manhole structure Do.
상기 제2 단계는: 수평 방향의 제1 강관의 내부에서 수직 방향으로 제2 강관을 압입 추진하여 기존 지중 맨홀 구조물의 하부에 연결시킬 수 있도록 수평 방향의 제1 강관의 내부 하측에 수평을 이루게 추진 받침대와 유압잭을 설치하는 단계; 상기 유압잭에 의해 제2 강관을 수직 방향으로 압입 추진할 수 있도록 밀대와 강관을 거치하는 단계; 상기 밀대에 의해 수직 방향의 제2 강관이 수평 방향의 제1 강관 내부에서 외부로 압입 추진되어 기존 지중 맨홀 구조물의 하부까지 압입 추진시킬 수 있도록 수평 방향의 제1 강관의 상부를 절단하고, 막음용 수직빔을 설치하는 단계; 및 제2 강관을 수직 방향으로 순차적으로 압입 추진하여 기존 지중 맨홀 구조물의 하부로 수직 방향의 제2 강관이 위치되게 압입 추진하는 단계;로 이루어지는 것이 바람직하다. The second step is to push the second steel pipe in the vertical direction inside the first steel pipe in the horizontal direction and to horizontally push the second steel pipe to the lower side of the first steel pipe in the horizontal direction so as to be connected to the lower part of the existing underground manhole structure Installing a pedestal and a hydraulic jack; Mounting a steel pipe and a steel pipe to press the second steel pipe vertically by the hydraulic jack; The second steel pipe in the vertical direction is pushed outward from the inside of the first steel pipe in the horizontal direction by the pusher so that the upper portion of the first steel pipe in the horizontal direction is cut so as to be able to push into the lower portion of the existing underground manhole structure, Installing a vertical beam; And pushing and pushing the second steel pipe into the lower part of the existing underground manhole structure in such a manner that the second steel pipe in the vertical direction is positioned.
상기 제2 강관을 압입 추진을 위해 상기 제1 강관을 절단하는 크기는, 상기 제2 강관의 직경에 대응하는 크기로 절단하여 박음용 수직빔을 설치함에 의해, 그 절단 부위를 지지함과 동시에 토사는 흘러내리지 않게 하면서 상기 제2 강관을 절단 부위를 통해 압입 추진하는 것이 바람직하다. The size of cutting the first steel pipe for pushing in the second steel pipe is cut to a size corresponding to the diameter of the second steel pipe so as to support the cut portion by installing the vertical beam for bucket, It is preferable to push the second steel pipe through the cut portion while pushing the second steel pipe.
상기 제1 단계에 의해 압입 추진되는 수평 방향의 제1 강관의 직경은 상기 제2 단계에 의해 압입 추진되는 수직 방향의 제2 강관 직경 보다 크게 형성되는 것이 바람직하다. It is preferable that the diameter of the first steel pipe in the horizontal direction to be press-impregnated by the first step is larger than the diameter of the second steel pipe in the vertical direction which is press-impelled by the second step.
본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의하면, 기존 지중 맨홀 구조물에 전력선 등을 연결하기 위해 새로운 지중 관로를 연결시 비개착식 공법에 의한 강관압입추진공법으로 연결시킬 수 있음으로, 별도의 도로 교통을 차단하지 않아도 되고, 공사 기간을 단축시켜 공사 비용을 절감할 수 있는 효과가 있다. According to the present invention, when a new underground channel is connected to a conventional underground manhole structure to connect a power line to the existing underground manhole structure, it is connected to a steel pipe indentation propulsion method by a non- Therefore, it is not necessary to cut off road traffic separately, and the construction period can be shortened to reduce the construction cost.
도 1은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법의 시공된 예를 위에서 보아 도시한 도면이고,
도 2는 도 1표시의 단면 구조를 나타낸 도면이고,
도 3은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 제1 강관이 압입 추진된 상태를 위에서 보아 도시한 도면이고,
도 4는 도 3표시의 정단면도이고,
도 5는 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 상부로 제2 강관이 기존 지중 맨홀 구조물의 하부로 압입 추진된 상태를 위에서 보아 도시한 도면이고,
도 6은 도 5표시의 정단면도이고,
도 7은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 제2 강관이 압입 추진된 상태에서 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄하는 예를 위에서 보아 도시한 도면이고,
도 8은 도 7표시의 정단면도이고,
도 9는 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄한 후, 굴착하는 예를 위에서 보아 도시한 도면이고,
도 10은 도 9표시의 정단면도이고,
도 11은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 새로운 수직구조물을 형성하기 위해 굴착이 완료된 예를 위에서 보아 도시한 도면이고,
도 12는 도 11표시의 정단면도이고,
도 13은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 새로운 수직구조물을 형성한 상태를 위에서 보아 도시한 도면이고,
도 14는 도 13표시의 정단면도이고,
도 15는 도 13표시의 측단면도이고,
도 16은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에서, 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 제2 강관을 상부로 압입하기 위한 추진장비의 설치예를 나타낸 도면이고,
도 17은 도 16표시의 측단면도이고,
도 18 내지 도 22는 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에서, 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 제2 강관을 상부로 압입 추진하는 상태를 순차적으로 나타낸 도면이고,
도 23는 도 22표시의 "A"부 확대도이다. FIG. 1 is a view showing an example of construction of an existing underground manhole structure connection installation and construction method by a non-installation method according to the present invention, and FIG.
FIG. 2 is a view showing a sectional structure of FIG. 1,
3 is a view showing a state in which a first steel pipe is press-fitted into a lower portion of an existing underground manhole structure by a conventional method of connecting and installing an existing underground manhole structure by the non-installation method according to the present invention,
Fig. 4 is a front sectional view of Fig. 3,
FIG. 5 is a cross-sectional view illustrating a state in which a second steel pipe is inserted into a lower portion of an existing underground manhole structure by the method of connecting and installing an existing underground manhole structure according to an embodiment of the present invention, FIG. 5 is a view showing a state in which the lower portion is press-
Fig. 6 is a front sectional view of Fig. 5,
FIG. 7 is a view showing an example of a method of crushing a floor concrete of a conventional underground manhole structure in a state in which a second steel pipe is press-fitted into a lower portion of an existing underground manhole structure by a conventional method of connecting and installing a conventional underground manhole structure by the non- And Fig.
Fig. 8 is a front sectional view of Fig. 7,
FIG. 9 is a view showing an example in which the bottom concrete of the existing underground manhole structure is crushed and then excavated by the existing underground manhole structure connection installation and construction method by the non-installation method according to the present invention, and FIG.
Fig. 10 is a front sectional view of Fig. 9,
11 is a view showing an example in which excavation is completed in order to form a new vertical structure in a lower part of an existing underground manhole structure by a conventional method of connecting and installing an existing underground manhole structure by a non-installation method according to the present invention,
Fig. 12 is a front sectional view of Fig. 11,
FIG. 13 is a view showing a state in which a new vertical structure is formed on a lower part of an existing underground manhole structure by a method of connecting and installing an existing underground manhole structure by the non-tearing method according to the present invention,
Fig. 14 is a front sectional view of Fig. 13,
Fig. 15 is a side sectional view of Fig. 13,
16 is a view illustrating a conventional method of connecting and installing a conventional underground manhole structure according to the present invention, in which a propelling device for press-fitting a second steel pipe into an upper portion of a first steel pipe, And Fig.
Fig. 17 is a side sectional view of Fig. 16,
18 to 22 show a method of connecting and installing an existing underground manhole structure according to an embodiment of the present invention by press-fitting a second steel pipe into an upper part of a first steel pipe which is press- , And Fig.
FIG. 23 is an enlarged view of the "A" part of FIG.
이하에서는, 첨부된 도면을 참고하여 본 발명에 따른 바람직한 실시예를 보다 상세하게 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
본 발명의 설명에 앞서, 이하의 특정한 구조 내지 기능적 설명들은 단지 본 발명의 개념에 따른 실시예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 개념에 따른 실시예들은 다양한 형태로 실시될 수 있으며, 본 명세서에 설명된 실시예들에 한정되는 것으로 해석되어서는 아니된다.Prior to the description of the present invention, the following specific structure or functional description is merely illustrative for the purpose of describing an embodiment according to the concept of the present invention, and embodiments according to the concept of the present invention may be embodied in various forms , And should not be construed as limited to the embodiments described herein.
또한, 본 발명의 개념에 따른 실시예는 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있으므로, 특정 실시예들을 도면에 예시하고 본 명세서에 상세하게 설명하고자 한다. 그러나, 이는 본 발명의 개념에 따른 실시예들을 특정한 개시 형태에 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경물, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. In addition, embodiments according to the concept of the present invention can make various changes and have various forms, so that specific embodiments are illustrated in the drawings and described in detail herein. However, it should be understood that the embodiments according to the concept of the present invention are not intended to limit the present invention to specific modes of operation, but include all modifications, equivalents and alternatives falling within the spirit and scope of the present invention.
첨부된 도 1은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 조물 연결 설치 시공방법의 시공된 예를 위에서 보아 도시한 도면이고, 도 2는 도 1표시의 단면 구조를 나타낸 도면이다 BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing a construction example of a conventional method of connecting and installing a conventional underground manhole by a non-installation method according to the present invention, and FIG. 2 is a view showing a sectional structure of FIG. 1
이들 도면에 도시되어 있는 바와 같이, 본 발명은 도시개발에 따른 지중에 구조물을 매설하는 경우, 이미 설치되어 있는 기존 지중 맨홀 구조물(104)에 전력선(L) 등을 연결하기 위해 새로운 지중 관로(P)(예컨대, 강관 등)를 기존 지중 맨홀 구조물(104)에 연결시키는 공사를 비개착식 공법에 의해 기존 지중 맨홀 구조물에 연결 설치 할 수 있음으로써, 도로 교통을 통제하지 않고 작업이 이루어지게 한 것이 특징이다. As shown in these drawings, in the case where a structure is buried in the ground according to the development of the present invention, a new ground pipe (P) is connected to an already existing
이러한 본 발명의 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법은, 횡단할 도로나 지장물의 일측에 작업구(102)를 설치한 후, 그 작업구(102)에서 설치될 구조물의 외곽선에 맞추어 지중을 굴착하면서 기존 지중 맨홀 구조물(104)의 하부에 연결될 계획 지점까지 정밀하게 제1 강관(100)을 수평 방향으로 순차적으로 압입 추진하는 제1 단계와, 상기 제1 단계에 의해 형성된 제1 강관(100)의 내부에서 기존 지중 맨홀 구조물(104)의 하부로 연결되도록 상부로 제2 강관(200)을 수직 방향으로 순차적으로 압입 추진하는 제2 단계, 및 상기 제2 단계에 의해 형성된 수직 방향의 제2 강관(200)과 상기 제1 단계에 의해 수평 방향의 제1 강관(100)을 통해 작업자가 기존 지중 맨홀 구조물(104)의 내부로 이동하면서 기존 지중 맨홀 구조물(104)의 바닥 콘크리트 파쇄물과 그 하부의 굴착토사 및 가설자재를 운반하여 맨홀 구조물의 내부로 반입하거나 외부로 반출하면서 기존 지중 맨홀 구조물(104)의 하부에 새로운 공간부를 확장하여 수직구조물(300)을 완성하는 제3 단계를 포함하여 구성된다. The method for connecting and installing a conventional underground manhole structure according to the present invention is characterized in that after a
첨부된 도 3은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 제1 강관이 압입 추진된 상태를 위에서 보아 도시한 도면이고, 도 4는 도 3표시의 정단면도이다. FIG. 3 is a view showing a state in which a first steel pipe is press-fitted into a lower portion of an existing underground manhole structure by a conventional method of connecting and installing an existing underground manhole structure by the non-installation method according to the present invention, 3 is a front sectional view of Fig. 3.
도 3 내지 도 4에는, 상기 제1 단계에 의해 제1 강관(100)이 기존 지중 맨홀 구조물(104)의 하부로 압입 추진되어 있는 상태가 도시되어 있다. 3 to 4 show a state where the
이러한 상기 제1 단계는, 기존 이미 알려져 있는 강관 추진 공법을 이용할 수 있다. 그러나 종래의 강관 추진 공법은 기존 지중 맨홀 구조물에 작업구를 형성하여야 됨으로, 도로 교통을 차단해야 하는 문제점이 있으나, 본 발명은 횡단할 도로나 지장물의 양측에 작업구를 설치하지 않고, 즉 기존 지중 맨홀 구조물(104)에는 작업구를 설치하지 않고, 다른 한쪽에만 작업구(102)를 설치한 상태에서 그 작업구(102)에서 설치될 구조물의 외곽선에 맞추어 지중을 굴착하면서 기존 지중 맨홀 구조물(104)의 하부에 연결될 계획 지점까지 정밀하게 제1 강관(100)을 수평 방향으로 순차적으로 압입 추진하는 것에 차이점이 있다. In the first step, a known steel pipe propulsion method may be used. However, the conventional steel pipe propulsion method has a problem that it is necessary to cut off the road traffic because the work hole must be formed in the existing underground manhole structure. However, the present invention is not limited to the existing underground manhole structure, The
첨부된 도 5는 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 상부로 제2 강관이 기존 지중 맨홀 구조물의 하부로 압입 추진된 상태를 위에서 보아 도시한 도면이고, 도 6은 도 5표시의 정단면도이다. FIG. 5 is a perspective view showing the construction of a conventional underground manhole structure according to an embodiment of the present invention; FIG. 5 is a cross- FIG. 6 is a front sectional view of FIG. 5, and FIG.
도 5 내지 도 6에는, 제2 단계에 의해 제1 강관(100)의 내부에서 상부로 제2 강관(200)이 압입 추진되어 있는 상태가 도시되어 있다. 5 to 6 show a state in which the
이러한 제2 단계는, 제1 단계에서 수평 방향으로 압입 추진된 제1 강관(100)의 내부에서 기존 지중 맨홀 구조물(104)의 하부로 연결되도록 제2 강관(200)을 상부로 수직 방향으로 순차적으로 압입 추진하는 것으로, 이에 대하여 도 16 내지 도 23을 참조하여 구체적으로 설명한다. In the second step, the
첨부된 도 16은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에서, 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 제2 강관을 상부로 압입하기 위한 추진장비의 설치예를 나타낸 도면이고, 도 17은 도 16표시의 측단면도이고, 도 18 내지 도 22는 본 발명에 따른 비개착식 공법에 의한 기존 구조물 연결 설치 시공방법에서, 기존 지중 맨홀 구조물의 하부에 압입 추진된 제1 강관의 내부에서 제2 강관을 상부로 압입 추진하는 상태를 순차적으로 나타낸 도면이고, 도 23은 도 22의 "A"부 확대도이다. FIG. 16 is a perspective view illustrating a conventional method for connecting and installing a conventional underground manhole structure according to an embodiment of the present invention, in which a second steel pipe is press- FIG. 17 is a side sectional view of FIG. 16, and FIG. 18 to FIG. 22 are views showing a conventional method of connecting and installing existing structures according to the present invention, FIG. 23 is an enlarged view of the portion "A" in FIG. 22; FIG. 23 is a view showing a state in which the second steel pipe is press-fitted upward from the inside of the first steel pipe which is press-
먼저, 도 18표시와 같이, 수평 방향의 제1 강관(100)의 내부에서 수직 방향으로 제2 강관(200)을 압입 추진하여 기존 지중 맨홀 구조물(104)의 하부에 연결시킬 수 있도록 하고자, 수평 방향의 제1 강관(100)의 내부 하측에 수평을 이루게 추진 받침대(302)와 유압잭(304)을 설치한다. 18, in order to press the
이후, 도 19표시와 같이, 상기 유압잭(304)에 의해 제2 강관(200)을 수직 방향으로 압입 추진할 수 있도록 밀대(306)와 제2 강관(200)을 거치하고, 도 20표시와 같이, 상기 밀대(306)에 의해 수직 방향의 제2 강관(200)이 수평 방향의 제1 강관(100)의 내부에서 외부로 압입 추진되어 기존 지중 맨홀 구조물(104)의 하부까지 압입 추진시킬 수 있도록 수평 방향의 제1 강관(100)의 상부를 절단(c)하고, 막음용 수직빔(308)을 설치한다.(도 23참조) Thereafter, as shown in FIG. 19, the
이러한 상기 막음용 수직빔(308)에 의해 상기 제1 강관(100)의 상부를 절단(c)하고, 그 절단 부위를 통해 제2 강관(200)의 압입을 추진함으로서, 상기 제2 강관(200)을 상부로 수직하게 압입 하여도 토사가 하부로 무너지지 않게 되고, 이후, 제2 강관(200)을 기존 지중 맨홀 구조물(104)의 하부 콘크리트까지 압입 추진한 후에 막음용 수직빔(308)을 제거함으로서 제2 강관을 수직방향으로 압입 추진하여도 안전성을 확보할 수 있다. The upper portion of the
따라서 상기 제2 강관(200)을 압입 추진하기 위해 상기 제1 강관(100)에 형성되는 절단(c)은 상기 제2 강관(200)의 직경에 대응하는 크기로 절단하여 박음용 수직빔(308)을 설치함으로서, 절단부위를 지지함과 동시에 토사는 흘러내지리 않게 하여 상기 제2 강관(200)을 압입 추진할 수 있다. The cutting c formed on the
한편, 도 21 내지 도 22표시와 같이, 제2 강관(200)을 수직 방향으로 순차적으로 압입 추진하여 기존 지중 맨홀 구조물(104)의 하부로 수직 방향의 제2 강관(200)이 위치되게 압입 추진할 수 있다. 이때, 상기 제2 강관(200)을 압입 추진하는 방법은 수평 방향으로의 강관압입추진방법을 수직 방향으로 압입 추진할 수 있게 한 것이다. Meanwhile, as shown in FIGS. 21 to 22, the
이와 같이 기존 지중 맨홀 구조물(104)의 하부에 제2 강관(200)이 위치되면, 제3 단계에 의해 수직구조물(300)을 형성하는 것으로, 이때, 작업자는 기존 지중 맨홀 구조물(104)의 내부에서 작업하면서 발생되는 콘크리트 파쇄물과 굴착토사 및 가설자재를 제1, 제2 강관(100,200)을 통해 외부로 운반하여 작업하는 제3 단계에 의해, 도로 교통을 통제함이 없이 작업이 가능한 정점을 갖는다. When the
첨부된 도 7은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 제2 강관이 압입 추진된 상태에서 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄하는 예를 위에서 보아 도시한 도면이고, 도 8은 도 7표시의 정단면도이다. FIG. 7 is a perspective view showing a state in which a second steel pipe is press-fitted into a lower part of an existing underground manhole structure by crushing a floor concrete of an existing underground manhole structure by the conventional method of connecting and installing a conventional underground manhole structure by the non- Fig. 8 is a front sectional view of Fig. 7; Fig.
도시된 바와 같이, 제2 단계에 의해 기존 지중 맨홀 구조물(104)의 하부에 제2 강관(200)이 위치되면, 기존 지중 맨홀 구조물(104)의 바닥 콘크리트를 파쇄한다. 이때, 발생되는 콘크리트 파쇄물은 제1, 제2 강관(100,200)을 통해 외부로 운반하여 반출할 수 있게 함으로서, 기존 지중 맨홀 구조물(104)의 지상에는 도로 교통을 통제할 필요가 없다. As shown in the figure, when the
첨부된 도 9는 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 바닥 콘크리트를 파쇄한 후, 굴착하는 예를 위에서 보아 도시한 도면이고, 도 10은 도 9표시의 정단면도이다. 9 is a view showing an example in which the bottom concrete of the existing underground manhole structure is crushed and then excavated by the existing underground manhole structure connection construction and installation method according to the non-installation method according to the present invention, 9 is a front sectional view of Fig. 9.
도시된 바와 같이, 기존 지중 맨홀 구조물(104)의 바닥 콘크리트를 파쇄한 후에는, 그 하부를 터파기하면서 흙막이 가설재(314)를 설치한다. 이때에도, 굴착토사 및 가설자재는 제1, 제2 강관(100,200)을 통해 운반함으로써, 역시 지상의 도로 교통을 통제할 필요가 없다. As shown in the figure, after the bottom concrete of the existing
첨부된 도 11은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 새로운 수직구조물을 형성하기 위해 굴착이 완료된 예를 위에서 보아 도시한 도면이고, 도 12는 도 11표시의 정단면도이다. 11 is a view showing an example in which excavation is completed in order to form a new vertical structure at a lower portion of an existing underground manhole structure by a conventional method of connecting and installing an existing underground manhole structure by the non-installation method according to the present invention And Fig. 12 is a front sectional view of Fig. 11.
도시된 바와 같이, 기존 지중 맨홀 구조물(104)의 하부에 굴착 및 가설재(314)를 설치할 때에는 단계적으로 수직 방향의 제2 강관(200)의 철거와 수평 방향의 제1 강관(100)의 일부를 철거하여야 된다. As shown in the drawing, when the excavation and
예컨대, 기존 지중 맨홀 구조물(104)의 하부에 형성되는 수직구조물(300)의 크기는 제1, 제2 강관(100,200)보다는 크기 때문에 그 부분의 제1, 제2 강관(100,200)을 철거하면서 기존 지중 맨홀 구조물(104)의 하부를 굴착하고, 또 가설재(314)를 설치하여 연결될 계획 지점의 바닥까지 굴착을 완료하게 된다. For example, since the size of the
첨부된 도 13은 본 발명에 따른 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법에 의해 기존 지중 맨홀 구조물의 하부에 새로운 수직구조물을 형성한 상태를 위에서 보아 도시한 도면이고, 도 14는 도 13표시의 정단면도이고, 도 15는 도 13표시의 측단면도이다.13 is a view showing a state in which a new vertical structure is formed at a lower portion of an existing underground manhole structure by a conventional method of connecting and installing an existing underground manhole structure according to the present invention, Fig. 13 is a front sectional view of the display, and Fig. 15 is a side sectional view of the display of Fig.
도시된 바와 같이, 기존 지중 맨홀 구조물(104)의 하부에 연결될 계획 지점의 바닥 굴착이 완료되면, 철근 가공조립과 거푸집 설치 및 레미콘 타설에 의해 기존 지중 맨홀 구조물(104) 하부에 굴착된 부위를 수직구조물(300)로 완성하게 된다. As shown in the drawing, when the bottom excavation of the planned point to be connected to the lower part of the existing
이때에도, 상기 제1, 제2 강관(100,200)을 통해 철근이나 거푸집 등을 운반함으로써, 지상의 도로 교통을 통제하지 않은 상태에서 기존 지중 맨홀 구조물(104)의 하부에 확장된 수직구조물(300)을 완성할 수 있다. At this time, the
본 발명에 공법을 용이하게 시행하기 위해서는, 상기 제1 단계에 의해 압입 추진되는 수평 방향의 제1 강관(100)의 직경은 상기 제2 단계에 의해 압입 추진되는 수직 방향의 제2 강관(200)의 직경 보다 크게 형성되어야 한다. In order to easily implement the method according to the present invention, the diameter of the
예컨대, 상기 제1 강관(100)은 새로운 도시 건설에 따른 전력선 등이 설치되기 위한 관로를 구성함으로써, 대구경인 대략 2,000mm 이상의 직경으로 형성되어야 하지만, 상기 제2 강관(200)은 기존 지중 맨홀 구조물(104)의 하부에 수직구조물(300)을 추가로 형성하기 위한 작업 통로 역할만을 함으로서, 제1 강관(100)보다 직경이 작은 소구경인 대략 1,000mm 정도의 직경으로 형성되어도 무방하다. For example, the
따라서 본 발명은 기존 맨홀에 전력선 등을 연결하기 위해 새로운 지중 관로(강관)를 기존 맨홀에 연결시키는 공사를 비개착식 공법에 의한 강관압입추진공법으로 진행할 수 있는 방법을 제공함으로써, 별도의 도로 교통을 차단하지 않아도 되고, 공사 기간도 단축시켜 공사 비용을 절감할 수 있다. Accordingly, the present invention provides a method of connecting a new underground pipe (steel pipe) to an existing manhole in order to connect a power line to an existing manhole by a method of proceeding to a method of pressurizing a steel pipe by an unfitting method, The construction period can be shortened and the construction cost can be reduced.
이러한 본 발명은, 현재 공법으로 기존 지중 맨홀 구조물에 새로운 지중 관로(강관)을 연결하기 위해 개착식으로 밖에 공사를 할 수 없었던 것을, 본 발명의 공법으로 지중 관로(강관)를 시공함으로써, 지상의 도로 교통을 통제하지 않고 비개착식으로 기존 지중 맨홀 구조물에 새로운 관로(강관)를 연결할 수 있는 전혀 새로운 공법이다. The present invention has been accomplished by constructing an underground pipeline (steel pipe) by the method of the present invention so that it can not be constructed only by an open type in order to connect a new underground channel (steel pipe) to an existing underground manhole structure by the present method. It is a completely new method that can connect a new pipe (steel pipe) to existing underground manhole structure with non-installation type without controlling road traffic.
본 발명에 따른 공법은, 기존의 모든 지중 맨홀 구조물에 연결 관로가 필요한 경우 예컨대, 상.하수도관, 송유관, 전력관, 가스관 등등에 모두 적용할 수 있다. The method according to the present invention can be applied to all existing underground manhole structures, for example, a sewer pipe, an oil pipeline, a power pipe, a gas pipe, and the like when a connecting pipeline is required.
이상에서와 같은 기술적 구성에 의해 본 발명의 기술적 과제가 달성되는 것이며, 비록 한정된 실시예와 도면에 의해 설명되었으나 여기에 한정되지 않고 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술사상과 아래에 기재될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능한 것임은 물론이다.Although the present invention has been fully described in connection with the preferred embodiments thereof with reference to the accompanying drawings, it is to be understood that the present invention is not limited thereto. It is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.
100 - 제1 강관 200 - 제2 강관
300 - 수직구조물 302 - 받침대
304 - 유압잭 306 - 밀대
308 - 막음용 수직빔 100 - first steel pipe 200 - second steel pipe
300 - vertical structure 302 - pedestal
304 - Hydraulic Jack 306 - Pusher
308 - Vertical beam for blocking
Claims (4)
상기 제1 단계에 의해 형성된 제1 강관(100)의 내부에서 기존 지중 맨홀 구조물(104)의 하부로 연결되도록 상부로 제2 강관(200)을 수직 방향으로 순차적으로 압입 추진하는 제2 단계; 및
상기 제2 단계에 의해 형성된 수직 방향의 제2 강관(200)과 상기 제1 단계에 의해 수평 방향의 제1 강관(100)을 통해 작업자가 기존 지중 맨홀 구조물(104)의 내부로 이동하면서 기존 지중 맨홀 구조물(104)의 바닥 콘크리트 파쇄물과 그 하부의 굴착토사 및 가설자재를 운반하여 맨홀 구조물의 내부로 반입하거나 외부로 반출하면서 기존 지중 맨홀 구조물(104)의 하부에 새로운 공간부를 확장하여 수직구조물(300)을 완성하는 제3 단계;를 포함하되,
상기 제3 단계는:
기존 지중 맨홀 구조물(104)의 바닥 콘크리트를 파쇄하는 단계;
기존 지중 맨홀 구조물(104)의 바닥 콘크리트를 파쇄한 후, 그 하부를 터파기하면서 흙막이 가설재(314)를 설치하는 단계;
기존 지중 맨홀 구조물(104)의 하부에 굴착 및 가설재(314)를 설치하면서 단계적으로 수직 방향의 제2 강관(200)의 철거와 수평 방향의 제1 강관(100)의 일부를 철거하여 기존 지중 맨홀 구조물(104)의 하부에 연결될 계획 지점의 바닥까지 굴착하는 단계; 및
기존 지중 맨홀 구조물(104)의 하부에 연결될 계획 지점의 바닥까지 굴착이 완료된 후, 철근 가공조립과 거푸집 설치 및 레미콘 타설에 의해 기존 지중 맨홀 구조물 하부의 굴착 부위에 새로운 수직구조물(300)을 완성하는 단계;
를 포함하는 것을 특징으로 하는 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법.
A work site 102 is installed on one side of a road or trail to be traversed and then excavated in accordance with the outline of a structure to be installed in the work site 102 to a planned site to be connected to a lower portion of the existing underground manhole structure 104 A first step of successively pushing and pushing the first steel pipe 100 in a horizontal direction in a precise manner;
A second step of sequentially pressing the second steel pipe 200 vertically in the upper part so as to be connected to the lower part of the existing underground manhole structure 104 in the first steel pipe 100 formed by the first step; And
The worker moves to the inside of the existing underground manhole structure 104 through the second steel pipe 200 in the vertical direction formed by the second step and the first steel pipe 100 in the horizontal direction by the first step, The bottom concrete of the manhole structure 104, the excavated soil and the sloped material at the bottom of the manhole structure 104 are transported to the inside of the manhole structure or taken out to the outside, and a new space is expanded at the bottom of the existing underground manhole structure 104, 300), the method comprising the steps of:
Wherein the third step comprises:
Crushing the bottom concrete of the existing underground manhole structure 104;
Dismounting the floor concrete of the existing underground manhole structure 104 and installing the earth retaining material 314 while dismantling the lower portion thereof;
The digging of the second steel pipe 200 in the vertical direction and the removal of a part of the first steel pipe 100 in the horizontal direction are performed step by step while installing the excavation and installation material 314 in the lower part of the existing underground manhole structure 104, Drilling to the bottom of the planned point to be connected to the lower portion of the structure 104; And
After completion of the excavation to the bottom of the planned site to be connected to the lower part of the existing underground manhole structure 104, a new vertical structure 300 is completed at the excavation site under the existing underground manhole structure by reinforcing machining assembly, formwork installation, step;
The method comprising the steps of: (a) providing a plurality of manholes to be connected to each other;
상기 제2 단계는:
수평 방향의 제1 강관(100)의 내부에서 수직 방향으로 제2 강관(200)을 압입 추진하여 기존 지중 맨홀 구조물(104)의 하부에 연결시킬 수 있도록 수평 방향의 제1 강관(100)의 내부 하측에 수평을 이루게 추진 받침대(302)와 유압잭(304)을 설치하는 단계;
상기 유압잭(304)에 의해 제2 강관(200)을 수직 방향으로 압입 추진할 수 있도록 밀대(306)와 제2 강관(200)을 거치하는 단계;
상기 밀대(306)에 의해 수직 방향의 제2 강관(200)이 수평 방향의 제1 강관(100)의 내부에서 외부로 압입 추진되어 기존 지중 맨홀 구조물(104)의 하부까지 압입 추진시킬 수 있도록 수평 방향의 제1 강관(100)의 상부를 절단하고, 막음용 수직빔(308)을 설치하는 단계; 및
제2 강관(200)을 수직 방향으로 순차적으로 압입 추진하여 기존 지중 맨홀 구조물(104)의 하부로 수직 방향의 제2 강관(200)이 위치되게 압입 추진하는 단계;
를 포함하는 것을 특징으로 하는 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법.
The method according to claim 1,
Said second step comprising:
The inner surface of the first steel pipe 100 in the horizontal direction is pressurized and inserted into the first steel pipe 100 in the vertical direction so that the second steel pipe 200 can be connected to the lower portion of the existing underground manhole structure 104. [ Installing a propelling bracket (302) and a hydraulic jack (304) horizontally on the lower side;
(306) and a second steel pipe (200) so as to push the second steel pipe (200) in the vertical direction by the hydraulic jack (304);
The second steel pipe 200 in the vertical direction is pushed outward from the inside of the first steel pipe 100 in the horizontal direction by the pusher 306 so as to be horizontally and horizontally inserted into the lower portion of the existing underground manhole structure 104 Cutting the upper portion of the first steel pipe (100) in the direction and installing the vertical beam (308) for blocking; And
Pushing and pushing the second steel pipe 200 in the vertical direction in order to push the second steel pipe 200 in the vertical direction to the lower part of the existing underground manhole structure 104;
The method comprising the steps of: (a) providing a plurality of manholes to be connected to each other;
상기 제2 강관(200)을 압입 추진을 위해 상기 제1 강관(100)을 절단(c)하는 부위는, 상기 제2 강관(200)의 직경에 대응하는 크기로 절단하여 박음용 수직빔(308)을 설치함에 의해, 그 절단 부위를 지지함과 동시에 토사는 흘러내리지 않게 하면서 상기 제2 강관(200)을 절단 부위를 통해 압입 추진하는 것을 특징으로 하는 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법.
3. The method of claim 2,
The portion cutting the first steel pipe 100 for pushing in the second steel pipe 200 is cut to a size corresponding to the diameter of the second steel pipe 200 to form the thinner vertical beam 308 ), The second steel pipe (200) is pushed in through the cut portion while supporting the cut portion and the gravel (210) is prevented from flowing down, so that the existing underground manhole structure connection Installation method.
상기 제1 단계에 의해 압입 추진되는 수평 방향의 제1 강관(100)의 직경은 상기 제2 단계에 의해 압입 추진되는 수직 방향의 제2 강관(200)의 직경 보다 크게 형성됨을 특징으로 하는 비개착식 공법에 의한 기존 지중 맨홀 구조물 연결 설치 시공방법. The method according to claim 1,
Wherein a diameter of the first vertical pipe (100) in the horizontal direction press-fitted by the first step is larger than a diameter of the vertical second pipe (200) Construction method of connecting existing underground manhole structure by the method of construction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020150087272A KR101620787B1 (en) | 2015-06-19 | 2015-06-19 | underground excavation construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020150087272A KR101620787B1 (en) | 2015-06-19 | 2015-06-19 | underground excavation construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR101620787B1 true KR101620787B1 (en) | 2016-05-23 |
Family
ID=56104331
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR1020150087272A Active KR101620787B1 (en) | 2015-06-19 | 2015-06-19 | underground excavation construction method |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR101620787B1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115185014A (en) * | 2022-07-04 | 2022-10-14 | 中建八局第三建设有限公司 | Method for accurately detecting existing underground pipeline |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101205500B1 (en) | 2011-10-20 | 2012-11-27 | 김채현 | Constraction Method of Non-Open Cut for Undergroud Cable Conduit |
-
2015
- 2015-06-19 KR KR1020150087272A patent/KR101620787B1/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101205500B1 (en) | 2011-10-20 | 2012-11-27 | 김채현 | Constraction Method of Non-Open Cut for Undergroud Cable Conduit |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115185014A (en) * | 2022-07-04 | 2022-10-14 | 中建八局第三建设有限公司 | Method for accurately detecting existing underground pipeline |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102136951B1 (en) | Construction Method of Duplex Tunnel | |
| KR100770202B1 (en) | Propulsion guide device of steel pipe loop structure | |
| KR20170102397A (en) | The Tunnel construction method to use retangular pipe | |
| KR100713787B1 (en) | Underground structure assembly and underground structure construction method using the same | |
| KR100986312B1 (en) | Propulsion guide device of steel pipe loop structure | |
| KR100562158B1 (en) | Steel pipe loop method for constructing underground structure and its loop structure, and structure of steel pipe | |
| KR101427812B1 (en) | Open cut method for constructing an underground structure | |
| KR101255515B1 (en) | The tunel execution method | |
| JP4888725B2 (en) | Tunnel construction method | |
| JP2019124019A (en) | Invert construction method to existing tunnel | |
| KR101620787B1 (en) | underground excavation construction method | |
| KR20060097891A (en) | Steel pipe roof structure and construction method of this steel pipe roof structure | |
| KR102568229B1 (en) | Bottom-up dismantling method using existing building slab | |
| KR20200024679A (en) | Apparatus and method for constructing non-open cut structure | |
| KR20200074412A (en) | Structure of steel pipe for work area to facilitate dismantling | |
| KR101447381B1 (en) | No-Dig construction method of step passage using gallery pipe pushed upward | |
| KR200385542Y1 (en) | Pipe roof structures | |
| JP6019690B2 (en) | Tunnel widening method | |
| JP2006112137A (en) | Branch tunnel junction structure and its construction method | |
| JP4593913B2 (en) | How to build a branch tunnel | |
| JP6276300B2 (en) | Open shield method | |
| KR100770159B1 (en) | Steel pipe roof structure | |
| KR100833700B1 (en) | Steel pipe roof structure | |
| KR100813910B1 (en) | Steel pipe roof structure | |
| KR102575701B1 (en) | A method of open cut excavation tunnel using a messer plate |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20150619 |
|
| PA0201 | Request for examination | ||
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20160418 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20160504 Patent event code: PR07011E01D |
|
| PR1002 | Payment of registration fee |
Payment date: 20160504 End annual number: 3 Start annual number: 1 |
|
| PG1601 | Publication of registration | ||
| FPAY | Annual fee payment |
Payment date: 20190610 Year of fee payment: 5 |
|
| PR1001 | Payment of annual fee |
Payment date: 20190610 Start annual number: 5 End annual number: 5 |
|
| PR1001 | Payment of annual fee |
Payment date: 20210504 Start annual number: 6 End annual number: 6 |
|
| PR1001 | Payment of annual fee |
Payment date: 20220509 Start annual number: 7 End annual number: 7 |
|
| PR1001 | Payment of annual fee |
Payment date: 20230503 Start annual number: 8 End annual number: 8 |
|
| PR1001 | Payment of annual fee |
Payment date: 20240507 Start annual number: 9 End annual number: 9 |
|
| PR1001 | Payment of annual fee |
Payment date: 20250506 Start annual number: 10 End annual number: 10 |