KR102107753B1 KR1020190073512A KR20190073512A KR102107753B1 KR 102107753 B1 KR102107753 B1 KR 102107753B1 KR 1020190073512 A KR1020190073512 A KR 1020190073512A KR 20190073512 A KR20190073512 A KR 20190073512A KR 102107753 B1 KR102107753 B1 KR 102107753B1
Authority
KR
South Korea
Prior art keywords
rail
rising
data
rising rail
smart
Prior art date
Application number
KR1020190073512A
Other languages
Korean (ko)
Inventor
김대웅
Original Assignee
주식회사 선진곤도라
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 선진곤도라 filed Critical 주식회사 선진곤도라
Priority to KR1020190073512A priority Critical patent/KR102107753B1/en
Application granted granted Critical
Publication of KR102107753B1 publication Critical patent/KR102107753B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/62Over or under weighing apparatus
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/14Central alarm receiver or annunciator arrangements
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B7/00Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00
    • G08B7/06Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00 using electric transmission, e.g. involving audible and visible signalling through the use of sound and light sources

Abstract

The present invention relates to a smart installation work hoist apparatus for preventing an overload by using data, which pushes up an installation work table by using hydraulic pressure, operates a fall prevention safety device even when an upper portion of a rail is damaged, enables a user to conveniently push up the installation work table when the same is pushed up, has load cells and frequently checks generated loads to sound a warning siren or stop the operation when an overload occurs, can collect data on the loads and enable real-time field matters to be checked on a smartphone of a site manager or a manager, and enables a central server to store and manage data on a use state of the hoist apparatus for the installation work table installed in each of a plurality of fields. To this end, the smart installation work hoist apparatus comprises: a rising rail hoisted along the outer wall of a building structure; a gondola support connected to a lower portion of the rising rail by a rail bracket to support a gondola on a lower portion thereof; and a fall prevention hinge for seating the rising rail in place by male-female coupling to seat the gondola in place and prevent a fall, and restraining lowering of the rising rail without restraining raising of the rising rail.

Description

데이터를 이용한 과하중 방지용 스마트가설작업 인양장치{Apparatus for smart installation work for overload prevention using data}Apparatus for smart installation work for overload prevention using data}

본 발명은 스마트가설작업 인양장치에 관한 것으로 더욱 상세하게는 유압을 이용하여 가설작업대를 상부로 밀어 올리되, 레일 상부가 파손시에도 추락방지 안전장치가 작동되도록 형성하고, 밀어 올릴경우 편리하게 들어올릴 수 있으며, 로드셀(load cell)을 형성하여 수시로 발생되는 하중을 체크하여 과하중이 발생시에는 경보 사이렌을 울리거나 작동을 중지시키며, 또한 각각의 하중에 대한 데이터를 수집하고 현장 소장 또는 관리자 스마트폰을 실시간의 현장 사항을 확인할 수 있으며, 다수의 각 현장에 설치되어 있는 가설작업대의 인양장치의 사용상태를 중앙 서버에 실시간으로 데이터를 저장 관리하도록 한 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치에 관한 것이다. The present invention relates to a smart hypothesis work lifting device, and more specifically, the hydraulic work platform is pushed up to the upper part by using hydraulic pressure. It can be raised, and a load cell is formed to check the load generated from time to time, and when an overload occurs, an alarm siren is sounded or stopped, and data for each load is collected and collected from the site manager or manager's smartphone. You can check the real-time site matters, and use the data to store and manage the state of use of the lifting device installed at each of the multiple sites in the central server in real time to the smart temporary work lifting device to prevent overload. It is about.

일반적으로 리프트는 건설현장에 설치되어 작업자 및 화물을 승강시켜주는 것으로서, 수직으로 세워진 마스터에 상기 리프트를 구성하는 승강기가 롤러로 연결되고, 상기 리프트의 상부에는 상기 마스터에 수직으로 세워진 래크와 치합되는 피니언을 전동으로 구동시키는 구동모터가 장착된 구동패널이 연결핀으로 연결된다.In general, a lift is installed at a construction site to lift workers and cargo, and an elevator constituting the lift is connected to a vertically erected master with a roller, and an upper part of the lift is engaged with a rack erected vertically to the master. A driving panel equipped with a driving motor for driving the pinion electrically is connected by a connecting pin.

따라서, 상기 구동모터가 작동되면 이와 축으로 연결된 피니언이 회전되면서 래크를 따라 주행되므로 결국 구동 패널이 상기 승강기를 견인하면서 승강시키는 구조이다. 이때 상기 승강기와 구동패널은 연결핀으로 연결되는데, 승강기의 중량이 초과될 경우 상기 연결핀에 무리가 발생되어 휘거나 또는 절단될 수 있으므로 무게를 감지하는 수단들이 상기 승강기의 바닥판에 설치되어 승차인원 또는 화물의 중량을 감지하도록 구성된다.Accordingly, when the driving motor is operated, the pinion connected to the shaft rotates and moves along the rack, so that the driving panel is lifted while pulling the elevator. At this time, the elevator and the driving panel are connected by a connecting pin. If the weight of the elevator is exceeded, means for detecting the weight may be bent or cut because the connecting pin is excessive, so that the weight is installed on the bottom plate of the elevator to ride. It is configured to detect the weight of personnel or cargo.

그러나, 종래의 리프트들은 상기 승강기의 내부의 무게만 감지하는 구성이므로 실질적으로 승강기와 구동패널을 연결시키는 연결핀의 휜 정도나 균열 등의 상태를 정확하게 파악할 수 없으므로 리프트 장치의 안전 신뢰성이 떨어지는 단점이 있었다.However, since the conventional lifts are configured to detect only the weight of the inside of the elevator, it is difficult to accurately grasp the state of the pins or cracks of the connecting pins connecting the elevator and the driving panel, so the safety reliability of the lift device is deteriorated. there was.

그리고 상기 승강기와 구동패널은 분리된 상태로 보관되는 것이므로 건설현장의 마스터에 먼저 승강기를 장착하고 그 뒤 상기 구동패널을 크레인 등으로 들어서 상기 승강기 상부에 연결핀으로 연결해야 되는 등의 조립상의 번거로움이 있었다.And since the elevator and the driving panel are stored in a separate state, it is difficult to assemble such that the elevator is first mounted on the master of the construction site and then the driving panel is lifted with a crane or the like and connected to the upper part of the elevator with a connecting pin. There was.

또 다른 문제로는, 갱폼은 타워크레인(Tower crane)에 의해 인양되기 때문에 기후의 영향에 민감하며, 인양 작업 중 기후나 현장의 상황에 따라 미끄러짐이 발생하는 문제점을 지니고 있다. 또한 노무자가 타워크레인과 갱폼의 와이어로프 클립(Wire rope clip)이 체결되지 않은 상태에서 갱폼의 체결 볼트를 풀어 지상으로 추락하는 사고가 발생하고 있다. 더욱이 타워크레인과 갱폼이 와이어로프로 연결되어 있어서 인양 시 갱폼의 자중에 의한 관성 및 바람의 영향으로 흔들림이 발생하여 노무자의 안전사고가 빈번하게 발생하고 있다.Another problem is that the gang form is lifted by a tower crane, so it is sensitive to the influence of the climate, and has a problem of slipping depending on the climate or the situation of the site during the lifting operation. In addition, there is an accident that the laborer loosens the fastening bolt of the gang form and falls to the ground without the tower crane and the gang form wire rope clip being fastened. Moreover, because the tower crane and the gang form are connected by wire rope, the shaking occurs due to the inertia and the wind due to the weight of the gang form during lifting, and safety accidents of laborers frequently occur.

위와 같은 문제점 해결을 위하여 갱폼 인양 자동화 시스템(Auto Climbing System;ACS)과 같은 다양한 연구 및 기술개발 노력이 수행되어 왔다 그러나 상기 ACS 폼(Form)의 상부 슬라이드를 위한 레일(H빔 플랜지)은 한쪽면만 슈(Shoe)에 구속되므로 각 레일의 한쪽 면에 ACS 폼의 전체 하중이 편중되는 현상이 발생하여 레일의 단면 및 두께가 두꺼워져 전체 시스템의 중량이 무거워지며, 슈(shoe)에 별도로 안전핀을 체결하여야 한다는 문제점도 있다.In order to solve the above problems, various research and technology development efforts have been performed, such as an gang form lifting system (ACS), but the rail for the upper slide of the ACS form (H beam flange) has only one side. Since it is constrained to the shoe, the entire load of the ACS foam is biased on one side of each rail, and the cross section and thickness of the rail become thicker, making the entire system heavy, and a separate safety pin is fastened to the shoe. There is also a problem that should be done.

또한, 현장에서 상승레일이 올리는 중에 부러지거나 파손되어 대형사고가 발생하는 경우에 별도의 안전장치가 없는 문제점이 있었다.In addition, there was a problem in that there is no separate safety device when a large accident occurs due to a break or damage while the lift rail is raised in the field.

대한민국 등록특허공보 제10-1819858호(2018년01월11일)Republic of Korea Registered Patent Publication No. 10-1819858 (January 11, 2018)

본 발명은 이러한 종래 문제점들을 해결하기 위한 것으로, 유압을 이용하여 가설작업대를 상부로 밀어 올리되, 레일 상부가 파손시에도 추락방지 안전장치가 작동되도록 형성하고, 밀어 올릴경우 편리하게 들어올릴 수 있는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치를 제공하는데 목적이 있다.The present invention is to solve these conventional problems, by using a hydraulic pressure to raise the temporary workbench to the top, the rail upper part is formed so that the fall prevention safety device works even when damaged, and can be conveniently lifted when pushed up The purpose is to provide a smart temporary work lifting device for preventing overload using data.

또한, 로드셀을 형성하여 수시로 발생되는 하중을 체크하여 과하중이 발생시에는 경보 사이렌을 울리거나 작동을 중지시키며, 또한 각각의 하중에 대한 데이터를 수집하고 현장 소장 또는 관리자 스마트폰을 실시간의 현장 사항을 확인할 수 있는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치를 제공하는데 목적이 있다.In addition, the load cell is formed to check the load generated from time to time, and when an overload occurs, an alarm siren is sounded or stopped, and data for each load is collected and the site manager or manager's smartphone monitors the site in real time. It is an object to provide a smart hypothesis work lifting device for preventing overload using data that can be confirmed.

또한, 다수의 각 현장에 설치되어 있는 가설작업대의 인양장치의 사용상태를 중앙 서버에 실시간으로 데이터를 저장 관리하도록 한 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치를 제공하는데 목적이 있다.In addition, an object of the present invention is to provide a smart temporary work lifting device for preventing overload using data that stores and manages the use state of the lifting device of the temporary work table installed in each site in a central server in real time.

본 발명이 해결하고자 하는 과제들은 이상에서 언급된 과제로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 통상의 기술자에게 명확하게 이해될 수 있을 것이다The problems to be solved by the present invention are not limited to the problems mentioned above, and other problems not mentioned will be clearly understood by those skilled in the art from the following description.

상기 목적을 달성하기 위해 본 발명에 따른 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치는, 건축구조물의 외벽을 따라 인양되는 상승레일; 상기 상승레일 하부에 레일 브라켓으로 연결되어, 그 하부에 곤도라를 지지하는 곤도라 지지대; 상기 곤도라의 정 위치 안착 및 낙하 방지를 위하여 암수 결합에 의해 상기 상승레일을 정 위치에 안착시키고, 상기 상승레일의 상승은 구속하지 않으면서 상기 상승레일의 하강을 구속하는 추락방지 힌지를 포함한다.In order to achieve the above object, a smart temporary work lifting device for preventing overload using data according to the present invention includes: a rising rail lifted along an outer wall of a building structure; A gondola support connected to the lower portion of the rising rail with a rail bracket to support the gondola on the lower portion thereof; To prevent seating and falling of the gondola in a fixed position, the rising rail is seated at a fixed position by male and female coupling, and a fall prevention hinge that restrains the falling of the rising rail without restraining the rising of the rising rail.

상기 상승레일에 결합되는 유압실린더와 연결되어 유압으로 세워지도록 구성되고, 상기 유압실린더에는 하중을 체크하는 로드셀이 구비되어 상기 상승레일의 파손 또는 과하중이 발생될 때 상기 상승레일의 작동을 중지시키거나 또는 상기 유압실린더의 작동을 중지시키도록 할 수 있다.It is connected to a hydraulic cylinder coupled to the rising rail and is configured to stand up hydraulically, and the hydraulic cylinder is provided with a load cell for checking the load to stop the rising rail from operating when the rising rail is damaged or overloaded. Alternatively, the hydraulic cylinder may be stopped.

또한, 상기 로드셀로부터 발생하는 각각의 하중에 대한 데이터를 무선통신을 이용하여 수집하는 현장 소장 또는 관리자 스마트폰을 구비하여 실시간의 현장 사항을 모니터링할 수 있다.In addition, a site manager or a manager smartphone for collecting data on each load generated from the load cell using wireless communication may be provided to monitor real-time site matters.

또한, 다수의 각 현장에 설치되어 있는 가설작업대의 인양장치의 사용상태를 상기 다수의 관리자 스마트폰을 통하여 수집한 후 다시 중앙 서버에 실시간으로 전송하여 데이터를 저장 관리할 수 있다.In addition, it is possible to collect and manage the state of use of the lifting device of the temporary work table installed in each of the plurality of sites through the plurality of manager smartphones, and transmit the data to the central server in real time to store and manage data.

본 발명의 기타 특징 및 더욱 구체적인 사항들은 상세한 설명 및 도면들에 포함되어 있다.Other features and more specific details of the invention are included in the detailed description and drawings.

상기와 같이 구성된 본 발명에 따른 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치에 의하면, 레일 상부가 파손시에도 추락방지 안전장치가 작동되도록 형성하여 안전사고를 막을 수 있고, 밀어 올릴경우 편리하게 들어올릴 수 있는 효과가 있다.According to the smart hypothesis work lifting device for preventing overload using data according to the present invention configured as described above, it is possible to prevent a safety accident by forming a fall prevention safety device to operate even when the rail upper part is damaged. There is an effect that can be raised.

또한, 로드셀을 형성하여 수시로 발생되는 하중을 체크하여 과하중이 발생시에는 경보 사이렌을 울리거나 작동을 중지시키며, 또한 각각의 하중에 대한 데이터를 수집하고 현장 소장 또는 관리자 스마트폰을 실시간의 현장 사항을 확인할 수 있는 효과도 있다.In addition, the load cell is formed to check the load generated from time to time, and when an overload occurs, an alarm siren is sounded or stopped, and data for each load is collected and the site manager or manager's smartphone monitors the site in real time. There is also an effect that can be confirmed.

또한, 다수의 각 현장에 설치되어 있는 가설작업대의 인양장치의 사용상태를 중앙 서버에 실시간으로 데이터를 저장 관리하도록 하는 효과도 있다.In addition, there is also an effect of storing and managing data in real time on a central server for the state of use of the lifting device of the temporary work table installed in each of a plurality of sites.

본 발명의 효과들은 이상에서 언급된 효과로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 아래의 기재로부터 통상의 기술자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the effects mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the following description.

도 1은 본 발명에 따른 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치의 일실시예를 나타낸 블록 구성도,
도 2는 도 1의 관리자 스마트폰 데이터 관리 시스템을 나타낸 블록 구성도,
도 3은 도 1의 다수의 현장에 대한 관리자 스마트폰 및 중앙 서버 데이터 관리 시스템을 나타낸 블록 구성도.
도 4-1과 도 4-2는 본 발명의 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치를 도시한 상태도.
도 5는 본 발명의 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치의 파손전과 파손후의 상태도.
도 6과 도 7은 본 발명의 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치의 단면도.
1 is a block diagram showing an embodiment of a smart temporary work lifting device for preventing overload using data according to the present invention;
FIG. 2 is a block diagram showing the manager smartphone data management system of FIG. 1;
FIG. 3 is a block diagram showing a manager smartphone and a central server data management system for a plurality of sites in FIG. 1.
4-1 and 4-2 are state diagrams showing a smart temporary work lifting device for preventing overload using the data of the present invention.
5 is a state diagram before and after the breakage of the smart temporary work lifting device for preventing overload using the data of the present invention.
6 and 7 are cross-sectional views of a smart temporary work lifting device for preventing overload using data of the present invention.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함하는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 각 도면을 설명하면서 유사한 참조부호를 유사한 구성요소에 대해 사용하였다. The present invention can be applied to various changes and may have various embodiments, and specific embodiments will be illustrated in the drawings and described in detail in the detailed description. However, this is not intended to limit the present invention to specific embodiments, and should be understood to include all modifications, equivalents, and substitutes included in the spirit and scope of the present invention. In describing each drawing, similar reference numerals are used for similar components.

제1, 제2 등의 용어는 다양한 구성요소들을 설명하는 데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리범위를 벗어나지 않으면서 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다. 및/또는 이라는 용어는 복수의 관련된 기재된 항목들의 조합 또는 복수의 관련된 기재된 항목들 중의 어느 항목을 포함한다.Terms such as first and second may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from other components. For example, without departing from the scope of the present invention, the first component may be referred to as the second component, and similarly, the second component may also be referred to as the first component. The term and / or includes a combination of a plurality of related described items or any one of a plurality of related described items.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.When an element is said to be "connected" or "connected" to another component, it is understood that other components may be directly connected to or connected to the other component, but other components may exist in the middle. It should be. On the other hand, when a component is said to be "directly connected" or "directly connected" to another component, it should be understood that no other component exists in the middle.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서 "포함하다" 또는 :가지다" 등의 용어는 명세서 상에 기재된 특징, 숫자, 단계, 이동, 구성요소, 부품 또는 이들을 조함한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 이동, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terms used in this application are only used to describe specific embodiments, and are not intended to limit the present invention. Singular expressions include plural expressions unless the context clearly indicates otherwise. In this application, the terms "include" or "have" are intended to indicate that a feature, number, step, move, component, part, or a combination thereof exists in the specification, or one or more other features or It should be understood that the existence or addition possibilities of numbers, steps, movements, components, parts or combinations thereof are not excluded in advance.

이하 첨부한 도면들을 참조하여, 본 발명의 바람직한 실시예를 보다 상세하게 설명하고자 한다. 이하 도면상의 동일한 구성요소에 대해서는 동일한 참조부호를 사용하고 동일한 구성요소에 대해서 중복된 설명은 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. Hereinafter, the same reference numerals are used for the same components in the drawings, and duplicate descriptions for the same components are omitted.

도 1은 본 발명에 따른 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치의 일실시예를 나타낸 블록 구성도이다.1 is a block diagram showing an embodiment of a smart temporary work lifting device for preventing overload using data according to the present invention.

도시된 바와 같이, 본 발명에 따른 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치는, 길이조절용 실린더(10), 턴버클 브라켓(11)(12), 상승레일(20), 레일 브라켓(21), 곤도라 지지대(22), 곤도라(30), 상부추락방지 및 힌지장치부(100), 하부추락방지 및 힌지장치부(200), 상승레일(20)은 하부추락방지 및 힌지장치부와 연결된 지지프레임(400)에 연결된 고정앵커부(300)에 고정하여 건축구조물(60)의 외벽을 따라 인양된다. 곤도라 지지대(22)는 상기 상승레일(20) 하부에 레일 브라켓(21)으로 연결되어, 그 하부에 곤도라(30)를 지지한다.As shown, the smart hypothesis work lifting device for preventing overload using data according to the present invention is a cylinder 10 for length adjustment, a turnbuckle bracket 11, 12, a rising rail 20, a rail bracket 21, The gondola support 22, the gondola 30, the upper fall prevention and hinge device part 100, the lower fall prevention and hinge device part 200, and the rising rail 20 are support frames connected to the lower fall prevention and hinge device part It is fixed to the fixed anchor portion 300 connected to the 400 and lifted along the outer wall of the building structure 60. The gondola support 22 is connected to the lower rail 20 by a rail bracket 21 to support the gondola 30 underneath.

상기 상승레일(20)과 곤도라 지지대(22)의 타측에는 길이조절용실린더(10)를 각각에 설치된 턴버클 브라켓(11)(12)에 의하여 결합된다.The lift rail 20 and the other side of the gondola support 22 are coupled by a turnbuckle bracket 11 and 12 installed on each of the cylinders for length adjustment 10.

또한, 상/하부인양및 추락방지장치부(100,200)는 상기 상승레일을 정(正) 위치 안착 및 낙하 방지를 위하여 암수 결합에 의해 상기 상승레일(20)을 정 위치에 안착시키고, 상기 상승레일(20)의 상승은 구속하지 않으면서 상기 상승레일(20)의 하강을 구속한다.In addition, the upper / lower lifting and fall prevention device portions 100 and 200 seat the rising rail 20 in the right position by male and female coupling to settle the rising rail in a positive position and prevent falling. The rise of the (20) is restrained from falling of the rising rail 20 without being restrained.

또한, 상기 상승레일(20)에 결합되는 유압실린더(50)와 연결되어 유압으로 세워지도록 구성되고, 상기 상부와 하부인양 및 추락방지장치부(100,200)내에는 하중을 체크하는 로드셀(90)이 구비된다.In addition, it is configured to be hydraulically connected to the hydraulic cylinder 50 coupled to the rising rail 20, and the upper and lower lifting and fall prevention device portions 100 and 200 have load cells 90 for checking loads. It is provided.

상기 로드셀(90)은 압력을 받으면 전기적인 신호를 발생시켜 제어부(미도시)로 제어신호를 보내는 일종의 센서로서 상기 로드셀(90)의 상부에는 연결핀의 중앙 하부에 근접되거나 또는 면접되는 버튼(미도시)이 구비될 수 있다. 따라서 상기 연결핀에 무리가 발생되어 휨변형이 발생될 경우 상기 버튼이 눌리면서 상기 로드셀(90)이 작동되고 제어부로 제어신호를 보내 상기 작동중인 승강기를 제동시킬 수 있다. 상기 로드셀의 전기신호를 검출한 데이터를 제어부로 송수신이 이루어지도록 형성 현장의 관리감독자와 통제실로 전송이 이루어져 적정한 하중이 작용되고 있는지 작동중에 과하중이 발생되는지를 체크와 제어가 이루어지도록 형성하였다.The load cell 90 is a type of sensor that generates an electrical signal when pressure is applied and sends a control signal to a control unit (not shown). The upper part of the load cell 90 is a button close to the center of the connection pin or interviewed (not shown) City) may be provided. Therefore, when a strain is generated due to an excessive force on the connecting pin, the load cell 90 is operated while the button is pressed, and a control signal is sent to a control unit to brake the operating elevator. The data detecting the electrical signal of the load cell is transmitted to the control unit so that it can be transmitted to the control supervisor and control room in the field, and it is formed to check and control whether an appropriate load is being applied or whether an overload occurs during operation.

따라서, 상기 상승레일(20)의 파손 또는 과하중이 발생될 때 상기 상승레일(20)의 작동을 중지시키거나 또는 상기 유압실린더(50)의 작동을 중지시키도록 할 수 있다. 이때, 비상라이트가 깜박이거나 음성으로 작업자 또는 감독관이 알 수 있도록 신호를 내도록 하였다.Accordingly, when damage or overload of the rising rail 20 occurs, the operation of the rising rail 20 may be stopped or the hydraulic cylinder 50 may be stopped. At this time, the emergency light was blinking or a signal was made so that the operator or supervisor could know by voice.

따라서, 본 발명은 상기한 구성에 의하여, 유압을 이용하여 가설작업대를 상부로 밀어 올리되, 레일 상부가 파손시에도 추락방지 안전장치가 작동되도록 형성하고, 밀어올릴 경우 편리하게 들어올릴 수 있으며, 로드셀(90)이 하중을 체크하여 상승레일(20)의 파손 또는 과하중이 발생이 될 때 상기 상승레일(20)의 작동을 중지시키거나 또는 상기 유압실린더(50)의 작동을 중지시키는 효과가 있다.Therefore, according to the above-described configuration, the temporary work platform is pushed upward by using hydraulic pressure, the fall prevention safety device is formed even when the rail upper part is damaged, and when it is pushed up, it can be conveniently lifted. When the load cell 90 checks the load and damage or overload of the rising rail 20 occurs, the effect of stopping the operation of the rising rail 20 or stopping the operation of the hydraulic cylinder 50 is have.

도 2는 도 1의 관리자 스마트폰 데이터 관리 시스템을 나타내는 블록 구성도이다.FIG. 2 is a block diagram illustrating the manager smartphone data management system of FIG. 1.

도시된 바와 같이, 본 발명에 따른 관리자 스마트폰 데이터 관리 시스템을 나타낸 블록 구성도는, 상기 로드셀(90)로부터 발생하는 각각의 하중에 대한 데이터를 무선통신을 이용하여 수집하는 현장 소장 또는 관리자 스마트폰(70)을 구비하여 실시간의 현장 사항을 모니터링할 수 있다.As shown, the block diagram showing the manager smartphone data management system according to the present invention is a site manager or manager smartphone that collects data on each load generated from the load cell 90 using wireless communication. It can be equipped with (70) to monitor the real-time matters.

따라서, 로드셀을 형성하여 수시로 발생되는 하중을 체크하여 과하중이 발생시에는 부져 또는 경보 사이렌을 울리거나 작동을 중지시키며, 또한 각각의 하중에 대한 데이터를 수집하고 현장 소장 또는 관리자 스마트폰을 실시간의 현장 사항을 확인할 수 있다.Therefore, it forms a load cell and checks the load generated from time to time to stop the buzzer or alarm siren or stop operation when an overload occurs, and also collects data about each load and collects the site manager or manager's smartphone in real time. You can check the matter.

도 3은 도 1의 다수의 현장에 대한 관리자 스마트폰 및 중앙 서버 데이터 관리 시스템을 나타낸 블록 구성도이다.FIG. 3 is a block diagram showing a manager smartphone and a central server data management system for a plurality of sites in FIG. 1.

도시된 바와 같이, 본 발명에 따른 다수의 현장에 대한 관리자 스마트폰 및 중앙 서버 데이터 관리 시스템은, 다수의 각 현장, 즉 제1구역에서 제4구역 까지에 설치되어 있는 각각의 가설작업대의 인양장치의 사용상태를 현장소장 또는 관리자스마트폰(70)을 통하여 수집한 후 다시 중앙 서버(80)에 실시간으로 전송하여 데이터를 저장 관리할 수 있다.As shown, the manager smart phone and the central server data management system for a plurality of sites according to the present invention, a lifting device for each of the temporary work stations installed in a number of each site, that is, from the first zone to the fourth zone After collecting the usage state of the site manager or manager through the smartphone 70, the data can be stored and managed by sending it back to the central server 80 in real time.

따라서, 다수의 각 현장에 설치되어 있는 가설작업대의 인양장치의 사용상태를 중앙 서버에 실시간으로 데이터를 저장 관리할 수 있다.Accordingly, the state of use of the lifting device of the temporary work table installed in each of a plurality of sites can be stored and managed in real time on a central server.

본 발명의 도 4 내지 도 7에 도시된 바와 같이, 상승레일(20), 레일 브라켓(21), 곤도라 지지대(22), 곤도라(30), 상부추락방지 및 힌지장치부(100), 하부추락방지 및 힌지장치부(200), 상승레일(20)은 지지프레임(400)에 체결된 고정앵커부(300)에 고정하여 하부추락방지 및 힌지장치부(200)을 고정하고 상부추락방지 및 힌지장치부(200)를 유압실린더(40)를 상부로 밀어올려서 건축구조물(60)의 외벽을 따라 인양된다. 곤도라 지지대(22)는 상기 상승레일(20) 하부에 레일 브라켓(21)으로 연결되어, 그 하부에 곤도라(30)를 지지하고 상승레일과 같이 상승한다.4 to 7 of the present invention, the rising rail 20, rail bracket 21, gondola support 22, gondola 30, the upper fall prevention and hinge device 100, the lower fall Prevention and hinge device 200, the rising rail 20 is fixed to the fixed anchor portion 300 fastened to the support frame 400 to prevent the lower fall and the hinge device portion 200 and prevent the upper fall and hinge The device 200 is lifted along the outer wall of the building structure 60 by pushing the hydraulic cylinder 40 upward. The gondola support 22 is connected to the lower rail 20 by a rail bracket 21, supports the gondola 30 at the lower portion and rises like a rising rail.

상기 상/하부인양 및 추락방지장치부(100,200)의 구성은 외부 프레임을 포함하는 본체(170)와, 상기 본체 내에 상부걸이(71)와 하부걸이(72)가 형성된 좌/우측힌지 부라켓(73,74)과, 상기 좌/우측힌지 부라켓(73,74)의 축에는 로드셀(90)이 삽입되어 형성되어 있으며, 본체의 전방에는 상승레일(20)을 고정하도록 전방에 가이드롤러(75)가 형성된 좌/우측체결부라켓(80,81)과, 상기 좌/우측힌지 부라켓(73,74)의 하부에는 각각 안착홈(73-1,74-1)이 형성된 받침대(76)로 이루어지도록 형성하였다.The upper / lower lifting and fall prevention device parts 100 and 200 include a main body 170 including an outer frame, and a left / right hinged bracket having an upper hook 71 and a lower hook 72 formed in the main body ( 73,74), and the load cell 90 is inserted into the shafts of the left / right hinged brackets 73,74, and guide rollers 75 in the front to fix the rising rail 20 in the front of the body ) Formed on the left and right fastening part rackets (80,81), and the lower left and right hinge brackets (73,74), respectively, the seating grooves (73-1,74-1) are formed on the base (76). It was formed to be made.

상기 좌/우측힌지 부라켓(73,74)는 상부걸이(71)와 하부걸이(72)로 형성되어 상승레일(20)의 홈(21)에 걸어서 상부로 들어 올려지도록 형성되며, 상기 좌우힌지 부라켓의 하부걸이(72)는 상부걸이(71)보다 돌출이 더 길게 형성되어, 들어올릴 경우에는 쉽게 걸려지도록 형성하고, 상기 상부걸이(71)는 미끌림을 방지하는 방지돌기를 다수개 형성되어 밀착되어 상승레일의 홈(21)에 쉽게 걸리도록 형성한 특징이 있다. The left / right hinge brackets 73 and 74 are formed of an upper hanger 71 and a lower hanger 72, and are formed to be lifted upward by walking on the groove 21 of the rising rail 20, and the left and right hinges. The lower hanger 72 of the bracket is formed to have a longer protrusion than the upper hanger 71, so that it is easily caught when lifted, and the upper hanger 71 is formed with a plurality of preventive protrusions to prevent slipping. There is a feature that is formed to be in close contact and easily caught in the groove 21 of the rising rail.

도 6과 도 7에 도시한 바와 같이 상기 상승레일을 이동중 또는 작업대에서 작업중에 좌/우측힌지 부라켓(73,74)가 파손시에 하부걸이(72)가 파손시에는 상부걸이(71)가 반시계 회전방향으로 회전하면서 상승레일의 홈(21)에 걸려지도록 하여 상승레일이 추락하는 것을 방지하도록 형성한 특징이 있다.6 and 7, when the left / right hinged brackets 73 and 74 are damaged while the rising rail is being moved or while working on a work table, the upper hook 71 is damaged. It has a feature to prevent the rising rail from falling by being caught in the groove 21 of the rising rail while rotating in the counterclockwise direction.

상기 본체(170)의 전방에는 상승레일(20)을 고정하도록 전방에 가이드롤러(75)가 각각 2개씩 형성된 좌/우측체결부라켓(80,81)을 형성하고, 상부에는 체결시 회전이 가능하도록 형성하고, 체결후에 빠지는 것을 방지하도록 레일가이드핀(82)을 형성하여 끼워 고정하도록 하였다. In the front of the main body 170, to form the left / right fastening part racks 80 and 81, each of which two guide rollers 75 are formed in the front to fix the rising rail 20, and the upper part can be rotated when fastened. The rail guide pin 82 was formed so as to prevent it from falling off after being fastened, and then fitted and fixed.

상기 도시한 바와 같이 상/하부인양 및 추락방지장치부(100,200)는As shown above, the upper / lower lift and fall prevention device parts 100 and 200 are

상부인양 및 추락방지장치부(100)는 상부에 형성하고, 하부인양 및 추락방지장치부(100,200)는 건축물에 설치시 클라이밍 앵커부(300)를 이용하여 결합되는 지지프레임(400)과 같이 결합하여 고정하였다.The upper lifting and falling prevention device 100 is formed on the upper part, and the lower lifting and falling prevention device parts 100 and 200 are combined with the supporting frame 400 which is coupled using the climbing anchor part 300 when installed in a building. Was fixed.

상기 상/하부인양 및 추락방지장치부(100,200)의 본체와 본체의 사이에는 유압실린더(50)를 형성하고, 상기 유압실리더(50)를 고정하는 고정부라켓(41,42)을 형성하였다.A hydraulic cylinder 50 is formed between the main body and the main body of the upper / lower lifting and fall prevention device parts 100 and 200, and fixed part racks 41 and 42 for fixing the hydraulic cylinder 50 are formed. .

상기 유압실린더(50)를 상부로 밀어올리면 하부걸이(72)에 상승레일의 홈(21)이 끼워져 상승하게 되고, 상승 후에 다시 올리기 위해 유압실린더(50)를 하부로 당기면 좌/우측힌지부라켓(73,74)이 시계방향으로 회전하면서 홈(21)에서 빠지면서 상부인양 및 추랑방지장치부(200)가 하부로 내려오게 되면 다시 유압실린더를 상승시키면 상부인양 및 추락방지장치부(200)는 상승하고, 하부인양 및 추락방지장치부(200)는 고정된 상태에서 좌/우측힌지부라켓(73,74)이 시계방향으로 회전하면서 홈(21)에서 빠지면서 상승레일이 상부로 이동하도록 형성하였다. When the hydraulic cylinder 50 is pushed upward, the groove 21 of the rising rail is fitted into the lower hanger 72 to rise, and when the hydraulic cylinder 50 is pulled downward to raise it again after rising, the left / right hinged racket When (73,74) is rotated clockwise and falls out of the groove (21), and the upper lifting and falling prevention device (200) descends to the lower side, when the hydraulic cylinder is raised again, the upper lifting and falling prevention device (200) The rising and lower lifting and fall prevention device 200 is formed so that the rising rail moves upward while the left / right hinge part rackets 73 and 74 rotate in the clockwise direction and fall out of the groove 21. .

본 명세서에 기재된 본 발명의 실시예와 도면에 도시된 구성은 본 발명의 바람직한 실시예에 관한 것으로, 발명의 기술적 사상을 모두 포괄하는 것은 아니므로, 출원시점에 있어서 이들을 대체할 수 있는 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다. 따라서, 본 발명은 상술한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 본 발명의 청구범위 기재의 권리범위 내에 있게 된다.The embodiments illustrated in the present specification and the configuration illustrated in the drawings are related to preferred embodiments of the present invention, and do not cover all technical spirits of the present invention, and thus various equivalents can be substituted at the time of filing. It should be understood that there may be and variations. Accordingly, the present invention is not limited to the above-described embodiments, and various modifications can be made to any person skilled in the art to which the present invention pertains without departing from the gist of the present invention as claimed in the claims. And such changes are within the scope of the claims of the present invention.

10 : 길이조절용실린더 11, 12 : 턴버클 브라켓
20 : 상승레일 21 : 레일 브라켓
22 : 곤도라 지지대 30 : 곤도라
40, 41 : 인양 및 추락방지 힌지 50 : 유압실린더 60 : 건축구조물 70 : 관리자 스마트폰
90 : 로드셀 100:상부추락방지 및 힌지장치부
200: 하부추락방지 및 힌지장치부
10: length adjustment cylinder 11, 12: turnbuckle bracket
20: rising rail 21: rail bracket
22: gondola support 30: gondola
40, 41: lifting and fall prevention hinge 50: hydraulic cylinder 60: building structure 70: manager smartphone
90: load cell 100: upper fall prevention and hinge device
200: lower fall prevention and hinge device

Claims (4)

건축구조물(60)의 외벽을 따라 인양되는 상승레일(20);
상기 상승레일(20)의 상승은 구속하지 않으면서 상기 상승레일(20)의 하강을 구속하도록 상부걸이(71)와 하부걸이(72)가 형성된 좌/우측힌지 부라켓(73,74)이 형성된 상/하부인양 및 추락방지 장치부(100,200);
상기 상승레일(20)에 결합되는 유압실린더(50)와 연결되어 유압으로 세워지도록 구성되고, 상기 좌/우측힌지 부라켓(73,74)의 축에 하중을 체크하는 로드셀(90)이 구비되어 상기 상승레일(20)의 파손 또는 과하중이 발생될 때 상기 상승레일(20)의 작동을 중지시키거나 또는 상기 유압실린더(50)의 작동을 중지시키도록 하고,
상기 로드셀(90)로부터 발생하는 각각의 하중에 대한 데이터를 무선통신을 이용하여 수집하는 현장 소장 또는 관리자 스마트폰(70)을 구비하여 실시간의 현장 사항을 모니터링하는 것을 특징으로 하는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치.
A rising rail 20 lifted along the outer wall of the building structure 60;
The left / right hinge brackets 73 and 74 are formed in which the upper hook 71 and the lower hook 72 are formed to restrain the descending of the rising rail 20 without restraining the rising of the rising rail 20. Upper / lower lifting and fall prevention device units 100 and 200;
It is configured to be hydraulically connected to the hydraulic cylinder 50 coupled to the rising rail 20, and is equipped with a load cell 90 for checking the load on the shaft of the left / right hinged brackets 73,74. When the damage or overload of the rising rail 20 occurs, stop the operation of the rising rail 20 or stop the operation of the hydraulic cylinder 50,
Overload using data characterized by having a field manager or a manager smartphone (70) collecting data on each load generated from the load cell (90) using wireless communication and monitoring real-time site matters. Smart construction work lifting device for prevention.
제 1항에 있어서, 상기 상/하부인양 및 추락방지장치부(100,200)는
본체(170)와, 상기 본체 내에 상부걸이(71)와 하부걸이(72)가 형성된 좌/우측힌지 부라켓(73,74)과, 상기 좌/우측힌지 부라켓(73,74)의 축에는 로드셀(90)이 삽입되어 형성되어 있으며, 본체의 전방에는 상승레일을 고정하도록 전방에 가이드롤러(75)가 형성된 좌/우측체결부라켓(80,81)과, 상기 좌/우측힌지 부라켓(73,74)의 하부에는 각각 안착홈(73-1,74-1)이 형성된 받침대(76)로 이루어지도록 형성하고, 상기 좌/우측힌지 부라켓(73,74)는 상부걸이(71)와 하부걸이(72)로 형성되어 상승레일(20)의 홈(21)에 걸어서 상부로 들어 올려지도록 형성되며, 상기 좌우힌지 부라켓(73,74)의 하부걸이(72)는 상부걸이(71)보다 돌출이 더 길게 형성되어 들어올릴 경우에는 쉽게 걸려지도록 형성하고, 상부걸이(71)는 미끌림을 방지하는 방지돌기를 다수개 형성되어 밀착되어 상승레일의 홈(20)에 쉽게 걸리도록 형성한 것을 특징으로 하는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치.
According to claim 1, wherein the upper / lower lifting and fall prevention device unit (100,200)
The main body 170, the left and right hinged brackets 73 and 74, in which the upper hook 71 and the lower hook 72 are formed in the main body, and the shafts of the left and right hinged brackets 73 and 74, The load cell 90 is inserted and formed, and the left / right fastening part rackets 80 and 81 with guide rollers 75 formed in front of the main body so as to fix the rising rail, and the left and right hinge brackets ( 73, 74) is formed to be made of a base 76 having seating grooves 73-1, 74-1, respectively, and the left / right hinged brackets 73,74 are provided with an upper hook 71. The lower hanger 72 of the left and right hinge brackets 73 and 74 is formed of a lower hanger 72 and is formed to be lifted upward by walking to the groove 21 of the rising rail 20, and the upper hanger 71 When the protrusion is formed longer and is lifted, it is formed to be easily hung, and the upper hook 71 is formed in close contact with a plurality of preventing protrusions to prevent slipping, so that the groove of the rising rail (2) Smart hypothesis work lifting device for preventing overload using data, characterized in that it is formed to easily hang on 0).
제 1항에 있어서, 상기 좌/우측힌지 부라켓은
상승 작업중에 좌/우측힌지 부라켓(73,74)의 하부걸이(72)가 파손시에는 상부걸이(71)가 반시계 회전방향으로 회전하면서 상승레일의 홈(21)에 걸려지도록 하여 상승레일이 추락하는 것을 방지하도록 형성한 것을 특징으로 하는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치.
According to claim 1, The left / right hinge bracket
When the lower hanger 72 of the left / right hinge brackets 73 and 74 is damaged during the ascending operation, the upper hanger 71 rotates in the counterclockwise rotation direction so as to be caught in the groove 21 of the ascending rail so that the rising rail Smart hypothesis work lifting device for preventing overload using data, characterized in that it is formed to prevent the fall.
제 1항에 있어서, 상기 로드셀에 설정된 하중이 발생시에는
각 현장에 설치되어 있는 가설작업대의 인양장치의 비상상태시 부져 또는 경보사이렌이 작동되고, 현재의 사용상태를 현장소장 또는 관리자 스마트폰(70)을 통하여 수집한 후 다시 중앙 서버(80)에 실시간으로 전송하여 데이터를 저장 관리하는 것을 특징으로 하는 데이터를 이용한 과하중 방지용 스마트가설작업 인양장치.
According to claim 1, When the load set in the load cell occurs
In the emergency state of the lifting device installed at each site, the buzzer or alarm siren is activated, and the current usage state is collected through the site manager or the manager's smartphone 70, and then real-time back to the central server 80. Smart hypothesis work lifting device for preventing overload using data, characterized in that the data is stored and managed by transmission to the device.
KR1020190073512A 2019-06-20 2019-06-20 Apparatus for smart installation work for overload prevention using data KR102107753B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190073512A KR102107753B1 (en) 2019-06-20 2019-06-20 Apparatus for smart installation work for overload prevention using data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190073512A KR102107753B1 (en) 2019-06-20 2019-06-20 Apparatus for smart installation work for overload prevention using data

Publications (1)

Publication Number Publication Date
KR102107753B1 true KR102107753B1 (en) 2020-05-07

Family

ID=70733136

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190073512A KR102107753B1 (en) 2019-06-20 2019-06-20 Apparatus for smart installation work for overload prevention using data

Country Status (1)

Country Link
KR (1) KR102107753B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102219814B1 (en) * 2020-07-27 2021-02-24 김대웅 Smart Gondola Device
WO2022136539A1 (en) * 2020-12-23 2022-06-30 Peri Se Climbing shoe device for a rail-guided climbing system
KR20220120306A (en) * 2021-02-23 2022-08-30 주식회사 선진알씨에스 Safety climbing gangform system using IOT convergence technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070059494A (en) * 2005-12-06 2007-06-12 주식회사 근하기공 Raising construction method of sliding foam
KR20110103210A (en) * 2010-03-12 2011-09-20 삼성중공업 주식회사 Elevating work platform for drillship
KR20160115605A (en) * 2015-03-27 2016-10-06 주식회사 경성기업 Overload prevention apparatus for gondola and control method thereof
KR101690273B1 (en) * 2016-10-07 2016-12-28 주식회사 선진곤도라 Lifting apparatus for height work
KR101819858B1 (en) 2017-05-10 2018-01-18 이명래 Climbing system for improved type of climbing system for quick and stable movement of climbing system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070059494A (en) * 2005-12-06 2007-06-12 주식회사 근하기공 Raising construction method of sliding foam
KR20110103210A (en) * 2010-03-12 2011-09-20 삼성중공업 주식회사 Elevating work platform for drillship
KR20160115605A (en) * 2015-03-27 2016-10-06 주식회사 경성기업 Overload prevention apparatus for gondola and control method thereof
KR101690273B1 (en) * 2016-10-07 2016-12-28 주식회사 선진곤도라 Lifting apparatus for height work
KR101819858B1 (en) 2017-05-10 2018-01-18 이명래 Climbing system for improved type of climbing system for quick and stable movement of climbing system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102219814B1 (en) * 2020-07-27 2021-02-24 김대웅 Smart Gondola Device
WO2022136539A1 (en) * 2020-12-23 2022-06-30 Peri Se Climbing shoe device for a rail-guided climbing system
KR20220120306A (en) * 2021-02-23 2022-08-30 주식회사 선진알씨에스 Safety climbing gangform system using IOT convergence technology
KR102530076B1 (en) * 2021-02-23 2023-05-09 주식회사 선진알씨에스 Safety climbing gangform system using IOT convergence technology

Similar Documents

Publication Publication Date Title
KR102107753B1 (en) Apparatus for smart installation work for overload prevention using data
US5927440A (en) Mobile hoist system and method
JP2013019195A (en) Brake equipment for scaffold lift
KR102045221B1 (en) Telescoping case and lifting method of tower crane using the same
KR20130105536A (en) Motorized height access device for tower cranes
CA2838259A1 (en) Scaffold system
CN104555646A (en) Rotating fall protector of lifting unit
KR102036152B1 (en) Climbing apparatus
JP2017077967A (en) Large vessel and super-large elevator for marine plant construction
CN111021705A (en) Hanging basket applied to curved surface and construction method thereof
CN108560896A (en) Working at height anti-falling safe hanging basket
JP4397431B1 (en) Scaffolding lift
KR102063608B1 (en) A Crane Having Telescoping Device
CN211974271U (en) Hanging basket applied to curved surface
CN218446466U (en) Chimney attached type climbing frame safety lifting construction monitoring mechanism
JP4844410B2 (en) Hook detection device for elevator ropes
EP3759040A1 (en) Lift installation, guide rails for said lift, kit for monitoring said installation and methods for monitoring and use thereof
CN206126577U (en) A safe lift for housing construction construction
KR102166616B1 (en) Elevator management system
CN113802862A (en) Novel platform of unloading with overload alarming function
KR101849937B1 (en) Supporting device for ascender
JP2001163542A (en) Lift for scaffold for riding cargo and worker
CN208792726U (en) A kind of high altitude operation anti-falling safe hanging basket
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
CN207684685U (en) Device for preventing elevator from falling and elevator

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant