KR101976724B1 - Method for installing elevator guide rails without a machine room - Google Patents

Method for installing elevator guide rails without a machine room Download PDF

Info

Publication number
KR101976724B1
KR101976724B1 KR1020170095574A KR20170095574A KR101976724B1 KR 101976724 B1 KR101976724 B1 KR 101976724B1 KR 1020170095574 A KR1020170095574 A KR 1020170095574A KR 20170095574 A KR20170095574 A KR 20170095574A KR 101976724 B1 KR101976724 B1 KR 101976724B1
Authority
KR
South Korea
Prior art keywords
rail
guide rail
guide rails
hoistway
plate
Prior art date
Application number
KR1020170095574A
Other languages
Korean (ko)
Other versions
KR20190012506A (en
Inventor
최성균
황회운
Original Assignee
최성균
황회운
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최성균, 황회운 filed Critical 최성균
Priority to KR1020170095574A priority Critical patent/KR101976724B1/en
Publication of KR20190012506A publication Critical patent/KR20190012506A/en
Application granted granted Critical
Publication of KR101976724B1 publication Critical patent/KR101976724B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/002Mining-hoist operation installing or exchanging guide rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

본 발명은 기계실이 없는 엘리베이터 레일 설치장치에 관한 것이다.
본 발명은 엘리베이터 승강로에 설치되어 케이지를 승 하강 안내하는 가이드레일을 권양기로 들어올려 상기 승강로의 최상부에 이르는 위치까지 설치하되, 권양기로 가이드레일을 소정의 높이로 끌어 올려가면서 차례로 결합하여 가이드레일 전체를 끌어올려 승강로 최상부에 설치함으로써, 가이드레일의 설치작업을 간편 용이하게 할 수 있어 가이드레일의 설치작업 시간을 크게 줄일 수 있으며, 아울러 설치하고자 하는 가이드레일의 크기나 무게에 제한을 받지 않고 가이드레일을 결합하여 끌어올릴 수 있는 플레이트를 구비함으로써, 설치하고자 하는 가이드레일에 따라 그에 해당하는 플레이트를 따로 구비하지 않아도 설치할 수 있어 설치 비용 및 작업 공수를 크게 줄일 수 있는 효과를 제공하게 되는 것이다.
The present invention relates to an elevator rail installation apparatus without a machine room.
The guide rails are installed on the elevator hoistway so as to lift up the guide rails for lifting up and down the cage up to a position reaching the uppermost part of the hoistway. The guide rails are lifted up to a predetermined height by the hoist, The installation work of the guide rails can be simplified easily and the installation work time of the guide rails can be greatly reduced. Further, the guide rails can be installed without any limitation on the size and weight of the guide rails to be installed, It is possible to install the plate without providing a corresponding plate according to the guide rail to be installed, thereby providing an effect of greatly reducing the installation cost and the number of workings.

Description

엘리베이터 승강로 가이드 레일의 설치방법{METHOD FOR INSTALLING ELEVATOR GUIDE RAILS WITHOUT A MACHINE ROOM }TECHNICAL FIELD [0001] The present invention relates to elevator elevator guide rails,

본 발명은 기계실이 없는 엘리베이터 승강로에서 엘리베이터 가이드 레일을 설치하는 방법에 관한 것으로, 상세하게는 엘리베이터의 케이지를 승 하강 안내하는 가이드레일을 승강로에 간편 용이하게 설치함은 물론, 설치되는 가이드레일의 무게에 제한을 받지 않고 설치할 수 있도록 하여 설치작업 시간 단축과 함께 비용을 크게 줄일 수 있도록 한 기계실이 없는 엘리베이터 레일 설치방법에 관한 것이다.The present invention relates to a method of installing an elevator guide rail in an elevator hoistway without a machine room, more specifically, to a method of easily installing a guide rail for raising and lowering a cage of an elevator in a hoistway, So that the installation work time can be shortened and the cost can be greatly reduced.

통상적으로 고층의 건물에는 엘리베이터를 설치하게 되는데, 이때 엘리베이터는 고층 건물의 높이방향으로 승, 하강할 수 있도록 승강로를 구축하여 설치하게 되는데, 상기 승강로에 설치되는 엘리베이터는 승강로 상부에 설치되는 구동기, 상기 구동기와 연결된 와이어로프를 권취드럼에 권회시켜 풀어주고 감아주면서 균형추로 무게균형을 유지해 가면서 승 하강시키는 케이지로 구비하게 된다.Generally, an elevator is installed in a high-rise building. At this time, the elevator is constructed by installing a hoistway so that it can rise and fall in the height direction of the high-rise building. The elevator installed in the hoistway includes a driver installed on the hoistway, A wire rope connected to a driving machine is wound around a winding drum to unwind and roll it, and a cage for lifting and lowering the weight rope while maintaining balance in a balance weight.

이때 상기 케이지는 승강로 측벽에 수직으로 설치되는 가이드레일에 설치되어 상기 가이드레일을 따라 승강로를 승 하강하게 되며, 상기 케이지가 승 하강하게 되는 가이드레일은 승강로의 최하부 저면으로부터 최상부의 고정 지점까지 다수개의 단위 가이드레일을 수직으로 세워서 브라켓을 이용하여 연결 고정하고, 상기 브라켓으로 연결 고정되는 다수의 단위 가이드레일은 다수개의 앵커볼트로 승강로의 측벽에 일일이 고정시켜 가면서 수직으로 길게 설치하게 된다.The guide rail is installed on a guide rail vertically installed on the side wall of the hoistway and moves up and down the hoistway along the guide rails. The guide rails of the hoistway are moved up and down from a lowermost bottom of the hoistway to a top The unit guide rails are vertically erected and fixed by using brackets. A plurality of unit guide rails connected and fixed by the brackets are vertically installed while being fixed to the side walls of the hoistway with a plurality of anchor bolts.

이와 같이 건물에 마련된 승강로에 케이지를 승,하강 안내하기 위하여 설치되는 가이드레일은 대한민국 등록특허 제10-1498950호(엘리베이터의 레일 설치용 카구조)와 같이 승강로에 임시 카를 설치하고, 상기 임시 카에 작업자가 승선한 상태에서 승강로의 최하부 저면으로부터 가이드레일을 세워 놓은 상태에서 다른 하나의 가이드레일을 별도의 권양기(winch)로 끌어올려 피쉬플레이트를 이용하여 서로 결합하고, 이어서 다시 임시 카를 가이드레일이 결합될 위치로 올려놓고, 또 다른 하나의 가이드레일을 권양기로 끌어올려 다른 하나의 가이드레일에 피쉬플레이트를 이용하여 서로 결합하는 것으로 가이드레일을 승강로의 최상부의 고정 지점까지 세워 설치하거나, 또는 승강로에 상기 가이드레일과 가이드레일이 피쉬플레이트로 결합되는 지점에 비계(scaffold)를 설치하여 상부로 끌어 올려지는 다수의 가이드레일을 결합하는 것으로 설치하게 되었다.As described above, the guide rail installed for guiding the cage up and down to the hoistway provided in the building is provided with a temporary car in the hoistway as in Korean Patent No. 10-1498950 (rail-mounted car structure for an elevator) The other guide rail is pulled up to a separate winch and joined to each other using a fish plate, and then the temporary car is joined to the guide rail again The guide rails are lifted up to the uppermost position of the hoistway by engaging the other guide rails with the other guide rails using the fish plates, At the point where the rails and guide rails are joined to the fish plate, And a plurality of guide rails which are raised to the upper side are assembled by installing a scaffold.

이와 같이 상기 임시 카를 이용하거나, 비계를 설치하여 다수의 가이드레일을 설치하게 되는 경우에는 상기 임시 카 또는 비계의 설치 및 해체에 따른 작업시간이 많이 소요될 뿐만 아니라, 다수의 가이드레일을 상기 임시 카 또는 비계 설치후 별도로 권양기를 이용하여 하나하나 들어올려 결합 설치하여야 하므로 설치 작업 공수가 많아지는 문제점을 가지게 되었다.When the temporary car is used or a plurality of guide rails are installed by installing a scaffold, it takes a long time to install and disassemble the temporary car or scaffold, Since scaffolds must be lifted up one by one using a winch separately after installing scaffolding, it has become a problem that the number of installation work increases.

뿐만아니라 종래에는 상기 임시 카의 설치를 위해 불필요한 자재들이 사용하게 되고, 더욱이 비계는 상기 다수의 가이드레일이 결합되는 위치 마다에 설치하여야 하므로 상기 임시 카를 설치하였을 때 비하여 많은 량의 자재들이 사용됨에 따라, 설치 작업시간이 길어지게 되어 상기 가이드레일의 설치 작업이 전체적으로 길어져 작업 능률 저하는 물론 비경제적인 문제점을 가지게 되었다.In addition, since unnecessary materials are used for installation of the temporary car in the past, and the scaffold is installed every position where the plurality of guide rails are coupled, a large amount of materials are used as compared with the case where the temporary car is installed , The installation work time is lengthened, so that the installation work of the guide rails becomes longer overall, resulting in a problem of not only a reduction in work efficiency but also an uneconomical problem.

또한, 상기 임시 카 또는 비계 설치의 경우, 작업자의 안전을 위해 방호천장 설치 및 작업자의 낙상을 방지하기 위하여 안전선 및 안전고리를 메고 걸어준 상태에서 설치작업을 하게 되므로, 작업하는데 부자연스러워 오히려 작업자의 안전성을 충분히 확보하지 못하는 문제점을 가지게 되었다.In addition, in the case of installing the temporary car or scaffold, it is unnatural to work because it installs in a state of hanging a safety line and a safety ring in order to install a protection ceiling and prevent a worker from falling down for the safety of an operator. So that the safety can not be sufficiently secured.

상기 문제점을 해결하기 위한 본 발명의 과제는 엘리베이터의 케이지를 승하강 안내하는 가이드레일을 승강로에 간편 용이하게 설치하여 가이드레일의 설치작업 시간을 줄이고자 하는데 있다.In order to solve the above problems, it is an object of the present invention to provide a guide rail for easily raising and lowering a cage of an elevator in a hoistway so as to reduce installation work time of a guide rail.

상기 본 발명의 다른 과제는 승강로에 설치되는 가이드레일의 크기 및 무게에 관계없이 이송하여 설치할 수 있도록 함으로써, 설치에 필요한 부품의 수를 줄여 설치작업 비용을 줄이고자 하는데 있다. Another object of the present invention is to reduce the number of parts required for installation by reducing the installation work cost by allowing the guide rails to be installed and transported irrespective of the size and weight of the guide rails installed in the hoistway.

상기 과제를 해결하고자 하는 본 발명의 해결수단은 기계실이 없는 엘리베이터 승강로의 최상부에 시설되는 빔에 현수되도록 설치되는 레일고정수단과, 상기 빔에 현수되는 도르래와 상기 도르래에 설치되는 로프를 권취하는 모터로 이루어지는 권양기를 이용하여 복수개의 가이드 레일들을 수직으로 연결하여 설치하는 기계실이 없는 엘리베이터 승강로 가이드 레일의 설치방법에 있어서: 상부에 상기 권양기의 로프가 결합되는 제1 결합공과 상기 레일고정수단이 결합되는 제2결합공, 및 하부에 상기 가이드레일이 결합되는 적어도 한쌍 이상의 레일결합공이 형성된 플레이트를 준비하는 플레이트 준비단계; 상기 승강로의 최하부에서 첫번째 가이드 레일의 상단을 상기 플레이트의 상기 레일결합공에 설치되는 결합수단으로 결합시킨 후 상기 권양기의 로프를 권취시켜 상기 첫번째 가이드 레일을 가이드 레일의 높이 만큼 상승시키고, 두번째 가이드 레일의 상부와 상기 첫번째 가이드 레일의 하부를 고정브라켓으로 연결한 후 상기 권양기의 로프를 권취시켜 상기 두번째 가이드 레일을 다시 가이드 레일의 높이 만큼 상승시킨 후 고정브라켓으로 상기 두번째 가이드 레일의 하부와 세번째 가이드 레일의 상부를 연결시키는 방법으로 복수개의 가이드 레일들을 순차적으로 수직으로 배열시키는 가이드 레일 수직배열단계; 상기 가이드 레일 수직배열단계의 종료 후에 첫번째 가이드 레일의 상부에 설치된 플레이트의 제2결합공에 상기 레일고정수단을 설치한 후 상기 권양기의 로프를 상기 플레이트로부터 분리시키는 레일고정수단의 고정단계를 포함하는 것이다.
또한 본 발명에 있어서 상기 레일고정수단은 일단에 후크가 구비되는 체인과, 타단에 턴버클이 설치되어 길이가 조절가능하도록 형성되고, 체인의 후크를 상기 빔을 타고 넘도록 한 후에 상기 후크를 상기 체인에 다시 걸어줌으로써 상기 빔에 상기 레일고정수단을 현수하는 것이 바람직하다.
In order to solve the above-mentioned problems, the present invention provides a railway vehicle comprising a rail fixing means installed to be suspended in a beam provided at an uppermost portion of an elevator hoistway without a machine room, a motor for winding up a pulley suspended on the beam, The elevator hoistway guide rail includes a plurality of guide rails vertically connected to each other by a hoist machine. The elevator hoistway guide rails are coupled to a hoistway, Preparing a plate having a second coupling hole and at least one pair of rail coupling holes to which the guide rail is coupled at a lower portion thereof; The upper end of the first guide rail is coupled with the coupling means provided on the rail coupling hole of the plate at the lowermost portion of the hoistway, the rope of the winch is wound to raise the first guide rail by the height of the guide rail, And the lower part of the first guide rail is connected to the lower part of the second guide rail by a fixing bracket, the rope of the hoist is wound up to raise the height of the second guide rail by the height of the guide rail again, A step of vertically arranging a plurality of guide rails in a vertical direction; And fixing the rail fastening means for separating the rope of the winch from the plate after the rail fastening means is installed on the second engagement hole of the plate provided on the top of the first guide rail after the end of the step of vertically arranging the guide rails will be.
Further, in the present invention, the rail fixing means may include a chain having hooks at one end thereof and a turnbuckle at the other end thereof so that the length thereof is adjustable, and after the hook of the chain is over the beam, It is preferable to suspend the rail fixing means to the beam by hanging it again.

삭제delete

삭제delete

삭제delete

상기 과제 해결수단에 따른 본 발명의 효과는 엘리베이터 승강로에 설치되어 케이지를 승 하강 안내하는 가이드레일을 권양기로 들어올려 상기 승강로의 최상부에 이르는 위치까지 설치하되, 권양기로 가이드레일을 소정의 높이로 끌어 올려가면서 차례로 결합하여 가이드레일 전체를 끌어올려 승강로 최상부에 설치함으로써, 가이드레일의 설치작업을 간편 용이하게 할 수 있어 가이드레일의 설치작업 시간을 크게 줄일 수 있으며, 아울러 설치하고자 하는 가이드레일의 크기나 무게에 제한을 받지 않고 가이드레일을 결합하여 끌어올릴 수 있는 플레이트를 구비함으로써, 설치하고자 하는 가이드레일에 따라 그에 해당하는 플레이트를 따로 구비하지 않아도 설치할 수 있어 설치 비용 및 작업 공수를 크게 줄일 수 있는 효과를 제공하게 되는 것이다. According to an aspect of the present invention, there is provided an elevator hoist system comprising a hoistway, a guide rail installed on an elevator hoistway and lifting up a guide rail for guiding the hoistway of the hoistway up to a top of the hoistway, It is possible to simplify the installation work of the guide rails so that the installation work time of the guide rails can be greatly shortened and the size of the guide rails to be installed It is possible to install the plate without a plate corresponding to the guide rail to be installed so that the installation cost and the work amount can be greatly reduced by providing the plate that can be lifted up by engaging the guide rail without being limited by the weight .

도 1은 본 발명 기계실 없는 엘리베이터 레일 설치장치의 사시도
도 2는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 분해 사시도
도 3은 본 발명 기계실 없는 엘리베이터 레일 설치장치의 설치 상태도
도 4는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 레일 설치작동 상태도
도 5는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 레일 설치 상태도
1 is a perspective view of an elevator rail installation apparatus without machine room of the present invention;
Fig. 2 is an exploded perspective view of the elevator rail installation apparatus without machine room of the present invention.
Fig. 3 is an installation view of elevator rail installation apparatus without machine room of the present invention
Fig. 4 is a view showing a rail installation operation state of the machine-room-free elevator rail installation apparatus according to the present invention.
Fig. 5 is a view showing a rail installation state of an elevator rail installation apparatus without a machine room according to the present invention.

이하 첨부되는 도면에 의거 본 발명을 상세히 설명하면 다음과 같다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명 기계실 없는 엘리베이터 레일 설치장치의 사시도이고, 도 2는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 분해 사시도이며. 도 3은 본 발명 기계실 없는 엘리베이터 레일 설치장치의 설치 상태도이다. FIG. 1 is a perspective view of an elevator rail installation device without machine room of the present invention, and FIG. 2 is an exploded perspective view of an elevator rail installation device without a machine room of the present invention. 3 is an installation view of an elevator rail installation apparatus without a machine room according to the present invention.

도 1 내지 도 3 에 도시한 바와 같이, 엘리베이터 레일 설치장치(100)는 엘리베이터의 케이지를 설치하고자 하는 건물에 형성된 승강로(1)에 설치하게 되고, 상기 엘리베이터 레일 설치장치(100)는 가이드레일(2), 상기 가이드레일(2)를 고정하는 레일고정수단(10), 상기 가이드레일(2)을 끌어올릴 수 있도록 상기 가이드레일(2)에 결합되는 플레이트(20)로 구성된다.1 to 3, the elevator rail installation apparatus 100 is installed in a hoistway 1 formed in a building to which a cage of an elevator is to be installed, and the elevator rail installation apparatus 100 is mounted on a guide rail A rail fixing means 10 for fixing the guide rail 2 and a plate 20 coupled to the guide rail 2 so as to raise the guide rail 2. The guide rail 2 is fixed to the guide rail 2,

상기 가이드레일(2)은 기계실이 없는 엘리베이터 건물 승강로(1)에 최하부로부터 최상부에 이르기까지 수직으로 길게 설치되어 케이지를 승하강시키게 된다.The guide rail 2 is vertically installed vertically from the lowermost portion to the uppermost portion of the elevator building hoistway 1 without a machine room, thereby raising and lowering the cage.

상기 가이드레일(2)은 통상적으로 길이 5m로 형성되고, 1m당 3kgf ~ 50kgf 공칭하중을 갖고 단면이 T형으로 형성되고, 엘리베이터의 용량에 따라 공칭하중 8kgf, 13kgf, 18kgf 또는 24kgf를 사용하게 된다. 대용량의 엘리베이터의 경우, 35kgf로 사용하게 된다The guide rail 2 is typically formed to have a length of 5 m, has a nominal load of 3 kgf to 50 kgf per 1 m, is formed into a T-shaped section, and a nominal load of 8 kgf, 13 kgf, 18 kgf or 24 kgf is used depending on the capacity of the elevator . In the case of a large-capacity elevator, 35 kgf is used

상기 가이드레일(2)은 길이 1m당 공칭하중이 8kgf인 경우, 상기 가이드레일(1)은 5m×8kgf = 40kg의 무게를 갖게 된다.When the nominal load per 1 m of the guide rail 2 is 8 kgf, the guide rail 1 has a weight of 5 m x 8 kgf = 40 kg.

이렇게 무게를 갖는 기계실이 없는 엘리베이터의 경우, 최상부에 설치되는 빔에 상기 가이드레일(2)을 승강로(1)의 내부 최하부로부터 최상부에 이르기까지 권양기(3)로 끌어올려 가면서 가이드레일(2)과 가이드레일(2)을 별도의 고정브라켓(4)으로 결합하면서 수직으로 설치하게 된다.In the case of an elevator without a machine room having such a weight, the guide rail 2 is lifted up to the winch 3 from the inner bottom of the hoistway 1 to the top of the guide rail 2, And the guide rail 2 is vertically installed while being coupled with a separate fixing bracket 4.

여기서 상기 권양기(3)는 로프(31)와 상기 최상부에 설치되는 도르래(32), 및 모터(33)로 구성되어, 상기 모터(33)의 회전력으로 드르레(32)를 타고 로프를 감고 풀어주면서 사물을 승하강시키게 된다. The hoist 3 comprises a rope 31, a pulley 32 mounted on the uppermost portion of the hoist 32 and a motor 33. The hoist 32 is wound around the hoist 32 by the rotating force of the motor 33, The object is raised and lowered.

상기 레일고정수단(10)은 일측에 상기 승강로(1)의 최상부에 시설된 빔에 감아서 고정되도록 일단에 후크(hook)(111)가 구비된 체인(11), 타측에 상기 후크가 구비된 체인(11)에 일측단이 제1 샤클(shackle)(12)로 고정되고 타측단이 제2 샤클(shackle)(13)이 결합된 턴버클(14)로 구비하게 된다.The rail fixing means 10 includes a chain 11 having a hook 111 at one end thereof so as to be wound and fixed to a beam provided at the top of the hoistway 1 at one side thereof, And a turnbuckle 14 having one end fixed to the chain 11 with a first shackle 12 and the other end coupled with a second shackle 13.

이러한 상기 레일고정수단(10)은 승강로(1)의 최상부에 시설된 빔에 턴버클(14)이 결합된 체인(11)의 후크(111)를 넘기고 넘겨진 후크(111)를 상기 체인(11)을 걸어줌으로 상기 레일고정수단(10)은 턴버클(14)을 하방으로 하여 상기 승강로(1)의 최상부에 위치한 빔에 고정 설치되게 된다.The rail fixing means 10 passes the hook 111 of the chain 11 to which the turnbuckle 14 is coupled to the beam installed at the uppermost portion of the hoistway 1 and transfers the turned hook 111 to the chain 11 The rail fixing means 10 is fixed to the beam located at the top of the hoistway 1 with the turnbuckle 14 downward.

상기 플레이트(20)는 상부의 어느 일측이 측방으로 돌출시켜 형성되는 돌출면에 천공시켜 상기 권양기(3)의 로프(31)가 결합되는 제1 결합공(21), 상기 제1 결합공(21)의 타측에 상기 레일고정수단(10)의 턴버클(14)과 결합되는 제2 결합공(22), 상기 제2 결합공(22)의 하방으로 서로 소정의 간격을 갖고 각각 천공되어 상기 가이드레일(2)과 결합되는 적어도 하나 이상의 한 쌍의 레일결합공(23)이 구비된다.The plate 20 includes a first coupling hole 21 through which a rope 31 of the win- dow 3 is pierced by a protruding surface formed by one side of the upper portion protruding sideways, A second engaging hole 22 which is engaged with the turnbuckle 14 of the rail fixing means 10 on the other side of the guide rail 22, At least one pair of rail coupling holes 23 to be coupled with the rail 2 is provided.

상기 적어도 하나 이상의 한 쌍의 레일결합공(23)은 설치되는 가이드레일(2)의 크기와 무게에 따라 한 쌍의 구경 크기와 간격을 서로 달리하는 한 쌍의 제1 레일결합공(24)과, 상기 한 쌍의 제1 레일결합공(24) 사이에 천공되어 상기 가이드레일(2)의 크기와 무게에 크게 제한을 받지 않고 설치 가능하도록 장방형으로 천공되는 한 쌍의 제2 레일결합공(25)이 구비된다.The at least one pair of rail coupling holes 23 may include a pair of first rail coupling holes 24 having different diameters and spacing according to the size and weight of the guide rail 2 to be installed, And a pair of second rail coupling holes (25) formed between the pair of first rail coupling holes (24) and perforated in a rectangular shape so as to be installed without being limited by the size and weight of the guide rail .

이렇게 상기 플레이트(20)는 상부 일측을 돌출하여 천공된 제1 결합공(21)에는 권양기(3)의 로프(31)가 결합되어 상기 권양기(3)에 의해 승하강하게 되고, 상기 적어도 하나 이상의 한 쌍의 레일결합공(23)에는 설치하고자 하는 가이드레일(2)의 크기와 무게에 따라 그에 해당하는 한 쌍의 제1 레일결합공(24) 또는 장방향으로 천공된 한 쌍의 제2 결합공(25)에 결합하여 사용할 수 있도록 함으로써, 설치하고자 하는 가이드레일(2)의 크기와 무게에 크게 제한을 받지 않고 사용할 수 있게 되어 상기 가이드레일(2)에 따라 그에 해당하는 플레이트(20)를 일일이 구비하지 않아도 되는 간편함을 제공하게 된다.The rope 31 of the hoist 3 is coupled to the first coupling hole 21 formed in the upper portion of the plate 20 so as to be raised and lowered by the hoist 3, The pair of rail coupling holes 23 are provided with a pair of first rail coupling holes 24 corresponding to the size and weight of the guide rail 2 to be installed or a pair of second coupling holes 24, The guide rails 2 can be used without being greatly limited by the size and the weight of the guide rails 2 to be installed so that the plates 20 corresponding to the guide rails 2 It is possible to provide a simplicity that is not required.

도 4는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 레일 설치작동 상태도이고, 도 5는 본 발명 기계실 없는 엘리베이터 레일 설치장치의 레일 설치 상태도 이다.FIG. 4 is a view illustrating a rail mounting operation of the machine-room-less elevator rail installation apparatus according to the present invention, and FIG. 5 is a rail installation state of the elevator installation apparatus without the machine room of the present invention.

도 4 및 도 5에 도시한 바와 같이, 엘리베이터의 케이지를 설치하고자 하는 건물의 승강로(1) 최상부에 시설된 빔에 레일 설치장치(100)를 설치하게 되는데, 이때 상기 승강로(1)의 최상부에 설치된 빔에 후크가 결합된 체인(11)과 일측이 제1 샤클(12)로 결합되고 타측이 제2 샤클(13)로 결합된 턴버클(14)로 구비된 레일고정수단(10)을 설치 고정하되, 상기 레일고정수단(10)을 플레이트(20)로부터 분리한 상태에서 상기 레일고정수단(10)의 체인(11) 부분을 승강로(1)의 최상부에 설치된 빔에 넘겨 걸어준 후 상기 체인(11)에 결합된 후크(111)를 상기 빔에 넘겨져 있지 않은 상기 체인(11)에 걸어줌으로써 상기 체인(11)은 상기 빔을 감싸아 풀어지지 않게 고정되게 되어 상기 체인(11)과 제1 샤클(12)로 결합 고정된 턴버클(14)은 상기 체인(11)과 함께 하방으로 현수되게 된다.As shown in FIGS. 4 and 5, the rail installation device 100 is installed on the uppermost portion of the hoistway 1 of the building to which the elevator cage is to be installed. At this time, A rail fixing means 10 including a chain 11 to which hooks are attached to the installed beam and a turnbuckle 14 to which one side is coupled to the first shackle 12 and the other side is coupled to the second shackle 13 is fixed The chain 11 of the rail fixing means 10 is hooked onto a beam provided at the top of the hoistway 1 in a state where the rail fixing means 10 is separated from the plate 20, The chain 11 is hooked to the chain 11 not connected to the beam so that the chain 11 is fixed so as not to be loosened by wrapping the beam so that the chain 11 and the first shackle 11, The turnbuckle 14 coupled with the chain 12 is suspended downward together with the chain 11.

이와 같이 상기 레일고정수단(10)을 빔에 설치 고정한 상태에서, 상기 레일고정수단(10)로부터 분리된 플레이트(20)는 승강로(1)의 최상부에 설치된 빔에 현수되는 도르래(32), 상기 도르래(32)에 설치되는 로프(31) 및 상기 로프(31)를 감아주고 풀어주는 모터(33)로 구성되는 권양기(3)에 결합하게 되는데, 여기서 상기 플레이트(20)는 상기 권양기(3)의 로프(31)에 아이볼트와 너트를 이용하여 돌출면(21)에 구비되는 제1 결합공(23)에 삽입 결합시켜 상기 플레이트(20)를 로프(31)에 설치하게 된다.The plate 20 separated from the rail fixing means 10 in the state where the rail fixing means 10 is fixed to the beam has a pulley 32 suspended in a beam provided at the top of the hoistway 1, Is connected to a winch (3) comprising a rope (31) provided on the pulley (32) and a motor (33) for winding and releasing the rope (31), wherein the plate (20) And the plate 20 is installed on the rope 31 by inserting the rope 31 into the first coupling hole 23 provided on the projecting surface 21 using an eye bolt and a nut.

이렇게 권양기(3)의 로프에 설치되는 플레이트(20)는 하방으로 소정의 간격을 갖고 각각 천공된 적어도 하나 이상의 한 쌍의 제1 레일결합공(24) 및 한 쌍의 제2 결합공(25)에 볼트와 너트를 이용하여 승강로(1)에 설치하고자 하는 가이드레일(2)을 체결하게 된다.The plate 20 installed in the rope of the hoist 3 has at least one pair of first rail coupling holes 24 and a pair of second coupling holes 25, The guide rail 2 to be installed in the hoistway 1 is fastened using bolts and nuts.

이때 상기 플레이트(20)의 하나 이상의 한 쌍의 제1 레일결합공(24) 및 한 쌍의 제2 결합공(25)에는 설치하고자 하는 가이드레일(2)의 크기 및 무게에 따라 그에 해당하는 한 쌍의 제1 레일결합공(24) 또는 한 쌍의 제2 레일결합공(25)에 체결하여 설치하게 되는데, 가령 설치하고자 하는 가이드레일(2)의 공칭하중 24kgf 즉 크기가 크고 무게가 무거운 경우, 구경이 크고 간격이 넓게 형성된 한 쌍의 제2 레일결합공(24)에 체결 고정하게 되고, 반면에 가이드레일(2)의 공칭하중 8kgf, 13kgf, 18kgf 경우 크기가 크지 않고 무게도 많이 무겁지 않은 경우, 한 쌍의 제2 레일결합공(25)에 결합하여 권양기(3)로 플레이트(20)를 상방으로 끌어올려서 설치하게 된다.At this time, at least one pair of the first rail coupling holes 24 and the pair of second coupling holes 25 of the plate 20 are provided with a corresponding one of the guide rails 2 For example, when the nominal load of the guide rail 2 to be installed is 24 kgf, that is, the size is large and the weight is heavy, the first rail coupling hole 24 and the second rail coupling hole 25 And a pair of second rail coupling holes 24 having a large diameter and a wide gap. On the other hand, when the nominal loads of the guide rails 2 are 8 kgf, 13 kgf, and 18 kgf, the size is not large and the weight is not heavy , The plate 20 is coupled to the pair of second rail coupling holes 25 and pulled upward by the winch 3.

이와 같이 상기 플레이트(20)에 결합되어 권양기(3)로 끌어 올려지는 가이드레일(2)은 승강로(1)의 최하부로부터 가이드레일(2)의 길이(5m) 높이만큼 끌어올려 정지한 상태에서 승강로(1)의 높이 5m 지점에서 상기 끌어 올려져 있는 가이드레일(2)의 하단과 다른 가이드레일(2-1)의 상단을 고정브라켓(4)으로 결합하여 고정한다.The guide rail 2 coupled to the plate 20 and pulled up to the winch 3 is lifted up from the lowermost portion of the hoistway 1 by the height of the guide rail 2 to a length of 5 m, The upper end of the guide rail 2-1 and the lower end of the raised guide rail 2 are fixedly coupled to each other by a fixing bracket 4 at a height of 5 m from the upper end of the guide rail 1.

이어서, 상기 권양기(3)로 상기 플레이트(20)에 결합되는 가이드레일(2)와 가이드레일(2-1)을 함께 승강로(1)의 최하부로부터 가이드레일(2)의 길이(5m) 높이만큼 끌어올린 후, 승강로(1)의 높이 5m 지점에서 또 다른 가이드레일(2-2)의 상단을 상기 다른 가이드 레일(2-1)의 하단과 고정브라켓(4)으로 결합하여 고정한다.The guide rails 2 and the guide rails 2-1 coupled to the plate 20 by the hoist 3 together with the guide rails 2 from the lowermost portion of the hoistway 1 by a length of 5 m The upper end of another guide rail 2-2 is fixedly coupled to the lower end of the other guide rail 2-1 by the fixing bracket 4 at a height of 5m from the hoistway 1.

그리고 다시 상기 권양기(3)로 상기 플레이트(20)에 결합되는 가이드레일(2)와 가이드레일(2-1), 가이드레일(2-2)을 함께 승강로(1)의 최하부로부터 가이드레일(2)의 길이(5m) 높이만큼 끌어올린 후, 승강로(1)의 높이 5m 지점에서 다시 다른 가이드레일(2-3)의 상단을 상기 다른 가이드 레일(2-2)의 하단과 고정브라켓(4)으로 결합 고정하는 것으로, 상기 승강로(1)의 최상부에 설치된 빔에 현수되어 있는 레일고정수단(10)의 높이까지 차례로 결합하여 끌어올리게 된다.The guide rails 2-1 and 2-2 and the guide rails 2-2 coupled to the plate 20 by the hoist 3 together with the guide rails 2 from the lowermost part of the hoistway 1, The upper end of the other guide rail 2-3 is moved to the lower end of the other guide rail 2-2 and the fixing bracket 4 at a height of 5 m from the hoistway 1, So as to be coupled to the height of the rail fixing means 10 suspended in the beam provided at the uppermost portion of the hoistway 1 in order.

한편, 상기 권양기(3)로 승강로(1)의 최상부에 설치된 빔에 현수된 레일고정수단(10)의 높이까지 플레이트(20)에 차례로 길게 결합되어 끌어 올려진 가이드레일(2)은 상기 플레이트(20)에 결합된 상태로 상기 레일고정수단(10)의 턴버클(14)의 제2 샤클(13)에 플레이트(20)의 제2 결합공(22)을 결합 고정하되, 상기 턴버클(14)로 제2 샤클(13)의 길이를 조절하면서 상기 플레이트(20)의 제2 결합공(22)에 결합함으로써, 상기 승강로(1)의 최하부로부터 최상부에 이르는 높이까지 상기 가이드레일(2)들을 간편하게 설치할 수 있게 된다.On the other hand, the guide rails 2, which are sequentially coupled to the plate 20 by the hoist 3 up to the height of the rail fixing means 10 suspended in the beam installed at the uppermost portion of the hoistway 1, The second engagement hole 22 of the plate 20 is fixedly coupled to the second shackle 13 of the turnbuckle 14 of the rail fixing means 10 while being coupled to the turnbuckle 14, The guide rail 2 can be easily installed from the lowermost portion to the highest portion of the hoistway 1 by engaging with the second engaging hole 22 of the plate 20 while adjusting the length of the second shackle 13 .

이렇게 상기 가이드레일(2)를 승강로(1)에 설치 완료하게 되면, 이어서 상기 플레이트(20)의 제1 결합공(21)에 결합된 권양기(3)의 로프(31)를 분리한 후, 상기 분리된 권양기(30의 로프(31)를 다시 설치하고자 하는 가이드레일(2)을 승강하기 위한 다른 플레이트(20)의 제1 결합공(21)에 결합하고, 상기 다른 플레이트(20)의 적어도 하나 이상의 한 쌍의 레일결합공(23)에 가이드레일(2)을 결합하여 권양기(3)로 플레이트(20)를 승강시키면서 가이드레일(2)을 설치하게 된다.After the guide rails 2 are installed in the hoistway 1, the ropes 31 of the hoist 3 connected to the first coupling holes 21 of the plate 20 are separated, (21) of another plate (20) for raising and lowering a guide rail (2) to which the rope (31) of a separate winch (30) is to be reinstalled, and at least one The guide rails 2 are installed while the plate 20 is lifted and lowered by the hoist 3 by engaging the guide rails 2 to the pair of rail coupling holes 23. [

이렇게 설치되는 가이드레일(2)은 상기 승강로(1)의 내측에 4개를 설치하게 되는데, 2개는 케이지를 승하강하는 가이드레일을 마주보게 설치되고, 2개는 케이지의 발란스를 맞추어주는 무게추를 승하강 안내하는 가이드레일로 설치하게 된다.Four guide rails 2 installed in this manner are installed inside the hoistway 1, two of which are provided so as to face guide rails for raising and lowering the cage, and two of them are provided for adjusting the balance of the cage And a guide rail for guiding the weight up and down.

그러므로 상기 권양기(3)로 끌어올려서 소정의 높이로 설치되는 가이드레일(2)을 작업자가 하나씩 끌어올려 일일이 결합하여야 하는 번거로움 및 소정의 높이마다 작업대를 설치하면서 결합작업하고 해체하여야 하는 번거로움 없이 설치 작업을 할 수 있게 되는 것이다.Therefore, there is a problem that it is troublesome that the worker lifts up the guide rails 2, which are lifted up to the hoist 3 and installed at a predetermined height, one by one and the worker is installed at the predetermined height, The installation work can be performed.

100; 엘리베이터 레일 설치장치 1; 승강로
2; 가이드레일 3; 권양기
31;로프 32; 도르래
33; 모터 4; 고정브라켓
10; 레일고정장치 11; 체인
111; 후크 12; 제1 샤클
13; 제2 사클 14; 턴버클
20; 플레이트 21; 제1 결합공
22; 제2 결합공 23; 한 쌍의 레일결합공
24; 한 쌍의 제1 레일결합공 25; 한 쌍의 제2 레일결합공
100; Elevator rail installation device 1; Hoistway
2; Guide rail 3; windlass
31; Pulley
33; Motor 4; fixed bracket
10; A rail fixing device 11; chain
111; Hook 12; The first shackle
13; A second squar 14; Turnbuckle
20; Plate 21; The first coupling ball
22; A second coupling hole 23; A pair of rail coupling balls
24; A pair of first rail engagement holes 25; A pair of second rail coupling balls

Claims (6)

삭제delete 삭제delete 삭제delete 삭제delete 기계실이 없는 엘리베이터 승강로의 최상부에 시설되는 빔에 현수되도록 설치되는 레일고정수단과, 상기 빔에 현수되는 도르래와 상기 도르래에 설치되는 로프를 권취하는 모터로 이루어지는 권양기를 이용하여 복수개의 가이드 레일들을 수직으로 연결하여 설치하는 기계실이 없는 엘리베이터 승강로 가이드 레일의 설치방법에 있어서:
상부에 상기 권양기의 로프가 결합되는 제1 결합공과 상기 레일고정수단이 결합되는 제2결합공 및 하부에 상기 가이드레일이 결합되는 적어도 한쌍 이상의 레일결합공이 형성된 플레이트를 준비하는 플레이트 준비단계;
상기 권양기의 로프를 상기 플레이트의 제1 결합공에 설치되는 결합수단과 결합시키는 플레이트와 권양기 로프 결합단계;
상기 승강로의 최하부에서 첫번째 가이드 레일의 상단을 상기 플레이트의 상기 레일결합공에 설치되는 결합수단으로 결합시킨 후 상기 권양기의 로프를 권취시켜 상기 첫번째 가이드 레일을 가이드 레일의 높이 만큼 상승시키고, 두번째 가이드 레일의 상부와 상기 첫번째 가이드 레일의 하부를 고정브라켓으로 연결한 후 상기 권양기의 로프를 권취시켜 상기 두번째 가이드 레일을 다시 가이드 레일의 높이 만큼 상승시킨 후 고정브라켓으로 상기 두번째 가이드 레일의 하부와 세번째 가이드 레일의 상부를 연결시키는 방법을 반복하여 복수개의 가이드 레일들을 순차적으로 수직으로 배열시키는 가이드 레일 수직배열단계;
상기 가이드 레일 수직배열단계의 종료 후에 첫번째 가이드 레일의 상부에 설치된 플레이트의 제2결합공에 상기 레일고정수단을 설치한 후 상기 권양기의 로프를 상기 플레이트로부터 분리시키는 레일고정수단의 고정단계를 포함하는 것을 특징으로 하는 기계실이 없는 엘리베이터 승강로 가이드 레일의 설치방법.
A plurality of guide rails are vertically arranged by using a hoisting machine comprising a rail fixing means provided so as to be suspended in a beam provided at an uppermost portion of an elevator hoistway without a machine room and a hoist comprising a pulley suspended on the beam and a hoist rope installed on the sheave, A method of installing an elevator hoistway guide rail without a machine room to be connected to the elevator hoistway guide rail, comprising:
Preparing a plate having a first coupling hole for coupling the rope of the winch with a second coupling hole for coupling the rail fixing means and at least one pair of rail coupling holes for coupling the guide rail to the lower portion;
A plate and a hoist rope joining step of joining the rope of the winch with joining means provided on the first joining hole of the plate;
The upper end of the first guide rail is coupled with the coupling means provided on the rail coupling hole of the plate at the lowermost portion of the hoistway, the rope of the winch is wound to raise the first guide rail by the height of the guide rail, And the lower part of the first guide rail is connected to the lower part of the second guide rail by a fixing bracket, the rope of the hoist is wound up to raise the height of the second guide rail by the height of the guide rail again, A step of vertically arranging a plurality of guide rails in a vertical direction;
And fixing the rail fastening means for separating the rope of the winch from the plate after the rail fastening means is installed on the second engagement hole of the plate provided on the top of the first guide rail after the end of the step of vertically arranging the guide rails Wherein the elevator hoistway guide rail is installed on the elevator shaft.
제 5 항에 있어서,
상기 레일고정수단은 일단에 후크가 구비되는 체인과, 타단에 턴버클이 설치되어 길이가 조절가능하도록 형성되고, 체인의 후크를 상기 빔을 타고 넘도록 한 후에 상기 후크를 상기 체인에 다시 걸어줌으로써 상기 빔에 상기 레일고정수단을 현수하는 것을 특징으로 하는 기계실이 없는 엘리베이터 승강로 가이드 레일의 설치방법.
6. The method of claim 5,
Wherein the rail fixing means comprises a chain having hooks at one end thereof and a turnbuckle at the other end thereof so that the length thereof is adjustable and the hooks of the chain are overlaid on the beams and then the hooks are hooked back to the chain, Wherein the elevator hoistway guide rail is suspended from the elevator hoistway.
KR1020170095574A 2017-07-27 2017-07-27 Method for installing elevator guide rails without a machine room KR101976724B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170095574A KR101976724B1 (en) 2017-07-27 2017-07-27 Method for installing elevator guide rails without a machine room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170095574A KR101976724B1 (en) 2017-07-27 2017-07-27 Method for installing elevator guide rails without a machine room

Publications (2)

Publication Number Publication Date
KR20190012506A KR20190012506A (en) 2019-02-11
KR101976724B1 true KR101976724B1 (en) 2019-05-09

Family

ID=65370463

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170095574A KR101976724B1 (en) 2017-07-27 2017-07-27 Method for installing elevator guide rails without a machine room

Country Status (1)

Country Link
KR (1) KR101976724B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114981197A (en) * 2020-01-20 2022-08-30 因温特奥股份公司 Lifting device for controlled lifting of a payload in an elevator shaft

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5541741Y2 (en) * 1977-08-19 1980-09-30
JPH0398977A (en) * 1989-09-12 1991-04-24 Toshiba Corp Standingly providing of guide rail for elevator
JPH11139714A (en) * 1997-11-04 1999-05-25 Fujitec Co Ltd Guide rail suspending device

Also Published As

Publication number Publication date
KR20190012506A (en) 2019-02-11

Similar Documents

Publication Publication Date Title
AU2013361847B2 (en) Installation method for a lift
EP0904247B1 (en) Procedure and apparatus for the installation of an elevator
AU2016202963B2 (en) An arrangement and a method for parallel transport and installation of elevator components
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
CA2544881A1 (en) Method and device for installation of guide rails in a lift shaft
CN102216545A (en) Mobile cantilever platforms and methods of installation thereof
CN113502924A (en) Method for constructing steel beam in high-rise closed core cylinder
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
JP2018070362A (en) Elevator installation method
EA016364B1 (en) Arrangement in the supply of rope to the speed limiter
JP6969686B2 (en) How to extend the lift of a construction elevator
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
JP2008222382A (en) Method for moving lifting device for installation
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
US20230322522A1 (en) Construction arrangement of an elevator and method
JP3844944B2 (en) Demolition method of construction elevator
JP2008285260A (en) Guide rail installation engineering method of machine room-less elevator
JP2008214062A (en) Lifting device and structural material mounting method
JP3920527B2 (en) Elevator for construction
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
JP2878936B2 (en) Elevator installation method
JP3519009B2 (en) Elevator installation method
CN203212170U (en) Elevator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant