KR102079703B1 - Modular staircase and method of constructing the same - Google Patents
Modular staircase and method of constructing the same Download PDFInfo
- Publication number
- KR102079703B1 KR102079703B1 KR1020190083949A KR20190083949A KR102079703B1 KR 102079703 B1 KR102079703 B1 KR 102079703B1 KR 1020190083949 A KR1020190083949 A KR 1020190083949A KR 20190083949 A KR20190083949 A KR 20190083949A KR 102079703 B1 KR102079703 B1 KR 102079703B1
- Authority
- KR
- South Korea
- Prior art keywords
- block
- staircase
- landing
- blocks
- contact
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
- E04F11/035—Stairways consisting of a plurality of assembled modular parts without further support
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/34823—Elements not integrated in a skeleton the supporting structure consisting of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F2011/0203—Miscellaneous features of stairways not otherwise provided for
- E04F2011/0205—Stairways characterised by the use of specific materials for the supporting structure of the treads
- E04F2011/021—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
- E04F2011/0212—Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
Description
모듈형 계단실 및 그의 시공방법이 개시된다. 보다 상세하게는, 복수개의 계단실 모듈을 포함하는 모듈형 계단실 및 그의 시공방법이 개시된다.Modular staircases and construction methods thereof are disclosed. More specifically, a modular staircase including a plurality of staircase modules and a construction method thereof are disclosed.
기존의 계단실 공사의 경우, 철골, 미장 및 수장 공사가 수반되어, 이동 통로로 활용되는 계단 작업을 포함하는 복합 공종이 좁은 작업 공간내에서 수행되면서, 많은 구간에서 공종간 간섭이 발생하여 공사 일정이 지연되는 문제점이 있다.In the case of the existing staircase work, the construction work involving steel frame, plastering and pavement is carried out in a narrow work space, including a stair work used as a moving passage, and the construction schedule is changed due to the interference between the works in many sections. There is a delay.
이와 같이, 기존 계단실 공사는 복합 공종이 동시다발적으로 진행되어야 하는 특성상 시공성을 확보하기 어려운 문제점이 있다.As such, the existing staircase room construction has a problem that it is difficult to secure the construction properties due to the nature that the complex construction must proceed simultaneously.
본 발명의 일 구현예는 복수개의 계단실 모듈을 포함하는 모듈형 계단실을 제공한다.One embodiment of the present invention provides a modular staircase room comprising a plurality of staircase modules.
본 발명의 다른 구현예는 상기 모듈형 계단실의 시공방법을 제공한다.Another embodiment of the present invention provides a construction method of the modular staircase.
본 발명의 일 측면은,One aspect of the invention,
사전 제작되어 건물 내부 또는 외부에 설치되도록 구성된 것으로, 별도의 지지부재 없이 자립이 가능하고 구조가 서로 다른 적어도 3종의 계단실 모듈을 포함하는 모듈형 계단실을 제공한다.It is pre-fabricated and configured to be installed inside or outside the building, and provides a modular staircase including at least three staircase modules different in structure and capable of self-supporting without a separate supporting member.
상기 모듈형 계단실은 적어도 일부분이 프리캐스트 콘크리트로 형성된 것일 수 있다.The modular staircase may be at least a portion formed of precast concrete.
상기 모듈형 계단실은 매립 전기설비 및 매립 소방설비 중 적어도 하나를 포함할 수 있다.The modular staircase may include at least one of a landfill electrical facility and a landfill fire fighting facility.
상기 모듈형 계단실은 서로 상이한 구조를 갖는 제1 계단실 모듈, 제2 계단실 모듈 및 제3 계단실 모듈을 포함할 수 있다.The modular staircase may include a first staircase module, a second staircase module, and a third staircase module having different structures from each other.
상기 제1 계단실 모듈, 상기 제2 계단실 모듈 및 상기 제3 계단실 모듈은 각각 서로 독립적으로 하기 블록들로 이루어진 군으로부터 선택된 복수개의 블록을 포함하되, 상기 제1 계단실 모듈 및 상기 제2 계단실 모듈은 하기 제1 블록을 필수적으로 포함할 수 있다:The first staircase module, the second staircase module and the third staircase module each include a plurality of blocks independently selected from the group consisting of the following blocks, wherein the first staircase module and the second staircase module are It may essentially include the first block:
(1) 일체로 형성된 벽체와 계단참을 포함하는 제1 블록;(1) a first block comprising integrally formed walls and landings;
(2) "ㄴ"자 형상의 평단면을 갖는 제2 블록;(2) a second block having a planar cross section shaped like a "b";
(3) "ㄴ"자 형상의 평단면을 가지며, 상기 제2 블록과 동일하거나 상이한 구조를 갖는 제3 블록;(3) a third block having a "b" shaped flat cross section and having the same or different structure as said second block;
(4) "1"자 형상의 평단면을 갖는 제4 블록;(4) a fourth block having a planar cross section of the shape of "1";
(5) 계단판을 포함하는 제5 블록;(5) a fifth block comprising a step plate;
(6) "ㄷ"자 형상의 평단면을 갖는 제6 블록;(6) a sixth block having a planar cross section in the shape of a "c";
(7) "ㄷ"자 형상의 평단면을 가지며, 상기 제6 블록 보다 높이가 높고, 측벽에 개구를 갖지 않는 제7 블록; 및(7) a seventh block having a "C" shaped flat cross section and having a height higher than that of the sixth block and having no opening in the sidewall; And
(8) "ㄷ"자 형상의 평단면 및 측벽에 형성된 문 형상의 개구를 가지며, 상기 제6 블록 보다 높이가 높은 제8 블록.(8) An eighth block having a height of a door-shaped opening formed in a flat cross-section and a sidewall having a letter 'C', and higher than the sixth block.
상기 제5 블록은 상기 계단판에 설치된 발끝막이판을 더 포함할 수 있다.The fifth block may further include a toe board installed on the step plate.
상기 제1 블록은 측벽에 개구가 형성되어 있지 않은 제1-1 블록 및 측벽에 개구가 형성되어 있는 제1-2 블록을 포함하고, 상기 제5 블록은 서로 동일하거나 상이한 구조의 계단판을 포함하는 제5-1 블록 및 제5-2 블록을 포함할 수 있다.The first block includes a first-first block having no opening in the sidewall and a 1-2 block having an opening in the sidewall, and the fifth block includes a step plate having the same or different structure. A 5-1 block and a 5-2 block may be included.
상기 제1 계단실 모듈은 제1-1 블록, 상기 제1-1 블록과 수평으로 나란하며 접하도록 배치된 제4 블록, 상기 제4 블록과 수평으로 나란하며 접하도록 배치된 제2 블록, 상기 제2 블록과 수평으로 나란하며 이격되도록 배치된 제3 블록, 상기 제1-1 블록 및 상기 제3 블록과 수평으로 나란하며 접하도록 배치된 추가 제4 블록, 상기 제1-1 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란하며 접하도록 배치된 제6 블록, 상기 제2 블록과 상기 제3 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란하며 접하도록 배치된 상기 제1-2 블록, 일단부가 상기 제1-1 블록의 계단참에 결합된 제5-1 블록, 및 일단부는 상기 제1-1 블록의 계단참에 결합되고 타단부는 상기 제1-2 블록의 계단참에 결합된 제5-2 블록을 포함할 수 있다.The first staircase module is a 1-1 block, a fourth block arranged to be in parallel with and in contact with the 1-1 block, a second block arranged to be in parallel and in contact with the fourth block, the first block A third block arranged parallel to and spaced apart from the second block, the first first block and an additional fourth block arranged to be in parallel with and in contact with the third block; A sixth block arranged to be in parallel with and in contact with the pair of fourth blocks; the first block stacked on the second block and the third block and arranged in parallel to and in contact with the pair of fourth blocks; A -2 block, a 5-1 block, one end of which is coupled to the landing of the first-first block, and one end of which is coupled to the landing of the first-first block, and the other end of which is coupled to the landing of the 1-2 block It may include the 5-2 block.
상기 제2 계단실 모듈은 제1-1 블록, 상기 제1-1 블록과 수평으로 나란하며 접하도록 배치된 제4 블록, 상기 제4 블록과 수평으로 나란하며 접하도록 배치된 제6 블록, 상기 제1-1 블록 및 상기 제6 블록과 수평으로 나란하며 접하도록 배치된 추가 제4 블록, 상기 제1-1 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란하며 접하도록 배치된 추가 제6 블록, 상기 제6 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란하며 접하도록 배치된 추가 제1-1 블록, 일단부가 상기 제1-1 블록의 계단참에 결합된 제5-1 블록, 및 일단부는 상기 제1-1 블록의 계단참에 결합되고 타단부는 상기 추가 제1-1 블록의 계단참에 결합된 제5-2 블록을 포함할 수 있다.The second staircase module may include a first-first block, a fourth block arranged to be in parallel with and in contact with the first-first block, a sixth block arranged to be in parallel with and in contact with the fourth block, and the fourth block. An additional fourth block arranged in parallel with and in contact with the 1-1 block and the sixth block; an additional agent stacked on the first-first block and arranged in parallel with and in contact with the pair of fourth blocks; A sixth block, an additional first-first block stacked on the sixth block and arranged to be in parallel with and in contact with the pair of fourth blocks; a fifth-one end of which is coupled to the landing of the first-first block; The block and one end may include a 5-2 block coupled to the landing of the first-first block and the other end coupled to the landing of the additional first-one block.
상기 제3 계단실 모듈은 제7 블록, 상기 제7 블록과 수평으로 나란하며 접하도록 배치된 제4 블록, 상기 제4 블록과 수평으로 나란하며 접하도록 배치된 제8 블록, 및 상기 제7 블록 및 상기 제8 블록과 수평으로 나란하며 접하도록 배치된 추가 제4 블록을 포함할 수 있다.The third staircase module may include a seventh block, a fourth block arranged to be in parallel with and in contact with the seventh block, an eighth block arranged to be in parallel with and in contact with the fourth block, and the seventh block; And an additional fourth block arranged in parallel with and in contact with the eighth block.
상기 각 블록은 매립철판을 포함하고, 상기 블록들 중 서로 접하는 두개의 블록은 상기 각 매립철판을 별도의 연결철판으로 연결함으로써 결합된 것일 수 있다.Each block includes a buried iron plate, two of the blocks in contact with each other may be combined by connecting the respective embedded iron plate with a separate connecting iron plate.
상기 매립철판 및 상기 연결철판은 용접 방식 및 나사결합 방식 중 적어도 하나의 방식으로 결합된 것일 수 있다.The buried iron plate and the connecting iron plate may be combined in at least one of a welding method and a screwing method.
상기 매립철판 및 상기 연결철판은 무수축 몰탈로 마감처리된 것일 수 있다.The buried iron plate and the connecting iron plate may be finished by non-shrink mortar.
상기 각 블록은 메인철근을 포함하고, 상기 블록들 중 서로 접하는 두개의 블록은 각각의 메인철근을 서로 연결함으로써 결합된 것일 수 있다.Each of the blocks includes a main reinforcing bar, and two of the blocks in contact with each other may be combined by connecting each of the main reinforcing bars.
상기 각 메인철근은 무수축 몰탈로 마감처리된 것일 수 있다.Each of the main reinforcing bars may be finished with non-shrink mortar.
상기 모듈형 계단실은 상기 각 계단실 모듈을 지지하는 기초를 더 포함할 수 있다.The modular staircase may further include a foundation supporting each of the staircase modules.
상기 기초는 복수개의 수직 다웰바를 포함할 수 있다.The base may include a plurality of vertical dowel bars.
본 발명의 다른 측면은,Another aspect of the invention,
복수개의 수직 다웰바를 포함하는 기초를 타설하는 단계;Placing a foundation comprising a plurality of vertical dowel bars;
상기 기초 상에 상기 모듈형 계단실을 설치하는 단계; 및Installing the modular staircase on the foundation; And
상기 모듈형 계단실의 이음부에 무수축 몰탈을 주입하고 양생하는 단계를 포함하는 모듈형 계단실의 시공방법을 제공한다.It provides a method of constructing a modular staircase comprising the step of injecting and curing the non-shrink mortar to the joint of the modular staircase.
상기 복수개의 수직 다웰바는 다각형 라인 상에 설치된 것일 수 있다.The plurality of vertical dowel bars may be installed on a polygonal line.
상기 다각형 라인은 직사각형 라인일 수 있다.The polygonal line may be a rectangular line.
본 발명의 일 구현예에 따른 모듈형 계단실은 하기와 같은 이점을 갖는다.Modular staircase according to an embodiment of the present invention has the following advantages.
(1) 모듈화를 통한 대량 생산이 가능하고 제작비 절감효과가 있다. 구체적으로, 현장내 적용이 일반화될 경우, 추가 몰드의 생산 없이 동일 제품의 대량 생산이 가능하다. 또한, 초기 설계 단계에서 계단실 크기를 표준화함으로써 몰드 재활용률을 향상시켜 제작비 절감효과를 도모할 수 있다.(1) Mass production is possible through modularization, and manufacturing cost is reduced. In particular, when in-situ application becomes common, mass production of the same product is possible without the production of additional molds. In addition, by standardizing the staircase size in the initial design stage, it is possible to reduce the production cost by improving the mold recycling rate.
(2) 현장작업 최소화를 통한 인력절감이 가능하다. 구체적으로, 개개의 계단실 모듈을 구성하는 블록을 프리캐스트 콘크리트로 제작함으로써 전기/소방 설비 및 발끝막이판의 선매립 등이 공장 제작 중에 진행되어 현장 투입 인력이 기존 공법 대비 약 90% 절감될 수 있다.(2) It is possible to save manpower by minimizing field work. Specifically, by manufacturing the blocks constituting the individual staircase module made of precast concrete, pre-filling of electric / fire fighting facilities and toe boards can be carried out during the production of the plant, and thus the work force on site can be reduced by about 90% compared to the existing construction method. .
(3) 벽체 자립화를 통한 시공 안전성 확보가 가능하다. 구체적으로, 계단실 코너 구간의 블록은 "ㄴ"자 또는 "ㄷ"자 형태로 제작됨으로써 별도의 지지부재의 도움 없이도 자립이 가능하다. 또한, 계단 벽체와 계단참을 일체화함으로써 현장 설치시 안전성 확보가 가능하다. 또한, 가설 비계 설치를 최소화하고, 개개의 계단실 모듈을 자립화 가능하도록 제작함으로써 작업시 발생할 수 있는 안전상의 문제를 최소화할 수 있다.(3) It is possible to secure construction safety through wall independence. Specifically, the block of the staircase corner section is made in the form of "b" or "c" is possible to be self-supporting without the need of a separate support member. In addition, by integrating the stair wall and landing, it is possible to secure safety when installing the site. In addition, it is possible to minimize the installation of the scaffolding, and to make the individual staircase modules to be independent, it is possible to minimize the safety problems that can occur during work.
(4) 설치 기간의 단축이 가능하다. 구체적으로, 실제 현장에서 철골, 미장 및 수장공사로 계단실을 설치할 경우, 계단실 1개당 평균 약 2.3개월이 소요되지만, 본 발명의 모듈형 계단실을 적용할 경우에는, 계단실 1개당 평균 1.3개월이 소요되어 약 1.0개월의 공기 단축 효과를 얻을 수 있다.(4) The installation period can be shortened. Specifically, if the staircase room is installed on the actual site by steel frame, plastering and storage work, it takes about 2.3 months on average per stair room, but when applying the modular stair room of the present invention, it takes an average of 1.3 months per stair room An air shortening effect of about 1.0 months can be obtained.
도 1은 본 발명의 일 구현예에 따른 모듈형 계단실의 사시도이다.
도 2는 본 발명의 일 구현예에 따른 모듈형 계단실의 부분 절개 사시도이다.
도 3은 도 1의 제1 계단실 모듈 중 제1 블록을 발췌하여 도시한 도면이다.
도 4는 도 1의 제1 계단실 모듈 중 제2 블록을 발췌하여 도시한 도면이다.
도 5는 도 1의 제1 계단실 모듈 중 제3 블록을 발췌하여 도시한 도면이다.
도 6은 도 1의 제1 계단실 모듈 중 제4 블록을 발췌하여 도시한 도면이다.
도 7은 도 1의 제1 계단실 모듈 중 제1 블록 및 제5 블록을 발췌하여 도시한 도면이다.
도 8은 도 1의 제1 계단실 모듈 중 제1 블록 및 제6 블록을 발췌하여 도시한 도면이다.
도 9는 본 발명의 일 구현예에 따른 모듈형 계단실에 포함된 제1 계단실 모듈을 도시한 도면이다.
도 10은 도 1의 제1 계단실 모듈에 매립된 전기설비를 도시한 도면이다.
도 11a는 도 9의 제1 계단실 모듈 중 “A”부분의 일 실시예를 확대하여 도시한 도면이다.
도 11b는 도 11a에 도시된 부분의 수평 이음 접합 공정을 설명하기 위한 도면이다.
도 12a는 도 9의 제1 계단실 모듈 중 “A”부분의 다른 실시예를 확대하여 도시한 도면이다.
도 12b는 도 12a에 도시된 부분의 수평 이음 접합 공정을 설명하기 위한 도면이다.
도 13a는 도 9의 제1 계단실 모듈 중 “B”부분의 일 실시예를 확대하여 도시한 도면이다.
도 13b는 도 13a에 도시된 부분의 수직 이음 접합 공정을 설명하기 위한 도면이다.
도 14a는 본 발명의 일 구현예에 따른 모듈화 계단실의 평면도이다.
도 14b는 본 발명의 일 구현예에 따른 모듈화 계단실의 입면도이다.
도 15a는 도 14a의 모듈화 계단실 중 "C"부분의 일 실시예를 확대하여 도시한 도면이다.
도 15b는 도 15a에 도시된 부분의 접합 공정을 설명하기 위한 도면이다.
도 16은 도 14a의 모듈화 계단실 중 "D"부분의 일 실시예를 확대하여 도시한 도면이다.
도 17a는 도 14a의 모듈화 계단실 중 "C"부분의 다른 실시예를 확대하여 도시한 도면이다.
도 17b는 도 17a에 도시된 부분의 접합 공정을 설명하기 위한 도면이다.
도 18은 도 14a의 모듈화 계단실 중 "D"부분의 다른 실시예를 확대하여 도시한 도면이다.
도 19는 본 발명의 일 구현예에 따른 모듈형 계단실에 포함된 제1 계단실 모듈의 시공방법을 설명하기 위한 도면이다.1 is a perspective view of a modular staircase in accordance with one embodiment of the present invention.
2 is a partial cutaway perspective view of a modular staircase in accordance with one embodiment of the present invention.
3 is a view showing an extract of the first block of the first staircase module of FIG.
4 is a view showing an extract of the second block of the first staircase module of FIG.
FIG. 5 is a view showing an extract of a third block of the first staircase module of FIG. 1.
6 is a view showing an extract of the fourth block of the first staircase module of FIG.
FIG. 7 is a view illustrating an extract of the first block and the fifth block of the first staircase module of FIG. 1.
FIG. 8 is a diagram illustrating an extract of a first block and a sixth block of the first staircase module of FIG. 1.
9 is a view showing a first staircase module included in the modular staircase according to an embodiment of the present invention.
FIG. 10 is a view illustrating electrical equipment embedded in the first staircase module of FIG. 1.
FIG. 11A is an enlarged view of an embodiment of portion “A” of the first staircase room module of FIG. 9.
FIG. 11B is a view for explaining a horizontal joint bonding process of the portion shown in FIG. 11A.
FIG. 12A is an enlarged view of another embodiment of a portion “A” of the first staircase module of FIG. 9.
12B is a view for explaining a horizontal joint bonding process of the portion shown in FIG. 12A.
FIG. 13A is an enlarged view of an embodiment of part “B” of the first staircase room module of FIG. 9.
It is a figure for demonstrating the vertical joint bonding process of the part shown in FIG. 13A.
14A is a plan view of a modular staircase in accordance with one embodiment of the present invention.
14B is an elevational view of a modular staircase in accordance with one embodiment of the present invention.
FIG. 15A is an enlarged view of an embodiment of part “C” of the modular staircase of FIG. 14A.
FIG. 15B is a view for explaining a bonding process of the portion shown in FIG. 15A.
FIG. 16 is an enlarged view of an embodiment of portion “D” of the modular staircase of FIG. 14A.
FIG. 17A is an enlarged view of another embodiment of part “C” of the modular staircase of FIG. 14A.
FIG. 17B is a view for explaining a bonding process of the portion shown in FIG. 17A. FIG.
FIG. 18 is an enlarged view of another embodiment of part “D” of the modular staircase of FIG. 14A.
19 is a view for explaining the construction method of the first staircase room module included in the modular staircase room according to an embodiment of the present invention.
이하, 도면을 참조하여 본 발명의 일 구현예에 따른 모듈형 계단실을 상세히 설명한다. Hereinafter, with reference to the drawings will be described in detail the modular staircase according to an embodiment of the present invention.
본 명세서에서, "모듈형 계단실이 사전 제작된다"는 것은 모듈형 계단실이 현장 시공에 따라 건물의 내부 또는 외부에 제작 및 설치되는 것이 아니라, 공장에서 제작된 후 건물의 내부 또는 외부에 설치되는 것을 의미한다.In the present specification, "the modular staircase is prefabricated" means that the modular staircase is not manufactured and installed inside or outside the building according to the construction of the site, but is installed inside or outside the building after being manufactured in the factory. it means.
또한 본 명세서에서, "계단실 모듈"이란 복수개의 블록으로 나뉘어 제작된 후 조립되는 조립체로서 계단실을 구성하는 복수개의 반복 단위들 중 하나를 의미한다.In addition, in the present specification, "stair room module" refers to one of a plurality of repeating units constituting the staircase as an assembly that is manufactured by being divided into a plurality of blocks and then assembled.
또한 본 명세서에서, "모듈형 계단실"이란 상이한 구조를 갖는 복수개의 계단실 모듈로 구성되는 계단실을 의미한다.In addition, in this specification, "modular staircase" means a staircase composed of a plurality of staircase modules having different structures.
또한 본 명세서에서, "평단면"이란 평면도로 보여진 블록의 형상을 의미한다.In addition, in the present specification, the "flat section" means the shape of the block shown in plan view.
또한 본 명세서에서, "계단판"이란 지지체(stringer), 챌판(riser) 및 계단 디딤판(tread)을 포함하되, 계단참(landing)을 포함하지 않은 계단 구조물을 의미한다.In addition, in the present specification, the "stair plate" means a staircase structure including a supporter, a riser, and a step tread, but not including landing.
또한 본 명세서에서, "거울 대칭 구조(mirror symmetric structure)"란 대비되는 두 물체가 실상과 거울상의 관계에 있는 것을 의미한다. In addition, in this specification, "mirror symmetric structure" means that two contrasting objects are in a relationship with the real image and the mirror image.
또한 본 명세서에서, "고력볼트(high strength bolt)"란 고장력강(high tensile steel)으로 만들어진 고강도 볼트를 의미한다.Also in this specification, "high strength bolt" means a high strength bolt made of high tensile steel.
도 1은 본 발명의 일 구현예에 따른 모듈형 계단실(100)의 사시도이고, 도 2는 본 발명의 일 구현예에 따른 모듈형 계단실(100)의 부분 절개 사시도이다.1 is a perspective view of a
도 1 및 도 2를 참조하면, 본 발명의 일 구현예에 따른 모듈형 계단실(100)은 공장에서 사전 제작되어 건물의 내부 또는 외부에 설치되도록 구성된다. 따라서, 무비계 시공으로 인력 절감 및 공기 단축이 가능하여 원가를 절감하고 시공 안정성을 확보할 수 있다.1 and 2, the
또한, 본 발명의 일 구현예에 따른 모듈형 계단실(100)은 모듈화를 통해 규격화, 공기 단축 및 비용 절감의 이점을 얻을 수 있다.In addition, the
본 발명의 일 구현예에 따른 모듈형 계단실(100)은 적어도 3종의 계단실 모듈(M1, M2, M3)을 포함한다.
상기 각각의 계단실 모듈은 별도의 지지부재 없이 자립이 가능하다. 따라서, 假시설물의 설치 및 해체가 불필요하여 계단실의 제작비용 절감, 시공기간 단축, 시공 안정성 및 시공 안전성(위험 작업 축소)이 향상될 수 있다.Each staircase module can be self-supporting without a separate support member. Therefore, it is not necessary to install and dismantle the facility, so that the manufacturing cost of the staircase can be reduced, the construction time can be shortened, construction stability and construction safety (reduction of dangerous work) can be improved.
또한, 적어도 3종의 계단실 모듈(M1, M2, M3)은 구조가 서로 상이하다.Moreover, the at least 3 types of staircase modules M1, M2, and M3 differ from each other in structure.
모듈형 계단실(100)은 적어도 일부분이 프리캐스트 콘크리트(precast concrete)로 형성된 것일 수 있다. 예를 들어, 모듈형 계단실(100)을 구성하는 모든 블록(즉, 벽체, 계단판 및 계단참)이 프리캐스트 콘크리트로 형성될 수 있다. 이와 같이, 모듈형 계단실(100)의 적어도 일부분을 프리캐스트 콘크리트로 제작함으로써 골조공사나 일부 마감공사를 현장에서 수행할 필요가 없어져서 작업성을 개선할 수 있다.
또한, 모듈형 계단실(100)은 매립 전기설비(미도시) 및/또는 매립 소방설비(미도시)를 포함할 수 있다. 예를 들어, 도 10을 참조하면, 모듈형 계단실(100)은 제1 블록(110) 및/또는 제6 블록(160)에 매립용 전선관(e), 전선관 연결용 홈(g1) 및 매립용 전선박스(bx)를 포함할 수 있다. 이와 같이 매립 전기설비 및/또는 매립 소방설비를 포함함으로써 현장 작업을 최소화하여 인건비를 절감하고 공종간 간섭을 최소화하는 등의 효과를 얻을 수 있다. 만일, 현장에서 전기설비공사 및/또는 소방설비공사를 진행할 경우에는 수장 벽체 마감이 손상될 우려가 있을뿐만 아니라 복합 공종의 동시 투입으로 인해 안전사고가 발생할 확률이 높아질 수 있다.In addition, the
또한, 모듈형 계단실(100)은 서로 상이한 구조를 갖는 제1 계단실 모듈(M1), 제2 계단실 모듈(M2) 및 제3 계단실 모듈(M3)을 포함할 수 있다.In addition, the
제1 계단실 모듈(M1), 제2 계단실 모듈(M2) 및 제3 계단실 모듈(M3)은 각각 서로 독립적으로 하기 블록들로 이루어진 군으로부터 선택된 복수개의 블록을 포함하되, 제1 계단실 모듈(M1) 및 제2 계단실 모듈(M2)은 하기 제1 블록(구체적으로, 제1-1 블록(110))을 필수적으로 포함할 수 있다. 예를 들어, 제1 계단실 모듈(M1), 제2 계단실 모듈(M2) 및 제3 계단실 모듈(M3)은 각각 서로 독립적으로 하기 각 블록을 0개, 1개 또는 2개 이상 포함할 수 있다:The first staircase module M1, the second staircase module M2, and the third staircase module M3 each include a plurality of blocks independently selected from the group consisting of the following blocks, and the first staircase module M1. The second staircase module M2 may essentially include the following first block (specifically, the 1-1 block 110). For example, the first staircase module M1, the second staircase module M2, and the third staircase module M3 may each independently include 0, 1, or 2 or more of the following blocks:
(1) 일체로 형성된 벽체와 계단참을 포함하는 제1 블록(110, 110');(1) first blocks (110, 110 ') including integrally formed walls and landings;
(2) "ㄴ"자 형상의 평단면을 갖는 제2 블록(120);(2) a
(3) "ㄴ"자 형상의 평단면을 가지며, 제2 블록(120)과 동일하거나 상이한 구조를 갖는 제3 블록(130);(3) a
(4) "1"자 형상의 평단면을 갖는 제4 블록(140);(4) a
(5) 계단판을 포함하는 제5 블록(150, 150');(5)
(6) "ㄷ"자 형상의 평단면을 갖는 제6 블록(160);(6) a
(7) "ㄷ"자 형상의 평단면을 가지며, 제6 블록(160) 보다 높이가 높고, 측벽에 개구를 갖지 않는 제7 블록(170); 및(7) a
(8) "ㄷ"자 형상의 평단면 및 측벽에 형성된 문 형상의 개구를 가지며, 제6 블록(160) 보다 높이가 높은 제8 블록(180).(8) An
이하, 다른 도면들과 함께 주로 도 1 내지 도 9를 참조하여, 제1 블록(110, 110') 내지 제8 블록(180)을 상세히 설명한다.Hereinafter, the
도 3은 도 1의 제1 계단실 모듈(M1) 중 제1 블록(구체적으로, 제1-1 블록(110))을 발췌하여 도시한 도면이고, 도 4는 도 1의 제1 계단실 모듈(M1) 중 제2 블록(120)을 발췌하여 도시한 도면이고, 도 5는 도 1의 제1 계단실 모듈(M1) 중 제3 블록(130)을 발췌하여 도시한 도면이고, 도 6은 도 1의 제1 계단실 모듈(M1) 중 제4 블록(140)을 발췌하여 도시한 도면이고, 도 7은 도 1의 제1 계단실 모듈(M1) 중 제1 블록(구체적으로, 제1-1 블록(110)) 및 제5 블록(구체적으로, 제5-1 블록(150))을 발췌하여 도시한 도면이고, 도 8은 도 1의 제1 계단실 모듈(M1) 중 제1 블록(구체적으로, 제1-1 블록(110)) 및 제6 블록(160)을 발췌하여 도시한 도면이고, 도 9는 본 발명의 일 구현예에 따른 모듈형 계단실(100)에 포함된 제1 계단실 모듈(M1)을 도시한 도면이다.FIG. 3 is a view showing an extract of a first block (specifically, 1-1 block 110) of the first staircase module M1 of FIG. 1, and FIG. 4 is a first staircase module M1 of FIG. 1. ) Is a view showing an extract of the
먼저, 도 3 및 도 9를 참조하면, 제1 블록(110, 110')은 제1-1 블록(110) 및 제1-2 블록(110')를 포함할 수 있다. 제1-1 블록(110)과 제1-2 블록(110')의 유일한 차이점은 측벽에 개구가 형성되어 있는지 여부이다. 즉, 제1-1 블록(110)은 도 3에 도시된 바와 같이 측벽에 개구가 형성되어 있지 않은데 반하여, 제1-2 블록(110')은 도 9에 도시된 바와 같이 측벽에 개구가 형성되어 있다. 또한, 제1-1 블록(110)은 기초(10) 상에 배치될 수 있다. 기초(10)는 몸체(11) 및 복수개의 수직 다웰바(dowel bar)(12)를 포함할 수 있다. 또한, 기초(10)는 모듈화 계단(100) 전체에 전달되는 하중을 고려하여, 작업성을 확보하고 시공 오차를 최소화하기 위해 철근 설치 구조를 간소화하여 제작된 것일 수 있다.First, referring to FIGS. 3 and 9, the
특히 도 3을 참조하면, 제1-1 블록(110)은 몸체(111), 계단참(112) 및 메인철근(113)을 포함할 수 있다. 몸체(111)는 "ㄷ"자 형태로 배치된 3개의 수직 벽체를 포함하고, 계단참(112)은 몸체(111)의 상부를 덮도록 배치되되, 몸체(111)와 일체로 형성된 것일 수 있다. 메인철근(113)은 몸체(111)의 내구성을 강화시킬뿐만 아니라, 도 9에 도시된 바와 같이, 다른 블록(예를 들어, 제6 블록(160))과의 결합력을 강화시키는 역할을 수행한다.In particular, referring to FIG. 3, the first-
제1 블록(110, 110')은 시공시 별도의 지지부재 없이 설치 가능하도록 "ㄷ"자 형태로 구성되며, 몸체(111, 111')(즉, 벽체)와 계단참(112, 112')이 일체화되어 있어서, 현장 작업의 최소화로 인한 시공 편의성 및 구조 안정성을 동시에 확보할 수 있다. 만일, 벽체와 계단참을 별도로 제작하여 현장에서 설치할 경우에는 벽체와 계단참 사이에 발생하는 접합부의 보강재가 추가되어야 할뿐만 아니라, 현장 작업도 추가되어야 하는 문제점이 있다.The first block (110, 110 ') is configured in a "c" shape so that it can be installed without a separate support member during construction, the body (111, 111') (that is, the wall) and landing (112, 112 ') Since it is integrated, it is possible to secure construction convenience and structural stability at the same time due to the minimization of field work. If the wall and landing are separately manufactured and installed in the field, not only the reinforcement of the joint generated between the wall and the landing should be added, but also the field work must be added.
도 4를 참조하면, 제2 블록(120)은 몸체(121) 및 메인철근(122)을 포함할 수 있다. 몸체(121)는 "ㄴ"자 형태로 배치된 2개의 수직 벽체를 포함할 수 있다. 메인철근(122)은 몸체(121)의 내구성을 강화시킬뿐만 아니라, 도 9에 도시된 바와 같이, 다른 블록(예를 들어, 제1-2 블록(110'))과의 결합력을 강화시키는 역할을 수행한다. 제2 블록(120)은 제1 블록(110, 110')과 동일한 높이를 가질 수 있다.Referring to FIG. 4, the
도 5를 참조하면, 제3 블록(130)은 몸체(131) 및 메인철근(132)을 포함할 수 있다. 몸체(131)는 "ㄴ"자 형태로 배치된 2개의 수직 벽체를 포함할 수 있다. 메인철근(132)은 몸체(131)의 내구성을 강화시킬뿐만 아니라, 도 9에 도시된 바와 같이, 다른 블록(예를 들어, 제1-2 블록(110'))과의 결합력을 강화시키는 역할을 수행한다. 또한, 제3 블록(130)은 제2 블록(120)과 거울 대칭 구조를 가질 수 있다. 그러나, 본 발명이 이에 한정되는 것은 아니며, 제2 블록(120)과 제3 블록(130)은 서로 크기가 다를 수 있으며, 이에 따라 제2 블록(120)과 제3 블록(130)은 거울 대칭 구조를 갖지 않을 수도 있다. 제3 블록(130)과 제2 블록(120)이 서로 결합될 경우, 도 1에 도시된 바와 같이, 일측면에 출입구가 형성될 수 있다. 제3 블록(130)은 제2 블록(120) 및 제1 블록(구체적으로, 제1-1 블록(110))과 동일한 높이를 가질 수 있다.Referring to FIG. 5, the
도 6을 참조하면, 제4 블록(140)은 몸체(141) 및 메인철근(142)을 포함할 수 있다. 몸체(141)는 "1"자 형태로 배치된 1개의 수직 벽체를 포함하거나 상기 수직 벽체 자체일 수 있다. 메인철근(142)은 몸체(141)의 내구성을 강화시킬뿐만 아니라, 도 1 및 도 2로부터 파악할 수 있는 바와 같이, 다른 블록(예를 들어, 또 다른 제4 블록(140))과의 결합력을 강화시키는 역할을 수행한다. 또한, 제4 블록(140)과 이격되게 서로 마주 보도록 추가 제4 블록(140)이 배치될 수 있다. 제4 블록(140)의 높이는 제1 블록(구체적으로, 제1-1 블록(110)), 제2 블록(120) 또는 제3 블록(130)의 높이의 2배일 수 있다. 그러나, 본 발명이 이에 한정되는 것은 아니며, 제4 블록(140)의 높이는 제1 블록(구체적으로, 제1-1 블록(110)), 제2 블록(120) 또는 제3 블록(130)의 높이의 2배가 아닐 수도 있다.Referring to FIG. 6, the
도 7을 참조하면, 제5 블록(구체적으로, 제5-1 블록(150))은 계단판을 포함할 수 있다. 또한, 도 2, 도 14a 및 도 14b에 도시된 바와 같이, 제5 블록(150)은 제5-1 블록(150) 및 제5-2 블록(150')을 포함할 수 있다. 제5-1 블록(150) 및 제5-2 블록(150')은 서로 동일하거나 상이한 구조를 가질 수 있다. 또한, 도 14b에 도시된 바와 같이, 제5 블록(150, 150')은 상기 계단판의 측면에 설치된 발끝막이판(toe plate)(155, 155')을 더 포함할 수 있다. 발끝막이판(155, 155')은 계단판과 함께 공장에서 사전 제작된 후 상기 계단판에 설치되어 현장에서의 용접작업을 최소화할 수 있다.Referring to FIG. 7, the fifth block (specifically, the fifth-first block 150) may include a step plate. In addition, as illustrated in FIGS. 2, 14A and 14B, the
도 8을 참조하면, 제6 블록(160)은 몸체(161) 및 메인철근(162)을 포함할 수 있다. 몸체(161)는 "ㄷ"자 형태로 배치된 3개의 수직 벽체를 포함하고, 메인철근(162)은 몸체(161)의 내구성을 강화시킬뿐만 아니라, 도 1 및 도 2로부터 파악할 수 있는 바와 같이, 다른 블록(예를 들어, 제1-1 블록(110))과의 결합력을 강화시키는 역할을 수행한다. 제6 블록(160)은 제3 블록(130), 제2 블록(120) 및 제1 블록(구체적으로, 제1-1 블록(110))과 동일한 높이를 가질 수 있다. 그러나, 본 발명이 이에 한정되는 것은 아니며, 제6 블록(160)은 제3 블록(130), 제2 블록(120) 및 제1 블록(구체적으로, 제1-1 블록(110))과 상이한 높이를 가질 수 있다.Referring to FIG. 8, the
다시 도 1을 참조하면, 제7 블록(170)은 몸체(171) 및 메인철근(172)을 포함할 수 있다. 몸체(171)는 "ㄷ"자 형태로 배치된 3개의 수직 벽체를 포함하고, 메인철근(172)은 몸체(171)의 내구성을 강화시키는 역할을 수행한다. 또한, 제7 블록(170)의 높이는 제1 블록(구체적으로, 제1-1 블록(110)), 제2 블록(120), 제3 블록(130) 또는 제6 블록(160)의 높이의 2배일 수 있다. 그러나 본 발명이 이에 한정되는 것은 아니며, 제7 블록(170)의 높이는 제1 블록(구체적으로, 제1-1 블록(110)), 제2 블록(120), 제3 블록(130) 또는 제6 블록(160)의 높이의 2배가 아닐 수도 있다.Referring back to FIG. 1, the
또한 도 1을 참조하면, 제8 블록(180)은 몸체(181) 및 메인철근(182)을 포함할 수 있다. 몸체(181)는 "ㄷ"자 형태로 배치된 3개의 수직 벽체를 포함하고, 메인철근(182)은 몸체(181)의 내구성을 강화시키는 역할을 수행한다. 또한, 제8 블록(180)의 높이는 제1 블록(110, 110'), 제2 블록(120), 제3 블록(130) 또는 제6 블록(160)의 높이의 2배일 수 있다. 또한, 제8 블록(180)의 높이는 제7 블록(170)의 높이와 동일할 수 있다.Also, referring to FIG. 1, the
제1 블록(110, 110') 내지 제8 블록(180)은 적어도 일부분이 프리캐스트 콘크리트로 형성된 것일 수 있다.At least a portion of the
상술한 제1 블록(110, 110') 내지 제8 블록(180)은 별도의 지지부재 없이 자립이 가능할뿐만 아니라, 타워 크레인 및 하이드로 크레인 등을 이용하여 쉽게 운반할 수 있도록 설계된 것일 수 있다.The
또한, 제1 블록(110, 110') 내지 제8 블록(180)은 공장에서 사전 제작되어 현장 작업을 최소화할 수 있다.In addition, the
<제1 계단실 모듈(M1)><1st staircase module (M1)>
이하, 도 2 및 도 7과 함께 주로 도 1 및 도 9를 참조하여 제1 계단실 모듈(M1)을 상세히 설명한다.Hereinafter, the first staircase room module M1 will be described in detail with reference to FIGS. 1 and 9 along with FIGS. 2 and 7.
도 7 및 도 9를 참조하면, 제1 계단실 모듈(M1)은 제1 블록(110, 110') 내지 제6 블록(160)을 포함할 수 있다.7 and 9, the first staircase room module M1 may include
먼저, 제1-1 블록(110)은 기초(10)의 몸체(11) 상에 배치되되, 다각형(예를 들어, 직사각형) 라인 상에 설치된 복수개의 수직 다웰바(12) 위에 배치될 수 있다. 예를 들어, 제1-1 블록(110)은 직사각형 라인 상에 설치된 복수개의 수직 다웰바(12) 중 길이가 짧은 제1 변 부분에 설치된 다웰바들(12)을 완전히 덮고, 상기 제1 변에 연접한 길이가 긴 제2 및 제3 변 부분에 설치된 다웰바들(12) 중 일부를 덮도록 배치될 수 있다.First, the first-
제4 블록(140)은 제1-1 블록(110)과 수평으로 나란한 방향으로 배치되되, 제1-1 블록(110)과 좁은 면끼리 접하도록 배치될 수 있다.The
제2 블록(120)은 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 제4 블록(140)과 좁은 면끼리 접하도록 배치될 수 있다.The
제3 블록(130)은 제2 블록(120)과 수평으로 나란한 방향으로 배치되되, 제2 블록(120)과 좁은 면끼리 서로 마주보며 이격되도록 배치될 수 있다.The
추가 제4 블록(140)은 제1-1 블록(110) 및 제3 블록(130)과 수평으로 나란한 방향으로 배치되되, 제1-1 블록(110) 및 제3 블록(130)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The additional
제6 블록(160)은 제1-1 블록(110) 상에 적층되고, 상기 한쌍의 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 상기 한쌍의 제4 블록(140)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The
제1-2 블록(110')은 제2 블록(120) 및 제3 블록(130) 상에 적층되고, 상기 한쌍의 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 상기 한쌍의 제4 블록(140)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The
도 2를 참조하면, 제5-1 블록(150)은 일단부는 제1-1 블록(110)의 계단참(112)에 결합되고, 타단부는 기초(10)의 몸체(11)에 결합된 것일 수 있다.Referring to FIG. 2, one end of the
또한 도 2를 참조하면, 제5-2 블록(150')은 일단부는 제1-1 블록(110)의 계단참(112)에 결합되고, 타단부는 제1-2 블록(110')의 계단참(112')에 결합된 것일 수 있다.Also, referring to FIG. 2, one end of the
<제2 계단실 모듈(M2)><2nd staircase module (M2)>
이하, 도 2 및 도 7과 함께 주로 도 1을 참조하여 제2 계단실 모듈(M2)을 상세히 설명한다.Hereinafter, the second staircase room module M2 will be described in detail with reference to FIG. 1 along with FIGS. 2 and 7.
먼저, 제1-1 블록(110)은 제1 계단실 모듈(M1)의 제6 블록(160) 상에 적층될 수 있다.First, the first-
제4 블록(140)은 제1 계단실 모듈(M1)의 제4 블록(140) 상에 적층되고, 제1-1 블록(110)과 수평으로 나란한 방향으로 배치되되, 제1-1 블록(110)과 좁은 면끼리 접하도록 배치될 수 있다.The
제6 블록(160)은 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 제4 블록(140)과 좁은 면끼리 접하도록 배치될 수 있다.The
추가 제4 블록(140)은 제1-1 블록(110) 및 제6 블록(160)과 수평으로 나란한 방향으로 배치되되, 제1-1 블록(110) 및 제6 블록(160)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The additional
추가 제6 블록(160)은 제1-1 블록(110) 상에 적층되고, 상기 한쌍의 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 상기 한쌍의 제4 블록(140)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The additional
추가 제1-1 블록(110)은 제6 블록(160) 상에 적층되고, 상기 한쌍의 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 상기 한쌍의 제4 블록(140)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The additional first-
도 2를 참조하면, 제5-1 블록(150)은 일단부는 제1-1 블록(110)의 계단참(112)에 결합되고, 타단부는 제1 계단실 모듈(M1)의 제1-2 블록(110')의 계단참(112')에 결합된 것일 수 있다.Referring to FIG. 2, one end of the
또한 도 2를 참조하면, 제5-2 블록(150')은 일단부는 제1-1 블록(110)의 계단참(112)에 결합되고, 타단부는 추가 제1-1 블록(110)의 계단참(112)에 결합된 것일 수 있다.Also, referring to FIG. 2, the 5-2
<제3 계단실 모듈(M3)><3rd stairwell module (M3)>
이하, 도 2 및 도 7과 함께 주로 도 1을 참조하여 제3 계단실 모듈(M3)을 상세히 설명한다.Hereinafter, the third staircase module M3 will be described in detail with reference to FIG. 1 along with FIGS. 2 and 7.
먼저, 제7 블록(170)은 제2 계단실 모듈(M2)의 제6 블록(160) 상에 적층될 수 있다.First, the
제4 블록(140)은 제2 계단실 모듈(M2)의 제4 블록(140) 상에 적층되고, 제7 블록(170)과 수평으로 나란한 방향으로 배치되되, 제7 블록(170)과 좁은 면끼리 접하도록 배치될 수 있다.The
제8 블록(180)은 제4 블록(140)과 수평으로 나란한 방향으로 배치되되, 제4 블록(140)과 좁은 면끼리 접하도록 배치될 수 있다.The
추가 제4 블록(140)은 제7 블록(170) 및 제8 블록(180)과 수평으로 나란한 방향으로 배치되되, 제7 블록(170) 및 제8 블록(180)과 각각 좁은 면끼리 접하도록 배치될 수 있다.The additional
이하, 도 9 및 도 11a 내지 도 13b를 참조하여, 블록간 접합부 및 접합 공정을 상세히 설명한다. 하기에서 설명되는 블록간 접합부는 지진 하중을 고려하여 내진 특성을 만족하도록 설계된 것일 수 있다.Hereinafter, with reference to FIGS. 9 and 11A to 13B, the interblock junction and the bonding process will be described in detail. Inter-block joints described below may be designed to satisfy the seismic characteristics in consideration of the seismic load.
<수평 이음 접합부의 제1 실시예><First Embodiment of Horizontal Joint Junction>
도 11a는 도 9의 제1 계단실 모듈(M1) 중 “A”부분의 일 실시예를 확대하여 도시한 도면이다. 도 11a의 (a)는 입면도이고, 도 11a의 (b)는 단면도이다.FIG. 11A is an enlarged view of an embodiment of part “A” of the first staircase room module M1 of FIG. 9. FIG. 11A (a) is an elevation view, and FIG. 11A (b) is a sectional view.
도 11a를 참조하면, 도 9의 제1 계단실 모듈(M1) 중 “A”부분의 수평 이음 접합부는 제1 벽체(W1), 제2 벽체(W2), 홈(g2), 매립철판(P1), 연결철판(P2), 용접부(We), 연결볼트(b1) 및 무수축 몰탈(mt)을 포함할 수 있다.Referring to FIG. 11A, the horizontal joint portion of the “A” portion of the first staircase module M1 of FIG. 9 is the first wall W1, the second wall W2, the groove g2, and the buried iron plate P1. It may include a connecting iron plate (P2), weld (We), connecting bolt (b1) and non-contraction mortar (mt).
제1 벽체(W1)와 제2 벽체(W2)는 서로 수평으로 나란한 방향으로 배치되되, 좁은 면끼리 서로 마주 보도록 배치될 수 있다.The first wall W1 and the second wall W2 may be arranged in parallel directions to each other, and may be disposed so that narrow surfaces thereof face each other.
홈(g2)은 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 것일 수 있다.The groove g2 may be formed in the first wall W1 and the second wall W2, respectively.
매립철판(P1)은 제1 벽체(W1) 및 제2 벽체(W2)에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed on the first wall W1 and the second wall W2, respectively.
연결철판(P2)은 제1 벽체(W1)에 설치된 매립철판(P1)의 일부분과 제2 벽체(W2)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 배치된 것일 수 있다.The connecting iron plate P2 may be disposed to cover a portion of the buried iron plate P1 installed on the first wall W1 and a portion of another buried iron plate P1 installed on the second wall W2.
용접부(We)는 연결철판(P2)의 테두리 부분과 매립철판(P1)의 대응 부분을 용접하여 형성된 것일 수 있다.The welding part We may be formed by welding the edge portion of the connecting iron plate P2 and the corresponding portion of the buried iron plate P1.
연결볼트(b1)는 연결철판(P2)과 매립철판(P1)을 관통하여 이들을 서로 결합시키는 것일 수 있다.The connecting bolt b1 may pass through the connecting iron plate P2 and the buried iron plate P1 to couple them to each other.
무수축 몰탈(mt)은 제1 벽체(W1)와 제2 벽체(W2)에 형성된 홈(g2)에 충진된 후 양생단계를 거쳐 마감처리된 것일 수 있다. 다만, 비록 도면에는 도시되어 있지 않지만, 제1 벽체(W1) 및 제2 벽체(W2) 사이의 틈새는 코킹재(예를 들어, 방화 코킹재) 및 백업재로 플러깅될 수 있으며, 별도의 무수축 몰탈로 충진될 필요는 없다. The non-shrink mortar (mt) may be filled in the groove g2 formed in the first wall (W1) and the second wall (W2) and then finished through a curing step. However, although not shown in the drawings, the gap between the first wall W1 and the second wall W2 may be plugged with a caulking material (for example, a fire caulking material) and a backing material, and may be plugged separately. It does not need to be filled with shrink mortar.
도 11b는 도 11a에 도시된 부분의 수평 이음 접합 공정을 설명하기 위한 도면이다.FIG. 11B is a view for explaining a horizontal joint bonding process of the portion shown in FIG. 11A.
먼저 도 11b의 ①을 참조하면, 제2 벽체(W2)를 제1 벽체(W1)쪽으로 이동시킨다.First, referring to ① of FIG. 11B, the second wall W2 is moved toward the first wall W1.
다음에 도 11b의 ②를 참조하면, 제2 벽체(W2)를 이동시켜 제1 벽체(W1)와 수평으로 나란하도록 정렬한 후, 연결철판(P2)을 위치시키고 볼트(b1)를 체결한다. 구체적으로, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 홈(g2)과 함께, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 설치된 매립철판(P1)을 정렬시킨 후, 제1 벽체(W1)에 설치된 매립철판(P1)의 일부분과 제2 벽체(W2)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 연결철판(P2)을 위치시킨다. 이후, 연결철판(P2)과 매립철판(P1)을 관통하도록 볼트(b1)를 체결한다.Next, referring to ② of FIG. 11B, the second wall W2 is moved to align horizontally with the first wall W1, and then the connecting iron plate P2 is positioned and the bolt b1 is fastened. Specifically, the buried iron plate P1 provided on the first wall W1 and the second wall W2 is aligned with the groove g2 formed in the first wall W1 and the second wall W2, respectively. Thereafter, the connecting iron plate P2 is positioned to cover a portion of the embedded iron plate P1 installed on the first wall W1 and another portion of another embedded iron plate P1 installed on the second wall W2. Thereafter, the bolt b1 is fastened to penetrate through the connecting iron plate P2 and the buried iron plate P1.
다음에 도 11b의 ③을 참조하면, 연결철판(P2)의 테두리 부분과 매립철판(P1)의 대응 부분을 용접한다.Next, referring to (3) in FIG. 11B, the edge portion of the connecting iron plate P2 and the corresponding portion of the buried iron plate P1 are welded.
다음에 도 11b의 ④를 참조하면, 거푸집(미도시)을 설치하고, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 홈(g2)에 무수축 몰탈(non-shrinkage mortar)(mt)을 채운 후 양생하여 마감처리한다.Next, referring to ④ of FIG. 11B, a formwork (not shown) is provided, and a non-shrinkage mortar is formed in a groove g2 formed in each of the first wall W1 and the second wall W2 ( mt) is filled and cured to finish.
다음에, 상기 거푸집을 제거한다.Next, the formwork is removed.
<수평 이음 접합부의 제2 실시예>Second Embodiment of Horizontal Joint Junction
도 12a는 도 9의 제1 계단실 모듈(M1) 중 “A”부분의 다른 실시예를 확대하여 도시한 도면이다. 도 12a의 (a)는 입면도이고, 도 12a의 (b)는 단면도이다.FIG. 12A is an enlarged view of another embodiment of part “A” of the first staircase room module M1 of FIG. 9. FIG. 12A (a) is an elevation view, and FIG. 12A (b) is a sectional view.
도 12a를 참조하면, 도 9의 제1 계단실 모듈(M1) 중 “A”부분의 수평 이음 접합부는 제1 벽체(W1), 제2 벽체(W2), 홈(g2), 매립철판(P1), 연결철판(P2), 고력볼트(b2) 및 무수축 몰탈(mt)을 포함할 수 있다.Referring to FIG. 12A, the horizontal joint portion of the “A” portion of the first staircase module M1 of FIG. 9 may include a first wall W1, a second wall W2, a groove g2, and a buried iron plate P1. It may include a connecting iron plate (P2), high-strength bolt (b2) and non-contraction mortar (mt).
제1 벽체(W1)와 제2 벽체(W2)는 서로 수평으로 나란한 방향으로 배치되되, 좁은 면끼리 서로 마주 보도록 배치될 수 있다.The first wall W1 and the second wall W2 may be arranged in parallel directions to each other, and may be disposed so that narrow surfaces thereof face each other.
홈(g2)은 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 것일 수 있다.The groove g2 may be formed in the first wall W1 and the second wall W2, respectively.
매립철판(P1)은 제1 벽체(W1) 및 제2 벽체(W2)에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed on the first wall W1 and the second wall W2, respectively.
연결철판(P2)은 제1 벽체(W1)에 설치된 매립철판(P1)의 일부분과 제2 벽체(W2)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 배치된 것일 수 있다.The connecting iron plate P2 may be disposed to cover a portion of the buried iron plate P1 installed on the first wall W1 and a portion of another buried iron plate P1 installed on the second wall W2.
고력볼트(b2)는 연결철판(P2)과 매립철판(P1)을 관통하여 이들을 서로 결합시키는 것일 수 있다.The high-strength bolt b2 may penetrate the connecting iron plate P2 and the buried iron plate P1 to couple them to each other.
특히 도 12a의 (b)를 참조하면, 제1 벽체(W1)와 제2 벽체(W2) 사이에 전단키(shear key)(sk)가 배치될 수 있다. 전단키(sk)는 제1 벽체(W1)와 제2 벽체(W2) 사이의 결합력을 향상시킬 수 있다. 이러한 전단키(sk)는 연결철판(P2) 상부에 채우는 무수축 몰탈(mt)과 동일한 재료로 형성되어 제1 벽체(W1)와 제2 벽체(W2) 사이에 생기는 Joint 구간을 메워주며, 단면상 요철이 있어 무수축 몰탈(mt) 주입시 구근이 형성되어 shear key 역할을 수행한다.In particular, referring to FIG. 12A (b), a shear key sk may be disposed between the first wall W1 and the second wall W2. The shear key sk may improve the bonding force between the first wall W1 and the second wall W2. The shear key sk is formed of the same material as the non-shrink mortar (mt) filling the upper portion of the connecting iron plate (P2) to fill the joint section generated between the first wall (W1) and the second wall (W2), irregularities in cross-section There is a bulb is formed during shrinkage mortar injection (mt) serves as a shear key.
무수축 몰탈(mt)은 제1 벽체(W1)와 제2 벽체(W2)에 형성된 홈(g2)뿐만 아니라, 제1 벽체(W1) 및 제2 벽체(W2) 사이의 틈새에 충진된 후 양생단계를 거쳐 마감처리된 것일 수 있다. 또한, 비록 도면에 도시되어 있지 않지만, 제1 벽체(W1) 및 제2 벽체(W2) 사이의 틈새는 코킹재(계단실 내부: 방화 코킹재, 계단실 외부: 일반 코킹재) 및 백업재로 플러깅될 수 있다.The non-shrink mortar (mt) is cured after filling the gap between the first wall (W1) and the second wall (W2) as well as the groove (g2) formed in the first wall (W1) and the second wall (W2). It may be finished through the steps. In addition, although not shown in the drawings, the gap between the first wall W1 and the second wall W2 is to be plugged into a caulking material (inside the staircase: a fire caulking material, a staircase outside: a regular caulking material) and a backing material. Can be.
도 12b는 도 12a에 도시된 부분의 수평 이음 접합 공정을 설명하기 위한 도면이다.12B is a view for explaining a horizontal joint bonding process of the portion shown in FIG. 12A.
먼저 도 12b의 ①을 참조하면, 제2 벽체(W2)를 제1 벽체(W1)쪽으로 이동시킨다.First, referring to ① of FIG. 12B, the second wall W2 is moved toward the first wall W1.
다음에 도 12b의 ②를 참조하면, 제2 벽체(W2)를 이동시켜 제1 벽체(W1)와 수평으로 나란하도록 정렬한 후, 연결철판(P2)을 위치시킨다. 구체적으로, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 홈(g2)과 함께, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 설치된 매립철판(P1)을 정렬시킨 후, 제1 벽체(W1)에 설치된 매립철판(P1)의 일부분과 제2 벽체(W2)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 연결철판(P2)을 위치시킨다. 또한, 상기 수평 이음 접합부는 연결철판(P2), 매립철판(P1) 및 제1 벽체(W1)(또는 제2 벽체(W2))를 관통하는 고력볼트 삽입홈(g3)을 포함할 수 있다. Next, referring to ② of FIG. 12B, the second wall W2 is moved to align horizontally with the first wall W1, and then the connecting iron plate P2 is positioned. Specifically, the buried iron plate P1 provided on the first wall W1 and the second wall W2 is aligned with the groove g2 formed in the first wall W1 and the second wall W2, respectively. Thereafter, the connecting iron plate P2 is positioned to cover a portion of the embedded iron plate P1 installed on the first wall W1 and another portion of another embedded iron plate P1 installed on the second wall W2. In addition, the horizontal joint portion may include a high-strength bolt insertion groove g3 penetrating through the connecting iron plate (P2), buried iron plate (P1) and the first wall (W1) (or the second wall (W2)).
다음에 도 12b의 ③을 참조하면, 연결철판(P2)과 매립철판(P1)을 관통하도록 고력볼트(b2)를 체결한다.Next, referring to ③ of FIG. 12B, the high-strength bolt b2 is fastened to penetrate the connecting iron plate P2 and the buried iron plate P1.
다음에 도 12b의 ④를 참조하면, 거푸집(미도시)을 설치하고, 제1 벽체(W1) 및 제2 벽체(W2)에 각각 형성된 홈(g2)뿐만 아니라, 제1 벽체(W1)와 제2 벽체(W2) 사이의 틈새에 무수축 몰탈(mt)을 채운 후 양생하여 마감처리한다.Next, referring to ④ of FIG. 12B, not only the groove g2 formed in each of the first wall W1 and the second wall W2 by installing a formwork (not shown), but also the first wall W1 and the first 2 Fill the gap between the walls (W2) with no shrinkage mortar (mt), then cure and finish.
다음에, 상기 거푸집을 제거한다.Next, the formwork is removed.
<수직 이음 접합부의 제1 실시예><First embodiment of vertical joint junction>
도 13a는 도 9의 제1 계단실 모듈(M1) 중 “B”부분의 일 실시예를 확대하여 도시한 도면이다. 도 13a는 단면도이다.FIG. 13A is an enlarged view of an embodiment of a portion “B” of the first staircase room module M1 of FIG. 9. 13A is a cross-sectional view.
도 13a를 참조하면, 도 9의 제1 계단실 모듈(M1) 중 “B”부분의 수직 이음 접합부는 제1 벽체(W1), 제2 벽체(W2), 무수축 몰탈(mt), 백업재(bu) 및 코킹재(ck)를 포함할 수 있다.Referring to FIG. 13A, the vertical joint portion of the “B” portion of the first staircase module M1 of FIG. 9 may include the first wall W1, the second wall W2, the non-shrink mortar mt and the backup material ( bu) and caulking material (ck).
제1 벽체(W1)와 제2 벽체(W2)는 서로 수직으로 나란한 방향으로 배치되되, 좁은 면끼리 서로 마주 보도록 배치될 수 있다.The first wall W1 and the second wall W2 may be disposed in a direction perpendicular to each other, and may be disposed such that narrow surfaces thereof face each other.
제1 벽체(W1)는 이에 수직으로 매립된 메인철근(st1)을 포함하고, 제2 벽체(W2)는 이에 수직으로 매립된 메인철근(st2)을 포함할 수 있다.The first wall W1 may include a main reinforcement st1 buried vertically thereto, and the second wall W2 may include a main reinforcement st2 buried vertically thereto.
슬리브(S)는 제2 벽체(W2)의 내부에 설치된 것일 수 있다. 이러한 슬리브(S)는 중공 실린더 형상을 가질 수 있다.The sleeve S may be installed inside the second wall W2. Such a sleeve S may have a hollow cylinder shape.
제2 벽체(W2)에 수직으로 매립된 메인철근(st2)은 그 일부분이 슬리브(S) 내에 위치하고, 제1 벽체(W2)에 수직으로 매립된 메인철근(st1)은 그 일부분이 슬리브(S) 내에 위치할 수 있다. 구체적으로, 메인철근(st1)과 메인철근(st2)은 서로 단부끼리 마주보도록 인접되게 배치될 수 있다.A portion of the main reinforcement st2 embedded perpendicular to the second wall W2 is located in the sleeve S, and a portion of the main reinforcement st1 embedded vertically in the first wall W2 is the sleeve S ) Can be located within. In detail, the main reinforcing bars st1 and the main reinforcing bars st2 may be disposed to face each other so that their ends face each other.
무수축 몰탈(mt)은 슬리브(S)의 내부뿐만 아니라 제1 벽체(W1)와 제2 벽체(W2) 사이의 틈새에도 충전된 것일 수 있다.The non-shrink mortar (mt) may be filled in the gap between the first wall (W1) and the second wall (W2) as well as the inside of the sleeve (S).
백업재(bu) 및 코킹재(ck)는 무수축 몰탈(mt)이 외부로 빠져나오지 않도록 지지하는 역할을 수행한다.The backing material bu and the caulking material ck serve to support the non-shrinkage mortar mt from escaping to the outside.
도 13b는 도 13a에 도시된 부분의 수직 이음 접합 공정을 설명하기 위한 도면이다.It is a figure for demonstrating the vertical joint bonding process of the part shown in FIG. 13A.
먼저 도 13b의 ①을 참조하면, 제2 벽체(W2)를 제1 벽체(W1)쪽으로 이동시킨다.First, referring to ① of FIG. 13B, the second wall W2 is moved toward the first wall W1.
다음에 도 13b의 ②를 참조하면, 제2 벽체(W2)를 이동시켜 제1 벽체(W1)와 수직으로 나란하도록 정렬한다. 구체적으로, 제2 벽체(W2)를 제1 벽체(W1)쪽으로 이동시켜 메인철근(st1)과 메인철근(st2)이 각각의 단부들끼리 인접한 위치에서 서로 마주보도록 정렬시킨다.Next, referring to ② of FIG. 13B, the second wall W2 is moved to align vertically with the first wall W1. Specifically, the second wall W2 is moved toward the first wall W1 so that the main reinforcing bars st1 and the main reinforcing bars st2 face each other at adjacent positions.
다음에 도 13b의 ③을 참조하면, 제1 벽체(W1)와 제2 벽체(W2) 사이의 틈새에 거푸집(d)을 설치한 후, 제2 벽체(W2)의 하부에 형성된 주입구(h1)에 무수축 몰탈(mt)을 주입하여 슬리브(S)의 내부뿐만 아니라 제1 벽체(W1)와 제2 벽체(W2) 사이의 틈새를 무수축 몰탈(mt)로 채운다. 과잉 무수축 몰탈(mt)은 제2 벽체(W2)의 상부에 형성된 배출구(h1)로 배출될 수 있다. 이후, 충전된 무수축 몰탈(mt)을 양생하여 마감처리한다.Next, referring to (3) in FIG. 13B, after the mold d is installed in the gap between the first wall W1 and the second wall W2, the injection hole h1 formed in the lower portion of the second wall W2. Non-shrink mortar (mt) is injected into the gap between the first wall (W1) and the second wall (W2) as well as the inside of the sleeve (S) to fill with the non-shrink mortar (mt). Excess non-contraction mortar (mt) may be discharged to the outlet (h1) formed in the upper portion of the second wall (W2). Thereafter, the filled non-contraction mortar (mt) is cured and finished.
다음에 도 13a 또는 도 13b의 ③을 참조하면, 거푸집(d)을 제거한 후, 코킹재(ck) 및 백업재(bu)를 차례로 설치할 수 있다. Next, referring to (3) in Fig. 13A or 13B, after removing the formwork d, the caulking material ck and the backing material bu may be sequentially installed.
상술한 제1 벽체(W1) 및 제2 벽체(W2)는 각각 서로 독립적으로 제1 블록(110, 110')의 몸체(111, 111') 내지 제8 블록(180)의 몸체(181) 중 어느 하나의 몸체에 포함된 벽체일 수 있다. The first wall W1 and the second wall W2 described above are independently of each other among the
또한, 상술한 메인철근(st1)과 메인철근(st2)은 각각 서로 독립적으로 제1 블록(110, 110')의 메인철근(113, 113') 내지 제8 블록(180)의 메인철근(182) 중 어느 하나의 메인철근일 수 있다. In addition, the main reinforcement st1 and the main reinforcement st2 described above are independently of each other, and the
이하, 도 14a 내지 도 18을 참조하여, 계단참과 계단판 간의 접합부 및 접합 공정을 상세히 설명한다.Hereinafter, referring to FIGS. 14A to 18, the junction between the landing and the step plate and the joining process will be described in detail.
도 14a는 본 발명의 일 구현예에 따른 모듈화 계단실(100)의 평면도이고, 도 14b는 본 발명의 일 구현예에 따른 모듈화 계단실(100)의 입면도이다.14A is a plan view of the
도 14a 및 도 14b를 참조하면, 제1-1 블록(110)은 몸체(111) 및 계단참(112)을 포함할 수 있다. 또한, 계단참(112)에는 제5-1 블록(150)의 일단부가 "C" 영역에서 결합될 수 있고, 제5-2 블록(150')의 일단부가 "D" 영역에서 결합될 수 있다.Referring to FIGS. 14A and 14B, the first-
특히 도 14b를 참조하면, 제5-1 블록(150) 및 제5-2 블록(150')은 각각 계단판에 설치된 발끝막이판(155, 155')을 더 포함할 수 있다.In particular, referring to FIG. 14B, the fifth-
<계단참과 계단판 접합부의 제1 실시예><First embodiment of step landing and step plate junction>
도 15a는 도 14a의 모듈화 계단실(100) 중 "C"부분의 일 실시예를 확대하여 도시한 도면이다.FIG. 15A is an enlarged view of an embodiment of part “C” of the
도 15a를 참조하면, 도 14a의 모듈화 계단실(100) 중 "C"부분의 접합부는 계단참(112), 제5-1 블록(150)(구체적으로, 계단판), 홈(g4), 매립철판(P1), 연결철판(P2), 용접부(We) 및 무수축 몰탈(mt)을 포함할 수 있다.Referring to FIG. 15A, the junction of the “C” portion of the
제5-1 블록(150)은 그 일단부가 계단참(112) 상에 안착되도록 구성될 수 있다.One end of the
홈(g4)은 계단참(112) 및 제5-1 블록(150)에 각각 형성된 것일 수 있다.The grooves g4 may be formed in the
매립철판(P1)은 계단참(112) 및 제5-1 블록(150)에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed in the
연결철판(P2)은 계단참(112)에 설치된 매립철판(P1)의 일부분과 제5-1 블록(150)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 배치된 것일 수 있다.The connecting iron plate P2 may be disposed to cover a part of the buried iron plate P1 installed on the
용접부(We)는 연결철판(P2)의 테두리 부분과 매립철판(P1)의 대응 부분을 용접하여 형성된 것일 수 있다.The welding part We may be formed by welding the edge portion of the connecting iron plate P2 and the corresponding portion of the buried iron plate P1.
무수축 몰탈(mt)은 계단참(112)과 제5-1 블록(150) 사이의 틈새에 충진된 후 양생하여 마감처리된 것일 수 있다.The non-shrink mortar (mt) may be finished by curing after filling in the gap between the landing 112 and the 5-1
도 15b는 도 15a에 도시된 부분의 접합 공정을 설명하기 위한 도면이다.FIG. 15B is a view for explaining a bonding process of the portion shown in FIG. 15A.
먼저 도 15b의 ①을 참조하면, 제5-1 블록(150)을 계단참(112)쪽으로 이동시킨다.First, referring to ① of FIG. 15B, the fifth-
다음에 도 15b의 ②를 참조하면, 제5-1 블록(150)를 이동시켜 그 일단부를 제1 계단참(112)에 안착시킨 후, 연결철판(P2)을 위치시키고 용접작업을 실시한다. 구체적으로, 계단참(112) 및 제5-1 블록(150)에 각각 형성된 홈(g4)과 함께, 계단참(112) 및 제5-1 블록(150)에 각각 설치된 매립철판(P1)을 정렬시킨 후, 계단참(112)에 설치된 매립철판(P1)의 일부분과 제5-1 블록(150)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 연결철판(P2)을 위치시킨다. 이후, 연결철판(P2)의 테두리 부분과 매립철판(P1)의 대응 부분을 용접한다.Next, referring to ② of FIG. 15B, the 5-
다음에 도 15b의 ③을 참조하면, 거푸집(d)을 설치하고, 계단참(112) 및 제5-1 블록(150)에 각각 형성된 홈(g4)뿐만 아니라, 계단참(112)과 제5-1 블록(150) 사이의 틈새에 무수축 몰탈(mt)을 채운 후 양생하여 마감처리한다.Next, referring to (3) in FIG. 15B, the formwork d is installed and the
다음에, 상기 거푸집(d)을 제거한다.Next, the mold d is removed.
도 16은 도 14a의 모듈화 계단실(100) 중 "D"부분의 일 실시예를 확대하여 도시한 도면이다. 도 16의 (a)는 입면도이고, 도 16의 (b)는 단면도이다.FIG. 16 is an enlarged view of an embodiment of part “D” of the
도 16을 참조하면, 도 14a의 모듈화 계단실(100) 중 "D"부분의 접합부는 계단참(112), 제5-2 블록(150')(구체적으로, 계단판), 홈(g5), 매립철판(P1), 연결철판(P2) 및 용접부(We)를 포함할 수 있다.Referring to FIG. 16, the junction of the “D” portion of the
제5-2 블록(150')는 그 일단부가 계단참(112) 상에 안착되도록 구성될 수 있다.The fifth-
홈(g5)은 계단참(112) 및 제5-2 블록(150')에 각각 형성된 것일 수 있다.The groove g5 may be formed in the
매립철판(P1)은 계단참(112) 및 제5-2 블록(150')에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed in the
연결철판(P2)은 계단참(112)에 설치된 매립철판(P1)의 일부분 및 제5-2 블록(150')에 설치된 또 다른 매립철판(P1)의 일부분과 모두 접촉하도록 배치된 것일 수 있다.The connecting iron plate P2 may be disposed to be in contact with both a portion of the buried iron plate P1 installed in the
용접부(We)는 연결철판(P2)과 매립철판(P1)의 접촉 부분을 용접하여 형성된 것일 수 있다. 용접작업 이후, 제5-2 블록(150')(구체적으로, 계단판)과 계단참(112)의 접합부 하단에 거푸집(미도시)을 설치한 후에 joint 부분 및 홈(g5) 부위에 무수축 몰탈(미도시)을 주입한다. 양생이 완료된 이후에는 거푸집을 탈형한다.The welding part We may be formed by welding a contact portion between the connecting iron plate P2 and the buried iron plate P1. After the welding operation, after forming a formwork (not shown) at the bottom of the junction of the 5-2
<계단참과 계단판 접합부의 제2 실시예><Second embodiment of the step and joining the staircase plate>
도 17a는 도 14a의 모듈화 계단실(100) 중 "C"부분의 다른 실시예를 확대하여 도시한 도면이다. 도 17a의 (a)는 입면도이고, 도 17a의 (b)는 단면도이다.FIG. 17A is an enlarged view of another embodiment of part “C” of the
도 17a를 참조하면, 도 14a의 모듈화 계단실(100) 중 "C"부분의 접합부는 계단참(112), 제5-1 블록(150)(구체적으로, 계단판), 홈(g4), 매립철판(P1), 연결철판(P2), 고력볼트(b2) 및 무수축 몰탈(mt)을 포함할 수 있다.Referring to FIG. 17A, the junction portion of the “C” portion of the
제5-1 블록(150)은 그 일단부가 계단참(112) 상에 안착되도록 구성될 수 있다.One end of the
홈(g4)은 계단참(112) 및 제5-1 블록(150)에 각각 형성된 것일 수 있다.The grooves g4 may be formed in the
매립철판(P1)은 계단참(112) 및 제5-1 블록(150)에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed in the
연결철판(P2)은 계단참(112)에 설치된 매립철판(P1)의 일부분과 제5-1 블록(150)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 배치된 것일 수 있다.The connecting iron plate P2 may be disposed to cover a part of the buried iron plate P1 installed on the
고력볼트(b2)는 연결철판(P2)과 매립철판(P1)을 관통하여 이들을 서로 결합시키는 것일 수 있다.The high-strength bolt b2 may penetrate the connecting iron plate P2 and the buried iron plate P1 to couple them to each other.
무수축 몰탈(mt)은 계단참(112) 및 제5-1 블록(150)에 각각 형성된 홈(g4)뿐만 아니라, 계단참(112)과 제5-1 블록(150) 사이의 틈새에 충진된 후 양생하여 마감처리된 것일 수 있다.The non-shrink mortar mt is filled in the gap between the landing 112 and the fifth-
도 17b는 도 17a에 도시된 부분의 접합 공정을 설명하기 위한 도면이다.FIG. 17B is a view for explaining a bonding process of the portion shown in FIG. 17A. FIG.
먼저 도 17b의 ①을 참조하면, 제5-1 블록(150)을 계단참(112)쪽으로 이동시킨다.First, referring to ① of FIG. 17B, the fifth-
다음에 도 17b의 ②를 참조하면, 제5-1 블록(150)를 이동시켜 그 일단부를 제1 계단참(112)에 안착시킨 후, 연결철판(P2)을 위치시킨다. 구체적으로, 계단참(112) 및 제5-1 블록(150)에 각각 형성된 홈(g4)과 함께, 계단참(112) 및 제5-1 블록(150)에 각각 설치된 매립철판(P1)을 정렬시킨 후, 계단참(112)에 설치된 매립철판(P1)의 일부분과 제5-1 블록(150)에 설치된 또 다른 매립철판(P1)의 일부분을 덮도록 연결철판(P2)을 위치시킨다. 또한, 상기 접합부는 연결철판(P2), 매립철판(P1) 및 계단참(112)(또는 제5-1 블록(150))를 관통하는 볼트 삽입홈(g6)을 포함할 수 있다.Next, referring to ② of FIG. 17B, the 5-
다음에 도 17b의 ③을 참조하면, 거푸집(d)을 설치하고, 계단참(112) 및 제5-1 블록(150)에 각각 형성된 홈(g4)뿐만 아니라, 계단참(112)과 제5-1 블록(150) 사이의 틈새에 무수축 몰탈(mt)을 채운 후 양생하여 마감처리한다.Next, referring to (3) in FIG. 17B, the formwork d is installed and the
다음에, 상기 거푸집(d)을 제거한다.Next, the mold d is removed.
도 18은 도 14a의 모듈화 계단실(100) 중 "D"부분의 다른 실시예를 확대하여 도시한 도면이다. 도 18의 (a)와 (b)는 각각 다른 각도에서 관찰한 단면도이다.FIG. 18 is an enlarged view of another embodiment of part “D” of the
도 18을 참조하면, 도 14a의 모듈화 계단실(100) 중 "D"부분의 접합부는 계단참(112), 제5-2 블록(150')(구체적으로, 계단판), 홈(g5), 매립철판(P1), 연결철판(P2) 및 고력볼트(b2)를 포함할 수 있다. 고력볼트 조임작업 이후, 제5-2 블록(150')(구체적으로, 계단판)과 계단참(112) 접합부 하단에 거푸집(미도시)을 설치한 후에 joint 부분 및 홈(g5) 부위에 무수축 몰탈(미도시)을 주입한다. 양생이 완료된 이후에는 거푸집을 탈형한다.Referring to FIG. 18, the junction portion of the “D” portion of the
제5-2 블록(150')은 그 일부분이 계단참(112) 상에 안착되도록 구성될 수 있다.The fifth-
홈(g5)은 계단참(112) 및 제5-2 블록(150')에 각각 형성된 것일 수 있다.The groove g5 may be formed in the
매립철판(P1)은 계단참(112) 및 제5-2 블록(150')에 각각 설치된 것일 수 있다.The buried iron plate P1 may be installed in the
연결철판(P2)은 계단참(112)에 설치된 매립철판(P1)의 일부분 및 제5-2 블록(150')에 설치된 또 다른 매립철판(P1)의 일부분과 모두 접촉하도록 배치된 것일 수 있다. 예를 들어, 연결철판(P2)은 "ㄴ"자 형상의 측단면을 가지며 일방향으로 연장된 것일 수 있다.The connecting iron plate P2 may be disposed to be in contact with both a portion of the buried iron plate P1 installed in the
고력볼트(b2)는 연결철판(P2)과 매립철판(P1)을 관통하여 이들을 서로 결합시키는 것일 수 있다. 예를 들어, 고력볼트(b2)는 "ㄴ"자 형상의 측단면을 가지며 일방향으로 연장된 연결철판(P2)을 관통하는 수직방향의 고력볼트와 수평방향의 고력볼트를 포함할 수 있다.The high-strength bolt b2 may penetrate the connecting iron plate P2 and the buried iron plate P1 to couple them to each other. For example, the high-strength bolt (b2) has a side cross-section of the "b" shape and may include a high-strength bolt in the vertical direction and a horizontal high-strength bolt passing through the connecting iron plate (P2) extending in one direction.
상기와 같은 구성을 갖는 본 발명의 일 구현예에 따른 모듈형 계단실(100)은 임시 계단으로 사용될 수도 있고, 본 계단으로 바로 사용될 수도 있다.
도 19는 본 발명의 일 구현예에 따른 모듈형 계단실(100)에 포함된 제1 계단실 모듈(M1)의 시공방법을 설명하기 위한 도면이다.19 is a view for explaining the construction method of the first staircase room module M1 included in the
먼저 도 19의 (a)를 참조하면, 건물의 내부 또는 외부의 현장에서 다각형 라인(예를 들어, 직사각형) 상에 설치된 복수개의 수직 다웰바를 포함하는 기초(10)를 타설한다.First, referring to FIG. 19A, a
다음에 도 19의 (b)를 참조하면, 기초(10) 위에(구체적으로, 수직 다웰바 위에) 자립이 가능하도록 구성된(self-standing) 제1-1 블록(110)을 설치하고 수직도를 조정한다.Referring next to FIG. 19B, a self-standing first-
다음에 도 19의 (c)를 참조하면, 기초(10) 위에(구체적으로, 수직 다웰바 위에) 자립이 가능하도록 구성된 제2 블록(120)을 설치하고 수직도를 조정한다.Next, referring to FIG. 19C, a
다음에 도 19의 (d)를 참조하면, 기초(10) 위에(구체적으로, 수직 다웰바 위에) 자립이 가능하도록 구성된 제3 블록(130)을 설치하고 수직도를 조정한다.Next, referring to FIG. 19D, a
다음에 도 19의 (e)를 참조하면, 기초(10) 위에 제5-1 블록(150) 및 제4 블록(140)을 차례로 설치한다. 구체적으로, 제5-1 블록(150)은 일단부가 제1-1 블록(110)의 계단참과 결합되고 타단부는 기초(10) 위에 배치된다. 제4 블록(140)은 수직 다웰바 위에 설치된다. 이 경우, 제5-1 블록(150)은 별도의 지지부재 없이 일단부는 제1-1 블록(110)에 의해 지지되고 타단부는 기초(10)에 의해 지지되어 자립이 가능하다. 또한, 제4 블록(140)은 별도의 지지부재 없이 제1-1 블록(110), 제2 블록(120) 및 제5-1 블록(150)에 의해 지지되어 자립이 가능하다.Next, referring to FIG. 19E, the fifth-
상술한 도 19의 (b) 내지 (e) 공정은 시공 1일차에 모두 수행될 수 있다.19 (b) to (e) described above can be all performed on the first day of construction.
다음에 도 19의 (f)를 참조하면, 기초(10) 위에(구체적으로, 수직 다웰바 위에) 추가 제4 블록(140)을 설치하고 고정철판과 연결철판의 결합(즉, 수직 이음 접합)을 통해 추가 제4 블록(140)을 제1-1 블록(110) 및 제3 블록(120)과 각각 결합한다. 이 경우, 추가 제4 블록(140)은 별도의 지지부재 없이 제1-1 블록(110)과 제3 블록(120)에 의해 지지되어 자립이 가능하다.Referring next to FIG. 19F, an additional
다음에 도 19의 (g)를 참조하면, 제1-1 블록(110) 위에(구체적으로, 메인철근 위에) 제6 블록(160)을 설치하고 고정철판과 연결철판의 결합(즉, 수직 이음 접합) 및 메인철근과 슬리브의 결합(즉, 수평 이음 접합)을 통해 제6 블록(160)을 제1-1 블록(110), 제4 블록(140) 및 추가 제4 블록(140)과 결합한다. 이 경우, 제6 블록(160)은 별도의 지지부재 없이 제1-1 블록(110), 제4 블록(140) 및 추가 제4 블록(140)에 의해 지지되어 자립이 가능하다.Next, referring to FIG. 19G, the
다음에 도 19의 (h)를 참조하면, 제2 블록(120) 및 제3 블록(130) 위에(구체적으로, 메인철근 위에) 제1-2 블록(110')을 설치하고 고정철판과 연결철판의 결합(즉, 수직 이음 접합) 및 메인철근과 슬리브의 결합(즉, 수평 이음 접합)을 통해 제1-2 블록(110')을 제2 블록(120), 제3 블록(130), 제4 블록(140) 및 추가 제4 블록(140)과 결합한다. 이 경우, 제1-2 블록(110')은 별도의 지지부재 없이 제2 블록(120), 제3 블록(130), 제4 블록(140) 및 추가 제4 블록(140)에 의해 지지되어 자립이 가능하다.Next, referring to FIG. 19 (h), the 1-2
다음에, 도 19의 (h)에 자세히 도시되어 있지 않지만, 제5-2 블록(150')을 설치한다. 구체적으로, 도 2에 도시된 바와 같이, 제5-2 블록(150')은 일단부는 제1-1 블록(110)의 계단참과 결합되고, 타단부는 제1-2 블록(110')의 계단참과 결합된다. 이 경우, 제5-2 블록(150')은 별도의 지지부재 없이 제1-1 블록(110) 및 제1-2 블록(110')에 의해 지지되어 자립이 가능하다.Next, although not shown in detail in FIG. 19H, the 5-2
상술한 도 19의 (f) 이후의 모든 공정은 시공 2일차에 모두 수행될 수 있다.All of the processes after FIG. 19 (f) may be performed on the second day of construction.
다음에 도 19의 (i)를 참조하면, 블록들간의 결합 부위 및 틈새를 막기 위하여 거푸집 작업 및 무수축 몰탈 주입 작업을 수행한다. 이는 3일차에 모두 수행될 수 있다.Next, referring to FIG. 19 (i), a form work and a shrinkage mortar injection work are performed to prevent the bonding site and the gap between the blocks. This can all be done on
다음에 다시 도 19의 (i)를 참조하면, 주입된 무수축 몰탈을 양생시킨다. 이는 4일차에 수행될 수 있다.Next, referring again to FIG. 19I, the injected non-contraction mortar is cured. This can be done on
결과적으로, 제1 계단실 모듈(M1)의 시공 기간은 총 4일이 되며, 모듈화 계단실(100) 전체의 시공 기간은 약 1.3개월이 된다. 종래에 현장에서 철골, 습식 및 수장 공사로 계단실을 설치할 경우에는 약 2.3개월이 소요되기 때문에, 본 발명의 일 구현예에 따른 모듈화 계단실의 시공방법은 약 1.0개월의 공기 단축 효과가 있다.As a result, the construction period of the first staircase module M1 is a total of four days, and the construction period of the entire
또한, 본 발명의 일 구현예에 따른 모듈화 계단실의 시공방법은 단순한 구조를 갖는 3종의 계단실 모듈을 반복적으로 시공함으로써 시공성이 향상될 수 있다.In addition, the construction method of the modular staircase room according to an embodiment of the present invention can be improved by constructing three types of staircase module having a simple structure repeatedly.
이상에서 도면 및 실시예를 참조하여 본 발명에 따른 바람직한 구현예가 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 구현예가 가능하다는 점을 이해할 수 있을 것이다. 따라서, 본 발명의 보호범위는 첨부된 특허청구범위에 의해서 정해져야 할 것이다.Although the preferred embodiments according to the present invention have been described above with reference to the drawings and the embodiments, these are merely exemplary, and various modifications and equivalent other embodiments are possible to those skilled in the art. You will understand. Therefore, the protection scope of the present invention should be defined by the appended claims.
11, 111, 111', 121, 131, 141, 161, 171, 181: 몸체
113, 113', 122, 132, 142, 162. 172, 182: 메인철근
10: 기초 12: 수직 다웰바
100: 모듈화 계단실 110, 110': 제1 블록
112, 112': 계단참 120: 제2 블록
130: 제3 블록 140: 제4 블록
150, 150': 제5 블록 160: 제6 블록
170: 제7 블록 180: 제8 블록
M1, M2, M3: 계단실 모듈 g1~g6: 홈
e: 매립용 전선관 bx: 매립용 전선박스
W1, W2: 벽체 P1: 매립철판
P2: 연결철판 b1: 철판 연결용 볼트
b2: 고력볼트 mt: 무수축 몰탈
sk: 전단키 bu: 백업재
ck: 코킹재 S: 슬리브
st1, st2: 메인철근 h1, h2: 홀
d: 거푸집11, 111, 111 ', 121, 131, 141, 161, 171, 181: body
113, 113 ', 122, 132, 142, 162. 172, 182: Main reinforcing bars
10: Base 12: Vertical Dowel Bar
100:
112, 112 ': landing 120: second block
130: third block 140: fourth block
150, 150 ': fifth block 160: sixth block
170: seventh block 180: eighth block
M1, M2, M3: Stair Module Modules g1 to g6: Grooves
e: Landfill conduit bx: Landfill conduit box
W1, W2: Wall P1: Landfill
P2: Connecting plate b1: Bolt for connecting plate
b2: high-strength bolt mt: non-shrink mortar
sk: shear key bu: backup material
ck: caulking material S: sleeve
st1, st2: main reinforcement h1, h2: hole
d: formwork
Claims (21)
(1) 일체로 형성된 벽체와 계단참을 포함하는 제1 블록으로서, 측벽에 개구가 형성되어 있지 않은 제1-1 블록 및 측벽에 개구가 형성되어 있는 제1-2 블록을 포함하는 제1 블록;
(2) "ㄴ"자 형상의 평단면을 갖는 제2 블록;
(3) "ㄴ"자 형상의 평단면을 가지며, 상기 제2 블록과 동일하거나 상이한 구조를 갖는 제3 블록;
(4) "1"자 형상의 평단면을 갖는 제4 블록;
(5) 계단판을 포함하는 제5 블록으로서, 서로 동일하거나 상이한 구조의 계단판을 포함하는 제5-1 블록 및 제5-2 블록을 포함하는 제5 블록;
(6) "ㄷ"자 형상의 평단면을 갖는 제6 블록;
(7) "ㄷ"자 형상의 평단면을 가지며, 상기 제6 블록 보다 높이가 높고, 측벽에 개구를 갖지 않는 제7 블록; 및
(8) "ㄷ"자 형상의 평단면 및 측벽에 형성된 문 형상의 개구를 가지며, 상기 제6 블록 보다 높이가 높은 제8 블록;
상기 제1 계단실 모듈은 상기 제1-1 블록, 상기 제1-1 블록과 수평으로 나란한 방향으로 배치되되 상기 제1-1 블록과 좁은 면끼리 접하도록 배치되도록 구성된 상기 제4 블록, 상기 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 제4 블록과 좁은 면끼리 접하도록 배치되도록 구성된 상기 제2 블록, 상기 제2 블록과 수평으로 나란한 방향으로 배치되되 상기 제2 블록과 좁은 면끼리 서로 마주보며 이격되도록 배치되도록 구성된 상기 제3 블록, 상기 제1-1 블록 및 상기 제3 블록과 수평으로 나란한 방향으로 배치되되 상기 제1-1 블록 및 상기 제3 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 추가 제4 블록, 상기 제1-1 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 한쌍의 제4 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 제6 블록, 상기 제2 블록 및 상기 제3 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 한쌍의 제4 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 상기 제1-2 블록, 일단부는 상기 제1-1 블록의 상기 계단참에 결합되고 타단부는 기초의 몸체에 결합되도록 구성된 상기 제5-1 블록, 및 일단부는 상기 제1-1 블록의 상기 계단참에 결합되고 타단부는 상기 제1-2 블록의 상기 계단참에 결합되도록 구성된 상기 제5-2 블록을 포함하고;
상기 제2 계단실 모듈은 상기 제1-1 블록, 상기 제1-1 블록과 수평으로 나란한 방향으로 배치되되 상기 제1-1 블록과 좁은 면끼리 접하도록 배치되도록 구성된 제 4 블록, 상기 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 제4 블록과 좁은 면끼리 접하도록 배치되도록 구성된 상기 제6 블록, 상기 제1-1 블록 및 상기 제6 블록과 수평으로 나란한 방향으로 배치되되 상기 제1-1 블록 및 상기 제6 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 추가 제4 블록, 상기 제1-1 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 한쌍의 제4 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 추가 제6 블록, 상기 제6 블록 상에 적층되고 상기 한쌍의 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 한쌍의 제4 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 추가 제1-1 블록, 일단부는 상기 제1-1 블록의 상기 계단참에 결합되고 타단부는 인접한 다른 계단실 모듈의 계단참에 결합되도록 구성된 상기 제5-1 블록, 및 일단부는 상기 제1-1 블록의 상기 계단참에 결합되고 타단부는 상기 추가 제1-1 블록의 상기 계단참에 결합되도록 구성된 상기 제5-2 블록을 포함하고,
상기 제3 계단실 모듈은 상기 제7 블록, 상기 제7 블록과 수평으로 나란한 방향으로 배치되되 상기 제7 블록과 좁은 면끼리 접하도록 배치되도록 구성된 상기 제4 블록, 상기 제4 블록과 수평으로 나란한 방향으로 배치되되 상기 제4 블록과 좁은 면끼리 접하도록 배치되도록 구성된 상기 제8 블록, 및 상기 제7 블록 및 상기 제8 블록과 수평으로 나란한 방향으로 배치되되 상기 제7 블록 및 상기 제8 블록과 각각 좁은 면끼리 접하도록 배치되도록 구성된 추가 제4 블록을 포함하는 모듈형 계단실.A first staircase module, a second staircase module, which are prefabricated and configured to be installed inside or outside a building, are capable of self-supporting without a separate supporting member and each include a plurality of blocks independently selected from the group consisting of the following blocks. Including a third staircase module:
(1) a first block including an integrally formed wall and landing, comprising: a first block including a first-first block having no opening formed in the sidewall and a 1-2 block having an opening formed in the sidewall;
(2) a second block having a planar cross section shaped like a "b";
(3) a third block having a "b" shaped flat cross section and having the same or different structure as said second block;
(4) a fourth block having a planar cross section of the shape of "1";
(5) a fifth block including a step plate, the fifth block including a 5-1 block and a 5-2 block including step plates of the same or different structure;
(6) a sixth block having a planar cross section in the shape of a "c";
(7) a seventh block having a flat surface having a “C” shape and having a height higher than that of the sixth block and having no opening in the sidewall; And
(8) an eighth block having a “c” shaped flat cross section and a door-shaped opening formed in the sidewall, the eighth block having a height higher than that of the sixth block;
The fourth staircase module is the fourth block, the fourth block, the fourth block, the fourth block is arranged to be in parallel with the first-one block, the horizontal direction parallel to the first-one block and arranged to be in contact with the narrow surface The second block is arranged in a direction parallel to the block and arranged to be in contact with the fourth block and the narrow surface, the second block is arranged in a direction parallel to the second block, and the second block and the narrow surface facing each other The third block, the first-first block, and the third block, which are arranged to be spaced apart from each other, and are arranged in a direction parallel to each other, wherein the first-one block and the third block are arranged to be in contact with narrow surfaces, respectively. An additional fourth block, stacked on the first-first block, disposed in a direction parallel to the pair of fourth blocks, wherein the pair of fourth blocks are in contact with each other in narrow surfaces. Stacked on the sixth block, the second block, and the third block, the second block and the third block, and arranged in a direction parallel to the pair of fourth blocks, and arranged to be in contact with the pair of fourth blocks, respectively; The configured second block, the one end of which is coupled to the landing of the first-first block and the other end of which is configured of the fifth-1 block, and the one end of the first-one of the block The fifth-2 block coupled to the landing and the other end configured to be coupled to the landing of the 1-2 block;
The second staircase module is arranged in a direction parallel to the first-first block, the first-one block, and the fourth block, the fourth block is configured to be in contact with the narrow surface and the first-first block, the fourth block And the sixth block, the first-first block, and the sixth block, which are arranged in a direction parallel to the horizontal and arranged to be in contact with the fourth block and the narrow surfaces, and are arranged in a direction parallel to the sixth block. A further fourth block configured to be in contact with the block and the sixth block, respectively, in a narrow plane, stacked on the first-first block and disposed in a direction parallel to the pair of fourth blocks, wherein the pair of fourth An additional sixth block configured to be in contact with the blocks, each of which is in narrow contact with the block; a sixth block stacked on the sixth block and disposed in a direction parallel to the pair of fourth blocks, wherein the pair of fourth blocks And a further first-first block configured to be in contact with each other, and narrow surfaces, one end of which is coupled to the landing of the first-first block and the other end of the fifth-first block configured to be coupled to the landing of another adjacent staircase module. And the fifth block, wherein one end is coupled to the landing of the first-first block and the other end is coupled to the landing of the additional first-one block.
The third staircase module is disposed in a direction parallel to the seventh block, the seventh block, the fourth block, the fourth block configured to be arranged so as to be in contact with the seventh block and the narrow surface horizontally parallel to the fourth block The eighth block, and the seventh block and the eighth block and the seventh block and the eighth block are arranged in a horizontal direction parallel to the fourth block and the seventh block and the eighth block and arranged to be in contact with the narrow surface, respectively, Modular staircase comprising an additional fourth block configured to be placed in contact with the narrow sides.
상기 모듈형 계단실은 적어도 일부분이 프리캐스트 콘크리트로 형성된 모듈형 계단실.The method of claim 1,
The modular staircase is a modular staircase at least partially formed of precast concrete.
상기 모듈형 계단실은 매립 전기설비 및 매립 소방설비 중 적어도 하나를 포함하는 모듈형 계단실.The method of claim 1,
The modular staircase is a modular staircase including at least one of a buried electrical equipment and a fire fighting equipment.
상기 제5 블록은 상기 계단판에 설치된 발끝막이판을 더 포함하는 모듈형 계단실.The method of claim 1,
The fifth block is a modular staircase room further comprises a toe board installed on the staircase.
상기 각 블록은 매립철판을 포함하고, 상기 블록들 중 서로 접하는 두개의 블록은 상기 각 매립철판을 별도의 연결철판으로 연결함으로써 결합된 모듈형 계단실.The method of claim 1,
Each block includes a buried iron plate, and two of the blocks in contact with each other is a modular staircase room coupled by connecting each of the buried iron plate with a separate connecting iron plate.
상기 매립철판 및 상기 연결철판은 용접 방식 및 나사결합 방식 중 적어도 하나의 방식으로 결합된 모듈형 계단실.The method of claim 12,
The buried iron plate and the connecting iron plate is a modular stair room coupled to at least one of the welding method and screwing method.
상기 매립철판 및 상기 연결철판은 무수축 몰탈로 마감처리된 모듈형 계단실.The method of claim 12,
The buried iron plate and the connecting iron plate is a modular staircase room with a non-shrink mortar finish.
상기 각 블록은 메인철근을 포함하고, 상기 블록들 중 서로 접하는 두개의 블록은 각각의 메인철근을 서로 연결함으로써 결합된 모듈형 계단실.The method of claim 1,
Each block includes a main reinforcing bar, two of the blocks in contact with each other modular staircase room coupled by connecting the respective main reinforcement.
상기 각 메인철근은 무수축 몰탈로 마감처리된 모듈형 계단실.The method of claim 15,
The main reinforcing bar is a modular staircase finishing with non-shrink mortar.
상기 각 계단실 모듈을 지지하는 기초를 더 포함하는 모듈형 계단실.The method of claim 1,
Modular stairs further comprises a foundation for supporting each staircase module.
상기 기초는 복수개의 수직 다웰바를 포함하는 모듈형 계단실.The method of claim 17,
And the foundation includes a plurality of vertical dowel bars.
상기 기초 위에 자립이 가능하도록 구성된(self-standing) 것으로 일체로 형성된 벽체와 계단참을 포함하며 측벽에 개구가 형성되어 있지 않은 제1-1 블록을 설치하고 수직도를 조정하는 단계;
상기 기초 위에 자립이 가능하도록 구성된 것으로 "ㄴ"자 형상의 평단면을 갖는 제2 블록을 설치하고 수직도를 조정하는 단계;
상기 기초 위에 자립이 가능하도록 구성된 것으로 "ㄴ"자 형상의 평단면을 가지며 상기 제2 블록과 동일하거나 상이한 구조를 갖는 제3 블록을 설치하고 수직도를 조정하는 단계;
상기 기초 위에 계단판을 포함하는 제5-1 블록 및 "1"자 형상의 평단면을 갖는 제4 블록을 차례로 설치하는 단계하는 단계로서, 상기 제5-1 블록은 일단부가 상기 제1-1 블록의 계단참과 결합되고 타단부는 상기 기초 위에 배치되고, 상기 제4 블록은 상기 수직 다웰바 위에 설치되는 단계;
상기 기초 위에 추가 제4 블록을 설치하고, 상기 추가 제4 블록을 상기 제1-1 블록 및 상기 제3 블록과 각각 결합하는 단계;
상기 제1-1 블록 위에 "ㄷ"자 형상의 평단면을 갖는 제6 블록을 설치하고, 상기 제6 블록을 상기 제1-1 블록, 상기 제4 블록 및 상기 추가 제4 블록과 결합하는 단계;
상기 제2 블록 및 상기 제3 블록 위에 측벽에 개구가 형성되어 있는 제1-2 블록을 설치하고, 상기 제1-2 블록을 상기 제2 블록, 상기 제3 블록, 상기 제4 블록 및 상기 추가 제4 블록과 결합하는 단계;
상기 제5-1 블록과 서로 동일하거나 상이한 구조의 계단판을 포함하는 제5-2 블록을 설치하는 단계로서, 상기 제5-2 블록은 일단부는 제1-1 블록의 계단참과 결합되고, 타단부는 제1-2 블록의 계단참과 결합되는 단계;
블록들간의 결합 부위 및 틈새를 막기 위하여 거푸집 작업 및 무수축 몰탈 주입 작업을 수행하는 단계; 및
상기 주입된 무수축 몰탈을 양생시키는 단계를 포함하는 모듈형 계단실의 시공방법.Placing a foundation comprising a plurality of vertical dowel bars installed on a polygonal line at a site inside or outside a building;
Installing a first-first block including a wall and landing integrally formed as self-standing on the foundation and having no opening in the sidewall and adjusting verticality;
Installing a second block having a “b” shaped flat cross section configured to be self-supporting on the foundation and adjusting verticality;
Installing a third block having a “b” shaped flat cross section configured to be self-supporting on the foundation and having a structure identical to or different from that of the second block and adjusting verticality;
5. The step of sequentially installing a 5-1 block including a step plate and a fourth block having a "1" shaped flat cross section on the base, wherein the 5-1 block has one end of the 5-1 block. Engaging with the landing of the block and the other end disposed on the foundation, and the fourth block being installed on the vertical dowel bar;
Installing an additional fourth block on the foundation and combining the additional fourth block with the first-first block and the third block, respectively;
Installing a sixth block having a flat surface having a “C” shape on the first-first block, and combining the sixth block with the first-one block, the fourth block, and the additional fourth block; ;
A 1-2 block having openings formed in sidewalls is provided on the second block and the third block, and the 1-2 block is added to the second block, the third block, the fourth block, and the addition. Combining with a fourth block;
Installing a 5-2 block including a step plate of the same or different structure than the 5-1 block, the 5-2 block is coupled to the landing of the 1-1 block, one end of the 5-2 block The end is engaged with landing of the 1-2 block;
Performing a formwork and a shrinkage mortar injection operation to prevent the bonding site and the gap between the blocks; And
Construction method of the modular staircase comprising the step of curing the injected non-shrink mortar.
상기 복수개의 수직 다웰바는 다각형 라인 상에 설치된 모듈형 계단실의 시공방법.The method of claim 19,
The plurality of vertical dowel bar is a construction method of a modular staircase room installed on a polygonal line.
상기 다각형 라인은 직사각형 라인인 모듈형 계단실의 시공방법.The method of claim 20,
The polygonal line is a rectangular staircase construction method of the construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190083949A KR102079703B1 (en) | 2019-07-11 | 2019-07-11 | Modular staircase and method of constructing the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020190083949A KR102079703B1 (en) | 2019-07-11 | 2019-07-11 | Modular staircase and method of constructing the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR102079703B1 true KR102079703B1 (en) | 2020-02-20 |
Family
ID=69647500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190083949A KR102079703B1 (en) | 2019-07-11 | 2019-07-11 | Modular staircase and method of constructing the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102079703B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102304397B1 (en) | 2021-01-13 | 2021-09-23 | (주)지산개발 | Mold assembly for stair unit and the manufacturing method of precast stair unit using the same |
KR102465330B1 (en) * | 2022-01-21 | 2022-11-09 | 금강공업 주식회사 | Structural Integrated Type Panelizing Rooftop Modular Construction Method |
KR20230067870A (en) | 2021-11-10 | 2023-05-17 | 조영철 | Method for constructing precast concrete staircase |
KR102567389B1 (en) * | 2022-07-27 | 2023-08-16 | 동서 피, 씨, 씨 주식회사 | Multistage staircase structure and Construction method for the same |
KR102721178B1 (en) * | 2021-07-28 | 2024-10-22 | 디엘이앤씨 주식회사 | Horizontal divided PC core |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110042879A (en) * | 2009-10-20 | 2011-04-27 | 김중삼 | Precast concrete stair and method for constructing the same |
KR101478611B1 (en) * | 2014-05-13 | 2015-01-02 | 정도건설 주식회사 | Method for pre-constructing staircase in building by using precast concrete column |
JP2018168574A (en) * | 2017-03-29 | 2018-11-01 | トヨタホーム株式会社 | Building unit and unit type building |
KR101984292B1 (en) * | 2018-08-02 | 2019-05-30 | 동진피씨이(주) | Building Core System using Precast Concrete Panel with Column |
-
2019
- 2019-07-11 KR KR1020190083949A patent/KR102079703B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110042879A (en) * | 2009-10-20 | 2011-04-27 | 김중삼 | Precast concrete stair and method for constructing the same |
KR101478611B1 (en) * | 2014-05-13 | 2015-01-02 | 정도건설 주식회사 | Method for pre-constructing staircase in building by using precast concrete column |
JP2018168574A (en) * | 2017-03-29 | 2018-11-01 | トヨタホーム株式会社 | Building unit and unit type building |
KR101984292B1 (en) * | 2018-08-02 | 2019-05-30 | 동진피씨이(주) | Building Core System using Precast Concrete Panel with Column |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102304397B1 (en) | 2021-01-13 | 2021-09-23 | (주)지산개발 | Mold assembly for stair unit and the manufacturing method of precast stair unit using the same |
KR102721178B1 (en) * | 2021-07-28 | 2024-10-22 | 디엘이앤씨 주식회사 | Horizontal divided PC core |
KR20230067870A (en) | 2021-11-10 | 2023-05-17 | 조영철 | Method for constructing precast concrete staircase |
WO2023085629A1 (en) * | 2021-11-10 | 2023-05-19 | 조영철 | Precast-concrete stairway room construction method |
KR102465330B1 (en) * | 2022-01-21 | 2022-11-09 | 금강공업 주식회사 | Structural Integrated Type Panelizing Rooftop Modular Construction Method |
KR102567389B1 (en) * | 2022-07-27 | 2023-08-16 | 동서 피, 씨, 씨 주식회사 | Multistage staircase structure and Construction method for the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102079703B1 (en) | Modular staircase and method of constructing the same | |
AU2020200977B2 (en) | Methods, systems and components for multi-storey building construction | |
US11680401B2 (en) | Precast wall panels and method of erecting a high-rise building using the panels | |
CN111622374B (en) | Composite structural wall and method of construction thereof | |
KR101632615B1 (en) | Base structure for connection of column and beam | |
AU2020100658A4 (en) | Building module and method for constructing a multistorey building | |
AU2017304226B2 (en) | Precast concrete formwork, floor system and a method of construction | |
KR100937745B1 (en) | Constructing method using precast concrete column | |
WO2020096526A1 (en) | Prefabricated volumetric module design, fabrication, assembly and installation method | |
KR102105457B1 (en) | Building Core System using Precast Concrete Box Shaped Modules with Connection Hardware at Corners And Core System Construction Method Using Thereof | |
CN106592859A (en) | Interior partition board and construction method | |
KR102050046B1 (en) | Building Core System using Precast Concrete Segmented Boxes with Tongue and Groove Joint | |
WO2020214086A1 (en) | Precast building | |
KR20220049720A (en) | Rapid Construction Structure of Core Part Using Multi-Story Precast Wall | |
KR102567389B1 (en) | Multistage staircase structure and Construction method for the same | |
KR102197994B1 (en) | Construction method using beam-reinforced deck plate | |
KR20170142384A (en) | Base structure for connection of column and beam | |
CN113969620B (en) | Multi-layer modular building consisting of a plurality of precast concrete modules and method for assembling same | |
WO2015054735A1 (en) | Building method and system | |
WO2012106650A1 (en) | Precast construction method and apparatus | |
KR20130022656A (en) | Hybrid building construction method combining dry type and wet type | |
AU635233B2 (en) | Prefabricated building construction | |
CN115596198B (en) | Assembled Z-shaped component, assembling die and construction method thereof | |
TW202432928A (en) | Method for constructing building structure | |
CN112942561A (en) | Multi-storey building structure adopting prefabricated panels and building method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |