KR102068320B1 - block assembly of module type and construction method of tunnel - Google Patents

block assembly of module type and construction method of tunnel Download PDF

Info

Publication number
KR102068320B1
KR102068320B1 KR1020170145924A KR20170145924A KR102068320B1 KR 102068320 B1 KR102068320 B1 KR 102068320B1 KR 1020170145924 A KR1020170145924 A KR 1020170145924A KR 20170145924 A KR20170145924 A KR 20170145924A KR 102068320 B1 KR102068320 B1 KR 102068320B1
Authority
KR
South Korea
Prior art keywords
block
coupling
plate
coupled
base
Prior art date
Application number
KR1020170145924A
Other languages
Korean (ko)
Other versions
KR20190050479A (en
Inventor
홍예진
Original Assignee
홍예진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍예진 filed Critical 홍예진
Priority to KR1020170145924A priority Critical patent/KR102068320B1/en
Publication of KR20190050479A publication Critical patent/KR20190050479A/en
Application granted granted Critical
Publication of KR102068320B1 publication Critical patent/KR102068320B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 터널 시공용 모듈형 블록조립체와 이를 이용한 터널 시공방법에 관한 것으로서, 더욱 상세하게는 굴착면의 보강력을 높이며 터널의 시공이 간편한 블록조립체와 이를 이용한 터널 시공방법에 관한 것이다.
본 발명의 터널 시공용 모듈형 블록조립체는 굴착통로의 좌우 양측에 각각 안착되어 지면에 고정되는 베이스블록과, 베이스블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 1철근노출부와, 베이스블록의 상부에 결합되는 중간블록과, 중간블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 2철근노출부와, 중간블록의 상부에 결합되는 상부블록과, 상부블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 3철근노출부와, 베이스블록과 중간블록을 결합시키기 위한 제 1결합수단과, 중간블록과 상부블록을 결합시키기 위한 제 2결합수단을 구비한다.
The present invention relates to a modular block assembly for tunnel construction and a tunnel construction method using the same, and more particularly, to a block assembly and a tunnel construction method using the same to increase the reinforcement of the excavation surface and easy construction of the tunnel.
The modular block assembly for tunnel construction according to the present invention includes a base block fixed to the ground and fixed to the left and right sides of an excavation passage, and a plurality of first rebar exposed portions formed by exposing reinforcing bars embedded in the base block to the outside; An intermediate block coupled to the upper portion of the base block, a plurality of second rebar exposed portions formed by exposing the reinforcement embedded in the intermediate block to the outside, an upper block coupled to the upper portion of the intermediate block, and reinforcement embedded in the upper block And a plurality of third rebar exposed portions formed by exposing the outside, first coupling means for coupling the base block and the intermediate block, and second coupling means for coupling the intermediate block and the upper block.

Figure R1020170145924
Figure R1020170145924

Description

터널 시공용 모듈형 블록조립체와 이를 이용한 터널 시공방법{block assembly of module type and construction method of tunnel}Modular block assembly for tunnel construction and tunnel construction method using same {block assembly of module type and construction method of tunnel}

본 발명은 터널 시공용 모듈형 블록조립체와 이를 이용한 터널 시공방법에 관한 것으로서, 더욱 상세하게는 굴착면의 보강력을 높이며 터널의 시공이 간편한 블록조립체와 이를 이용한 터널 시공방법에 관한 것이다. The present invention relates to a modular block assembly for tunnel construction and a tunnel construction method using the same, and more particularly, to a block assembly and a tunnel construction method using the same to increase the reinforcement of the excavation surface and easy construction of the tunnel.

일반적으로, 터널을 시공하기 위해서는 터널 굴착, 보강, 콘크리트 라이닝 설치의 순서로 공정을 진행하게 되는바, 상기한 콘크리트 라이닝은 현장에서 직접 콘크리트를 타설하여 라이닝을 제작하는 현장타설 라이닝 공법을 사용하게 된다.In general, in order to construct a tunnel, the process proceeds in the order of tunnel excavation, reinforcement, and installation of concrete lining. The above-described concrete lining uses an in-site casting lining method in which concrete is directly cast in the field to produce lining. .

굴착 후 굴착면에 보강용 숏크리트(SHOTCRETE)를 타설하여 굴착면을 고르게 한 후, 숏크리트의 외측면에 부직포 또는 방수시트를 부착하게 된다. 그리고 숏크리트의 외측면에 부직포 또는 방수시트를 부착한 후, 여기에 거푸집을 설치하고 그 내측에 콘크리트를 타설함과 아울러 양생하여 라이닝을 형성하게 된다.After excavation, reinforcing shotcrete (SHOTCRETE) is placed on the excavation surface to uniform the excavation surface, and then the nonwoven fabric or waterproof sheet is attached to the outer surface of the shotcrete. Then, after attaching the nonwoven fabric or the waterproof sheet to the outer surface of the shotcrete, the formwork is installed there, and the concrete is poured on the inside, and curing is formed to form a lining.

종래의 터널 시공방법은 여러가지 문제점이 있고, 이에 따라 여러가지 개서된 터널 시공방법이 알려져 있다. Conventional tunnel construction methods have various problems, and thus, various rewritten tunnel construction methods are known.

대한민국 등록특허 제10-0785459호에는 프리캐스트 콘크리트 라이닝을 이용한 터널 시공방법이 개시되어 있다. Republic of Korea Patent No. 10-0785459 discloses a tunnel construction method using precast concrete lining.

상기 터널 시공방법은 지반을 굴착하여 터널 굴착부를 시공하는 단계; 상기 터널 굴착부의 굴착면에 숏크리트를 분사하여 숏크리트 라이닝을 시공하고 터널의 바닥부분에 콘크리트를 타설하여 터널 바닥면을 시공하는 단계; 상기 터널 바닥면에는 상면이 마찰저감재료의 도포에 의하여 미끄럼 처리된 레일부를 설치하는 단계; 및 터널의 단면 형상 및 치수에 맞추어 아치형 단면을 가지도록 사전 제작된 다수개의 프리캐스트 콘크리트 라이닝 유닛을 상기 레일부에 올려놓고, 차례로 터널 굴착부에 진출시켜 일체로 결합함으로써 터널 라이닝을 시공하는 단계를 포함한다. The tunnel construction method includes the steps of constructing a tunnel excavation part by excavating the ground; Constructing shotcrete lining by spraying shotcrete on the excavation surface of the tunnel excavation part and constructing the tunnel bottom surface by pouring concrete into the bottom portion of the tunnel; Installing a rail portion on the tunnel bottom surface of which a top surface is slid by application of a friction reducing material; And constructing the tunnel lining by placing a plurality of precast concrete lining units, which are prefabricated to have an arcuate cross section according to the cross-sectional shape and dimensions of the tunnel, on the rails, and then advancing into the tunnel excavation section to be integrally combined. Include.

이러한 시공방법은 사전 제작된 프리캐스트 콘크리트 라이닝을 터널의 굴착부에 차례로 진출시켜 터널 라이닝을 시공한다는 면에서 일부 장점은 있으나 사전 제작된 프리캐스트 콘크리트 라이닝의 부피가 매우 커 운반 및 시공에 어렵다는 문제점이 있다. This construction method has some advantages in that tunnel prefabricated precast concrete linings are pushed into the excavation part of the tunnel in order to construct the tunnel lining. have.

대한민국 등록특허 제10-0785459호: 프리캐스트 콘크리트 라이닝을 이용한 터널 시공방법Republic of Korea Patent No. 10-0785459: Tunnel construction method using precast concrete lining

본 발명은 상기의 문제점을 개선하고자 창출된 것으로서, 다수의 블록을 현장에서 조립하는 방식으로 하나의 콘크리트 모듈을 형성함으로써 운반 및 시공이 간편하고 굴착면의 보강력을 높일 수 있는 블록조립체와 이를 이용한 터널 시공방법을 제공하는 데 그 목적이 있다. The present invention was created to improve the above problems, by forming a single concrete module in the manner of assembling a plurality of blocks in the field is easy to transport and construction and to increase the reinforcement of the excavation surface and using the same The purpose is to provide a tunnel construction method.

상기의 목적을 달성하기 위한 본 발명의 터널 시공용 모듈형 블록조립체는 굴착통로의 좌우 양측에 각각 안착되어 지면에 고정되는 베이스블록과; 상기 베이스블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 1철근노출부와; 상기 베이스블록의 상부에 결합되는 중간블록과; 상기 중간블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 2철근노출부와; 상기 중간블록의 상부에 결합되는 상부블록과; 상기 상부블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 3철근노출부와; 상기 베이스블록과 상기 중간블록을 결합시키기 위한 제 1결합수단과; 상기 중간블록과 상기 상부블록을 결합시키기 위한 제 2결합수단;을 구비한다.Tunnel construction modular block assembly of the present invention for achieving the above object is a base block which is fixed to the ground and respectively seated on both sides of the excavation passage; A plurality of first reinforcing bar exposed portions formed by exposing reinforcing bars embedded in the base block to the outside; An intermediate block coupled to an upper portion of the base block; A plurality of second rebar exposure parts formed by exposing the reinforcing bars embedded in the intermediate block to the outside; An upper block coupled to an upper portion of the intermediate block; A plurality of third rebar exposure parts formed by exposing the reinforcing bars embedded in the upper block to the outside; First coupling means for coupling the base block and the intermediate block; And a second coupling means for coupling the intermediate block and the upper block.

상기 제 1결합수단은 상기 베이스블록의 상부에 결합되는 제 1결합판과, 상기 제 1결합판의 단부에서 하방으로 절곡되어 형성된 제 1지지판과, 상기 중간블록의 하부에 결합되어 상기 제 1결합판과 포개지는 제 2결합판과, 상기 제 2결합판의 단부에서 상방으로 절곡되어 형성된 제 2지지판을 구비하고, 상기 제 2결합수단은 상기 중간블록의 상부에 결합되는 제 3결합판과, 상기 제 3결합판의 단부에서 하방으로 절곡되어 형성된 제 3지지판과, 상기 아치블록의 하부에 결합되어 상기 제 3결합판과 포개지는 제 4결합판과, 상기 제 4결합판의 단부에서 상방으로 절곡되어 형성된 제 4지지판을 구비한다.The first coupling means may include a first coupling plate coupled to an upper portion of the base block, a first support plate formed by bending downwardly from an end of the first coupling plate, and coupled to a lower portion of the intermediate block to the first coupling plate. A plate and a second coupling plate nested with a second support plate bent upward from the end of the second coupling plate, the second coupling means comprising: a third coupling plate coupled to an upper portion of the intermediate block; A third support plate bent downward from the end of the third coupling plate, a fourth coupling plate coupled to the lower portion of the arch block and overlapping with the third coupling plate, and upward from an end of the fourth coupling plate; A fourth support plate is bent and formed.

그리고 상기의 목적을 달성하기 위한 본 발명의 터널 시공방법은 일정거리의 굴착통로를 형성한 후 상기 굴착통로의 좌우 양측에 베이스블록을 각각 안착시키는 베이스블록안착단계와; 상기 베이스블록을 지면에 고정시키는 베이스블록고정단계와; 상기 베이스블록의 상부에 중간블록을 안착시키는 중간블록안착단계와; 상기 중간블록과 상기 베이스블록을 제 1결합수단으로 결합시키는 제 1결합단계와; 상기 중간블록의 상부에 상부블록을 안착시켜 아치 형태의 블록 조립체를 형성하는 상부블록안착단계와; 상기 중간블록과 상기 상부블록을 제 2결합수단으로 결합시키는 제 2결합단계와; 상기 블록조립체와 이격되도록 상기 블록조립체의 내측 방향에 아치 형태의 거푸집을 설치하는 거푸집설치단계와; 상기 블록조립체와 상기 거푸집 사이에 콘크리트를 타설하는 콘크리트타설단계;를 포함한다.And the tunnel construction method of the present invention for achieving the above object comprises a base block seating step of seating the base block on each of the left and right sides of the excavation passage after the excavation passage formed at a predetermined distance; A base block fixing step of fixing the base block to the ground; An intermediate block seating step of seating an intermediate block on an upper portion of the base block; A first coupling step of coupling the intermediate block and the base block by a first coupling means; An upper block seating step of seating an upper block on an upper portion of the intermediate block to form an arch block assembly; A second coupling step of coupling the intermediate block and the upper block with a second coupling means; A formwork installation step of installing an arch formwork in an inward direction of the block assembly to be spaced apart from the block assembly; It includes; concrete placing step of placing concrete between the block assembly and the formwork.

상기 베이스블록고정단계는 상기 베이스블록의 저면에 결합된 고정판을 고정부재로 상기 지면에 고정시킨다.The base block fixing step fixes the fixing plate coupled to the bottom of the base block to the ground with a fixing member.

상기 베이스블록고정단계는 상기 고정부재로 상기 고정판을 고정시킨 후 버팀대를 설치하여 상기 베이스블록을 더 고정시키고, 상기 버팀대의 하부는 지중에 박힌 파일에 결합시키고 상기 버팀대의 상부는 상기 베이스블록에 매설된 철근을 외부로 노출시켜 형성한 제 1철근노출부에 결합시킨다. The base block fixing step is to fix the fixing plate with the fixing member and then install a brace to further fix the base block, the bottom of the brace is coupled to the pile embedded in the ground and the top of the brace embedded in the base block The exposed reinforcing bar is bonded to the first reinforcing bar exposed part formed by exposing to the outside.

상술한 바와 같이 본 발명은 다수의 블록을 현장에서 조립하는 방식으로 하나의 콘크리트 모듈을 형성함으로써 운반 및 시공이 간편하고 굴착면의 보강력을 높일 수 있다.As described above, the present invention forms a single concrete module in a manner of assembling a plurality of blocks in the field, thereby making it easy to transport and construct and increase reinforcement of the excavation surface.

또한, 본 발명은 터널을 한번에 모두 굴착하지 않고 하나의 블록조립체를 설치하기 위한 공간만을 굴착한 후 3종류의 블록을 조립하여 굴착된 공간에 맞는 블록조립체를 형성하는 모듈방식으로 공사를 진행하므로 공사 중 좌굴에 대한 위험이 낮고 공기를 단축할 수 있는 장점을 갖는다. In addition, the present invention is to excavate only the space for installing one block assembly without excavating the tunnel all at once and then proceed with the construction in a modular manner to form a block assembly suitable for the excavated space by assembling three types of blocks The risk of buckling is low and has the advantage of shortening the air.

도 1은 본 발명의 제 1실시 예의 블록조립체에 적용되는 베이스블록의 사시도이고,
도 2는 본 발명의 제 1실시 예의 블록조립체에 적용되는 중간블록의 사시도이고,
도 3은 본 발명의 제 1실시 예의 블록조립체에 적용되는 상부블록의 사시도이고,
도 4 및 도 5는 본 발명의 제 1실시 예의 블록조립체를 이용한 터널의 시공방법을 나타낸 정면도이고,
도 6은 본 발명의 터널의 시공방법의 다른 예를 나타낸 정면도이고,
도 7은 본 발명의 제 2실시 예의 블록조립체에 적용되는 베이스블록의 사시도이고,
도 8은 본 발명의 제 2실시 예의 블록조립체에 적용되는 중간블록의 사시도이고,
도 9는 본 발명의 제 2실시 예의 블록조립체에 적용되는 상부블록의 사시도이고,
도 10은 본 발명의 제 2실시 예의 블록조립체를 이용한 터널의 시공방법을 나타낸 정면도이고,
1 is a perspective view of a base block applied to the block assembly of the first embodiment of the present invention,
2 is a perspective view of an intermediate block applied to the block assembly of the first embodiment of the present invention,
3 is a perspective view of an upper block applied to the block assembly of the first embodiment of the present invention,
4 and 5 are front views showing the construction method of the tunnel using the block assembly of the first embodiment of the present invention,
6 is a front view showing another example of the construction method of the tunnel of the present invention,
7 is a perspective view of a base block applied to the block assembly of the second embodiment of the present invention,
8 is a perspective view of an intermediate block applied to the block assembly of the second embodiment of the present invention,
9 is a perspective view of an upper block applied to a block assembly of a second embodiment of the present invention;
10 is a front view showing a tunnel construction method using the block assembly of the second embodiment of the present invention,

이하, 첨부된 도면을 참조하면서 터널 시공용 모듈형 블록조립체와 이를 이용한 터널 시공방법에 대하여 구체적으로 설명한다. Hereinafter, a modular block assembly for tunnel construction and a tunnel construction method using the same will be described in detail with reference to the accompanying drawings.

도 1 내지 도 4를 참조하면, 본 발명의 일 예에 따른 터널 시공용 모듈형 블록조립체는 크게 굴착통로(1)의 좌우 양측에 각각 안착되어 지면에 고정되는 베이스블록(10)과, 베이스블록(10)에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 1철근노출부(17)와, 베이스블록(10)의 상부에 결합되는 중간블록(30)과, 중간블록(30)에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 2철근노출부(37)와, 중간블록(30)의 상부에 결합되는 상부블록(50)과, 상부블록(50)에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 3철근노출부(57)와, 베이스블록(10)과 중간블록(30)을 결합시키기 위한 제 1결합수단과, 중간블록(30)과 상부블록(50)을 결합시키기 위한 제 2결합수단을 구비한다.1 to 4, the modular block assembly for tunnel construction according to an embodiment of the present invention is largely seated on both the left and right sides of the excavation passage (1) base block 10 and the base block fixed to the ground, A plurality of first reinforcing bar exposed portions 17 formed by exposing the reinforcement embedded in the (10) to the outside, the intermediate block 30 is coupled to the upper portion of the base block 10, and embedded in the intermediate block (30) A plurality of second rebar exposure portion 37 formed by exposing the reinforcing bars to the outside, the upper block 50 is coupled to the upper portion of the intermediate block 30, and the reinforcing bars embedded in the upper block 50 to the outside A plurality of third rebar exposure portion 57 formed by exposure, the first coupling means for coupling the base block 10 and the intermediate block 30, the intermediate block 30 and the upper block 50 is coupled It has a second coupling means for making.

베이스블록(10)은 굴착통로(1)의 좌우 양측에 각각 안착되어 중간블록(30)을 지지하는 역할을 한다. The base block 10 is seated on both left and right sides of the excavation passage 1 to serve to support the intermediate block 30.

베이스블록(10)은 하부몸체(11)와, 하부몸체(11)의 상부에 형성된 상부몸체(13)로 이루어진다.The base block 10 is formed of a lower body 11 and an upper body 13 formed on the lower body 11.

하부몸체(11)는 상부몸체(13)의 바깥방향으로 뻗어나가도록 형성된다. 이러한 하부몸체(11)는 지면과의 접촉면적을 넓혀 지지력을 높인다. The lower body 11 is formed to extend outwardly of the upper body 13. The lower body 11 expands the contact area with the ground to increase the bearing capacity.

상부몸체(13)는 터널의 아치 형태와 유사하게 굽어지도록 형성된다. The upper body 13 is formed to bend similar to the arch shape of the tunnel.

상부몸체(13)의 상부에는 제 1결합턱(15)이 형성된다. 제 1결합턱(15)은 상부몸체(13)의 상부에 돌출되게 형성된다. 제 1결합턱(15)은 중간블록(30)의 하부에 형성된 결합홈(35)에 결합되어 블록간의 결합력을 높인다. 그리고 도 7에 도시된 바와 같이 상부몸체(13)에는 제 1결합턱이 형성되지 않을 수 있다. The first coupling jaw 15 is formed on the upper portion of the upper body 13. The first coupling jaw 15 is formed to protrude above the upper body 13. The first coupling jaw 15 is coupled to the coupling groove 35 formed in the lower portion of the intermediate block 30 to increase the coupling force between the blocks. As shown in FIG. 7, the first coupling jaw may not be formed in the upper body 13.

상술한 베이스블록(10)은 콘크리트로 형성된다. 베이스블록(10)의 내부에는 여러가닥의 철근이 매설되어 있다. 베이스블록(10)의 내부에 매설된 철근의 일부는 외부로 노출되어 제 1철근노출부(17)를 형성한다. The base block 10 described above is formed of concrete. Inside the base block 10 is embedded several strands of rebar. A part of the rebar embedded in the base block 10 is exposed to the outside to form the first rebar exposed portion 17.

제 1철근노출부(17)는 베이스블록(10)의 내측면과 상면, 저면에 각 형성될 수 있다. 베이스블록(10)의 상면에 형성된 제 1철근노출부는 후술할 제 1결합판(25)과 용접결합되고, 베이스블록(10)의 저면에 형성된 제 1철근노출부는 후술할 고정판(20)과 용접결합될 수 있다. The first rebar exposed portion 17 may be formed on the inner surface, the upper surface and the bottom surface of the base block 10. The first rebar exposed portion formed on the upper surface of the base block 10 is welded to the first coupling plate 25 to be described later, and the first rebar exposed portion formed on the bottom surface of the base block 10 is welded to the fixing plate 20 to be described later. Can be combined.

베이스블록(10)의 내측면에 위치하는 제 1철근노출부(17)는 U자 형태로 굽어지게 형성될 수 있다. The first rebar exposed portion 17 positioned on the inner side of the base block 10 may be formed to be bent in a U shape.

중간블록(30)은 베이스블록(10)의 상부에 결합된다. 중간블록(30)은 터널의 좌우측에 하나씩 설치되나 이와 달리 2개 또는 3개 이상이 연속배치될 수 있음은 물론이다. The intermediate block 30 is coupled to the top of the base block 10. Intermediate block 30 is installed one by one on the left and right side of the tunnel, otherwise two or three or more may be arranged in a row of course.

중간블록(30)은 터널의 아치 형태와 유사하게 굽어지도록 형성된다. 중간블록(30)은 하부에 결합홈(35)이 형성되고, 상부에 제 2결합턱(31)이 형성된다. 제 2결합턱(31)은 상부블록(50)의 하부에 형성된 결합홈(53)에 결합되어 블록간의 결합력을 높인다. 그리고 도 8에 도시된 바와 같이 중간블록(30)에는 결합홈과 제 2결합턱이 형성되지 않을 수 있다. The intermediate block 30 is formed to bend similar to the arch shape of the tunnel. The intermediate block 30 has a coupling groove 35 formed at a lower portion thereof, and a second coupling jaw 31 formed at an upper portion thereof. The second coupling jaw 31 is coupled to the coupling groove 53 formed in the lower portion of the upper block 50 to increase the coupling force between the blocks. As shown in FIG. 8, the coupling block and the second coupling jaw may not be formed in the intermediate block 30.

중간블록(30)은 콘크리트로 형성된다. 중간블록(30)의 내부에는 여러가닥의 철근이 매설되어 있다. 중간블록(30)의 내부에 매설된 철근의 일부는 외부로 노출되어 제 2철근노출부(37)를 형성한다. The intermediate block 30 is formed of concrete. Inside the intermediate block 30 is embedded several strands of rebar. A part of the rebar embedded in the intermediate block 30 is exposed to the outside to form a second rebar exposed portion 37.

제 2철근노출부(37)는 중간블록(30)의 내측면과 상면, 저면에 각 형성될 수 있다. 중간블록(30)의 저면에 형성된 제 2철근노출부는 후술할 제 2결합판(40)과 용접결합되고, 중간블록(300의 상면에 형성된 제 1철근노출부는 후술할 제 3결합판(45)과 용접결합될 수 있다. Second rebar exposure portion 37 may be formed on the inner surface, the upper surface, the bottom surface of the intermediate block 30, respectively. The second rebar exposing portion formed on the bottom of the intermediate block 30 is welded to the second coupling plate 40 to be described later, and the first reinforcing bar exposing portion formed on the upper surface of the intermediate block 300 is the third coupling plate 45 to be described later. And welded together.

중간블록(30)의 내측면에 위치하는 제 2철근노출부(37)는 U자 형태로 굽어지게 형성될 수 있다. The second rebar exposed portion 37 positioned on the inner side of the intermediate block 30 may be formed to be bent in a U shape.

상부블록(50)은 중간블록(30)의 상부에 결합된다. 따라서 상부블록(50)의 일측은 굴착통로(1)의 좌측에 위치한 중간블록(30)의 상부에 결합되고, 상부블록(50)의 타측은 굴착통로(1)의 우측에 위치한 중간블록(30)의 상부에 결합된다. 그리고 도시된 예에서 상부블록은 하나의 블록으로 이루어지고 있으나, 이와 달리 다수의 블록들이 결합되어 하나의 상부블록을 형성할 수 있음은 물론이다. The upper block 50 is coupled to the upper portion of the intermediate block 30. Therefore, one side of the upper block 50 is coupled to the upper portion of the intermediate block 30 located on the left side of the excavation passage (1), the other side of the upper block 50 is the intermediate block 30 located on the right side of the excavation passage (1) ) Is coupled to the top. In the illustrated example, the upper block is composed of one block. Alternatively, a plurality of blocks may be combined to form one upper block.

상부블록(50)은 터널의 아치 형태와 유사하게 굽어지도록 형성된다. 상부블록(50)의 좌우 양측에는 결합홈(53)이 형성된다. 상부블록의 결합홈(53)에는 좌우측에 각각 위치하는 중간블록(30)의 제 2결합턱(31)이 각각 결합된다. 그리고 도 9에 도시된 바와 같이 상부블록(50)에는 결합홈이 형성되지 않을 수 있다. The upper block 50 is formed to bend similar to the arch shape of the tunnel. Coupling grooves 53 are formed at left and right sides of the upper block 50. The second coupling jaw 31 of the intermediate block 30 positioned on the left and right sides is coupled to the coupling groove 53 of the upper block, respectively. 9, the coupling groove may not be formed in the upper block 50.

상부블록(50)은 콘크리트로 형성된다. 상부블록(50)의 내부에는 여러가닥의 철근이 매설되어 있다. 상부블록(50)의 내부에 매설된 철근의 일부는 외부로 노출되어 제 3철근노출부(57)를 형성한다. The upper block 50 is formed of concrete. Inside the upper block 50 is embedded several strands of rebar. A part of the rebar embedded in the upper block 50 is exposed to the outside to form a third rebar exposed portion 57.

제 3철근노출부(57)는 상부블록(50)의 내측면과 하부 좌우측에 각 형성될 수 있다. 상부블록(50)의 하부 좌우측에 형성된 제 2철근노출부는 후술할 제 4결합판(60)과 용접결합될 수 있다. The third rebar exposed portion 57 may be formed on the inner side and the lower left and right sides of the upper block 50, respectively. The second rebar exposing portions formed on the lower left and right sides of the upper block 50 may be welded to the fourth coupling plate 60 to be described later.

상부블록(50)의 내측면에 위치하는 제 3철근노출부(57)는 U자 형태로 굽어지게 형성될 수 있다. The third rebar exposed portion 57 positioned on the inner side surface of the upper block 50 may be formed to be bent in a U shape.

고정수단은 베이스블록(10)을 지면에 고정시키는 역할을 한다. 고정수단의 일 예로 베이스블록(10)의 저면에 결합되는 고정판(20)과, 고정판(20)을 지면에 고정시키기 위한 고정부재를 구비한다. The fixing means serves to fix the base block 10 to the ground. An example of the fixing means includes a fixing plate 20 coupled to the bottom of the base block 10 and a fixing member for fixing the fixing plate 20 to the ground.

고정판(20)은 상술한 바와 같이 베이스블록의 저면에 형성된 제 1철근노출부에 용접결합된다. The fixed plate 20 is welded to the first rebar exposed portion formed on the bottom of the base block as described above.

고정부재로 지면에 박힌 앵커볼트(70)와, 앵커볼트(70)를 고정판(20)에 고정시키는 너트(73)로 이루어질 수 있다. 이와 달리 앵커볼트(70)에 고정판(20)을 용접으로 결합시킬 수 있다. An anchor bolt 70 embedded in the ground as a fixing member, and a nut 73 for fixing the anchor bolt 70 to the fixing plate 20. Unlike this, the fixing plate 20 may be coupled to the anchor bolt 70 by welding.

제 1결합수단은 베이스블록(10)과 중간블록(30)을 견고하게 결합시킨다. The first coupling means firmly couples the base block 10 and the intermediate block 30.

제 1결합수단은 베이스블록(10)의 상부에 결합되는 제 1결합판(25)과, 제 1결합판(25)의 단부에서 하방으로 절곡되어 형성된 제 1지지판(27)과, 중간블록(30)의 하부에 결합되어 제 1결합판(25)과 포개지는 제 2결합판(40)과, 제 2결합판(40)의 단부에서 상방으로 절곡되어 형성된 제 2지지판(43)을 구비한다. The first coupling means includes a first coupling plate 25 coupled to an upper portion of the base block 10, a first support plate 27 formed by bending downward from an end of the first coupling plate 25, and an intermediate block ( 30 is coupled to the lower portion of the first coupling plate 25 and overlapping with the second coupling plate 40 and a second support plate 43 formed by bending upwardly at the end of the second coupling plate 40 .

제 1결합판(25)은 제 1결합턱(15)의 상부에 결합된다. 제 1결합판(25)은 금속판으로 형성될 수 있다. 제 1결합판(25)에는 다수의 관통홀(26)이 일정 간격으로 형성된다. 제 1결합판(25)은 베이스블록(10)의 상부로 노출된 제 1철근노출부에 용접으로 결합될 수 있다. 제 1결합판(25)의 단부는 베이스블록(10)의 내측면 방향으로 돌출된다. 돌출된 제 1결합판(25)의 단부에는 제 1지지판(27)이 형성된다. 제 1지지판(27)은 제 1결합판(25)의 단부에서 하방으로 절곡된 형태로 형성된다. The first coupling plate 25 is coupled to the upper portion of the first coupling jaw 15. The first coupling plate 25 may be formed of a metal plate. A plurality of through holes 26 are formed in the first coupling plate 25 at regular intervals. The first coupling plate 25 may be welded to the first rebar exposed portion exposed to the upper portion of the base block 10. An end of the first coupling plate 25 protrudes in the inner surface direction of the base block 10. The first support plate 27 is formed at the end of the protruding first coupling plate 25. The first support plate 27 is formed to be bent downward at the end of the first coupling plate 25.

제 2결합판(40)은 중간블록(30)의 하부에 결합된다. 제 2결합판(40)은 금속판으로 형성될 수 있다. 제 2결합판(40)에는 다수의 관통홀(41)이 일정 간격으로 형성된다. 제 2결합판(40)은 중간블록(30)의 하부로 노출된 제 2철근노출부에 용접으로 결합될 수 있다. 제 2결합판(40)의 단부는 중간블록(30)의 내측면 방향으로 돌출된다. 돌출된 제 2결합판(40)의 단부에는 제 2지지판(43)이 형성된다. 제 2지지판(43)은 제 2결합판(40)의 단부에서 상방으로 절곡된 형태로 형성된다. The second coupling plate 40 is coupled to the lower portion of the intermediate block 30. The second coupling plate 40 may be formed of a metal plate. A plurality of through holes 41 are formed in the second coupling plate 40 at regular intervals. The second coupling plate 40 may be welded to the second rebar exposed portion exposed to the lower portion of the intermediate block 30. The end of the second coupling plate 40 protrudes in the inner surface direction of the intermediate block 30. A second support plate 43 is formed at the end of the protruding second coupling plate 40. The second support plate 43 is formed to be bent upward at the end of the second coupling plate 40.

베이스블록(10)의 상부에 중간블록(30)을 안착시켜 제 1결합판(25) 및 제 2결합판(40)에 형성된 관통홀들(26)(41)을 일치시킨 다음 볼트(23)를 삽입한 후 너트(24)를 체결하여 제 1결합판(25)과 제 2결합판(40)을 결합시킬 수 있다. 또한, 이와 달리 제 1결합판(25)과 제 2결합판(40)을 용접으로 결합시킬 수 있음은 물론이다. The intermediate block 30 is seated on the upper portion of the base block 10 to align the through holes 26 and 41 formed in the first and second coupling plates 25 and 40, and then bolt 23. After inserting the nut 24 may be fastened to couple the first coupling plate 25 and the second coupling plate 40. In addition, of course, the first coupling plate 25 and the second coupling plate 40 may be coupled by welding.

제 2결합수단은 중간블록(30)과 상부블록(50)을 결합시키는 역할을 한다. The second coupling means serves to couple the intermediate block 30 and the upper block 50.

제 2결합수단은 중간블록(30)의 상부에 결합되는 제 3결합판(45)과, 제 3결합판(45)의 단부에서 하방으로 절곡되어 형성된 제 3지지판(47)과, 상부블록(50)의 하부에 결합되어 제 3결합판(45)과 포개지는 제 4결합판(60)과, 제 4결합판(60)의 단부에서 상방으로 절곡되어 형성된 제 4지지판(63)을 구비한다. The second coupling means includes a third coupling plate 45 coupled to the upper portion of the intermediate block 30, a third support plate 47 formed by bending downwardly from the end of the third coupling plate 45, and an upper block ( 50 is coupled to the lower portion of the third coupling plate 45 and overlapping with the fourth coupling plate 60 and the fourth support plate 63 formed by bending upward from the end of the fourth coupling plate 60 .

제 3결합판(45)은 제 2결합턱(31)의 상부에 결합된다. 제 3결합판(45)은 금속판으로 형성될 수 있다. 제 3결합판(45)에는 다수의 관통홀(46)이 일정 간격으로 형성된다. 제 3결합판(45)은 중간블록(30)의 상부로 노출된 제 2철근노출부에 용접으로 결합될 수 있다. 제 3결합판(45)의 단부는 중간블록(30)의 내측면 방향으로 돌출된다. 돌출된 제 3결합판(45)의 단부에는 제 3지지판(47)이 형성된다. 제 3지지판(47)은 제 3결합판(45)의 단부에서 하방으로 절곡된 형태로 형성된다. The third coupling plate 45 is coupled to the upper portion of the second coupling jaw 31. The third coupling plate 45 may be formed of a metal plate. A plurality of through holes 46 are formed in the third coupling plate 45 at regular intervals. The third coupling plate 45 may be welded to the second rebar exposed portion exposed to the upper portion of the intermediate block 30. The end of the third coupling plate 45 protrudes in the inner surface direction of the intermediate block 30. A third support plate 47 is formed at the end of the protruding third coupling plate 45. The third support plate 47 is formed to be bent downward at the end of the third coupling plate 45.

제 4결합판(60)은 상부블록(50)의 좌우측 하부에 각각 결합된다. 제 4결합판(60)은 금속판으로 형성될 수 있다. 제 4결합판(60)에는 다수의 관통홀(61)이 일정 간격으로 형성된다. 제 4결합판(60)은 상부블록(50)의 좌우측 하부로 노출된 제 3철근노출부에 용접으로 결합될 수 있다. 제 4결합판(60)의 단부는 상부블록(50)의 내측면 방향으로 돌출된다. 돌출된 제 4결합판(60)의 단부에는 제 4지지판(63)이 형성된다. 제 4지지판(63)은 제 4결합판(60)의 단부에서 상방으로 절곡된 형태로 형성된다. The fourth coupling plate 60 is coupled to the lower left and right sides of the upper block 50, respectively. The fourth coupling plate 60 may be formed of a metal plate. A plurality of through holes 61 are formed in the fourth coupling plate 60 at regular intervals. The fourth coupling plate 60 may be welded to the third rebar exposed portion exposed to the lower left and right sides of the upper block 50 by welding. An end portion of the fourth coupling plate 60 protrudes in the inner surface direction of the upper block 50. A fourth support plate 63 is formed at the end of the protruding fourth coupling plate 60. The fourth supporting plate 63 is formed to be bent upward at the end of the fourth coupling plate 60.

중간블록(30)의 상부에 상부블록(50)을 안착시켜 제 3결합판(45) 및 제 4결합판(60)에 형성된 관통홀들(46)(61)을 일치시킨 다음 볼트를 삽입한 후 너트를 체결하여 제 3결합판(45)과 제 4결합판(60)을 결합시킬 수 있다. 또한, 이와 달리 제 3결합판(45)과 제 4결합판(60)을 용접으로 결합시킬 수 있음은 물론이다. The upper block 50 is seated on the upper part of the intermediate block 30 to match the through holes 46 and 61 formed in the third coupling plate 45 and the fourth coupling plate 60, and then insert a bolt. Then, the third coupling plate 45 and the fourth coupling plate 60 may be coupled by fastening the nut. In addition, of course, the third coupling plate 45 and the fourth coupling plate 60 may be welded.

이와 같이 고정수단과 제 1 및 제 2결합수단에 의해 베이스블록(10), 중간블록(30), 상부블록(50)은 아치 형태로 조립되어 하나의 모듈을 이룬다. 하나의 모듈은 2개의 베이스블록(10)과 2개의 중간블록(30), 1개의 상부블록(50)이 이용된다. As such, the base block 10, the intermediate block 30, and the upper block 50 are assembled in an arch form by the fixing means and the first and second coupling means to form a module. One module uses two base blocks 10, two intermediate blocks 30, and one upper block 50.

이와 같이 본 발명은 아치 형태로 모듈화된 블록 조립체를 이용하여 터널을 시공하므로 굴착면의 보강력을 높이며 터널을 시공을 간편하게 할 수 있다. As such, the present invention can be used to construct the tunnel using a modular block assembly in the form of an arch to increase the reinforcement of the excavation surface and simplify the construction of the tunnel.

이하, 도 1 내지 도 5를 참조하면서 상술한 본 발명의 모듈화된 블록 조립체를 이용한 터널의 시공방법에 대하여 설명한다. Hereinafter, a method of constructing a tunnel using the modular block assembly of the present invention described above with reference to FIGS. 1 to 5 will be described.

본 발명의 터널 시공방법은 일정 거리 굴착통로(1)를 형성한 후 3종류의 블록(10,30,50)을 조립하여 모듈화된 블록 조립체를 굴착통로(1)의 내측에 설치된다. 그리고 블록조립체의 내측에 거푸집(80)을 설치한 후 블록조립체와 거푸집 사이의 공간에 콘트리트를 타설하여 콘크리트 라이닝을 형성한다. In the tunnel construction method of the present invention, after forming a predetermined distance excavation passage 1, three types of blocks 10, 30, and 50 are assembled to install a modular block assembly inside the excavation passage 1. Then, after the formwork 80 is installed inside the block assembly, concrete is placed in the space between the block assembly and the formwork to form a concrete lining.

콘크리트 라이닝이 형성되면 다시 일정 거리 더 굴착한다. 새롭게 굴착된 굴착통로에는 위의 방법을 반복하여 2차로 콘크리트 라이닝을 형성한다. Once the concrete lining is formed, it is excavated again for a certain distance. Newly drilled excavation passages are repeated to form secondary concrete lining.

이와 같은 과정을 반복하여 터널을 시공한다. Repeat this process to construct the tunnel.

구체적으로, 본 발명의 일 예에 따른 터널 시공방법은 일정거리의 굴착통로(1)를 형성한 후 굴착통로(1)의 좌우 양측에 베이스블록(10)을 각각 안착시키는 베이스블록안착단계와, 베이스블록(10)을 지면에 고정시키는 베이스블록고정단계와, 베이스블록(10)의 상부에 중간블록(30)을 안착시키는 중간블록안착단계와, 중간블록(30)과 베이스블록(10)을 제 1결합수단으로 결합시키는 제 1결합단계와, 중간블록(30)의 상부에 상부블록(50)을 안착시켜 아치 형태의 블록 조립체를 형성하는 상부블록안착단계와, 중간블록(30)과 상부블록(50)을 제 2결합수단으로 결합시키는 제 2결합단계와, 블록조립체와 이격되도록 블록조립체의 내측 방향에 아치 형태의 거푸집(80)을 설치하는 거푸집설치단계, 블록조립체와 거푸집(80) 사이에 콘크리트를 타설하는 콘크리트타설단계를 포함한다. Specifically, the tunnel construction method according to an embodiment of the present invention and the base block seating step of seating the base block 10 on each of the left and right sides of the excavation passage (1) after forming the excavation passage 1 of a predetermined distance, and A base block fixing step of fixing the base block 10 to the ground, an intermediate block seating step of seating the intermediate block 30 on top of the base block 10, and an intermediate block 30 and the base block 10; A first coupling step of coupling with a first coupling means, an upper block seating step of seating an upper block 50 on an upper portion of the intermediate block 30 to form an arch block assembly, and an intermediate block 30 and an upper portion The second coupling step of coupling the block 50 to the second coupling means, the form installation step of installing the arch formwork 80 in the inner direction of the block assembly so as to be spaced apart from the block assembly, block assembly and formwork 80 Concrete placing step of placing concrete between It includes.

먼저, 터널의 입구가 되는 지점에서부터 일정거리의 굴착통로(1)를 형성한다. 그리고 굴착통로(1)의 좌우 양측에 베이스블록(10)을 각각 안착시킨다. First, the excavation passage 1 is formed at a predetermined distance from the point of the entrance of the tunnel. And base blocks 10 are respectively seated on both left and right sides of the excavation passage (1).

베이스블록(10)이 안착되면 베이스블록(10)을 지면에 고정시킨다. 이를 위해 지중에 매립시킨 앵커볼트(70)에 고정판(20)을 결합시킨 후 너트(73)를 체결한다. 결합방법으로 용접을 이용할 수 있음은 물론이다. When the base block 10 is seated, the base block 10 is fixed to the ground. To this end, the fixing plate 20 is coupled to the anchor bolt 70 embedded in the ground, and then the nut 73 is fastened. Of course, welding can be used as a joining method.

다음으로, 중간블록(30)을 들어올려서 베이스블록(10)의 상부에 중간블록(30)을 안착시킨다. Next, the intermediate block 30 is lifted to seat the intermediate block 30 on the base block 10.

그리고 중간블록(30)이 베이스블록(10)의 상부에 안착된 상태에서 중간블록(30)과 베이스블록(10)을 제 1결합수단으로 결합시킨다. 중간블록(30)이 베이스블록(10)의 상부에 안착되면 제 1결합판(25)과 제 2결합판(40)이 포개된다. 이 상태에서 제 1 및 제 2결합판(25)(40)에 형성된 관통홀(26)(41)에 볼트(23)를 삽입한 후 너트(24)를 체결하여 제 1결합판(25)과 제 2결합판(40)을 견고히 결합시킨다. 이와 달리 제 1결합판(25)과 제 2결합판(40)을 용접으로 결합시킬 수 있음은 물론이다. And the intermediate block 30 is coupled to the intermediate block 30 and the base block 10 by the first coupling means in a state seated on the upper portion of the base block 10. When the intermediate block 30 is seated on the top of the base block 10, the first coupling plate 25 and the second coupling plate 40 are stacked. In this state, the bolts 23 are inserted into the through holes 26 and 41 formed in the first and second coupling plates 25 and 40, and then the nuts 24 are fastened to the first coupling plate 25. The second coupling plate 40 is firmly coupled. Unlike this, of course, the first coupling plate 25 and the second coupling plate 40 may be joined by welding.

다음으로, 상부블록(50)을 들어올려서 중간블록(30)의 상부에 상부블록(50)을 안착시킨다. Next, the upper block 50 is lifted to seat the upper block 50 on top of the intermediate block 30.

그리고 상부블록(50)이 중간블록(30)의 상부에 안착된 상태에서 상부블록(50)과 중간블록(30)을 제 2결합수단으로 결합시킨다. 상부블록(50)이 중간블록(30)의 상부에 안착되면 제 3결합판(45)과 제 4결합판(60)이 포개진다. 이 상태에서 제 3 및 제 4결합판(45)(60)에 형성된 관통홀(46)(61)에 볼트를 삽입한 후 너트를 체결하여 제 3결합판(45)과 제 4결합판(60)을 견고히 결합시킨다. 이와 달리 제 3결합판(45)과 제 4결합판(60)을 용접으로 결합시킬 수 있음은 물론이다. And the upper block 50 is coupled to the upper block 50 and the intermediate block 30 in the state seated on the upper portion of the intermediate block 30 by a second coupling means. When the upper block 50 is seated on the upper portion of the intermediate block 30, the third coupling plate 45 and the fourth coupling plate 60 are stacked. In this state, a bolt is inserted into the through holes 46 and 61 formed in the third and fourth coupling plates 45 and 60, and then the nut is fastened to the third coupling plate 45 and the fourth coupling plate 60. ) Firmly combined. Unlike this, of course, the third coupling plate 45 and the fourth coupling plate 60 may be joined by welding.

이와 같이 베이스블록(10), 중간블록(30), 상부블록(50)을 결합시켜 블록조립체가 형성되면 거푸집(80)을 설치한다. As such, when the block assembly is formed by combining the base block 10, the intermediate block 30, and the upper block 50, the formwork 80 is installed.

거푸집(80)은 도 5에 나타난 바와 같이 블록조립체와 이격되도록 블록조립체의 내측 방향에 아치 형태로 설치된다. 거푸집은 제 1지지판(27) 및 제 2지지판(43), 제 3지지판(47) 및 제 4지지판(63)에 고정시킬 수 있다. 고정방법으로 각 지지판에 관통홀을 형성하여 각 지지판과 거푸집을 볼트로 고정시킬 수 있다. 또한, 거푸집은 각 블록에 형성된 제 1 내지 제 3철근노출부에 고정시킬 수 있음은 물론이다. As shown in FIG. 5, the formwork 80 is installed in an arch shape in an inner direction of the block assembly so as to be spaced apart from the block assembly. The formwork can be fixed to the first support plate 27 and the second support plate 43, the third support plate 47, and the fourth support plate 63. Through fixing method, through holes are formed in each support plate to fix each support plate and formwork with bolts. In addition, the formwork can of course be fixed to the first to third rebar exposed portion formed in each block.

이와 같이 거푸집(80)이 설치된 상태에서 블록조립체와 거푸집 사이의 빈 공간에 콘크리트를 타설한다. 콘크리트의 타설 전에 배수관거 및 전기시설 등을 미리 설치할 수 있음은 물론이다. As such, in the state where the formwork 80 is installed, the concrete is poured into the empty space between the block assembly and the formwork. Of course, drainage pipes and electrical facilities can be installed in advance before concrete is poured.

콘크리트의 타설 후 콘크리트가 양생되면 거푸집을 해체하여 아치 형태의 콘크리트 라이닝이 형성된다. When concrete is cured after pouring concrete, the formwork is formed by dismantling the formwork.

콘크리트 라이닝이 형성되면 일정 거리 다시 굴착한 후 상술한 과정들을 반복하여 터널이 완성된다. After the concrete lining is formed, the tunnel is completed by repeating the above steps after excavating again for a certain distance.

이와 같이 본 발명은 터널을 한번에 모두 굴착하지 않고 하나의 블록조립체를 설치하기 위한 공간만을 굴착한 후 3종류의 블록을 조립하여 굴착된 공간에 맞는 블록조립체를 형성하는 모듈방식으로 공사를 진행하므로 공사 중 좌굴에 대한 위험이 낮고 공기를 단축할 수 있는 장점을 갖는다. As such, the present invention does not excavate the tunnel all at once, excavates only the space for installing one block assembly, and then assembles three types of blocks to form a block assembly suitable for the excavated space. The risk of buckling is low and has the advantage of shortening the air.

한편, 본 발명은 다른 예로 베이스블록고정단계는 고정부재(70)(73)로 상고정판(20)을 고정시킨 후 버팀대(93)를 설치하여 베이스블록(10)을 더 고정시킬 수 있다. On the other hand, the present invention, in another example, the base block fixing step may further fix the base block 10 by fixing the upper fixing plate 20 with the fixing members 70 and 73 and then installing a brace 93.

도 6을 참조하면, 지중에 다수의 파일(90)을 박은 후 버팀대(93)의 하부를 파일의 상부에 결합시킨다. 그리고 버팀대(93)의 상부는 제 1철근노출부(17)에 용접하여 결합시킨다. 이러한 버팀대(93)는 콘크리트 라이닝 형성 후 콘크리트 라이닝의 외부로 노출된 부분을 절단하여 제거할 수 있다. Referring to FIG. 6, after the plurality of piles 90 are driven into the ground, the bottom of the brace 93 is coupled to the upper portion of the pile. And the upper portion of the brace 93 is joined to the first rebar exposed portion 17 by welding. The brace 93 can be removed by cutting the exposed portion of the concrete lining after the concrete lining is formed.

또한, 본 발명은 제 2결합단계와 거푸집설치단계 사이에 메움단계를 더 수행할 수 있다. In addition, the present invention may further perform a filling step between the second coupling step and the formwork installation step.

메움단계는 베이스블록(10)과 중간블록(30), 중간블록(30)과 상부블록(50) 사이의 틈새에 충진제를 주입하는 과정이다. Filling is a process of injecting a filler in the gap between the base block 10 and the intermediate block 30, the intermediate block 30 and the upper block 50.

충진제로 모르타르나 아스팔트, 고분자 수지를 이용할 수 있다. 이러한 충진재를 틈새에 주입함으로써 블록간의 결합력을 향상시키고 금속소재인 결합판의 부식을 막을 수 있다.As the filler, mortar, asphalt, or polymer resin can be used. By injecting such a filler into the gap, it is possible to improve the bonding force between the blocks and to prevent corrosion of the bonding plate which is a metal material.

한편, 본 발명은 도 7 내지 도 9에 적용된 베이스블록(10), 중간블록(30), 상부블록(50)을 결합시켜 형성된 블록조립체의 모습을 도 10에 나타내고 있다. 도시된 블록조립체는 각 블록에 결합턱과 결합홈이 형성되지 않은 구조를 나타낸다. 이 경우 고정수단과, 제 1 및 제 2결합수단에 의해 각 블록은 견고히 결합된다.Meanwhile, the present invention shows a block assembly formed by combining the base block 10, the intermediate block 30, and the upper block 50 applied to FIGS. 7 to 9 in FIG. 10. The illustrated block assembly shows a structure in which each coupling block and a coupling groove are not formed in each block. In this case, each block is firmly coupled by the fixing means and the first and second coupling means.

이상, 본 발명은 일 실시 예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 당해 기술분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 보호 범위는 첨부된 청구범위에 의해서만 정해져야 할 것이다.As described above, the present invention has been described with reference to one embodiment, which is merely exemplary, and those skilled in the art will understand that various modifications and equivalent embodiments are possible therefrom. Therefore, the true scope of protection of the present invention should be defined only by the appended claims.

10: 베이스블록 20: 고정판
25: 제 1결합판 30: 중간블록
40: 제 2결합판 45: 제 3결합판
50: 상부블록 60: 제 4결합판
80: 거푸집
10: base block 20: fixed plate
25: first coupling plate 30: intermediate block
40: second bonding plate 45: third bonding plate
50: upper block 60: fourth coupling plate
80: formwork

Claims (5)

굴착통로의 좌우 양측에 각각 안착되어 지면에 고정되는 베이스블록과;
상기 베이스블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 1철근노출부와;
상기 베이스블록의 상부에 결합되는 중간블록과;
상기 중간블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 2철근노출부와;
상기 중간블록의 상부에 결합되는 상부블록과;
상기 상부블록에 매설된 철근을 외부로 노출시켜 형성한 다수의 제 3철근노출부와;
상기 베이스블록과 상기 중간블록을 결합시키기 위한 제 1결합수단과;
상기 중간블록과 상기 상부블록을 결합시키기 위한 제 2결합수단;을 구비하고,
상기 베이스블록은 지면과 접촉하는 하부몸체와, 상기 하부몸체의 상부에 굽어지게 형성되어 상기 중간블록의 하부에 결합되는 상부몸체를 구비하며,
상기 하부몸체는 상기 상부몸체의 바깥방향으로 뻗어나가도록 형성되고,
상기 제 1결합수단은 상기 베이스블록의 상부에 결합되는 제 1결합판과, 상기 제 1결합판의 단부에서 하방으로 절곡되어 형성된 제 1지지판과, 상기 중간블록의 하부에 결합되어 상기 제 1결합판과 포개지는 제 2결합판과, 상기 제 2결합판의 단부에서 상방으로 절곡되어 형성된 제 2지지판을 구비하고,
상기 제 2결합수단은 상기 중간블록의 상부에 결합되는 제 3결합판과, 상기 제 3결합판의 단부에서 하방으로 절곡되어 형성된 제 3지지판과, 상기 상부블록의 하부에 결합되어 상기 제 3결합판과 포개지는 제 4결합판과, 상기 제 4결합판의 단부에서 상방으로 절곡되어 형성된 제 4지지판을 구비하는 것을 특징으로 하는 터널 시공용 모듈형 블록조립체.
A base block seated on both left and right sides of the excavation passage and fixed to the ground;
A plurality of first reinforcing bar exposed portions formed by exposing reinforcing bars embedded in the base block to the outside;
An intermediate block coupled to an upper portion of the base block;
A plurality of second rebar exposure parts formed by exposing the reinforcing bars embedded in the intermediate block to the outside;
An upper block coupled to an upper portion of the intermediate block;
A plurality of third rebar exposure parts formed by exposing the reinforcing bars embedded in the upper block to the outside;
First coupling means for coupling the base block and the intermediate block;
And a second coupling means for coupling the intermediate block and the upper block.
The base block has a lower body in contact with the ground, and the upper body is formed to be bent in the upper portion of the lower body is coupled to the lower portion of the intermediate block,
The lower body is formed to extend in the outward direction of the upper body,
The first coupling means may include a first coupling plate coupled to an upper portion of the base block, a first support plate formed by bending downwardly from an end of the first coupling plate, and coupled to a lower portion of the intermediate block to the first coupling plate. A plate and a nested second bonding plate, and a second support plate formed by bending upwardly at an end of the second bonding plate,
The second coupling means includes a third coupling plate coupled to an upper portion of the intermediate block, a third support plate formed by bending downwardly from an end of the third coupling plate, and coupled to a lower portion of the upper block. The plate and the nested fourth block, and the modular block assembly for tunnel construction, characterized in that it comprises a fourth support plate bent upward from the end of the fourth coupling plate.
삭제delete 일정거리의 굴착통로를 형성한 후 상기 굴착통로의 좌우 양측에 베이스블록을 각각 안착시키는 베이스블록안착단계와;
상기 베이스블록을 지면에 고정시키는 베이스블록고정단계와;
상기 베이스블록의 상부에 중간블록을 안착시키는 중간블록안착단계와;
상기 중간블록과 상기 베이스블록을 제 1결합수단으로 결합시키는 제 1결합단계와;
상기 중간블록의 상부에 상부블록을 안착시켜 아치 형태의 블록 조립체를 형성하는 상부블록안착단계와;
상기 중간블록과 상기 상부블록을 제 2결합수단으로 결합시키는 제 2결합단계와;
상기 블록조립체와 이격되도록 상기 블록조립체의 내측 방향에 아치 형태의 거푸집을 설치하는 거푸집설치단계와;
상기 블록조립체와 상기 거푸집 사이에 콘크리트를 타설하는 콘크리트타설단계;를 포함하고,
상기 베이스블록은 지면과 접촉하는 하부몸체와, 상기 하부몸체의 상부에 굽어지게 형성되어 상기 중간블록의 하부에 결합되는 상부몸체를 구비하며,
상기 하부몸체는 상기 상부몸체의 바깥방향으로 뻗어나가도록 형성되고,
상기 제 1결합수단은 상기 베이스블록의 상부에 결합되는 제 1결합판과, 상기 제 1결합판의 단부에서 하방으로 절곡되어 형성된 제 1지지판과, 상기 중간블록의 하부에 결합되어 상기 제 1결합판과 포개지는 제 2결합판과, 상기 제 2결합판의 단부에서 상방으로 절곡되어 형성된 제 2지지판을 구비하고,
상기 제 2결합수단은 상기 중간블록의 상부에 결합되는 제 3결합판과, 상기 제 3결합판의 단부에서 하방으로 절곡되어 형성된 제 3지지판과, 상기 상부블록의 하부에 결합되어 상기 제 3결합판과 포개지는 제 4결합판과, 상기 제 4결합판의 단부에서 상방으로 절곡되어 형성된 제 4지지판을 구비하는 것을 특징으로 하는 터널 시공방법.
A base block seating step of seating base blocks on both left and right sides of the excavation passage after forming an excavation passage at a predetermined distance;
A base block fixing step of fixing the base block to the ground;
An intermediate block seating step of seating an intermediate block on an upper portion of the base block;
A first coupling step of coupling the intermediate block and the base block by a first coupling means;
An upper block seating step of seating an upper block on an upper portion of the intermediate block to form an arch block assembly;
A second coupling step of coupling the intermediate block and the upper block with a second coupling means;
A formwork installation step of installing an arch formwork in an inward direction of the block assembly to be spaced apart from the block assembly;
And placing concrete between the block assembly and the formwork;
The base block has a lower body in contact with the ground, and the upper body is formed to be bent in the upper portion of the lower body is coupled to the lower portion of the intermediate block,
The lower body is formed to extend in the outward direction of the upper body,
The first coupling means may include a first coupling plate coupled to an upper portion of the base block, a first support plate formed by bending downwardly from an end of the first coupling plate, and coupled to a lower portion of the intermediate block to the first coupling plate. A plate and a nested second bonding plate, and a second support plate formed by bending upwardly at an end of the second bonding plate,
The second coupling means includes a third coupling plate coupled to an upper portion of the intermediate block, a third support plate formed by bending downwardly from an end of the third coupling plate, and coupled to a lower portion of the upper block. And a fourth coupling plate and a fourth supporting plate formed by bending upwardly from an end of the fourth coupling plate.
제 3항에 있어서, 상기 베이스블록고정단계는 상기 베이스블록의 저면에 결합된 고정판을 고정부재로 상기 지면에 고정시키는 것을 특징으로 하는 터널 시공방법. According to claim 3, The base block fixing step Tunnel construction method characterized in that the fixing plate coupled to the bottom surface of the base block is fixed to the ground by a fixing member. 제 4항에 있어서, 상기 베이스블록고정단계는 상기 고정부재로 상기 고정판을 고정시킨 후 버팀대를 설치하여 상기 베이스블록을 더 고정시키고,
상기 버팀대의 하부는 지중에 박힌 파일에 결합시키고 상기 버팀대의 상부는 상기 베이스블록에 매설된 철근을 외부로 노출시켜 형성한 제 1철근노출부에 결합시키는 것을 특징으로 하는 터널 시공방법.


The method of claim 4, wherein the base block fixing step is to further secure the base block by installing a brace after fixing the fixing plate with the fixing member,
And a lower portion of the brace is coupled to a pile embedded in the ground, and the upper portion of the brace is coupled to a first rebar exposed portion formed by exposing reinforcing bars embedded in the base block to the outside.


KR1020170145924A 2017-11-03 2017-11-03 block assembly of module type and construction method of tunnel KR102068320B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170145924A KR102068320B1 (en) 2017-11-03 2017-11-03 block assembly of module type and construction method of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170145924A KR102068320B1 (en) 2017-11-03 2017-11-03 block assembly of module type and construction method of tunnel

Publications (2)

Publication Number Publication Date
KR20190050479A KR20190050479A (en) 2019-05-13
KR102068320B1 true KR102068320B1 (en) 2020-01-20

Family

ID=66581856

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170145924A KR102068320B1 (en) 2017-11-03 2017-11-03 block assembly of module type and construction method of tunnel

Country Status (1)

Country Link
KR (1) KR102068320B1 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0689638B2 (en) * 1989-10-11 1994-11-09 東日本旅客鉄道株式会社 Tunnel lining method
JP3011170B2 (en) * 1998-01-20 2000-02-21 鹿島建設株式会社 Segment joint structure
KR100717390B1 (en) * 2005-09-14 2007-05-11 박창순 Assembly precasted panel for excavation tunnel
KR100785459B1 (en) 2006-06-20 2007-12-13 (주)대우건설 Method for constructing tunnel using precast concrete tunnel lining
KR100964995B1 (en) * 2008-02-25 2010-06-21 코오롱건설주식회사 Soil retaining method for two rows pile using raker

Also Published As

Publication number Publication date
KR20190050479A (en) 2019-05-13

Similar Documents

Publication Publication Date Title
KR101078047B1 (en) Precast concrete truss support structure and construction method thereof
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR20090030716A (en) Joint structure for connecting slurry wall and girder/slab and method for constructing girder/slab of underground structures using the same
KR101780370B1 (en) Composite structure using shear connector made of anchor and socket shoe
KR101648704B1 (en) Underground wall structure
JP4333801B2 (en) Construction method of wall structure with permanent anchor construction, Wall structure with permanent anchor construction
KR101222522B1 (en) Precast tunnel structure using corrugated multi plate
JP2008231799A (en) Base isolation structure
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
KR20070095481A (en) Semi open cut type tunnel construction method at low overburden and arch type structure for tunnel construction
KR102208236B1 (en) Semi Open Cut Type Supporting System of Tunnel and the Construction Method of Tunnel Using by Same
JP6043454B1 (en) Construction method of underground structure and underground structure
JP7334948B2 (en) Culvert structure and its construction method
JP2016205051A (en) Construction method for structure
JP4890217B2 (en) Construction method of underground structure and underground structure
JP6368584B2 (en) Foundation construction method
JP6703816B2 (en) Footing foundation structure
JP5480744B2 (en) Foundation for structure and its construction method
KR102068320B1 (en) block assembly of module type and construction method of tunnel
KR101973566B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by bolting cutoff plate to phc pile with longitudinal plate
KR101222523B1 (en) Precast tunnel structure using corrugated multi plate
KR101017127B1 (en) Connecting Structure between Foundation and Pier, and Construction Method thereof
KR101553865B1 (en) Composite phc pile with concrete filling plate and structure therewith
KR20080103260A (en) Reinforcing bar assembly for separate concrete pours and strut system method utilizing the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant