KR102034408B1 - Construction method of double pillar for greenhouse having sinking prevention function - Google Patents

Construction method of double pillar for greenhouse having sinking prevention function Download PDF

Info

Publication number
KR102034408B1
KR102034408B1 KR1020190044439A KR20190044439A KR102034408B1 KR 102034408 B1 KR102034408 B1 KR 102034408B1 KR 1020190044439 A KR1020190044439 A KR 1020190044439A KR 20190044439 A KR20190044439 A KR 20190044439A KR 102034408 B1 KR102034408 B1 KR 102034408B1
Authority
KR
South Korea
Prior art keywords
hole
compaction
underground
pillar
greenhouse
Prior art date
Application number
KR1020190044439A
Other languages
Korean (ko)
Inventor
홍성욱
Original Assignee
홍성욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍성욱 filed Critical 홍성욱
Priority to KR1020190044439A priority Critical patent/KR102034408B1/en
Application granted granted Critical
Publication of KR102034408B1 publication Critical patent/KR102034408B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a method for constructing a double pillar for a greenhouse having a sinking prevention function, which comprises: a step that a packing hole is formed by a packing piece; a step that a first center guide is mounted on the inside of the packing hole; a step that an underground pillar is buried in the packing hole; a step that the first center guide is removed from the packing hole; a step that a second center guide is provided at an upper portion of the packing hole; a step that a first underground burial unit is formed after concrete is injected into the packing hole; a step that a main pillar is provided at an upper portion of the underground pillar to be coupled and fixated thereto; and a step that a second underground burial unit is formed after concrete is injected into the packing hole.

Description

침하방지 기능을 갖는 온실용 이중 기둥의 시공방법{Construction method of double pillar for greenhouse having sinking prevention function}Construction method of double pillar for greenhouse having sinking prevention function

본 발명은 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 관한 것으로, 더욱 상세하게는 온실을 시공하기에 앞서 연약한 지반을 다짐과 아울러 지반이 다져진 지중에 각각 침하방지구를 갖는 지중기둥 및 주기둥을 순차적으로 적층 매설함으로써, 이중으로 시공되는 지중기둥 및 주기둥으로 인해 침하가 방지되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 관한 것이다.The present invention relates to a method for constructing a double pillar for a greenhouse having a sinking prevention function, and more specifically, before constructing a greenhouse, the ground pillars and the main pillars having settlements in the ground where the ground is compacted and ground are also ground. By stacking pillars sequentially, the present invention relates to a construction method of a double pillar for a greenhouse having a sinking prevention function to prevent settlement due to underground pillars and periodic pillars that are constructed in a double manner.

유리 온실이나 비닐하우스 등은 일반적으로 골조 구조로 시공되며, 지붕과 벽체 등의 하중을 지지하는 기초로는 기둥이나 말뚝 등이 사용된다.Glass greenhouses and vinyl houses are generally constructed in a framed structure, and pillars and piles are used as a basis for supporting loads such as roofs and walls.

종래의 온실용 말뚝은 금속 또는 플라스틱을 이용하여 단순한 원뿔 형상으로 만들어지며, 말뚝을 땅 속에 박거나 매립하여 설치한다. 이러한 말뚝에 기둥이나 프레임을 체결하고 고정함으로써, 온실의 기초 구조가 완성된다.Conventional greenhouse piles are made of a simple cone shape using metal or plastic, and the piles are installed in the ground or embedded. By fastening and fixing a pillar or a frame to such a pile, the basic structure of a greenhouse is completed.

종래의 온실용 지주 말뚝의 일례로서, 한국 등록실용신안 제20-0444041호에 의하면, 지주 파이프가 삽입되는 말뚝 몸체의 상부에 지주 파이프가 관통되도록 설치된 볼트부 및 조임 캡과, 볼트부와 조임 캡 사이에 설치된 실링 부재와, 말뚝 몸체가 지면 내부에 박혀지는 깊이를 제한하기 위한 저지 환형돌기를 포함함으로써, 지주 파이프의 부식 및 오염을 방지할 수 있는 비닐하우스용 지주 말뚝을 제안하고 있다.As an example of a conventional greenhouse prop pile, according to Korean Utility Model No. 20-0444041, a bolt portion and a tightening cap installed so that the prop pipe penetrates an upper portion of the pile body into which the prop pipe is inserted, and a bolt portion and a tightening cap By including a sealing member interposed therebetween and a stopping annular projection for limiting the depth to which the pile body is embedded in the ground, it is proposed a support pile for a plastic house that can prevent corrosion and contamination of the support pipe.

그러나, 상기와 같은 선행기술은 지주말뚝의 침하방지 수단이 없어 시간이 흐른 뒤 연약한 지반에 매설된 지주말뚝이 침하됨으로써, 지주말뚝에 고정된 온실 또는 비닐하우스가 뒤틀리거나 무너지는 등의 문제점이 있는 것이었다.However, the prior art as described above had a problem such as a greenhouse or a plastic house fixed to the pillar pile is twisted or collapsed due to the settlement of the pillar pile buried in the soft ground after a period of time there is no means to prevent settlement of the pillar pile. .

따라서, 상기와 같은 종래의 문제점을 해결한 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법이 요구되고 있는 실정이다.Therefore, there is a demand for a construction method of a double pillar for a greenhouse having a settlement prevention function that solves the conventional problems as described above.

한국 등록실용신안 제20-0444041호Korea Utility Model Registration No. 20-0444041

본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위하여 발명된 것으로서, 종래에 온실의 시공을 위한 지주말뚝의 침하방지 수단이 없어 시간이 흐른 뒤 연약한 지반에 매설된 지주말뚝이 침하됨으로써, 지주말뚝에 고정된 온실 또는 비닐하우스가 뒤틀리거나 무너지는 등의 문제점이 있었던 것을 온실의 시공을 위한 기둥을 시공하기에 앞서 기둥이 매설되는 연약한 지반을 다짐과 아울러 지반이 다져진 지중에 각각 침하방지구을 갖는 지중기둥 및 주기둥을 순차적으로 적층 매설함으로써, 이중으로 시공되는 지중기둥 및 주기둥으로 인해 기둥의 침하가 방지되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법을 제공하는데 그 목적이 있다.The present invention has been invented to solve the problems of the prior art as described above, there is no means to prevent settlement of the support pile for the construction of the greenhouse in the past so that the propagation of the pillars embedded in the soft ground after the time has settled, Underground pillars with settlement subsidences in the ground where the pillars are buried before the construction of the pillars for the construction of greenhouses, which have problems such as twisting or collapse of the fixed greenhouse or the plastic house. And it is an object of the present invention to provide a construction method of the double pillars for greenhouses having a function to prevent the settlement of the pillars due to the underground pillar and the pillars to be duplex construction by sequentially laying the pillars.

상기와 같은 목적을 실현하기 위하여, 본 발명은 유리 온실이나 비닐하우스 등의 골조 프레임이 상부에 고정되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 있어서, 굴삭기의 암에 연결된 원통형의 다짐구로 지면에 지름 300~500mm, 깊이 500~700mm의 다짐공을 형성하는 단계와, 상기 다짐공의 내측 하부에 다수개가 대칭되게 판형으로 형성되어 원판형으로 결합 구비되며, 결합된 내측에 관통된 제1센터공이 형성되고, 각각의 상부에는 파지 가능한 제1손잡이가 각각 형성되는 제1센터가이드가 안착되는 단계와, 상기 제1센터가이드의 제1센터공을 관통하여 매설됨과 아울러 외측에 제1침하방지구를 갖는 지중기둥의 하부가 다짐공의 하부에서 100~300mm의 깊이로 매설되는 단계와, 상기 제1센터가이드를 다짐공에서 제거하는 단계와, 상기 다짐공의 상부에 다짐공에 비해 직경이 큰 판형으로 형성되어 구비되며, 하부에는 다짐공에 대응되게 하부로 돌출되어 다짐공에 끼움되는 연장부가 형성되고, 중앙에는 지중기둥에 대응되게 관통된 제2센터공이 형성되며, 제2센터공의 외측에는 방사상으로 관통된 다수개의 주입공이 형성되는 제2센터가이드가 구비되는 단계와, 상기 제2센터가이드의 주입공을 통해 콘크리트를 다짐공 깊이의 반만큼 주입함과 아울러 주입된 콘크리트를 양생하여 제1지중매설부를 형성하는 단계와, 상기 지중기둥의 상부에 하부가 삽입 결합됨과 아울러 하단이 제1지중매설부의 상부에 구비되며, 지중기둥과 결합구에 의해 결합 고정되고, 다짐공 상의 외측에 제2침하방지구를 갖는 주기둥이 구비되는 단계와, 상기 다짐공에 콘크리트를 주입하여 다짐공을 메우고 콘크리트를 양생하여 제2지중매설부를 형성하는 단계를 포함하여 이루어지며, 상기 지중기둥 및 주기둥 각각은 내측이 관통된 사각 형상의 파이프로 형성되며, 각각에 형성되는 제1침하방지구 및 제2침하방지구는 판형 또는 원기둥형 중 선택된 어느 하나로 형성되어 이루어지는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법을 제공한다.In order to achieve the above object, the present invention in the construction method of a double pillar for greenhouses having a function to prevent settlement, the frame frame such as a glass greenhouse or a plastic house is fixed to the upper, with a cylindrical compaction sphere connected to the arm of the excavator Forming a compaction hole having a diameter of 300 to 500 mm and a depth of 500 to 700 mm on the ground, and a plurality of symmetrical plates are formed on the inner lower portion of the compaction hole to be symmetrically formed in a plate shape, the first penetrating through the combined inner side A center hole is formed, and a first center guide is formed on each upper part of the first gripper, and a first handle is formed through the first center hole of the first center guide. The lower part of the underground column having the earth is buried to a depth of 100 ~ 300mm from the bottom of the compaction hole, the step of removing the first center guide from the compaction hole, The part is formed in a plate shape having a larger diameter than the compaction hole, and the lower portion protrudes downward to correspond to the compaction hole and is fitted with the compaction hole, and a second center hole penetrates corresponding to the ground column is formed at the center. And a second center guide having a plurality of radially penetrated injection holes formed outside the second center hole, and injecting concrete by half the depth of the compaction hole through the injection hole of the second center guide. And curing the injected concrete to form a first underground buried part, and a lower part is inserted into and coupled to an upper part of the underground pillar, and a lower end is provided at an upper part of the first underground buried part, and coupled by a underground pillar and a coupling hole. Fixed and provided with a main pillar having a second anti-settling on the outside on the compaction hole, and injecting concrete into the compaction hole to fill the compaction hole and the amount of concrete And forming a second underground buried part, wherein each of the underground pillars and the main pillars is formed of a rectangular pipe having a penetrating inner side, and the first and second settlements are formed in each of the underground pillars and the periodic pillars. The sphere provides a construction method of a double pillar for greenhouses having a function of preventing settlement, which is formed of any one selected from a plate or a cylinder.

이와 같이 이루어지는 본 발명에 의한 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법은 온실의 시공을 위한 지중기둥 및 주기둥을 시공하기에 앞서 지중기둥 및 주기둥이 매설되는 연약한 지반을 다져 다짐공을 형성하며, 다짐공에 각각 침하방지구를 갖는 지중기둥 및 주기둥을 순차적으로 적층 매설하고 콘크리트를 2차에 걸쳐 타설함으로써, 지중기둥 및 주기둥의 침하가 방지되는 이점이 있는 것이다.The method of constructing a double pillar for a greenhouse having a sinking prevention function according to the present invention as described above forms a compacted ground by laying a soft ground in which underground pillars and periodic pillars are buried before constructing underground pillars and periodic pillars for construction of a greenhouse. In addition, by sequentially laying and laying underground pillars and periodic pillars each having a settlement prevention hole in the compaction hole and placing concrete over two times, there is an advantage that the settlement of the underground pillars and the periodic pillars is prevented.

또한, 본 발명에는 제1센터가이드 및 제2센터가이드가 구비됨으로써, 지중기둥 및 주기둥이 다짐공 상의 중앙에 용이하게 위치됨으로 무게가 효율적으로 분산되어 지중기둥 및 주기둥의 침하가 더욱 방지되는 이점 또한 있는 것이다.In addition, the present invention is provided with a first center guide and a second center guide, the weight of the underground pillar and the main pillar is easily located in the center on the compaction hole, the weight is effectively dispersed, the advantage of preventing the settlement of the underground pillar and the main pillar further There is also.

도 1은 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법을 설명하기 위한 순서도,
도 2는 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 따른 지반을 다지는 모습을 보여주는 도면,
도 3은 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 따른 지중기둥이 매설된 모습을 보여주는 도면,
도 4는 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 따라 1차로 콘크리트가 타설된 모습을 보여주는 도면,
도 5는 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 따른 지중기둥에 주기둥이 적층 결합되는 모습을 보여주는 도면,
도 6은 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 따라 2차로 콘크리트가 타설된 모습을 보여주는 도면,
도 7은 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 사용되는 제1센터가이드의 모습을 보여주는 도면,
도 8은 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 사용되는 제2센터가이드의 모습을 보여주는 도면,
도 9는 본 발명의 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 사용되는 지중기둥 및 주기둥의 모습을 보여주는 도면,
도 10은 본 발명에 따른 다른 일 실시예의 지중기둥 및 주기둥의 모습을 보여주는 도면이다.
1 is a flow chart for explaining the construction method of a double pillar for a greenhouse having a settlement prevention function of the present invention,
Figure 2 is a view showing the appearance of the ground according to the construction method of the double pillar for greenhouses having a function to prevent settlement of the present invention,
Figure 3 is a view showing the underground pillar buried according to the construction method of the double pillar for greenhouses having a function of preventing settlement of the present invention,
4 is a view showing a state in which the concrete is first poured in accordance with the construction method of the double pillar for greenhouses having a function to prevent settlement of the present invention,
5 is a view showing a state in which the main pillar laminated coupled to the ground pillar according to the construction method of the double pillar for greenhouses having a settlement prevention function of the present invention,
6 is a view showing a state in which the second concrete is poured in accordance with the construction method of the double pillars for greenhouses having a sinking prevention function of the present invention,
7 is a view showing a state of the first center guide used in the construction method of the double pillars for greenhouses having a settlement prevention function of the present invention,
8 is a view showing a state of the second center guide used in the construction method of the double pillars for greenhouses having a settlement prevention function of the present invention,
9 is a view showing the state of the underground pillar and the main pillar used in the construction method of the double pillar for greenhouses having a settlement prevention function of the present invention,
10 is a view showing the appearance of the underground pillar and the periodic pillar of another embodiment according to the present invention.

이하 본 발명의 실시를 위한 구체적인 내용을 첨부한 도면을 참조하여 더욱 상세하게 설명한다.DETAILED DESCRIPTION Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 10을 참조하여 보면 본 발명에 의한 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법은 유리 온실이나 비닐하우스 등의 골조 프레임이 상부에 고정되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 있어서, 굴삭기의 암에 연결된 원통형의 다짐구(10)로 지면에 지름 300~500mm, 깊이 500~700mm의 다짐공(12)을 형성하는 단계와, 상기 다짐공(12)의 내측 하부에 다수개가 대칭되게 판형으로 형성되어 원판형으로 결합 구비되며, 결합된 내측에 관통된 제1센터공(14)이 형성되고, 각각의 상부에는 파지 가능한 제1손잡이(16)가 각각 형성되는 제1센터가이드(18)가 안착되는 단계와, 상기 제1센터가이드(18)의 제1센터공(14)을 관통하여 매설됨과 아울러 외측에 제1침하방지구(20)를 갖는 지중기둥(22)의 하부가 다짐공(12)의 하부에서 100~300mm의 깊이로 매설되는 단계와, 상기 제1센터가이드(18)를 다짐공(12)에서 제거하는 단계와, 상기 다짐공(12)의 상부에 다짐공(12)에 비해 직경이 큰 판형으로 형성되어 구비되며, 하부에는 다짐공(12)에 대응되게 하부로 돌출되어 다짐공(12)에 끼움되는 연장부(24)가 형성되고, 중앙에는 지중기둥(22)에 대응되게 관통된 제2센터공(26)이 형성되며, 제2센터공(26)의 외측에는 방사상으로 관통된 다수개의 주입공(28)이 형성되고, 상부에는 파지 가능한 다수개의 제2손잡이(30)가 형성되는 제2센터가이드(32)가 구비되는 단계와, 상기 제2센터가이드(32)의 주입공(28)을 통해 콘크리트를 다짐공(12) 깊이의 반만큼 주입함과 아울러 주입된 콘크리트를 양생하여 제1지중매설부(34)를 형성하는 단계와, 상기 지중기둥(22)의 상부에 하부가 삽입 결합됨과 아울러 하단이 제1지중매설부(34)의 상부에 구비되며, 지중기둥(22)과 결합구(36)에 의해 결합 고정되고, 다짐공(12) 상의 외측에 제2침하방지구(38)를 갖는 주기둥(40)이 구비되는 단계와, 상기 다짐공(12)에 콘크리트를 주입하여 다짐공(12)을 메우고 콘크리트를 양생하여 제2지중매설부(42)를 형성하는 단계로 이루어진다.1 to 10, the construction method of a double pillar for a greenhouse having a settlement prevention function according to the present invention is a double pillar for a greenhouse having a settlement settlement function in which a frame frame such as a glass greenhouse or a plastic house is fixed at the top In the construction method, forming a compaction hole 12 having a diameter of 300 ~ 500mm, depth 500 ~ 700mm in the ground with a cylindrical compaction opening 10 connected to the arm of the excavator, and the inner lower portion of the compaction hole 12 A plurality of symmetrical plates are formed in a symmetrical shape, and are provided in a disc shape, and a first center hole 14 penetrated therein is formed, and a first gripper 16 that can be gripped is formed on each upper portion thereof. The first pillar guide (18) is seated, and the underground pillar (22) having a first settlement prevention hole (20) is buried through the first center hole (14) of the first center guide (18) Bottom of) to the depth of 100 ~ 300mm from the bottom of the compaction hole (12) A step of embedding, removing the first center guide 18 from the compaction hole 12, and formed in a plate shape having a larger diameter than the compaction hole 12 in the upper portion of the compaction hole 12 The lower part protrudes downward to correspond to the compaction hole 12, and an extension part 24 is fitted to the compaction hole 12, and a second center hole 26 penetrated corresponding to the underground column 22 is formed at the center thereof. ) Is formed, a plurality of injection holes 28 penetrated radially on the outside of the second center hole 26, and a second center guide having a plurality of second handles 30 that can be gripped on the upper part. 32) is provided, and through the injection hole 28 of the second center guide 32, the concrete is injected by half the depth of the compaction hole 12, and curing the injected concrete to the first underground buried part And forming a lower portion of the first underground embedding portion 34 while a lower portion is inserted into and coupled to an upper portion of the underground column 22. It is provided at the top, and coupled to the ground column 22 and the coupling hole 36, the main pillar 40 having a second anti-settling 38 on the outside on the compaction hole 12 and , Filling the compaction hole 12 by filling concrete into the compaction hole 12 and curing the concrete to form a second underground buried part 42.

먼저, 유리 온실이나 비닐하우스 등의 골조 프레임이 상부에 고정되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 있어서, 굴삭기의 암에 연결된 원통형의 다짐구(10)로 지면에 지름 300~500mm, 깊이 500~700mm의 다짐공(12)을 형성한다.(S10단계)First, in the construction method of a double pillar for a greenhouse having a sinking prevention function in which a frame frame, such as a glass greenhouse or a plastic house, is fixed to the upper portion, a cylindrical compaction hole 10 connected to an arm of an excavator is 300 to 500 mm in diameter on the ground. , To form a compaction hole 12 with a depth of 500 ~ 700mm. (S10 step)

이때, 상기 다짐구(10)는 금속재로 형성됨과 아울러 상부가 굴삭기의 암과 연결되며, 지면을 다지는 역할을 하는 다짐구(10)의 하부가 지름 300~500mm, 높이 200~300mm의 원통형으로 형성됨이 바람직한 것이다.At this time, the compaction opening 10 is formed of a metal material and the upper portion is connected to the arm of the excavator, the lower portion of the compaction opening 10 to serve to chop the ground is formed in a cylindrical shape having a diameter of 300 ~ 500mm, height 200 ~ 300mm This is desirable.

또한, 상기 다짐구(10) 하부 지름의 크기에 따라 후술되는 제1센터가이드(18) 및 제2센터가이드(32)의 직경 또한 대응되게 형성되는 것이다.In addition, the diameters of the first center guide 18 and the second center guide 32 which will be described later also correspond to the size of the lower diameter of the compaction opening 10.

한편, 상기 다짐공(12)의 깊이는 500~700mm로 형성되는 것이 바람직한 것이나 지반에 따라 유기적으로 대응하여 형성됨이 더욱 바람직한 것이다.On the other hand, the depth of the compaction hole 12 is preferably formed to 500 ~ 700mm or more preferably is formed corresponding to the organic according to the ground.

상기 다짐공(12)의 내측 하부에 다수개가 대칭되게 판형으로 형성되어 원판형으로 결합 구비되며, 결합된 내측에 관통된 제1센터공(14)이 형성되고, 각각의 상부에는 파지 가능한 제1손잡이(16)가 각각 형성되는 제1센터가이드(18)가 안착된다.(S20단계)A plurality of symmetrical plates are formed on the inner lower portion of the compaction hole 12 to be symmetrically formed in a disc shape, and a first center hole 14 penetrated in the combined inner side is formed, and each of the first gripping portions is provided. The first center guides 18, on which the handles 16 are formed, are seated. (S20)

이때, 상기 제1센터가이드(18)는 도 7에서와 같이 각각 분해 또는 결합 가능하도록 형성되는 것이며, 후술되는 지중기둥(22)이 제1센터공(14)을 통해 다짐공(12)의 정중앙에 매설될 수 있도록 구비되는 것이고, 각각에는 제1손잡이(16)가 구비되어 용이하게 사용할 수 있는 것이다.In this case, the first center guide 18 is formed so as to be disassembled or combined, respectively, as shown in Figure 7, the underground column 22 to be described later through the first center hole 14, the center of the compaction hole 12 It is provided to be embedded in, each of the first handle 16 is provided that can be used easily.

상기 제1센터가이드(18)의 제1센터공(14)을 관통하여 매설됨과 아울러 외측에 제1침하방지구(20)를 갖는 지중기둥(22)의 하부가 다짐공(12)의 하부에서 100~300mm의 깊이로 매설된다.(S30단계)The lower portion of the underground column 22 having the first centering hole 14 of the first center guide 18 and having the first anti-seizure opening 20 on the outside is located at the lower portion of the compaction hole 12. Buried to a depth of 100 ~ 300mm. (S30 step)

이때, 상기 지중기둥(22)은 내측이 관통된 사각 형상의 파이프로 형성되며, 제1침하방지구(20)는 도 9내지 도 10에서와 같이 판형 또는 원기둥형 중 선택된 어느 하나로 형성되어 지중기둥(22)이 후술되는 제1지중매설부(34)에서 이탈되는 것을 방지하게 되는 것이다.At this time, the underground column 22 is formed of a square-shaped pipe through which the inside is penetrated, and the first anti-seizure hole 20 is formed of any one selected from a plate shape or a cylindrical shape as shown in FIGS. 9 to 10. (22) is to be prevented from being separated from the first underground buried portion 34 to be described later.

한편, 상기 지중기둥(22)은 하부가 다짐공(12)의 하부에서 100~300mm의 깊이로 매설됨으로써, 후술되는 제1지중매설부(34)가 양생되는 동안 용이하게 고정되는 것이다.On the other hand, the underground column 22 is to be easily fixed during the curing of the first underground buried portion 34, which will be described later by being buried in the lower portion of the compaction hole 12 to a depth of 100 ~ 300mm.

이때, 지중기둥(22)의 하부가 다짐공(12)의 하부에서 100mm의 깊이 이하로 매설될 시에는 지중기둥(22)이 수직으로 곧게 서있지 못하고 기우는 문제가 발생되는 것이며, 지중기둥(22)의 하부가 다짐공(12)의 하부에서 300mm 이상으로 매설될 시에는 과도한 시간 및 인력의 낭비가 발생되는 것이다.At this time, when the lower portion of the underground column 22 is buried below a depth of 100 mm from the lower portion of the compaction hole 12, the ground column 22 does not stand vertically and is inclined, and the ground column ( When the lower portion of 22) is buried more than 300mm from the lower portion of the compaction hole 12 is an excessive waste of time and manpower is generated.

상기 제1센터가이드(18)를 다짐공(12)에서 제거한다.(S40단계)The first center guide 18 is removed from the compaction hole 12. (S40 step)

이때, 상기 제1센터가이드(18)는 후술되는 제1지중매설부(34)를 형성하기 위해 제거하는 것이며, 제1센터가이드(18)를 다짐공(12)에서 제거한 후 다짐공(12)에 후술되는 콘크리트를 주입하게 되는 것이다.At this time, the first center guide 18 is to remove to form the first underground buried portion 34 to be described later, the first center guide 18 is removed from the compaction hole 12, the compaction hole 12 Injecting concrete to be described later.

상기 다짐공(12)의 상부에 다짐공(12)에 비해 직경이 큰 판형으로 형성되어 구비되며, 하부에는 다짐공(12)에 대응되게 하부로 돌출되어 다짐공(12)에 끼움되는 연장부(24)가 형성되고, 중앙에는 지중기둥(22)에 대응되게 관통된 제2센터공(26)이 형성되며, 제2센터공(26)의 외측에는 방사상으로 관통된 다수개의 주입공(28)이 형성되고, 상부에는 파지 가능한 다수개의 제2손잡이(30)가 형성되는 제2센터가이드(32)가 구비된다.(S50단계)The upper portion of the compaction hole 12 is formed in a plate shape having a larger diameter than the compaction hole 12, the lower portion is protruded downward to correspond to the compaction hole 12 is fitted into the compaction hole 12 24 is formed, a second center hole 26 penetrated corresponding to the underground column 22 is formed in the center, a plurality of injection holes 28 radially penetrated outside the second center hole 26. ) Is formed, and the second center guide 32 is formed on the upper portion of the second handle 30 which can be gripped (step S50).

이때, 상기 제2센터가이드(32)는 후술되는 제1지중매설부(34)를 형성하기 위해 콘크리트를 다짐공(12)에 주입하는 과정에서 지중기둥(22)이 기울어지는 것을 방지하기 위해 구비되는 것이다.In this case, the second center guide 32 is provided to prevent the ground pillar 22 from tilting in the process of injecting concrete into the compaction hole 12 to form the first underground buried portion 34 to be described later. Will be.

한편, 상기 제2센터가이드(32)는 금속재로 형성됨과 아울러 외면은 콘크리트의 박리가 용이한 고무재로 코팅 형성됨으로써, 제2센터가이드(32)의 주입공(28)을 통해 다짐공(12)에 콘크리트를 주입할 시에 콘크리트가 제2센터가이드(32)에 들러붙더라도 용이하게 박리 가능하게 되는 것이다.On the other hand, the second center guide 32 is formed of a metal material and the outer surface is formed of a coating of a rubber material that is easy to peel off the concrete, the compaction hole 12 through the injection hole 28 of the second center guide 32 At the time of injecting the concrete into the concrete, even if the concrete adheres to the second center guide 32, it becomes easy to peel off.

상기 제2센터가이드(32)의 주입공(28)을 통해 콘크리트를 다짐공(12) 깊이의 반만큼 주입함과 아울러 주입된 콘크리트를 양생하여 제1지중매설부(34)를 형성한다.(S60단계)Through the injection hole 28 of the second center guide 32, the concrete is injected by half of the depth of the compaction hole 12, and the injected concrete is cured to form the first underground buried portion 34. S60 step)

이때, 상기 제1지중매설부(34)는 지중기둥(22)을 고정하기 위해 형성되는 것이며, 제1지중매설부(34)로 인해 지중기둥(22)이 지중에 견고히 고정되는 것이다.At this time, the first underground buried portion 34 is formed to fix the underground column 22, the ground column 22 is firmly fixed to the ground due to the first underground buried portion (34).

상기 지중기둥(22)의 상부에 하부가 삽입 결합됨과 아울러 하단이 제1지중매설부(34)의 상부에 구비되며, 지중기둥(22)과 결합구(36)에 의해 결합 고정되고, 다짐공(12) 상의 외측에 제2침하방지구(38)를 갖는 주기둥(40)이 구비된다.(S70단계)A lower portion is inserted into and coupled to an upper portion of the underground column 22, and a lower portion thereof is provided at an upper portion of the first underground embedding portion 34, and is fixed and coupled by the underground column 22 and the coupling hole 36. A main pillar 40 having a second anti-seizure opening 38 on the outside of the 12 is provided.

이때, 상기 결합구(36)는 나사, 볼트 또는 리벳 중 선택된 어느 하나를 사용함이 바람직한 것이나 용접을 통하여 지중기둥(22)과 주기둥(40)이 결합 고정되어도 무방한 것이다.At this time, the coupler 36 is preferably any one selected from a screw, bolt or rivet, but the underground column 22 and the main column 40 may be coupled and fixed by welding.

또한, 상기 주기둥(40)은 내측이 관통된 사각 형상의 파이프로 형성되며, 제2침하방지구(38)는 도 9내지 도 10에서와 같이 판형 또는 원기둥형 중 선택된 어느 하나로 형성되어 지중기둥(40)이 후술되는 제2지중매설부(42)에서 이탈되는 것을 방지하게 되는 것이다.In addition, the main pillar 40 is formed of a square pipe with an inner side penetrated therein, and the second anti-seizure hole 38 is formed of any one selected from a plate shape or a cylinder shape as shown in FIGS. 9 to 10. 40 is to be prevented from being separated from the second underground buried portion 42 to be described later.

상기 다짐공(12)에 콘크리트를 주입하여 다짐공(12)을 메우고 콘크리트를 양생하여 제2지중매설부(42)를 형성한다.(S80단계)Injecting concrete into the compaction hole 12 to fill the compaction hole 12 and curing the concrete to form a second underground buried portion 42 (step S80).

이때, 상기 제2지중매설부(42)의 상부는 지면과 동일한 높이로 형성되는 것이다.At this time, the upper portion of the second underground buried portion 42 is formed at the same height as the ground.

이와 같이 이루어지는 본 발명에 의한 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법은 온실의 시공을 위한 지중기둥(22) 및 주기둥(40)을 시공하기에 앞서 지중기둥(22) 및 주기둥(40)이 매설되는 연약한 지반을 다져 다짐공(12)을 형성하며, 다짐공(12)에 각각 침하방지구(20)(38)를 갖는 지중기둥(22) 및 주기둥(40)을 순차적으로 적층 매설하고 콘크리트를 2차에 걸쳐 타설함으로써, 지중기둥(22) 및 주기둥(40)의 침하가 방지되는 이점이 있는 것이다.The construction method of the double pillar for a greenhouse having a settlement prevention function according to the present invention made in this way prior to the construction of the underground column 22 and the main column 40 for the construction of the greenhouse underground column 22 and the main column ( 40 is embedded in the soft ground to form a compacted hole (12), each of the underground pillar 22 and the main column 40 having a settling prevention hole (20, 38) in the compaction hole 12, respectively By laying down and pouring concrete over two times, there is an advantage that the settlement of the underground column 22 and the main column 40 is prevented.

또한, 본 발명에는 제1센터가이드(18) 및 제2센터가이드(32)가 구비됨으로써, 지중기둥(22) 및 주기둥(40)이 다짐공(12) 상의 중앙에 용이하게 위치됨으로 무게가 효율적으로 분산되어 지중기둥(22) 및 주기둥(40)의 침하가 더욱 방지되는 이점 또한 있는 것이다.In addition, since the first center guide 18 and the second center guide 32 are provided in the present invention, the ground column 22 and the main column 40 are easily positioned at the center of the compaction hole 12, thereby increasing the weight. It is also advantageous that the settlement of the underground column 22 and the periodic column 40 is more effectively prevented from being dispersed.

10 : 다짐구 12 : 다짐공
14 : 제1센터공 16 : 제1손잡이
18 : 제1센터가이드 20 : 제1침하방지구
22 : 지중기둥 24 : 연장부
26 : 제2센터공 28 : 주입공
30 : 제2손잡이 32 : 제2센터가이드
34 : 제1지중매설부 36 : 결합구
38 : 제2침하방지구 40 : 주기둥
42 : 제2지중매설부
10: compaction sphere 12: compaction ball
14: the first center ball 16: the first handle
18: 1st center guide 20: 1st sink prevention
22: underground column 24: extension
26: the second center hole 28: injection hole
30: second handle 32: second center guide
34: first underground buried part 36: coupling sphere
38: second subsidence prevention 40: periodic pillar
42: Second underground burial department

Claims (5)

유리 온실이나 비닐하우스 등의 골조 프레임이 상부에 고정되는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법에 있어서,
굴삭기의 암에 연결된 원통형의 다짐구(10)로 지면에 지름 300~500mm, 깊이 500~700mm의 다짐공(12)을 형성하는 단계(S10);
상기 다짐공(12)의 내측 하부에 다수개가 대칭되게 판형으로 형성되어 원판형으로 결합 구비되며, 결합된 내측에 관통된 제1센터공(14)이 형성되고, 각각의 상부에는 파지 가능한 제1손잡이(16)가 각각 형성되는 제1센터가이드(18)가 안착되는 단계(S20);
상기 제1센터가이드(18)의 제1센터공(14)을 관통하여 매설됨과 아울러 외측에 제1침하방지구(20)를 갖는 지중기둥(22)의 하부가 다짐공(12)의 하부에서 100~300mm의 깊이로 매설되는 단계(S30);
상기 제1센터가이드(18)를 다짐공(12)에서 제거하는 단계(S40);
상기 다짐공(12)의 상부에 다짐공(12)에 비해 직경이 큰 판형으로 형성되어 구비되며, 하부에는 다짐공(12)에 대응되게 하부로 돌출되어 다짐공(12)에 끼움되는 연장부(24)가 형성되고, 중앙에는 지중기둥(22)에 대응되게 관통된 제2센터공(26)이 형성되며, 제2센터공(26)의 외측에는 방사상으로 관통된 다수개의 주입공(28)이 형성되고, 상부에는 파지 가능한 다수개의 제2손잡이(30)가 형성되는 제2센터가이드(32)가 구비되는 단계(S50);
상기 제2센터가이드(32)의 주입공(28)을 통해 콘크리트를 다짐공(12) 깊이의 반만큼 주입함과 아울러 주입된 콘크리트를 양생하여 제1지중매설부(34)를 형성하는 단계(S60);
상기 지중기둥(22)의 상부에 하부가 삽입 결합됨과 아울러 하단이 제1지중매설부(34)의 상부에 구비되며, 지중기둥(22)과 결합구(36)에 의해 결합 고정되고, 다짐공(12) 상의 외측에 제2침하방지구(38)를 갖는 주기둥(40)이 구비되는 단계(S70);
상기 다짐공(12)에 콘크리트를 주입하여 다짐공(12)을 메우고 콘크리트를 양생하여 제2지중매설부(42)를 형성하는 단계(S80);를 포함하여 이루어지며,
상기 지중기둥(22) 및 주기둥(40) 각각은 내측이 관통된 사각 형상의 파이프로 형성되며, 각각에 형성되는 제1침하방지구(20) 및 제2침하방지구(38)는 판형 또는 원기둥형 중 선택된 어느 하나로 형성되어 이루어지는 것을 특징으로 하는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법.
In the construction method of a double pillar for greenhouses having a function to prevent settlement, in which a frame frame such as a glass greenhouse or a plastic house is fixed at the top,
Forming a compaction hole 12 having a diameter of 300 to 500 mm and a depth of 500 to 700 mm on the ground with a cylindrical compaction opening 10 connected to an arm of an excavator (S10);
A plurality of symmetrical plates are formed on the inner lower portion of the compaction hole 12 to be symmetrically formed in a disc shape, and a first center hole 14 penetrated in the combined inner side is formed, and each of the first gripping portions is provided. Step (S20) is seated on the first center guide 18, each handle 16 is formed;
The lower portion of the underground column 22 having the first centering hole 14 of the first center guide 18 and having the first anti-seizure opening 20 on the outside is located at the lower portion of the compaction hole 12. Embedded in a depth of 100 ~ 300mm (S30);
Removing the first center guide 18 from the compaction hole 12 (S40);
The upper portion of the compaction hole 12 is formed in a plate shape having a larger diameter than the compaction hole 12, the lower portion is protruded downward to correspond to the compaction hole 12 is fitted into the compaction hole 12 24 is formed, a second center hole 26 penetrated corresponding to the underground column 22 is formed in the center, a plurality of injection holes 28 radially penetrated outside the second center hole 26. A second center guide 32 having a plurality of second handles 30 formed thereon and having a gripper formed thereon (S50);
Injecting concrete by half the depth of the compaction hole 12 through the injection hole 28 of the second center guide 32 and curing the injected concrete to form the first underground buried portion 34 ( S60);
A lower portion is inserted into and coupled to an upper portion of the underground column 22, and a lower portion thereof is provided at an upper portion of the first underground embedding portion 34, and is fixed and coupled by the underground column 22 and the coupling hole 36. Step (S70) is provided with a main pillar (40) having a second anti-seizure 38 on the outside on (12);
Injecting concrete into the compaction hole 12 to fill the compaction hole 12 and curing the concrete to form a second underground buried portion 42 (S80);
Each of the underground pillars 22 and the main pillars 40 is formed of a square pipe having a penetrating inside thereof, and each of the first and second sinks 20 and 38 is formed in a plate shape or Construction method of a double pillar for a greenhouse having a function to prevent settlements, characterized in that formed in any one selected from the columnar.
제1항에 있어서,
상기 다짐구(10)는 금속재로 형성됨과 아울러 상부가 굴삭기의 암과 연결되며, 지면을 다지는 하부가 지름 300~500mm, 높이 200~300mm의 원통형으로 형성되어 이루어지는 것을 특징으로 하는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법.
The method of claim 1,
The compaction opening 10 is formed of a metal material and the upper portion is connected to the arm of the excavator, the lower portion to chop the ground has a sinking prevention function, characterized in that formed in a cylindrical shape of 300 ~ 500mm, 200 ~ 300mm high Construction method of double pillar for greenhouse.
삭제delete 제1항에 있어서,
상기 결합구(36)는 나사, 볼트 또는 리벳 중 선택된 어느 하나인 것을 특징으로 하는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법.
The method of claim 1,
The coupler (36) is a construction method of a double pillar for a greenhouse having a sinking function, characterized in that any one selected from screws, bolts or rivets.
제1항에 있어서,
상기 제2센터가이드(32)는 금속재로 형성됨과 아울러 외면은 고무재로 코팅 형성되어 이루어지는 것을 특징으로 하는 침하방지 기능을 갖는 온실용 이중 기둥의 시공방법.
The method of claim 1,
The second center guide 32 is formed of a metal material and the outer surface is coated with a rubber material, the method of constructing a double pillar for a greenhouse having a function of preventing settlement, characterized in that formed.
KR1020190044439A 2019-04-16 2019-04-16 Construction method of double pillar for greenhouse having sinking prevention function KR102034408B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190044439A KR102034408B1 (en) 2019-04-16 2019-04-16 Construction method of double pillar for greenhouse having sinking prevention function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190044439A KR102034408B1 (en) 2019-04-16 2019-04-16 Construction method of double pillar for greenhouse having sinking prevention function

Publications (1)

Publication Number Publication Date
KR102034408B1 true KR102034408B1 (en) 2019-10-18

Family

ID=68462614

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190044439A KR102034408B1 (en) 2019-04-16 2019-04-16 Construction method of double pillar for greenhouse having sinking prevention function

Country Status (1)

Country Link
KR (1) KR102034408B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200444041Y1 (en) 2008-02-18 2009-04-03 최명근 A vinyl house post
KR20090060591A (en) * 2007-12-10 2009-06-15 일향토건주식회사 Center guide for inserting a pile of frame structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090060591A (en) * 2007-12-10 2009-06-15 일향토건주식회사 Center guide for inserting a pile of frame structure
KR200444041Y1 (en) 2008-02-18 2009-04-03 최명근 A vinyl house post

Similar Documents

Publication Publication Date Title
KR102034408B1 (en) Construction method of double pillar for greenhouse having sinking prevention function
CN207904914U (en) A kind of anti-floating constructing structure of filling pile cage of reinforcement
KR101959769B1 (en) Installation and removal equipment for agricultural holding
CN204163095U (en) A kind of foundation structure of building and combined member thereof
CN211395755U (en) Prefabricated square inspection shaft
KR101199514B1 (en) Apparatus for preventing tunnel-caving in
CN105951863A (en) Construction device of active assembling type open caisson and construction method using same
KR20130108845A (en) Slope stabilization structures anchor system and its construction method
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
KR102180213B1 (en) Concrete Formwork for Installation of Water and Sewer Pipes and Construction Method using the same
CN101586451B (en) Erection device
CN103981881B (en) A kind of foundation structure of building and construction method thereof
CN102561378A (en) Concrete pile cap structure and construction method thereof
KR102136256B1 (en) Rainwater storage tank construction method using top-down method
KR20120001556U (en) Basic Fabric for Facilities
CN204326682U (en) A kind of electric pole sleeve structure being convenient to install
KR101114860B1 (en) Structure lifting and supporting method and apparatus by using a micro pile and shear plate
JP6345328B1 (en) Original position building method and original position structure
CN209872726U (en) Prefabricated glass fiber reinforced plastic cover plate for top surface of civil septic tank
KR200496881Y1 (en) Storage tank type reclamation
KR101415867B1 (en) Precast concrete structure construction method for downward construction of underground structures
KR20090103192A (en) A head reinforcement concrete pile
CN217998140U (en) Tower crane base steel bearing platform connecting device
JP5050286B2 (en) Steel pipe type support and its support method
CN211775605U (en) Double-row overhanging scaffold for near edge of foundation pit