KR101880257B1 - A structure of soil retaining plate and retaining wall using the same - Google Patents

A structure of soil retaining plate and retaining wall using the same Download PDF

Info

Publication number
KR101880257B1
KR101880257B1 KR1020170018088A KR20170018088A KR101880257B1 KR 101880257 B1 KR101880257 B1 KR 101880257B1 KR 1020170018088 A KR1020170018088 A KR 1020170018088A KR 20170018088 A KR20170018088 A KR 20170018088A KR 101880257 B1 KR101880257 B1 KR 101880257B1
Authority
KR
South Korea
Prior art keywords
plate
delete delete
main body
soil
prestressed
Prior art date
Application number
KR1020170018088A
Other languages
Korean (ko)
Inventor
손성곤
정승현
Original Assignee
코오롱글로벌 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 코오롱글로벌 주식회사 filed Critical 코오롱글로벌 주식회사
Priority to KR1020170018088A priority Critical patent/KR101880257B1/en
Application granted granted Critical
Publication of KR101880257B1 publication Critical patent/KR101880257B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a soil retaining plate (100) applying a precompression load (P) to apply tensile stress to a rear surface in contact with an excavation surface (11) of the ground (10) comprising: a main body part (110); a protrusion part (120) formed on the front surface part of the main body part (110) with respect to a horizontal direction and protruding from an inner area; and a tension member (130) mounted on left and right surface parts of the protrusion part (120) while the precompression load (P) is applied. In this case, the precompression load is applied to apply tensile stress to the rear surface of the soil retaining plate, so the length of the soil retaining plate is able to be increased. In other words, the precompression load is applied to the soil retaining plate by the tension member, so as to effectively resist to soil pressure. Moreover, the size of the soil retaining plate is increased, thereby providing advantages of reducing the number of installed H-piles since an interval between the H-piles is increased, reducing the number of furring strips installed to the H-pile, and reducing a construction period for installing the H-pile and the furring strip to reduce the entire construction period.

Description

프리스트레스트 토류판 및 이를 이용한 흙막이 벽체{A STRUCTURE OF SOIL RETAINING PLATE AND RETAINING WALL USING THE SAME}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a prestressed earth plate,

본 발명은 건설분야에 관한 것으로서, 상세하게는 프리스트레스트 토류판 및 이를 이용한 흙막이 벽체에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction field and, more particularly, to a prestressed earth plate and an earth retaining wall using the same.

흙막이 벽체는 개착식 흙막이 가시설의 일종으로서, 일정간격으로 엄지말뚝(H-Pile)을 항타하거나 천공 후 삽입하는 방식에 의해 근입하고, 터파기를 진행하면서 토류판(흙막이 부재)을 엄지말뚝 사이에 끼워 넣어 벽체를 형성하는 공법이다.The retaining wall is a kind of anchorage type earth retaining pavement. It is inserted by inserting the pile (H-Pile) at regular intervals or by inserting it after the piercing. The soil pile (earth retaining member) is sandwiched between the thumb piles This is a method of forming a wall.

도 1은 종래의 흙막이 공법 중 엄지말뚝 토류판 공법에 의한 흙막이 구조물의 구성을 개략적으로 도시한 것으로서, 상호 홈부가 마주 보도록 수직하게 설치된 복수개의 엄지말뚝(H 빔)(1)과, 홈부에 삽입 지지가 되어 후방의 흙더미 등이 전방을 향하여 무너지는 것을 방지하기 위한 토류판(10)에 의해 구성된다.FIG. 1 schematically shows the construction of an earth retaining structure according to the artificial soil piling method in a conventional earth retaining method, which comprises a plurality of thumb piles (H beams) 1 vertically installed to face each other with mutual grooves facing each other, And a soil plate 10 for preventing the soil or the like on the rear side from being collapsed toward the front.

토류판(10)으로는 소정 규격의 목재판이 사용되며, 이를 적층하여 벽체를 형성하고, 그 적층된 토류판을 고정하기 위하여 끼움목(쐐기)을 설치한 구조를 채용하는 것이 일반적이었다.As the current plate 10, a wooden plate having a predetermined size is used, and a structure is generally employed in which a wall is formed by laminating the same, and a wedge is provided to fix the laminated plate.

그러나 종래의 엄지말뚝 흙막이 공법은 다음과 같은 점에서 문제로 지적되어 왔다.However, the conventional pile cladding method has been pointed out as a problem in the following points.

첫째, 토류판의 강성이 약하기 때문에 일정길이 이상으로 토류판 제작이 불가능하고, 이로 인해 엄지말뚝의 간격이 좁아져 엄지말뚝의 사용량이 증가하는 문제가 있다.First, since the stiffness of the soil plate is weak, it is impossible to manufacture the soil plate over a certain length, and the distance between the thumb piles is narrowed, thereby increasing the usage amount of the thumb pile.

또한, 순차적인 적층구조로 토류판을 설치하고, 제거해야 하기 때문에 공사기간이 증가하는 문제가 있다.In addition, there is a problem that the construction period is increased because a soil plate is installed and removed in a sequential laminated structure.

상술한 종래기술의 기술구성, 명칭 및 도면번호는 그 종래기술의 설명에 한정되어 사용한다.The technical structure, name, and reference numerals of the above-described prior art are limited to the description of the prior art.

본 발명은 상기와 같은 문제점을 해결하기 위하여 도출된 것으로서, 본 발명의 프리스트레스트 토류판 및 이를 이용한 흙막이 벽체는 토류판의 길이를 증가시킬 수 있기 때문에 엄지말뚝을 최소화할 수 있다.SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it is an object of the present invention to provide a prestressed soil plate and an earth retaining wall using the prestressed soil plate.

또한, 상층과 하층에 설치되는 토류판을 동시에 삽입하여 설치하고, 동시에 철거할 수 있기 때문에 시공과 철거시 시공기간을 단축할 수 있다.In addition, since the earth plates installed in the upper layer and the lower layer can be inserted at the same time and removed at the same time, the construction period can be shortened during construction and dismantling.

상기 과제의 해결을 위하여, 지반(10)의 굴착면(11)에 접촉되는 후면에 인장응력이 도입되도록 선행하중(P)이 도입된 본 발명의 토류판(100)은 본체부(110); 좌우방향을 기준으로 상기 본체부(110)의 전면부에 형성됨과 아울러, 내측 영역에 돌출 형성된 돌출부(120); 상기 선행하중(P)이 도입된 상태로 상기 돌출부(120)의 좌우 측면부에 정착되는 긴장재(130);를 포함한다.To solve the above problems, the soil board 100 of the present invention in which the preceding load P is introduced such that a tensile stress is introduced to the rear surface contacting the excavation surface 11 of the ground 10 includes a main body 110; A protrusion 120 formed on a front surface of the main body 110 with respect to a lateral direction and protruding from an inner region; And a tensile member 130 which is fixed to the right and left side portions of the protrusion 120 with the leading load P introduced thereto.

상기 돌출부(120)는 상하 방향을 따라 상호 이격되어 복수가 형성되는 것이 바람직하다. The protrusions 120 are preferably spaced apart from each other along the vertical direction.

상기 긴장재(130)의 양단부는 상기 돌출부(120)의 좌우 단부에 각각 정착되고, 중앙부는 상기 본체부(110)의 중앙부에 위치하도록 만곡진 구조로 설치되는 것이 바람직하다.Preferably, both ends of the tensile member 130 are fixed to the left and right ends of the protrusion 120, respectively, and the central portion of the tensile member 130 is positioned at a central portion of the main body 110.

상기 본체부(110)의 후면은 상기 굴착면(11)으로 볼록하도록 만곡진 구조로 형성된 것이 바람직하다.The rear surface of the main body 110 may be curved so as to be convex to the excavation surface 11.

상기 긴장재(130)는 강선, 강봉, 케이블 중 어느 하나인 것이 바람직하다.The tension member 130 may be any one of a steel wire, a steel bar, and a cable.

상기 본체부(110)는 강 재질인 것이 바람직하다.The main body 110 is preferably made of a steel material.

본 발명의 일 실시 예에 따른 프리스트레스트 토류판(100)을 이용한 흙막이 벽체는 상기 지반(10)에 설치되는 복수의 엄지말뚝(200); 한 쌍의 상기 엄지말뚝(200)의 사이 구간에 결합되되, 상기 엄지말뚝(200)의 한 쌍의 플랜지, 복부에 의해 형성된 'ㄷ'형 끼움부(200a)에 좌우 가장자리부가 끼워지는 구조로 결합되는 상기 프리스트레스트 토류판(100);을 포함한다.The earth retaining wall using the prestressed soil board (100) according to an embodiment of the present invention includes a plurality of thumb piles (200) installed on the ground (10); Shaped portion 200a formed by a pair of flanges and abdomen of the thumb pile 200 and is coupled to a section between the pair of thumb piles 200. The left and right edge portions of the ' And the prestressed soil board 100.

상기 엄지말뚝(200)은 상기 복부에 좌우 방향으로 각각 한 쌍의 결합플랜지(210)가 돌출 형성되고, 상기 결합플랜지(210)에 의해 형성된 'ㄷ'형 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 복수의 상기 프리스트레스트 토류판(100)이 각각 결합되는 것이 바람직하다.The thumb pile 200 has a pair of coupling flanges 210 protruding from the abdomen in the left and right direction and a 'F' type front fitting part 200b-a formed by the coupling flange 210, It is preferable that a plurality of the prestressed dust catching plates 100 are respectively coupled to the fitting portion 200b-b and the rear fitting portion 200b-c.

상기 엄지말뚝(200)은 복수의 상기 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 결합되는 상기 프리스트레스트 토류판(100)의 삽입 높이를 서로 다르게 고정하기 위해, 상기 복부와 상기 복수의 결합플랜지(210)에 결합되는 판구조의 전방 지지부(220a), 중앙 지지부(220b), 후방 지지부(220c)가 각각 결합된 것이 바람직하다.The thumb pile 200 has an insertion height of the prestressed soil board 100 coupled to the plurality of the front fitting parts 200b-a, the central fitting part 200b-b, and the rear fitting part 200b-c The front support portion 220a, the center support portion 220b and the rear support portion 220c of the plate structure coupled to the abdomen and the plurality of coupling flanges 210 are preferably coupled to each other.

본 발명의 일 실시 예에 따른 흙막이 벽체 시공방법은 상기 지반(10)에 상기 엄지말뚝(200)을 설치하는 엄지말뚝 설치단계; 상기 지반(10)을 굴착하는 지반굴착단계; 상기 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 복수의 상기 프리스트레스트 토류판(100) 중 전방 토류판(100a), 중앙 토류판(100b), 후방 토류판(100c)을 동시에 각각 삽입 고정하는 토류판설치단계;를 포함한다.The method of constructing an earth retaining wall according to an embodiment of the present invention includes the steps of installing a thumb pile 200 on the ground 10; A ground excavating step of excavating the ground (10); The front leg plate 100a, the middle leg plate 100b, the middle leg plate 100b, the middle leg plate 100b, and the rear leg plate 100b of the plurality of the prestress leg plates 100 are fitted to the front fitting portion 200b-a, the central fitting portion 200b- And a backing plate 100c are inserted and fixed at the same time.

본 발명의 프리스트레스트 토류판은 긴장재에 의해 선행하중이 도입되어 토압에 효과적으로 저항할 수 있다.The prestressed soil board of the present invention is able to effectively resist the earth pressure by introducing the preceding load by the tension member.

또한, 선행하중에 의해 토류판의 길이를 증대시킬 수 있어, 엄지말뚝 사이 간격을 증대시키고, 엄지말뚝의 설치 개수를 절감할 수 있다.In addition, the length of the current plate can be increased by the preceding load, so that the distance between the thumb piles can be increased and the number of the thumb piles can be reduced.

도 1은 종래의 엄지말뚝 흙막이 부재 구조물의 사시도.
도 2는 본 발명의 일 실시 예에 따른 흙막이 벽체 사시도.
도 3은 본 발명의 일 실시 예에 따른 프리스트레스트 토류판 사시도.
도 4는 본 발명의 또 다른 실시 예에 따른 프리스트레스트 토류판 사시도.
도 5는 본 발명의 일 실시 예에 따른 프리스트레스트 토류판 측면도.
도 6은 본 발명의 또 다른 실시 예에 따른 흙막이 벽체 사시도.
도 7은 본 발명의 또 다른 실시 예에 따른 흙막이 벽체 사시도.
도 8은 본 발명의 일 실시 예에 따른 엄지말뚝 단면도.
도 9는 본 발명의 또 다른 실시 예에 따른 엄지말뚝 사시도.
도 10은 본 발명의 또 다른 실시 예에 따른 엄지말뚝 단면도.
도 11은 본 발명의 일 실시 예에 따른 엄지말뚝 설치단계 공정도.
도 12는 본 발명의 일 실시 예에 따른 지반굴착단계 공정도.
도 13은 본 발명의 일 실시 예에 따른 토류판설치단계 공정도.
1 is a perspective view of a conventional artificial pile cladding member structure.
2 is a perspective view of an earth retaining wall according to an embodiment of the present invention;
3 is a perspective view of a prestressed soil board according to an embodiment of the present invention.
4 is a perspective view of a prestressed soil board according to another embodiment of the present invention;
5 is a side view of a prestressed turntable according to an embodiment of the present invention;
6 is a perspective view of an earth retaining wall according to another embodiment of the present invention.
7 is a perspective view of an earth retaining wall according to another embodiment of the present invention.
8 is a cross-sectional view of a thumb pile according to an embodiment of the present invention.
9 is a perspective view of a thumb pile according to another embodiment of the present invention.
10 is a cross-sectional view of a thumb pile according to another embodiment of the present invention.
11 is a process diagram of a thumb pile installation step according to an embodiment of the present invention.
12 is a process diagram of a ground excavation step according to an embodiment of the present invention.
FIG. 13 is a process diagram of a soil plate installation step according to an embodiment of the present invention; FIG.

본 발명에 따른 프리스트레스트 토류판 및 이를 이용한 흙막이 벽체의 일 실시 예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대해 중복되는 설명은 생략하기로 한다.BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings, in which like or corresponding elements are denoted by the same reference numerals A duplicate description thereof will be omitted.

또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.

또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

이하, 첨부도면을 참조하여 본 발명의 일 실시 예에 따른 프리스트레스트 토류판 및 이를 이용한 흙막이 벽체에 관하여 상세히 설명한다.BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, a prestressed soil board and an earth retaining wall using the same according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

이하에서 도 2에 나타난 방향을 기준으로 전후좌우상하의 방향을 정의한다.Hereinafter, the directions of the front, back, left, right, and up and down are defined based on the direction shown in FIG.

지반(10)의 굴착면(11)에 접촉되는 후면에 인장응력이 도입되도록 선행하중(P)이 도입된 본 발명의 토류판(100)은 본체부(110); 좌우방향을 기준으로 본체부(110)의 전면부에 형성됨과 아울러, 내측 영역에 돌출 형성된 돌출부(120); 선행하중(P)이 도입된 상태로 돌출부(120)의 좌우 측면부에 정착되는 긴장재(130);를 포함한다.The soil board 100 of the present invention in which the preceding load P is introduced such that a tensile stress is applied to the rear surface contacting the excavation surface 11 of the ground 10 includes a main body 110; A protrusion 120 formed on the front surface of the main body 110 with respect to the left and right direction and protruding from the inner area; And a tension member 130 which is fixed to the right and left side portions of the protrusion 120 with the leading load P introduced therein.

이 경우, 토류판 후면에 인장응력이 도입되도록 선행하중이 도입되기 때문에 토류판의 길이를 장대화할 수 있다.In this case, since the leading load is introduced so that the tensile stress is introduced to the back surface of the soil sheet, the length of the soil sheet can be changed.

즉, 본원발명의 토류판은 긴장재에 의해 선행하중이 도입되어 토압에 효과적으로 저항할 수 있다.That is, the soil board of the present invention can effectively resist the earth pressure by introducing the preceding load by the tension member.

토류판이 장대화되면 얻는 장점은 다음과 같다.The advantage of having a confluence is as follows.

우선 토류판의 장대화는 엄지말뚝 사이 간격을 증대시키기 때문에 엄지말뚝 의 설치 개수를 절감할 수 있다.First of all, it is possible to reduce the number of thumb piles installed because the gap between the piles is increased.

또한, 엄지말뚝에 설치되는 띠장의 개수를 최소화할 수 있다.In addition, the number of strips installed on the thumb pile can be minimized.

마지막으로 엄지말뚝과 띠장의 설치를 위한 공사기간을 단축하여, 전체 공사기간을 단축할 수 있다.Finally, the construction period for the installation of the thumb pile and the belt can be shortened, and the entire construction period can be shortened.

돌출부(120)는 상하 방향을 따라 상호 이격되어 복수가 형성되는 것이 바람직하다.The protrusions 120 are preferably spaced apart from each other along the vertical direction.

이 경우, 토류판의 높이에 따라 복수의 돌출부를 형성하여 긴장력을 도입할 수 있다.In this case, a plurality of protrusions can be formed in accordance with the height of the current plate to introduce a tensile force.

긴장재(130)의 양단부는 돌출부(120)의 좌우 단부에 각각 정착되고, 중앙부는 본체부(110)의 중앙부에 위치하도록 만곡진 구조로 설치되는 것이 바람직하다.Preferably, both ends of the tensile member 130 are fixed to the right and left ends of the protrusion 120, respectively, and the central portion of the tensile member 130 is positioned at a central portion of the body portion 110.

이 경우, 긴장재는 본체부와 돌출부에 만곡진 구조로 설치되어 토류판 후면에 인장응력을 효과적으로 도입시킬 수 있다.In this case, the tensile material is installed in a curved structure in the main body portion and the projecting portion, so that tensile stress can be effectively introduced into the back surface of the soil plate.

본체부(110)의 후면은 굴착면(11)으로 볼록하도록 만곡진 구조로 형성된 것이 바람직하다.It is preferable that the rear surface of the main body 110 is formed in a curved structure so as to be convex to the excavation surface 11. [

이 경우, 본체부가 굴착면(11)의 후면을 따라 아치 구조로 형성되기 때문에 토압에 대하여 아칭효과(Arching effect)를 얻을 수 있다.In this case, since the main body portion is formed as an arch structure along the rear surface of the excavation surface 11, an arching effect can be obtained with respect to the earth pressure.

긴장재(130)는 강선, 강봉, 케이블 중 어느 하나인 것이 바람직하다.The tension member 130 is preferably any one of a steel wire, a steel bar, and a cable.

본체부(110)는 강 재질인 것이 바람직하다.The main body 110 is preferably made of a steel material.

본 발명의 일 실시 예에 따른 프리스트레스트 토류판(100)을 이용한 흙막이 벽체는 지반(10)에 설치되는 복수의 엄지말뚝(200); 한 쌍의 엄지말뚝(200)의 사이 구간에 결합되되, 엄지말뚝(200)의 한 쌍의 플랜지, 복부에 의해 형성된 'ㄷ'형 끼움부(200a)에 좌우 가장자리부가 끼워지는 구조로 결합되는 프리스트레스트 토류판(100);을 포함한다.The earth retaining wall using the prestressed soil board 100 according to an embodiment of the present invention includes a plurality of thumb piles 200 installed on the ground 10; A pair of thumb piles 200 and a pair of flanges of the thumb pile 200. The left and right edge portions of the ' And a rest leg plate (100).

이 경우, 프리스트레스트 토류판이 엄지말뚝에 결합되기 때문에 엄지말뚝의 사이 간격이 넓고, 엄지말뚝의 개수가 감소한다.In this case, since the prestressed soil board is coupled to the thumb pile, the interval between the thumb piles is wide, and the number of thumb piles decreases.

또한, 흙막이 벽체의 안전성을 향상시키기 위해 전후방향으로 마주보는 엄지말뚝에 결합되는 보강 스트럿의 개수도 감소시킬 수 있다.In addition, the number of reinforcing struts that are coupled to the facing thumb piles in the anteroposterior direction can also be reduced to improve the safety of the retaining wall.

엄지말뚝(200)은 복부에 좌우 방향으로 각각 한 쌍의 결합플랜지(210)가 돌출 형성되고, 결합플랜지(210)에 의해 형성된 복수의 'ㄷ'형 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 복수의 프리스트레스트 토류판(100)이 각각 결합되는 것이 바람직하다.The thumb pile 200 has a pair of coupling flanges 210 protruding from the abdomen in the transverse direction and each having a plurality of "c" type front fitting portions 200b-a formed by the coupling flange 210, It is preferable that a plurality of prestressed dust catching plates 100 are respectively coupled to the front portion 200b-b and the rear fitting portion 200b-c.

이 경우, 도 10과 같이 엄지말뚝에는 결합플랜지가 형성되기 때문에 상하 방향을 따라 적층되는 복수의 토류판을 엄지말뚝에 각각 결합시킬 수 있다.In this case, as shown in FIG. 10, since the coupling flange is formed on the thumb pile, a plurality of soil plates stacked along the vertical direction can be coupled to the thumb pile.

따라서 상하 방향을 따라 설치되는 복수의 토류판을 동시에 설치하고, 동시에 제거할 수 있다.Therefore, a plurality of soil plates installed along the vertical direction can be simultaneously installed and removed at the same time.

엄지말뚝(200)은 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 결합되는 각각의 프리스트레스트 토류판(100)의 삽입 높이를 서로 다르게 고정하기 위해, 복부와 복수의 결합플랜지(210)에 결합되는 판구조의 전방 지지부(220a), 중앙 지지부(220b), 후방 지지부(220c)가 결합된 것이 바람직하다.The thumb pile 200 has fixed heights of the prestressed soil board 100 coupled to the front fitting portion 200b-a, the central fitting portion 200b-b, and the rear fitting portion 200b-c, The front supporting portion 220a, the center supporting portion 220b and the rear supporting portion 220c of the plate structure coupled to the abdomen and the plurality of coupling flanges 210 are preferably combined.

이 경우, 토류판의 높이에 따라 지지부를 엄지말뚝에 결합하여 흙막이 벽체를 형성할 수 있다.In this case, depending on the height of the earth plate, the supporting part may be coupled to the thumb pile to form the earth retaining wall.

본 발명의 일 실시 예에 따른 흙막이 벽체 시공방법은 지반(10)에 엄지말뚝(200)을 설치하는 엄지말뚝 설치단계; 지반(10)을 굴착하는 지반굴착단계; 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 복수의 프리스트레스트 토류판(100) 중 전방 토류판(100a), 중앙 토류판(100b), 후방 토류판(100c)을 동시에 각각 삽입 고정하는 토류판설치단계;를 포함한다.The method of constructing the earth retaining wall according to an embodiment of the present invention includes the steps of installing a thumb pile 200 on a ground 10; A ground excavation step of excavating the ground 10; The front flap plate 100a, the middle flap plate 100b, the rear flap plate 100b, the rear flap plate 100b, the rear flap plate 100b, the rear flap plate 100b, and the rear flap plate 100b are provided in the front fitting portion 200b-a, the central fitting portion 200b- (100c) at the same time.

이 경우, 상하 방향을 따라 설치되는 복수의 토류판을 동시에 설치하고, 제거할 수 있기 때문에 공사기간을 단축할 수 있다.In this case, since a plurality of dust plates installed along the vertical direction can be simultaneously installed and removed, the construction period can be shortened.

또한, 상하 방향을 따라 설치되는 복수의 토류판을 동시에 설치하기 때문에 굴착면(11)이 외부에 노출되는 시간을 최소화할 수 있다.In addition, since a plurality of soil plates provided along the vertical direction are provided at the same time, the time during which the excavation surface 11 is exposed to the outside can be minimized.

10 : 지반 11 : 굴착면
100 : 프리스트레스트 토류판 110 : 본체부
120 : 돌출부 130 : 긴장재
200 : 엄지말뚝 200a, 200b : 끼움부
210 : 결합플랜지 220 : 지지부
10: Ground 11: Excavation surface
100: Prestressed earth plate 110:
120: protrusion 130:
200: thumb pile 200a, 200b:
210: coupling flange 220:

Claims (10)

지반(10)의 굴착면(11)에 접촉되는 후면에 인장응력이 도입되도록 선행하중(P)이 도입된 토류판(100)으로서,
본체부(110);
좌우방향을 기준으로 상기 본체부(110)의 전면부에 형성됨과 아울러, 내측 영역에 돌출 형성된 돌출부(120);
상기 선행하중(P)이 도입된 상태로 상기 돌출부(120)의 좌우 측면부에 정착되는 긴장재(130);를 포함하고,
상기 돌출부(120)는 상하 방향을 따라 상호 이격되어 복수가 형성되고,
상기 긴장재(130)는
양단부가 상기 돌출부(120)의 좌우 단부에 각각 정착되고, 중앙부는 상기 본체부(110)의 중앙부에 위치하도록 만곡진 구조로 설치되며,
상기 본체부(110)의 후면은 상기 굴착면(11)으로 볼록하도록 만곡진 구조로 형성된 프리스트레스트 토류판(100)을 이용한 흙막이 벽체는
상기 지반(10)에 설치되는 복수의 엄지말뚝(200);
한 쌍의 상기 엄지말뚝(200)의 사이 구간에 결합되되, 상기 엄지말뚝(200)의 한 쌍의 플랜지, 복부에 의해 형성된 'ㄷ'형 끼움부(200a)에 좌우 가장자리부가 끼워지는 구조로 결합되는 상기 프리스트레스트 토류판(100);을 포함하고,
상기 엄지말뚝(200)은
상기 복부에 좌우 방향으로 각각 한 쌍의 결합플랜지(210)가 돌출 형성되고, 상기 결합플랜지(210)에 의해 형성된 'ㄷ'형 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 복수의 상기 프리스트레스트 토류판(100)이 서로 다른 높이에서 각각 결합되며,
상기 엄지말뚝(200)은
상기 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 각각 결합되는 상기 프리스트레스트 토류판(100)의 삽입 높이를 서로 다르게 고정하기 위해, 상기 복부와 상기 복수의 결합플랜지(210)에 결합되는 판구조의 전방 지지부(220a), 중앙 지지부(220b), 후방 지지부(220c)가 각각 결합되고,
상기 긴장재(130)는 강선, 강봉, 케이블 중 어느 하나이며, 상기 본체부(110)는 강 재질인 흙막이 벽체 시공방법으로서,
상기 지반(10)에 상기 엄지말뚝(200)을 설치하는 엄지말뚝 설치단계;
상기 지반(10)을 굴착하는 지반굴착단계;
상기 전방 끼움부(200b-a), 중앙 끼움부(200b-b), 후방 끼움부(200b-c)에 상기 프리스트레스트 토류판(100) 중 전방 토류판(100a), 중앙 토류판(100b), 후방 토류판(100c)을 동시에 각각 삽입 고정하는 토류판설치단계;를 포함하는 것을 특징으로 하는 흙막이 벽체 시공방법.
A soil plate (100) having a leading load (P) introduced therein so that a tensile stress is applied to a rear surface contacting the excavation surface (11) of the ground (10)
A main body 110;
A protrusion 120 formed on a front surface of the main body 110 with respect to a lateral direction and protruding from an inner region;
And a tension member (130) fixed to the right and left side portions of the protrusion (120) with the leading load (P) introduced,
The protrusions 120 are spaced apart from each other in the vertical direction,
The tension member (130)
Both ends of which are fixed to the right and left ends of the protrusion 120 and the center portion is installed in a curved structure so as to be positioned at a central portion of the main body 110,
The rear wall of the main body 110 is formed of a prestressed soil board 100 having a curved structure convex to the excavation surface 11,
A plurality of thumb piles (200) installed on the ground (10);
Shaped portion 200a formed by a pair of flanges and abdomen of the thumb pile 200 and is coupled to a section between the pair of thumb piles 200. The left and right edge portions of the ' The prestressed soil board (100)
The thumb pile (200)
A pair of coupling flanges 210 protruding from the abdomen in the left and right direction and a 'C' type front fitting portion 200b-a formed by the coupling flange 210, a center fitting portion 200b-b, A plurality of the prestressed dust collecting plates 100 are coupled to the rear fitting portion 200b-c at different heights,
The thumb pile (200)
In order to fix the insertion heights of the prestressed stag plate 100 coupled to the front fitting part 200b-a, the central fitting part 200b-b and the rear fitting part 200b-c differently from each other, And a front support portion 220a, a center support portion 220b, and a rear support portion 220c of a plate structure coupled to the plurality of coupling flanges 210 are respectively coupled,
Wherein the tension member 130 is one of a steel wire, a steel bar, and a cable, and the main body 110 is a steel material,
A thumb pile installing step of installing the thumb pile (200) on the ground (10);
A ground excavating step of excavating the ground (10);
The front flap plate 100a, the middle flap plate 100b, the rear flap plate 100b, and the rear flap plate 100b of the prestressed flaps 100 are fixed to the front fitting part 200b-a, the central fitting part 200b- (100c) at the same time as the installation of the earth retaining wall.
삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020170018088A 2017-02-09 2017-02-09 A structure of soil retaining plate and retaining wall using the same KR101880257B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170018088A KR101880257B1 (en) 2017-02-09 2017-02-09 A structure of soil retaining plate and retaining wall using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170018088A KR101880257B1 (en) 2017-02-09 2017-02-09 A structure of soil retaining plate and retaining wall using the same

Publications (1)

Publication Number Publication Date
KR101880257B1 true KR101880257B1 (en) 2018-07-19

Family

ID=63058249

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170018088A KR101880257B1 (en) 2017-02-09 2017-02-09 A structure of soil retaining plate and retaining wall using the same

Country Status (1)

Country Link
KR (1) KR101880257B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403369A (en) * 2018-10-16 2019-03-01 安徽海螺建材设计研究院有限责任公司 A kind of production method of breast boards structure and breast boards structure
KR101983650B1 (en) * 2018-11-21 2019-06-03 주식회사 티에프이앤씨 Perpendicular wall type block assembly breast wall
KR102088761B1 (en) * 2018-11-21 2020-04-08 주식회사 티에스토건 Plate system for SCW Construction method
KR102309753B1 (en) * 2021-03-12 2021-10-07 최경철 Steel plate wall order structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61266735A (en) * 1985-05-17 1986-11-26 Kensetsu Kiso Eng Kk Sheathing panel
KR20030039869A (en) * 2001-11-16 2003-05-22 김준성 Panel for reinforcing con'c body and its manufacturing method
KR20100066887A (en) * 2008-12-10 2010-06-18 변웅호 Temporary retaining wall structure
KR20120128345A (en) * 2011-05-17 2012-11-27 보림토건(주) A Prevention Plate of the Ground Subsidence and Construction Method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61266735A (en) * 1985-05-17 1986-11-26 Kensetsu Kiso Eng Kk Sheathing panel
KR20030039869A (en) * 2001-11-16 2003-05-22 김준성 Panel for reinforcing con'c body and its manufacturing method
KR20100066887A (en) * 2008-12-10 2010-06-18 변웅호 Temporary retaining wall structure
KR20120128345A (en) * 2011-05-17 2012-11-27 보림토건(주) A Prevention Plate of the Ground Subsidence and Construction Method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403369A (en) * 2018-10-16 2019-03-01 安徽海螺建材设计研究院有限责任公司 A kind of production method of breast boards structure and breast boards structure
KR101983650B1 (en) * 2018-11-21 2019-06-03 주식회사 티에프이앤씨 Perpendicular wall type block assembly breast wall
KR102088761B1 (en) * 2018-11-21 2020-04-08 주식회사 티에스토건 Plate system for SCW Construction method
KR102309753B1 (en) * 2021-03-12 2021-10-07 최경철 Steel plate wall order structure and construction method

Similar Documents

Publication Publication Date Title
KR101880257B1 (en) A structure of soil retaining plate and retaining wall using the same
KR101419863B1 (en) Pc panel needless of concrete forms using construction method of cast-in-place step retaining wall for slope reinforcement
KR101595702B1 (en) Soil retaining structure using plate pile with reinforcing bridge and construction method thereof
KR101382609B1 (en) Earths wall for groundprotection and Construction Method thereof
KR102216504B1 (en) Waterproofing block assembly used to water stop construction for forming underground continuous wall and connecting method for the same
US9103089B2 (en) Loop and saddle connection system and method for mechanically stablized earth wall
KR20190132771A (en) Prestress beam with reinforcement structure and temporary soil sheathing method using the same
KR101494132B1 (en) Self reliance type sheathing structure
KR101926160B1 (en) Method and wale for temporary soil sheathing work
KR101251466B1 (en) Anchor supporting system
KR100924104B1 (en) Self supporting retaining wall construction using curved steel panel and steel wire
KR101419001B1 (en) Earths wall for groundprotection and Construction Method thereof
KR20140069845A (en) Retaining wall using diagonal reinforcement member
JPH01187226A (en) Coating material for banking
KR101988528B1 (en) Self-supporting pile structure using anchor
JP2015175110A (en) Steel and concrete composite floor slab
KR101354574B1 (en) Double pf wale, double pf wale construction method and temporary retaining wall construction method therewith
KR102008991B1 (en) supporting system for strut using wale girders with plural row
KR101628049B1 (en) Self-retained wall sructures and construction method thereof
CN210238939U (en) Outsourcing column base connecting piece and utilize its outsourcing column base connection structure
RU2130996C1 (en) Method of reinforcement of strip foundation
JP2023022488A (en) Slope crushed stone installation structure and slope protection structure
KR20230057054A (en) Soil retaning structure for two rows pile using prestressed wale
JP6211731B1 (en) Concrete pressure receiving plate and pressure receiving structure using the pressure receiving plate
KR101938988B1 (en) Soil retaining wall structure and Method for constructinging the same

Legal Events

Date Code Title Description
GRNT Written decision to grant