KR101827381B1 - Multi-layer construction structure of the structure using double-wall PC and construction method thereof - Google Patents
Multi-layer construction structure of the structure using double-wall PC and construction method thereof Download PDFInfo
- Publication number
- KR101827381B1 KR101827381B1 KR1020150165356A KR20150165356A KR101827381B1 KR 101827381 B1 KR101827381 B1 KR 101827381B1 KR 1020150165356 A KR1020150165356 A KR 1020150165356A KR 20150165356 A KR20150165356 A KR 20150165356A KR 101827381 B1 KR101827381 B1 KR 101827381B1
- Authority
- KR
- South Korea
- Prior art keywords
- slab
- double wall
- concrete
- month
- wall
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/04—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
- E04B1/043—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
- E04H1/04—Apartment houses arranged in two or more levels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
The present invention relates to a multi-layer construction structure and a construction method for a structure by a double wall PC, which comprises a first wall PC and two or more A double wall PC which is connected by reinforcing members to form spaced spaces in which concrete is poured therein; At least one first PC slab which is a ceiling part of a lower layer and forms a bottom part of an upper layer and is connected to the double wall PC by a concrete disposed horizontally with respect to the double wall PC at a set height in the vertical direction of the double wall PC; And at least one second PC slab disposed horizontally with respect to the double wall PC at the top and bottom of the double wall PC and connected to the double wall PC by concrete.
Description
[0001] The present invention relates to a multi-layer construction structure and a construction method of a structure by a double wall PC. More particularly, the present invention relates to a double wall construction capable of forming a plurality of layers, And more particularly, to a multi-layer construction structure and a construction method using the PC.
Generally, in order to form a ceiling, a bottom surface, a wall surface, and a column in the construction of an apartment, a mall, a house, a building, and the like, a reinforcing bar is used to form a mold, The reinforced concrete frame is formed by pouring concrete inside.
However, in the above-described construction method, all the processes such as the step of assembling the reinforcing bars to each other by the binding line, the step of installing and removing the formwork, and the supporting and supporting of the supporting slabs are performed at the construction site, And work time. In addition, there is a problem that the construction period is prolonged due to the work schedule because the concrete held until the cured concrete is cured with sufficient strength. There is also a problem that there is a lot of troubles in the disassembly of slab, support and wall formwork, and there is a risk of safety accident.
Particularly, in the process of installing and removing the formwork, a large number of form panels are broken and must be repaired or dismantled. Therefore, not only is the material loss large, but also it takes a lot of time such as the laying process, A carpenter who installs and dismantles a steelwork, a formwork, and a skilled artisan.
In addition, since each layer needs to be separately constructed, the construction period of the entire structure becomes long, which causes a cost increase, and there is a problem that leakage occurs at the connection portion of each layer.
An object of the present invention is to provide a multi-layer construction structure and a construction method of a double wall PC by which a double wall PC capable of forming a plurality of layers can be manufactured and the construction can be simplified while air can be shortened.
In the present invention, a first month PC and two or more second month PCs facing the first month PC and separated by a predetermined interval along a vertical direction are connected to each other by a reinforcing member, Double Wall PC to form; At least one first PC slab which is a ceiling part of a lower layer and forms a bottom part of an upper layer and is connected to the double wall PC by a concrete disposed horizontally with respect to the double wall PC at a set height in the vertical direction of the double wall PC; And at least one second PC slab arranged horizontally with respect to the double wall PC at the top and bottom of the double wall PC and connected to the double wall PC by concrete, Lt; RTI ID = 0.0 > a < / RTI >
According to another aspect of the present invention, there is provided a method of manufacturing a concrete structure, comprising the steps of: providing a first wall PC and second wall PCs facing the first wall PC and spaced apart from each other by a predetermined interval along a vertical direction, A step of preparing a double wall PC to form a spacing space in which the double wall PC is installed; Placing the double wall PC on a foundation; Placing topping concrete in the spacing space up to a set height; Disposing at least one first PC slab forming a ceiling of a lower layer and forming a bottom of an upper layer horizontally with respect to the double wall PC at a set height of the double wall PC; Disposing a second PC slab forming a ceiling portion of the uppermost layer horizontally on the upper side of the double wall PC in relation to the double wall PC; And placing the concrete from the upper surface of the first PC slab and the upper surface of each of the second PC slabs to the predetermined height to join the double wall PC, the first PC slab, and the second PC slab, Layer construction of a structure by a double wall PC.
According to another aspect of the present invention, there is provided a method of manufacturing a display device, including: a first month PC and second month PCs facing the first month PC and spaced apart from each other by a predetermined interval along a vertical direction, Making a double wall PC that forms a spaced space in which concrete is poured; Placing the double wall PC on a foundation; Disposing at least one first PC slab forming a ceiling of a lower layer and forming a bottom of an upper layer horizontally with respect to the double wall PC at a set height of the double wall PC; Placing the concrete from the upper surface of the first PC slab to the set height up to the set height of the spacing space to join the first PC slab to the double wall PC; Disposing a second PC slab forming a ceiling portion of the uppermost layer horizontally on the upper side of the double wall PC in relation to the double wall PC; And placing the concrete over the remaining portion of the spacing space and the set height from the upper surface of the second PC slab to bond the second PC slab to the double wall PC. Provides a construction method.
The multi-layer construction method of the structure by the double wall PC according to the present invention has the following effects.
First, one double wall PC having at least two floors can be manufactured, and multiple layers of the structure can be constructed at a time, thereby reducing the construction period (air) of the structure.
Secondly, since the outer wall is formed of one wall PC at one double wall PC having a height of at least two floors, it is possible to reduce the interlayer coupling part, minimizing the leakage of the structure and improving the quality.
1 is a cross-sectional view showing a multiple-layer construction structure of a double wall PC according to the present invention.
FIG. 2 is a block diagram illustrating a multi-layer construction method of a structure by double wall PC according to an embodiment of the present invention.
3 to 6 illustrate a multiple layer construction process of a structure by double wall PC according to FIG.
FIG. 7 is a block diagram illustrating a multi-layer construction method of a structure by double wall PC according to another embodiment of the present invention.
8 to 10 illustrate a multiple layer construction process of a structure by double wall PC according to FIG.
11 is a cross-sectional view illustrating a multi-layer construction structure of the double wall PC according to another embodiment.
12 is a front partial cross-sectional view of a structure constructed by a multi-layer construction method of a structure by double wall PC according to FIG. 1;
1 to 11 illustrate a multi-layer construction structure and a construction method of a double wall PC according to the present invention. Before describing the present invention in detail, the multi-layer construction structure and the construction method of the double wall PC according to the present invention are for constructing a two-layer structure, for example. The underground two-story structure may be, for example, an underground parking lot, but is not limited thereto and may be applied to various underground two-story structures. In addition, the present invention is not limited to the construction of the two-story structure, but may be applied to a structure constructed on the ground.
First, referring to FIG. 1, a multi-layer construction structure of a double wall PC according to an embodiment of the present invention will be described. The double wall PC 100, the
Like the first month PC's 110, the second monthly PC's 130-1 and 130-3 have a
The length h1 of the second wall paper 130-1 located at the lower side and the length h2 of the second wall paper 130-3 located at the upper side are the same The vertical length h2 of the second wall paper 130-3 located on the upper side is shorter than the length h1 of the first wall paper 130-1 located on the lower side in the vertical direction . The height of the concrete slurry can be adjusted by adjusting the vertical length h2 of the second month PC 130-3 located on the upper side of the
The reinforcing
As described above, the second month PCs 130-1 and 130-3 are spaced apart from each other by a predetermined interval in the vertical direction. The second month PC 130-1 located on the lower side and the second monthly PC 130-3 located on the upper side are connected by a vertical
Although only one vertical
The
That is, in this embodiment, two layers are simultaneously constructed by the double wall PC 100. However, if three layers are to be simultaneously constructed by the double wall PC 100, the
As will be described later, the
One end of the first slab
The
Similarly to the first slab
The second slab
As described above, the
A method of constructing a plurality of structures of the double wall PC according to an embodiment of the present invention will be described with reference to FIGS. 2 to 6. FIG.
First, the step of fabricating the
The second moonPCs 130-1 and 130-3 are spaced apart from each other by a predetermined interval in the vertical direction and are connected by the
When the
A part of one side of the
When the
It is possible to prevent the
The reinforcing
The
At this time, one side of the
After the
When the concrete placed on the upper surface of the
After the
After the
After the
The remaining portion of the spacing space and the concrete placed on the upper surface of the
7 to 10 show a method of simultaneously constructing a plurality of layers by double wall PC according to another embodiment of the present invention. 7 to 10, a method for constructing a double wall structure using a double wall PC is performed by first manufacturing the
When the
When the
At this time, one side of the
After installing the
The height at which the concrete is placed in the spacing space (unmarked) is laid up to the same height as the height at which the concrete is poured on the upper surface of the
When the
The
After the
11 shows a construction example in which the
The
After the
12 is a front partial sectional view showing a construction applied by the above-mentioned construction methods. 12, a
While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims.
100: Double Wall PC 110: 1st month PC
130-1, 130-3: 2nd month PC 150: reinforcing member
200: first PC slab 210: first slab main
300: second PC slab 310: second slab main
Claims (20)
Disposing the double wall PC on a base;
Placing the topping concrete first in the spacing space to a first predetermined height;
At least one first PC slab, which is a ceiling part of a lower layer and forms a bottom part of an upper layer, is disposed between the second wall PCs, and contacts the upper surface of the second wall PC located on the lower side and horizontally ;
A first slab having one side inserted into the spacing space and the other side disposed in parallel with the first slab; and a first slab main body having one side bent in a direction crossing the first slab, ;
Joining the double wall PC and the first PC slab to a second set height of the spacing space and second concrete pouring up to a set height on the upper surface of the first PC slab to fill the first slab main floor,
Disposing a second PC slab forming a ceiling portion of the uppermost layer horizontally on the upper side of the double wall PC in relation to the double wall PC; And
And a step of joining the double wall PC and the second PC slab by placing the remaining part of the spacing space and the concrete from the upper surface of the second PC slab to the set height to form a plurality of layers Construction method.
Disposing the double wall PC on a base;
At least one first PC slab, which is a ceiling part of a lower layer and forms a bottom part of an upper layer, is disposed between the second wall PCs, and contacts the upper surface of the second wall PC located on the lower side and horizontally ;
A first slab having one side inserted into the spacing space and the other side disposed in parallel with the first PC slab; a first slab main body having one side bent in a direction intersecting with the first PC slab; ;
Placing the concrete from the upper surface of the first PC slab to the set height up to the set height of the spacing space to bond the first PC slab to the double wall PC while filling the first slab main frame;
Disposing a second PC slab forming a ceiling portion of the uppermost layer horizontally on the upper side of the double wall PC in relation to the double wall PC; And
Placing a second concrete slab on the double wall concrete by placing the concrete from the remaining part of the spacing space to a predetermined height from the upper surface of the second concrete slab, and joining the second concrete slab to the double wall concrete. Way.
The second PC slab is disposed on the second wall PC located on the uppermost layer, and one side of the second PC slab is disposed on the upper wall of the second wall PC positioned on the uppermost floor. ≪ / RTI >
In the step of horizontally arranging the second PC slab on the upper side of the double wall PC in relation to the double wall PC,
And installing a second slab main line disposed on the second PC slab in parallel with the second PC slab.
One side of the second slab main line is bent in a direction intersecting with the second PC slab,
And passing through the upper side of the second month PC located on the uppermost layer and inserted into the spacing space.
The concrete placed on the upper surface of the first PC slab may have a height equal to the lower surface of the second month PC located on the upper side or a double wall PC placed higher than the lower surface of the second monthly PC located on the upper side A method for constructing a plurality of structures.
Wherein the concrete placed on the upper surface of the second PC slab is poured up to a height equal to the upper surface of the first month PC by a double wall PC.
The base is formed with a groove at a position where the double wall PC is disposed,
In the step of disposing the double wall PC on the base,
Wherein the double wall PC is placed in the groove and the non-shrinkage mortar is placed in the groove.
In the step of disposing the double wall PC on the base,
Placing one or more level shims between the base and the double wall PC so as to separate the double wall PC from the base,
Wherein the shrinkage mortar is poured from the foundation to the set height of the spacing space.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150165356A KR101827381B1 (en) | 2015-11-25 | 2015-11-25 | Multi-layer construction structure of the structure using double-wall PC and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150165356A KR101827381B1 (en) | 2015-11-25 | 2015-11-25 | Multi-layer construction structure of the structure using double-wall PC and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20170060769A KR20170060769A (en) | 2017-06-02 |
KR101827381B1 true KR101827381B1 (en) | 2018-03-22 |
Family
ID=59222624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150165356A KR101827381B1 (en) | 2015-11-25 | 2015-11-25 | Multi-layer construction structure of the structure using double-wall PC and construction method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101827381B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102256121B1 (en) * | 2020-05-27 | 2021-05-27 | 배기동 | The construction method of a building with an intermediate floor on each floor |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102282995B1 (en) * | 2020-12-28 | 2021-07-28 | (주)지산개발 | Elvation module for column structure and construction method of building using it |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101556545B1 (en) * | 2015-05-27 | 2015-10-02 | 삼표피앤씨 주식회사 | Method for constructing using a double wall Precast Concrete |
-
2015
- 2015-11-25 KR KR1020150165356A patent/KR101827381B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101556545B1 (en) * | 2015-05-27 | 2015-10-02 | 삼표피앤씨 주식회사 | Method for constructing using a double wall Precast Concrete |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102256121B1 (en) * | 2020-05-27 | 2021-05-27 | 배기동 | The construction method of a building with an intermediate floor on each floor |
Also Published As
Publication number | Publication date |
---|---|
KR20170060769A (en) | 2017-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101740919B1 (en) | Precast concrete wall and manufacturing method of the wall | |
KR101553345B1 (en) | Method for constructing junction between the double wall Precast Concrete panels and the junction structure | |
KR101570484B1 (en) | Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same | |
KR101574253B1 (en) | A method for construction using a twin wall structure using a PC panel | |
KR102197689B1 (en) | Vertical core structure horizontally assembled and construction method therewith | |
CN103850352A (en) | Connection method of prefabricated slab | |
KR20170013455A (en) | the hybrid self-positioning connecting structure of column and beam | |
CN107642104B (en) | Connecting structure of prefabricated sandwich wall and middle laminated slab and construction method thereof | |
WO2020214086A1 (en) | Precast building | |
KR101827381B1 (en) | Multi-layer construction structure of the structure using double-wall PC and construction method thereof | |
KR101798138B1 (en) | Multi precast wall structure and its construction method | |
KR20170013009A (en) | Method for constructing junction between the double wall Precast Concretes and the junction structure thereof, the construction method for underground parking using he double wall Precast Concrete, and construction method for the rainwater storage using he double wall Precast Concrete | |
CN207453225U (en) | A kind of superstructure unit and assembly concrete integrated floor | |
KR101327785B1 (en) | Construction Method of Core Part in Building | |
KR101105883B1 (en) | Basic mat constructing method of high rise concrete structure | |
JP6552863B2 (en) | How to beat the outer wall | |
JP4808018B2 (en) | Assembly-type foundation block and its installation method | |
KR101324884B1 (en) | Hybrid building construction method combining dry type and wet type | |
JP6849491B2 (en) | Exposed column base structure of steel columns and its construction method | |
KR20200075600A (en) | Method for constructing transfer layer of building using precast concrete slab | |
KR101346736B1 (en) | Improved Semi-concrete filled tube Column Structure | |
KR101826086B1 (en) | The Horizontal And Vertical Expansion Of Public Housing Methods Applied Post-Tensioning | |
JP2009013641A (en) | Aseismatic reinforcing structure | |
KR101785627B1 (en) | Method for Fabricating the Structure using a PC Pannel | |
KR20160043501A (en) | A sump or elevator pit under structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |