KR101795777B1 - Supporting Device for Form - Google Patents

Supporting Device for Form Download PDF

Info

Publication number
KR101795777B1
KR101795777B1 KR1020160044971A KR20160044971A KR101795777B1 KR 101795777 B1 KR101795777 B1 KR 101795777B1 KR 1020160044971 A KR1020160044971 A KR 1020160044971A KR 20160044971 A KR20160044971 A KR 20160044971A KR 101795777 B1 KR101795777 B1 KR 101795777B1
Authority
KR
South Korea
Prior art keywords
support frame
support
groove
frame
vertical foam
Prior art date
Application number
KR1020160044971A
Other languages
Korean (ko)
Other versions
KR20170116834A (en
Inventor
채다인
Original Assignee
(주)동은에프앤씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동은에프앤씨 filed Critical (주)동은에프앤씨
Priority to KR1020160044971A priority Critical patent/KR101795777B1/en
Publication of KR20170116834A publication Critical patent/KR20170116834A/en
Application granted granted Critical
Publication of KR101795777B1 publication Critical patent/KR101795777B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G19/00Auxiliary treatment of forms, e.g. dismantling; Cleaning devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 거푸집 지지장치에 관한 것으로, 본 발명에 따른 거푸집 지지장치는 X축 방향으로 연장되어 형성되고, 내부에 길이방향으로 제1 홈(110)이 형성된 보멍에재(100), Y축 방향으로 연장되어 형성되고 수직폼(400)의 일면을 지지하는 제1 지지프레임(210), 및 제1 지지프레임(210)의 하단에서 X축 방향으로 연장되어 형성되고 제1 홈(110)에 삽입되어 슬라이딩하면서 이동가능한 제2 지지프레임(220)을 포함하고, 보멍에재(100)에 2개가 마주보도록 배치된 지지구조체(200), 및 Z축 방향으로 연장되어 형성되고, 제1 지지프레임(210)의 측면과 제2 지지프레임(220)의 상면에 접촉하도록 배치되며, 수직폼(400)의 하단을 지지하는 레일(300)을 포함한다.[0001] The present invention relates to a die support apparatus, wherein a die support apparatus according to the present invention comprises a bobbin member 100 formed to extend in the X-axis direction and having a first groove 110 formed therein in the longitudinal direction, A first support frame 210 extending from the first support frame 210 and supporting one side of the vertical foam 400 and a second support frame 210 extending from the lower end of the first support frame 210 in the X- And a second support frame (220) slidably movable between the first support frame (200) and the second support frame (220). The support structure (200) 210 and a rail 300 that is disposed to contact the upper surface of the second support frame 220 and supports the lower end of the vertical foam 400.

Description

거푸집 지지장치{Supporting Device for Form}{Supporting Device for Form}

본 발명은 거푸집 지지장치에 관한 것이다.
The present invention relates to a die support apparatus.

일반적으로 아파트, 빌딩 등과 같은 콘크리트 구조물을 축조하기 위하여 내외 벽체 및 기둥 등을 성형할 때, 콘크리트가 경화되는 시간 동안 상기 콘크리트가 원하는 형태를 유지시켜 줄 수 있는 거푸집을 필요로 한다. 이러한 거푸집 내에 철근 등을 배근한 다음, 콘크리트를 타설하고, 일정기간 동안 양생을 하여 소정의 강도로 콘크리트가 경화된 후 거푸집을 제거한다. 이후에도, 계속해서 주기적으로 일정량의 수분을 공급하여 콘크리트가 충분히 경화되도록 양생한다.
Generally, when molding inner and outer walls and columns to construct concrete structures such as apartments, buildings, and the like, it is necessary to form the concrete so that the concrete can maintain its desired shape during the time of curing of the concrete. After placing reinforcing bars or the like in the formwork, the concrete is laid, cured for a predetermined period, and the concrete is cured at a predetermined strength, and then the formwork is removed. After that, the concrete is cured so that the concrete is sufficiently cured by continuously supplying a predetermined amount of water.

통상적으로 콘크리트 들보의 타설시에 외형을 형성하여 주는 거푸집은 합판이나 스틸 폼 등의 패널 요소를 순서에 맞춰 조립 형성함이 일반적이다. 이때, 각 패널 요소는 각목을 덧대어 못질하거나 턴 버클, 클램프 등과 같은 철 구조물에 의존하여 지지시키고 있다. 목재 합판은 들보 형태를 원하는 대로 짜 맞추기가 용이하고, 스틸 폼은 조립이 간편하고 정밀 시공을 가능케 하는 장점을 가지고 있으나, 들보용 거푸집은 콘크리트를 타설하였을 때에 그 중량이 하부로 집중하기 때문에 거푸집은 원형을 유지할 수 있도록 견고한 구조로 지지되어야 한다.
Generally, a form that forms an outer shape when a concrete beam is poured is generally formed by assembling panel elements such as plywood or steel foam in order. At this time, each panel element is supported depending on the iron structure such as a nail or a turn buckle, a clamp or the like. Wood plywood has the advantages of easy to assemble beam shapes and steel foams are easy to assemble and enable precise construction. However, when the concrete beam is laid, its weight is concentrated downward. Therefore, It shall be supported by a rigid structure so as to maintain its original shape.

하지만, 하기 선행기술문헌에 개시된 종래기술에 따른 보 거푸집 지지장치는, 콘크리트 타설 작업을 통하여 보를 만드는 과정에서 거푸집 지지장치의 조립과 해체가 용이하지 않아 작업 공수가 증대되어 작업 시간 증가와 비용이 상승하는 문제점이 있었다.However, the prior art support apparatus disclosed in the following prior art documents is not easy to assemble and disassemble the form support apparatus in the course of making beams through concrete pouring work, .

KRKR 10-2010-011927510-2010-0119275 AA

본 발명은 상술한 종래기술의 문제점을 해결하기 위한 것으로, 수직폼의 하단을 연속적으로 지지할 수 있는 레일을 구비함으로써, 콘크리트 타설 작업을 통하여 보를 만드는 과정에서 견고한 조립이 가능하고, 시공이 간단한 거푸집 지지장치를 제공하기 위한 것이다.
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems of the prior art and it is an object of the present invention to provide a rail structure capable of continuously supporting a lower end of a vertical foam, So as to provide a supporting device.

본 발명의 실시예에 따른 거푸집 지지장치는 X축 방향으로 연장되어 형성되고, 내부에 길이방향으로 제1 홈이 형성된 보멍에재, Y축 방향으로 연장되어 형성되고 수직폼의 일면을 지지하는 제1 지지프레임, 및 상기 제1 지지프레임의 하단에서 X축 방향으로 연장되어 형성되고 상기 제1 홈에 삽입되어 슬라이딩하면서 이동가능한 제2 지지프레임을 포함하고, 상기 보멍에재에 2개가 마주보도록 배치된 지지구조체, 및 Z축 방향으로 연장되어 형성되고, 상기 제1 지지프레임의 측면과 상기 제2 지지프레임의 상면에 접촉하도록 배치되며, 상기 수직폼의 하단을 지지하는 레일을 포함한다.The die support apparatus according to an embodiment of the present invention includes a bobbin member extending in the X-axis direction and having a first groove formed therein in the longitudinal direction, a bobbin member extending in the Y-axis direction, And a second support frame extending in the X-axis direction at a lower end of the first support frame, the second support frame being inserted into the first groove and being slidable while being movable, And a rail which is formed to extend in the Z-axis direction and is arranged to contact the side surface of the first support frame and the upper surface of the second support frame, and supports the lower end of the vertical foam.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 보멍에재에는 다수의 제1 홀이 형성되고, 상기 제2 지지프레임에는 제2 홀이 형성되며, 상기 보멍에재에 상기 제2 지지프레임이 고정되도록, 상기 제1 홀과 상기 제2 홀에 삽입되는 고정핀을 더 포함한다.In the die support apparatus according to the embodiment of the present invention, a plurality of first holes are formed in the bobbin, a second hole is formed in the second support frame, and the second support frame And a fixing pin inserted into the first hole and the second hole to fix the fixing hole.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 레일은, 일측면이 상기 제1 지지프레임에 체결되고, 상면이 상기 수직폼의 하단과 체결되며, 관형으로 연장되는 제1 부재, 및 상기 제1 부재의 타측면에 관형으로 형성되고, 내부에 길이방향으로 제2 홈이 형성되어, 상기 제2 홈에 제1 막대형부재가 삽입되는 제2 부재를 포함한다.In the form support apparatus according to an embodiment of the present invention, the rail includes a first member having one side fixed to the first support frame, an upper surface coupled to a lower end of the vertical foam and extending in a tubular shape, And a second member formed in a tubular shape on the other side surface of the first member and having a second groove formed therein in the longitudinal direction, into which the first rod-like member is inserted.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 제1 부재의 내부에는 분할벽을 기준으로 제1 체결홈과 제2 체결홈이 형성되고, 상기 제1 체결홈에 삽입되는 제1 체결수단에 의해서 상기 레일과 제1 지지프레임이 체결되고, 상기 제2 체결홈에 삽입되는 제2 체결수단에 의해서 상기 레일과 상기 수직폼이 체결된다.In the die support device according to the embodiment of the present invention, the first fastening groove and the second fastening groove are formed in the first member with reference to the dividing wall, and the first fastening means The rail and the vertical frame are fastened together by the second fastening means which is inserted into the second fastening groove.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 제1 부재의 일측면에는 상기 제1 지지프레임과 마주보는 방향으로 상기 제1 체결홈을 개방시키는 제1 입구가 형성되고, 상기 제1 입구에는 상기 제1 체결홈보다 폭이 좁아지도록 돌출된 제1 걸림부가 형성되며, 상기 제1 부재의 상면에는 상기 수직폼과 마주보는 방향으로 상기 제2 체결홈을 개방시키는 제2 입구가 형성되고, 상기 제1 체결수단은 일단이 상기 제1 체결홈에 삽입되어 상기 제1 걸림부에 걸리고, 상기 제2 체결수단은 일단이 상기 제2 입구를 통해서 상기 제2 체결홈에 삽입된다.In the die support device according to the embodiment of the present invention, a first inlet is formed at one side of the first member to open the first fastening groove in a direction facing the first support frame, A second coupling portion is formed on an upper surface of the first member so as to open the second coupling groove in a direction opposite to the vertical foam, One end of the first fastening means is inserted into the first fastening groove and engaged with the first fastening portion, and one end of the second fastening means is inserted into the second fastening groove through the second inlet.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 레일은, 상기 제1 부재의 일측면의 상단으로부터 상측으로 연장되고, 말단에 상기 수직폼 방향으로 돌출된 돌기부가 형성된 연장부를 더 포함하며, 상기 돌기부는 상기 수직폼의 일면에 형성된 지지홈에 삽입된다.The rail further includes an extension portion extending upward from an upper end of one side of the first member and having a protrusion protruding in the vertical foam direction at a distal end thereof, The protrusion is inserted into a support groove formed on one surface of the vertical foam.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 제2 홈에 삽입된 상기 제1 막대형부재의 상측에는 제1 플레이트형부재가 배치되며, 상기 수직폼의 타면에는 제2 플레이트형부재가 배치된다.In the die support apparatus according to the embodiment of the present invention, a first plate member is disposed above the first rod member inserted in the second groove, and a second plate member is provided on the other surface of the vertical foam .

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 수직폼의 상단에는 빔을 지지하는 브라켓이 체결된다.In the form support apparatus according to an embodiment of the present invention, a bracket for supporting a beam is fastened to an upper end of the vertical foam.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 브라켓은, 상기 수직폼의 상단에 체결되고, 일측면이 상기 수직폼의 타면에 배치된 제2 플레이트형부재를 지지하는 본체, 상기 빔의 말단에 형성된 후크부가 걸리도록, 상기 본체의 상면으로부터 돌출된 돌출부, 및 상기 돌출부보다 상기 제1 지지프레임에서 먼 방향에 배치되고, 상기 본체의 상면으로부터 상측으로 연장된 격벽을 포함하고, 상기 본체의 상면과 상기 격벽은 제2 막대형부재를 지지하며, 상기 제2 막대형부재는 상기 수직폼의 타면에 배치된 상기 제2 플레이트형부재를 지지하고, 상기 빔의 상면에 배치된 제3 플레이트형부재를 지지한다.The bracket includes a main body which is fastened to an upper end of the vertical foam and has a side supporting a second plate member disposed on the other side of the vertical foam, And a partition wall extending upward from the upper surface of the main body and disposed in a direction farther from the first support frame than the protrusion, Wherein the upper surface and the partition wall support a second rod member, the second rod member supports the second plate member disposed on the other surface of the vertical foam, and a third plate member Thereby supporting the member.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 제1 지지프레임은, 내부에 Y축 방향으로 공간이 형성된 고정프레임, 상기 공간에 삽입되어, Y축 방향으로 슬라이딩가능한 이동프레임, 및 상기 이동프레임을 정지시키는 정지수단을 포함한다.The first supporting frame may include a fixed frame having a space formed therein in the Y axis direction, a movable frame inserted in the space and slidable in the Y axis direction, And stop means for stopping the frame.

본 발명의 실시예에 따른 거푸집 지지장치에 있어서, 상기 정지수단은, 상기 고정프레임의 상단에 배치되고, 마주보는 2개의 개구부가 형성된 지지부, 및 상기 지지부에 형성된 2개의 상기 개구부에 삽입되고, 일방향으로 갈수록 너비가 증가하는 쇄기형부재를 포함하고, 상기 쇄기형부재를 타방향으로 이동시키면, 상기 쇄기형부재가 상기 이동프레임의 측면을 가압하여 이동프레임을 정지시킨다.
In the die support apparatus according to the embodiment of the present invention, the stop means includes a support portion which is disposed at the upper end of the fixed frame and in which two opposed openings are formed, and a support portion inserted into the two openings formed in the support portion, And the wedge-shaped member presses the side surface of the movable frame to stop the movable frame when the wedge-shaped member is moved in the other direction.

본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이다.The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings.

이에 앞서 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이고 사전적인 의미로 해석되어서는 아니되며, 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합되는 의미와 개념으로 해석되어야만 한다.
Prior to that, terms and words used in the present specification and claims should not be construed in a conventional and dictionary sense, and the inventor may properly define the concept of the term in order to best explain its invention It should be construed as meaning and concept consistent with the technical idea of the present invention.

본 발명에 따르면, 수직폼의 하단을 연속적으로 지지할 수 있는 레일을 구비함으로써, 콘크리트 타설 작업을 통하여 보를 만드는 과정에서 견고한 조립이 가능하고, 시공이 간단한 장점이 있다.
According to the present invention, by providing a rail capable of continuously supporting the lower end of the vertical foam, it is possible to assemble rigidly in the course of making beams through concrete pouring work, and has a merit of simple construction.

도 1은 본 발명의 실시예에 따른 거푸집 지지장치의 사시도,
도 2는 본 발명의 실시예에 따른 거푸집 지지장치의 단면도,
도 3 내지 도 4는 도 1에 도시된 지지구조체의 사시도, 및
도 5 내지 도 6은 도 3 내지 도 4에 도시된 고정프레임, 이동프레임, 및 정지수단의 단면도이다.
1 is a perspective view of a die support apparatus according to an embodiment of the present invention,
2 is a cross-sectional view of a die support apparatus according to an embodiment of the present invention,
Figures 3 to 4 are perspective views of the support structure shown in Figure 1, and
5 to 6 are sectional views of the fixed frame, the movable frame, and the stopping means shown in Figs. 3 to 4. Fig.

본 발명의 목적, 특정한 장점들 및 신규한 특징들은 첨부된 도면들과 연관되어지는 이하의 상세한 설명과 바람직한 실시예들로부터 더욱 명백해질 것이다. 본 명세서에서 각 도면의 구성요소들에 참조번호를 부가함에 있어서, 동일한 구성 요소들에 한해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 번호를 가지도록 하고 있음에 유의하여야 한다. 또한, "제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위해 사용되는 것으로, 구성요소가 상기 용어들에 의해 제한되는 것은 아니다. 이하, 본 발명을 설명함에 있어서, 본 발명의 요지를 불필요하게 흐릴 수 있는 관련된 공지 기술에 대한 상세한 설명은 생략한다.BRIEF DESCRIPTION OF THE DRAWINGS The objectives, specific advantages and novel features of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG. It should be noted that, in the present specification, the reference numerals are added to the constituent elements of the drawings, and the same constituent elements are assigned the same number as much as possible even if they are displayed on different drawings. Also, the terms "first "," second ", and the like are used to distinguish one element from another element, and the element is not limited thereto. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS In the following description of the present invention, detailed description of related arts which may unnecessarily obscure the gist of the present invention will be omitted.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시형태를 상세히 설명하기로 한다.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

기본적으로, 본 실시예에 따른 거푸집 지지장치는 용도가 특별히 한정되는 것은 아니지만, 콘크리트 보를 타설하는데 이용될 수 있다. 따라서, 본 실시예에 따른 거푸집 지지장치는 콘크리트 보를 타설하는 예를 중심으로 기술하도록 한다.
Basically, the form support apparatus according to the present embodiment is not particularly limited in use, but can be used for installing a concrete beam. Therefore, the die support apparatus according to the present embodiment is described mainly with reference to an example in which a concrete beam is laid.

도 1은 본 발명의 실시예에 따른 거푸집 지지장치의 사시도이고, 도 2는 본 발명의 실시예에 따른 거푸집 지지장치의 단면도이다.FIG. 1 is a perspective view of a die support apparatus according to an embodiment of the present invention, and FIG. 2 is a sectional view of a die support apparatus according to an embodiment of the present invention.

도 1 내지 도 2에 도시된 바와 같이, 본 실시예에 따른 거푸집 지지장치는 X축 방향으로 연장되어 형성되고, 내부에 길이방향으로 제1 홈(110)이 형성된 보멍에재(100), Y축 방향으로 연장되어 형성되고 수직폼(400)의 일면을 지지하는 제1 지지프레임(210), 및 제1 지지프레임(210)의 하단에서 X축 방향으로 연장되어 형성되고 제1 홈(110)에 삽입되어 슬라이딩하면서 이동가능한 제2 지지프레임(220)을 포함하고, 보멍에재(100)에 2개가 마주보도록 배치된 지지구조체(200), 및 Z축 방향으로 연장되어 형성되고, 제1 지지프레임(210)의 측면과 제2 지지프레임(220)의 상면에 접촉하도록 배치되며, 수직폼(400)의 하단을 지지하는 레일(300)을 포함한다.
1 and 2, the die support apparatus according to the present embodiment includes a bobbin member 100 having a first groove 110 formed in its longitudinal direction and extending in the X-axis direction, a Y A first support frame 210 extending in the axial direction and supporting one side of the vertical foam 400 and a first support frame 210 extending in the X axis direction at the lower end of the first support frame 210, And a second support frame 220 which is inserted into the first support frame 220 so as to be slidable and movable. The support structure 200 includes two support structures 200 disposed on the support member 100 so as to face each other, And a rail 300 that is disposed to contact the side surface of the frame 210 and the upper surface of the second support frame 220 and supports the lower end of the vertical foam 400.

상기 보멍에재(100)는 콘크리트 보의 하부를 지지하고, 지지구조체(200)가 슬라이딩 방식으로 이동할 공간을 제공하는 역할을 수행한다. 여기서, 보멍에재(100)는 X축 방향으로 연장되고, 내부에 길이방향으로 제1 홈(110)이 형성된다(도 1 참조). 이러한 제1 홈(110)에는 지지구조체(200)가 삽입되어 X 방향으로 슬라이딩하면서 이동할 수 있다. 또한, 보멍에재(100)의 측면에는 다수의 제1 홀(120)이 형성될 수 있다(도 2 참조). 이러한 제1 홀(120)은 지지구조체(200)의 제2 홀(221)과 정렬된 후, 고정핀(130)이 삽입될 수 있다. 이와 같이, 제1 홀(120)과 제2 홀(221)에 고정핀(130)이 삽입되면, 지지구조체(200)가 이동하지 않고 보멍에재(100)에 고정될 수 있다. 추가적으로, 보멍에재(100)의 하면에는 전체적인 거푸집 지지장치를 지지하는 서포트 등이 결합될 수 있는 결합구(140)가 구비될 수 있다. 또한, 거푸집 지지장치가 시공되기 전에 결합구(140)가 바닥으로부터 이격되도록, 보멍에재(100)의 하면에는 결합구(140)보다 더 돌출된 지지구(150)가 구비될 수 있다. 여기서, 지지구(150)는 거푸집 지지장치가 시공 전에 결합구(140)가 손상되는 것을 방지하는 역할을 수행한다.
The bush member 100 supports a lower portion of the concrete beam and provides a space for the support structure 200 to move in a sliding manner. Here, the bush member 100 extends in the X-axis direction, and a first groove 110 is formed in the longitudinal direction inside the bush member 100 (see FIG. 1). The support structure 200 is inserted into the first groove 110 and can be moved while sliding in the X direction. In addition, a plurality of first holes 120 may be formed on the side surface of the bamboo member 100 (see FIG. 2). After the first holes 120 are aligned with the second holes 221 of the support structure 200, the fixing pins 130 may be inserted. When the fixing pin 130 is inserted into the first hole 120 and the second hole 221 as described above, the support structure 200 can be fixed to the bamboo member 100 without moving. In addition, a coupling hole 140 may be provided on the lower surface of the bamboo member 100, to which a support or the like for supporting the entire form support apparatus can be coupled. In addition, a support 150 may be provided on the lower surface of the shaft member 100 so that the coupling member 140 is spaced from the floor before the form support apparatus is installed. Here, the support member 150 serves to prevent the form support apparatus from damaging the coupling member 140 before installation.

상기 지지구조체(200)는 최종적인 콘크리트 보의 너비를 조절하고, 수직폼(400)을 지지하는 역할을 수행한다. 여기서, 지지구조체(200)는 제1 지지프레임(210)과 제2 지지프레임(220)을 포함한다. 구체적으로, 제1 지지프레임(210)은 Y축 방향으로 연장되어 형성되고 수직폼(400)의 일면을 지지한다. 또한, 제2 지지프레임(220)은 제1 지지프레임(210)의 하단에서 X축 방향(제1 지지프레임(210)의 하단을 기준으로 +X 축 방향과 -X축 방향 모두)으로 연장되어 형성되고, 보멍에재(100)의 제1 홈(110, 도 1 참조)에 삽입되어 슬라이딩하면서 이동가능하다. 이때, 제1 지지프레임(210)과 제2 지지프레임(220)을 포함하는 지지구조체(200)는 보멍에재(100) 상에서 2개가 마주보도록 배치될 수 있고, 최종적으로 2개의 지지구조체(200) 사이의 공간에는 콘크리트 보가 시공될 수 있다. 따라서, 제2 지지프레임(220)이 보멍에재(100)의 제1 홈(110)을 따라 슬라이딩하면서 이동시킴으로써, 2개의 지지구조체(200) 각각의 제1 지지프레임(210) 사이의 거리를 조절하면, 시공될 콘크리트 보의 너비를 조절할 수 있다. 한편, 제2 지지프레임(220)의 측면에는 제2 홀(221)이 형성될 수 있다(도 2 참조). 이때, 제2 지지프레임(220)의 제2 홀(221)과 보멍에재(100)의 다수의 제1 홀(120) 중 어느 하나를 정렬시킨 후, 제2 홀(221)과 제1 홀(120)에 고정핀(130)을 삽입시키면, 보멍에재(100)에 제2 지지프레임(220)을 고정시킬 수 있다. 한편, 지지구조체(200)는 제1 지지프레임(210)와 제2 지지프레임(220)이 만나는 모서리 영역에 구비된 삼각형상의 보강부재(230)를 더 포함할 수 있다. 여기서, 보강부재(230)는 제1 지지프레임(210)이 수직폼(400)으로부터 하중을 인가받을 때 제1 지지프레임(210)을 지지하는 역할을 수행할 수 있다.
The support structure 200 controls the width of the final concrete beam and supports the vertical foam 400. Here, the support structure 200 includes a first support frame 210 and a second support frame 220. Specifically, the first support frame 210 is formed to extend in the Y-axis direction and supports one side of the vertical foam 400. The second support frame 220 extends in the X-axis direction (both the + X-axis direction and the -X-axis direction with respect to the lower end of the first support frame 210) at the lower end of the first support frame 210 And is inserted into the first groove 110 (see FIG. 1) of the bobbin 100, and is slidable while being movable. At this time, the support structure 200 including the first support frame 210 and the second support frame 220 may be disposed on the bobbin 100 so as to face each other, and finally the two support structures 200 A concrete beam can be applied to the space between them. The second support frame 220 slides along the first groove 110 of the bobbin member 100 so that the distance between the first support frames 210 of each of the two support structures 200 is By adjusting, the width of the concrete beam to be constructed can be adjusted. Meanwhile, a second hole 221 may be formed on a side surface of the second support frame 220 (see FIG. 2). At this time, after aligning the second holes 221 of the second support frame 220 and the first holes 120 of the bobbin 100, the second holes 221, The second support frame 220 can be fixed to the bobbin member 100 by inserting the fixing pin 130 into the first support frame 120. The supporting structure 200 may further include a triangular-shaped reinforcing member 230 provided in an edge area where the first supporting frame 210 and the second supporting frame 220 meet. Here, the reinforcing member 230 may support the first support frame 210 when the first support frame 210 receives a load from the vertical foam 400.

상기 레일(300)은 수직폼(400)의 하단을 지지하는 역할을 수행한다. 여기서, 레일(300)은 Z축 방향으로 연장되어 형성되고(도 1 참조), 제1 지지프레임(210)의 측면과 제2 지지프레임(220)의 상면에 접촉하도록 배치된다. 이때, 레일(300)은 Z축 방향으로 가면서 다수의 지지구조체(200)와 체결된다. 따라서, 레일(300)에 의해서 Z축 방향으로 다수의 지지구조체(200)와 다수의 보멍에재(100)가 일체로 결합될 수 있으므로, 견조한 조립이 가능하고, 시공이 간단한 장점이 있다. 구체적으로, 레일(300)은 제1 부재(310)와 제2 부재(320)가 X축 방향으로 나란히 형성될 수 있다. 여기서, 제1 부재(310)는 일측면이 제1 지지프레임(210)에 체결되고, 상면이 수직폼(400)의 하단과 체결되며, 관형으로 연장된다. 또한, 제2 부재(320)는 제1 부재(310)의 타측면에 관형으로 형성되고, 내부에 길이방향으로 제2 홈(323)이 형성된다. 이때, 제1 부재(310)와 제2 부재(320)는 별도로 형성되어 결합될 수도 있지만, 일체로 형성되는 것이 바람직하다. 제1 부재(310)와 제2 부재(320)를 구체적으로 살펴보면, 제1 부재(310)는 내부에 분할벽(311)을 기준으로 제1 체결홈(313)과 제2 체결홈(316)이 형성된다. 이때, 도 2의 확대도에 도시된 바와 같이, 제1 체결홈(313)에 삽입되는 제1 체결수단(315)에 의해서 레일(300)과 제1 지지프레임(210)이 체결되고, 제2 체결홈(316)에 삽입되는 제2 체결수단(318)에 의해서 레일(300)과 수직폼(400)이 체결될 수 있다. 즉, 제1 체결홈(313)은 제1 지지프레임(210)과의 체결을 위해서 형성되고, 제2 체결홈(316)은 수직폼(400)과의 체결을 위해서 형성되는 것이다. 더욱 구체적으로, 제1 부재(310)의 일측면에는 제1 지지프레임(210)과 마주보는 방향으로 상기 제1 체결홈(313)을 개방시키는 제1 입구(314)가 형성되고, 제1 입구(314)에는 제1 체결홈(313)보다 폭이 좁아지도록 돌출된 제1 걸림부(314a)가 형성된다. 이때, 제1 체결수단(315)은 일단이 제1 체결홈(313)에 삽입되어 제1 걸림부(314a)에 걸리고, 타단이 제1 지지프레임(210)에 체결된다. 예를 들어, 제1 체결수단(315)은 웨지핀(wedge pin)일 수 있고, 이 경우 웨지핀의 헤드(일단)가 제1 체결홈(313)에 삽입되어 제1 걸림부(314a)에 걸리고, 웨지핀의 바디(타단)에 제1 지지프레임(210)으로부터 돌출된 체결돌기(211)가 삽입되고, 또 다른 웨지핀(315a)이 체결돌기(211)의 관통홀에 삽입되어, 웨지핀이 체결돌기(211)에 고정된다(도 1의 확대도 참조). 이러한 구성을 통해서, 제1 체결수단(315)은 제1 지지프레임(210)에 체결될 수 있다. 또한, 제1 부재(310)의 상면에는 수직폼(400)과 마주보는 방향으로 제2 체결홈(316)을 개방시키는 제2 입구(317)가 형성된다(도 2의 확대도 참조). 이때, 제2 체결수단(318)은 일단이 제2 입구(317)를 통해서 제2 체결홈(316)에 삽입되고, 타단이 수직폼(400)에 체결된다. 예를 들어, 제2 체결수단(318)은 원형핀일 수 있고, 이 경우 원형핀의 바디(일단)가 제2 입구(317)를 통해서 제2 체결홈(316)에 삽입되고, 원형핀의 헤드(타단)이 수직폼(400)에 형성된 체결홀(420)에 걸려 수직폼(400)에 체결될 수 있다. 여기서, 제2 입구(317)는 Z축 방향으로 연장되므로, 제2 체결수단(318)은 Z축 방향으로 이동할 수 있고, 그에 따라 수직폼(400) 역시 레일(300)에 대해서 Z축 방향으로 이동할 수 있다. 추가적으로, 레일(300)은 수직폼(400)을 안정적으로 지지하기 위해서 연장부(330)를 더 포함할 수 있다. 여기서, 연장부(330)는 제1 부재(310)의 일측면의 상단으로부터 상측으로 연장되고, 말단에 수직폼(400) 방향(도면상 왼쪽 레일(300)을 기준으로 +X축 방향)으로 돌출된 돌기부(335)가 형성된다. 이러한 연장부(330)의 돌기부(335)는 수직폼(400)의 일면에 함몰되어 형성된 지지홈(410)에 삽입될 수 있다. 이와 같이, 연장부(330)의 돌기부(335)가 수직폼(400)의 지지홈(410)에 삽입됨으로써, 수직폼(400)은 레일(300)로부터 임의의 분리되거나, 또는 레일(300)에 대해서 기울어지는 것을 방지할 수 있다.The rail 300 supports the lower end of the vertical foam 400. Here, the rail 300 is formed so as to extend in the Z-axis direction (see FIG. 1) and is arranged to contact the side surface of the first support frame 210 and the upper surface of the second support frame 220. At this time, the rail 300 is fastened to the support structure 200 in the Z-axis direction. Therefore, since a plurality of support structures 200 and a plurality of bamboo members 100 can be integrally joined to each other in the Z-axis direction by the rail 300, it is possible to assemble solidly and simplify construction. Specifically, the first member 310 and the second member 320 of the rail 300 may be formed in parallel to each other in the X-axis direction. Here, the first member 310 is fastened to the first support frame 210 at one side, and the upper surface of the first member 310 is fastened to the lower end of the vertical foam 400 and extends in a tubular form. The second member 320 is formed in a tubular shape on the other side of the first member 310, and a second groove 323 is formed in the longitudinal direction. At this time, the first member 310 and the second member 320 may be separately formed and coupled together, but they are preferably integrally formed. The first member 310 includes a first coupling groove 313 and a second coupling groove 316 with respect to the partition wall 311. The first coupling groove 313 and the second coupling groove 316 are formed in the first member 310, . 2, the rail 300 and the first support frame 210 are fastened by the first fastening means 315 inserted into the first fastening groove 313, The rail 300 and the vertical foam 400 can be fastened by the second fastening means 318 inserted into the fastening groove 316. [ That is, the first fastening groove 313 is formed for fastening with the first support frame 210, and the second fastening groove 316 is formed for fastening with the vertical foam 400. More specifically, a first inlet 314 for opening the first fastening groove 313 in a direction facing the first support frame 210 is formed on one side of the first member 310, (314) is formed with a first latching part (314a) protruding so as to be narrower than the first engagement groove (313). One end of the first fastening means 315 is inserted into the first fastening groove 313 to be caught by the first fastening portion 314a and the other end is fastened to the first support frame 210. For example, the first fastening means 315 may be a wedge pin. In this case, the head (one end) of the wedge pin is inserted into the first fastening groove 313 and is inserted into the first fastening portion 314a And a wedge pin 211 protruding from the first support frame 210 is inserted into the body of the wedge pin (the other end), and another wedge pin 315a is inserted into the through hole of the fastening protrusion 211, The pin is fixed to the fastening protrusion 211 (see an enlarged view of Fig. 1). With this configuration, the first fastening means 315 can be fastened to the first support frame 210. A second inlet 317 is formed on the upper surface of the first member 310 to open the second coupling groove 316 in a direction facing the vertical foam 400 (see an enlarged view of FIG. 2). At this time, one end of the second fastening means 318 is inserted into the second fastening groove 316 through the second inlet 317, and the other end is fastened to the vertical foam 400. For example, the second fastening means 318 may be a circular pin, in which case the body (one end) of the circular pin is inserted into the second fastening groove 316 through the second inlet 317, (The other end) may be caught in the fastening hole 420 formed in the vertical foam 400 and fastened to the vertical foam 400. Here, since the second inlet 317 extends in the Z-axis direction, the second fastening means 318 can move in the Z-axis direction, so that the vertical foam 400 can move in the Z-axis direction with respect to the rail 300 Can be moved. In addition, the rail 300 may further include an extension 330 to stably support the vertical foam 400. Here, the extension part 330 extends upward from the upper end of one side of the first member 310, and extends in the direction of the vertical foam 400 (in the + X-axis direction with respect to the left rail 300 in the drawing) A protruded protrusion 335 is formed. The protrusion 335 of the extension 330 may be inserted into the support groove 410, which is recessed on one side of the vertical foam 400. As such, the protrusion 335 of the extension 330 is inserted into the support groove 410 of the vertical foam 400, so that the vertical foam 400 can be removed from the rail 300, Can be prevented.

한편, 제2 부재(320)의 제2 홈(323)에는 제1 막대형부재(325)가 삽입될 수 있다. 이때, 제1 막대형부재(325)는 각목일 수 있고, 제1 막대형부재(325)의 상측에는 제1 플레이트형부재(500)가 배치될 수 있다. 즉, 제1 막대형부재(325)로 제1 플레이트형부재(500)의 양단을 지지할 수 있다. 또한, 수직폼(400)의 타면(제1 지지프레임(210)으로 지지되는 일면의 반대면)에는 제2 플레이트형부재(520)가 배치될 수 있다. 즉, 수직폼(400)으로 제2 플레이트형부재(520)를 지지할 수 있다. 여기서, 제1 막대형부재(325)는 각목일 수 있고, 제1 플레이트형부재(500)는 합판일 수 있다. 따라서, 못 등을 이용하여 제1 플레이트형부재(500)를 제1 막대형부재(325)에 고정할 수 있다. 이와 유사하게, 수직폼(400)의 상측에 배치되는 후술할 제2 막대형부재(635)는 각목일 수 있고, 제2 플레이트형부재(520)는 합판일 수 있다. 따라서, 못 등을 이용하여 제2 플레이트형부재(520)를 제2 막대형부재(635)에 고정할 수 있다. 추가적으로, 제1 플레이트형부재(500)를 안정적으로 지지하기 위해서, 보멍에재(100)에 마주보도록 배치된 2개의 제1 막대형부재(325) 사이에는 각관(510)이 배치될 수 있다. 이때, 각관(510)은 레일(300)과 평행하게 Z축 방향으로 연장되어 형성될 수 있다.On the other hand, the first bar member 325 may be inserted into the second groove 323 of the second member 320. At this time, the first bar-shaped member 325 may be an individual piece, and the first plate-like member 500 may be disposed above the first bar-shaped member 325. That is, both ends of the first plate member 500 can be supported by the first bar member 325. In addition, the second plate member 520 may be disposed on the other surface of the vertical foam 400 (the opposite surface of the one surface supported by the first support frame 210). That is, the second plate member 520 can be supported by the vertical foam 400. Here, the first bar-shaped member 325 may be an individual piece, and the first plate-like member 500 may be a plywood. Therefore, the first plate member 500 can be fixed to the first bar member 325 using a nail or the like. Similarly, a second rod-shaped member 635, which will be described later, disposed on the upper side of the vertical foam 400 may be an individual piece, and the second plate-like member 520 may be a plywood. Therefore, the second plate member 520 can be fixed to the second bar member 635 using a nail or the like. In addition, in order to stably support the first plate-like member 500, a square tube 510 may be disposed between the two first rod-shaped members 325 arranged to face the shaft member 100. At this time, each pipe 510 may extend in the Z-axis direction in parallel with the rail 300.

상술한 제1 플레이트형부재(500)와 제2 플레이트형부재(520)는 전체적으로 "ㄷ"자 형으로 형성되고, 이러한 제1 플레이트형부재(500)와 제2 플레이트형부재(520)로 이루어진 공간에 콘크리트 보를 타설할 수 있는 것이다. 또한, 본 실시예에 따른 거푸집 지지장치는 레일(300)에 구비된 제1 막대형부재(325, 각목)와 각관(510)을 구비하고, 그 위에 제1 플레이트형부재(500, 합판)를 구비함으로써, 종래 기술과 달리 별도의 수평폼이 필요하지 않은 장점이 있다.
The first plate member 500 and the second plate member 520 are formed as a whole in a " C "shape, and the first plate member 500 and the second plate member 520 It is possible to put a concrete beam in space. The die support apparatus according to the present embodiment includes a first bar member 325 and an annular pipe 510 provided on the rail 300 and a first plate member 500 There is an advantage that a separate horizontal foam is not required unlike the prior art.

한편, 수직폼(400)의 상단에는 Z축 방향으로 연장되어 빔(700)을 지지하는 브라켓(600)이 체결될 수 있다. 여기서, 브라켓(600)은 본체(610), 돌출부(620), 및 격벽(630)을 포함할 수 있다. 구체적으로, 본체(610)는 수직폼(400)의 상단에 웨지핀이나 원형핀으로 체결되고, 일측면이 제2 플레이트형부재(520)의 상단을 지지한다. 또한, 돌출부(620)는 본체(610)의 상면으로부터 돌출되어, 빔(700)의 말단에 형성된 후크부(710)가 걸린다. XY 평면을 기준으로 볼 때, 브라켓(600)의 돌출부(620)는 원형으로 형성되고, 빔(700)의 후크부(710)는 돌출부(620)에 대응하도록 반원형으로 형성될 수 있다. 그리고, 격벽(630)은 돌출부(620)보다 제1 지지프레임(210)에서 먼 방향(도면상 왼쪽 브라켓(600)을 기준으로 +X축 방향)에 배치되고, 본체(610)의 상면으로부터 상측으로 연장된다. 따라서, 본체(610)의 상면은 격벽(630)을 기준으로 돌출부(620)가 배치된 영역과 돌출부(620)가 없는 영역으로 분할되고, 돌출부(620)가 없는 영역에는 제2 막대형부재(635)가 배치된다. 이때, 제2 막대형부재(635)는 본체(610)의 상면과 격벽(630)에 의해서 지지될 수 있다. 이러한 제2 막대형부재(635)는 제2 플레이트형부재(520)의 상단을 지지하고, 빔(700)의 상면에 배치되는 제3 플레이트형부재(800)의 말단을 지지할 수 있다. 여기서, 제2 막대형부재(635)는 각목일 수 있고, 제2 플레이트형부재(520)와 제3 플레이트형부재(800)는 합판일 수 있다. 따라서, 못 등을 이용하여 제2 플레이트형부재(520)와 제3 플레이트형부재(800)를 제2 막대형부재(635)에 고정할 수 있다. 참고로, 제3 플레이트형부재(800)의 상측에는 슬라브(slab) 등을 타설할 수 있다.
Meanwhile, a bracket 600 supporting the beam 700 can be fastened to the upper end of the vertical foam 400 in the Z-axis direction. Here, the bracket 600 may include a body 610, a protrusion 620, and a partition 630. Specifically, the main body 610 is fastened to the upper end of the vertical foam 400 with a wedge pin or a circular fin, and one side thereof supports the upper end of the second plate-like member 520. The protrusion 620 protrudes from the upper surface of the main body 610, and hooks 710 formed at the ends of the beam 700 are hooked. The protrusion 620 of the bracket 600 may be formed in a circular shape and the hook portion 710 of the beam 700 may be formed in a semicircular shape corresponding to the protrusion 620 as viewed from the XY plane. The partition wall 630 is disposed in a direction away from the first support frame 210 (in the + X axis direction with respect to the left bracket 600 as viewed in the figure) than the protrusion 620, . The upper surface of the main body 610 is divided into a region in which the protrusion 620 is disposed and a region in which the protrusion 620 is not provided in relation to the partition wall 630. In the region where the protrusion 620 is not provided, 635 are disposed. At this time, the second bar-shaped member 635 can be supported by the upper surface of the main body 610 and the partition wall 630. The second rod-like member 635 supports the upper end of the second plate-like member 520 and can support the end of the third plate-like member 800 disposed on the upper surface of the beam 700. Here, the second rod-like member 635 may be an individual piece, and the second plate-like member 520 and the third plate-like member 800 may be plywood. Therefore, the second plate member 520 and the third plate member 800 can be fixed to the second bar member 635 using a nail or the like. For reference, a slab or the like may be placed on the upper side of the third plate member 800.

도 3 내지 도 4는 도 1에 도시된 지지구조체의 사시도이고, 도 5 내지 도 6은 도 3 내지 도 4에 도시된 고정프레임, 이동프레임, 및 정지수단의 단면도이다.Figs. 3 to 4 are perspective views of the support structure shown in Fig. 1, and Figs. 5 to 6 are sectional views of the fixed frame, the movable frame, and the stopping means shown in Figs.

도 3 내지 도 4에 도시된 바와 같이, 본 실시예에 따른 거푸집 지지장치는 제1 지지프레임(210)의 길이조절이 가능하다. 이와 같이, 제1 지지프레임(210)의 길이조절이 가능하므로, 콘크리트 보의 다양한 Y 방향 길이에 모두 대응할 수 있다. 여기서, 제1 지지프레임(210)은 고정프레임(213), 이동프레임(215), 및 정지수단(217)을 포함할 수 있다. 구체적으로, 고정프레임(213)은 상대적으로 하부에 배치되어 제2 지지프레임(220)과 만나는 것으로, 내부에 Y축 방향으로 공간(213a, 도5 또는 도 6 참조)이 형성된다. 또한, 이동프레임(215)은 고정프레임(213)의 공간(213a)에 삽입되어, Y축 방향으로 슬라이딩가능하다. 이와 같이, 이동프레임(215)이 고정프레임(213)의 공간(213a) 내에서 슬라이딩함으로써, 전체적인 제1 지지프레임(210)의 길이조절이 가능하다. 그리고, 정지수단(217)은 제1 지지프레임(210)의 길이조절 후, 이동프레임(215)이 고정프레임(213)의 공간(213a) 내에서 슬라이딩하는 것을 방지하는 것으로, 이동프레임(215)을 특정위치에 정지시킨다. 더욱 구체적으로, 정지수단(217)은 지지부(128)와 쇄기형부재(219)를 포함할 수 있다. 여기서, 지지부(128)는 고정프레임(213)의 상단에 배치되고, 이동프레임(215)의 측면을 둘러싸도록 "ㄷ"자 형으로 형성되며, 마주보는 2개의 개구부(218a)가 Z축 방향으로 관통되어 형성된다(도 3 또는 도 4 참조). 또한, 도 5 내지 도 6에 도시된 바와 같이, 쇄기형부재(219)는 지지부(128)에 형성된 2개의 개구부(218a)에 삽입되고 일방향(A)으로 갈수록 너비가 증가하는 바디부(219a) 및 바디부(219a)의 양단에 형성되어 지지부(128)에 형성된 2개의 개구부(218a)에 각각 걸리는 2개의 헤드부(219b)를 포함할 수 있다. 따라서, 쇄기형부재(219)를 타방향(B)으로 이동시키면(도 6 참조), 일방향(A)으로 갈수록 너비가 증가하는 바디부(219a)가 이동프레임(215)의 측면을 가압함으로써, 이동프레임(215)을 정지시킬 수 있다. 역으로, 쇄기형부재(219)를 일방향(A)으로 이동시키면(도 5 참조), 일방향(A)으로 갈수록 너비가 증가하는 바디부(219a)가 이동프레임(215)의 측면을 가압하지 않으므로, 이동프레임(215)을 고정프레임(213)의 공간(213a) 내에서 슬라이딩시킬 수 있다. 또한, 쇄기형부재(219)를 일방향(A)이나 타방향(B)으로 이동시키기 위해서, 헤드부(219b)를 망치 등의 타격부재로 타격할 수 있다. 한편, 쇄기형부재(219)는 개구부(218a)에 걸리는 헤드부(219b)가 구비되므로, 쇄기형부재(219)를 일방향(A)이나 타방향(B)으로 이동시키더라도, 쇄기형부재(219)가 지지부(128)의 개구부(218a)로부터 완전히 빠지는 것을 방지할 수 있다.
As shown in FIGS. 3 to 4, the form support apparatus according to the present embodiment is capable of adjusting the length of the first support frame 210. Since the length of the first support frame 210 can be adjusted as described above, it is possible to cope with the various Y-direction lengths of the concrete beams. Here, the first supporting frame 210 may include a fixed frame 213, a moving frame 215, and a stopping means 217. Specifically, the stationary frame 213 is disposed at a relatively lower portion to meet with the second support frame 220, and a space 213a (see FIG. 5 or 6) is formed in the Y-axis direction. The movable frame 215 is inserted into the space 213a of the fixed frame 213 and is slidable in the Y-axis direction. Thus, the length of the first support frame 210 as a whole can be adjusted by sliding the movable frame 215 in the space 213a of the fixed frame 213. [ The stopping means 217 prevents the moving frame 215 from sliding in the space 213a of the fixed frame 213 after the length of the first supporting frame 210 is adjusted. Is stopped at a specific position. More specifically, the stop means 217 may include a support 128 and a wedge member 219. Here, the support portion 128 is disposed at the upper end of the fixed frame 213 and is formed in a "C" shape so as to surround the side surface of the movable frame 215. Two opposed openings 218a extend in the Z- (See FIG. 3 or FIG. 4). 5 to 6, the wedge-shaped member 219 has a body portion 219a inserted into two openings 218a formed in the support portion 128 and increasing in width toward the one direction A, And two head portions 219b formed at both ends of the body portion 219a and engaged with two opening portions 218a formed in the support portion 128. [ Therefore, when the wedge-shaped member 219 is moved in the other direction B (see Fig. 6), the body portion 219a whose width increases toward the one direction A presses the side surface of the moving frame 215, The moving frame 215 can be stopped. Conversely, when the wedge-shaped member 219 is moved in the one direction A (see Fig. 5), the body portion 219a whose width increases toward the one direction A does not press the side surface of the moving frame 215 , The movable frame 215 can be slid in the space 213a of the fixed frame 213. [ In order to move the wedge-shaped member 219 in the one direction A or the other direction B, the head portion 219b may be hit with a striking member such as a hammer. On the other hand, since the wedge-shaped member 219 is provided with the head portion 219b engaged with the opening 218a, even if the wedge-shaped member 219 is moved in the one direction A or the other direction B, 219 from completely disengaging from the opening 218a of the support portion 128 can be prevented.

이상 본 발명을 구체적인 실시예를 통하여 상세히 설명하였으나, 이는 본 발명을 구체적으로 설명하기 위한 것으로, 본 발명은 이에 한정되지 않으며, 본 발명의 기술적 사상 내에서 당 분야의 통상의 지식을 가진 자에 의해 그 변형이나 개량이 가능함이 명백하다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the same is by way of illustration and example only and is not to be construed as limiting the present invention. It is obvious that the modification or improvement is possible.

본 발명의 단순한 변형 내지 변경은 모두 본 발명의 영역에 속하는 것으로 본 발명의 구체적인 보호 범위는 첨부된 특허청구범위에 의하여 명확해질 것이다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

100: 보멍에재 110: 제1 홈
120: 제1 홀 130: 고정핀
140: 결합구 150: 지지구
200: 지지구조체 210: 제1 지지프레임
211: 체결돌기 213: 고정프레임
213a: 공간 215: 이동프레임
217: 정지수단 218: 지지부
218a: 개구부 219: 쇄기형부재
219a: 바디부 219b: 헤드부
220: 제2 지지프레임 221: 제2 홀
230: 보강부재 300: 레일
310: 제1 부재 311: 분할벽
313: 제1 체결홈 314: 제1 입구
314a: 제1 걸림부 315: 제1 체결수단
315a: 또 다른 웨지핀 316: 제2 체결홈
317: 제2 입구 318: 제2 체결수단
320: 제2 부재 323: 제2 홈
325: 제1 막대형부재 330: 연장부
335: 돌기부 400: 수직폼
410: 지지홈 420: 체결홀
500: 제1 플레이트형부재 510: 각관
520: 제2 플레이트형부재 600: 브라켓
610: 본체 620: 돌출부
630: 격벽 635: 제2 막대형부재
700: 빔 710: 후크부
800: 제3 플레이트형부재 A: 일방향
B: 타방향
100: yoke 110: first groove
120: first hole 130: fixing pin
140: Coupling port 150:
200: support structure 210: first support frame
211: fastening protrusion 213: fastening frame
213a: space 215: moving frame
217: stop means 218:
218a: opening 219: wedge member
219a: Body part 219b: Head part
220: second support frame 221: second hole
230: reinforcing member 300: rail
310: first member 311: partition wall
313: first fastening groove 314: first entrance
314a: first fastening portion 315: first fastening means
315a: another wedge pin 316: second fastening groove
317: second inlet 318: second fastening means
320: second member 323: second groove
325: first loudspeaker member 330: extension member
335: protrusion part 400: vertical foam
410: support groove 420: fastening hole
500: first plate member 510:
520: second plate member 600: bracket
610: main body 620:
630: partition wall 635: second bar member
700: Beam 710: Hook part
800: Third plate member A: One-way
B: Another direction

Claims (11)

X축 방향으로 연장되어 형성되고, 내부에 길이방향으로 제1 홈이 형성된 보멍에재;
Y축 방향으로 연장되어 형성되고 수직폼의 일면을 지지하는 제1 지지프레임, 및 상기 제1 지지프레임의 하단에서 X축 방향으로 연장되어 형성되고 상기 제1 홈에 삽입되어 슬라이딩하면서 이동가능한 제2 지지프레임을 포함하고, 상기 보멍에재에 2개가 마주보도록 배치된 지지구조체; 및
Z축 방향으로 연장되어 형성되고, 상기 제1 지지프레임의 측면과 상기 제2 지지프레임의 상면에 접촉하도록 배치되며, 상기 수직폼의 하단을 지지하는 레일;
을 포함하고,
상기 레일은,
일측면이 상기 제1 지지프레임에 체결되고, 상면이 상기 수직폼의 하단과 체결되며, 관형으로 연장되는 제1 부재; 및
상기 제1 부재의 타측면에 관형으로 형성되고, 내부에 길이방향으로 제2 홈이 형성되어, 상기 제2 홈에 제1 막대형부재가 삽입되는 제2 부재;
를 포함하며,
상기 제2 홈에 삽입된 상기 제1 막대형부재의 상측에는 제1 플레이트형부재가 배치되며,
상기 수직폼의 타면에는 제2 플레이트형부재가 배치되는 거푸집 지지장치.
A bobbin member extending in the X-axis direction and having a first groove formed therein in the longitudinal direction;
A first support frame extending in the Y-axis direction and supporting one side of the vertical foam, and a second support frame extending in the X-axis direction at a lower end of the first support frame, A support structure comprising a support frame, the support structure being disposed such that two of the support members face each other; And
A rail extending in the Z-axis direction and arranged to contact a side surface of the first support frame and an upper surface of the second support frame, the support supporting the lower end of the vertical foam;
/ RTI >
The rail
A first member having one side fixed to the first support frame, an upper surface coupled to a lower end of the vertical foam and extending in a tubular shape; And
A second member formed in a tubular shape on the other side surface of the first member and having a second groove formed therein in the longitudinal direction, and a first rod-like member inserted into the second groove;
/ RTI >
A first plate member is disposed on the upper side of the first bar-shaped member inserted into the second groove,
And a second plate member is disposed on the other surface of the vertical foam.
청구항 1에 있어서,
상기 보멍에재에는 다수의 제1 홀이 형성되고,
상기 제2 지지프레임에는 제2 홀이 형성되며,
상기 보멍에재에 상기 제2 지지프레임이 고정되도록, 상기 제1 홀과 상기 제2 홀에 삽입되는 고정핀;
을 더 포함하는 거푸집 지지장치.
The method according to claim 1,
A plurality of first holes are formed in the bobbin material,
A second hole is formed in the second support frame,
A fixing pin inserted into the first hole and the second hole so that the second support frame is fixed to the bobbin material;
Further comprising:
삭제delete 청구항 1에 있어서,
상기 제1 부재의 내부에는 분할벽을 기준으로 제1 체결홈과 제2 체결홈이 형성되고,
상기 제1 체결홈에 삽입되는 제1 체결수단에 의해서 상기 레일과 제1 지지프레임이 체결되고, 상기 제2 체결홈에 삽입되는 제2 체결수단에 의해서 상기 레일과 상기 수직폼이 체결되는 거푸집 지지장치.
The method according to claim 1,
A first fastening groove and a second fastening groove are formed in the first member with respect to the partition wall,
Wherein the rail and the first support frame are fastened by the first fastening means inserted in the first fastening groove and the fastening member is fastened to the rail by the second fastening means inserted into the second fastening groove Device.
청구항 4에 있어서,
상기 제1 부재의 일측면에는 상기 제1 지지프레임과 마주보는 방향으로 상기 제1 체결홈을 개방시키는 제1 입구가 형성되고, 상기 제1 입구에는 상기 제1 체결홈보다 폭이 좁아지도록 돌출된 제1 걸림부가 형성되며,
상기 제1 부재의 상면에는 상기 수직폼과 마주보는 방향으로 상기 제2 체결홈을 개방시키는 제2 입구가 형성되고,
상기 제1 체결수단은 일단이 상기 제1 체결홈에 삽입되어 상기 제1 걸림부에 걸리고,
상기 제2 체결수단은 일단이 상기 제2 입구를 통해서 상기 제2 체결홈에 삽입되는 거푸집 지지장치.
The method of claim 4,
Wherein the first member has a first inlet formed on one side thereof for opening the first coupling groove in a direction opposite to the first supporting frame and a second inlet formed on the first inlet for projecting to a width smaller than the first coupling groove A first latching portion is formed,
A second inlet is formed on an upper surface of the first member to open the second fastening groove in a direction facing the vertical foam,
The first fastening means has one end inserted into the first fastening groove and engaged with the first fastening portion,
And the second fastening means is inserted into the second fastening groove through one end of the second opening.
청구항 1에 있어서,
상기 레일은,
상기 제1 부재의 일측면의 상단으로부터 상측으로 연장되고, 말단에 상기 수직폼 방향으로 돌출된 돌기부가 형성된 연장부;
를 더 포함하며,
상기 돌기부는 상기 수직폼의 일면에 형성된 지지홈에 삽입되는 거푸집 지지장치.
The method according to claim 1,
The rail
An extension extending upward from an upper end of one side of the first member and having a protrusion protruding in the vertical foam direction at an end thereof;
Further comprising:
Wherein the protrusion is inserted into a support groove formed on one surface of the vertical foam.
삭제delete 청구항 1에 있어서,
상기 수직폼의 상단에는 빔을 지지하는 브라켓이 체결되는 거푸집 지지장치.
The method according to claim 1,
And a bracket for supporting the beam is fastened to the upper end of the vertical foam.
청구항 8에 있어서,
상기 브라켓은,
상기 수직폼의 상단에 체결되고, 일측면이 상기 수직폼의 타면에 배치된 제2 플레이트형부재를 지지하는 본체;
상기 빔의 말단에 형성된 후크부가 걸리도록, 상기 본체의 상면으로부터 돌출된 돌출부; 및
상기 돌출부보다 상기 제1 지지프레임에서 먼 방향에 배치되고, 상기 본체의 상면으로부터 상측으로 연장된 격벽을 포함하고,
상기 본체의 상면과 상기 격벽은 제2 막대형부재를 지지하며,
상기 제2 막대형부재는 상기 수직폼의 타면에 배치된 상기 제2 플레이트형부재를 지지하고, 상기 빔의 상면에 배치된 제3 플레이트형부재를 지지하는 거푸집 지지장치.
The method of claim 8,
The bracket
A body coupled to an upper end of the vertical foam, the body supporting a second plate-like member having one side disposed on the other side of the vertical foam;
A protrusion protruding from an upper surface of the main body so that a hook portion formed at an end of the beam is caught; And
And a partition wall extending upward from the upper surface of the main body, the partition wall being disposed farther from the first support frame than the projection,
The upper surface of the main body and the partition wall support the second rod member,
The second bar-like member supports the second plate-like member disposed on the other surface of the vertical foam, and supports the third plate-like member disposed on the upper surface of the beam.
청구항 1에 있어서,
상기 제1 지지프레임은,
내부에 Y축 방향으로 공간이 형성된 고정프레임;
상기 공간에 삽입되어, Y축 방향으로 슬라이딩가능한 이동프레임; 및
상기 이동프레임을 정지시키는 정지수단;
을 포함하는 거푸집 지지장치.
The method according to claim 1,
The first support frame includes:
A fixed frame having a space formed therein in the Y axis direction;
A movable frame inserted in the space and slidable in the Y axis direction; And
Stop means for stopping the moving frame;
.
청구항 10에 있어서,
상기 정지수단은,
상기 고정프레임의 상단에 배치되고, 마주보는 2개의 개구부가 형성된 지지부; 및
상기 지지부에 형성된 2개의 상기 개구부에 삽입되고, 일방향으로 갈수록 너비가 증가하는 쇄기형부재;
를 포함하고,
상기 쇄기형부재를 타방향으로 이동시키면, 상기 쇄기형부재가 상기 이동프레임의 측면을 가압하여 이동프레임을 정지시키는 거푸집 지지장치.
The method of claim 10,
Wherein the stop means comprises:
A support disposed at an upper end of the fixed frame and having two opposed openings; And
A wedge-shaped member inserted into the two openings formed in the support portion and increasing in width in one direction;
Lt; / RTI >
And the wedge-shaped member presses the side surface of the movable frame to stop the movable frame when the wedge-shaped member is moved in the other direction.
KR1020160044971A 2016-04-12 2016-04-12 Supporting Device for Form KR101795777B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160044971A KR101795777B1 (en) 2016-04-12 2016-04-12 Supporting Device for Form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160044971A KR101795777B1 (en) 2016-04-12 2016-04-12 Supporting Device for Form

Publications (2)

Publication Number Publication Date
KR20170116834A KR20170116834A (en) 2017-10-20
KR101795777B1 true KR101795777B1 (en) 2017-11-08

Family

ID=60299254

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160044971A KR101795777B1 (en) 2016-04-12 2016-04-12 Supporting Device for Form

Country Status (1)

Country Link
KR (1) KR101795777B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102215637B1 (en) * 2019-09-19 2021-02-16 (주)장원피앤에이치 Pipe supporting device equipped with length-adjustable width support

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100826556B1 (en) * 2005-03-17 2008-04-30 권대용 Panel structure for slab
KR100926750B1 (en) * 2009-01-07 2009-11-16 성진경 Construction method for crossbeam mold
KR101501693B1 (en) * 2014-04-16 2015-03-11 (주)화인폼 Supporting device for concrete mold panel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100826556B1 (en) * 2005-03-17 2008-04-30 권대용 Panel structure for slab
KR100926750B1 (en) * 2009-01-07 2009-11-16 성진경 Construction method for crossbeam mold
KR101501693B1 (en) * 2014-04-16 2015-03-11 (주)화인폼 Supporting device for concrete mold panel

Also Published As

Publication number Publication date
KR20170116834A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
KR101694747B1 (en) Yoke for constructing mold of beam
KR101301529B1 (en) supporting device for concrete beam form
KR101795777B1 (en) Supporting Device for Form
KR101618703B1 (en) Slab concrete mold for building
KR200482972Y1 (en) Beam bracket
KR101024888B1 (en) A truss mounting structure for supporting forms
KR101302466B1 (en) Temporary wall for construction
JP2017227052A (en) Mold hanger
KR200461500Y1 (en) A flash board waterproof sill
KR100786144B1 (en) Supporter suitable to matrix for slab using structure
KR101848560B1 (en) Fixing structure of form
KR101341864B1 (en) Slab Form Girder Beam Coupling Device
KR200321372Y1 (en) side supporting system to a beam form for forming concreate beam
KR20190042121A (en) Slab panel lowering device using stopper
KR101501693B1 (en) Supporting device for concrete mold panel
KR20180136749A (en) Slab panel system
KR100942693B1 (en) The construction structure of concrete forms
KR101379897B1 (en) Bracket unit for supporting middle beam and apparatus for supporting slab form using the same
KR100750718B1 (en) A pillar concrete form
KR102330671B1 (en) Construction support structure with yoke with magnetic
CN209837670U (en) Prefabricated floor concatenation strutting arrangement
KR101724538B1 (en) Repeated utilizable stripping deck
KR20160012497A (en) Apparatus for fixing and supporting of concrete mold
KR100643527B1 (en) Establishment structure of temporary wall for building
KR20180001113U (en) Upper rebar fixing unit with arragement of concrete slab

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant