KR101791097B1 - Support for construction - Google Patents

Support for construction Download PDF

Info

Publication number
KR101791097B1
KR101791097B1 KR1020160021114A KR20160021114A KR101791097B1 KR 101791097 B1 KR101791097 B1 KR 101791097B1 KR 1020160021114 A KR1020160021114 A KR 1020160021114A KR 20160021114 A KR20160021114 A KR 20160021114A KR 101791097 B1 KR101791097 B1 KR 101791097B1
Authority
KR
South Korea
Prior art keywords
bolt
upper beam
fixing
pair
lower beam
Prior art date
Application number
KR1020160021114A
Other languages
Korean (ko)
Other versions
KR20170099126A (en
Inventor
조성주
Original Assignee
조성주
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조성주 filed Critical 조성주
Priority to KR1020160021114A priority Critical patent/KR101791097B1/en
Publication of KR20170099126A publication Critical patent/KR20170099126A/en
Application granted granted Critical
Publication of KR101791097B1 publication Critical patent/KR101791097B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut

Abstract

A building support is disclosed. A construction support for supporting a workpiece spaced from a ground surface, the construction support comprising: a lower beam supported vertically on the ground and formed in a square pipe shape and having a pair of bolt holes opposed to both sides; An upper beam formed in a square pipe shape and inserted into the lower beam and drawn or drawn up and down, the upper beam having slit grooves formed along the longitudinal direction on side surfaces thereof; A support plate fixed to the upper end of the upper beam to support the die; And a pair of fixing members for fixing the lower beam and the upper beam in a length-adjusted state, wherein each of the pair of fixing members includes a first T-bolt and a first nut, The front end of the first T-bolt is inserted into the lower portion of the lower beam, and the front end of the first T-bolt is inserted into the lower portion of the lower beam, The rear end of the first T-bolt is moved along the slit groove while the length of the upper beam relative to the lower beam is adjusted, and the first nut is inserted into the front end of the first T- And the length of the upper beam relative to the lower beam is fixed by screwing and tightening.

Description

SUPPORT FOR CONSTRUCTION

BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a construction support, and more particularly, to a construction support as a foundation for supporting a formwork.

In order to cure concrete at the site where civil engineering and structures are built, usually, a support that supports the lower portion of the concrete structure is used until curing of the concrete structure is completed.

This support supports the formwork, which is previously constructed before placing the concrete, so that it is leveled at a uniform height so as to prevent the concrete from being collapsed by blocking the local load of the concrete laid on the upper part, Thereby preventing deformation from occurring.

A typical construction support comprises a cylindrical lower pipe and a cylindrical upper pipe inserted in the upper part of the lower pipe, a long hole is formed in the upper part of the lower pipe, and a plurality of pin insertion holes are formed in the upper pipe in the longitudinal direction , The length of the upper pipe relative to the lower pipe is adjusted, and then the fixing pin is inserted into one of the plurality of pin insertion holes through the slot to be fixed.

However, in the conventional construction support, the length of the lower pipe and the upper pipe is adjusted, and then, in order to fix the fixing pin, the upper pipe is rotated with respect to the lower pipe so that the pin insertion hole of the upper pipe matches the slot of the lower pipe. And the upper pipe must be raised or lowered relative to the lower pipe, so that the work is difficult and time-consuming, which is a time-consuming operation.

Further, it is not easy to insert the pin at a time in a state where the pin insertion hole of the upper pipe and the slot of the lower pipe coincide with each other.

Korean Patent Publication No. 10-2006-0037137 Korean Patent Publication No. 10-2007-0008470 Korean Patent Publication No. 10-2012-0096744 Korean Patent Publication No. 10-2014-0090409

SUMMARY OF THE INVENTION The present invention has been made to overcome the above-mentioned problems, and it is an object of the present invention to provide a construction support having a simple structure and easy installation and having an improved working time.

In order to achieve the above object, a construction support according to the present invention is a construction support for supporting a workpiece spaced from the ground, the construction support being vertically supported on the ground, formed in a square pipe shape, A lower beam having a bolt passage hole formed therein; An upper beam formed in a square pipe shape and inserted into the lower beam and drawn or drawn up and down, the upper beam having slit grooves formed along the longitudinal direction on side surfaces thereof; A support plate fixed to the upper end of the upper beam to support the die; And a pair of fixing members for fixing the lower beam and the upper beam in a length-adjusted state, wherein each of the pair of fixing members includes a first T-bolt and a first nut, The front end of the first T-bolt is inserted into the lower portion of the lower beam, and the front end of the first T-bolt is inserted into the lower portion of the lower beam, The rear end of the first T-bolt is moved along the slit groove while the length of the upper beam relative to the lower beam is adjusted, and the first nut is inserted into the front end of the first T- And the length of the upper beam relative to the lower beam is fixed by screwing and tightening.

Wherein the support plate has a pair of coupling pieces extending downwardly and spaced apart from each other by a predetermined distance therebetween, and the upper end of the upper beam is inserted between the pair of coupling pieces, And the beam and the coupling piece are coupled to each other.

The support plate may include a pair of fitting plates extending upward and spaced apart from each other by a predetermined distance.

A guide protrusion may be formed on the inner surface of the lower beam so as to guide upward and downward movement of the upper beam with respect to the lower beam.

A horizontal connecting beam formed in a square pipe shape and having slit grooves formed along the longitudinal direction on the side surfaces thereof and horizontally connecting the adjacent upper beams to each other; And a second fixing member for fixing the horizontal connection beam and the upper beam.

The second fixing member includes: an angle formed in an "a" shape; A third T bolt and a third nut for fixing one end of the angle and the upper beam; And a fourth T-bolt and a fourth nut for fixing the other end of the angle and the horizontal connection beam.

The construction support according to the present invention is a construction support for supporting a workpiece spaced from the ground, the construction support being vertically supported on a ground surface, formed in a square pipe shape, and having a pair of bolt holes ; An upper beam formed in a square pipe shape and inserted into the lower beam and drawn or drawn up and down, the upper beam having slit grooves formed along the longitudinal direction on side surfaces thereof; A support plate fixed to the upper end of the upper beam to support the die; And a pair of fixing members for fixing the lower beam and the upper beam in a length-adjusted state, wherein each of the pair of fixing members has a "?" And a fifth T bolt and a fifth nut for fixing one end of the position fixing angle to the upper beam.

According to the present invention, since the worker can adjust the length more easily than before, the construction time can be shortened to shorten the entire construction period, and the worker's labor cost can be reduced, There is an effect that can be saved.

1 is a partial plan view showing a construction support according to a first embodiment of the present invention,
FIG. 2 is an enlarged view of one construction support shown in FIG. 1. FIG. 2 is a view showing a lower portion of the construction support shown in FIG. 1 as viewed from the side,
FIG. 3 is a perspective view showing an upper beam of the construction support shown in FIG. 1,
FIG. 4 is a plan view showing the fixed state of the upper beam and the lower beam of the construction support shown in FIG. 1,
FIG. 5 is a plan view showing a state in which the upper beam and the support plate of the construction support shown in FIG. 1 are engaged with each other,
FIG. 6 is an exploded perspective view illustrating a coupling process for adjusting the lengths of the upper beam and the lower beam of the construction support shown in FIG. 1. FIG.
7 is a partial plan view showing a construction support according to a second embodiment of the present invention,
FIG. 8 is an exploded perspective view illustrating a process of coupling the upper beam and the horizontal connection beam in FIG. 7,
9 is a partial plan view showing a construction support according to a third embodiment of the present invention,
FIG. 10 is an enlarged view of one construction support shown in FIG. 9. FIG. 10 is a bottom view of the construction support shown in FIG. 9 as viewed from the side,
FIG. 11 is a plan view showing a state in which the support plate of the construction support shown in FIG. 9 is viewed from above,
12 is a partial plan view showing a construction support according to a third embodiment of the present invention,
FIG. 13 is an enlarged view of the construction support shown in FIG. 12,
FIG. 14 is a plan view showing the fixed state of the upper beam and the lower beam of the construction support shown in FIG. 12. FIG.

BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features, and advantages of the present invention will become more readily apparent from the following description of preferred embodiments with reference to the accompanying drawings. However, the present invention is not limited to the embodiments described herein but may be embodied in other forms. Rather, the embodiments disclosed herein are provided so that the disclosure can be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.

In this specification, when an element is referred to as being on another element, it may be directly formed on another element, or a third element may be interposed therebetween. Also in the figures, the thickness of the components is exaggerated for an effective description of the technical content.

Embodiments described herein will be described with reference to cross-sectional views and / or plan views that are ideal illustrations of the present invention. In the drawings, the thicknesses of the films and regions are exaggerated for an effective description of the technical content. Thus, the shape of the illustrations may be modified by manufacturing techniques and / or tolerances. Accordingly, the embodiments of the present invention are not limited to the specific forms shown, but also include changes in the shapes that are produced according to the manufacturing process. For example, the etched area shown at right angles may be rounded or may have a shape with a certain curvature. Thus, the regions illustrated in the figures have attributes, and the shapes of the regions illustrated in the figures are intended to illustrate specific forms of regions of the elements and are not intended to limit the scope of the invention. Although the terms first, second, etc. have been used in various embodiments of the present disclosure to describe various components, these components should not be limited by these terms. These terms have only been used to distinguish one component from another. The embodiments described and exemplified herein also include their complementary embodiments.

The terminology used herein is for the purpose of illustrating embodiments and is not intended to be limiting of the present invention. In the present specification, the singular form includes plural forms unless otherwise specified in the specification. The terms "comprises" and / or "comprising" used in the specification do not exclude the presence or addition of one or more other elements.

In describing the specific embodiments below, various specific details have been set forth in order to explain the invention in greater detail and to assist in understanding it. However, it will be appreciated by those skilled in the art that the present invention may be understood by those skilled in the art without departing from such specific details. In some instances, it should be noted that portions of the invention that are not commonly known in the description of the invention and are not significantly related to the invention do not describe confusing reasons to explain the present invention.

Hereinafter, a construction support according to a first embodiment of the present invention will be described with reference to Figs. 1 to 6. Fig.

The construction support of the present invention is for supporting the dies 110 and 120 for casting the concrete 130 at the time of building construction. Although only two building supports are shown in FIG. 1, only a part of the building supports is shown. A large number of building supports can be installed to stably support the dies 110 and 120 at the time of building construction.

The building support of the present invention includes an upper beam 10, a lower beam 20, a fixing member 30, and a support plate 40.

The upper beam 10 is formed in the shape of a square pipe, and slit grooves 12 are formed on the side surfaces thereof along the longitudinal direction.

The lower beam 20 is formed by a square pipe having bolt through holes 24 on both upper surfaces thereof and is configured to have a slightly larger inner surface than the outer surface of the upper beam 10, So as to be moved up and down. Accordingly, the upper beam 10 may be drawn or drawn relative to the lower beam 20 to adjust the length of the upper beam 10 and the lower beam 20. [

At this time, on the inner surface of the lower beam 20, a guide protrusion 22 is protruded to be inserted into the slit groove 12 along the longitudinal direction. The guide protrusion 22 is guided by the slit grooves 12 to move the upper beam 10 upward and downward relative to the lower beam 20 when the upper beam 10 is pulled out or pulled in against the lower beam 20. [ You will be guided.

In addition, the lower beam 20 may be vertically arranged to be supported on the ground, and the upper beam 10 may be vertically adjusted in the vertical direction in the lower beam 20.

At this time, the lower beam 20 may be installed directly on the ground, but it may be arranged on the wooden plate 25 placed on the ground, as shown in the figure.

The fixing members 30 and 33 are for fixing the adjusted length of the lower beam 20 and the upper beam 10 and are composed of a T bolt 30 and a nut 33. The fixing members 30 and 33 are formed as a pair to fix the lower beam 20 and the upper beam 10 on both sides.

3, 4, and 6, the T bolt 30 is inserted into the slit groove 12 of the upper beam 10 with its rear end (bolt head) (24) and protrudes to the outside of the lower beam (20). In this case, when the length of the upper beam 10 to be pulled out or inserted into the lower beam 20 is adjusted, the front end of the T-bolt 30 is moved outward through the bolt hole 24 of the lower beam 20 The rear end of the T-bolt 30 is moved along the slit groove 12 in the protruded state.

With the above configuration, the operator pulls out the upper beam 10 by designing a desired length for the lower beam 20, pulls out the T beam 30, screws the nut 33 into the T bolt 30, The adjusted length of the lower beam 10 and the lower beam 20 is fixed.

Conventionally, there has been a problem in that the construction period is delayed because the upper pipe is rotated with respect to the lower pipe so that the fixing pin can be inserted, or the upper and lower pipes are adjusted in position, The upper beam 10 is drawn out to a length required by design with respect to the lower beam 20 without the need of pin insertion or difficult and laborious work to insert the pin, The lower beam 20 and the upper beam 10 are combined and fixed by tightening the nut 33 to the T bolt 30 projected outward of the lower beam 20.

1, 2 and 5, a support plate 40 is fixed to the upper end of the upper beam 10 to support the dies 110 and 120.

The support plate 40 is formed of a rectangular plate member 41 and a pair of engagement pieces 44 are formed at the lower end of the support plate 40 so as to be vertically spaced apart from each other. The gap between the pair of coupling pieces 44 is configured to be equal to or slightly larger than the thickness of the upper beam 10 so that the upper beam 10 can be inserted between the pair of coupling pieces 44 .

The pair of coupling pieces 44 and the upper beam 10 are configured to be coupled and fixed via a pair of T-bolts 50 and a nut 53 at the upper side. Specifically, a bolt hole (not shown) is formed in each of the pair of coupling pieces 44 so that the coupling piece 44 is inserted into the slit groove 12 of the upper beam 10 while the rear end of the T bolt 50 is inserted into the slit groove 12 of the upper beam 10. [ The coupling plate 44 and the upper beam 10 are coupled and fixed to each other so that the support plate 40 can be coupled to the upper end of the upper beam 10 have.

1, construction of a construction support according to a first embodiment of the present invention will be described.

In the present invention, the nut 33 of the fixing members 30 and 33 is not fastened, and all the components can be prepared in a cooked state.

6, the T bolts 30 are inserted into the slit grooves 12 of the upper beam 10 and passed through the bolt holes 24 of the lower beam 20 to be projected outwardly As shown in FIG. 2, the support plate 40 may be assembled on the upper end of the upper beam 10.

In this state, the operator pulls the upper beam 10 to a predetermined length with respect to the lower beam 20, and then tightens and tightens the nut 33 with the T bolt 30, (10) is fixed.

1, a plurality of building supports are installed, a mold composed of a wood supporting member 110 and a plywood panel 120 is installed on the upper part of the support panel 40, The concrete 130 can be laid and cured.

As described above, according to the present invention, if the upper beam 10 is pulled out with respect to the lower beam 20 by a predetermined length and the nut 33 is fastened to the T bolt 30 projected outward to the lower beam 20, Since the adjustment is simple, the construction is simple and the construction time can be shortened.

7 and 8, a construction support according to a second embodiment of the present invention will be described.

The second embodiment differs from the first embodiment only in that there is a structure in which neighboring upper beams 10 are connected and fixed to each other so that the supports provided adjacent to each other are easily connected to each other so as not to fall right and left And therefore the description of the same configuration will be omitted and only the configuration having the difference will be described.

Conventionally, in order to connect a plurality of supports to each other, the wood is horizontally supported on a plurality of supports in a horizontal state, and the wood and the support are wound and fixed with wires. In this case, the fixing force is weak and the wood and the support are easily separated. There is a disadvantage in that it takes a long time to wind the workpiece.

The present embodiment includes a horizontal connecting beam 60 and second fixing members 71, 73 and 75 for fixing the horizontal connecting beam 60 to the upper beam 10

The horizontal connecting beam 60 has the same structure as the upper beam 10. That is, the horizontal connecting beams 60 are formed in the shape of a square pipe, and the slit grooves 62 are formed on the side surfaces along the longitudinal direction. The horizontal connecting beam 60 is horizontally arranged to connect the adjacent upper beams 10 to each other.

The second fixing members 71, 73 and 75 are for fixing the horizontal connecting beam 60 and the respective upper beams 10 and are provided with an angle 71, a pair of T-bolts 73 and 75, (73a, 75a).

One end of the angle 71 is fixed to the upper beam 10 via the T bolts 73 and the nut 73a and the other end is fixed to the upper end of the upper beam 10 via the T bolts 75 and the nuts 75a Is fixed to the horizontal connecting beam (60).

At this time, the T-bolts 73, 75 are inserted into the slit grooves 12 of the upper beam 10 and the slit grooves 62 of the horizontal connecting beam 60, 73a, 75a.

The horizontal connecting beam 60 is formed on the side surface of the upper beam 10 through the angle 71 and the T bolts 73 and 75. In this case, So that the operator can easily carry out the work and the construction time can be shortened.

9 to 11, the construction support according to the third embodiment is different from that of the first embodiment only in the structure of the support plate 40 ', but the remaining structures are the same, .

The support plate 40 'includes a horizontal plate member 41, a coupling piece 44 formed at a predetermined interval below the plate member 41, and a pair of fitting plates 47 protruding upward from the plate member 41 Lt; / RTI >

That is, the supporting plate 40 'of the third embodiment differs only in that the fitting plate 47 is further formed on the upper portion of the plate member 41, and the remaining configuration of the supporting plate 40' same.

In this case, a wooden supporting member 112 in the form of a tree is fitted between the pair of fitting plates 47, and the second wooden supporting member 114 is arranged on the upper portion of the wooden supporting member 112 in a right angle And the concrete part 130 can be formed with the plywood 120 installed on the upper part of the second wooden support member 114. [

Although the above description has been made on the assumption that the wooden support member 112 is sandwiched between the pair of fitting plates 47, the present invention is not limited thereto, and rectangular pipes (metal or base metal) And the concrete part 130 can be installed on the plywood 120 after the plywood 120 is placed on the upper part of the second square pipe.

12 to 14, the construction support according to the fourth embodiment is different from the first embodiment only in the structure of the fixing members 35 and 37, and the remaining structures are the same, Explain.

In the first embodiment, the fixing member is composed only of the bolts 30 and the nuts 33. In the state where the rear end of the bolt 30 is inserted into the slit groove 12, In the fourth embodiment, the fixing members 35 and 37 are composed of the position fixing angle 35, the T bolt 37 and the nut 37a .

The operator inserts the T bolt 37 into a predetermined position of the slit groove 12 of the upper beam 10 and then passes through a bolt hole (not shown) formed in the position fixing angle 35 and is fastened with a nut 37a The position fixing angle 35 is fixedly coupled to the predetermined position of the upper beam 10 and then the upper beam 10 is inserted into the lower beam 20 so that the position fixing angle 35 The upper beam 10 is fixed to the lower beam 20 and fixed in length.

While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. It will be understood by those skilled in the art that many changes and modifications of the present invention can be made without departing from the spirit and scope of the appended claims. Accordingly, all such appropriate modifications and changes, and equivalents thereof, should be regarded as within the scope of the present invention.

10 ... upper beam
12 ... slit groove
20 ... lower beam
30, 33 ... fixed member
40 ... support plate
60 ... Horizontal connection beam

Claims (7)

1. A construction support for supporting a formwork spaced from a ground,
A lower beam supported vertically on the ground and formed in the shape of a square pipe and having a pair of bolt holes opposed to both sides thereof;
An upper beam formed in a square pipe shape and inserted into the lower beam and drawn or drawn up and down, the upper beam having slit grooves formed along the longitudinal direction on side surfaces thereof;
A support plate fixed to the upper end of the upper beam to support the die;
And a pair of fixing members for fixing the length of the lower beam and the upper beam,
Wherein each of the pair of fixing members includes a first T-bolt and a first nut,
The first T-bolt is installed so as to extend forward in a state of being inserted in the slit groove and to protrude to the outside of the lower beam through the bolt passage hole. When the upper beam is drawn or drawn into the lower beam, The rear end of the first T bolt is moved along the slit groove while the front end of the 1T bolt protrudes to the outside of the lower beam and the length of the upper beam relative to the lower beam is adjusted, The length of the upper beam relative to the lower beam is fixed by screwing and tightening the first nut to the front end,
Wherein the support plate has a pair of engagement pieces extending downwardly and spaced apart from each other by a predetermined distance,
The upper beam and the coupling piece are coupled to each other by the second T-bolt and the second nut in a state where the upper end of the upper beam is inserted between the pair of coupling pieces,
Wherein the support plate includes a pair of fitting plates extending upwardly and spaced apart from each other by a predetermined distance,
A guide protrusion is formed on the inner surface of the lower beam for guiding upward and downward movement of the upper beam with respect to the lower beam,
A horizontal connecting beam formed in a square pipe shape and having slit grooves formed along the longitudinal direction on the side surfaces thereof and horizontally connecting the adjacent upper beams to each other; And
And a second fixing member for fixing the horizontal connection beam and the upper beam,
Wherein the second fixing member comprises:
An angle of "a"type;
A third T bolt and a third nut for fixing one end of the angle and the upper beam; And
And a fourth T-bolt and a fourth nut for fixing the other end of the angle and the horizontal connection beam.
delete delete delete delete delete 1. A construction support for supporting a formwork spaced from a ground,
A lower beam supported vertically on the ground and formed in the shape of a square pipe and having a pair of bolt holes opposed to both sides thereof;
An upper beam formed in a square pipe shape and inserted into the lower beam and drawn or drawn up and down, the upper beam having slit grooves formed along the longitudinal direction on side surfaces thereof;
A support plate fixed to the upper end of the upper beam to support the die;
And a pair of fixing members for fixing the length of the lower beam and the upper beam,
Wherein each of the pair of fixing members comprises:
Position fixed angle of "b"type; And
A fifth T-bolt and a fifth nut for fixing one end of the position fixing angle to the upper beam,
Wherein the support plate has a pair of engagement pieces extending downwardly and spaced apart from each other by a predetermined distance,
The upper beam and the coupling piece are coupled to each other by the second T-bolt and the second nut in a state where the upper end of the upper beam is inserted between the pair of coupling pieces,
Wherein the support plate includes a pair of fitting plates extending upwardly and spaced apart from each other by a predetermined distance,
A guide protrusion is formed on the inner surface of the lower beam for guiding upward and downward movement of the upper beam with respect to the lower beam,
A horizontal connecting beam formed in a square pipe shape and having slit grooves formed along the longitudinal direction on the side surfaces thereof and horizontally connecting the adjacent upper beams to each other; And
And a second fixing member for fixing the horizontal connection beam and the upper beam,
Wherein the second fixing member comprises:
An angle of "a"type;
A third T bolt and a third nut for fixing one end of the angle and the upper beam; And
And a fourth T-bolt and a fourth nut for fixing the other end of the angle and the horizontal connection beam.

KR1020160021114A 2016-02-23 2016-02-23 Support for construction KR101791097B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160021114A KR101791097B1 (en) 2016-02-23 2016-02-23 Support for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160021114A KR101791097B1 (en) 2016-02-23 2016-02-23 Support for construction

Publications (2)

Publication Number Publication Date
KR20170099126A KR20170099126A (en) 2017-08-31
KR101791097B1 true KR101791097B1 (en) 2017-10-27

Family

ID=59761032

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160021114A KR101791097B1 (en) 2016-02-23 2016-02-23 Support for construction

Country Status (1)

Country Link
KR (1) KR101791097B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200351342Y1 (en) * 2004-03-04 2004-05-20 주식회사 삼우이엠씨 Bay partition post device for clean rooms
KR101514395B1 (en) * 2013-12-30 2015-04-23 주식회사 주신산업개발 Supporting device of slab form

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200351342Y1 (en) * 2004-03-04 2004-05-20 주식회사 삼우이엠씨 Bay partition post device for clean rooms
KR101514395B1 (en) * 2013-12-30 2015-04-23 주식회사 주신산업개발 Supporting device of slab form

Also Published As

Publication number Publication date
KR20170099126A (en) 2017-08-31

Similar Documents

Publication Publication Date Title
KR100878791B1 (en) Transformable formwork apparatus for construction of concrete column
KR101745242B1 (en) Bariable beam form and construction method thereof
KR100917833B1 (en) Form fixing structure for constructing pillar
KR102128100B1 (en) variable type detachable beam deck
KR20190008053A (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
KR101679346B1 (en) Form construction structure and method for building concrete slab
KR20170100829A (en) Top of the spacing member dies
KR20170119777A (en) Safety support device module
KR20180047905A (en) Device for fixing concrete form for construction and method of manafacturing thereof
KR101791097B1 (en) Support for construction
KR101739126B1 (en) Method for Forming Top-down-typed Underground Strucutre
KR102079030B1 (en) Truss type assembly for form supporting member
KR101677423B1 (en) Tool for Connecting and Fastening beams
KR101360360B1 (en) Form assembly easily installed distance maintenance implement
KR101606330B1 (en) apparatus for adjusting horizon of a concrete mold
KR101722021B1 (en) System pillar form
KR102471710B1 (en) Extension apparatus for from
KR200475755Y1 (en) fixing bracket
KR20050061405A (en) Fixing apparatus for mold
KR20180133969A (en) Supporting unit of girder panel
KR102128099B1 (en) variable type detachable beam deck system
KR200486761Y1 (en) Corner angle for connecting form panels
KR101806000B1 (en) Extender for extending length of support
JP5430483B2 (en) Connecting bracket
JP5294094B2 (en) Steel foundation using channel steel

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant