KR101780228B1 - Method for replacing boiler sling tube of power generation facility - Google Patents

Method for replacing boiler sling tube of power generation facility Download PDF

Info

Publication number
KR101780228B1
KR101780228B1 KR1020170061251A KR20170061251A KR101780228B1 KR 101780228 B1 KR101780228 B1 KR 101780228B1 KR 1020170061251 A KR1020170061251 A KR 1020170061251A KR 20170061251 A KR20170061251 A KR 20170061251A KR 101780228 B1 KR101780228 B1 KR 101780228B1
Authority
KR
South Korea
Prior art keywords
tube
bundle
jig
sling
fixing
Prior art date
Application number
KR1020170061251A
Other languages
Korean (ko)
Inventor
강찬주
Original Assignee
신원기업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신원기업 주식회사 filed Critical 신원기업 주식회사
Priority to KR1020170061251A priority Critical patent/KR101780228B1/en
Application granted granted Critical
Publication of KR101780228B1 publication Critical patent/KR101780228B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/10Water tubes; Accessories therefor
    • F22B37/20Supporting arrangements, e.g. for securing water-tube sets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/62Component parts or details of steam boilers specially adapted for steam boilers of forced-flow type
    • F22B37/64Mounting of, or supporting arrangements for, tube units

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a method to replace a sling tube of a boiler in a power generation facility, comprising: a support beam coupling step of attaching a support beam (140) to a sling tube (40) of a lower side tube bundle (30); a fixation bundle jig coupling step of vertically inserting a fixation bundle jig (110) between upper side tube bundles (30) and then rotating the fixation bundle jig (110) by 90 to fixate the same; an upper bundle jig coupling step of vertically inserting an upper bundle jig (120) between upper tube bundles (30a) and then rotating the upper bundle jig (120) by 90 to fixate the same; a lower bundle jig coupling step of vertically inserting a lower bundle jig (130) between lower tube bundles (30b) and then rotating the lower bundle jig (130) by 90 to fixate the same; a tube bundle fixation step of using a chain block (150) to allow a support lug (113) of the fixation bundle jig (110) to a tube (31) of the tube bundle (30) and, at the same time, putting the tube (31) of the tube bundles (30a, 30b) on mounting lugs (123, 133) of the upper and lower bundle jigs (120, 130) respectively to maintain a supporting state; and a sling tube replacing step of replacing an old sling tube with a new sling tube (40) to install the same. Thus, the sling tube (40) is able to be quickly and efficiently replaced without separating or moving the tube bundles (30, 30a, 30b).

Description

발전설비의 보일러 슬링 튜브 교체방법{Method for replacing boiler sling tube of power generation facility}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for replacing boiler sling tubes in a power plant,

본 발명은 발전설비의 보일러 슬링 튜브 교체방법에 관한 것으로, 상세하게 발전소 등의 보일러 내부의 튜브 번들 이동 없이 안정적으로 지지함과 동시에 슬링 튜브를 안전하고 효율적으로 교체할 수 있도록 하는 발전설비의 보일러 슬링 튜브 교체방법에 관한 것이다.The present invention relates to a method for replacing a boiler sling tube in a power generation facility, and more particularly, to a boiler sling type power generation system for stably supporting a boiler sling tube in a power plant without moving a tube bundle inside the boiler, To a tube replacement method.

일반적으로 화력발전소의 보일러는 필요한 증기를 생성하는 장치로 그 구성요소를 살펴보면 증기를 발생시키는 본체(노, 과열기, 재열기, 절탄기) 및 순환계통과, 연료의 공급 및 연소를 통해 보일러 내에 열원을 공급하는 연소장치, 연소에 필요한 공기의 공급 및 연소와 가스를 방출시키는 통풍장치, 기타 보일러를 빠져 나가는 연소가스로부터 열량을 회수하는 공기 예열기, 보일러 본체 내에 축적되는 회분을 제거하기 위한 제매기, 보일러 본체를 보호하기 위한 안전 밸브 등 부대설비로 이루어진 것으로, 특히 보일러 내부에는 증기를 모아서 분배하는 헤더(Header)와, 고온의 가스와 열교환으로 증기 생성하는 튜브 번들(Tube Bundle)과, 헤더와 튜브 번들을 연결하는 커넥션 튜브(Connecti Tube), 및 튜브 번들을 가이드 하는 슬링 튜브(Sling Tube)로 형성한다.Generally, a boiler of a thermal power plant is a device that generates necessary steam. When the components are examined, the heat source (eg, furnace, superheater, reheater, absorbent) passing through the circulating system and fuel supply and combustion An air preheater for recovering heat from the combustion gas exiting the boiler, a jogging machine for removing the ash accumulated in the boiler body, a boiler A header for collecting and distributing the steam in the boiler, a tube bundle for generating steam by heat exchange with the high temperature gas, a header and a tube bundle A connection tube for connecting the tube bundle, and a sling tube for guiding the tube bundle.

그러나 이러한 종래의 발전설비용 보일러는 튜브 번들을 지지하는 슬링 튜브를 교체하고 할 경우 할 때, 튜브 번들과 슬링 튜브 전체를 분리하여 외부로 옮김 다음 일일이 슬링튜브를 교체하므로 상당한 중량의 튜브 번들 이동 및 재설치로 작업시간이 장시간 걸릴 뿐만 아니라 효율적으로 작업을 수행하기 까다롭고 안전사고 우려가 높은 문제점이 있었다.However, in the conventional boiler for power generation equipment, when the sling tube supporting the tube bundle is replaced, the tube bundle and the entire sling tube are separated and transferred to the outside, and then the sling tube is replaced one by one. There is a problem that it takes a long time to work with the reinstallation, it is difficult to perform the operation efficiently, and there is a high possibility of safety accident.

종래의 관련 기술로는 등록실용신안공보 제20-0426466호와 공개특허공보 10-2013-0073889호 등이 있다.The related related arts include Registration Practical Utility Model No. 20-0426466 and Publication No. 10-2013-0073889.

따라서 상기한 목적을 달성하기 위하여 본 발명의 주 목적은 발전설비용 보일러의 튜브 번들 등을 이동 없이 안전하게 지지함과 동시에 슬링 튜브를 원활하고 안정적이며 신속하게 교체할 수 있도록 하는 발전설비의 보일러 슬링 튜브 교체방법을 제공하는 데 있다.In order to achieve the above-mentioned object, a main object of the present invention is to provide a boiler sling tube for a power plant that can securely support a tube bundle of a boiler for power generation facilities without moving, And to provide a replacement method.

상기한 목적을 달성하기 위하여 본 발명의 발전설비의 보일러 슬링 튜브 교체방법은 하측 슬링튜브에 지지빔을 부착하는 지지빔 결합단계와; 상측 튜브번들 사이에 고정용번들지그를 수직으로 끼운 다음 90도 회전시켜 결합하는 고정용번들지그 결합단계와; 상부튜브번들 사이에 상부번들지그를 수직으로 끼운 다음 90도 회전시켜 고정하는 상부번들지그 결합단계와; 하부튜브번들 사이에 하부번들지그를 수직으로 끼운 다음 90도 회전시켜 고정하는 하부번들지그 결합단계와; 체인블록을 이용하여 고정용번들지그와 상부번들지그 및 하부번들지그를 팽팽하게 당겨 고정용번들지그의 지지러그가 튜브번들의 튜브에 걸리도록 함과 동시에 상,하부번들지그의 안치러그에 튜브번들의 튜브가 각각 올려져 견고한 지지상태를 유지하는 튜브번들 고정단계와; 상,하측튜브번들에 결합된 슬링튜브를 절단하여 분리한 다음 신규 슬링튜브를 설치하는 슬링튜브 교체단계를 포함하여 구성함을 그 기술적 구성상 기본 특징으로 한다.In order to accomplish the above object, the present invention provides a method of replacing a boiler slip tube in a power plant, comprising: a support beam coupling step of attaching a support beam to a lower sling tube; A fixing bundle jig fitting step of vertically fitting the fixing bundle jig between the upper tube bundles and then rotating the fixing bundle jig by 90 degrees; An upper bundle jig attaching step of vertically inserting the upper bundle jig between upper tube bundles and then fixing the upper bundle jig by rotating it by 90 degrees; A lower bundle jig attaching step of vertically inserting the lower bundle jig between the lower tube bundles and then rotating the bundle jig by 90 degrees; The fixing bundle jig, the upper bundle jig and the lower bundle jig are pulled up by using the chain block so that the supporting lugs of the fixing bundle jig are caught by the tubes of the tube bundles, and at the same time, A tube bundle fixing step in which tubes of the tube bundle are respectively lifted and held in a firmly supported state; And a sling tube replacement step of cutting and separating the sling tube coupled to the upper and lower tube bundles and then installing a new sling tube.

따라서 본 발명의 발전설비의 보일러 슬링 튜브 교체방법은 튜브번들의 튜브 사이에 끼워 수직으로 결합시킨 고정용번들지그와 상부번들지그와 하부번들지그를 90도 회전시킨 다음 체인블록을 조절하여 고정용번들지그와 상부번들지그 및 하부번들지그를 팽팽하게 당기도록 하므로서, 고정용번들지그의 지지러그가 튜브번들의 튜브에 걸리도록 하여 견고한 지지상태를 함과 동시에 상,하부번들지그의 안치러그에 튜브번들의 튜브가 각각 올려져 견고한 지지상태를 유지하도록 하되, 이로 인하여 견고한 상,하측튜브번들을 견고하게 지지한 상태에서 가지관 포함하는 슬링튜브를 튜브번들의 분리나 이동없이 안전하고 신속하며 효율적으로 교체하는 효과가 있는 것이다.Therefore, in the method of replacing the boiler sling tube of the power plant of the present invention, the fixed bundle jig, the upper bundle jig and the lower bundle jig, which are vertically coupled with each other by being inserted between the tubes of the tube bundle, are rotated 90 degrees, The jig and the upper bundle jig and the lower bundle jig are tightly pulled so that the supporting lugs of the fixing bundle jig are caught by the tubes of the bundle bundle so as to be firmly supported and the tube bundles The tubes are raised and held firmly so that the sling tubes including the tubes can be safely, promptly and efficiently replaced without the need to separate or move the tube bundles while the rigid upper and lower tube bundles are firmly supported .

도 1 은 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 나타낸 개략도.
도 2는 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 지지 지그를 나타낸 정면도.
도 3 은 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 지그 설치 위치를 확대하여 나타낸 단면도.
도 4 는 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 지그 삽입상태를 나타낸 정면도.
도 5 는 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 지그 지지상태를 나타낸 정면도.
도 6 은 본 발명에 따른 발전설비의 보일러 슬링 튜브 교체방법을 설명하기 위해 나타낸 순서도.
1 is a schematic view for explaining a boiler sling tube replacement method of a power generation facility according to the present invention.
BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a boiler,
FIG. 3 is an enlarged cross-sectional view illustrating a jig installation position for explaining a method of replacing a boiler sling tube in a power generation facility according to the present invention.
4 is a front view illustrating a jig insertion state to explain a method of replacing a boiler sling tube in a power generation facility according to the present invention.
FIG. 5 is a front view showing a jig supporting state to explain a boiler sling tube replacement method of a power generation facility according to the present invention. FIG.
6 is a flowchart illustrating a method for replacing a boiler sling tube in a power generation facility according to the present invention.

이하 첨부한 도면을 참조하면서 본 발명의 실시 예를 상세하게 설명하면 다음과 같다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 6 에 나타낸 바와 같이, 본 발명의 발전설비의 보일러 슬링 튜브 교체방법은 교체 하측 튜브번들(30b)의 하측 튜브번들(30)의 슬링튜브(40)에 지지빔(140)을 부착하는 지지빔 결합단계와; 상기 지지빔 결합단계가 완료되면 교체 상측 튜브번들(30a)의 상측 튜브번들(30) 사이에 고정용번들지그(110)를 수직으로 끼운 다음 90도 회전시켜 결합하는 고정용번들지그 결합단계와; 상기 고정용번들지그 결합단계가 완료되면 고정용번들지그(110)의 하측에 위치한 교체하고자 하는 상부튜브번들(30a) 사이에 상부번들지그(120)를 수직으로 끼운 다음 90도 회전시켜 고정하는 상부번들지그 결합단계와; 상기 상부번들지그 결합단계가 완료되면 상부번들지그(120)의 하측에 위치한 교체하고자 하는 하부튜브번들(30b) 사이에 하부번들지그(130)를 수직으로 끼운 다음 90도 회전시켜 고정하는 하부번들지그 결합단계와; 상기 하부번들지그 결합단계가 완료되면 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 순차적으로 체인블록(150)으로 연결한 다음 체인블록(150)을 조절하여 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 팽팽하게 당겨 고정용번들지그(110)의 지지러그(113)가 튜브번들(30)의 튜브(31)에 걸리도록 함과 동시에 상,하부번들지그(120,130)의 안치러그(123,133)에 튜브번들(30a,30b)의 튜브(31)가 각각 올려져 견고한 지지상태를 유지하는 튜브번들 고정단계와; 상기 튜브번들 고정단계가 완료되면 상,하측튜브번들(30a,30b)에 결합된 슬링튜브(40)를 절단하여 분리한 다음 신규 슬링튜브(40)를 설치하는 슬링튜브 교체단계를 포함하여 구성한다.1 to 6, the boiler sling tube replacement method of the present invention includes attaching the support beams 140 to the sling tube 40 of the lower tube bundle 30 of the replacement lower tube bundle 30b A supporting beam combining step; A fixing bundle jig bonding step of vertically inserting the fixing bundle jig 110 between the upper tube bundles 30 of the replacement upper tube bundle 30a and rotating the fixing bundle jig 110 by 90 degrees after the supporting beam combining step is completed; When the fixing bundle jig attaching step is completed, the upper bundle jig 120 is inserted vertically between the upper tube bundles 30a to be replaced, which is located below the fixing bundle jig 110, A bundle jig combining step; When the upper bundle jig attaching step is completed, the lower bundle jig 130 is vertically inserted between the lower bundle bundles 30b positioned below the upper bundle jig 120, A coupling step; The upper bundle jig 120 and the lower bundle jig 130 are sequentially connected to the chain block 150 and then the chain block 150 is adjusted The fixing bundle jig 110 and the upper bundle jig 120 and the lower bundle jig 130 are pulled tightly so that the supporting lug 113 of the fixing bundle jig 110 is pushed to the tube 31 of the tube bundle 30 A tube bundle fixing step of holding the tubes 31 of the tube bundles 30a and 30b on the inner lugs 123 and 133 of the upper and lower bundle jigs 120 and 130, respectively, so as to maintain a firm supporting state; And a sling tube replacement step of cutting and separating the sling tube 40 coupled to the upper and lower tube bundles 30a and 30b and installing a new sling tube 40 when the tube bundle fixing step is completed .

상기 지지빔 결합단계는 보일러 슬링 튜브 교체를 위한 튜브 번들 지지구조(100)는 하측 튜브번들(30)의 상부 슬링튜브(40)에 용접하여 하부측을 지지하도록 하되, H_빔이나 채널 등을 이용하여 튜브번들(30)의 상측 슬링튜브(40) 등에 용접하여 견고하게 고정상태를 유지할 수 있도록 함이 바람직하다.In the supporting beam combining step, the tube bundle supporting structure 100 for replacing the boiler sling tube is welded to the upper sling tube 40 of the lower tube bundle 30 to support the lower side, It is preferable to weld the tube to the upper sling tube 40 of the tube bundle 30 to maintain a firmly fixed state.

상기 고정용번들지그 결합단계는 고정용번들지그(110)의 지지대(111)에 좌우 한 쌍으로 형성한 지지러그(113)를 상하로 다수개 형성하여 상측 튜브번들(30)의 튜브(31)에 위치시켜 하향으로 걸리도록 한다.The fixing bundle jig may be formed by vertically arranging a plurality of support lugs 113 formed on the support base 111 of the fixing bundle jig 110 to form a pair of left and right support tubes, So as to be hooked downward.

즉, 고정용번들지그(110)의 지지대(111)를 상측 튜브번들(30)의 튜브(31) 사이로 수직으로 관통시켜 90도 회전시키면 지지러그(113)가 튜브번들(30)의 튜브(31) 상측에 각각 위치하여 안전하게 하향으로 걸릴 수 있도록 하는 것이다.That is, when the supporting base 111 of the fixing bundle jig 110 is vertically passed through the tubes 31 of the upper tube bundle 30 and rotated 90 degrees, the supporting lugs 113 are inserted into the tubes 31 of the tube bundles 30 Respectively, so that they can be safely pulled downward.

여기서 지지러그(113)는 상측 튜브번들(30)의 튜브(31) 상하 간격과 동일한 간격으로 지지대(111)에 형성하여 각각의 튜브(31)에 정확하게 걸리도록 하므로 안정적이고 효율적으로 튜브번들(30)에 고정용번들지그(110)를 고정할 수 있도록 함이 바람직하다.The support lugs 113 are formed on the support 111 at the same intervals as the upper and lower intervals of the tube 31 of the upper tube bundle 30 to accurately engage with the tubes 31 so that the tube bundles 30 So that the fixing bundle jig 110 can be fixed.

상기 상부번들지그 결합단계는 상부번들지그(120)의 지지대(121)에 좌우 한 쌍으로 형성한 안치러그(123)를 상하로 다수개 형성하여 상부 슬링튜브(40)측 튜브번들(30a)의 튜브(31) 하측에 각각 위치시켜 튜브번들(30a)의 튜브(31) 하측을 받칠 수 있도록 한다.The upper bundle jig engaging step may be performed by vertically arranging a plurality of left and right inner lugs 123 on the support 121 of the upper bundle jig 120, Are positioned below the tube 31 so as to support the lower side of the tube 31 of the tube bundle 30a.

즉, 상부번들지그(120)의 지지대(121)를 슬링튜브(40)를 교체를 위한 상부 튜브번들(30a)의 튜브(31) 사이로 수직으로 관통시켜 90도 회전시키면 안치러그(123)가 튜브번들(30a)의 튜브(31) 하측에 위치하여 안전하게 각각의 튜브(31)를 받칠 수 있도록 한다.That is, when the support base 121 of the upper bundle jig 120 is vertically passed through the tube 31 of the upper tube bundle 30a for replacement and rotated 90 degrees, the anchor lug 123 is inserted into the tube And is positioned below the tube 31 of the bundle 30a so that each tube 31 can be securely supported.

여기서 안치러그(123)는 튜브번들(30a)의 튜브(31) 상하 간격과 동일한 간격으로 지지대(121)에 형성하여 각각의 튜브(31)에 정확하게 걸리도록 하므로 안정적이고 효율적으로 튜브번들(30a)을 받쳐 지지할 수 있도록 함이 바람직하다.The inner lugs 123 are formed on the support 121 at the same intervals as the vertical intervals of the tubes 31 of the tube bundles 30a so as to be accurately engaged with the respective tubes 31, So that it can be supported.

상기 하부번들지그 결합단계는 하부번들지그(130)의 지지대(131)에 좌우 한 쌍으로 형성한 안치러그(133)를 상하로 다수개 형성하여 상부 슬링튜브(40)측 튜브번들(30b)의 튜브(31) 하측에 각각 위치시켜 튜브번들(30b)의 튜브(31) 하측을 받칠 수 있도록 한다.The lower bundle jig may be formed by vertically arranging a plurality of left and right pair of the inner lugs 133 on the support 131 of the lower bundle jig 130 so that the upper bundle jig Are positioned below the tube 31 so that the tube 31 of the tube bundle 30b can be supported under the tube 31. [

즉, 하부번들지그(130)의 지지대(131)를 슬링튜브(40)를 교체를 위한 상부 튜브번들(30b)의 튜브(31) 사이로 수직으로 관통시켜 90도 회전시키면 안치러그(133)가 튜브번들(30b)의 튜브(31) 하측에 위치하여 안전하게 각각의 튜브(31)를 받칠 수 있도록 한다.That is, when the support 131 of the lower bundle jig 130 is vertically passed through the tube 31 of the upper tube bundle 30b for replacement and rotated 90 degrees, the inner lug 133 is inserted into the tube And is positioned below the tube 31 of the bundle 30b so that each tube 31 can be securely supported.

여기서 안치러그(133)는 튜브번들(30b)의 튜브(31) 상하 간격과 동일한 간격으로 지지대(131)에 형성하여 각각의 튜브(31)에 정확하게 걸리도록 하므로 안정적이고 효율적으로 튜브번들(30b)을 받쳐 지지할 수 있도록 함이 바람직하다.The inner lugs 133 are formed on the support 131 at the same intervals as the upper and lower intervals of the tubes 31 of the tube bundles 30b so as to be accurately engaged with the respective tubes 31, So that it can be supported.

상기 튜브번들 고정단계는 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 순차적으로 체인블록(150)으로 연결하여 팽팽하게 당김으로 고정용번들지그(110)의 지지러그(113)가 튜브번들(30)의 튜브(31)에 걸리도록 함과 동시에 상,하부번들지그(120,130)의 안치러그(123,133)에 튜브번들(30a,30b)의 튜브(31)를 받치도록 하여 견고한 지지상태를 유지하도록 하므로 한다.In the tube bundle fixing step, the fixing bundle jig 110, the upper bundle jig 120, and the lower bundle jig 130 are sequentially connected to the chain block 150 to be pulled up tightly, The tube 31 of the tube bundles 30a and 30b is inserted into the inner lugs 123 and 133 of the upper and lower bundle jigs 120 and 130 while the supporting lug 113 is caught by the tube 31 of the tube bundle 30 So as to maintain a solid support state.

아울러 튜브번들(30)의 좌우에서 상하측의 튜브(31)를 벌려 400mm 정도의 작업공간을 확보함이 바람직하다.In addition, it is preferable to secure the working space of about 400 mm by opening the upper and lower tubes 31 at the left and right of the tube bundle 30.

상기 슬링튜브 교체단계는 상,하측튜브번들(30a,30b)에 결합된 슬링튜브(40)를 절단하여 분리한 다음 신규 슬링튜브(40)를 설치하도록 하되 가지관(41) 교체위치 튜브번들(30)의 양측을 벌려 400mm 정도의 작업공간을 확보하도록 하고, 기존 슬링튜브(40)의 인근(200mm 정도)에 신규 슬링튜브(40)를 설치한다.The replacement of the sling tubes may be performed by cutting and separating the sling tubes 40 coupled to the upper and lower tube bundles 30a and 30b and then installing the new sling tubes 40, 30 are opened to secure a work space of about 400 mm, and a new sling tube 40 is installed near the existing sling tube 40 (about 200 mm).

이러한 상태에서 기존 가지관(41)을 철거하고 신규 가지관(41)을 용접하여 설치하되, 상측튜브번들(30a)과 하측튜브번들(30b) 사이를 먼저 용접한 다음 상부 와 하부를 순차적으로 용접작업하도록 함이 바람직하다.In this state, the existing branch pipe 41 is removed and the new branch pipe 41 is welded, and the upper and lower tube bundles 30a and 30b are welded first, then the upper and lower pipes are sequentially welded It is desirable to work.

이러한 본 발명의 보일러 슬링 튜브 교체를 위한 구조는 지지대(131)를 수직으로 형성하고 지지대(131)의 좌우로 안치러그(133)를 돌출시키되 안치러그(133)를 지지대(111)의 상하로 다수개 형성하여 교체를 위한 하부 슬링튜브(40)측 튜브번들(30b)의 튜브(31) 하측에 각각 위치시키는 하부번들지그(130)와, 상기 하부번들지그(130)의 상단에 상향으로 지지대(121)를 수직 연결하고 지지대(121)의 좌우로 안치러그(123)를 돌출시키되 안치러그(123)를 지지대(121)의 상하로 다수개 형성하여 교체를 위한 상부 슬링튜브(40)측 튜브번들(30a)의 튜브(31) 하측에 각각 위치시키는 상부번들지그(120)와, 상기 상부번들지그(120)의 상단에 상향으로 지지대(111)를 수직 결합하고 지지대(111)의 좌우로 지지러그(113)를 돌출시키되 지지러그(113)를 지지대(111)의 상하로 다수개 형성하여 상측 튜브번들(30)의 튜브(31) 상측에 각각 위치시키는 고정용번들지그(110), 및 상기 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 연결하는 체인블록(150)으로 구성한다.The structure for replacing the boiler sling tube according to the present invention includes a support base 131 vertically formed and protruding from the left and right of the support base 131. The anchor lugs 133 are supported by a plurality A lower bundle jig 130 for positioning the upper bundle jig 130 and lower bundle jig 130 for lowering the tube bundle 30b of the lower bundling jig 130, 121 of the upper sling tube 40 are vertically connected and the inner lug 123 is protruded to the left and right of the supporter 121. A plurality of the inner lugs 123 are formed on the upper and lower sides of the supporter 121, The upper bundle jig 120 vertically couples the upper end of the upper bundle jig 120 to the upper end of the upper bundle jig 120 and vertically couples the upper end of the upper bundle jig 120 to the lower end of the tube 31, A plurality of supporting lugs 113 are formed on the upper and lower sides of the supporting table 111, A fixing bundle jig 110 for positioning the upper bundle jig 120 and the lower bundle jig 130 on the upper side of the tube 31 of the tube bundle 30, Block 150 as shown in FIG.

상기 고정용번들지그(110)의 지지대(111)는 튜브번들(30)의 튜브(31) 사이를 수직으로 관통하도록 하여 지지대(111)를 90도 회전시키면 지지러그(113)가 튜브번들(30)의 튜브(31) 상측에 각각 위치하여 걸리도록 하되, 튜브번들(30)의 튜브(31) 상하 간격과 지지러그(113)의 상하 간격을 동일한 간격으로 형성하고 지지대(111)의 하부에 연결고리(112)를 형성함이 바람직하다.The supporting base 111 of the fixing bundle jig 110 vertically penetrates between the tubes 31 of the tube bundle 30 and the supporting base 111 is rotated 90 degrees so that the supporting lug 113 is inserted into the tube bundle 30 The upper and lower spaces of the tubes 31 of the tube bundles 30 and the upper and lower spaces of the support lugs 113 are formed at equal intervals and connected to the lower portion of the support base 111 It is preferable to form the ring 112.

상기 상, 하부번들지그(120,130)의 지지대(121,131)는 슬링튜브(40)를 교체를 위한 상하부 튜브번들(30a,30b)의 튜브(31) 사이를 수직으로 관통하여 지지대(121,131)를 90도 회전시키면 안치러그(123,133)가 튜브번들(30a,30b)의 튜브(31) 하측에 위치하여 각각의 튜브(31)를 지지하도록 하되, 튜브번들(30a,30b)의 튜브(31) 상하 간격과 안치러그(123,133)의 상하 간격을 동일한 간격으로 형성하고 지지대(121,131)의 상부와 하부에 연결고리(122,132)를 각각 형성함이 이상적이다.The supporters 121 and 131 of the upper and lower bundle jigs 120 and 130 vertically penetrate between the tubes 31 of the upper and lower tube bundles 30a and 30b for replacement of the sling tube 40, The inner lugs 123 and 133 are positioned below the tubes 31 of the tube bundles 30a and 30b so as to support the respective tubes 31 so that the tube bundles 30a and 30b are spaced apart from each other It is ideal to form the annular lugs 123 and 133 at equal intervals in the vertical direction and to form the linking rings 122 and 132 respectively at the upper and lower portions of the support bases 121 and 131, respectively.

한편 지지빔(140)은 H_빔이나 채널 등을 이용하여 형성함이 일반적이다.On the other hand, the support beam 140 is generally formed using an H beam or a channel.

상기 체인블록(150)은 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 설치하여 연결하는 체인블록(150)을 조작하여 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 팽팽하게 당겨 조절하므로, 교체를 위한 슬링튜브(40) 측 튜브번들(30,30a,30b)을 견고하게 지지할 수 있도록 한다.The chain block 150 is operated by operating the chain block 150 connecting and fixing the upper bundle jig 120 and the lower bundle jig 130 to the fixing bundle jig 110, The bundle jig 120 and the lower bundle jig 130 are tightly pulled and adjusted to firmly support the tube bundles 30, 30a and 30b on the sling tube 40 for replacement.

이러한 본 발명의 발전설비의 보일러 슬링 튜브 교체방법은 교체 상측 튜브번들(30a)의 상측 튜브번들(30) 사이에 고정용번들지그(110)를 수직으로 끼워 90도 회전시켜 결합한 다음 고정용번들지그(110)의 하측에 위치한 교체하고자 하는 상부튜브번들(30a) 사이에 상부번들지그(120)를 수직으로 끼워 90도 회전시켜 결합하고, 상부번들지그(120)의 하측에 위치한 교체하고자 하는 하부튜브번들(30b) 사이에 하부번들지그(130)를 수직으로 끼워 90도 회전시켜 결합한다.The method of replacing the boiler sling tube of the power plant according to the present invention comprises vertically inserting the fixing bundle jig 110 between the upper tube bundles 30 of the upper tube bundle 30a, The upper bundle jig 120 is vertically inserted and rotated by 90 degrees between the upper bundle bundle 30a to be replaced located at a lower side of the upper bundle jig 120, The lower bundle jig 130 is vertically fitted between the bundles 30b and rotated by 90 degrees.

여기서 체인블록(150)으로 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 연결하여 튜브번들(30,30a,30b)을 견고하게 지지할 수 있도록 한다.In this case, the fixing bundle jig 110, the upper bundle jig 120, and the lower bundle jig 130 are connected by the chain block 150 to firmly support the tube bundles 30, 30a, 30b.

따라서, 견고한 상,하측튜브번들(30a,30b)을 견고하게 지지한 상태에서 상기와 같이 상,하측튜브번들(30a,30b)에 결합된 슬링튜브(40)를 상하를 절단하여 분리한 다음 신규 슬링튜브(40)를 안전하게 교체할 수 있도록 하는 것으로 상,하측튜브번들(30a,30b)의 분리없이 슬링튜브(40)와 가지관(41)을 안전하고 신속하며 효율적으로 교체작업을 할 수 있도록 하는 것이다.Therefore, the sling tube 40 coupled to the upper and lower tube bundles 30a and 30b is vertically cut and separated as described above while firmly supporting the rigid upper and lower tube bundles 30a and 30b, The sling tube 40 can be safely replaced so that the sling tube 40 and the branch tube 41 can be safely and quickly and efficiently replaced without separating the upper and lower tube bundles 30a and 30b. .

10 : 헤드 20 : 커넥터튜브
30, 30a, 30b : 튜브번들 31 : 튜브
40 : 슬링튜브 41 : 가지관
42 : 지지돌기 43 : 결합편
110 : 고정용번들지그 111 : 지지대
112 : 연결고리 113 : 지지러그
120 : 상부번들지그 121 : 지지대
122 : 연결고리 123 : 안치러그
124 : 가이드홈 130 : 하부번들지그
131 : 지지대 132 : 연결고리
133 : 안치러그 134 : 가이드홈
140 : 지지빔 150 : 체인블록
10: head 20: connector tube
30, 30a, 30b: tube bundle 31: tube
40: Sling tube 41: Branch pipe
42: support projection 43:
110: Fixing bundle jig 111: Support
112: connecting collar 113: supporting lug
120: upper bundle jig 121: support
122: Link collar 123: Anchor rug
124: guide groove 130: lower bundle jig
131: support 132: connection ring
133: Anchor lug 134: Guide groove
140: support beam 150: chain block

Claims (4)

교체를 위한 하측 튜브번들(30b)의 하측에 위치하는 튜브번들(30)의 슬링튜브(40)에 지지빔(140)을 부착하는 지지빔 결합단계와,
상기 지지빔 결합단계가 완료되면 교체 상측 튜브번들(30a)의 상측 튜브번들(30) 사이에 고정용번들지그(110)를 수직으로 끼운 다음 90도 회전시켜 결합하는 고정용번들지그 결합단계와,
상기 고정용번들지그 결합단계가 완료되면 고정용번들지그(110)의 하측에 위치한 교체하고자 하는 상부튜브번들(30a) 사이에 상부번들지그(120)를 수직으로 끼운 다음 90도 회전시켜 고정하는 상부번들지그 결합단계와,
상기 상부번들지그 결합단계가 완료되면 상부번들지그(120)의 하측에 위치한 교체하고자 하는 하부튜브번들(30b) 사이에 하부번들지그(130)를 수직으로 끼운 다음 90도 회전시켜 고정하는 하부번들지그 결합단계와,
상기 하부번들지그 결합단계가 완료되면 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 순차적으로 체인블록(150)으로 연결하고 고정용번들지그(110)와 상부번들지그(120) 및 하부번들지그(130)를 팽팽하게 당겨 고정용번들지그(110)의 지지러그(113)가 튜브번들(30)의 튜브(31)에 걸리도록 함과 동시에 상,하부번들지그(120,130)의 안치러그(123,133)에 튜브번들(30a,30b)의 튜브(31)가 각각 올려져 견고한 지지상태를 유지하는 튜브번들 고정단계와,
상기 튜브번들 고정단계가 완료되면 상,하측튜브번들(30a,30b)에 결합된 슬링튜브(40)를 절단하여 분리한 다음 신규 슬링튜브(40)를 설치하는 슬링튜브 교체단계를 포함하여 구성한 것을 특징으로 하는 발전설비의 보일러 슬링 튜브 교체방법.
Attaching a support beam (140) to a sling tube (40) of a tube bundle (30) positioned below the lower tube bundle (30b) for replacement;
A fixing bundle jig coupling step of vertically inserting the fixing bundle jig 110 between the upper tube bundles 30 of the replacement upper tube bundle 30a and rotating the fixing bundle jig 110 by 90 degrees after the supporting beam combining step is completed,
When the fixing bundle jig attaching step is completed, the upper bundle jig 120 is inserted vertically between the upper tube bundles 30a to be replaced, which is located below the fixing bundle jig 110, A bundle jig combining step,
When the upper bundle jig attaching step is completed, the lower bundle jig 130 is vertically inserted between the lower bundle bundles 30b positioned below the upper bundle jig 120, A coupling step,
The upper bundle jig 120 and the lower bundle jig 130 are sequentially connected to the chain block 150 and the fixing bundle jig 110 and the lower bundle jig 130 are sequentially connected to each other, The bundle jig 120 and the lower bundle jig 130 are tightly pulled so that the supporting lug 113 of the bundling bundle for fixing 110 is caught by the tube 31 of the tube bundle 30, A tube bundle fixing step in which the tubes 31 of the tube bundles 30a and 30b are respectively mounted on the inner lugs 123 and 133 of the jigs 120 and 130 to maintain a firm supporting state,
And a sling tube replacement step of cutting and separating the sling tube 40 coupled to the upper and lower tube bundles 30a and 30b and then installing a new sling tube 40 when the tube bundle fixing step is completed A method for replacing a boiler sling tube in a power plant.
제 1항에 있어서,
상기 고정용번들지그 결합단계는 고정용번들지그(110)의 지지대(111)에 좌우 한 쌍으로 형성한 지지러그(113)를 상하로 다수개 형성하여 상측 튜브번들(30)의 튜브(31)에 위치시켜 하향으로 걸리도록 하되, 지지러그(113)를 상측 튜브번들(30)의 튜브(31) 상하 간격과 동일한 간격으로 지지대(111)에 형성하여 각각의 튜브(31)에 정확하게 걸리도록 하므로 안정적이고 효율적으로 튜브번들(30)에 고정용번들지그(110)를 고정할 수 있도록 구성한 것을 특징으로 하는 발전설비의 보일러 슬링 튜브 교체방법.
The method according to claim 1,
The fixing bundle jig may be formed by vertically arranging a plurality of support lugs 113 formed on the support base 111 of the fixing bundle jig 110 to form a pair of left and right support tubes, And the support lugs 113 are formed on the support table 111 at the same intervals as the upper and lower intervals of the tubes 31 of the upper tube bundles 30 so as to be accurately engaged with the respective tubes 31 Wherein the fixing bundle jig (110) is fixed to the tube bundle (30) in a stable and efficient manner.
제 1 항에 있어서,
상기 상,하부번들지그 결합단계는 상부번들지그(120,130)의 지지대(121,131)에 좌우 한 쌍으로 형성한 안치러그(123,133)를 상하로 다수개 형성하여 상부 슬링튜브(40)측 튜브번들(30a,30b)의 튜브(31) 하측에 각각 위치시켜 튜브번들(30a,30b)의 튜브(31) 하측을 받칠 수 있도록 하되, 안치러그(123,133)를 튜브번들(30a,30b)의 튜브(31) 상하 간격과 동일한 간격으로 지지대(121,131)에 형성하여 각각의 튜브(31)에 정확하게 걸리도록 하므로 안정적이고 효율적으로 튜브번들(30a,30b)을 받쳐 지지할 수 있도록 구성한 것을 특징으로 하는 발전설비의 보일러 슬링 튜브 교체방법.
The method according to claim 1,
The upper and lower bundle jigs are formed by vertically arranging a plurality of left and right pair of the inner lugs 123 and 133 on the upper and lower support bars 121 and 131 of the upper bundle jigs 120 and 130, 30b so as to support the lower side of the tube 31 of the tube bundles 30a, 30b while the inner lugs 123, 133 are positioned below the tube 31 of the tube bundles 30a, 30b, And the tube bundles (30a, 30b) can be supported and supported stably and efficiently because they are formed on the supports (121, 131) at the same intervals as the upper and lower intervals and are accurately engaged with the respective tubes (31) How to replace the sling tube.
제 1 항에 있어서,
상기 슬링튜브 교체단계는 상,하측튜브번들(30a,30b)에 결합된 슬링튜브(40)를 절단하여 분리한 후 신규 슬링튜브(40)를 설치하도록 하되 기존 슬링튜브(40)에 근접하여 신규 슬링튜브(40)를 설치하고, 다시 기존 가지관(41)을 철거하고 신규 가지관(41)을 용접하여 설치하되 이때 상측튜브번들(30a)과 하측튜브번들(30b) 사이를 용접한 다음 상부와 하부를 순차적으로 용접작업하도록 구성한 것을 특징으로 하는 발전설비의 보일러 슬링 튜브 교체방법.
The method according to claim 1,
The sling tube replacement step is performed by cutting the sling tube 40 coupled to the upper and lower tube bundles 30a and 30b to separate and install a new sling tube 40, The sling tube 40 is installed and the existing branch pipe 41 is removed and the new branch pipe 41 is welded. At this time, the upper tube bundle 30a and the lower tube bundle 30b are welded, And a lower portion of the boiler slip tube are sequentially welded.
KR1020170061251A 2017-05-17 2017-05-17 Method for replacing boiler sling tube of power generation facility KR101780228B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020170061251A KR101780228B1 (en) 2017-05-17 2017-05-17 Method for replacing boiler sling tube of power generation facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020170061251A KR101780228B1 (en) 2017-05-17 2017-05-17 Method for replacing boiler sling tube of power generation facility

Publications (1)

Publication Number Publication Date
KR101780228B1 true KR101780228B1 (en) 2017-09-21

Family

ID=60034744

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020170061251A KR101780228B1 (en) 2017-05-17 2017-05-17 Method for replacing boiler sling tube of power generation facility

Country Status (1)

Country Link
KR (1) KR101780228B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190062826A (en) * 2017-11-29 2019-06-07 비에이치아이 주식회사 Support device for tube bundle

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000249490A (en) 1999-03-01 2000-09-14 Ishikawajima Harima Heavy Ind Co Ltd Pipe support
JP2017032200A (en) 2015-07-31 2017-02-09 三菱日立パワーシステムズ株式会社 Heat transfer tube block replacement method of heat exchanger

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000249490A (en) 1999-03-01 2000-09-14 Ishikawajima Harima Heavy Ind Co Ltd Pipe support
JP2017032200A (en) 2015-07-31 2017-02-09 三菱日立パワーシステムズ株式会社 Heat transfer tube block replacement method of heat exchanger

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190062826A (en) * 2017-11-29 2019-06-07 비에이치아이 주식회사 Support device for tube bundle
KR101990636B1 (en) * 2017-11-29 2019-06-18 비에이치아이 주식회사 Support device for tube bundle

Similar Documents

Publication Publication Date Title
US8607451B2 (en) Combustor-transition-piece guide jig and method of detaching and attaching combustor of gas turbine
KR101780228B1 (en) Method for replacing boiler sling tube of power generation facility
US9010404B2 (en) Inspection apparatus and inspection method for heat transfer tube
KR101818585B1 (en) Welding method for head to tube and fixing-jig apparatus of tube
KR101822840B1 (en) Tube bundle supporting structure for boiler sling tube replacement
US7487745B2 (en) Boiler tube position retainer assembly
KR20180129380A (en) Hrsg
WO2015186207A1 (en) Boiler and method for replacing heat transfer tube thereof
KR101236184B1 (en) Pendant assembling type prefabricated scaffolding system device for large heat power plant
KR200431175Y1 (en) Boling device of Steam Generator Tube
RU2391724C1 (en) Fuel assembly of nuclear reactor
CN204665241U (en) A kind of fixture of boiler tail convection heating surface
KR100873953B1 (en) Device for pulling welded plug installed in the damaged heat exchanger tubes in steam generator
JP6671146B2 (en) Repair method for economizer, boiler and heat transfer tube
CN110883533A (en) Water-cooled wall optical alignment automatic pipe penetrating machine and pipe penetrating method
CN218614193U (en) Isolator for vaccine production
CN111235347A (en) Self-adaptive adjustment sliding support for converter vaporization flue and use method thereof
JP6550244B2 (en) Drive axis handling tools
CN205111197U (en) U type nest of tubes is to ware
CN215732902U (en) Distribution box for photovoltaic power generation
JP2004060983A (en) Supporting structure of boiler horizontal heat transfer tube
CN212430816U (en) Pipe type pipe row clamp with front vertical pipe
JP3220385U (en) Combustion burner insertion jig
KR101512417B1 (en) Radiation shielding for steam generator channel repair
CN216976767U (en) Fixing device suitable for suspension boiler drain pipe synchronous expansion

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant