KR101744646B1 - Electric power management system and method for new and renewable energy generation plant - Google Patents

Electric power management system and method for new and renewable energy generation plant Download PDF

Info

Publication number
KR101744646B1
KR101744646B1 KR1020100126967A KR20100126967A KR101744646B1 KR 101744646 B1 KR101744646 B1 KR 101744646B1 KR 1020100126967 A KR1020100126967 A KR 1020100126967A KR 20100126967 A KR20100126967 A KR 20100126967A KR 101744646 B1 KR101744646 B1 KR 101744646B1
Authority
KR
South Korea
Prior art keywords
power
unit
renewable energy
amount
plant
Prior art date
Application number
KR1020100126967A
Other languages
Korean (ko)
Other versions
KR20120065701A (en
Inventor
한정훈
우일국
오영태
이성근
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020100126967A priority Critical patent/KR101744646B1/en
Publication of KR20120065701A publication Critical patent/KR20120065701A/en
Application granted granted Critical
Publication of KR101744646B1 publication Critical patent/KR101744646B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Abstract

본 발명은 신재생에너지 발전 플랜트에서 발전된 전력의 활용 기술에 관한 것으로, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템은 신재생에너지를 이용하여, 전력을 생산하는 신재생에너지발전부, 상기 신재생에너지발전부와 연결되어, 상기 신재생에너지발전부에서 생산되는 전력의 송전을 제어하는 제1전력제어부와 상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 전력을 이용하여, 연료에너지를 생산하는 전력활용플랜트부와 상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 잔여 전력을 저장하는 전력저장부와 상기 전력저장부 및 상기 전력활용플랜트부와 연결되어, 상기 전력저장부에 저장된 전력의 송전을 제어하는 제2전력제어부를 포함하는 것을 기술적 특징으로 하며, 신재생에너지발전부와 근접한 곳에 상기 신재생에너지발전부에서 발전된 전력을 이용할 수 있는 전력활용플랜트부를 구성하여, 신재생에너지발전부의 전력 송전 거리를 단축하여, 전력효율을 향상시키는 것을 기술적 목적으로 한다.The present invention relates to a power utilization technology developed in a renewable energy generation plant, and a power utilization system of a renewable energy generation plant according to the present invention includes a renewable energy generation section for generating electricity using renewable energy, A first power control unit connected to the renewable energy generating unit and controlling transmission of power generated by the renewable energy generating unit and a second power control unit connected to the first power control unit, And a power storage unit connected to the first power control unit and connected to the power storage unit and the power utilization plant unit for storing the remaining power of the renewable energy generation unit, And a second power control unit for controlling the transmission of power stored in the second power storage unit. Where one to constitute a power plant utilizing the available electric power from the renewable energy power generation unit, and the speed of the renewable energy power generation portion power supply distance, the power efficiency improvement in technical purposes.

Figure R1020100126967
Figure R1020100126967

Description

신재생에너지 발전 플랜트의 전력 제어 시스템 및 그 활용 방법{Electric power management system and method for new and renewable energy generation plant}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power control system for a renewable energy generation plant,

본 발명은 신재생에너지 발전 플랜트에서 발전된 전력의 활용 기술에 관한 것으로 보다 상세하게는 신재생에너지 발전 플랜트와 인접한 곳에 상기 신재생에너지 발전 플랜트의 활용할 수 있는 전력활용플랜트 시설을 구성하고, 상기 전력활용플랜트 시설에 제공되는 전력을 제어하는 신재생에너지 발전 플랜트의 전력 제어 시스템 및 그 활용 방법에 관한 것이다.The present invention relates to a power utilization technology developed in a renewable energy generation plant, and more particularly, to a power utilization plant facility capable of utilizing the renewable energy generation plant adjacent to a renewable energy generation plant, To a power control system of a renewable energy power plant for controlling power supplied to a plant facility and a utilization method thereof.

일반적으로 자연에너지를 이용하여 발전하는 신재생에너지 발전 플랜트는 공급되는 자연에너지의 특성에 따라서 시간과 장소에 따라 가변되는 변동성과 분산성을 가지고 있다.Generally, renewable energy power plants that are developed using natural energy have variable volatility and dispersibility depending on time and place depending on the nature of supplied natural energy.

따라서 신재생 에너지 발전 플랜트에서 생산되는 전력도 변동성을 가짐에 따라 안정적인 전력 생산이 어려우며, 생산된 전력을 전력계통에 연결 시, 추가적인 장비가 구비되어야 하고, 많은 비용이 소요되는 문제점이 있다.Therefore, it is difficult to produce stable electric power because the electric power produced by the renewable energy power plant has variability. Further, when the generated electric power is connected to the electric power system, additional equipment must be provided, which is costly.

또한, 신재생에너지 발전 플랜트에서 생산된 전력을 전력계통에 연결하여 송전 시, 전력계통과의 거리에 따라 전력 효율이 급격히 떨어지는 문제점이 있다.In addition, there is a problem that the power produced by the renewable energy generation plant is connected to the power system and the power efficiency is rapidly deteriorated according to the distance of the power system when the power is transmitted.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 제안된 것으로,The present invention has been proposed in order to solve the above-mentioned problems,

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템의 목적은 신재생에너지발전부와 근접한 곳에 상기 신재생에너지발전부에서 발전된 전력을 이용할 수 있는 전력활용플랜트부를 구성하여, 신재생에너지발전부의 전력 송전 거리를 단축하여, 전력효율을 향상시키는데 있다.An object of the power control system of a new and renewable energy generation plant according to the present invention is to construct a power utilization plant unit that can utilize the power generated by the renewable energy generation unit near a renewable energy generation unit, To shorten the transmission distance, and to improve the power efficiency.

다른 목적은, 전력저장부를 더 포함하여, 신재생에너지발전부에서 생산되는 잉여 전력을 저장하는데 있다.Another object is to store the surplus power produced by the renewable energy generation unit, further including a power storage unit.

또 다른 목적은, 제2전력제어부를 더 포함하여, 전력저장부에 저장된 전력의 송전을 제어하는데 있다.Still another object is to control the transmission of power stored in the power storage unit, further comprising a second power control unit.

또 다른 목적은, 제1전력제어부를 포함하여, 전력활용플랜트부의 가동여부에 따라 신재생에너지발전부의 전력의 송전을 제어하는데 있다.Another object of the present invention is to control the transmission of power of the renewable energy generation section according to whether the power utilization plant section is operated or not, including the first power control section.

또 다른 목적은, 제2전력제어부를 포함하여, 전력저장부의 전력 송전을 제어하여, 상기 전력활용플랜트부에 전력을 공급하는데 있다.Another object is to control the power transmission of the power storage unit, including the second power control unit, to supply power to the power utilization plant unit.

또 다른 목적은, 제3전력제어부를 포함하여, 전력저장부의 저장 전력에 따라 전력활용플랜트부와 전력계통부의 연결을 제어한다.Another object is to control the connection between the power utilization plant part and the power system part according to the stored power of the power storage part, including the third power control part.

또 다른 목적은, 자연에너지를 이용하여 발전하는 신재생에너지발전부를 단일 또는 복합적으로 구성하는데 있다.Another objective is to construct a single or a combination of renewable energy generating units that develop using natural energy.

또 다른 목적은, 신재생에너지발전부의 대용량의 전력을 소비할 수 있는 전력활용플랜트부를 구성하는데 있다.Another object is to construct a power utilization plant part capable of consuming a large amount of power of the renewable energy generation part.

또 다른 목적은 대용량의 전력을 저장할 수 있는 전력저장장치를 구성하는데 있다.
Another object is to construct a power storage device capable of storing a large amount of power.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 방법의 목적은 전력활용플랜트부의 전력량을 측정 후, 전력활용플랜트부를 가동 여부를 판단하여, 전력활용플랜트부의 가동 시, 신재생에너지발전부의 전력을 전력활용플랜부에 제공하는데 있다.A power control method of a renewable energy power plant according to the present invention is characterized in that it is determined whether or not a power utilization plant unit is operated after measuring a power amount of a power utilization plant unit, Utilization plan department.

다른 목적은, 신재생에너지발전부의 잉여 전력을 전력저장부에 저장하는데 있다.Another purpose is to store the surplus power of the renewable energy generation section in the power storage section.

또 다른 목적은, 전력저장부의 전력량을 측정하여, 전력활용플랜트부의 가동이 가능한 전력을 공급하는데 있다.Another object is to measure the amount of electric power in the electric power storage unit and to supply electric power that can operate the electric power utilization plant unit.

또 다른 목적은, 전력저장부의 잉여 전력을 상기 전력계통부로 송전하는데 있다.Another object is to transmit surplus power of the power storage unit to the power system unit.

또 다른 목적은, 전력저장부에 저장된 전력량이 전력활용플랜트부를 가동할 수 없을 경우, 제3제어장치를 구동하는데 있다.Another object is to drive the third control device when the amount of electric power stored in the electric power storage portion can not operate the power utilization plant portion.

또 다른 목적은, 전력저장부에 저장된 전력량이 전력활용플랜트부를 가동할 수 없을 경우, 전력계통부의 전력을 전력활용플랜트부로 송전하는데 있다. Another object is to transmit power of the power system section to the power utilization plant section when the amount of power stored in the power storage section can not operate the power utilization plant section.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템은 신재생에너지를 이용하여, 전력을 생산하는 신재생에너지발전부, 상기 신재생에너지발전부와 연결되어, 상기 신재생에너지발전부에서 생산되는 전력의 송전을 제어하는 제1전력제어부 및 상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 전력을 이용하여, 연료에너지를 생산하는 전력활용플랜트부, 상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 잔여 전력을 저장하는 전력저장부와 상기 전력저장부 및 상기 전력활용플랜트부와 연결되어, 상기 전력저장부에 저장된 전력의 송전을 제어하는 제2전력제어부를 포함하는 것을 특징으로 한다.A power control system of a renewable energy power plant according to the present invention is a renewable energy power generation unit that generates electricity using renewable energy and a renewable energy generation unit that is connected to the renewable energy generation unit and is produced in the renewable energy generation unit A power utilization plant unit connected to the first power control unit and generating fuel energy using the power of the renewable energy generation unit, a first power control unit connected to the first power control unit, And a second power control unit connected to the power storage unit and the power utilization plant unit and controlling transmission of power stored in the power storage unit, the power storage unit storing the remaining power of the renewable energy generation unit, .

또한, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템은 제2전력제어부와 연결되며, 전력계통부의 전력 송전을 제어하여, 상기 전력활용플랜트부에 상기 전력계통부의 전력을 공급하는 제3전력제어부를 더 포함하는 것을 특징으로 한다.The power control system of the renewable energy power plant according to the present invention is connected to the second power control unit and controls the power transmission of the power system unit to generate a third power And a control unit.

또한, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템은 제2전력제어부와 연결되며, 전력계통부의 전력 송전을 제어하여, 전력활용플랜트부에 상기 전력계통부의 전력을 공급하는 더 제3전력제어부를 포함하는 것을 특징으로 한다.In addition, the power control system of the renewable energy power plant according to the present invention is connected to the second power control unit, and controls power transmission of the power system unit, and supplies a third power And a control unit.

또한, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템의 제1전력제어부는 상기 신재생에너지발전부로부터 전력 제어신호를 전달받고, 상기 전력활용플랜트부에 전력 제어신호를 전달하는 제1제어신호송수신부, 상기 신재생에너지발전부의 전력량을 측정하는 제1전력량측정부, 상기 제1제어신호송수신부 및 상기 제1전력량측정부와 연결되어, 상기 신재생에너지발전부의 전력량에 따라 상기 전력활용플랜드부의 전력 송전 여부를 판단하는 제1전력송전판단부 및 상기 제1전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제1제어설정부를 포함하는 것을 특징으로 한다.The first power control unit of the power control system of the new and renewable energy generation plant according to the present invention receives the power control signal from the renewable energy generation unit and transmits a power control signal to the power utilization plant unit. A first power amount measurement unit for measuring a power amount of the renewable energy generation unit, a second power amount measurement unit connected to the first control signal transmission / reception unit and the first power amount measurement unit, And a first control setting unit connected to the first power transmission determination unit to set an amount of power that is a driving reference of the power utilization plant unit, do.

또한, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템의 제2전력제어부는 상기 전력활용플랜트부로부터 전력 제어신호를 전달받고, 상기 제3전력제어부에 전력 제어신호를 전달하는 제2제어신호송수신부, 상기 신재생에너지발전부의 전력량을 측정하는 제2전력량측정부, 상기 제2제어신호송수신부 및 상기 제2전력량측정부와 연결되어, 상기 전력저장장치의 전력량에 따라 상기 전력활용플랜드부의 전력 송전 여부를 판단하는 제2전력송전판단부 및 상기 제2전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제2제어설정부를 포함하는 것을 특징으로 한다.The second power control unit of the power control system of the renewable energy power plant according to the present invention receives a power control signal from the power utilization plant unit and receives a second control signal A second power measurement unit for measuring a power amount of the renewable energy generation unit, a second power control unit connected to the second control signal transmission and reception unit and the second power amount measurement unit, And a second control setting unit that is connected to the second power transmission determination unit and sets an amount of power that is a reference for operating the power utilization plant unit.

또한, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 시스템의 제3전력제어부는 상기 제2전력제어부로부터 전력 제어신호를 전달받고, 상기 전력계통부에 전력 제어신호를 전달하는 제3제어신호송수신부, 상기 전력활용플랜트부의 전력량을 측정하는 제3전력량측정부, 상기 제3제어신호송수신부 및 상기 제3전력량측정부와 연결되어, 상기 전력활용플랜트부의 전력량에 따라 상기 전력계통부의 전력 송전 여부를 판단하는 제3전력송전판단부 및 상기 제3전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제3제어설정부를 포함하는 것을 특징으로 한다.
The third power control unit of the power control system of the new and renewable energy generation plant according to the present invention includes a third control signal transmission / reception unit for receiving the power control signal from the second power control unit and transmitting the power control signal to the power system control unit, A third power measurement unit for measuring a power amount of the power utilization plant unit, a third power measurement unit connected to the third control signal transmission / reception unit and the third power measurement unit, and determining whether or not power transmission of the power system unit is performed according to an amount of power of the power utilization plant unit And a third control setting unit that is connected to the third power transmission determination unit and sets an amount of power that is a reference of operation of the power utilization plant unit.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 방법은 제1전력제어부를 이용하여, 신재생에너지발전부의 전력량은 측정하는 단계, 상기 제1전력제어부를 이용하여, 전력활용플랜트부가 가동 중인지 여부를 판단하는 단계, 상기 전력활용플랜트가 가동 중일 경우, 상기 제1전력제어부에서 측정된 상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위인지 판단하는 단계, 상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위일 경우, 상기 신재생에너지발전부에서 생산된 전력을 상기 전력활용플랜트부로 송전하는 단계를 포함하며, 상기 전력활용플랜트부가 가동 중인지 여부를 판단하는 단계에서, 상기 전력활용플랜트부가 가동되지 않을 경우, 상기 신재생에너지발전부의 전력량이 전력계통부와 연결 가능한 범위이면 상기 전력계통부로 송전하는 단계를 더 포함하는 것을 특징으로 한다.A power control method for a renewable energy power plant according to the present invention includes the steps of: measuring a power amount of a renewable energy generation unit using a first power control unit; determining whether a power utilization plant unit is in operation using the first power control unit Determining whether the amount of power of the renewable energy generation unit measured by the first power control unit is within a range capable of operating the power utilization plant unit when the power utilization plant is in operation, And transmitting power generated by the renewable energy generation unit to the power utilization plant unit when the power utilization plant unit is in a range capable of operating the power utilization plant unit. In the step of determining whether the power utilization plant unit is in operation, Wherein when the power utilization plant section is not operated, And transmitting power to the power system section if the power can be connected to the barrel section.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 방법에 있어서, 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위인지 판단하는 단계 이후에, 상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 없는 범위일 경우, 상기 신재생에너지발전부에서 생산된 전력을 상기 전력저장부로 송전하는 단계를 더 포함하는 것을 특징으로 한다.In the power control method for a new and renewable energy generation plant according to the present invention, it is preferable that, after determining whether the amount of power of the renewable energy generation unit is within a range capable of operating the power utilization plant unit, And transmitting power generated by the renewable energy generation unit to the power storage unit when the power saving unit can not operate the power storage unit.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 방법에 있어서, 신재생에너지발전부에서 생산된 전력을 상기 전력저장부로 송전하는 단계 이후에, 제2전력제어부를 이용하여, 상기 전력활용플랜트부의 전력량을 측정하여, 전력량이 부족한지 여부를 판단하는 단계, 상기 전력활용플랜트부의 전력이 가동 기준치보다 부족할 경우, 상기 전력저장부의 전력량을 측정하는 단계, 상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 높은지 여부를 판단하는 단계, 상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 높을 경우, 전력저장부에 저장된 전력을 상기 전력활용플랜트부로 송전하는 단계를 포함하는 것을 특징으로 한다.In the power control method for a new and renewable energy generation plant according to the present invention, after the step of transmitting the power generated by the renewable energy generation unit to the power storage unit, a second power control unit is used to control the power consumption of the power utilization plant unit Measuring a power amount of the power storage unit when the power of the power utilization plant unit is less than an operation reference value, measuring a power amount of the power storage unit And transmitting power stored in the power storage unit to the power utilization plant unit when the power amount of the power storage unit is higher than the movable power amount of the power utilization plant unit.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 제어 방법에 있어서, 전력활용플랜트부의 전력량을 측정하여, 전력량이 부족한지 여부를 판단하는 단계 이후에,  상기 전력활용플랜트부의 전력량이 부족하지 않을 경우, 상기 전력저장장치의 전력을 전력계통부로 송전하는 단계를 더 포함하는 것을 특징으로 한다.In the power control method for a new and renewable energy generation plant according to the present invention, if the amount of power of the power utilization plant part is not insufficient after the step of determining the power amount of the power utilization plant part, And transmitting power of the power storage device to the power system unit.

이상에서 설명한 바와 같이, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템은 신재생에너지발전부와 근접한 곳에 상기 신재생에너지발전부에서 발전된 전력을 이용할 수 있는 전력활용플랜트부를 구성함으로써, 신재생에너지발전부의 전력 송전 거리를 단축하여, 발전된 전력의 효율을 향상시킬 수 있으며, 전력 생산 단차를 줄여, 발전된 전력의 품질을 안정화하는 효과가 있다.As described above, the power utilization system of the new and renewable energy generation plant according to the present invention includes a power utilization plant unit that can utilize the power generated by the renewable energy generation unit near the renewable energy generation unit, It is possible to shorten the power transmission distance of the energy generation section, to improve the efficiency of the developed power, to reduce the step of generating power, and to stabilize the quality of the developed power.

또한, 전력저장부를 더 포함함으로써, 신재생에너지발전부에서 생산되는 잉여 전력을 저장할 수 있는 효과가 있다.Further, by further including the power storage unit, the surplus power produced by the renewable energy generation unit can be saved.

또한, 제2전력제어부를 더 포함함으로써, 전력저장부에 저장된 전력을 적정 시기에 전력활용플랜트부에 제공할 수 있는 효과가 있다.In addition, by further including the second power control unit, the power stored in the power storage unit can be provided to the power utilization plant unit at an appropriate time.

또한, 제1전력제어부를 포함함으로써, 전력활용플랜트부의 가동여부에 따라 신재생에너지발전부에서 생성된 전력의 송전을 제어할 수 있는 효과가 있다.Also, by including the first power control unit, it is possible to control the transmission of the power generated by the renewable energy generation unit according to the operation of the power utilization plant unit.

또한, 제2전력제어부를 포함함으로써, 전력저장부의 전력 송전을 제어하여, 상기 전력활용플랜트부에 전력을 원활히 공급할 수 있는 효과가 있다.In addition, by including the second power control unit, there is an effect that power can be smoothly supplied to the power utilization plant unit by controlling power transmission of the power storage unit.

또한, 제3전력제어부를 포함함으로써, 전력저장부의 저장 전력에 따라 전력활용플랜트부와 전력계통부의 연결을 효율적으로 제어할 수 있는 효과가 있다.Also, by including the third power control unit, there is an effect that the connection between the power utilization plant unit and the power system unit can be efficiently controlled according to the stored power of the power storage unit.

또한, 자연에너지를 이용하여 발전하는 신재생에너지발전부를 단일 또는 복합적으로 구성할 수 있는 효과가 있다.In addition, there is an effect that a new and renewable energy generating unit that is developed using natural energy can be constituted singly or in combination.

또한, 신재생에너지발전부의 대용량의 전력을 소비할 수 있는 전력활용플랜트부를 구성할 수 있는 효과가 있다.Further, there is an effect that a power utilization plant unit capable of consuming a large amount of power of the renewable energy generation unit can be constituted.

또한, 대용량의 전력을 저장할 수 있는 전력저장장치를 구성할 수 있는 효과가 있다.
Further, there is an effect that a power storage device capable of storing a large amount of electric power can be constituted.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 방법은 전력활용플랜트부의 전력량을 측정 후, 전력활용플랜트부를 가동 여부를 판단하고, 전력활용플랜트부의 가동 시, 신재생에너지발전부의 전력을 전력활용플랜트부에 원활하게 제공할 수 있는 효과가 있다.A power utilization method of a new and renewable energy generation plant according to the present invention includes the steps of: measuring a power amount of a power utilization plant part and determining whether the power utilization plant part is in operation; So that it can be smoothly provided to the part.

또한, 신재생에너지발전부의 잉여 전력을 전력저장부에 저장할 수 있는 효과가 있다.Further, there is an effect that surplus power of the renewable energy generator can be stored in the power storage.

또한, 전력저장부의 전력량을 측정함으로써, 전력활용플랜트부의 가동이 가능한 적정한 전력을 공급할 수 있는 효과가 있다.Further, by measuring the amount of power in the power storage unit, it is possible to supply an appropriate amount of power that can operate the power utilization plant unit.

또한, 전력저장부의 잉여 전력을 상기 전력계통부로 송전할 수 있는 효과가 있다.Further, there is an effect that surplus power of the power storage unit can be transmitted to the power system unit.

또한, 전력저장부에 저장된 전력량이 전력활용플랜트부를 가동할 수 없을 경우, 제3제어장치를 구동할 수 있는 효과가 있다.Further, when the amount of power stored in the power storage unit can not operate the power utilization plant unit, there is an effect that the third control unit can be driven.

또한, 전력저장부에 저장된 전력량이 전력활용플랜트부를 가동할 수 없을 경우, 전력계통부의 전력을 전력활용플랜트부로 송전할 수 있는 효과가 있다. In addition, when the amount of power stored in the power storage unit can not operate the power utilization plant unit, there is an effect that the power of the power system unit can be transmitted to the power utilization plant unit.

도 1은 신재생에너지 발전 플랜트의 활용 시스템의 전체 구성도.
도 2는 신재생에너지 발전 플랜트의 활용 시스템의 제1전력제어부의 상세구성도.
도 3은 신재생에너지 발전 플랜트의 활용 시스템의 제2전력제어부의 상세구성도.
도 4는 신재생에너지 발전 플랜트의 활용 시스템의 제3전력제어부의 상세구성도.
도 5는 신재생에너지 발전 플랜트의 활용 방법의 전체 흐름도.
도 6은 신재생에너지 발전 플랜트의 활용 방법의 S10 단계의 상세 흐름도.
도 7은 신재생에너지 발전 플랜트의 활용 방법의 S20 단계의 상세 흐름도.
도 8은 신재생에너지 발전 플랜트의 활용 방법의 S30 단계의 상세 흐름도.
Fig. 1 is an overall configuration diagram of a utilization system of a renewable energy generation plant; Fig.
2 is a detailed configuration diagram of a first power control unit of a utilization system of a renewable energy generation plant;
3 is a detailed configuration diagram of a second power control unit of a utilization system of a renewable energy generation plant;
4 is a detailed configuration diagram of a third power control unit of the utilization system of the renewable energy generation plant.
5 is an overall flowchart of a method of utilizing a renewable energy generation plant.
6 is a detailed flowchart of step S10 of the utilization method of the renewable energy generation plant.
7 is a detailed flowchart of step S20 of a method of utilizing a renewable energy generation plant.
8 is a detailed flowchart of step S30 of the method of utilizing a renewable energy generation plant.

이하, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템 및 그 활용 방법을 실시하기 위한 구체적인 내용을 설명하면 다음과 같다.
Hereinafter, specific details of a power utilization system and a utilization method of the renewable energy power plant according to the present invention will be described.

[도 1]은 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템의 전체 구성도로, 신재생에너지발전부(10), 제1전력제어부(20), 전력활용플랜트부(30), 전력저장부(40), 제2전력제어부(50), 제3전력제어부(60) 및 전력계통부(70)을 포함한다.FIG. 1 is a diagram showing an entire construction of a power utilization system of a renewable energy generation plant according to the present invention, a renewable energy generation unit 10, a first power control unit 20, a power utilization plant unit 30, A second power control unit 50, a third power control unit 60,

상기 신재생에너지발전부(10)는 신재생에너지를 이용하여, 전력을 생산하는 역할을 하며, 상기 제2전력제어부(50)에 발전 상태를 전달한다.The new and renewable energy generation unit 10 uses the new and renewable energy to produce power and transmits the power generation state to the second power control unit 50.

본 발명에 따른 상기 신재생에너지발전부(10)는 풍력발전, 태양광발전, 태양열발전, 조류발전, 조력발전, 파력발전 중 어느 하나 이상의 발전플랜트가 단일 또는 복합적으로 구성된다.The renewable energy generating unit 10 according to the present invention may be composed of one or more power plants of at least one of wind power generation, solar power generation, solar power generation, tidal power generation, tidal power generation, and wave generation.

즉, 동일한 자연에너지를 이용하는 발전플랜트를 구성하거나 서로 다른 자연에너지 발전부를 복합적으로 구성하여, 신재생에너지발전부(10)의 변동성을 줄여, 전력 생산의 안정성을 향상시키는 것이 바람직한 것이다.
In other words, it is preferable to construct a power plant using the same natural energy or a combination of different natural energy generators to reduce the variability of the renewable energy generator 10, thereby improving the stability of power generation.

상기 제1제어부(20)는 상기 신재생에너지발전부(10)와 연결되어, 상기 신재생에너지발전부(10)에서 생산되는 전력의 송전을 제어하는 역할을 하며, 본 발명에 따른 상기 제1제어부(20)는 [도 2]에 도시된 바와 같이, 제1제어신호송수신부(21), 제1전력송전판단부(23), 제1제어설정부(25) 및 제1전력량측정부(27)를 포함한다.The first control unit 20 is connected to the renewable energy generating unit 10 and controls the transmission of electric power generated by the renewable energy generating unit 10, 2, the control unit 20 includes a first control signal transmission / reception unit 21, a first power transmission determination unit 23, a first control setting unit 25, and a first power amount measurement unit 27).

상기 제1제어신호송수신부(21)는 상기 신재생에너지발전부(10)로부터 전력 제어신호를 전달받고, 상기 전력활용플랜트부(30)에 전력 제어신호를 전달하는 역할을 하며, 상기 수신된 전력 제어신호는 상기 제1전력송전판단부(23)에 전달된다.The first control signal transmission / reception unit 21 receives a power control signal from the renewable energy generation unit 10 and transmits a power control signal to the power utilization plant unit 30. The first control signal transmission / The power control signal is transmitted to the first power transmission determination unit 23.

상기 제1전력량측정부(27)는 상기 신재생에너지발전부(10)의 전력량을 측정하는 역할을 하며, 측정된 전력량은 상기 제1전력송전판단부(23)에 전달된다.The first power measurement unit 27 measures the amount of power of the renewable energy generation unit 10 and the measured power amount is transmitted to the first power transmission determination unit 23.

상기 제1전력송전판단부(23)는 제1제어신호송수신부(21) 및 상기 제1전력량측정부(27)와 연결되어, 상기 신재생에너지발전부(10)의 전력량에 따라 상기 전력활용플랜트부(30)의 전력 송전 여부를 판단하는 역할을 한다.The first power transmission determination unit 23 is connected to the first control signal transmission and reception unit 21 and the first power amount measurement unit 27 and controls the power utilization And determines whether or not power transmission of the plant unit 30 is performed.

상기 제1제어설정부(25)는 제1전력송전판단부(23)와 연결되어, 상기 전력활용플랜트부(30)의 가동 기준이 되는 전력량을 설정하는 역할을 한다.
The first control setting unit 25 is connected to the first power transmission determining unit 23 and serves to set an amount of power that is a reference for operating the power utilization plant unit 30. [

상기 전력활용플랜트부(30)는 상기 제1전력제어부(20)와 연결되어, 상기 신재생에너지발전부(10)와 근거리에 위치하여, 상기 신재생에너지발전부(10)의 전력을 이용하여, 연료에너지를 생산하는 역할을 한다.The power utilization plant unit 30 is connected to the first power control unit 20 and is located near the renewable energy generation unit 10 and uses the power of the renewable energy generation unit 10 , And produces fuel energy.

본 발명에 따른 상기 전력활용플랜트부(30)는 바이오연료발전플랜트, 담수화플랜트, 석유화학플랜트, 합성연료플랜트 중 어느 하나 이상으로 구성된다.The power utilization plant unit 30 according to the present invention is composed of at least one of a biofuel generation plant, a desalination plant, a petrochemical plant, and a synthetic fuel plant.

즉, 전력활용플랜트부(30)를 상기 신재생에너지 발전부(10)와 근접하게 위치시킴으로써, 상기 신재생에너지발전부(10)에서 생산된 전력의 송전에 따라 효율이 저하되는 것을 방지하며, 대량의 전력이 요구되는 전력활용플랜트부(30)의 가동도 원활하게 할 수 있는 효과가 있는 것이다.
That is, by positioning the power utilization plant unit 30 close to the renewable energy generation unit 10, it is possible to prevent the efficiency from being lowered due to the transmission of the power generated by the renewable energy generation unit 10, The operation of the power utilization plant unit 30 requiring a large amount of electric power can be smoothly performed.

또한, 전력저장부(40)는 상기 제1전력제어부(20)와 연결되어, 상기 신재생에너지발전부(10)의 잔여 전력을 저장하는 역할을 하며, 상기 전력저장부(40)에 저장된 전력은 상기 전력활용플랜트부(30)를 가동하거나, 전력계통부(70)로 송전하게 된다.The power storage unit 40 is connected to the first power control unit 20 and stores the remaining power of the renewable energy generation unit 10. The power stored in the power storage unit 40 The power utilization plant unit 30 is operated or the power system unit 70 is transmitted.

본 발명에 따른 상기 전력저장부(40)는 전기화학 커패서티(Electrochemical capacity), 플라이 휠(Flywheel), 납축전지(Lead-Acid batteries), 리튬이온 배터리(Li-ion batteries), 금속배터리(Metal batteries), 나트륨황(NAS batteries), 플로우 배터리(Flow batteries) 중 어느 하나 이상을 포함한다.The power storage unit 40 according to an embodiment of the present invention may be applied to an electrochemical capacity, a flywheel, a lead-acid battery, a lithium-ion battery, a metal battery batteries, NAS batteries, and Flow batteries.

이처럼 본 발명에 따른 전력저장부(40)를 포함함으로써, 상기 신재생에너지발전부(10)의 발전량이 낮을 경우, 발전된 전력을 저장하여, 발전 효율을 향상시킬 수 있는 것이다.
By including the power storage unit 40 according to the present invention, when the power generation amount of the renewable energy generation unit 10 is low, it is possible to save the generated power and improve the power generation efficiency.

상기 제2전력제어부(50)는 상기 전력저장부(40) 및 상기 전력활용플랜트부(30)와 연결되어, 상기 전력저장부(40)에 저장된 전력의 송전을 제어하는 역할을 한다.The second power control unit 50 is connected to the power storage unit 40 and the power utilization plant unit 30 and controls transmission of power stored in the power storage unit 40. [

본 발명에 따른 제2전력제어부(50)는 [도 3]에 도시된 바와 같이, 제2제어신호송수신부(51), 제2전력송전판단부(53), 제2제어설정부(55) 및 제2전력량측정부(57)를 포함한다.3, the second power control unit 50 includes a second control signal transmission / reception unit 51, a second power transmission determination unit 53, a second control setting unit 55, And a second power amount measuring unit (57).

상기 제2제어신호송수신부(51)는 상기 전력활용플랜트부(30)로부터 전력 제어신호를 전달받고, 상기 제3전력제어부(60)에 전력 제어신호를 전달하는 역할을 하며, 수신된 제어신호는 상기 제2전력송전판단부(53)에 전달한다.The second control signal transmitting and receiving unit 51 receives a power control signal from the power utilization plant unit 30 and transmits a power control signal to the third power control unit 60, To the second power transmission determination unit (53).

상기 제2전력량측정부(57)는 상기 제2전력송전판단부(53)의 제어 신호에 따라 상기 신재생에너지발전부(10)의 전력량을 측정하는 역할을 한다. The second power amount measuring unit 57 measures the power amount of the renewable energy generating unit 10 according to the control signal of the second power transmission determining unit 53.

상기 제2전력송전판단부(53)는 상기 제2제어신호송수신부(51) 및 상기 제2전력량측정부(57)와 연결되어, 상기 전력저장장치(40)의 전력량에 따라 상기 전력활용플랜트부(30)의 전력 송전 여부를 판단하는 역할을 한다.The second power transmission determination unit 53 is connected to the second control signal transmission and reception unit 51 and the second power amount measurement unit 57 and is connected to the power utilization plant And determines whether or not the power transmission unit 30 is transmitting power.

상기 제2제어설정부(57)는 상기 제2전력송전판단부(53)와 연결되어, 상기 전력활용플랜트부(30)의 가동 기준이 되는 전력량을 설정하는 역할을 한다. The second control setting unit 57 is connected to the second power transmission determination unit 53 to set the amount of power that is a reference for operating the power utilization plant unit 30. [

즉, 상기 제2전력제어부(50)는 상기 전력저장부(40)에 저장된 전력량이 상기 전력활용플랜트부(30)를 가동할 수 있는 범위일 경우, 상기 전력활용플랜트부(30)에 전력을 공급하도록 하고, 상기 전력저장부(40)에 저장된 전력량이 상기 전력활용플랜트부(30)를 가동할 수 없는 범위일 경우, 상기 제3전력제어부(60)에 제어신호를 전달하게 되는 것이다.
That is, when the amount of power stored in the power storage unit 40 is within a range in which the power utilization plant unit 30 can be operated, the second power control unit 50 may supply power to the power utilization plant unit 30 And transmits a control signal to the third power control unit 60 when the amount of power stored in the power storage unit 40 is within a range in which the power utilization plant unit 30 can not be operated.

상기 제3전력제어부(70)는 상기 제2전력제어부(50)와 연결되며, 상기 전력계통부(70)의 전력 송전을 제어하여, 상기 전력활용플랜트부(30)에 상기 전력계통부의 전력을 공급하는 역할을 한다.
The third power control unit 70 is connected to the second power control unit 50 and controls power transmission of the power system unit 70 to supply the power of the power system unit 30 to the power utilization plant unit 30 .

본 발명에 따른 상기 제3전력제어부(70)는 [도 4]에 도시된 바와 같이, 제3제어신호송수신부(61), 제3전력송전판단부(63), 제3제어설정부(65) 및 제3전력량측정부(67)를 포함한다.4, the third power control unit 70 according to the present invention includes a third control signal transmission / reception unit 61, a third power transmission determination unit 63, a third control setting unit 65 And a third power amount measuring unit 67. [

상기 제3제어신호송수신부(61)는 상기 제2전력제어부로부터 전력 제어신호를 전달받고, 상기 전력계통부에 전력 제어신호를 전달하는 역할을 하며, 수신된 전력 제어신호는 상기 제3전력송전판단부(63)에 전달한다.The third control signal transmission / reception unit 61 receives the power control signal from the second power control unit and transmits the power control signal to the power system control unit, and the received power control signal is transmitted to the third power transmission / (63).

상기 제3전력량측정부(67)는 상기 전력활용플랜트부(30)의 전력량을 측정하는 역할을 하며, 측정된 전력량은 상기 제3전력송전판단부(63)에 전달한다.The third power measurement unit 67 serves to measure the power amount of the power utilization plant unit 30 and transmits the measured power amount to the third power transmission determination unit 63.

상기 제3전력송전판단부(63)는 상기 제3제어신호송수신부(61) 및 상기 제3전력량측정부(67)와 연결되어, 상기 전력활용플랜트부(30)의 전력량에 따라 상기 전력계통부(70)의 전력 송전 여부를 판단하는 역할을 한다. The third power transmission determination unit 63 is connected to the third control signal transmission and reception unit 61 and the third power measurement unit 67 and controls the third power transmission unit 61 and the third power measurement unit 67 according to the amount of power of the power utilization plant unit 30. [ And determines whether or not the power transmission of the power source 70 is performed.

상기 제3제어설정부(65)는 상기 제3전력송전판단부(63)와 연결되어, 상기 전력활용플랜트부(30)의 가동 기준이 되는 전력량을 설정하는 역할을 한다. The third control setting unit 65 is connected to the third power transmission determination unit 63 and sets the amount of power that is a reference for operating the power utilization plant unit 30. [

이처럼 본 발명에 따른 제3전력제어부(60)를 포함함으로써, 상기 전력활용플랜트부(30)의 전력량이 부족할 경우, 전력계통부(70)의 전력을 원활하게 공급할 수 있는 것이다.
By including the third power control unit 60 according to the present invention, the power of the power system unit 70 can be smoothly supplied when the power utilization plant unit 30 is insufficient.

이상에서 살펴본 바와 같이, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템을 적용하게 되면, 신재생에너지발전부와 근접한 곳에 상기 신재생에너지발전부에서 발전된 전력을 이용할 수 있는 전력활용플랜트부를 구성함으로써, 신재생에너지발전부의 전력 송전 거리를 단축하여, 발전된 전력의 효율을 향상시킬 수 있을 뿐만 아니라, 신재생에너지발전부의 전력 변동성을 줄이기 위해 별도의 추가 장비를 구비하지 않으며, 추가적인 비용을 소요하지 않아도 되는 효과를 누릴 수 있다. As described above, when the power utilization system of the new and renewable energy generation plant according to the present invention is applied, a power utilization plant unit that can utilize the power generated by the renewable energy generation unit near the renewable energy generation unit The power transmission distance of the new and renewable energy generation section can be shortened and the efficiency of the developed power can be improved. Further, in order to reduce the power fluctuation of the renewable energy generation section, additional additional equipment is not provided, You can enjoy the effect you do not need.

더불어, 상기 신재생에너지발전부에서 생산되는 전력의 단차를 줄여, 발전된 전력의 품질을 안정화하는 효과를 누릴 수 있는 것이다.
In addition, it is possible to enjoy the effect of stabilizing the quality of the developed electric power by reducing the step of the electric power produced by the renewable energy generating unit.

본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 시스템을 이용한 전력 활용 방법을 설명하면 다음과 같다.A power utilization method using a power utilization system of a renewable energy power plant according to the present invention will now be described.

[도 5]는 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 방법의 전체 흐름도를 나타내는 도면으로, 먼저 제1전력제어부(20)를 이용하여, 상기 신재생에너지발전부(10)의 전력 송전을 제어하는 단계를 수행한다.(S10)5 is a flowchart illustrating an overall power utilization method of a renewable energy power plant according to the present invention. First, the first power controller 20 is used to control the power transmission of the renewable energy generator 10 (S10). ≪ RTI ID = 0.0 >

[도 6]은 상기 S10의 상세 흐름을 나타내는 도면으로, 상기 제1전력제어부(20)를 이용하여, 신재생에너지발전부의 전력량은 측정하는 단계를 수행한다.(S11)6 is a flowchart showing the detailed flow of step S10. The power consumption of the renewable energy generation unit is measured using the first power control unit 20. (S11)

다음으로, 상기 제1전력제어부(20)를 이용하여, 상기 전력활용플랜트부(30)가 가동 중인지 여부를 판단하는 단계(S12)를 수행하며, 상기 전력활용플랜트부(30)가 가동 중일 경우, 상기 제1전력제어부(20)에서 측정된 상기 신재생에너지발전부(10)의 전력량이 전력활용플랜트부를 가동할 수 있는 범위인지 판단하는 단계를 수행한다.(S15)Next, a step S12 of determining whether the power utilization plant unit 30 is in operation is performed using the first power control unit 20, and when the power utilization plant unit 30 is in operation , And a step of determining whether the amount of power of the renewable energy generator 10 measured by the first power controller 20 is within a range capable of operating the power utilization plant unit.

만일 상기 S12단계에서 상기 전력활용플랜트부(30)가 상기 전력활용플랜트부(30)가 가동을 중단한 상태일 경우, 상기 신재생에너지발전부(10)의 전력량이 전력계통부(70)와 연결 가능한 범위이면 상기 전력계통부(70)로 송전하는 단계를 수행한다.(S17)If it is determined in step S12 that the power utilization plant unit 30 has stopped operating the power utilization plant unit 30, the power amount of the renewable energy generation unit 10 is connected to the power system unit 70 And transmits power to the power system unit 70 when it is within a possible range. (S17)

또한, 만일 상기 S15단계에서 상기 신재생에너지발전부(10)의 전력량이 전력활용플랜트부(30)를 가동할 수 있는 범위 즉, 제1설정값 보다 클 경우, 상기 신재생에너지발전부(10)에서 생산된 전력을 상기 전력활용플랜트부(30)로 송전하는 단계를 수행한다.(S18)If it is determined in step S15 that the amount of power of the renewable energy generator 10 is greater than the first set value that the power plant unit 30 can operate, To the power utilization plant unit 30 (S18)

또한, 상기 S15단계에서, 상기 신재생에너지발전부910)의 전력량이 상기 전력활용플랜트부(30)를 가동할 수 없는 범위일 경우, 상기 신재생에너지발전부(10)에서 생산된 전력을 상기 전력저장부(40)로 송전하는 단계를 수행한다.(S19)If it is determined in step S15 that the amount of power of the renewable energy generation unit 910 is in a range where the power utilization plant unit 30 can not be operated, And transmits power to the power storage unit 40. (S19)

이처럼 본 발명에 따른 S10 단계를 수행함으로써, 신재생에너지발전부(10)에서 생산된 전력량에 따라 상기 전력활용플랜트부(30)에 적정시기에 전력을 공급할 수 있는 효과가 있는 것이다.
By performing the step S10 according to the present invention, the power can be supplied to the power plant unit 30 at an appropriate time according to the amount of power produced by the renewable energy generator 10.

다음으로, 제2전력제어부(50)를 이용하여, 상기 전력저장부(40)의 전력 송전을 제어하는 단계를 수행한다.(S20)Next, a step of controlling the power transmission of the power storage unit 40 is performed using the second power control unit 50. In step S20,

[도 7]은 본 발명에 따른 상기 S20단계의 상세흐름을 나타내는 도면으로, 상기 제2전력제어부(50)를 이용하여, 상기 전력활용플랜트부(30)의 전력량을 측정하는 단계(S21)를 수행하며, 측정된 전력량이 상기 전력활용플랜트부(30)를 가동할 수 있는 전력량 즉, 제1설정값 보다 부족한지 여부를 판단하는 단계를 수행한다.(S22)7 is a flowchart illustrating the detailed flow of step S20 according to the present invention. The step S21 of measuring the amount of power of the power utilization plant unit 30 using the second power control unit 50 And performs a step of determining whether the measured amount of power is less than a power amount that can operate the power utilization plant unit 30, that is, a first set value. (S22)

상기 S22단계에서 상기 전력활용플랜트부(30)의 전력이 제1설정값보다 부족할 경우, 상기 전력저장부(40)의 전력량을 측정하는 단계를 수행한다.(S24)If it is determined in step S22 that the power of the power utilization plant unit 30 is less than the first set value, a step of measuring the power amount of the power storage unit 40 is performed.

만일 상기 S22 단계에서, 상기 전력활용플랜트부(30)의 전력량이 부족하지 않을 경우, 상기 전력저장장치(40)의 전력을 상기 전력계통부(70)로 송전하는 단계를 수행한다.(S23)If it is determined in step S22 that the amount of electric power of the power utilization plant unit 30 is insufficient, the step of transmitting the power of the power storage device 40 to the power system unit 70 is performed (step S23)

다음으로, 상기 전력저장부(40)의 전력량이 상기 전력활용플랜트부(30)의 가동 전력량보다 높은지 여부를 판단하는 단계(S25)를 수행하고, 상기 S25 단계에서 상기 전력저장부(40)의 전력량이 상기 전력활용플랜트부(30)의 가동 전력량보다 높을 경우, 상기 전력저장부(40)에 저장된 전력을 상기 전력활용플랜트부(30)로 송전하는 단계를 수행한다.(S27)In step S25, it is determined whether the amount of power of the power storage unit 40 is higher than the amount of power of the power utilization plant unit 30. In step S25, When the amount of electric power is higher than the amount of movable electric power of the power utilization plant unit 30, the power stored in the electric power storage unit 40 is transmitted to the power utilization plant unit 30. (S27)

만일 상기 S25 단계에서 상기 전력저장부(40)의 전력량이 상기 전력활용플랜트부(30)의 가동 전력량(제1설정값)보다 낮을 경우, 상기 제3전력제어부(60)로 송전 제어 신호를 전달하는 단계를 수행한다.(S29)If it is determined in step S25 that the power amount of the power storage unit 40 is lower than the movable power amount of the power utilization plant unit 30 (the first set value), the third power control unit 60 transmits (S29). ≪ RTI ID = 0.0 >

이처럼 S20 단계를 수행함으로써, 상기 전력저장부(20)에 저장된 전력을 상기 전력활용플랜트부(30)에 적정하게 공급할 수 있는 효과가 있는 것이다.
As described above, the power stored in the power storage unit 20 can be properly supplied to the power utilization plant unit 30 by performing the step S20.

다음으로, 제3전력제어부(60)를 이용하여, 상기 전력계통부(70)의 전력 송전을 제어하는 단계를 수행한다.(S30)Next, the power control of the power system unit 70 is controlled using the third power control unit 60. (S30)

[도 8]은 본 발명에 따른 상기 S30 단계의 상세 흐름을 나타내는 흐름도로, 상기 제3제어장치(60)를 이용하여, 상기 전력저장장치(40)의 전력량을 측정하는 단계를 수행한다.(S31)FIG. 8 is a flowchart showing a detailed flow of step S30 according to the present invention. The third control device 60 is used to measure the amount of power of the power storage device 40. S31)

다음으로, 상기 전력저장장치(40)의 전력량이, 상기 전력활용플랜트부(30)를 가동할 수 있는 전력량(제1설정값)보다 낮은지 여부를 판단하는 단계(S33)를 수행하고, 상기 S33단계에서 상기 전력저장장치(40)의 전력량이 상기 전력활용플랜트부(30)의 가동 전력량보다 낮을 경우, 상기 전력계통부(70)의 전력을 상기 전력활용플랜트부(30)로 송전하는 단계를 수행한다.(S35)Next, a step (S33) of determining whether or not the amount of power of the power storage device (40) is lower than a power amount (first set value) capable of operating the power utilization plant part (30) If the power amount of the power storage device 40 is lower than the amount of power of the power utilization plant unit 30 in step S33, the step of transmitting the power of the power system unit 70 to the power utilization plant unit 30 (S35)

이처럼 본 발명에 따른 상기 S30 단계를 수행함으로써, 상기 전력저장부(40)에 저장된 전력이 부족하며, 상기 전력활용플랜트부(30)에서 전력의 공급이 필요할 경우, 상기 전력계통부(70)의 전력을 상기 전력활용플랜트부(30)에 전달하여, 상기 전력활용플랜트부(30)의 가동을 원활하게 할 수 있는 효과가 있는 것이다.
When the power stored in the power storage unit 40 is insufficient and power is supplied from the power utilization plant unit 30 by performing the step S30 according to the present invention, the power of the power system unit 70 To the power utilization plant part (30), thereby making it possible to smoothly operate the power utilization plant part (30).

이상에서 설명한 바와 같이, 본 발명에 따른 신재생에너지 발전 플랜트의 전력 활용 방법을 적용하면, 상기 신재생에너지발전부(30)의 전력량을 측정 후, 전력활용플랜트부(30)의 가동 여부를 판단하고, 전력활용플랜트부(30)의 가동 시, 신재생에너지발전부(10)의 전력을 전력활용플랜부(30)에 원활하게 제공함으로써, 신재생에너지발전부(10)에서 생산된 전력을 효율적으로 운영할 수 있는 효과를 누릴 수 있는 것이다.
As described above, when the power utilization method of the renewable energy generation plant according to the present invention is applied, it is determined whether or not the power utilization plant unit 30 is in operation after measuring the amount of power of the renewable energy generation unit 30 And smoothly supplies power of the renewable energy generation unit 10 to the power utilization plan unit 30 when the power utilization plant unit 30 is in operation so that power generated by the renewable energy generation unit 10 It is possible to enjoy the effect of operating efficiently.

이상 본 발명의 실시예로 설명하였으나 본 발명의 기술적 사상이 상기 실시예로 한정되는 것은 아니며, 본 발명의 기술적 사상을 벗어나지 않는 범주에서 다양한 신재생에너지 발전 플랜트의 전력 활용 시스템 및 그 활용 방법으로 구현할 수 있다.
While the present invention has been described with reference to the exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, but may be implemented by a power utilization system and various utilization methods of various renewable energy generation plants in a scope not departing from the technical idea of the present invention. .

10 : 신재생에너지발전부    20 : 제1전력제어부
21 : 제1제어신호송수신부    23 : 제1전력송전판단부
25 : 제1전력량측정부   27 : 제1제어설정부
30 : 전력활용플랜트부    40 : 전력저장부
50 : 제2전력제어부     51 : 제2제어신호송수신부  
53 : 제2전력송전판단부    55 : 제2전력량측정부 
57 : 제2제어설정부     60 : 제3전력제어부
61 : 제3제어신호송수신부    63 : 제3전력송전판단부
65 : 제3전력량측정부    67 : 제3제어설정부
70 : 전력계통부    
10: Renewable energy generator 20: First power controller
21: first control signal transmission / reception unit 23: first power transmission determination unit
25: first power amount measuring unit 27: first control setting unit
30: Power utilization plant unit 40: Power storage unit
50: second power control unit 51: second control signal transmission /
53: second power transmission judging unit 55: second power measuring unit
57: second control setting unit 60: third power control unit
61: third control signal transmitting / receiving unit 63: third power transmission determining unit
65: third power amount measuring unit 67: third control setting unit
70: Power meter

Claims (14)

신재생에너지를 이용하여, 전력을 생산하는 신재생에너지발전부와;
상기 신재생에너지발전부와 연결되어, 상기 신재생에너지발전부에서 생산되는 전력의 송전을 제어하는 제1전력제어부와;
상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 전력을 이용하여, 연료에너지를 생산하는 전력활용플랜트부와;
상기 제1전력제어부와 연결되어, 상기 신재생에너지발전부의 잔여 전력을 저장하는 전력저장부와;
상기 전력저장부 및 상기 전력활용플랜트부와 연결되어, 상기 전력저장부에 저장된 전력의 송전을 제어하는 제2전력제어부; 및
상기 제2전력제어부와 연결되며, 전력계통부의 전력 송전을 제어하여, 상기 전력활용플랜트부에 상기 전력계통부의 전력을 공급하는 제3전력제어부를 포함하고,
상기 제2전력제어부는:
상기 전력활용플랜트부로부터 전력 제어신호를 전달받고, 상기 제3전력제어부에 전력 제어신호를 전달하는 제2제어신호송수신부;
상기 신재생에너지발전부의 전력량을 측정하는 제2전력량측정부;
상기 제2제어신호송수신부 및 상기 제2전력량측정부와 연결되어, 상기 전력저장부의 전력량에 따라 상기 전력활용플랜트부로의 전력 송전 여부를 판단하는 제2전력송전판단부; 및
상기 제2전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제2제어설정부를 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
A renewable energy generating unit for generating electricity using renewable energy;
A first power controller connected to the renewable energy generator and controlling transmission of power generated by the renewable energy generator;
A power utilization plant unit connected to the first power control unit and generating fuel energy using power of the renewable energy generation unit;
A power storage unit connected to the first power control unit and storing the remaining power of the renewable energy generation unit;
A second power controller connected to the power storage unit and the power utilization plant unit to control transmission of power stored in the power storage unit; And
And a third power control unit connected to the second power control unit and controlling power transmission of the power system unit to supply power of the power system unit to the power utilization plant unit,
Wherein the second power control unit comprises:
A second control signal transmitting / receiving unit that receives a power control signal from the power utilization plant unit and transmits a power control signal to the third power control unit;
A second power amount measuring unit for measuring a power amount of the renewable energy generating unit;
A second power transmission determination unit, connected to the second control signal transmission / reception unit and the second power measurement unit, for determining power transmission to the power utilization plant unit according to an amount of power of the power storage unit; And
And a second control setting unit connected to the second power transmission determination unit to set an amount of power that is a reference for operation of the power utilization plant unit.
삭제delete 제1항에 있어서,
상기 제1전력제어부는,
상기 신재생에너지발전부로부터 전력 제어신호를 전달받고, 상기 전력활용플랜트부에 전력 제어신호를 전달하는 제1제어신호송수신부;
상기 신재생에너지발전부의 전력량을 측정하는 제1전력량측정부;
상기 제1제어신호송수신부 및 상기 제1전력량측정부와 연결되어, 상기 신재생에너지발전부의 전력량에 따라 상기 전력활용플랜트부로의 전력 송전 여부를 판단하는 제1전력송전판단부 및
상기 제1전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제1제어설정부를 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
The method according to claim 1,
Wherein the first power control unit comprises:
A first control signal transmission / reception unit receiving a power control signal from the renewable energy generation unit and transmitting a power control signal to the power utilization plant unit;
A first power amount measuring unit for measuring a power amount of the renewable energy generator;
A first power transmission determination unit connected to the first control signal transmission / reception unit and the first power amount measurement unit to determine whether power is transmitted to the power utilization plant unit according to the amount of power of the renewable energy generation unit,
And a first control setting unit connected to the first power transmission determining unit to set an amount of power that is a driving reference of the power utilization plant unit.
삭제delete 제1항에 있어서,
상기 제3전력제어부는
상기 제2전력제어부로부터 전력 제어신호를 전달받고, 상기 전력계통부에 전력 제어신호를 전달하는 제3제어신호송수신부;
상기 전력활용플랜트부의 전력량을 측정하는 제3전력량측정부;
상기 제3제어신호송수신부 및 상기 제3전력량측정부와 연결되어, 상기 전력활용플랜트부의 전력량에 따라 상기 전력계통부의 전력 송전 여부를 판단하는 제3전력송전판단부 및
상기 제3전력송전판단부와 연결되어, 상기 전력활용플랜트부의 가동 기준이 되는 전력량을 설정하는 제3제어설정부를 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
The method according to claim 1,
The third power control unit
A third control signal transmission / reception unit receiving the power control signal from the second power control unit and transmitting a power control signal to the power system control unit;
A third power amount measuring unit for measuring a power amount of the power utilization plant unit;
A third power transmission determination unit connected to the third control signal transmission and reception unit and the third power measurement unit to determine whether or not power transmission of the power system unit is performed according to an amount of power of the power utilization plant unit,
And a third control setting unit that is connected to the third power transmission determination unit and sets an amount of power that is a reference of operation of the power utilization plant unit.
제1항에 있어서,
상기 신재생에너지발전부는 풍력발전, 태양광발전, 태양열발전, 조류발전, 조력발전, 파력발전 중 어느 하나 이상의 발전플랜트가 단일 또는 복합적으로 구성되는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
The method according to claim 1,
Wherein the new and renewable energy generating unit comprises one or more power plants of at least one of wind power generation, photovoltaic power generation, solar power generation, tidal power generation, tidal power generation, and wave power generation. .
제1항에 있어서,
상기 전력활용플랜트부는 바이오연료발전플랜트, 담수화플랜트, 석유화학플랜트, 합성연료플랜트 중 어느 하나 이상인 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
The method according to claim 1,
Wherein the power utilization plant part is at least one of a biofuel generation plant, a desalination plant, a petrochemical plant, and a synthetic fuel plant.
제1항에 있어서,
상기 전력저장부는, 전기화학 커패시터(Electrochemical capacitor), 플라이 휠(Flywheel), 납축전지(Lead-Acid batteries), 리튬이온 배터리(Li-ion batteries), 금속배터리(Metal batteries), 나트륨황(NAS batteries), 플로우 배터리(Flow batteries) 중 어느 하나 이상을 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 시스템.
The method according to claim 1,
The power storage unit may include an electrochemical capacitor, a flywheel, a lead-acid battery, a lithium-ion battery, a metal battery, a sodium battery, ), And a flow battery (Flow battery).
제1전력제어부를 이용하여, 신재생에너지발전부의 전력량을 측정하는 단계;
상기 제1전력제어부를 이용하여, 전력활용플랜트부가 가동 중인지 여부를 판단하는 단계;
상기 전력활용플랜트부가 가동 중일 경우, 상기 제1전력제어부에서 측정된 상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위인지 판단하는 단계;
상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위일 경우, 상기 신재생에너지발전부에서 생산된 전력을 상기 전력활용플랜트부로 송전하는 단계를 포함하며,
상기 전력활용플랜트부가 가동 중인지 여부를 판단하는 단계에서, 상기 전력활용플랜트부가 가동되지 않을 경우, 상기 신재생에너지발전부의 전력량이 전력계통부와 연결 가능한 범위이면 상기 전력계통부로 송전하는 단계를 더 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
Measuring a power amount of the renewable energy generator using a first power controller;
Using the first power control unit to determine whether the power utilization plant unit is in operation;
Determining whether a power amount of the renewable energy generation unit measured by the first power control unit is within a range capable of operating the power utilization plant unit when the power utilization plant unit is in operation;
And transmitting power generated by the renewable energy generator to the power plant unit when the power of the renewable energy generator is in a range capable of operating the power utilization plant unit,
Further comprising the step of transmitting power to the power system section when the power utilization plant section is not operated in the step of determining whether the power utilization plant section is in operation or when the power amount of the renewable energy generation section is connectable with the power system section And a method for utilizing power of a renewable energy power plant.
제9항에 있어서,
상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 있는 범위인지 판단하는 단계에서,
상기 신재생에너지발전부의 전력량이 전력활용플랜트부를 가동할 수 없는 범위일 경우, 상기 신재생에너지발전부에서 생산된 전력을 전력저장부로 송전하는 단계를 더 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
10. The method of claim 9,
In the step of determining whether the amount of electric power of the renewable energy generation unit is in a range capable of operating the power utilization plant unit,
Further comprising the step of transmitting power generated by the renewable energy generation unit to the power storage unit when the amount of power of the renewable energy generation unit is within a range in which the power utilization plant unit can not be operated. Of power utilization.
제10항에 있어서,
상기 신재생에너지발전부에서 생산된 전력을 상기 전력저장부로 송전하는 단계 이후에,
제2전력제어부를 이용하여, 상기 전력활용플랜트부의 전력량을 측정하여, 전력량이 부족한지 여부를 판단하는 단계;
상기 전력활용플랜트부의 전력이 가동 기준치보다 부족할 경우, 상기 전력저장부의 전력량을 측정하는 단계;
상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 높은지 여부를 판단하는 단계;
상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 높을 경우, 상기 전력저장부에 저장된 전력을 상기 전력활용플랜트부로 송전하는 단계를 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
11. The method of claim 10,
After the step of transmitting power generated by the renewable energy generator to the power storage unit,
Measuring a power amount of the power utilization plant unit using the second power control unit to determine whether the power amount is insufficient;
Measuring a power amount of the power storage unit when the power of the power utilization plant unit is less than the operation reference value;
Determining whether a power amount of the power storage unit is higher than a movable power amount of the power utilization plant unit;
And transmitting power stored in the power storage unit to the power utilization plant unit when the power amount of the power storage unit is higher than the movable power amount of the power utilization plant unit.
제11항에 있어서,
상기 전력활용플랜트부의 전력량을 측정하여, 전력량이 부족한지 여부를 판단하는 단계 이후에,
 상기 전력활용플랜트부의 전력량이 부족하지 않을 경우, 상기 전력저장부의 전력을 전력계통부로 송전하는 단계를 더 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
12. The method of claim 11,
After the step of measuring the amount of power of the power utilization plant unit and determining whether the amount of power is insufficient,
Further comprising the step of transmitting power of the power storage unit to the power system unit when the power consumption of the power utilization plant unit is not insufficient.
제11항에 있어서,
상기 전력활용플랜트부의 가동 전력량보다 높은지 여부를 판단하는 단계 이후에,
상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 낮을 경우, 제3전력제어부로 송전 제어 신호를 전달하는 단계를 더 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
12. The method of claim 11,
After determining whether the power utilization plant unit is higher than the movable power amount of the power utilization plant unit,
Further comprising the step of transmitting a power transmission control signal to the third power control unit when the power amount of the power storage unit is lower than the movable power amount of the power utilization plant unit.
제13항에 있어서,
상기 제3전력제어부로 송전 제어 신호를 전달하는 단계 이후에,
상기 제3전력제어부를 이용하여, 상기 전력저장부의 전력량을 측정하는 단계;
상기 전력저장부의 전력량이, 상기 전력활용플랜트부를 가동할 수 있는 범위인지 여부를 판단하는 단계;
상기 전력저장부의 전력량이 상기 전력활용플랜트부의 가동 전력량보다 낮을 경우, 전력계통부의 전력을 전력활용플랜트부로 송전하는 단계를 더 포함하는 것을 특징으로 하는 신재생에너지 발전 플랜트의 전력 활용 방법.
14. The method of claim 13,
After transmitting the transmission control signal to the third power control unit,
Measuring a power amount of the power storage unit using the third power control unit;
Determining whether a power amount of the power storage unit is within a range capable of operating the power utilization plant unit;
Further comprising the step of transmitting power of the power system unit to the power utilization plant unit when the power amount of the power storage unit is lower than the amount of movable power of the power utilization plant unit.
KR1020100126967A 2010-12-13 2010-12-13 Electric power management system and method for new and renewable energy generation plant KR101744646B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100126967A KR101744646B1 (en) 2010-12-13 2010-12-13 Electric power management system and method for new and renewable energy generation plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100126967A KR101744646B1 (en) 2010-12-13 2010-12-13 Electric power management system and method for new and renewable energy generation plant

Publications (2)

Publication Number Publication Date
KR20120065701A KR20120065701A (en) 2012-06-21
KR101744646B1 true KR101744646B1 (en) 2017-06-21

Family

ID=46685329

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100126967A KR101744646B1 (en) 2010-12-13 2010-12-13 Electric power management system and method for new and renewable energy generation plant

Country Status (1)

Country Link
KR (1) KR101744646B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102427181B1 (en) * 2020-07-21 2022-08-02 이택홍 Electrolysis device preventing accident through power control

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004120903A (en) * 2002-09-26 2004-04-15 Sharp Corp Power supply unit

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004120903A (en) * 2002-09-26 2004-04-15 Sharp Corp Power supply unit

Also Published As

Publication number Publication date
KR20120065701A (en) 2012-06-21

Similar Documents

Publication Publication Date Title
CN104734195B (en) Monitoring method of wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
RU2014101451A (en) HYBRID POWER PLANT IN WHICH A COMBINATION OF GENERATING MEANS AND REAL-TIME ENERGY ACCUMULATION SYSTEM IS USED
KR100704963B1 (en) Control apparatus for generation system using solar light and wind power
WO2012062323A3 (en) Method and system for operating a wind turbine
KR101379343B1 (en) Energy storage system, and method of controlling energy storage system
RU2012157078A (en) ENERGY MANAGEMENT DEVICE AND METHOD FOR ENERGY MANAGEMENT
WO2012171532A3 (en) Selective droop response control for a wind turbine power plant
CN104734194B (en) Wind, photovoltaic and storage-integrated micro-grid capable of being operated in a grid-connected manner
CN105226729B (en) A kind of active control method for coordinating of new energy combined generating system containing energy storage
CN103907259A (en) Methods of controlling a combined plant including at least one generator and an energy store
CN105244920B (en) Consider the energy-storage system multi objective control method and its system of cell health state
CN202651806U (en) Smooth wind-power photovoltaic power generation control system of battery energy storage station
CN109599881A (en) A kind of power grid frequency modulation pressure regulation method based on lithium manganate battery energy-storage system
US10097065B2 (en) Bioenergy storage and management system and method
CN103560533A (en) Method and system for causing energy storage power station to smooth wind and photovoltaic power generation fluctuation based on change rate
CN103441547A (en) Charger and electric moped with same
CN105253956A (en) Reverse osmosis sea water desalination self-adaption control system and method
KR101744646B1 (en) Electric power management system and method for new and renewable energy generation plant
CN101141066B (en) Method for regulating and controlling renewable energy resources power generation system by flywheel accumulation energy device
US11626739B2 (en) Hybrid power plant and a method for controlling a hybrid power plant
CN103532143A (en) New energy power generation system capable of making up power prediction accuracy
CN104158216B (en) A kind of solar energy and energy and wind energy integrative electricity generation system
CN203840063U (en) Energy storage apparatus
Budh et al. Smoothing control for BESS based hybrid renewable energy system
SE534553C2 (en) Method, control device, system and computer program product for power supply of a radio base station

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant