KR101686765B1 - A Construction method for the compound pile with the inner pile installed through the suction pile - Google Patents
A Construction method for the compound pile with the inner pile installed through the suction pile Download PDFInfo
- Publication number
- KR101686765B1 KR101686765B1 KR1020160011338A KR20160011338A KR101686765B1 KR 101686765 B1 KR101686765 B1 KR 101686765B1 KR 1020160011338 A KR1020160011338 A KR 1020160011338A KR 20160011338 A KR20160011338 A KR 20160011338A KR 101686765 B1 KR101686765 B1 KR 101686765B1
- Authority
- KR
- South Korea
- Prior art keywords
- suction
- pile
- file
- outer casing
- water
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0084—Production methods for working underwater using pneumatical means
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention relates to a method of constructing a composite pile having an internal pile installed through a suction pile. More particularly, the present invention relates to a method of constructing a composite pile, The slope of the structure is corrected during the construction by changing the height of the water level inside. The suction file is penetrated into the ground by pressurizing the suction pile to the bedrock by using the hydraulic press-in part while penetrating the suction file to prevent the settlement of the structure. The present invention relates to a method of constructing a composite pile.
Description
The present invention relates to a composite pile passing through a suction pile, which facilitates the installation of the suction pile on the underwater ground by adjusting the height of the water level in the outer casing connected to the suction pile, The present invention relates to a method of constructing a composite pile having an inner pile installed through a suction pile for stably supporting a structure by constructing a pile.
Generally, the suction file has a structure in which the lower part is opened and the upper part is sealed. The construction method is as follows.
Once the bottom of the suction pile of the structure is seated in the waterborne ground, part of the suction pile is intruded into the ground by the weight of the structure. When intrusion of the self-weight is stopped, as shown in FIGS. 1A to 1C, the suction pump installed at the upper portion of the suction file is operated to discharge the water inside the suction file. As the water in the suction file is discharged, there is a pressure difference between the inside and the outside of the suction file, and the pressure difference causes the file to be buried in the ground.
However, according to the conventional suction file indenting method, when the water inside the file is discharged, the inside of the file is evacuated and the pressure difference between the inside and outside of the file is rapidly generated. The instantaneous pressure difference, If the file is not intrusive, and the ground is weak, there may be a problem that the ground inside the suction file rises as if it were a loom.
In addition, the diameter of the suction file is usually designed to be 6 to 12 meters. Once the file is penetrated into the ground, the horizontal resistance and the pull resistance are large. However, since the bottom of the file is installed at a position higher than the bedrock, There is a problem of insufficient resistance.
In order to solve such a problem, a 'suction file for rapid construction' of Patent Publication No. 10-2012-0074047, a 'hybrid support structure of offshore wind turbine generator' of Patent No. 10-1342445 and a base of a bucket file of a registered patent 10-0719300 A method of constructing an additional 'external foundation file' on the outside of the suction file was developed to prevent settlement of the suction file structure as disclosed in 'Construction structure and its construction method'.
The common feature of the above-mentioned 'external foundation file' method is that a pump is installed on the upper surface of the above-mentioned suction file to penetrate the suction file, and the 'external foundation file' is installed from the outside of the suction file to the bedrock, .
However, in the above method, since the coupling between the suction file and the external foundation file is accomplished in water, the quality of the coupling part deteriorates, and in order to dismantle the pump installed in the suction file, the diver must descend to a deep water depth, There is a common problem that the structure is complicated and the construction cost rises due to the structure of the 'external foundation file'. Particularly, in the 'hybrid supporting structure of an offshore wind turbine generator', a structural part to be combined with an 'external foundation file' is installed lower than the bottom of a suction file. This is problematic in that, at the beginning, the suction file interferes with the movement of the self-weight at the time of inserting the suction file, and the length of the small-diameter file that accommodates the vertical force becomes long.
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and it is an object of the present invention to facilitate the control of the depth of penetration of the suction puff by adjusting the water level inside the outer casing, and to eliminate the diver operation by eliminating the existing suction pump. In addition, the suction pile penetrated into the ground is used as a pullout resistor to press-fit the inner pile into the suction pile, thereby preventing settlement of the structure and simplifying the structure as a whole, thereby achieving economical construction and reducing the construction cost.
According to an aspect of the present invention,
The suction file having at least one or more openings in which at least one portion of the suction file is opened at least one part of the suction file and an outer casing for connecting the openings are extended out of the water surface, A step of intrusion by self weight; Adjusting a water pressure inside the suction file by lowering the water level in the outer casing and penetrating the suction file into the ground using the water pressure difference in the suction file generated at this time; A step of lowering the inner pile passing through the inside of the outer casing to the ground in the suction pile after the suction of the suction pile is completed; A step of press-fitting the inner pile to a bedrock using a hydraulic press-fitting part with a reaction force end of the outer casing; And joining the inner pile and the outer casing using a bonding material of cement component after the inner pile reaches the bedrock.
Here, the suction file may further include an extension wall portion extending upward from the upper surface of the suction file.
The method of
According to the method of constructing a composite pile passing through a suction pile of the present invention having the above-described structure, by adjusting the water level inside the outer casing connected to the upper opening of the suction pile, It is possible to easily adjust the internal water pressure. As a result, it is easy to control the penetration speed of the suction file penetrated into the ground, and the suction pump installed outside the suction file can be omitted and the diver operation can be omitted.
According to the present invention, when the suction pile of the suction file is completed, the inner pile penetrating the outer casing of the suction pile is press-fitted into the bedrock using a hydraulic press-fitting part for preventing the long-term settlement. Injection of the internal pile can be accomplished by using the suction pile embedded in the ground and the external casing as reaction force, omitting the use of large scale marine pile driving equipment for internal pile construction, can do.
According to the present invention, since the inner pile is press-fitted using the suction pressure of the suction pile penetrated into the ground, it is possible to perform a load test for confirming the supporting force of the pile when the inner pile reaches the bedrock as the supporting layer.
Further, according to the present invention, when the inner pile and the outer casing are joined using the cement-based bonding material, since the water can be removed in the outer casing, the quality of the coupling portion can be maintained well.
Also, according to the present invention, since the inner pile is coupled using the outer casing and the binder, the length of the inner pile is shortened, thereby improving the workability and reducing the material cost.
FIGS. 1A to 1C are schematic diagrams of hydraulic pressure differences in a suction file and an external pressure by an existing method.
FIGS. 2A to 2C are schematic diagrams of hydrostatic pressure generation when adjusting the water level in the outer casing of the present invention. FIG.
FIG. 3 is an illustration of a suction file underground according to the present invention. FIG.
4 is a diagram illustrating an example of vertical adjustment of a suction file according to the present invention.
5 is an illustration of an example of an inner pile passing through an outer casing according to the present invention.
FIG. 6 is a view showing an example in which an inner pile is press-fitted into a ground by using a hydraulic press-fitting unit according to the present invention.
FIG. 7 is an exemplary view showing a process for installing a bonding material according to the present invention and a process for pressurizing an internal pile simultaneously. FIG.
8 is an illustration of an example of completion of a work process according to a preferred embodiment of the present invention.
Figures 9a-b illustrate examples of a suction file further comprising an enlarged wall portion or partitions according to the present invention.
Hereinafter, a method of constructing a composite pile having an internal pile installed through a suction pile according to the present invention will be described in detail with reference to the accompanying drawings.
In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear. The following terms are defined in consideration of the function of the present invention, and may vary depending on the user, the intention or custom of the operator, and the like. Therefore, the definition should be based on the contents throughout this specification.
The density of the water exemplified in the present invention was assumed to be constant regardless of the depth of water.
FIGS. 1A to 1C illustrate the change in water pressure and the penetration of the
The distribution of water pressure outside the suction file (1) increases linearly as the depth of water starts from the atmospheric pressure of the water surface. After the
2A to 2C illustrate a process of generating the
An upper casing (5) of the suction file extends above the water surface, an outer casing (12) connecting the opening with an opening through which at least one part is open. The suction pump unit (11) is installed inside the outer casing (12). As shown in FIG. 2A, when the water level in the
3 to 8 are operation diagrams according to a preferred embodiment of the present invention.
When the
FIG. 3 shows the suction of the
5 is an example for supplementing the disadvantage of the long term settlement that may occur due to the bottom end of the
The work type illustrated in Fig. 6 is an operation in which the hydraulic press-fitting
Fig. 7 shows an arrangement in which the
8 shows a state in which the
9 to 10 illustrate a feature that further includes the
1: Distribution of water pressure outside the suction file
2: Distribution of water pressure inside suction file
3: Suction file inside, external water pressure car
10: Suction file (5: upper part 6: wall part 7: expansion wall part 8: partitions)
11: Suction pump section
12: External casing
13: Bracing
14: inner pile
15: Hydraulic press-
16: bonding material
P: External pressure acting on the suction file
p: internal hydraulic pressure acting on the suction file
Claims (3)
Placing the suction paddle having an opening through which at least one part of the suction paddle is partially opened and an outer casing connecting the opening with the suction padding extending out of the water surface,
Adjusting a water pressure inside the suction file by lowering the water level inside the outer casing and inserting the suction file into the ground using the water pressure difference in the suction file generated at this time;
Adjusting a water level in the outer casing to adjust a penetration speed of the suction pail and adjusting a tilt of the structure;
A step of lowering the inner pile to the inside of the suction pile into the outer casing after the suction pile is penetrated into the ground;
A step of press-fitting the inner pile to a bedrock using a hydraulic press-fitting part with a reaction force end of the outer casing; And
And joining the inner pile and the outer casing using a binder of cement component after the inner pile reaches the bedrock,
Wherein the outer casing is coupled to the suction pile and the permanent structure.
The suction file,
Further comprising an enlarged wall portion extending above the water surface in the upper portion of the suction pile.
The suction file,
Further comprising a partition for partitioning an internal space formed by the wall portion of the suction pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160011338A KR101686765B1 (en) | 2016-01-29 | 2016-01-29 | A Construction method for the compound pile with the inner pile installed through the suction pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020160011338A KR101686765B1 (en) | 2016-01-29 | 2016-01-29 | A Construction method for the compound pile with the inner pile installed through the suction pile |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20160018634A KR20160018634A (en) | 2016-02-17 |
KR101686765B1 true KR101686765B1 (en) | 2016-12-14 |
Family
ID=55457644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020160011338A KR101686765B1 (en) | 2016-01-29 | 2016-01-29 | A Construction method for the compound pile with the inner pile installed through the suction pile |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101686765B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102521885B1 (en) * | 2021-06-15 | 2023-04-14 | 주식회사 콤스 | Offshore wind farm structure installed by jacking method and its construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001311166A (en) * | 2000-04-26 | 2001-11-09 | Ohbayashi Corp | Construction method for underwater foundation structure |
JP2011236675A (en) * | 2010-05-12 | 2011-11-24 | Kajima Corp | Underwater foundation construction method and outer shell section structure |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100556302B1 (en) * | 2004-04-02 | 2006-03-07 | (주) 선암기술연구소 | Caisson Installed Support Means and Construction Method of Underwater Structure Using It |
KR100719300B1 (en) | 2006-04-12 | 2007-05-18 | 한국해양연구원 | Foundation construction structure of bucket pile and method thereof |
KR101794280B1 (en) | 2010-12-27 | 2017-11-07 | 재단법인 포항산업과학연구원 | Suction pile for rapid construction |
KR101342445B1 (en) | 2012-10-24 | 2013-12-18 | 한국해양과학기술원 | Hybrid spport structure for offshore wind power generator |
-
2016
- 2016-01-29 KR KR1020160011338A patent/KR101686765B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001311166A (en) * | 2000-04-26 | 2001-11-09 | Ohbayashi Corp | Construction method for underwater foundation structure |
JP2011236675A (en) * | 2010-05-12 | 2011-11-24 | Kajima Corp | Underwater foundation construction method and outer shell section structure |
Also Published As
Publication number | Publication date |
---|---|
KR20160018634A (en) | 2016-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111827274B (en) | High-strength grouting method for marine wind power weakly-weathered bedrock single-pile socketed foundation | |
Zhu et al. | Installation and lateral loading tests of suction caissons in silt | |
CN109208589B (en) | Implanted large-diameter rock-socketed single pile grouting system and construction method | |
US11585064B2 (en) | Hollow subsea foundations | |
CN110374131A (en) | A kind of cylinder composite truss formula offshore wind turbine foundation and its construction technology | |
KR101623741B1 (en) | Support structure of offshore wind turbines and construction method thereof | |
CN111456075A (en) | Pile barrel composite truss type offshore wind turbine foundation and construction process thereof | |
DK2700750T3 (en) | Pile FOR OFFSHORE STRUCTURES AND METHOD FOR CONSTRUCTION OF A pile FOR OFFSHORE STRUCTURES | |
CN110258538A (en) | A kind of soil nailing reinforces buffer-type artificial digging pile and its construction method | |
KR101686765B1 (en) | A Construction method for the compound pile with the inner pile installed through the suction pile | |
KR101544640B1 (en) | Suction Foundation Assembly, Construction Method for Adjusting Horizontality and Offshore Wind Power System using the same | |
CN106978801A (en) | The construction method of its progress reinforced soft soil ground of multifunction vibration air-pressure tube and application | |
KR102392135B1 (en) | Pre-filing construction apparatus and construction method of offshore jacket foundation structure | |
KR20150143114A (en) | Support structure of offshore wind turbines and structure method thereof | |
KR20140069818A (en) | suction pile for submarine foundation using grouting method | |
JP2020128672A (en) | Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation | |
US20230212834A1 (en) | Hybrid anchor | |
KR101358636B1 (en) | Foundation reinforcement construction method with guide tube | |
JP6586213B2 (en) | Construction method of jacket structure | |
CN113356214A (en) | Grouting bottom sealing method for offshore wind turbine jacket foundation structure | |
KR20170017198A (en) | Landslide Protection Wall Construction Method Using PHC Pile and Anchor Bolt | |
KR102557752B1 (en) | Pre-drilling and positioning method for installation of jacket foundation | |
JP2021530634A (en) | How to install a tubular metal pile on rocky ground | |
KR102374486B1 (en) | Method for contructing offshore substructure using vertical lifting jack and horizontal gripper | |
CN213062013U (en) | High-strength grouting structure of marine wind power weakly-weathered bedrock single-pile socketed foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |