KR101668861B1 - Virtual training system of nuclear power plant - Google Patents

Virtual training system of nuclear power plant Download PDF

Info

Publication number
KR101668861B1
KR101668861B1 KR1020150168729A KR20150168729A KR101668861B1 KR 101668861 B1 KR101668861 B1 KR 101668861B1 KR 1020150168729 A KR1020150168729 A KR 1020150168729A KR 20150168729 A KR20150168729 A KR 20150168729A KR 101668861 B1 KR101668861 B1 KR 101668861B1
Authority
KR
South Korea
Prior art keywords
indicator
procedure
unit
data
shape
Prior art date
Application number
KR1020150168729A
Other languages
Korean (ko)
Inventor
장을순
장신
Original Assignee
주식회사 한빛파워
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한빛파워 filed Critical 주식회사 한빛파워
Priority to KR1020150168729A priority Critical patent/KR101668861B1/en
Application granted granted Critical
Publication of KR101668861B1 publication Critical patent/KR101668861B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/008Man-machine interface, e.g. control room layout
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The present invention relates to a mock control panel system for education and training on a nuclear power plant. Among various measuring instruments and indicators installed to each panel on a mock control panel for education and training purposes, the mock control panel selects measuring instruments and indicators required to check to correspond to a procedure for each scenario, and automatically displays the measuring instruments and indicators to allow all educators to check in real time. More particularly, the mock control panel system comprises: a database part storing a scenario DB, a nuclear power plant procedure DB, and a measuring and indicating instrument geometry DB; an operating server including a scenario extracting part, a power plant procedure extracting part, a measuring and indicating instrument geometry extracting part, a nuclear power plant procedure checking part, a measuring and indicating instrument data collecting part, a measuring and indicating instrument geometrical data gathering part, and a control part; and a display part.

Description

절차서 별 계측기 및 지시기가 자동으로 디스플레이되는 원전 교육 훈련용 모의 제어반 시스템{Virtual training system of nuclear power plant}Technical Field [0001] The present invention relates to a virtual training system for a nuclear power plant,

본 발명은 원자력 발전소 교육 훈련용 모의 제어반 시스템에 관한 것으로, 더욱 상세하게는 교육 훈련용 원전 모의 제어반에 각 패널 별로 다수 개가 설치되는 각종 계측기 및 지시기를 각 시나리오별 절차서에 대응하기 위하여 필수적으로 확인하여야 하는 계측기 및 지시기를 선별하여 자동으로 디스플레이하여 모든 교육자가 실시간으로 확인할 수 있도록 하는 절차서 별 계측기 및 지시기가 자동으로 디스플레이되는 원전 교육 훈련용 모의 제어반 시스템에 관한 것이다.The present invention relates to a simulated control panel system for training and training of nuclear power plants, and more particularly, it is essential to check various instruments and indicators provided for each panel on a simulated control panel of a training nuclear power plant to correspond to each scenario-specific procedure And an indicator is automatically displayed for each training person so that all the educators can view it in real time.

원자력 발전소의 교육 훈련용 모의 제어반 시스템(시뮬레이터)은 실제 원자력 발전소의 주 제어실(MCR)의 복잡한 운전설비 및 운영 체계와 동일하게 형상 관리되고 있어, 이에 사용되는 각종 계측기들도 등급의 차이는 다소 있으나 동일한 기기를 사용하고 있다. 이에 따라 교육 훈련용 모의 제어반도 원자력 발전소의 주 제어반과 동일한 다수의 운전설비 패널로 구성되어 있으며, 모의 제어반의 각 운전설비는 계통별로 한 패널씩 구분되면서 연결되어 있다. 또한, 원자력 발전소 교육 훈련용 모의 제어반 시스템은 실제로 주 제어실과 동일한 형상으로 구성되면서, 교육 훈련을 진행하기 위하여 진행 교수가 조작하는 별도의 인스트럭터 시스템(Instructor System)이 더 설치된다.Simulation control system (simulator) for training and training of nuclear power plant is managed in the same manner as complex operation equipment and operating system of main control room (MCR) of actual nuclear power plant. I am using the same device. Accordingly, the simulation control panel for education and training is composed of the same number of operation equipment panels as the main control panel of the nuclear power plant, and each operation facility of the simulation control panel is divided into one panel for each system. In addition, the simulated control panel system for training and training of nuclear power plants is constructed in the same shape as that of the main control room, and a separate Instructor System for operating the training course is installed.

도 1은 원자력 발전소 교육 훈련용 모의 제어반의 패널 배치 구조의 일반적인 예를 도시한 도면이다. 도시된 바와 같이 원자력 발전소 모의 제어반은 운전원 콘솔(11)을 중심으로 공기조화설비(13), 보조냉각설비(14), 안전설비(15), 화학 및 체적 제어설비(16), 원자로 냉각설비(17), 원자로제어 및 보호설비(18), 증기발생설비(19), 급수설비(20), 터빈설비(21), 발전설비(22), 소내전력설비(23)를 포함하는 각 계통별 운전설비 패널들이 배치된다. 상기와 같은 구성의 모의 제어반은 각 발전소 시스템에 따라 다소 달리 구성될 수 있으나, 실제 해당 발전소의 주 제어실과 동일한 구성과 조건으로 배치되고, 상기 설비들의 후방에는 교수에 의한 교육 진행을 위하여 인스트럭터 시스템(12)이 설치되어 있다. 1 is a diagram showing a general example of a panel layout structure of a simulation control panel for training and training of a nuclear power plant. As shown in the figure, the simulation control panel of the nuclear power plant includes the air conditioning system 13, the auxiliary cooling system 14, the safety system 15, the chemical and volume control system 16, the reactor cooling system Operation of each grid including reactor control and protection facility 18, steam generating facility 19, water supply facility 20, turbine facility 21, power generation facility 22, Equipment panels are deployed. The simulation control panel having the above configuration may be configured differently according to each power plant system, but it is arranged in the same configuration and condition as the actual control room of the corresponding power plant. At the rear of the facilities, an instructor system 12 are installed.

상기와 같은 교육훈련 모의 제어반 시스템에서 사고를 대비한 모의 훈련은 교수가 인스트럭터 시스템을 통하여 특정 사고의 시나리오를 기동시키면, 발전부장(SRO : Senior Reactor Operator), 안전과장(STA : Shift Technical Advisor), 원자로과장(RO : Reactor Operator), 터빈과장(TO : Turbine Operator), 전력설비운전원(EO : Electric Operator) 등의 발전 운전원들이 팀을 이루어 해당 시나리오에 적합한 절차서를 찾아 절차서에 기록된 운전 절차 순서에 따라 해당 운전설비 패널의 계측기 및 지시기를 직접 확인하면서 해당 운전설비 패널을 조작하여야 한다. Simulation training for accidents in the above-mentioned training simulator control panel system is performed by the instructor in case of activating a scenario of a specific accident through the instructor system, the Senior Reactor Operator (SRO), the Shift Technical Advisor (STA) Operators such as the reactor operator (RO), the turbine operator (TO), and the electric operator (EO) are teamed to find the appropriate procedure for the scenario, The user must operate the corresponding operation equipment panel while checking the instruments and indicators of the corresponding operation equipment panel.

각 운전설비 패널에는 각종 스위치, 경보 및 조정자가 발전소 계통 도면의 흐름에 맞게 배치되고, 발전소의 각 계통의 온도, 압력 및 수위 등과 같이 운전에 필요한 치수를 표현하는 계측기 및 지시기가 각 패널 당 수십 개 내지 수백 개 설치된다. 이때, 각 운전설비 패널은 한정된 크기에 각종 스위치, 경고, 조정자, 계측기 및 지시기를 포함하는 다수의 장치들을 설치하여야 하므로 각 장치들은 서로 간섭되지 않도록 최소의 크기로 설치된다.In each operation equipment panel, various switches, alarms and controllers are arranged according to the flow chart of the power plant, and meters and indicators representing the required dimensions for operation, such as temperature, pressure and water level of each system of the power plant, To hundreds. At this time, since each operation equipment panel has to be installed with a plurality of devices including various switches, warnings, adjusters, meters and indicators in a limited size, each device is installed in a minimum size so as not to interfere with each other.

한편, 원자력 발전소의 각종 정상 혹은 비정상 운전은 모두 절차서에 따라 조작 운전되어야 하며, 교육 훈련용 모의 제어반에서도 원자력 발전소의 각 상황에 맞추어 기동, 정지, 100% 출력, 50% 출력, 20% 출력 상황 및 비정상 등의 상황을 가상 시나리오 상황으로 설정하여 절차서에 따라 교육 훈련을 하고 있다. 이때, 교육 훈련 진행시 각 절차서에 따라 어느 운전설비의 수위나 압력이 조절되며 다른 다수의 운전설비에서도 압력, 온도, 수위 등이 변하게 된다. 이와 같이 각 운전설비의 운전은 유기적으로 상호 관련되어 있으므로, 운전원은 담당 운전설비의 패널 외에 상호 관련된 다수의 다른 운전설비 패널의 각 계측기 및 지시기에서 표시되는 수치를 유기적으로 연결하면서 확인하여야 한다. 만약, 관련된 특정 운전설비 패널의 계측기나 지시기 확인을 누락하거나 잘못 확인하여 운전 조작을 진행하는 경우 모의 제어반의 교육 진행에 큰 차질이 발생되며, 모의 제어반에서 이러한 행위가 간과되거나 자주 발생되면 실제 원자력 발전 운전 상황에서 발전중단 및 대형 사고로 이어질 수 있다.On the other hand, all normal or abnormal operation of the nuclear power plant should be operated according to the procedure and the simulation control panel for training and training should be operated and stopped, 100% output, 50% output, 20% And abnormal situations are set as hypothetical scenario scenarios and training is conducted according to the procedure. At this time, the level or pressure of the operation equipment is controlled according to each procedure when the training is conducted, and pressure, temperature, water level, etc. are changed in many other operation facilities. Since the operation of each operation facility is interrelated with each other, the operator should confirm the values displayed on the respective meters and indicators of the various operation facility panels related to each other, in addition to the panel of the operation facility, by organically connecting them. If the operation of the operation is proceeded by omitting or checking the meter or indicator of the relevant operation equipment panel concerned, there will be a great disruption in the education process of the simulation control panel. If such a behavior is overlooked or frequently occurs in the simulation control panel, It can lead to power outages and major accidents in the driving situation.

그러나 각 운전설비 패널에는 계측기나 지시기 등의 다수의 장치가 작은 크기로 복잡하게 배치되므로 운전자가 짧은 시간에 수백 개의 장치를 신속하게 확인하기에 어려움 점이 있다. 또한, 다수 패널의 계측기 및 지시기를 유기적으로 연결하면서 확인하여야 하지만, 각 운전원이 담당 패널 외의 다른 패널의 계측기나 지시기는 확인하기에 큰 어려움이 존재한다.However, since a large number of devices such as meters and indicators are arranged in a complicated manner on each operation equipment panel, it is difficult for the driver to quickly check hundreds of devices in a short time. In addition, although it is necessary to confirm while connecting the meters and the indicators of many panels organically, there is a great difficulty for each operator to check the meters or indicators of the panel other than the panel in charge.

각 발전소의 교육 훈련용 모의 제어반에는 각 운전설비 패널의 계측기 및 지시기 수치를 인스트럭터 시스템의 단말기와 같은 별도의 컴퓨터에서 확인할 수는 지만, 이 경우 해당 패널의 계측기 및 지시기를 모니터 화면으로 불러와 확인하여야 하고, 각 패널 단위로 모니터링만 할 수 있어 상호 관련된 다수 패널의 계측기나 지시기를 동시에 확인할 수는 없으며, 다수의 운전원들이 동시에 모니터링하기에는 많은 불편한 점이 존재한다. 따라서, 각 운전설비 패널 앞에서 운전하는 운전원들이 교육 훈련을 하는 과정에서 상기와 같은 별도의 컴퓨터를 통하여 계측기나 지시기를 확인하는 것은 현실적으로 매우 어려운 방법이다. In the simulation control panel of each power plant, the meter and indicator values of each operation equipment panel can be confirmed by a separate computer such as the terminal of the instructor system. In this case, the instrument and the indicator of the panel should be checked on the monitor screen However, there is a lot of inconvenience that a plurality of operators can simultaneously monitor an instrument or an indicator of a plurality of interconnected panels because they can only monitor each panel. Therefore, it is a very difficult method to check the meter or the indicator through the separate computer in the process of training the operators who are driving in front of each operation equipment panel.

따라서 종래의 기술에 따른 교육 훈련용 모의 제어반에서는 각 운전원은 담당 운전설비의 패널에서 표시되는 계측기와 지시기에 나타나는 수치만을 확인하면서 교육을 진행하고 있는 것이 현실이다.Therefore, in the simulation control panel for training and training according to the related art, each operator is learning while observing only the numerical values displayed on the meter and the indicator displayed on the panel of the operation facility.

국내등록특허 10-0208653호(1999.04.16.등록, 원자력발전소의 운전원 작업반)Registered Patent No. 10-0208653 (Registered on Apr. 16, 1999, Working Group of Nuclear Power Plant Operator) 국내등록특허 10-1425527호(2014.07.25.등록, 원자력발전소 훈련용 시뮬레이터의 실시간 중대사고 모의 시스템 및 그 방법)Domestic Registration No. 10-1425527 (Registered, Simulation System for Real-time Accident in Nuclear Power Plant Training Simulator and Method)

원자력 발전소 모의 제어반에서 진행되는 교육 훈련은 각 운전원이 자신의 담당 설비에 해당하는 운전설비 패널 외에 절차서에 대응하는 다수 운전설비 패널의 계측기 및 지시기 등에서 표시되는 수치들을 유기적으로 확인하면서 교육을 진행하도록 할 필요가 있다.In addition to the operation equipment panel corresponding to the equipment in charge, the education and training conducted in the simulation control panel of the nuclear power plant allows the operator to organically check the numerical values displayed on the instrument and indicator of the multiple operation equipment panel corresponding to the procedure There is a need.

본 발명은 상기와 종래의 문제점을 해결하기 위하여 제안된 것으로, 발전 흐름 계통에 맞추어 배치되는 각 운전설비 패널의 계측기와 지시기에서 교육 훈련 시나리오에 대응하는 절차서에 따라 상호 유기적으로 확인되어야 하는 주요 계측기 및 지시기의 표시 정보를 다수의 운전설비 패널로부터 추출하고 절차 단계별로 취합하여 모든 운전원들이 동시에 모니터링할 수 있도록 제공함으로써, 교육 훈련의 질과 효율을 향상시킬 수 있는 원전 교육 훈련용 모의 제어반 디스플레이 시스템을 제공하는 것을 목적으로 한다.The present invention has been proposed in order to solve the problems described above and the related art, and it is an object of the present invention to provide a main measuring instrument and an indicator of each operation equipment panel arranged according to a power generation flow system, Provides display control system for nuclear training and training that can improve the quality and efficiency of education and training by extracting the indication information of the indicator from a plurality of operation equipment panels and collecting them according to the procedural steps so that all the operators can monitor simultaneously .

상기와 같은 목적을 달성하기 위한 본 발명의 절차서 별 계측기 및 지시기가 자동으로 디스플레이되는 원전 교육 훈련용 모의 제어반 시스템은 원자력 발전소 운전에서 발생되는 각종 사고 시나리오의 시나리오 DB와, 상기 사고 시나리오에 대한 원전 조작 절차서의 원전절차 DB와, 각 운선설비 패널에 설치된 계측기와 지시기 형상의 계측지시기 형상 DB가 저장되는 데이터베이스부; 상기 시나리오 DB로부터 특정 사고 시나리오를 추출하여 기동하는 시나리오 추출부와, 기동된 시나리오에 대응하여 조작되어야 하는 운전 절차를 상기 원전절차 DB로부터 추출하는 원전절차 추출부와, 각 운전설비 패널에 설치된 계측기와 지시기의 형상을 상기 계측지시기 형상 DB로부터 추출하는 계측지시기 형상 추출부와, 기동된 시나리오에 따라 운전설비가 해당 원전절차에 따라 운전되는지 확인하는 원전절차 확인부와, 각 운전설비 패널에 설치된 계측기와 지시기의 표시 데이터를 수집하는 계측지시기 데이터 수집부와, 수집된 계측기 및 지시기의 표시 데이터와 해당 계측기 및 지시기의 형상을 취합하는 계측지시기 형상데이터 취합부와, 상기 사고 시나리오 추출부, 원전절차 추출부, 계측지시기 형상 추출부, 원전절차 확인부, 계측지시기 데이터 수집부 및 계측지시기 형상데이터 취합부의 구동을 제어하는 제어부를 포함하는 운영 서버; 및, 상기 운영 서버의 제어에 따라 상기 계측지시기 형상데이터 취합부에서 취합된 운전설비 패널의 계측기 및 지시기를 디스플레이하는 디스플레이부;로 이루어지는 것을 특징으로 한다. In order to achieve the above object, a simulated control panel system for a nuclear power plant training and training apparatus in which instruments and indicators for each procedure are automatically displayed according to the present invention includes a scenario DB of various accident scenarios generated in operation of a nuclear power plant, A database unit for storing a nuclear plant procedure DB in the procedure, an instrument indicator installed in each shipboard facility panel, and an instrument indicator shape DB in the form of an indicator; A scenario extraction section for extracting and starting a specific accident scenario from the scenario DB; a nuclear plant procedure extraction section for extracting an operation procedure to be operated corresponding to the activated scenario from the nuclear procedure procedure DB; A measurement indicator shape extracting unit for extracting a shape of the indicator from the measurement indicator shape DB; a nuclear power plant procedure confirmation unit for confirming whether the operation facility is operated according to the nuclear plant procedure according to the activated scenario; A measurement indicator shape data collecting unit for collecting the display data of the collected meters and indicators and the shape of the corresponding meters and indicators and a measurement indicator shape data collecting unit for collecting display data of the indicators, , A measurement indicator shape extracting unit, a nuclear power plant procedure confirmation unit, a measurement indicator Operating a server that is a control unit that controls the data collecting unit and a measurement indicator driving portion shape data collection; And a display unit for displaying a meter and an indicator of the operation equipment panel collected by the measurement indicator shape data collecting unit under the control of the operation server.

여기서, 상기 계측지시기 형상데이터 취합부는 원전 조작 절차서에 따라 관련된 운전설비 패널의 계측기와 지시기에 대한 데이터와 형상을 취합하여 디스플레이부에 제공하는 계측지시기 자동취합부; 및, 인스트럭터 단말기를 통하여 입력되는 운전설비 패널의 계측기와 지시기에 대한 데이터와 형상을 취합하여 디스플레이부에 제공하는 계측지시기 수동취합부;로 구성되는 것을 특징으로 한다.Here, the measurement indicator shape data collecting unit collects data and shapes of the meters and indicators of the related operation equipment panel according to the NPN operation procedure and provides the collected data and shape to the display unit; And a measurement indicator manual collection unit for collecting data and shapes of the meters and the indicators of the operation equipment panel inputted through the instructor terminal and providing the data and the shapes to the display unit.

본 발명은 교육 훈련 과정에서 절차서에 따라 상호 유기적으로 확인되어야 하는 주요 계측기 및 지시기의 표시 정보를 모든 운전원들이 동시에 모니터링할 수 있도록 제공함으로써, 각 운전원들은 개인의 담당 운전설비뿐만 아니라 절차서에 따라 상호 유기적으로 조작되어야 하는 각 운전설비에 대한 수치 정보를 확인할 수 있어 교육 훈련의 질과 효율이 크게 향상되는 효과를 제공한다.The present invention provides that all the operators can simultaneously monitor the display information of the main instruments and indicators that should be mutually organically confirmed according to the procedure in the training and training process, It is possible to confirm the numerical information of each operation facility to be operated by the user, thereby providing a significant improvement in the quality and efficiency of the training and training.

도 1은 원자력 발전소 교육 훈련용 모의 제어반의 패널 배치 구조의 일반적인 예를 도시한 도면,
도 2는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반의 패널 배치 구조를 나타낸 도면,
도 3은 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 운전설비에 대한 네트워크 구성을 나타낸 블록도,
도 4는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 구성을 나타낸 블록도, 및
도 5는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 운영 과정을 나타낸 순서도이다.
1 is a view showing a general example of a panel arrangement structure of a simulation control panel for training and training of a nuclear power plant,
2 is a view showing a panel arrangement structure of a simulation control panel for training and training according to an embodiment of the present invention,
3 is a block diagram illustrating a network configuration of a driving facility of a simulated control panel system for training and training according to an embodiment of the present invention.
4 is a block diagram showing a configuration of a simulated control panel system for training and training according to an embodiment of the present invention, and Fig.
FIG. 5 is a flowchart illustrating an operation procedure of a simulation control panel system for training and training according to an embodiment of the present invention.

본 발명과 본 발명의 실시에 의해 달성되는 기술적 과제는 다음에서 설명하는 바람직한 실시예들에 의해 명확해질 것이다. 이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 살펴보기로 한다.BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG. Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반의 패널 배치 구조를 나타낸 도면이고, 도 3은 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 운전설비에 대한 네트워크 구성을 나타낸 블록도이다.3 is a block diagram illustrating a network configuration of a driving facility of a simulated control panel system for training and training according to an embodiment of the present invention; .

먼저, 도 2에 도시된 바와 같이 본 발명의 교육 훈련용 모의 제어반은 운전원 콘솔(11)을 중심으로 공기조화설비(13), 보조냉각설비(14), 안전설비(15), 화학 및 체적 제어설비(16), 원자로 냉각설비(17), 원자로제어 및 보호설비(18), 증기발생설비(19), 급수설비(20), 터빈설비(21), 발전설비(22), 소내전력설비(23)를 포함하는 각 계통별 운전설비 패널들이 배치되고, 상기 패널들의 후방에는 교육 진행을 위하여 인스트럭터 시스템(12)이 설치된다. 특히, 본 발명의 교육 훈련용 모의 제어반은 모든 운전원들이 조작 운전에 따른 각 운전설비 패널에 설치된 계측기 및 지시기에서 표시되는 수치의 변화 상황을 실시간으로 확인할 수 있도록 디스플레이 패널(24)이 설치된다. 2, the simulated control panel for training and training of the present invention includes an air conditioning system 13, an auxiliary cooling system 14, a safety system 15, a chemical and volume control system It is also possible to use the facilities 16, reactor cooling facility 17, reactor control and protection facility 18, steam generating facility 19, water supply facility 20, turbine facility 21, power generation facility 22, 23 are disposed in the rear of the panels, and an instructor system 12 is installed at the rear of the panels. Particularly, the display panel 24 is installed in the simulation control panel of the present invention so that all the operators can check the change of the numerical value displayed on the meter and the indicator installed on each operation equipment panel according to the operation operation in real time.

상기와 같은 교육훈련 모의 제어반 시스템에서 특정 시나리오에 대응하여 운전원이 절차서에 따라 담당 운전설비 패널을 조작 운전하면, 해당 운전설비 패널과 관련된 다른 운전설비 패널의 계측기나 지시기에서 나타나는 값도 변하게 되며, 특정 운전설비 패널 및 이와 관련된 다른 운전설비 패널의 계측기 및 지시기에서 표시되는 데이터가 디스플레이 패널(24)에도 동시에 표시된다. 이와 같이 디스플레이 패널(24)에 표시되는 데이터 정보는 조작 운전을 하는 운전원뿐만 아니라 모의 훈련 중인 모든 운전원이 확인할 수 있게 된다. 이러한 디스플레이 패널(24)은 모든 운전원이 신속하게 모니터링할 수 있도록 제어반의 전방과 좌우측면 등 다수의 위치에 설치되거나 일 측에서 고정식 또는 이동식으로 설치될 수 있다.When the operator operates the corresponding operation equipment panel in accordance with the procedure according to the specific scenario in the training and simulation control panel system, the values displayed in the meters or indicators of the other operation equipment panels related to the operation equipment panel are changed, The data displayed on the instrument panel and indicators of the operation equipment panel and other operation equipment panels associated therewith are also displayed on the display panel 24 simultaneously. Thus, the data information displayed on the display panel 24 can be confirmed not only by the operator who performs the operation operation but also by all the operators who are performing the simulation. The display panel 24 may be installed at a plurality of positions such as the front, left and right sides of the control panel, or may be fixedly or movably installed on one side so that all the operators can quickly monitor the operation panel.

한편, 상기와 같이 운전설비 패널, 인스트럭터 단말기, 디스플레이 패널 등을 포함하는 모의 제어반은 네트워크로 서로 연결된다. 도 3에 도시된 바와 같이 모의 제어반은 모의 훈련을 운영하는 운영 서버(200)와 운전원이 절차서에 따라 각 설비를 조작하는 다수의 운전설비 패널(100)로 구성되며, 운영 서버(200)와 다수의 운전설비 패널(100)은 통신 네트워크를 이루면서 서로 연결되어 각종 정보와 명령이 송수신될 수 있도록 구성된다. 또한, 상기 네트워크 통신망에는 인스트럭터 단말기(300)가 연결되어 교육 훈련의 과정을 관찰 및 진행하고, 디스플레이부(400)가 연결되어 각 설비에서 나타나는 계측기 및 지시기 수치를 모든 운전원들이 모니터링할 수 있도록 구성된다.Meanwhile, as described above, the simulation control panels including the operation equipment panel, the instructor terminal, and the display panel are connected to each other via a network. As shown in FIG. 3, the simulation control panel includes an operation server 200 for running simulated drills, and a plurality of operation equipment panels 100 for operating each facility according to a procedure. The operation equipment panel 100 of the first embodiment is configured to be connected to each other to form a communication network so that various information and commands can be transmitted and received. In addition, the instructor terminal 300 is connected to the network communication network to observe and process the training process, and the display unit 400 is connected to allow all the operators to monitor the numerical values of the meters and indicators displayed in each facility .

여기서, 운전설비 패널(100)은 공기조화설비, 보조냉각설비, 안전설비, 화학 및 체적제어설비, 원자로 냉각설비, 원자로제어 및 보호설비, 증기발생설비, 급수설비, 터빈설비, 발전설비 및 소내전력설비 등을 운전하기 위한 다수의 패널들로 구성되며, 이들 각 운전설비 패널(100)은 실제 원자력 발전소 주 제어실의 제어반과 동일하게 배치된다. 또한, 각 운전설비 패널(100)은 운전자가 절차서에 따라 운전을 조작하기 위한 조작패널(120)과 운영 서버(200)와 통신을 위한 모뎀(110)으로 구분될 수 있으며, 상기 모뎀(110)은 CPU 유니트(111), TCP/IP 통신부(112), 아날로그 입력처리부(113), 아날로그 출력처리부(114), 디지털 입력처리부(115), 디지털 출력처리부(116) 및 필드버스 인터페이스부(117)를 포함한다.Herein, the operation equipment panel 100 is a system for controlling the operation of the air conditioning system, the auxiliary cooling system, the safety facility, the chemical and volume control facility, the reactor cooling facility, the reactor control and protection facility, the steam generating facility, And each of the operation equipment panels 100 is arranged in the same manner as the control panel of the actual control room of the nuclear power plant. The operation equipment panel 100 may be divided into an operation panel 120 for operating the operation according to the procedure and a modem 110 for communication with the operation server 200, An analog input processing unit 113, an analog output processing unit 114, a digital input processing unit 115, a digital output processing unit 116, and a fieldbus interface unit 117. The CPU unit 111, the TCP / IP communication unit 112, .

상기와 같은 교육 훈련용 모의 제어반에서 운영 서버(200)는 교육 훈련용 제어 프로그램과 발전소 구성요소의 모델링을 수행하고, 교육 훈련 프로그램에 필요한 입출력 데이터를 수집하며, 교육 훈련 프로그램을 통해 계산된 명령값을 통신망을 통하여 각 운전설비 패널(100)로 전송한다. 이때, 운영 서버(200)는 각 조작패널(120)에 설치된 모뎀(110)의 CPU 유니트(111)와 TCP/IP 통신부(112)를 통하여 데이터 통신을 수행하며 아날로그 입력처리부(113)과 디지털 입력처리부(115)로부터 데이터를 수집하며, 교육 훈련 프로그램에 의해서 계산된 명령값을 아날로그 출력처리부(114)와 디지털 출력처리부(116)로 전송한다. 상기와 같은 교육 훈련용 모의 제어반과 운영 서버(200)와 운전설비 패널(100) 사이에 전송되는 명령과 각종 데이터가 인스트럭터 단말기(300)를 통하여 교육을 진행하는 교수에게 제공된다. In the simulated control panel for training and training, the operation server 200 performs modeling of a control program for training and a power plant component, collects input / output data necessary for the training program, To the respective operation equipment panel 100 through a communication network. At this time, the operation server 200 performs data communication through the CPU unit 111 of the modem 110 installed in each operation panel 120 and the TCP / IP communication unit 112, and controls the analog input processing unit 113 and the digital input Collects data from the processing unit 115, and transmits the command value calculated by the training program to the analog output processing unit 114 and the digital output processing unit 116. The command and various data transmitted between the simulated control panel for the training and training, the operation server 200 and the operation facility panel 100 are provided to the instructor through the instructor terminal 300.

도 4는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 구성을 나타낸 블록도이다.4 is a block diagram showing a configuration of a simulated control panel system for training and training according to an embodiment of the present invention.

도시된 바와 같이 본 발명의 교육 훈련용 모의 제어반 시스템은 모의 제어반 시스템의 전체적인 운영을 제어하는 제어부(210), 교육 훈련에 필요한 각종 데이터를 추출하는 교육 데이터 추출부(220), 운전설비 패널(100)에서 조작되는 운전이 원자력 발전소 운영절차(이하, '원전절차'라 함)에 따른 운전인지 확인하는 원전절차 확인부(230), 운전설비 패널(100)에 설치된 계측기 및 지시기에서 표시되는 수치 정보를 수집하는 계측지시기 데이터 수집부(240) 및 수집된 계측지시기 데이터를 디스플레이부(400)에 표시하기 위하여 취합하는 계측지시기 형상데이터 취합부(250)를 포함한다. 여기서, 상기 교육 데이터 추출부(220)는 사고 시나리오를 추출하는 시나리오 추출부(221), 시나리오에 대응되는 원전절차를 추출하는 원전절차 추출부(222) 및 계측기나 지시기의 형상을 추출하는 계측지시기 형상 추출부(223)로 구성된다. 상기 제어부(210), 교육 데이터 추출부(220), 원전절차 확인부(230), 계측지시기 데이터 수집부(240) 및 계측지시기 형상데이터 취합부(250)는 운영 서버(200)를 구성한다.As shown in the figure, the simulation control panel system of the present invention includes a control unit 210 for controlling the overall operation of the simulation control panel system, a training data extraction unit 220 for extracting various data required for the training and training, A nuclear power plant procedure confirmation unit 230 for confirming whether the operation to be operated by the nuclear power plant is an operation according to a nuclear power plant operation procedure (hereinafter referred to as a nuclear power plant procedure), a meter installed in the operation facility panel 100, And a measurement indicator shape data collecting unit 250 for collecting the collected measurement indicator data to display on the display unit 400. [ The training data extracting unit 220 includes a scenario extracting unit 221 for extracting an accident scenario, a nuclear plant procedure extracting unit 222 for extracting a nuclear plant procedure corresponding to the scenario, and a measurement indicator And a shape extracting unit 223. The control unit 210, the training data extraction unit 220, the nuclear power plant procedure verification unit 230, the measurement indicator data collection unit 240 and the measurement indicator shape data collection unit 250 constitute the operation server 200.

또한, 모의 제어반 시스템은 교수가 교육 훈련을 진행하는 인스트럭터 단말기(300) 및 각 운전설비 패널(100)의 계측기와 지시기에서 표시되는 정보를 표시하는 디스플레이부(400)를 포함한다. 또한, 모의 제어반 시스템은 교육 훈련을 위한 각종 데이터가 저장되는 데이터베이스부(500)를 포함하며, 데이터베이스부(500)는 원자력 발전소에서 실제 발생 가능한 다양한 사고를 각 시나리오가 DB화되어 저장되는 시나리오 DB(510), 해당 사고 시나리오에 대한 각 운전설비의 원전 조작 절차서가 DB화되어 저장되는 원전절차 DB(520) 및 각 패널에 설치된 계측기와 지시기의 실제 형상이 DB화되어 저장되는 계측지시기 형상 DB(530)를 포함한다.In addition, the simulation control panel system includes an instructor terminal 300 in which a professor conducts education and training, and a display unit 400 that displays information displayed on an indicator and an indicator of each operation equipment panel 100. In addition, the simulation control panel system includes a database unit 500 in which various data for education and training are stored. The database unit 500 stores various scenarios that may occur in a nuclear power plant, such as scenarios DB 510), a nuclear plant procedure DB 520 in which a nuclear operation procedure of each operation facility for each accident scenario is stored in a DB, and a measurement indicator configuration DB 530 in which the actual configuration of the indicators and the indicators installed in each panel is DB- ).

구체적으로 살펴보면, 시나리오 추출부(221)는 시나리오 DB(510)에 저장된 다수의 사고 시나리오 중 하나를 추출하여 모의 제어반 시스템에 기동시킨다. 이에 따라 각 운전원들은 기동된 사고 시나리오에 따라, 사고에 대응하기 위하여 절차서를 찾아 절차서에 따라 담당 운전설비 패널(100)을 조작하게 된다. Specifically, the scenario extracting unit 221 extracts one of a plurality of accident scenarios stored in the scenario DB 510, and activates the extracted one of the plurality of accident scenarios in the simulation control panel system. Accordingly, each operator operates the corresponding operation equipment panel 100 according to the procedure in accordance with the accident scenario to find the procedure and respond to the accident.

원전절차 추출부(222)는 기동된 사고 시나리오에 대하여 조작하여야 할 원전절차를 원전절차 DB(520)에서 가져온다. 원전절차 추출부(222)에서 추출된 원전절차 정보는 원전절차 확인부(230)와 계측지시기 형상데이터 취합부(250)로 제공된다. The nuclear plant procedure extraction unit 222 fetches the nuclear plant procedure to be operated on the activated accident scenario from the nuclear plant procedure DB 520. [ The nuclear plant procedure information extracted by the nuclear plant procedure extracting unit 222 is provided to the nuclear reactor procedure check unit 230 and the measurement indicator shape data collecting unit 250.

계측지시기 형상 추출부(223)는 조작 및 운전 중인 설비의 패널에 설치된 각종 계측기 형상과 지시기 형상을 계측지시기 형상 DB(530)에서 가져온다. 계측지시기 형상 추출부(223)에서 추출된 계측지시기 형상은 계측지시기 형상데이터 취합부(250)로 제공된다. 이를 위하여 계측지시기 형상 DB(530)는 모든 운전설비 패널(100)에 설치된 계측기 및 지시기의 형상들이 각 패널별 및 기기별로 DB화되어 저장된다.The measurement indicator shape extraction unit 223 fetches various types of meter and indicator shapes installed on the panel of the operation and operation equipment from the measurement indicator shape DB 530. The measurement indicator shape extracted by the measurement indicator shape extraction section 223 is provided to the measurement indicator shape data collection section 250. To this end, the measurement indicator shape DB 530 stores the shapes of the meters and indicators installed in all the operation equipment panels 100 in DB form for each panel and each device.

상기 원전절차 확인부(230)는 운전원이 시나리오에 대응하여 각 운전설비 패널(100)을 조작하는지 확인하고, 운전원이 원전절차에 따라 운전설비 패널(100)을 조작하는 것이 확인되면, 제어부(210)는 디스플레이부(400)를 통하여 계측지시기 데이터를 표시하도록 제어한다.The nuclear plant procedure check unit 230 confirms whether the operator operates each operation facility panel 100 corresponding to the scenario and if the operator confirms to operate the operation facility panel 100 according to the nuclear plant procedure, Controls the display unit 400 to display the measurement indicator data.

상기 계측지시기 데이터 수집부(240)는 각 운전설비 패널(100)에 설치된 각종 계측기 및 지시기에서 표시되는 수치 정보(즉, 표시 데이터)를 수집하는 구성이다. 이를 위한 계측지시기 데이터 수집부(240)는 교육 훈련중 운전원이 조작하는 운전설비 패널(100)뿐만 아니라 이와 상호 관련된 운전설비 패널(100)에 설치된 계측기와 지시기에서 표시되는 데이터를 실시간으로 감시하면서 해당 데이터를 수집한다. 계측지시기 데이터 수집부(240)에서 수집된 데이터는 계측지시기 형상데이터 취합부(250)로 제공된다.The measurement indicator data collection unit 240 collects numerical information (i.e., display data) displayed by various instruments and indicators installed in each operation equipment panel 100. [ The measurement indicator data collection unit 240 monitors the data displayed on the operation equipment panel 100 operated by the operator during the training and the data displayed on the instrument and the indicator installed on the operation equipment panel 100, Collect the data. The data collected by the measurement indicator data collection unit 240 is provided to the measurement indicator configuration data collection unit 250.

계측지시기 형상데이터 취합부(250)는 디스플레이부에 표시될 계측기 및 지시기를 선택하고, 계측지시기 데이터 수집부(240)에서 제공되는 계측기 및 지시기의 데이터를 계측지시기 형상 추출부(223)에서 전송된 해당 계측기 및 지시기의 형상에 취합시키는 구성이다. The measurement indicator shape data collecting unit 250 selects an indicator and an indicator to be displayed on the display unit and outputs the data of the meter and the indicator provided by the measurement indicator data collector 240 to the measurement indicator shape extracting unit 223 To the shape of the measuring instrument and the indicator.

이러한 계측지시기 형상데이터 취합부(250)는 계측지시기 자동취합부(251)와 계측지시기 수동취합부(252)로 구성된다. 계측지시기 자동취합부(251)는 절차서의 정보에 따라 자동으로 계측기와 지시기를 추출하여 그 표시 데이터와 형상을 취합하는 구성이며, 계측지시기 수동취합부(252)는 인스트럭터 단말기(300)에서 수동으로 입력되는 계측기와 지시기 정보에 따라 그 표시 데이터와 형상을 취합하는 구성이다.The measurement indicator shape data collecting unit 250 includes a measurement indicator automatic collecting unit 251 and a measurement indicator manual collecting unit 252. The measurement indicator automatic collecting unit 251 automatically extracts the measuring instrument and the indicator according to the information of the procedure and collects the display data and the shape. The measuring indicator manual collecting unit 252 manually collects the measuring data And the display data and the shape are collected according to the input meter and the indicator information.

디스플레이부(400)에 표시될 계측기 및 지시기는 절차서에 따라 해당 절차에서 조작이 이루어지는 운전설비 패널(100)과 그에 상호 관련되는 별도의 운전설비 패널(100)의 계측기 및 지시기가 대상이 된다. 이 경우 상기 계측지시기 자동취합부(251)는 원전절차 추출부(222)에서 제공되는 원전절차 DB로부터 조작 대상의 운전설비 패널과 그에 관련되는 운전설비 패널의 계측기 및 지시기를 표시 대상으로 추출하여, 해당 계측기 및 지시기의 형상과 데이터를 취합한다.The meter and the indicator to be displayed on the display unit 400 are subject to the operation equipment panel 100 operated in the procedure according to the procedure and the meter and the indicator of the separate operation equipment panel 100 related to the operation equipment panel 100. In this case, the measurement indicator automatic collecting unit 251 extracts, from the nuclear procedure procedure DB provided by the nuclear plant procedure extracting unit 222, the operation facility panel to be operated and the meters and indicators of the operation equipment panel associated therewith, Collect the shape and data of the instrument and indicator.

한편, 디스플레이부(400)에 표시될 대상의 계측기 및 지시기는 교수가 인스트럭터 단말기(300)를 통하여 임으로 선택할 수 있다. 이 경우 상기 계측지시기 수동취합부(252)는 인스트럭터 단말기(300)로부터 선택되어 제공되는 계측기 및 지시기를 표시 대상으로 하여, 해당 계측기 및 지시기의 형상과 데이터를 취합한다.Meanwhile, the instrument and the indicator to be displayed on the display unit 400 can be selected by the instructor through the instructor terminal 300. In this case, the measurement indicator manual collecting unit 252 collects the shape and data of the meter and the indicator by using the meter and the indicator selected and provided from the instructor terminal 300 as display targets.

따라서, 본 발명의 디스플레이부(400)에는 계측지시기 자동취합부(251)에 의하여 절차서에 정해진 원전절차에 따른 상호 관련된 운전설비 패널(100)들의 계측지시기 데이터가 표시될 수 있으며, 계측지시기 수동취합부(252)에 의하여 교수가 선택하는 임의의 운전설비 패널(100)들의 계측지시기 데이터가 표시될 수 있어, 운전원들에게 교육 훈련 상황에 따라 적절하면서 효율적으로 정보를 제공하는 효과를 나타낸다. 또한, 본 발명은 디스플레이부(400)를 통하여 표시되는 데이터가 해당 계측기나 지시기의 형상에 취합되어 실제 운전설비 패널(100)에 설치되어 표시되는 계측기 및 지시기와 동일하게 표시됨으로써, 운전자는 실제 패널과의 이질감을 느끼지 못하여 더욱 효율적인 교육 훈련이 이루어질 수 있게 된다.Therefore, in the display unit 400 of the present invention, the measurement indicator data of the operation equipment panels 100 related to each other according to the nuclear power procedure defined by the procedure can be displayed by the measurement indicator automatic collecting unit 251, The measurement indicator data of the arbitrary operation equipment panels 100 selected by the professor can be displayed by the display unit 252 and thus provides the effect of appropriately and efficiently providing information to the operators according to the education and training situation. In the present invention, data displayed through the display unit 400 is displayed in the same manner as a meter and an indicator installed and displayed on the actual operation equipment panel 100 by being combined with the shape of the meter or indicator, It is possible to achieve more efficient education and training.

상기와 같은 각 구성들에 의하여 이루어지는 시나리오 추출 및 기동, 원전절차 추출, 계측지시기 형상 추출, 원전절차 확인, 계측지시기 데이터 수집, 계측지시기 데이터 취합 및 계측지시기 표시 등과 같은 일련의 과정은 제어부(210)에 의하여 제어된다.A series of processes such as scenario extraction and start-up, extraction of the nuclear power plant procedure, extraction of the measurement indicator shape, confirmation of the nuclear power plant procedure, measurement indicator data collection, measurement indicator data collection and measurement indicator display, Lt; / RTI >

도 5는 본 발명의 실시예에 따른 교육 훈련용 모의 제어반 시스템의 운영 과정을 나타낸 순서도이다.FIG. 5 is a flowchart illustrating an operation procedure of a simulation control panel system for training and training according to an embodiment of the present invention.

도 5를 참조하여 본 발명의 교육 훈련용 모의 제어반 시스템에서 진행되는 모의 훈련 과정을 살펴보면, 먼저, 교수가 인스트럭터 단말기(300)에서 시나리오를 선택하여 기동시키면, 시나리오 추출부(221)에서 특정 사고 시나리오 DB를 추출하여 운전반으로 기동하고(S11), 동시에 원전절차 추출부(222)는 기동된 시나리오에 대응하는 원전절차 DB를 추출하며(S12), 계측지시기 형상 추출부(223)는 각 운전설비 패널의 계측지시기 형상 DB를 추출한다(S13). 이때, 각 운전원들은 기동된 사고 시나리오에 대응하는 절차서에 따라 담당 운전설비 패널(100)을 조작하여 운전설비의 운전을 제어하게 되고, 원전절차 확인부(230)에서 운전자가 원전절차에 따라 운전설비 패널(100)을 조작하는 것을 확인한다(S14). 원전절차 확인부(230)에서 운전자가 원전절차에 따라 운전설비 패널(100)을 조작하는 것이 확인되면, 계측지시기 데이터 수집부(240)는 조작 운전에 따라 각 운전설비 패널(100)에서 표시되는 계측지시기 데이터를 수집한다(S15).Referring to FIG. 5, a simulation process performed in the simulated control panel system of the present invention will be described. First, when a teacher selects and activates a scenario in the instructor terminal 300, the scenario extracting unit 221 extracts, (S11). At the same time, the nuclear plant procedure extracting unit 222 extracts the nuclear plant procedure DB corresponding to the activated scenario (S12), and the measurement indicator shape extracting unit 223 extracts the nuclear plant procedure DB corresponding to the activated scenario The measurement indicator shape DB of the panel is extracted (S13). At this time, each of the operators controls the operation of the operation facility by operating the corresponding operation facility panel 100 according to a procedure corresponding to the activated accident scenario. In the nuclear plant procedure confirmation unit 230, the driver operates the operation facility It is confirmed that the panel 100 is operated (S14). When it is confirmed that the driver operates the operation equipment panel 100 according to the nuclear plant procedure at the nuclear plant procedure confirmation unit 230, the measurement indicator data collector 240 displays the measurement indicator data in the operation facility panel 100 Instrumentation indicator data is collected (S15).

그리고 계측지시기 형상데이터 취합부(250)는 인스트럭터 단말기(300)로부터 명령이 입력되는지를 확인하며(S16), 어떠한 명령도 입력되지 않은 경우 통상적인 절차에 따라 계측지시기 자동취합부(251)는 절차서에 따라 상호 관련된 운전설비 패널(100)의 계측기 및 지시기 데이터와 해당 계측기 및 지시기 형상을 취합한다(S17). 한편, 인스트럭터 단말기(300)로부터 표시될 특정 대상의 계측기 및 지시기 정보가 입력되는 경우 계측지시기 수동취합부(252)는 입력된 계측기 및 지시기 데이터와 해당 계측기 및 지시기의 형상을 취합한다(S18).The measurement indicator form data collecting unit 250 checks whether an instruction is input from the instructor terminal 300 (S16). If no command is input, the measurement indicator automatic collecting unit 251 acquires the procedure The meter and indicator data of the mutually related operation equipment panel 100 and the corresponding meter and indicator shapes are collected (S17). Meanwhile, when the indicator and the indicator information of a specific object to be displayed are inputted from the instructor terminal 300, the measurement indicator manual collection unit 252 collects the shapes of the inputted meter and indicator data and the corresponding meter and indicator (S18).

이어서 최종적으로 계측지시기 자동취합부(251) 또는 계측지시기 수동취합부(252)에서 취합된 표시 데이터는 모든 운전원들이 확인할 수 있도록 디스플레이부(400)를 통하여 표시된다(S19).Then, finally, the display data collected by the measurement indicator automatic collecting unit 251 or the measurement indicator manual collecting unit 252 is displayed through the display unit 400 so that all the operators can confirm it (S19).

한편, 상기와 같은 계측지시기 데이터 수집, 인스트럭터 명령 입력 확인, 계측지시기 데이터 취합 및 디스플레이 과정은 교육 훈련의 진행에 따라 연속적으로 이루어진다. Meanwhile, the measurement indicator data collection, the instructor command input confirmation, and the measurement indicator data collection and display process are continuously performed according to the progress of the training.

상기와 같이 원전절차에 따른 각 운전원의 패널 조작 과정에서 모든 운전원들이 필수적으로 확인하여야 하는 각 운전설비 패널의 다양한 계측기과 지시기에 대한 수치와 그 변화 정보를 모든 운전원들이 모니터링할 수 있도록 함으로써, 다수의 운전원들 사이에서 상호 유기적으로 이루어져야 하는 교육 훈련의 효율성이 향상될 수 있다.By allowing all the operators to monitor the numerical values and the change information of various instruments and indicators of each operation equipment panel which all operators must confirm in the process of panel operation of each operator according to the nuclear power plant procedure, The efficiency of education and training that should be mutually organized is improved.

이상에서 본 발명에 있어서 실시예를 참고로 설명되었으나, 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.

100 : 운전설비 패널
200 : 운영 서버 210 : 제어부
221 : 시나리오 추출부 222 : 원전절차 추출부
223 : 계측지시기 형상 추출부
230 : 원전절차 확인부
240 : 계측지시기 데이터 수집부
251 : 계측지시기 자동취합부
252 : 계측지시기 수동취합부
300 : 인스트럭터 단말기
400 : 디스플레이부
500 : 데이터베이스부 510 : 시나리오 DB
520 : 원전절차 DB 530 : 계측지시기 형상 DB
100: Operation equipment panel
200: Operation server 210:
221: scenario extracting unit 222: nuclear plant procedure extracting unit
223: Measurement indicator shape extracting unit
230: Nuclear Power Plant Procedure Verification Department
240: Measurement indicator data collection unit
251: Measurement indicator automatic collecting part
252: Measuring indicator manual collecting part
300: Instructor terminal
400:
500: Database part 510: Scenario DB
520: Nuclear power plant procedure DB 530: Instrumentation indicator shape DB

Claims (2)

원자력 발전소 운전에서 발생되는 각종 사고 시나리오의 시나리오 DB와, 상기 사고 시나리오에 대한 원전 조작 절차서의 원전절차 DB와, 각 운선설비 패널에 설치된 계측기와 지시기 형상의 계측지시기 형상 DB가 저장되는 데이터베이스부;
상기 시나리오 DB로부터 특정 사고 시나리오를 추출하여 기동하는 시나리오 추출부와, 기동된 시나리오에 대응하여 조작되어야 하는 운전 절차를 상기 원전절차 DB로부터 추출하는 원전절차 추출부와, 각 운전설비 패널에 설치된 계측기와 지시기의 형상을 상기 계측지시기 형상 DB로부터 추출하는 계측지시기 형상 추출부와, 기동된 시나리오에 따라 운전설비가 해당 원전절차에 따라 운전되는지 확인하는 원전절차 확인부와, 각 운전설비 패널에 설치된 계측기와 지시기의 표시 데이터를 수집하는 계측지시기 데이터 수집부와, 수집된 계측기 및 지시기의 표시 데이터와 해당 계측기 및 지시기의 형상을 취합하는 계측지시기 형상데이터 취합부와, 상기 사고 시나리오 추출부, 원전절차 추출부, 계측지시기 형상 추출부, 원전절차 확인부, 계측지시기 데이터 수집부 및 계측지시기 형상데이터 취합부의 구동을 제어하는 제어부를 포함하는 운영 서버; 및,
상기 운영 서버의 제어에 따라 상기 계측지시기 형상데이터 취합부에서 취합된 운전설비 패널의 계측기 및 지시기를 디스플레이하는 디스플레이부;로 이루어지되,
상기 계측지시기 형상데이터 취합부는,
원전 조작 절차서에 따라 관련된 운전설비 패널의 계측기와 지시기에 대한 데이터와 형상을 취합하여 디스플레이부에 제공하는 계측지시기 자동취합부; 및
인스트럭터 단말기를 통하여 입력되는 운전설비 패널의 계측기와 지시기에 대한 데이터와 형상을 취합하여 디스플레이부에 제공하는 계측지시기 수동취합부;로 구성되는 것을 특징으로 하는 절차서 별 계측기 및 지시기가 자동으로 디스플레이되는 원전 교육 훈련용 모의 제어반 시스템.

A database section storing a scenario DB of various accident scenarios generated in operation of a nuclear power plant, a nuclear plant procedure DB of a nuclear power plant operation procedure document for the accident scenario, an instrument indicator installed in each shipboard facility panel and an indicator shape DB of an indicator shape;
A scenario extraction section for extracting and starting a specific accident scenario from the scenario DB; a nuclear plant procedure extraction section for extracting an operation procedure to be operated corresponding to the activated scenario from the nuclear procedure procedure DB; A measurement indicator shape extracting unit for extracting a shape of the indicator from the measurement indicator shape DB; a nuclear power plant procedure confirmation unit for confirming whether the operation facility is operated according to the nuclear plant procedure according to the activated scenario; A measurement indicator shape data collecting unit for collecting the display data of the collected meters and indicators and the shape of the corresponding meters and indicators and a measurement indicator shape data collecting unit for collecting display data of the indicators, , A measurement indicator shape extracting unit, a nuclear power plant procedure confirmation unit, a measurement indicator Operating a server that is a control unit that controls the data collecting unit and a measurement indicator driving portion shape data collection; And
And a display unit for displaying a meter and an indicator of the operation equipment panel collected by the measurement indicator shape data collecting unit under the control of the operation server,
Wherein the measurement indicator shape data collecting unit comprises:
An automatic measuring and collecting unit for collecting data and shapes of the meters and indicators of the related operation equipment panel according to the NPN operation procedure and providing the data and the shapes to the display unit; And
And a measuring indicator manual collecting unit for collecting data and shapes of the measuring instrument and the indicator of the operation equipment panel input through the instructor terminal and providing the data and the shape to the display unit. Simulated control panel system for training and education.

삭제delete
KR1020150168729A 2015-11-30 2015-11-30 Virtual training system of nuclear power plant KR101668861B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150168729A KR101668861B1 (en) 2015-11-30 2015-11-30 Virtual training system of nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150168729A KR101668861B1 (en) 2015-11-30 2015-11-30 Virtual training system of nuclear power plant

Publications (1)

Publication Number Publication Date
KR101668861B1 true KR101668861B1 (en) 2016-10-25

Family

ID=57446612

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150168729A KR101668861B1 (en) 2015-11-30 2015-11-30 Virtual training system of nuclear power plant

Country Status (1)

Country Link
KR (1) KR101668861B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109903621A (en) * 2017-12-08 2019-06-18 中国石油化工股份有限公司 The safe simulation training system of petrochemical sales company
CN114203007A (en) * 2021-12-14 2022-03-18 三门核电有限公司 Rod position coding card fault simulation system and troubleshooting system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001067113A (en) * 1999-08-30 2001-03-16 Toshiba Corp System for evaluating plant operation
WO2010064459A1 (en) * 2008-12-02 2010-06-10 三菱電機株式会社 Operation training system and plant operation supporting system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001067113A (en) * 1999-08-30 2001-03-16 Toshiba Corp System for evaluating plant operation
WO2010064459A1 (en) * 2008-12-02 2010-06-10 三菱電機株式会社 Operation training system and plant operation supporting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109903621A (en) * 2017-12-08 2019-06-18 中国石油化工股份有限公司 The safe simulation training system of petrochemical sales company
CN109903621B (en) * 2017-12-08 2021-02-26 中国石油化工股份有限公司 Safety simulation training system for petrochemical marketing enterprises
CN114203007A (en) * 2021-12-14 2022-03-18 三门核电有限公司 Rod position coding card fault simulation system and troubleshooting system
CN114203007B (en) * 2021-12-14 2024-04-09 三门核电有限公司 Bar code card fault simulation system and fault investigation system

Similar Documents

Publication Publication Date Title
KR101621434B1 (en) Operating error detecting system of human operator process in virtual training system and human operator training process for nuclear power plant
CN103559822A (en) Substation simulation training system
CN110189568A (en) A kind of substation simulation system and method based on virtual reality technology
KR102069442B1 (en) The operation support and monitoring system in the nuclear power plant
CN109697903A (en) A kind of substation relay protection safety practical training method based on VR
Liu et al. Systematic layout planning in human–system interface: An evaluation of alarm displays with spatial proximity for accidents diagnosis of advanced boiling water reactor
CN109508844B (en) Security risk analysis method and system for collaborative operation
KR101972269B1 (en) Simulator for nurturing maintenace personnel at nuclear power plants
KR101668861B1 (en) Virtual training system of nuclear power plant
CN106997720A (en) A kind of voltage direct-current transmission valve cooling system emulation training platform
CN108172082A (en) A kind of automatic evaluation method for power transformation operation Simulated training
JP3512494B2 (en) Plant operation support device
KR101668862B1 (en) Virtual training system of nuclear power plant
Li et al. Study on operator's SA reliability in digital NPPs. Part 2: Data-driven causality model of SA
CN112259272A (en) Method and system for auxiliary operation of nuclear power plant
Zhang et al. The simulator experimental study on the operator reliability of Qinshan nuclear power plant
CN112632325A (en) Remote monitoring management method and device for operation site based on digital 3D imaging
JP2021135429A (en) Scenario creation method, simulation method, scenario creation device, simulation system and scenario creation program
CN114023133A (en) Hydropower station operation accident handling training and emergency drilling evaluation method
Wu et al. An integrated alarm display design in digital nuclear power plants
Park et al. An empirical study on the use of the rancor microworld simulator to support full-scope data collection
JP6636902B2 (en) Nuclear power plant system and training method using the same
Grozdanovic et al. Control and Management of Coal Mines with Control Information Systems.
Boring Lessons learned using a full-scale glasstop simulator for control room modernization in nuclear power plants
CN106599409A (en) Virtual experiment system for industrial control

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191015

Year of fee payment: 4